HomeMy WebLinkAboutCC AG PKT 2011-05-09 #G AGENDA STAFF REPORT DATE: May 9, 2011 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, Acting City Manager FROM: Sean P. Crumby, P.E., Director of Public Works SUBJECT: NOTICE OF COMPLETION FOR EISENHOWER PARK RESTROOMS REMODEL PROJECT NO PRO901 SUMMARY OF REQUEST: It is requested that the City Council adopt Resolution No. 6132 to formally accept completion of the Eisenhower Park Restrooms Remodel Project No PRO901, direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk- Recorder within ten (10) days from the date of acceptance, and to release retention in the amount of $6,925.71 in 35 days. • BACKGROUND AND ANALYSIS: On December 13, 2010, City Council awarded a contract to Unique Performance Construction for the Eisenhower Park Restrooms Remodel Project No. PRO901 in the amount of $60,600. The Eisenhower Park Restrooms Remodel Project involved replacement of the existing entrance doors and frames, upgrading the ventilation system, new light fixtures, wall painting, floor sealant, and other appurtenances. Several change orders were encountered on the project; all were requested by the City during construction. These include: adding door stops to keep the doors open during the day, changing out the door to the plumbing corridor, modifying the HVAC ducting during construction and bringing in temporary portable toilets to handle the demand during the warmer weather while the pier restrooms were out of service during construction. The contractor was successful in meeting the City's expectations, including fast - tracking the construction to have the restrooms open in time for the 5K/10K race weekend. The project is now complete with the satisfaction of the City Engineer and formal acceptance of the project is recommended. Agenda Item G Page 2 This project was completed on time. The project was inspected and it meets all standards and requirements within the project specifications. It is customary to formally accept the project and file a notice of completion with the Orange County Clerk. ENVIRONMENTAL IMPACT: This project has complied with all requirements of the California Environmental Quality Act (CEQA). FINANCIAL IMPACT: The project is funded through the 2002 Resources Bond Act Block Grants. The City received grant funds of $86,124 to cover the cost of design, construction and inspection and there is no City match requirement. The final cost to the contractor was $69,257.10 including all change orders. The final design and inspection cost was $20,279.93. This brings the entire project cost to $89,537.03. The $3,413.03 in additional expenses was paid out of the General Fund Building Maintenance - Contract Services account 001- 052 - 44000. RECOMMENDATION: It is recommended that the City Council adopt Resolution No. 6132 to formally accept completion of the Eisenhower Park Restrooms Remodel Project No PRO901, direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk- Recorder within ten (10) days from the date of acceptance and to release retention in the amount of $6,925.71 in 35 days. SUBMITTED BY: NOTED AND APPROVED: ,LU 6 0 Sean P. Crumby, P.E. ,V. . Ingram Director of Public Works Acting City Manager Prepared by: David Spitz, Associate Engineer Attachments: A. Resolution No. 6132 B. Notice of Completion RESOLUTION NUMBER 6132 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL DECLARING WORK TO BE COMPLETED PER CONTRACT DOCUMENTS FOR THE EISENHOWER PARK RESTROOMS REMODEL PROJECT NUMBER PRO901 WHEREAS, on December 13, 2010 the City of Seal Beach entered into a contract with Unique Performance Construction; and WHEREAS, the City Engineer has determined that the work has been substantially completed in accordance with the contract documents. NOW, THEREFORE, THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE: Section 1. That the work required to be performed by Unique Performance Construction has been completed. Section 2. That the total cost of amount to be paid to Unique Performance Construction is $69,257.10 for the work performed. Section 4. That the work is hereby accepted and approved. Section 5. It is further ordered that a "Notice of Completion" be filed on behalf of the City in the Office of the Orange County Recorder within 10 days of the date of this resolution. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 9th day of May , 2011 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6132 on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council at a regular meeting held on the 9th day of May , 2011. City Clerk RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Attn: City Clerk 211 - 8th Street Seal Beach, CA 90740 Space of above this line for Recorder's use. * ** No Recording Fee Pursuant to Government Code Section 6103, 27383 * * ** NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: 2. The full name of the owner is: City of Seal Beach. 3. The address of the owner is: 211 — 8th Street, Seal Beach, CA 90740. 4. The nature of the interest or estate of the owner is: In Fee. The City of Seal Beach. 5. A work of improvement on the property hereinafter is described as substantially completed on April 1, 2011. The work was Eisenhower Park Restrooms Remodel Project No PRO901 _ 6. The name of the contractor(s), if any, for such improvement was: Unique Performance Construction The date of the Contract Award was December 13, 2010. 7. The property on which said work of improvement was completed in the City of Seal Beach, County of Orange, State of California, and is described as follows: APM 199 - 103 -03. Date: Director of Public Works, City of Seal Beach Signature of owner or corporate officer of owner named in paragraph 2 or agent. VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have read said notice of completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury the foregoing is true and correct. Executed on , 2011, at Seal Beach, California. (Date of Signature) Director of Public Works, City of Seal Beach