Loading...
HomeMy WebLinkAboutCC AG PKT 2011-07-11 #LAGENDA STAFF REPORT DATE: July 11, 2011 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Sean P. Crumby, Acting Assistant City Manager /Public Works SUBJECT: NOTICE OF COMPLETION FOR 2011 ANNUAL CONCRETE REPAIR PROGRAM PROJECT NO. ST1107 SUMMARY OF REQUEST: It is requested that the City Council adopt Resolution No. 6163 to formally accept completion of the 2011 Annual Concrete Repair Program Project No ST1107, direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk- Recorder within ten (10) days from the date of acceptance, and to release retention in the amount of $11,969.50 in 35 days. BACKGROUND AND ANALYSIS: On March 14, 2011, City Council awarded a contract to Golden State Constructors, Inc. for the 2011 Annual Concrete Repair Program Project No. ST1107 in the amount of $107,970. The 2011 Annual Concrete Repair Program Project involved the repair of sidewalks, curb & gutter, driveways and installation of new access ramps. The access ramps are necessary to provide pedestrian access in accordance with the American Disability Act (ADA). In the attempt to rehabilitate all remaining asphalt patches, staff additionally identified several locations throughout the City to be included for repair. The majority of the asphalt patches have been eliminated with this project. The remaining asphalt patch locations, primarily in Old Town and Bridgeport areas, will be addressed with the upcoming 2012 Annual Concrete Repair Program Project. The contractor was successful in meeting the City's expectations, addressed resident concerns that occurred during construction, and completed the construction on time. The project was inspected and it meets all standards and requirements within the project specifications. Agenda Item L Page 2 The project is now complete with the satisfaction of the City Engineer and formal acceptance of the project is recommended. It is customary to formally accept the project and file a notice of completion with the Orange County Clerk. ENVIRONMENTAL IMPACT: This project has complied with all requirements of the California Environmental Quality Act (CEQA). FINANCIAL IMPACT: The 2010/11 Adopted Budget, General Fund in the amount of $200,000 was allocated for 2011 Annual Concrete Repair Program Project No. ST1107. On March 14, 2011, a contract was awarded to Golden State Constructors, Inc. in the amount of $107,970. During construction, staff identified additional locations to be repaired. These locations had asphalt patches, which increased the construction cost by $11,725. The total cost of amount paid to Golden State Constructors, Inc. for construction is $119,695 and $5,900 for inspection totaling to $125,595. RECOMMENDATION: It is recommended that the City Council adopt Resolution No. 6163 to formally accept completion of the 2011 Annual Concrete Repair Program Project No. ST1107, direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk- Recorder within ten (10) days from the date of acceptance, and to release retention in the amount of $11,969.50 in 35 days. SUBMITTED BY: Sean P. Crumby, Acting Assistant City Manager /Publi Works NOTED AND APPROVED: A !l:. ' • Mk .•- Prepared by: Cesar Rangel, Assistant Engineer Attachments: A. Resolution No. 6163 B. Notice of Completion RESOLUTION NUMBER 6163 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL DECLARING WORK TO BE COMPLETED PER CONTRACT DOCUMENTS FOR THE 2011 ANNUAL CONCRETE REPAIR PROGRAM PROJECT NO. ST1107 WHEREAS, on March 14, 2011 the City of Seal Beach entered into a contract with Golden State Constructors, Inc.; and WHEREAS, the City Engineer has determined that the work has been substantially completed in accordance with the contract documents. NOW, THEREFORE, THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE. Section 1. That the work required to be performed by Golden State Constructors has been completed. Section 2. That the total cost of amount to be paid to Golden State Constructors, Inc. is $119,695 for the work performed. Section 4. That the work is hereby accepted and approved. Section 5. It is further ordered that a "Notice of Completion" be filed on behalf of the City in the Office of the Orange County Recorder within 10 days of the date of this resolution. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 11th day of July , 2011 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members ATTEST: City Clerk Mayor STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6163 on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council at a regular meeting held on the 11th day of July , 2011. City Clerk RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Attn: City Clerk 211 - 8th Street Seal Beach, CA 90740 Space of above this line for Recorder's use. * ** No Recording Fee Pursuant to Government Code Section 6103, 27383 * * ** NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described. 2. The full name of the owner is: City of Seal Beach. 3. The address of the owner is: 211 — 8th Street, Seal Beach, CA 90740. 4. The nature of the interest or estate of the owner is: In Fee. The City of Seal Beach. 5. A work of improvement on the property hereinafter is described as substantially completed on June 27, 2011 The work was 2011 Annual Concrete Repair Program Project No ST1107. 6. The name of the contractor(s), if any, for such improvement was: Golden State Constructors, Inc The date of the Contract Award was March 14, 2011 7. The property on which said work of improvement was completed in the City of Seal Beach, County of Orange, State of California, and is described as follows: APM 199 - 103 -03, Date: Director of Public Works, City of Seal Beach Signature of owner or corporate officer of owner named in paragraph 2 or agent. VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have read said notice of completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury the foregoing is true and correct. Executed on , 2011, at Seal Beach, California. (Date of Signature) Director of Public Works, City of Seal Beach