HomeMy WebLinkAboutAGMT - Cal-Air (Energy Services Agreement)r)- .
411
•
•
•
,piA.C.C:c' ,,...: -wie
�v► t <<: =' L Pia.►r,.e(
ENERGY SERVICES AGREEMENT
BETWEEN
CAL -AIR, INC., AND
CITY OF SEAL BEACH
This Energy Services Agreement ( "Agreement "), is made this 1 ^day of fi7#L*/ , 2001, by and
between CAL -AIR, INC., a California Corporation having its local office at 12393 Slauson Avenue,
Whittier, CA 90606 ( "CAL- AIR "), and City of Seal Beach, having its City Hall at 211 Eighth Street,
Seal Beach, CA 90740 ( "Customer ").
Section 1. The Project
1.1
CAL -AIR agrees to evaluate, engineer, procure, and install various energy efficiency measures
(the "Project ") at the Customer's premises, as identified in Schedule A ( "Description of
Premises "), in accordance with the project scope as described in Schedule B ( "Project Scope ").
1.2 CAL -AIR shall guarantee its performance of the Project Scope as described in Schedule D
( "Performance Guarantee "). During the Guarantee Term (as defined in Section 5 below) CAL -
AIR shall perform the monitoring services described in Schedule E ( "Measurement and
Verification Plan ").
Section 2. Commencement Date and Construction Period
2.1 The effective date of this Agreement is the date this Agreement is executed by both CAL -AIR
and the Customer ( "Effective Date "). CAL -AIR shall complete the Project within five (5)
months after the Effective Date, subject to extension due to force majeure.
2.2 The Customer shall cooperate with CAL -AIR to achieve substantial completion of the Project.
All work shall be scheduled between CAL -AIR and the Customer to minimize disruption to the
Customer's operations and personnel, while working with the Customer to ensure the deadlines
are achieved. Upon request by CAL -AIR, the Customer shall not unreasonably withhold
execution of a Certificate of Substantial Completion and Acceptance ( "Certificate of
Substantial Completion and Acceptance ") certifying that, except for "punch list" items, the
Project is substantially completed, is in operating condition and has been accepted. Execution of
a Certificate of Substantial Completion and Acceptance shall not be deemed a waiver of any
warranty or guaranty, nor shall it excuse CAL -AIR from promptly completing the punch list
items. The period from the Effective Date until the date of execution of the Certificate of
Substantial Completion and Acceptance is hereinafter referred to as the "Construction Period."
Section 3. CAL -AIR Compensation
The Customer agrees to pay CAL -AIR for the goods and services to be provided hereunder the sum of
$896,502, in accordance with the schedule described in Schedule C ( "Payment Schedule ").
•
City of Seal Beach 1 Cal -Air, Inc.
•
•
• •
Section 4. Term of Guarantee
The term of the Performance Guarantee ( "Guarantee Term ") shall commence on the date
( "Commencement Date ") that CAL -AIR and the Customer execute the Certificate of Substantial
Completion and Acceptance, and shall end twelve (12) years after the Commencement Date.
Section 5. Actions by the Customer, Maintenance of Premises and Equipment
5.1 During the Guarantee Term the Customer shall cause all Project Scope components and existing
heating, ventilating and air conditioning systems, lighting and electrical systems, HVAC and
lighting controls shall be maintained to the equipment manufacturer's guidelines and in
accordance with the industry standards; the Customer's obligations under this Section 5.1 shall
be deemed fully satisfied during any period that the Customer contracts with CAL -AIR to
perform such maintenance. If the Customer does not contract with CAL -AIR to perform all such
maintenance, the Customer will provide CAL -AIR with accurate preventive maintenance and
repair records for any work not performed by CAL -AIR within twenty (20) business days of
receipt by Customer.
5.2 The Customer shall submit all utility data for the period from September 1, 2000, through the
end of the Construction Period. This data shall to be submitted to CAL -AIR within ten (10)
business days prior to executing the Certificate of Substantial Completion and Acceptance, or as
soon thereafter as reasonably possible. During the Guarantee Term, the Customer shall forward
copies of the actual utility bills to CAL -AIR within ten (10) business days of receipt.
5.3 The Customer shall notify CAL -AIR of any changes that affect the energy use during the
Guarantee Term, including but not limited to additions, deletions, and/or changes to energy
consuming equipment, operating schedules, normal use, or hours of operation, additions to the
existing building structures, or new added facilities, within twenty (20) business days of
occurrence. In addition, the Customer will provide CAL -AIR with such copies of purchasing
records for energy consuming equipment and documentation of any other changes as may
reasonably be requested by CAL -AIR.
5.4 During the Guarantee Term, if the Customer does not contract with CAL -AIR to perform all
maintenance required under Section 5.1, and CAL -AIR determines that maintenance procedures
are inadequate pursuant to the equipment manufacturer guidelines and industry standards or the
equipment is not operating properly, CAL -AIR shall notify the Customer in writing.
Section 6. Late Payment
The Customer shall pay, or cause to be paid, all amounts due CAL -AIR for work hereunder within
twenty (20) business days after receipt of CAL -AIR's (or assignee's) invoice, and shall pay interest from
due date on any amount not paid within said time period at the rate of ten (10) percent per annum.
•
City of Seal Beach 2 Cal -Air, Inc.
•
•
• •
Section 7. Utility Rebate /Grants
The utility rebate /grant disposition is detailed in Schedule F ( "Utility Rebate Disposition ").
Section 8. Intentionally Omitted
Section 9. Intentionally Omitted
Section 10. Insurance
10.1 CAL -AIR shall provide and maintain throughout the Construction Period and the Guarantee
Term worker's compensation, comprehensive general liability, contractual liability and
comprehensive automobile liability insurance at the following minimum limits:
10.2
a) Workers' compensation and employer's liability insurance with a limit of
$1,000,000 (or such higher limit as may be required by law).
b) Commercial general liability insurance, all operations, including completed
operations, contractual and broad form comprehensive endorsement with combined
single limit of $1,000,000 each occurrence for bodily and/or personal injury,
including death and property damage.
This policy is to also include an Excess Liability Endorsement with combined
single limit of $2,000,000 each occurrence for bodily and/or personal injury
including death and property damage.
c) Primary Comprehensive Automobile Public Liability Insurance (including owned,
non -owned and hired automotive equipment), used in connection with CAL -AIR's
operations, with a combined single limit for bodily injury or death and property
damage of $1,000,000 per accident or occurrence.
In the event any of the Project Scope hereunder is contracted to subcontractors by CAL -AIR,
CAL -AIR shall require its subcontractors to carry and maintain the same insurance as specified
above. The Customer shall be included as an additional named insured on all policies specified in
this section with the exception of the Worker' Compensation policy(ies).
The naming of the Customer as an additional named insured shall not obligate the Customer to pay
any premium on the policy(ies). Such insurance shall be primary insurance and shall contain a
severability of interest clause with respect to each insured. The "other insurance" clause of such
policies shall be modified, if necessary, to specify that any separate insurance maintained in force
by the Customer shall be considered excess insurance and shall not contribute with insurance
extended by CAL -AIR's and/or subcontractor's insurer(s) under this requirement.
CAL -AIR shall deliver to the Customer, a Certificate(s) of Insurance completed by CAL -AIR and
its subcontractor's insurance carrier or agent certifying that minimum insurance coverage, as
required above, is in effect and shall not be canceled or changed until at least twenty (20) business
days after written notice is given to CAL -AIR and the Customer. CAL -AIR shall immediately
• notify the Customer upon receipt of any cancellation notice.
City of Seal Beach 3 Cal -Air, Inc.
• •
Not more frequently than each two (2) years, if, in the opinion of the Customer or the Customer's risk
• manager or insurance broker, the foregoing amounts of insurance coverage at that time are not adequate,
CAL -AIR shall increase the insurance coverage as reasonably required by the Customer or the
Customer's risk manager or insurance broker.
•
Section 11. Environmental Requirement
The Customer shall disclose all locations, if any, in the Customer's premises where asbestos, materials
containing asbestos, pollutants, hazardous wastes, hazardous materials or other contaminants
(collectively "Hazardous Materials ") are present, to the extent that the Customer's City Manager is
aware of such presence. CAL -AIR shall not be responsible for identification of or any work relating to
currently- existing Hazardous Materials on the Premises, or the storage, handling, use, transportation,
treatment, disposal, discharge, leakage, detection, removal, containment or clearance testing thereof,
except that if applicable laws do not require that such Hazardous Materials be removed, CAL -AIR shall
not move, touch or otherwise disturb such Hazardous Materials, and shall comply with all reasonable
instructions of the Customer regarding the Hazardous Materials. If applicable laws do require that such
Hazardous Materials be removed, the Customer shall be solely responsible for disposing of the
Hazardous Materials in accordance with all federal, state and local laws applicable thereto, unless
otherwise agreed to in writing elsewhere, whether as part of this Agreement or otherwise.
If CAL -AIR becomes aware of any additional Hazardous Materials that are not included in the Scope of
Work, it shall immediately notify the Customer about the presence of Hazardous Materials.
Section 12. Events of Default
12.1 Events of Default by the Customer Each of the following shall constitute an event of default by
the Customer:
a) Any failure by the Customer to pay CAL -AIR its compensation required in Section
4 of this Agreement for a period of more than twenty (20) business days after the
date of the invoice thereof and after a ten (10) business day cure notice;
b) Any representation or warranty furnished by the Customer in this Agreement which
was false or misleading in any material respect when made;
c) Failure by the Customer to perform its other obligations under this Agreement, if
not cured within twenty (20) business days after written notice.
City of Seal Beach 4 Cal -Air, Inc.
• •
• 12.2 Events of Default by CAL -AIR Each of the following events shall constitute an event of default
by CAL -AIR:
a) Any failure by CAL -AIR to credit or pay the Customer the amount required
pursuant to Schedule D of this Agreement for a period of more than twenty (20)
business days after the amount has been established;
•
•
b) Failure to perform by CAL -AIR its responsibilities pursuant to this Agreement, if
not cured within twenty (20) business days after written notice.
c) Any representation or warranty furnished by CAL -AIR in this Agreement which
was false or misleading in any material respect when made.
Section 13. Remedies Upon Default
13.1 Remedies Upon Default by the Customer If an event of default by the Customer occurs, CAL -
AIR may exercise all remedies available by law or at equity or other appropriate proceedings
including bringing an action or actions from time to time for recovery of amounts due and unpaid
by the Customer.
The Customer agrees to pay all costs and expenses reasonably incurred by CAL -AIR to exercise
its remedies (including reasonable attorney's fees).
13.2 Remedies Upon Default bv CAL -AIR If an event of default by CAL -AIR occurs, the Customer
may exercise all remedies available by law or at equity or other appropriate proceedings,
including an action for recovery of amounts due and unpaid by CAL -AIR, and/or for specific
performance, and/or for damages.
CAL -AIR agrees to pay all costs and expenses reasonably incurred by the Customer to exercise
any of its remedies, including reasonable attorney's fees. .
Section 14. Compliance with Law and Standard Practices
CAL -AIR shall perform its obligations hereunder in a good and workmanlike manner, in compliance
with any and all applicable federal, state, and local laws, rules, and regulations, in accordance with
sound engineering and safety practices and in compliance with reasonable rules of the Customer
(provided in writing to CAL -AIR) relative to the Premises.
Section 15. Delegation bv CAL -AIR
CAL -AIR shall have the right to retain or engage any person, firm or corporation to perform discrete
portions but in no event more than 50% in value of its obligations hereunder, provided that CAL -AIR
shall supervise and control the work performed by each such subcontractor. CAL -AIR shall remain
primarily responsible for such performance and shall give notice of any such employment to the
Customer prior to the commencement of any work by such person, firm or corporation.
City of Seal Beach 5 Cal -Air, Inc.
•
•
• •
Section 16. Taxes
CAL -AIR shall be responsible for and shall pay all applicable sales taxes related to the procurement and
installation of the equipment as referenced in Schedule B herein. The Customer shall be responsible for
and shall pay all applicable taxes related to operation of the Equipment, including, but not limited to,
property taxes.
Section 17. Usage of the Customer's Records
CAL -AIR shall have free access to the Customer's existing construction documents, equipment
submittals, operation and maintenance manuals, utility usage bills and records, other energy audits or
studies and any other public utility records for periods of time as reasonably requested by CAL -AIR.
CAL -AIR may reproduce any such records for its use in connection with the Project. CAL -AIR shall
bear all reproduction costs associated with the reproduction of the Customer's records. Such records
shall be used only in connection with the performance of CAL -AIR's obligations under this Agreement,
and shall not be used for any other purpose without the prior written consent of the Customer.
Section 18. Notices
All notices to be given by either Party to the other shall be in writing and must be delivered or mailed by
registered or certified mail, return receipt requested, or sent by a courier service which renders a receipt
upon delivery addressed as set forth below or such other addresses as either Party may hereinafter
designate by a Notice to the other. Notices are deemed delivered or given and become effective upon
mailing if mailed as aforesaid and upon actual receipt if otherwise delivered.
To CAL -AIR:
To the Customer:
CAL -AIR, INC.
Attn.: Alan Butcher, Regional Vice President
12393 Slauson Ave.
Whittier, CA 90606
City of Seal Beach
Attn: John Bahorski, City Manager
211 Eighth Street
Seal Beach, CA 90740
Section 19. Final Agreement
This Agreement, together with the schedules, exhibits and any subsequent modification, shall constitute
the full and final Agreement between the parties as to the subject matter hereof, shall supersede all prior
agreements, communications and understandings regarding the subject matter hereof, and may not be
amended or modified except by a writing evidencing said change or changes signed by the Parties. This
Agreement shall be binding on and inure to the benefit of the successors and permitted assigns of the
respective Parties.
THIS AGREEMENT SHALL BECOME BINDING WHEN EXECUTED BY CAL -AIR AND THE
• CUSTOMER. Any inconsistency in this Agreement shall be resolved by giving precedence in the
City of Seal Beach 6 Cal -Air, Inc.
• •
•following order: (i) Amendments to this Agreement, in reverse chronological order; (ii) this Agreement;
(iii) Schedules to this Agreement; (iv) Exhibits to this Agreement.
•
Section 20. Applicable Law
This Agreement and the construction and enforceability thereof shall be interpreted under the laws of the
State of California.
Section 21. Performance and Payment Bond
CAL -AIR shall provide to the Customer Performance and Payment Bonds, in form and substance
reasonably acceptable to the Customer, for the Project.
IN WITNESS WHEREOF, the Parties hereto subscribe their names to this instrument on the date first
written above.
WARNING: Contractors are required by law to be licensed and regulated by the Contractors'
State License Board which has jurisdiction to investigate complaints against Contractors if a
complaint is filed within three years of the date of the alleged violation. Any questions
concerning a Contractor may be referred tot he Registrar, Contractors' State License Board, P.
O. Box 26000, Sacramento, CA 95826. [California Business and Professions Code § 7030(a)]
CITY OF SEAL BEACH
ahorski, y Manager
s/2o4/
Date
City Attorney
Approved As To Form.
CAL -AIR, INC.
Alan Butcher, Regional Vice President
Date
20 id(
•
City of Seal Beach 7 Cal -Air, Inc.
,
•
Schedules
• •
LIST OF SCHEDULES
"A" Description of Premises
"B" Project Scope
"C" Payment Schedule
"D" Performance Guarantees
"E" Measurement & Verification Plan
" F" Utility Rebate Disposition
•
•
City of Seal Beach 8 Cal -Air, Inc.
•
•
•
SCHEDULE A
DESCRIPTION OF PREMISES
City Hall
211 Eighth Street
Seal Beach, CA 90740
Police Station
911 Seal Beach Blvd.
Seal Beach, CA 90740
Public Works Yard
1776 Adolfo Lopez Drive
Seal Beach, CA 90740
Mary Wilson Library
707 Electric Avenue
Seal Beach, CA 90740
North Seal Beach Community Center
3333 St. Cloud Drive
Seal Beach, CA 90740
Marina Community Center
151 Marina Drive
Seal Beach, CA 90740
lSt Beach Complex
13 First Street
Seal Beach, CA 90740
•
City of Seal Beach 9 Cal -Air, Inc.
•
•
•
SCHEDULE B
PROJECT SCOPE
1.0 Engineering
CAL -AIR shall provide the following engineering services as necessary to complete the work described
in this Schedule B:
• Energy Audit
• Necessary Construction Drawings/Documents, including structural engineering
• Project Submittals
• Operation and Maintenance Manuals
• Measurement and Verification (M &V) Submittals
2.0 Lighting Retrofit
2.1 General Lighting Scope of Work
CAL -AIR shall provide retrofit work that will include all necessary labor, materials, equipment, fixture
cleaning, transportation and storage for all locations identified in the detailed Lighting Scope of Work.
The disposal shall include all materials, trash, fluorescent lamps, and ballasts. All of the fluorescent
lamps and ballasts will be disposed of as per California EPA guidelines. All T -8 fluorescent lamps and
electronic ballasts will be OSRAM/Sylvania. All fluorescent lamps will be "741" Series Lamps unless
otherwise specified. Any and all reflectors will be white powder- coated by JK Manufacturer or equal.
Prior to substituting a proposed equal for any specified item, CAL -AIR at its expense shall establish to
the reasonable satisfaction of the Customer that the proposed substitute item is in fact equal or better in
quality, performance and appearance than the specified item.
The lighting retrofit work will be performed after normal business hours so as to minimize disruption to
business activities.
The total lighting project is detailed in the following Lighting Detail Summary Report.
The detailed Lighting Scope of Work, listed on the following pages, is itemized by fixture, location, and
existing condition along with the proposed retrofit description. Unless otherwise specified, the basis for
the lighting retrofit selections is to achieve minimum IES standards, maintain current light levels and
maximize energy savings. It is not the intent to redesign the system or provide revised lighting layouts
unless specifically requested.
•
City of Seal Beach 10 Cal -Air, Inc.
•
•
• •
2.2 Lighting Warranty Replacement
In addition to the warranties described in Section 5.0 below, CAL -AIR at its cost shall provide the
Customer with the following supply of lighting equipment for the Customer's use during the one -year
warranty period:
Quantity
Description
175
FO32 T -8 Lam. s
25
FO17 T -8 Lam. s
1
F25 T -8 Lam. s
70
Electronic Ballasts
12
18 watt Com. act Fluorescents
4
13 watt Como act Fluorescence
1
26 watt Com. act Fluorescents
1
Globe Lam.
5
WA100 Wall Occu.anc Motion Sensors
If the Customer elects to replace defective lighting components during the warranty period rather than
having CAL -AIR perform the work, the Customer shall bear its own labor costs, and CAL -AIR's
responsibility shall be limited to replenishing the used lighting warranty stock.
•
City of Seal Beach 11 Cal -Air, Inc.
•
•
•
2.3 Detailed Lighting Scope of Work
Ci 7 Hall
•
•
City of Seal Beach
12
Cal -Air, Inc.
PRE - RETROFIT
POST- RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
2nd Floor Hall
11
75W Inc
11
18W Screw in
2nd Floor Hall
3
4L -F4OSS Wra.
3
2L -F032 New Wra. Fixture
2nd Floor Hall
2
2L -F4OSS Wra.
2
2L -F032 New Wra. Fixture
Blue.rint
1
4L F4OSS Troffer
1
2L F032 STD w /refl - WA100
Co •
3
4L F4OSS Troffer
3
2L F032 STD w /refl - WA100
Health Ins.ector
1
4L F4OSS Troffer
1
2L F032 STD w /refl - WA100
Conference Room
2
4L F4OSS Troffer
2
2L F032 STD w /refl - WA100
Office 27 0 e
10
4L F4OSS Wra.
10
2L -F032 New Wra. Fixture
1st Office L
4
4L F4OSS Wra.
4
2L -F032 New Wra. Fix - WA100
Back O.en
17
4L F4OSS Wra.
17
2L -F032 New Wra. Fixture
2nd Office
6
4L F4OSS Wra.
6
2L -F032 New Wra. Fix - WA100
Back Hall
2
2L -F4OSS Wra.
2
2L -F032 New Wra. Fix - WA100
Kitchen
1
4L F4OSS Wra.
1
2L -F032 New Wra. Fix - WA100
Men's Restroom
2
1L F4OSS Wra.
2
1L F032 New Wra. Fixture
Men's Restroom
1
2L -F4OSS Wra.
1
2L -F032 New Wra. Fix - WA100
Stora • e
1
75W Inc
1
18W Screw in
Women's Restroom
1
1L F4OSS Wra.
1
1L F032 New Wra. Fixture
1
2L -F4OSS Wra.
1
2L -F032 New Wra. Fix - WA100
8
75W Globe Lams
8
CF20EL Globe Screw in
File
3
2L F4OSS Wra.
3
2L -F032 New Wra. Fixture
Joe Whitenber•
4
4L F4OSS Wra.
4
2L -F032 New Wra. Fix - WA100
Office
4
4L F4OSS Wra.
4
2L -F032 New Wra. Fix - WA100
Office
4
4L F4OSS Wra.
4
2L -F032 New Wra. Fix - WA100
Room 20
4
4L F4OSS Wra.
4
2L -F032 New Wra. Fixture
Office
4
4L F4OSS Troffer
4
2L F032 STD w /refl - W500
Room 24
2
4L F4OSS Wra.
2
2L -F032 New Wra. Fixture
Next Room
2
4L F4OSS Wra.
2
2L -F032 New Wra. Fixture
Stora•e
1
75W Inc
1
18W Screw in
Exterior Hall
5
150W Inc
5
Do Nothin:
Storage
5
150W Inc
5
Do Nothin:
Tower
1
2L F4OSS Wra.
1
2L -F032 New Wra. Fixture
Stair
4
2L 75W Inc
4
2 — 18W CF Screw ins
Tele.hone Room
3
135W Inc
3
Do Nothin:
Exit
22
Fluorescent Ed:e Lit Exit Sins
22
Ed:elit LED Exit Sins
Stair
1
75W Inc
1
18W Screw in
Clock Room/Stora:e
6
75W Inc
6
18W Screw in
To.
6
75W Inc
6
18W Screw in
Roof Exterior
4
75W Inc
4
18W Screw in
Stair
1
2L F4OSS Wra.
1
2L -F032 New Wra. Fixture
Stair
1
2L F3OSS Wra.
1
2L -F032 New Wra. Fixture
1st Floor
4
2L F4OSS Wra.
4
2L -F032 New Wra. Fixture
1st Floor
2
75W Inc
2
18W Screw in
Elevator
1
2L F4OSS
1
2L -F032 New Wra. Fixture
•
City of Seal Beach
12
Cal -Air, Inc.
• City Hall
Continued
•
1
•
WA100 = Wall Mounted Occupancy Sensor
W500, W1000 and W2000 = Ceiling Mounted Occupancy Sensor
TS200 = Timer
Police Station
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Water
17
4L F4OSS Troffer
17
2L F032 STD w /ref - W2000
Office
4
4L F4OSS Troffer
4
2L F032 STD w /refl - W500
Office
3
4L F4OSS Troffer
3
2L F032 STD w /refl - WA100
Stora_e
1
4L F96T12SS Stri.
1
2L -F032 New Wra. Fixture
Co.ier
6
4L F4OSS Troffer
6
2L F032 STD w /refl - WA100
Men's RR
18
4L F4OSS Troffer
18
2L F032 STD Ballast w /reflector
Conference Room
10
4L F4OSS Troffer
10
2L F032 STD w /refl - WA100
Ci Mana • er /Office
6
4L F4OSS Troffer
6
2L F032 STD w /refl - W1000
Office
3
4L F4OSS Troffer
3
2L F032 STD w /refl - WA100
Office
4
4L F4OSS Troffer
4
2L F032 STD w /refl - WA100
Ci Clerk
4
4L F4OSS Troffer
4
2L F032 STD w /refl - WA100
4
4L F4OSS Troffer
4
2L F032 STD w /refl - WA100
4
4L F4OSS Troffer
4
2L F032 STD w /refl - WA100
Stora:e
1
75W Inc
1
18W Screw in
Elevator
1
75W Inc
1
18W Screw in
Stora:e
1
75W Inc
1
18W Screw in
Council Chambers
6
75W Inc
6
18W Screw in
Council Chambers
34
150W Floods Inc
34
Do Nothin:
Men's Restroom
4
Circuline
4
2L - 13W CF New Drum Fixture
Women's Restroom
6
Circuline
6
2L - 13W CF New Drum Fixture
Stora:e
2
3 -90W Par Ca. Flood
2
3 -18W Screw in — TS200
Chandelier
8
90W Par Ca. Flood
8
Do Nothin:
Wall Fixture
9
90W Par Ca. Flood
9
Do Nothin:
Wall
1
90W Par Ca. Flood
1
Do Nothin:
Ground Li •ht
2
90W Par Ca. Flood
2
Do Nothin:
Ground Li ht
4
100W Inc
4
18W Screw in
Electrical
1
100W Inc
1
18W Screw in
Cou and
2
70W HPS
2
Do Nothin:
Wall Pack
1
150W Metal Halide
1
Do Nothin:
WA100 = Wall Mounted Occupancy Sensor
W500, W1000 and W2000 = Ceiling Mounted Occupancy Sensor
TS200 = Timer
Police Station
•
City of Seal Beach
13
Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Cano•
7
2L FB40 SS
7
2L F017/841 STD Ballast w /reflector
Wall Wash
3
150W Inc
3
18W CF Screw in
Wall Packs
11
250W HPS
11
Do Nothin:
Exit Si•ns
11
2 -13W CF
11
New LED Exit Si:n
Lobb
26
2L FB40 SS
26
2L F017/841 STD Ballast w /reflector
Men's RR
1
2L F4OSS Stri.
1
2L F032 LP Ballast - WA100
•
City of Seal Beach
13
Cal -Air, Inc.
•
•
1
•
•
City of Seal Beach
14
Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Men's RR
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Women's RR
1
2L F4OSS Stri.
1
2L F032 LP Ballast - WA100
Women's RR
1
2L F4OSS Wra.
1
2L F032 LP Ballast
4
2L F4OSS Troffer
4
2L F032 LP Ballast
Hall
18
2L F4OSS Troffer
18
2L F032 LP Ballast
Chief of Police
Lobb
9
2L FB40 SS
9
2L F017/841 STD w /refl - WA100
Chief Of Police
12
2L FB40 SS
12
2L F017/841 STD w /refl - WA100
Chief Of Police
1
2L F4OSS Troffer
1
2L F032 LP Ballast
Restroom
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Restroom
1
100W Inc
1
18W CF Screw in
Closet
1
2L FB40 SS
1
2L FO17/841 STD Ballast w /reflector
Conference Room
12
2L FB40 SS
12
2L F017/841 STD w /ref - W500
Watch Commander
4
4L F4OSS Troffer
4
2L F032 Std Ballast w /reflector
Closet
1
2 -75W Inc
1
New Drum Fixture 2 -13W
Administrative
20
4L F4OSS Troffer
20
2L F032 Std Ballast w /reflector
Press Room
2
4L F4OSS Troffer
2
2L F032 Std Ballast w /reflector
Hall
1
2L FB40 SS
1
2L F017/841 STD Ballast w /reflector
File Room
6
4L F4OSS Troffer
6
2L F032 Std Ballast w /reflector
Records Su•ervisor
3
4L F4OSS Troffer
3
2L F032 Std w /refl - WA100
Crime Prevention
4
4L F4OSS Troffer
4
2L F032 Std w /refl - WA100
Libra
3
4L F4OSS Troffer
3
2L F032 Std w /refl - WA100
Office
3
4L F4OSS Troffer
3
2L F032 Std Ballast w /ref - W500
Com.uter
1
4L F4OSS Troffer
1
2L F032 Std Ballast w /reflector
Office
2
4L F4OSS Troffer
2
2L F032 Std Ballast w /reflector
Trainin_
6
4L F4OSS Troffer
6
2L F032 Std Ballast w /reflector
Trainin
12
2L F4OSS Troffer
12
2L F032 LP Ballast - WA100
Trainin
4
100W Inc Dimmable
4
18W CF Screw in Dimmable
Resorts
6
4L F4OSS Troffer
6
2L F032 Std w /refl - WA100
Office
2
4L F4OSS Troffer
2
2L F032 Std w /refl - WA100
Traffic
9
2L FB40 SS
9
2L F017/841 STD w /refl - WA100
Men's RR
2
2L F4OSS Wra.
2
2L F032 LP Ballast - WA100
Men's RR
2
2L F3OSS Stri.
2
2L F032 LP Ballast
Women's RR
2
2L F4OSS Wra.
2
2L F032 LP Ballast - WA100
Women's RR
1
2L F4OSS Stri.
1
2L F032 LP Ballast
Janitor
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Elevator
2
1L F4OSS Stri.
2
2L F032 LP Ballast
CSI Darkroom
2
2L F4OSS Troffer
2
2L F032 LP Ballast
Breakroom
5
2L F4OSS Troffer
5
2L F032 LP Ballast - W1000
Communications
20
3L F032 Electronic Ball Troffer
20
2L F032 w /reflector
Communications
23
50W Par Ca. Floods
23
Do Nothin:
Entrance Comm
1
4L F4OSS Troffer
1
2L F032 Std Ballast w /reflector
Stairwell
4
2L F4OSS Wra.
4
2L F032 LP Ballast
West COM
4
2L F4OSS Troffer
4
2L F032 LP Ballast - WA100
•
City of Seal Beach
14
Cal -Air, Inc.
1
•
ontinued
•
•
•
City of Seal Beach
15
Cal -Air, Inc.
PRE - RETROFIT
POST- RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Rita's Office
6
2L F4OSS Troffer
6
2L F032 LP Ballast - WA100
Detective Hall
1
2L F4OSS Troffer
1
2L F032 LP Ballast
Detective 0 • en
21
4L F4OSS Troffer
21
2L F032 Std Ballast w /reflector
Vice/Narcotics
1
4L F4OSS Troffer
1
2L F032 Std Ballast w /reflector
Bureau
4
2L F4OSS Troffer
4
2L F032 LP Ballast - WA100
Hall
2
2L FB40 SS
2
2L F017/841 STD Ballast w /reflector
Private
2
2L F4OSS Troffer
2
2L F032 LP Ballast
Ca•tain Kin:
4
2L F4OSS Troffer
4
2L F032 LP Ballast - WA100
S:t. Mullins
4
2L F4OSS Troffer
4
2L F032 LP Ballast - WA100
• . erations
4
2L F4OSS Troffer
4
2L F032 LP Ballast - WA100
Interview
1
2L F4OSS Troffer
1
2L F032 LP Ballast
Stora e
1
100W Inc
1
18W CF Screw in
Interview
1
2L F4OSS Troffer
1
2L F032 LP Ballast
Stairwell
3
2L F4OSS Wra •
3
2L F032 LP Ballast
Storage Lower
6
4L F4OSS Troffer
6
2L F032 Std Ballast w /reflector
Stora e
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Hall
5
2L F4OSS Wra.
5
2L F032 LP Ballast
Wash Room
1
2L F4OSS Troffer
1
2L F032 LP Ballast
Lobb
4
2L F4OSS Wra •
4
2L F032 LP Ballast
Men's Lockeroom
4
2L F4OSS Wra.
4
2L F032 LP Ballast
Men's Lockeroom
12
2L F4OSS Troffer
12
2L F032 LP Ballast - W2000
Restroom
2
2L F4OSS Wra •
2
2L F032 LP Ballast
Restroom
2
2L F3OSS Stri.
2
2L F032 LP Ballast
Shower
1
100W Inc
1
18W CF Screw in
Wei ht Room
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Wei • ht Room
9
4L F4OSS Troffer
9
2L F032 Std w /refl - WA100
Women's Lockeroom
5
4L F4OSS Troffer
5
2L F032 Std Ballast w /reflector
Women's RR
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Women's RR
2
2L F3OSS Stri •
2
2L F025 STD Ballast
Shower
1
100W Inc
1
18W CF Screw in
Entrance
Wei:htroom
1
2L F4OSS Wrap
1
2L F032 LP Ballast
Back Hall
4
2L F4OSS Troffer
4
2L F032 LP Ballast
Armo
1
2L F4OSS Troffer
1
2L F032 LP Ballast
Storage
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Stairwell
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Elevator
1
2L F4OSS Stri.
1
2L F032 LP Ballast
Visitor
2
150W Inc
2
Do Nothin:
Generator
2
2L F4OSS Stri.
2
2L F032 LP Ballast
Bookin Hall
7
2L F4OSS Wra.
7
2L F032 LP Ballast
Vendin.
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Television
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Hall
16
150W Inc
16
Do Nothin:
Cell 1
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Cell 1
2
150W Inc
2
Do Nothin:
•
City of Seal Beach
15
Cal -Air, Inc.
•
•
•
.
PRE- RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Dorm 1
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Dorm 1
2
150W Inc
2
Do Nothin:
Shower
5
150W Inc
5
Do Nothin_
Shower
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Kitchen
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Stora_e
1
150W Inc
1
Do Nothin:
Cell 3 & 4
4
150W Inc
4
Do Nothin:
Cell 3 & 4
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Medical
3
2L F4OSS Wra.
3
2L F032 LP Ballast
Jail Exit
3
2 -13W CF
3
New LED Exit Sian
Holdin:
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Shower
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Lock Down
2
150W Inc
2
Do Nothin:
Gara•e
4
2L F4OSS Wra.
4
2L F032 LP Ballast
Pro.e Office
13
2L F4OSS Stri.
13
2L F032 LP Ballast
Pro.er Office
1
150W Inc
1
Do Nothin:
WA100 = Wall Mounted Occupancy Sensor. W500, W1000 and W2000 =
Ceiling Mounted Occupancy Sensor.
Public Works
•
City of Seal Beach
16
Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Exterior
10
250W HPS
10
Do Nothin•
Hall
8
2L F4OSS Wra.
8
2L F032 LP Ballast
Hall
1
4L F40SS Troffer
1
2L F032 STD w /refl - W1000
Ban • uet Hall
21
2L F40SS Troffer
21
2L F032 LP Ballast
Water Heater
1
100W Inc
1
18W CF Screw in
Bob Ea le Office
2
4L F4OSS Troffer
2
2L F032 STD w /refl - WA100
Men's Restroom
2
2L F4OSS Wra.
2
2L F032 LP Ballast - WA100
Men's Restroom
6
2L F4OSS Troffer
6
2L F032 LP Ballast - W500
Shower
1
13W CF
1
Do Nothin:
1st Office
2
4L F4OSS Troffer
2
2L F032 STD w /refl - WA100
Maestro
2
4L F4OSS Troffer
2
2L F032 STD w /refl - WA100
Women's Restroom
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Women's Restroom
1
2L F4OSS Troffer
1
2L F032 LP Ballast - WA100
Stockett Office
2
4L F4OSS Troffer
2
2L F032 STD w /refl - WA100
Locked
5
4L F4OSS Wra.
5
2L F032 STD w /refl - WA100
Branlett Office
3
2L F4OSS Troffer
3
2L F032 LP Ballast - WA100
Locked
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Water
5
2L — F96T12SS Stri.
5
4L FO32 New Stri. Fixture
Work Bench
2
2L F4OSS
2
2L F032 LP Ballast
Gara • e
6
2L — F96T12SS Stri.
6
4L FO32 New Stri. Fixture
•
City of Seal Beach
16
Cal -Air, Inc.
•
1
•Public Works
Continued
•
WA100 = Wall Mounted Occupancy Sensor. W500 and W1000 = ei mg Mounte
•
. •
ccupancy ensor.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Sewa:e Division
4
2L — F96T12SS Stri.
4
4L F032 New Stri. Fix - WA100
Electrical
6
2L — F96T12SS Stri.
6
4L F032 New Stri. Fix - WA100
Ca • en.
8
2L — F96T12SS Stri.
8
4L FO32 New Stri. Fix - WA100
Construction
Division
4
2L — F96T12SS Strip
4
4L F032 New Strip Fix - WA100
Mechanic
27
2L — F96T12SS Stri.
27
4L F032 New Stri. Fixture
U.stairs
1
2L F4OSS
1
2L F032 LP Ballast
Office
10
2L F4OSS
10
2L F032-LP Ballast - WA100
Parkin Lot
1
500W •uartz
1
Do Nothin:
Exterior
20
250W HPS
20
Do Nothin:
Storeroom
6
2L — F96T12SS Stri.
6
4L F032 New Stri. Fix - WA100
Landsca.ed Locked
12
2L — F96T12SS Stri.
12
4L F032 New Stri. Fix - WA100
Paint
8
2L — F96T12SS Stri.
8
4L FO32 New Stri. Fix - WA100
Paint
2
100W Inc
2
18W CF Screw in
Street Division
6
2L — F96T12SS Stri.
6
4L F032 New Stri. Fix - WA100
Safe — Saint
6
2L — F96T12SS Stri.
6
4L F032 New Stri. Fix - WA100
Parkin Lot
5
250W HPS
5
Do Nothin:
WA100 = Wall Mounted Occupancy Sensor. W500 and W1000 = ei mg Mounte
•
. •
ccupancy ensor.
•
City of Seal Beach
17
Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Parkin• Lot
1
150W HPS
1
Do Nothin•
Entrance Cano.
6
75W Par Ca
6
26W Reflector Flood
Entrance Cano.
4
150W Inc
4
CF26W Screw In
Entrance Cano.
2
2L F4OSS
2
2L F032 LP Ballast
Entrance Cano.
6
2L F4OSS
6
2L F032 LP Ballast
Entrance Cano•
2
100W Inc
2
CF26W Screw In
Men's RR
2
2L F4OSS
2
2L F032 LP Ballast - WA100
Men's RR
1
75W Par Ca •
1
26W Reflector Flood
Men's RR
1
2L F4OSS
1
2L F032 LP Ballast
Women's RR
1
2L F4OSS
1
2L F032 LP Ballast - WA100
Women's RR
1
75W Par Ca.
1
26W Reflector Flood
Women's RR
2
2L F4OSS
2
2L F032 LP Ballast
Book Sho• Hall
2
100W Inc
2
CF26W Screw In
Friends Room
4
2L F4OSS
4
2L F032 LP Ballast
Conference
Chandelier
4
CF26W Screw in
4
Do Nothing
Conference
Chandelier
4
75 W Inc
4
CF26W Screw In
Conference
Chandelier
3
100W Inc
3
CF26W Screw In
Stora:e
1
2L F4OSS
1
21, F032 LP Ballast
•
City of Seal Beach
17
Cal -Air, Inc.
• Mar Wilson Libra
•
•
Continued
•
WA = Wall Mounted Occupancy Sensor, W500 and W2000 = Ceiling Mounted Occupancy Sensor
North Seal Beach Community Center
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Storage
3
100W Inc
3
CF26W Screw In
Kitchen
4
2L F4OSS
4
2L F032 LP Ballast - WA100
Patio
2
50W HPS
2
Do Nothin
Ground Li ht
3
150W Par Ca.
3
Do Nothin:
Custodian
2
2L F4OSS
2
2L F032 LP Ballast
Libra
12
3L F4OSS
12
2L F032 Std Ballast w/ reflector
Libra
3
150W Par Ca.
3
Do Nothin:
Wall Wash
2
75 W Inc
2
CF26W Screw In
Libra
10
2L F4OSS
10
2L F032 LP Ballast
Libra
74
3L F4OSS
74
2L F032 Std Ballast w/ reflector
Libra
3
2L FB40 SS
3
2L F017/841 w /reflector
Side Li:hts
5
3L F4OSS
5
2L F032 Std Ballast w/ reflector
Chandelier Libra
6
CF26W Screw in
6
Do Nothin:
Chandelier Libra
6
23W Genera Lam.
6
Do Nothin:
Office
4
2L F4OSS
4
2L F032 LP Ballast - WA100
Back O •en
11
3L F4OSS
11
2L F032 Std w/ reflector - W2000
Cans
2
100W Inc
2
CF26W Screw In
Closet
1
150W Par Ca.
1
CF26W Screw In
Lunch Room
4
3L F4OSS
4
2L F032 Std w/ reflector - W500
Restroom
1
2L F4OSS
1
2L F032 LP Ballast - WA100
Book Dro.
1
100W Inc
1
CF26W Screw In
Ground Li ' ht
2
150W Par Ca.
2
Do Nothin.
WA = Wall Mounted Occupancy Sensor, W500 and W2000 = Ceiling Mounted Occupancy Sensor
North Seal Beach Community Center
•
City of Seal Beach
18
Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Entrance
6
75W Inc
6
18W CF Screw in
Exit Signs
4
2 -25W Inc
4
New Universal Plastic LED
Open
33
4L F4OSS Wrap
33
New 1x4 Wrap T8 -EB
Office
2
4L F4OSS Wrap
2
New 1x4 Wrap T8 -EB
Office
1
120W Spot Inc
1
26W CF Screw in W /ref
Kitchen
4
4L F40 SS Troffer
4
2 Lamp F32841 Std Eb W/Wt ref
Open
2
2L F72SST12
2
4 Lamp F25 W /Conv. Kit LPEB
Open
4
75W Inc
4
18W CF Screw in
Storage
2
135W Inc
2
26W CF Screw in W /ref
Storage
2
135W Inc
2
26W CF Screw in W /ref
Restroom Hall
2
2L F4OSS
2
2 Lamp F32841 LPEB
Women's Restroom
2
2L F4OSS
2
2 Lamp F32841 LPEB
•
City of Seal Beach
18
Cal -Air, Inc.
: • ach Commune Center
ontinue
•
•
•
•
v. ,, . ..
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Men's Restroom
2
2L F4OSS
2
2 Lamp F32841 LPEB
Open
8
100W Flood Inc
8
26W CF Screw in W /ref
Cans
10
100W HPS
10
Do Nothing
Wallpacks
11
100W HPS
11
Do Nothing
0 e
Ground light
1
100W HPS
1
Do Nothing
Stora e
Wallpacks
1
100W HPS
1
Do Nothing
•
•
•
•
v. ,, . ..
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Basketball Courts
20
150W Metal Halide
20
Do Nothin.
Can
14
90W Par Ca. Flood
14
Weathe •roof 18W SI
Wall Pack
10
70W HPS
10
Do Nothin:
Stora e
3
100W Inc
3
CF18W Screw in
0 e
54
2L F4OSS Wra.
54
2L F032 LP Ballast
Stora e
4
3L 75W In
4
39W CF New Drum Fixture
Stora e
4
3L 75W Inc
4
39W CF New Drum Fixture
Kitchen
6
4L F4OSS Wra.
6
2L F032 New Wra. Fixture
Anthon
4
2L F4OSS
4
2L F032 LP Ballast
Stora • e
2
2L F4OSS Wra.
2
2L F032 LP Ballast
Restroom 0 • en
6
4L F4OSS Wra.
6
2L F032 New Wra • Fixture
Men's Restroom
3
2L F4OSS Wra •
3
2L F032 LP Ballast - WA100
Women's Restroom
3
2L F4OSS Wra.
3
2L F032 LP Ballast - WA100
Classroom
13
2L F4OSS Wra.
13
2L F032 LP Ballast
Stora:e
1
2L F4OSS Wra.
1
2L F032 LP Ballast
Marina Park
2
400W Metal Halide
2
Do Nothin•
Rac. uetball
' 3
150W Metal Halide
3
Do Nothin:
WA100 = Wall Mounted Occupancy Sensor
1st Beach Complex
•
City of Seal Beach
19
Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Garage
16
2L - F96T12SS Strip
16
4L F032 New Strip Fixture
Shop
1
2L - F96T12SS Strip
1
4L F032 New Strip Fix - WA100
Women's Restroom
1
2L - F96T12SS Strip
1
4L F032 New Strip Fix - WA100
•
City of Seal Beach
19
Cal -Air, Inc.
•
•
1
1
WA100 = Wall Mounted Occupancy Sensor
2.4 Lighting Exclusions
With the assistance of the Customer's personnel, CAL -AIR has conducted a thorough audit of the
facilities. The following exclusions have not been included in the above scope of work. Should they
arise, a fair and equitable solution will be assessed between, CAL -AIR and the Customer.
• Asbestos identification, testing, abatement, and removal.
• Repair of existing electrical systems found in disrepair and/or a non -code compliant condition.
• Any replacement of an existing fixture and/or part of that fixture caused by a defect or failure in the
craftsmanship found during retrofit.
• Overtime labor incurred because the Customer requires that work be done at a time other than CAL -
AIR's regular hours for this type of work (which regular hours are generally in the evening and at
night so as not to conflict with the Customer's operations)
• Any and all items not specified in this scope of work or the lighting detail report.
3.0 HVAC
3.1 General Scope of Work
CAL -AIR shall provide HVAC retrofit services as listed herein. CAL -AIR and the Customer shall work
towards, and agree upon, construction logistics and scheduling in an effort to minimize interference with
normal business activities at each facility. Should there be major scheduling alterations, compared to
those anticipated and for which was planned by CAL -AIR, any additional costs will be negotiated in
good faith. All equipment will be as listed or equal to. Prior to substituting a proposed equal for any
specified item, CAL -AIR at its expense shall establish to the reasonable satisfaction of the Customer that
the proposed substitute item is in fact equal or better in quality, performance and appearance than the
specified item.
•
City of Seal Beach 20 Cal -Air, Inc.
PRE - RETROFIT
POST - RETROFIT
Area Description
Fixture
Qty.
Description
Fixture
Qty.
Description
Women's Restroom
1
4L F4OSS Wrap
1
2L F032 New Wrap Fixture
Office
2
4L F4OSS Wrap
2
2L F032 New Wrap Fix - WA100
Wall Mount
2
70W HPS
2
Do Nothing
Lockeroom
1
F40 Strip
1
1L F032 STD Ballast
Men's Restroom
1
90 W Par Inc
1
18W CF Screw in
Men's Restroom
1
2L F4OSS Wrap
1
2L F032 New Wrap Fixture
Women's Restroom
1
2L F4OSS Wrap
1
2L F032 New Wrap Fixture
WA100 = Wall Mounted Occupancy Sensor
2.4 Lighting Exclusions
With the assistance of the Customer's personnel, CAL -AIR has conducted a thorough audit of the
facilities. The following exclusions have not been included in the above scope of work. Should they
arise, a fair and equitable solution will be assessed between, CAL -AIR and the Customer.
• Asbestos identification, testing, abatement, and removal.
• Repair of existing electrical systems found in disrepair and/or a non -code compliant condition.
• Any replacement of an existing fixture and/or part of that fixture caused by a defect or failure in the
craftsmanship found during retrofit.
• Overtime labor incurred because the Customer requires that work be done at a time other than CAL -
AIR's regular hours for this type of work (which regular hours are generally in the evening and at
night so as not to conflict with the Customer's operations)
• Any and all items not specified in this scope of work or the lighting detail report.
3.0 HVAC
3.1 General Scope of Work
CAL -AIR shall provide HVAC retrofit services as listed herein. CAL -AIR and the Customer shall work
towards, and agree upon, construction logistics and scheduling in an effort to minimize interference with
normal business activities at each facility. Should there be major scheduling alterations, compared to
those anticipated and for which was planned by CAL -AIR, any additional costs will be negotiated in
good faith. All equipment will be as listed or equal to. Prior to substituting a proposed equal for any
specified item, CAL -AIR at its expense shall establish to the reasonable satisfaction of the Customer that
the proposed substitute item is in fact equal or better in quality, performance and appearance than the
specified item.
•
City of Seal Beach 20 Cal -Air, Inc.
•
•
• •
3.2 Engineering:
Cal -Air will furnish mechanical engineering and structural calculations produced by an independent
structural engineer certifying the seismic hold down ties, bolts and anchors required to meet building
codes.
3.3 Demolition:
Cal -Air will furnish all labor, materials and rigging required to remove the old equipment, piping,
electrical and pipe insulation, that is to be replaced with the new equipment. Cal -Air will dispose of all
removed equipment, materials and associated chemicals as per the EPA guide lines.
3.4 Equipment:
The equipment listed in the Mechanical Scope will be installed as per specifications or as equal. Units
are at the highest Seasonal Energy Efficiency Rating (SEER) level available and shall be equipped with
economizers, power exhaust, copper fins and copper coils (Heriste coated coils for 25 ton unit at City
Hall).
3.5 Smoke Detectors:
Smoke detectors will be installed in the ductwork for newly installed HVAC units, as building code
dictates.
3.6 Miscellaneous:
Labor and Materials incidental to the installation of the equipment shall be incorporated, as necessary at
not additional cost to the Customer. These items include but are not limited to sheetmetal transitions,
ductwork modifications, supply and return grilles (Marina Community Center), condensate and gas
piping disconnect/reconnect, new condensate and gas piping runs (Marina Community Center), ceiling
repairs, disconnecting from and reconnecting to utilities and roof curbs.
3.7 Asbestos:
As described in Section 11 of the Agreement.
3.8 Rigging:
Cal -Air will provide all rigging and handling to remove existing equipment and install the new
equipment. The rigging will require trucks, dumpsters, forklifts, cranes and helicopters. The Customer
shall provide reasonably safe access to the buildings and provide reasonable for facility occupants'
safety during the rigging and equipment handling process.
3.9 Ping•
The new piping to be installed will be type K copper for all water lines. The new pipe and equipment
insulation will be fiberglass and or closed cell synthetic rubber.
3.10 Electrical:
The existing electrical wiring will be reconnected to the new equipment using the existing wire, conduit
and circuit breakers. If the existing wire, conduit or circuit breakers are of an improper size for the new
equipment to be installed, Cal -Air shall notify the Customer in writing of the additional cost to remedy
City of Seal Beach 21 Cal -Air, Inc.
•
1 •
the problem; the Customer may elect either to cause the work to be performed by the Customer or
another contractor, or to have Cal -Air perform the work.
3.11 Codes:
All work by Cal -Air will comply with the Uniform Building Code (UBC), the Uniform Plumbing Code
(UPC), the Uniform Mechanical Code and the National Electrical Code (NEC) unless otherwise required
by applicable law.
3.12 Detailed HVAC Scope of Work
CITY HALL
• The replacement of two (2) existing gas - electric rooftop HVAC units with two (2) new gas -
electric HVAC units. The replacement of one (1) existing window A/C unit with a new
window A/C unit. The replacement of one (1) existing duct furnace with one (1) new duct
furnace.
Existing Description
Proposed Description
Manufacturer /
Description
Qty.
Rating
Type
Manufacturer /
Description
Qty.
Rating
Type
Carrier Multizone
1
25 Tons
MZ
Carrier Multizone
48MA028 -5
1
25 Tons
MZ
Carrier Split
System
1
12.5 Tons
SS
Carrier Split
System
38AKS014 -5
1
12.5 Tons
SS
Carrier Window
Unit
1
1 Ton
WU
Carrier Window
Unit
XCB123D
1
1 Ton
WU
Reznor Duct
Furnace
1
175,000 Btu
DF
Reznor Duct
Furnace
HX175A
Fan Coil Unit
4ORM014 -5
1
175,000 Btu
DF
MZ = Multizone HVAC Unit
SS = Split System
WU = A/C Wall Unit
DF = Duct Furnace
Also included is the repair of collapsed ductwork in the rear section of City Hall.
•
City of Seal Beach 22 Cal -Air, Inc.
•
POLICE STATION
•
• The replacement of fourteen (14) existing gas- electric rooftop single zone HVAC units with
fourteen (14) new gas - electric single zone HVAC units.
Existing Description
Proposed Description
Manufacturer /
Description
Qty.
Rating
Type
Manufacturer /
Description
Qty.
Rating
Type
Carrier Single
Zone Package Unit
3
2 Tons
SZ
Carrier Single Zone
Package Unit
48GX024 -3
3
2 Tons
SZ
Carrier Single
Zone Package Unit
4
3 Tons
SZ
Carrier Single Zone
Package Unit
48HJD004 -5
4
3 Tons
SZ
Carrier Single
Zone Package Unit
3
4 Tons
SZ
Carrier Single Zone
Package Unit
48HJD005 -5
3
4 Tons
SZ
Carrier Single
Zone Package Unit
4
5 Tons
SZ
Carrier Single Zone
Package Unit
48HJD006 -5
4
5 Tons
SZ
• SZ = Single Zone Rooftop HVAC Unit
MARY WILSON LIBRARY
• The replacement of three (3) existing gas - electric rooftop HVAC units with three (3) new
gas - electric HVAC units.
Existing Description
Proposed Description
Manufacturer /
Description
Qty.
Rating
Type
Manufacturer /
Description
Qty.
Rating
Type
Carrier Single
Package Unit
3
15 Tons
MZ
Carrier Single Zone
Package Unit
48HJD017 -5
3
15 Tons
MZ
MZ = Multizone Rooftop HVAC Unit
•
City of Seal Beach
23
Cal -Air, Inc.
•
•
•
•
MARINA COMMUNITY CENTER
•
• The replacement of one (1) existing heating only unit with two (2) new gas - electric single
zone HVAC units.
Existing Description
Proposed Description
Manufacturer /
Description
Qty.
Rating
Type
Manufacturer /
Description
Qty.
Rating
Type
Reznor Heating
Only Unit
1
4 Tons
HO
Carrier Single Zone
Package Unit
48HJD006 -5
2
5 Tons
SZ
HO = Heating Only Unit
SZ = Single Zone Rooftop HVAC Unit
NORTH SEAL BEACH COMMUNITY CENTER
• The replacement of three (3) existing heat pump rooftop single zone HVAC units with three
(3) new heat pump single zone HVAC units.
Existing Description
Proposed Description
Manufacturer /
Description
Qty.
Rating
Type
Manufacturer /
Description
Qty.
Rating
Type
Carrier Single
Zone Package Unit
2
4 Tons
HP
Carrier Single Zone
Package Unit
5OHJQ005 -5
2
4 Tons
HP
Carrier Single
Zone Package Unit
1
5 Tons
HP
Carrier Single Zone
Package Unit
50HJ • 006 -5
1
5 Tons
HP
HP = Single Zone Rooftop Heat Pump HVAC Unit
3.13 General Mechanical Exclusions
With the assistance of Customer personnel, CAL -AIR has conducted a thorough audit of the facilities. A
fair and equitable solution will be assessed between CAL -AIR and the Customer should any unforeseen
situations arise. The above scope of work does not include the following exclusions:
City of Seal Beach 24 Cal -Air, Inc.
•
•
•
• •
• Asbestos identification, testing, abatement, and removal.
• An Industrial Hygienist to provide any and all Asbestos identification, testing, inspections and or
clearances.
• Repair of existing electrical systems found in disrepair and/or in a non -code compliant condition.
• Repair of existing control systems and systems' components found in disrepair and/or in a non -code
compliant condition.
• Upgrades of existing structural Maintenance systems.
• Upgrades of existing main panel electrical system(s).
• New electrical disconnects.
• Site Screens.
• Repair of Existing Ductwork systems found in disrepair and/or in a non -code compliant condition.
• Repair or replacement of existing piping, prior to the point of connection, found to be in disrepair
and/or in a non -code compliant condition.
• Concrete coring or x -rays.
• Access doors.
• Independent air balance.
• Smoke detector panels, annunciator panel, strobes or indicator light.
• Painting of any surface not installed or specified in this Agreement.
• Overtime labor incurred because the Customer requires that work be done at a time other than CAL -
AIR' s regular hours
• Fire Life and Safety equipment
• Permitting Fees
• Any and all items not specified in this scope.
4.0 Controls:
4.1 Detailed Controls Scope of Work
Cal -Air shall provide and install new thermostats for newly installed HVAC units and/or replace the
existing thermostats for replaced HVAC units as follows:
Facility
HVAC Control Description
Cit Hall
New thermostats, di_ital timeclocks and b 1. ass timers
Police Station
New •ro: ammable thermostats
Ma Wilson Libr•
New thermostats, di • ital timeclocks and b pass timers
Marina Communit Center
New .ro: ammable thermostats
North Seal Beach Communit
Center
New .ro: ammable thermostats
City of Seal Beach
25
Cal -Air, Inc.
•
•
• •
4.2 Controls Exclusions:
• Asbestos identification, testing, abatement, and removal.
• Repair of electrical systems found in disrepair or non -code compliant.
• As it is not required for this scope of work, DSA engineering and approvals.
• Overtime labor incurred because the Customer requires that work be done at a time other than CAL -
AIR's regular hours.
• Any and all items not specified in this scope.
5.0 Warranties
CAL -AIR shall obtain and transfer to the Customer the manufacturers' warranties for the equipment
provided as part of the Project Scope, which warranties shall at a minimum cover defective materials or
workmanship as follows:
One (1) Year Parts and Labor Warranty and One (1) Year Workmanship Guarantee on all components
Parts only warranties on the following components for the specified periods (all from the date of
installation):
LIGHTING
Lamps - 2 Years
Ballasts - 5 Years
Occupancy Motion Sensors - 5 Years
Compact Fluorescents - 1 Year
LED Exit Signs - 15 Years
Reflectors -10 Years
HVAC MECHANICAL
Compressors - 5 Years
CONTROLS
All Control Components - 1 Year
In addition, CAL -AIR's warranty is as follows:
• Equipment, Materials, Parts and Labor Warranty: One Year
The warranties set forth herein are exclusive, and CAL -AIR expressly disclaims all other warranties,
whether oral, written, implied, or statutory, including, but not limited to, any warranties of
merchantability, workmanship, or fitness for a particular purpose.
•
City of Seal Beach 26 Cal -Air, Inc.
•
•
•
• •
6.0 'Project Time Line
The Project will require extensive scheduling and coordination to insure the efficient implementation of
the Scope of Work. CAL -AIR will work with the Customer to develop a detailed project schedule.
City of Seal Beach 27 Cal -Air, Inc.
•
•
411
• •
SCHEDULE C
Payment Schedule
1.0 Total Project Amount: $ 896,502
Payment Schedule
Paid to
CAL -AIR
Retention
per item 1.4
Below
1.1
Upon Execution of
A • eement
Ten Percent (10 %)
$ 80,685
$ 8,965
1.2
Upon Ordering Equipment
Twenty Percent (20 %)
$ 161,370
$ 17,930
1.3
Monthly Progress
Payments
CAL -AIR will prepare a Project
Construction Schedule and Schedule of
Values based upon the Scope of Work in
Schedule B. CAL -AIR will invoice the
Customer monthly, based
proportionately upon the percentage of
work completed during that month, less
a 10% retention. The Customer shall
approve the Payment Authorization
Form within five (5) business days of
recei.t.
$ 564,797
$ 62,755
Sub - Total:
$ 806,852
$ 89,650
1.4
Upon Acceptance of the
Certificate of Substantial
Com.letion *
Retention Paid
$ 89,650
* The Customer may withhold from the final payment an amount not to exceed one hundred and fifty
percent (150 %) of any disputed component's dollar value.
City of Seal Beach 28 Cal -Air, Inc.
•
• •
SCHEDULE D
Performance Guarantees
1.0 Guaranteed Savings Overview
The purpose of the following performance guarantees is to remove the down side risk from the Customer
and place the burden of performance upon CAL -AIR, by requiring CAL -AIR to pay the amount of the
excess to the Customer if the Customer's costs during any year during the Guarantee Term exceed the
adjusted costs that would have been incurred during that year if the Project had not been implemented.
The total guaranteed savings amount will not exceed the total project cost, including principal and
interest (or, if financed by an equipment lease, lease payments) and maintenance costs.
The savings verification process will be conducted for the first year of the Guarantee Term. If the first
year's report concludes the Customer's total costs during that year were less than the total adjusted costs
that would have been incurred during that year if the Project had not been implemented, CAL -AIR shall
have no further verification obligation. Otherwise, CAL -AIR shall continue the verification process for
the measures that did not achieve the guaranteed savings until the Customer's total costs during a year
exceed the total adjusted costs that would have been incurred during that year if the Project had not been
implemented. CAL -AIR may in its sole discretion elect to continue the verification process for some or
all measures even if not required to do so hereunder.
2.0 Adjusted Costs Absent Project
For purposes of the Performance Guarantee, the Customer's "Adjusted Costs Absent Project" for each
one -year period during the Guarantee Term shall be the sum of:
(i) Customer's adjusted cost of electricity, determined by multiplying (A) the number of
KwH used by the Customer during the Base Period, times (B) the average cost per KwH
actually paid by the Customer during the comparison year; plus
(ii) Customer's adjusted cost of natural gas, determined by multiplying (A) the number of
Kcf used by the Customer during the Base Period, times (B) the average cost per Kcf
actually paid by the Customer during the comparison year; plus
(iii) $12,500 per year (an agreed allowance for projected costs which would have been
incurred for the Police Station, North Seal Beach Community Center and Marina
Community Center over the twelve -year period, as more fully described in Section 6.0 of
Schedule E); plus
(iv) An allowance for the estimated annual repair costs for existing HVAC equipment over
the twelve -year period, as more fully described in Section 5.0 of Schedule E; plus
(v) An allowance for the estimated annual material component replacement costs for existing
lighting equipment over the twelve -year period, as more fully described in Section 4.0 of
Schedule E.
•
City of Seal Beach 29 Cal -Air, Inc.
•
• •
2.1 Actual Costs
For purposes of the Performance Guarantee, the Customer's "Actual Costs" for each one -year period
during the Guarantee Term shall be the sum of:
(i) Customer's total actual cost of electricity during that year; plus
(ii) Customer's total actual cost of natural gas during that year; plus
(iii) Customer's total actual HVAC maintenance and repair costs during that year; plus
(iv) Customer's total actual material component replacement costs during that year; plus
(v) Customer's total principal and interest payments (or lease payments) during that year
amortizing the cost of the Project (including without limitation Construction Period
interest) over the Guarantee Term. (If, as currently anticipated, the entire cost of the
Project is financed under an equipment lease with option to purchase, having the same
term as the Guarantee Period, with lease payments sufficient to fully amortize the total
cost of the Project with interest, the amount specified in this paragraph (v) for each year
will be the sum of the lease payments during that year. The parties acknowledge that (a)
the actual cost of the Project may increase or decrease as the result of change orders, and
the amount financed may not be adjusted to reflect the increase or decrease, and (b) the
Customer may subsequently elect to refinance all or a portion of the amount financed,
and the amount refinanced may differ from the unamortized balance of the original cost
of the Project, or the refinancing may be amortized over a period other than the remaining
portion of the Guarantee Term. In any such case, the amount specified in this paragraph
(v) shall be adjusted so that this component of "Actual Costs" shall be the amount that
would have been paid during that year on a hypothetical loan(s), bearing interest at the
interest rate(s) actually paid by the City, fully amortized over the remaining portion of the
Guarantee Term.)
3.0 Savings Shortfall
Within forty (40) business days after each anniversary of the Commencement Date, CAL -AIR shall
deliver to the Customer an annual savings report showing the calculation of the Customer's "Adjusted
Costs Absent Project" and the Customer's "Actual Costs" for the year ended on that anniversary, along
with the amount of savings if the Customer's "Actual Costs" were less than the Customer's "Adjusted
Costs Absent Project" or the amount of the "Savings Shortfall" if the Customer's "Actual-Costs" were
greater than the Customer's "Adjusted Costs Absent Project ".
4.0 Savings Shortfall
CAL -AIR shall compensate the Customer for the amount of any Savings Shortfall; the Customer shall
have the option of choosing one of the following compensation methods:
• Provide the Customer with additional services that will result in additional savings equal to the
cumulative Savings Shortfall within forty (40) business days after the Customer notifies CAL -AIR
of its election to accept such additional services.
•
City of Seal Beach 30 Cal -Air, Inc.
• •
• • Pay the Customer any cumulative Savings Shortfall amount within ten (10) business days after the
Customer notifies CAL -AIR of its election to receive payment in cash.
•
•
5.0 Energy Savings Dispute
To remedy a dispute over the energy savings, both parties will mutually agree to select a disinterested
independent third party engineer. The engineer shall be either a California Professional Engineer (PE)
or a Certified Energy Manager (CEM). Both parties shall agree to abide by the independent engineer's
analysis report.
If the third party engineer's review indicates the Savings Shortfall is greater than CAL -AIR'S calculation
by more than five percent (5 %), then CAL -AIR shall be responsible for the third party engineer's review
costs.
If the third party engineer's review does not indicate a Savings Shortfall more than five percent (5 %)
greater than CAL - AIR's calculation, the Customer is responsible for the third party engineer's review
costs.
City of Seal Beach 31 Cal -Air, Inc.
•
•
• •
SCHEDULE E
Measurement & Verification Plan
1.0 Measurement & Verification Overview
CAL -AIR will use the verification plans outlined in the International Performance Measurement &
Verification Protocol, dated December 1997. This Protocol is also currently being used for all California
Public Utilities Commission's performance based energy efficiency programs.
2.0 Specific Measurement & Verification Protocols
The energy savings measurement and verification will be performed on a direct measure -by- measure
basis and will be demonstrated by comparing the value of physical parameters after the installation to its
value before the installation. This method is structured so the savings are not affected by unrelated
building modifications such as added or deleted computers, process equipment, added portable .
buildings, etc. Utility bills may be analyzed and evaluated in order to identify energy consumption
trends and/or savings.
The following information will be calculated and performed via the spreadsheets in the Energy Savings
Verification Plan Submittal package. The Energy Savings Verification Plan Submittal package will be
presented to the Customer within ten (10) business days prior to the completion of project construction.
2.1 Pre - installation Measurement:
To determine the energy consumption of the existing systems, Cal -Air will perform data - logging and
other analysis.
• For packaged air conditioning units, Cal -Air will data -log a random sample of the units for a two
week period to determine how units operate under varying loads
• To determine current operating hours, Cal -Air received data from the facility maintenance staff.
2.2 Mechanical Measurement & Verification Process:
The mechanical measurement will be for the packaged air conditioning units.
• The method used to measure and verify the savings will be the BIN analysis method. Cal -Air will
measure the performance of the installed systems for a maximum of three weeks to develop a
complete load profile.
• Five percent (5 %) for each of the different manufacturers and model numbers of the packaged air
conditioning units will be measured for the purpose of verifying the savings. The measurements will
be taken at the motor control center.
The results of the measurements (graphs and spreadsheets) along with the summarized energy
City of Seal Beach 32 Cal -Air, Inc.
•
•
• •
calculations will be reported to the Customer.
2.3 Lighting Measurement & Verification (M &V) Process: Five percent (5 %) of each fixture
type at each facility will be measured for the purpose of verifying the savings. The measurements will
be taken at the light fixtures. The actual measurement will be multiplied by the annual composite
electrical cost at each site to determine the actual dollar savings based on the calculated current and
proposed annual burn hours.
3.0 Cost Avoidance
Cost Avoidance is defined as the difference between the energy cost after the installation of the energy
efficiency measures and what the energy cost would have been without the energy efficiency measures.
The Cost Avoidance procedure requires a baseline data adjustment be performed prior to calculating
energy savings. The adjusted baseline represents the amount of energy the equipment would have
consumed under normal operating conditions, which would be greater than the present energy usage.
This may be required if one of the following conditions exist:
• The existing equipment is in a state of disrepair.
• HVAC equipment does not currently exist.
• The existing equipment is not compliant with current codes.
• The existing equipment is not operated or maintained properly.
• The existing equipment was not in full operation for the full baseline data period.
CAL -AIR will utilize standard engineering practices to quantify any baseline adjustments to
accommodate the above mentioned conditions.
4.0 Lighting Operational Savings
The parties agree that the following lighting replacement costs will be avoided through the
comprehensive installation of the new lighting system lamps and ballasts. These values are listed in the
following table.
Yearl
Year 2
Year 3
Year 4
Year 5
Year 6
$ 5,481
$ 5,645
$ 5,815
$ 5,989
$ 6,169
$ 6,354
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
$ 6,544
$ 6,741
$ 6,943
$ 7,151
$ 7,366
$ 7,587
City of Seal Beach
33
Cal -Air, Inc.
•
•
•
• •
5.0 HVAC Operational Savings
The Customer agrees that the following HVAC Operational Savings will be achieved through the
installation and retrofit of the HVAC systems. The current budgeted HVAC service and repair cost
information was provided by the Customer. These savings are based on the average repair costs incurred
(or the costs likely to be incurred as the existing HVAC equipment ages) by the Customer. These values
are listed in the following table.
Yearl
Year 2
Year 3
Year 4
Year 5
Year 6
$ 32,299
$ 33,268
$ 34,266
$ 35,294
$ 36,353
$ 37,443
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
$ 38,567
$ 39,724
$ 40,915
$ 42,143
$ 43,407
$ 44,709
6.0 Current Budget Offsets /Re- Allocations
The Customer agrees that the following HVAC Replacement Budget Offsets/Re- Allocations will be
achieved through the installation and retrofit of the HVAC systems at the City Hall, the Police Station,
Mary Wilson Library, North Seal Beach Community Center and Marina Community Center. The current
budgeted HVAC replacement cost was provided by the Customer. The budget offset/re- allocation values
are as follows:
Site
Year 2
HVAC Replacement
Budgeted Amount
Police Station
Year 5
$ 70,000
North Seal Beach Communi
Center
$ 40,000
Marina Communit Center
$ 12,500
$ 40,000
These values are divided by the financing term (12 years) and are represented annually. These
annualized values are listed in the following table.
Yearl
Year 2
Year 3
Year 4
Year 5
Year 6
$ 12,500
$ 12,500
$ 12,500
$ 12,500
$ 12,500
$ 12,500
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
$ 12,500
$ 12,500
$ 12,500
$ 12,500
$ 12,500
$ 12,500
7.0 Base Line Data
The Base Line Data for this Project is based on costs incurred during the period from September 1, 1999
through August 31, 2000. The Base Line Data will take into consideration the quantity of facilities and
size, building schedules, occupancy factors and utilization and utility usage, costs and rate schedules
along with the average weather conditions. The weather station used for this analysis will be Long
Beach, CA.
City of Seal Beach
34
Cal -Air, Inc.
•
•
•
4.
• •
8.0 Baseline Adjustment Fee
Should the Customer properly notify CAL -AIR in advance of any changes, other than weather, that
would possibly affect the energy savings, CAL -AIR shall work with the Customer to re- calculate the
baseline adjustment and resulting energy savings at the rate of ninety- five - ($95.00) per hour. In
addition, should the Customer request additional verification of energy savings after they have been
established and achieved, CAL -AIR shall perform such a task at a fee of ninety -five- ($95.00) per hour.
Should CAL -AIR need to develop any special reports, or revise the baselines or any energy calculations
pursuant to an independent third party engineer's request, CAL -AIR will charge the Customer a fee of
ninety- five - ($95.00) per hour.
Any such fee shall be submitted in advance and approved by the Customer prior to CAL -AIR
performing any work. CAL -AIR reserves the right to escalate the fee by an amount not greater than 3%
per annum.
City of Seal Beach 35 Cal -Air, Inc.
i
• •
SCHEDULE F
• Utility Rebate Disposition
•
•
Any and all direct or express utility rebates or incentives that are the result of this project will remain
with the Customer.
CAL -AIR cannot guarantee exact amounts, nor does CAL -AIR guarantee any amount provided by the
Utility Company. CAL -AIR will reasonably assist the Customer in the Utility Rebate process by
conducting the "pre" and "post" job walk - through with utility company personnel, assisting in the
application process, and providing reasonable documentation to facilitate the direct or express rebate
transaction. All other requirements governed by the utility company are the sole responsibility of the
Customer.
City of Seal Beach 36 Cal -Air, Inc.
n .
• i •
•
• •
Certificate of Substantial Completion and Acceptance
The undersigned, City of Seal Beach ( "The Customer "), having its City office at 211 Eighth Street, Seal
Beach, CA 90740 having entered into an Energy Services Agreement ( "ESA Agreement ") dated
Ay 1() , 2001, with CAL -AIR, INC., a California corporation ( "CAL- AIR "), does
hereby certify to CAL -AIR that with reference to the equipment listed in Schedule B attached hereto (the
"Equipment ") and specifically located at the Premises identified in Schedule A attached hereto, that:
1. The Equipment is of a size, design and capacity and manufacture selected by the Customer with
the assistance of CAL -AIR and its authorized agents and representative, is in good condition and
has been satisfactorily delivered and installed, excluding any minor punch list or warrantee items
outstanding and agreed to by CAL -AIR and the Customer;
2. Based on the representation of CAL -AIR and its authorized agents and representative, the
Customer is satisfied that the Equipment is suitable for the Customer's purposes;
3. There exists no Event of Default or condition which, but for the passing of time or giving of
notice, or both, would constitute an Event of Default under the CAL -AIR Agreement;
Dated this day of , 2001 ( "Commencement Date" as defined in the ESA
Agreement).
111 ACCEPTANCE
•
CITY OF SEAL BEACH
John Bahorski, City Manager
Date
City of Seal Beach 37 Cal -Air, Inc.
•
•
• •
ENERGY SERVICES AGREEMENT
BETWEEN
CAL -AIR, INC., AND
CITY OF SEAL BEACH
This Energy Services Agreement ( "Agreement "), is made this day of , 2001, by and
between CAL -AIR, INC., a California Corporation having its local office at 12393 Slauson Avenue,
Whittier, CA 90606 ( "CAL- AIR "), and City of Seal Beach, having its City Hall at 211 Eighth Street,
Seal Beach, CA 90740 ( "Customer ").
Section 1. The Proiect
1.1 CAL -AIR agrees to evaluate, engineer, procure, install, operate and monitor various energy
efficiency measures at the Customer's premises, as identified in Schedule A ( "Description of
Premises "), in accordance with the project scope as described in Schedule B, and any other
Schedules identified by the letter `B" as a prefix attached hereto (collectively, "Project Scope "),
Schedule E ( "Measurement and Verification Plan "), and shall, as determined appropriate,
complete a comprehensive energy conservation retrofit of some or all of the Premises. The
complete range of services to be provided by CAL -AIR under this Agreement shall be referred to
as the Project ( "Project ").
1.2 CAL -AIR may perform the work described in Section 1.1 above in phases, as agreed to between
the parties ( "Phase "), and the parties agree and acknowledge that this Agreement may be
amended in writing from time to time as necessary to document the detailed scope and payment
terms of each Phase. The detailed scope, payment terms and performance guarantees of each
Phase shall conform with the guidelines described in Schedule B ( "Project Scope "), Schedule C
( "Payment Schedule "), Schedule D ( "Performance Guarantee ") and Schedule E
( "Measurement and Verification Plan ").
Section 2. Commencement Date and Term of Agreement
2.1 The effective date of this Agreement shall be the date this Agreement is executed by both CAL -
AIR and the Customer ( "Effective Date ") and, unless terminated earlier as provided for in this
Agreement, shall end one hundred and forty four (144) months after the "Commencement
Date ", as defined in Section 2.2 below. The parties may adjust the term of this Agreement by
mutual written consent once the specific energy efficiency measures to be installed at the
Premises are agreed to by the Customer and CAL -AIR.
2.2 The Customer shall cooperate with CAL -AIR to achieve substantial completion and shall not
unreasonably withhold execution of the Certificate of Substantial Completion and Acceptance
( "Certificate of Substantial Completion and Acceptance ") in Exhibit 1. The Commencement
Date ( "Commencement Date ") shall be the date CAL -AIR and the Customer execute the
Certificate of Substantial Completion and Acceptance stating that, except for minor completion
items, the Project is substantially installed, is in operating condition and has been accepted by the
parties.
City of Seal Beach 1 Cal -Air, Inc.
•
•
• •
Section 3. The Equipment
CAL -AIR shall retain title to all equipment installed, as set forth in Schedule B, at the Customer's,
facilities as set forth in Schedule A, until CAL -AIR receives full compensation for items installed as set
forth in Schedule C.
Section 4. CAL -AIR Compensation
The Customer agrees to pay CAL -AIR for its services as set forth in Schedule C and Schedule G
( "Maintenance Services ").
Section 5. Actions by The Customer, Maintenance of Premises and Equipment
5.1 The Customer agrees that all Project Scope components and existing heating, ventilating and air
conditioning systems, lighting and electrical systems, HVAC and lighting controls shall be
maintained to equipment manufacturer's guidelines and in accordance with the industry
standards. The Customer will provide CAL -AIR with accurate preventive maintenance and
repair records for any work not performed by CAL -AIR within twenty (20) business days of
receipt by Customer. Records are required for the term set forth in Schedule E.
5.2 The Customer shall submit all utility data for the period ending from the base line data up to the
completion of the project. This data shall to be submitted to CAL -AIR within ten (10) business
days prior to executing the Certificate of Substantial Completion and Acceptance. From the
commencement date through the term of this Agreement, the Customer is also obligated to
forward copies of the actual utility bills to CAL -AIR within ten (10) business days of receipt.
5.3 The Customer shall notify CAL -AIR of any changes that affect the energy use during the term of
this Agreement. These changes include, but are not limited to additions, deletions, and/or
changes to energy consuming equipment, operating schedules, normal use, or hours of operation,
additions to the existing building structures, or new added facilities. Without limiting the
generality of the foregoing, the Customer will provide CAL -AIR copies of limited purchasing
records for energy consuming equipment and documentation of any other changes within twenty
(20) business days of occurrence.
5.4 During the term of this Agreement, if CAL -AIR determines that maintenance procedures are
inadequate pursuant to the equipment manufacturer guidelines and industry standards or the
equipment is not operating properly for any reason beyond the control of CAL -AIR, CAL -AIR
shall notify the Customer in writing.
Section 6. Late Payment
The Customer shall pay, or cause to be paid, all amounts due CAL -AIR for work hereunder within
twenty (20) business days after receipt of CAL -AIR's (or assignee's) invoice, and shall pay interest from
due date on any amount not paid within said time period at the rate of one and one -half (1 1/2) percent
• per month.
City of Seal Beach 2 Cal -Air, Inc.
•
so
• •
Section 7. Utility Rebate /Grants
The parties shall identify and negotiate all utility rebates /grants prior to approval of each Phase, unless
otherwise mutually agreed by the parties. The utility rebate /grant disposition is detailed in Schedule F
( "Utility Rebate Disposition ").
Section 8. Electrical Power Deregulation
CAL -AIR may elect to work, as an independent agent for the Customer, to assist with their energy
procurement choices, which may be available through the deregulation of the utility energy markets in
California. CAL -AIR may evaluate potential options, including but limited to, evaluating current energy
rate tariffs, exploring direct access benefits, and negotiating with the local utility to ensure that cost -
effective utility costs are achieved. To the extent CAL -AIR is successful in negotiating and assisting the
Customer procure a lower cost of energy, CAL -AIR may claim the incremental cost savings between
energy rates to the guaranteed savings amount as set forth in Schedule D.
Section 9. Construction Schedule
All work shall be scheduled between CAL -AIR and the Customer to minimize disruption to the
Customer's operations and personnel, while working with the Customer to ensure the deadlines are
achieved.
Section 10. Insurance
10.1 CAL -AIR shall provide and maintain throughout the term of this Agreement worker's
compensation, comprehensive general liability, contractual liability and comprehensive
automobile liability insurance at the following minimum limits:
10.2
a) Workers' compensation and employer's liability insurance with a limit of
$1,000,000 (or such higher limit as may be required by law), to provide for
payment to CAL -AIR's employees, and/or their dependents, employed on or in
connection with the Project Scope covered by this Agreement, of worker's
compensation benefits in accordance with applicable laws.
b) Commercial general liability insurance, all operations, including completed
operations, contractual and broad form comprehensive endorsement with combined
single limit of $1,000,000 each occurrence for bodily and/or personal injury,
including death and property damage.
This policy is to also include an Excess Liability Endorsement with combined
single limit of $2,000,000 each occurrence for bodily and/or personal injury
including death and property damage.
c) Primary Comprehensive Automobile Public Liability Insurance (including owned,
non -owned and hired automotive equipment), used in connection with CAL -AIR's
•
City of Seal Beach 3 Cal -Air, Inc.
•
•
•
•
operations, with a combined single limit for bodily injury or death and property
damage of $1,000,000 per accident or occurrence.
In the event any of the Project Scope hereunder is contracted to subcontractors by CAL -AIR,
CAL -AIR shall require its subcontractors to carry and maintain the same insurance as specified
above. The Customer shall be included as an additional named insured on all policies specified in
this section with the exception of the Worker' Compensation policy(ies).
The naming of the Customer as an additional named insured shall not obligate the Customer to pay
any premium on the policy(ies). Such insurance shall be primary insurance and shall contain a
severability of interest clause with respect to each insured. The "other insurance" clause of such
policies shall be modified, if necessary, to specify that any separate insurance maintained in force
by the Customer shall be considered excess insurance and shall not contribute with insurance
extended by CAL -AIR's and/or subcontractor's insurer(s) under this requirement.
If requested to do so by the Customer, CAL -AIR shall deliver to the Customer, a Certificate(s) of
Insurance completed by CAL -AIR and its subcontractor's insurance carrier or agent certifying that
minimum insurance coverage, as required above, is in effect and shall not be canceled or changed
until twenty (20) business days after written notice is given to CAL -AIR and The Customer.
CAL -AIR shall immediately notify The Customer upon receipt of any cancellation notice.
Section 11. Environmental Requirement
The Customer shall disclose all locations where asbestos, materials containing asbestos, pollutants,
hazardous wastes, hazardous materials or other contaminants (collectively "Hazardous Materials ") are
present and recognizes and agrees that, in connection with the installation and/or service or maintenance
of the equipment at the Premises, CAL -AIR may encounter, but shall not be responsible for
identification of or, any work relating to asbestos, materials containing asbestos, pollutants, hazardous
wastes, hazardous materials or other, or the storage, handling, use, transportation, treatment, disposal,
discharge, leakage, detection, removal, containment or clearance testing thereof. The Customer shall be
solely responsible for disposing of the Hazardous Materials in accordance with all federal, state and
local laws applicable thereto, unless otherwise agreed to in writing elsewhere, whether as part of this
Agreement or otherwise.
If CAL -AIR becomes aware of any additional Hazardous Materials that are not included in the Scope of
Work, it shall immediately notify the Customer about the presence of Hazardous Materials. The
Customer agrees to and does release, indemnify, defend and hold harmless CAL -AIR, its consultants, its
contractors, its partners and their officers, agents and employees of and from all costs, claim, damages
and liability arising out of or relating to Hazardous Materials, or third parties relating thereto, or injury
caused thereby, except for such costs, claims, damages or liability which are directly caused by the
willful misconduct and/or gross negligence of CAL -AIR.
Section 12. Events of Default
12.1 Events of Default by the Customer Each of the following shall constitute an event of default by
• the Customer:
City of Seal Beach 4 Cal -Air, Inc.
• •
a) Any failure by the Customer to pay CAL -AIR its compensation required in Section
4 of this Agreement for a period of more than twenty (20) business days after the
date of the invoice thereof and after a ten (10) business day cure notice;
b) Any representation or warranty furnished by the Customer in this Agreement which
was false or misleading in any material respect when made;
c) Failure by the Customer to perform its obligations under this Agreement;
d) Repeated failure of the Customer to perform its obligations in Section 5.
12.2 Events of Default by CAL -AIR Each of the following events shall constitute an event of default
by CAL-MR:
a) Any failure by CAL -AIR to credit or pay the Customer the amount required
pursuant to Schedule D of this Agreement for a period of more than twenty (20)
business days after the amount has been established;
b) Failure to perform by CAL -AIR its responsibilities pursuant to this Agreement;
c) Any representation or warranty furnished by CAL -AIR in this Agreement which
was false or misleading in any material respect when made.
• Section 13. Remedies Upon Default
13.1 Remedies Upon Default by the Customer In the event the Customer fails to pay CAL -AIR its
compensation when due or if any other event of default by the Customer occurs, CAL -AIR may
without an election of remedies:
a) Exercise all remedies available by law or at equity or other appropriate proceedings
including bringing an action or actions from time to time for recovery of amounts
due and unpaid by the Customer.
b) Subject to the notice requirement provided for below, take such action as is
reasonably necessary to cure the default.
The Customer agrees to pay all costs and expenses reasonably incurred by CAL -AIR to exercise
of any of its remedies (including reasonable attorney's fees). Notwithstanding anything in this
Section, in the event of default by the Customer other than a failure to pay CAL -AIR it's
compensation, the Customer shall have the right to cure such default for a period of twenty (20)
business days after written notice.
In the event the Customer fails to perform any other duty, covenant, or condition under this
Agreement after twenty (20) business days' notice, CAL -AIR may perform such duty at its
option and invoice the Customer for the cost incurred.
•
City of Seal Beach 5 Cal -Air, Inc.
• •
fra 13.2 Remedies Upon Default by CAL -AIR In the event of default by CAL -AIR, the Customer may
elect any and all remedies below:
a) Exercise all remedies available by law or at equity or other appropriate
proceedings, including an action for recovery of amounts due and unpaid by CAL -
AIR, and/or for specific performance, and/or for damages.
b) Subject to the notice requirement provided for below, take such action as is
reasonably necessary to cure the default.
CAL -AIR agrees to pay all costs and expenses reasonably incurred by the Customer to exercise
any of its remedies, including reasonable attorney's fees. Notwithstanding anything in this
Section, in the event of a default by CAL -AIR, CAL -AIR shall have the right to cure such default
for a period of twenty (20) business days after written notice.
In the event CAL -AIR fails to perform any other duty, covenant or condition under this Agreement after
twenty (20) business days' notice, The Customer may perform such duty at its option and invoice CAL -
AIR for the costs incurred.
Section 14. Compliance with Law and Standard Practices
CAL -AIR shall perform its obligations hereunder in compliance with any and all applicable federal,
0 state, and local laws, rules, and regulations, in accordance with sound engineering and safety practices
and in compliance with reasonable rules of the Customer (provided in writing to CAL -AIR) relative to
the Premises.
Section 15. Delegation by CAL -AIR
CAL -AIR shall have the right to retain or engage any person, firm or corporation to perform any of its
obligations hereunder, provided that CAL -AIR shall remain responsible for such performance and shall
give notice of any such employment to the Customer prior to the commencement of any work by such
person, firm or corporation.
Section 16. Taxes
CAL -AIR shall be responsible for and shall pay all applicable sales taxes related to the procurement and
installation of the equipment as referenced in Schedule B herein. The Customer shall be responsible for
and shall pay all applicable taxes related to operation of the Equipment, including, but not limited to,
property taxes.
Section 17. Usage of the Customer's Records
CAL -AIR shall have free access to the Customer's existing construction documents, equipment
submittals, operation and maintenance manuals, utility usage bills and records, other energy audits or
• studies and any other public utility records for periods of time as requested by CAL -AIR. CAL -AIR
City of Seal Beach 6 Cal -Air, Inc.
•
• •
may reproduce any such records for its use in connection with the Project. CAL -AIR shall bear all
reproduction costs associated with the reproduction of the Customer's records.
Section 18. Notices
All notices to be given by either Party to the other shall be in writing and must be delivered or mailed by
registered or certified mail, return receipt requested, or sent by a courier service which renders a receipt
upon delivery addressed as set forth below or such other addresses as either Party may hereinafter
designate by a Notice to the other. Notices are deemed delivered or given and become effective upon
mailing if mailed as aforesaid and upon actual receipt if otherwise delivered.
To CAL -AIR:
To the Customer:
CAL -AIR, INC.
Attn.: Alan Butcher, Regional Vice President
12393 Slauson Ave.
Whittier, CA 90606
City of Seal Beach
Attn: John Bahorski, City Manager
211 Eighth Street
Seal Beach, CA 90740
Section 19. Final Agreement
This Agreement, together with the schedules, exhibits and any subsequent modification, shall constitute
the full and final Agreement between the parties as to the subject matter hereof, shall supersede all prior
agreements, communications and understandings regarding the subject matter hereof, and may not be
amended or modified except by a writing evidencing said change or changes signed by the Parties. This
Agreement shall be binding on and inure to the benefit of the successors and permitted assigns of the
respective Parties.
THIS AGREEMENT SHALL BECOME BINDING WHEN EXECUTED BY CAL -AIR AND THE
CUSTOMER. Any inconsistency in this Agreement shall be resolved by giving precedence in the
following order: (I) Amendments to this Agreement, in reverse chronological order; (ii) this Agreement;
(iii) Schedules to this Agreement; (iv) General Terms and Conditions of this Agreement; and (v)
Exhibits to this Agreement.
•
City of Seal Beach 7 Cal -Air, Inc.
0 •
fiSection 20. Applicable Law
•
This Agreement and the construction and enforceability thereof shall be interpreted under the laws of the
State of California.
Section 21. Performance and Payment Bond
CAL -AIR shall carry Performance and Payment Bonding relative to this agreement's scope of work as
detailed in "Project Scope" (Schedule B) herein.
IN WITNESS WHEREOF, the Parties hereto subscribe their names to this instrument on the date first
written above.
WARNING: Contractors are required by law to be licensed and regulated by the Contractors'
State License Board which has jurisdiction to investigate complaints against Contractors if a
complaint is filed within three years of the date of the alleged violation. Any questions
concerning a Contractor may be referred tot he Registrar, Contractors' State License Board, P.
O. Box 26000, Sacramento, CA 95826. [California Business and Professions Code § 7030(a)]
CITY OF SEAL BEACH
CAL -AIR, INC.
John Bahorski, City Manager Alan Butcher, Regional Vice President
Date Date
•
City of Seal Beach 8 Cal -Air, Inc.