Loading...
HomeMy WebLinkAboutCC AG PKT 2011-09-26 #J5 AGENDA STAFF REPORT�� s. - S �Y.gC�FORN�P .' DATE: September 26, 2011 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Sean P. Crumby P.E., Assistant City Manager /Public Works SUBJECT: LAMPSON AVENUE MEDIAN IMPROVEMENT PROJECT NO. ST1108 SUMMARY OF REQUEST It is requested that the City Council adopt Resolution No. 6188 awarding a contract for the Lampson Avenue Median Project No. ST1108 to All American Asphalt, Inc. in the amount of $1,131 ,131. (Federal Project No. RPSTPLE 5229 - 012) BACKGROUND AND ANALYSIS On September 27, 2010, OCTA approved the Transportation Enhancement 2010 Proposed List of Projects. The City was awarded grant funding for Lampson Avenue Median Improvement in the amount of $500,000. At the October 11, 2010 City Council meeting, Council approved plans and specifications for the Lampson Avenue Median Improvement Project and authorized staff to solicit for bids. The Lampson Avenue Median Improvement Project consists of constructing new medians with landscaping, irrigation and stamped concrete. In the approved FY 2011 -12 Budget, the Council approved $857,000 for this project, including $500,000 in grant funding and $357,000 of matching general funds. On August 30, 2011, three bids were received with the following results: RANK I CONTRACTOR "BASE BID "ALTERNATIVE BID DIFFERENCE 1 All American Asphalt $1,131,131.00 $1,200,131.00 $69,000.00 2 Excel Paving $1,247,915.00 $1,617,915.00 ! $370,000.00 3 Rancho Pacific Engineering $1,737,404.14 i $1,746,823.93 I $9,419.79 " Construction commencing after January 2012. Construction commencing after January 2014 to when the West County Connector Project is estimated to be completed. Agenda Item J The Alternative Bid was added to determine the additional cost for delaying the project to start after the West County Connector Project to minimize the construction impacts in and around College Park East. The grant requires that the City award a construction contract by September 30 but does not have a required completion date. Due to the significant cost increase, staff has recommended not to proceed with award of the alternative bid, but to award the lowest base bid and commence after January 2012. Per the grant, there are two stipulations related to this project: 1. The City must award a construction contract by September 30, 2011. 2. The grant is only $500,000 with no additional grant funds available. All American Asphalt (AAA) submitted the lowest bid of $1,131,131. AAA has successfully constructed numerous similar projects throughout Orange County and is currently constructing a similar median project on Seal Beach Boulevard. Thus, AAA is the lowest responsible bidder. Due to the amount of the lowest bid, a shortfall will exist between total project cost and approved funding. The total project cost with construction, inspection, testing, contingency and construction management is anticipated to be $1,357,000, thereby creating a shortfall of approximately $500,000. Staff's recommendation is to award construction to the lowest responsible bidder (All American Asphalt). Two other options are present for moving forward with the project. All three are outlined as follows: 1. AWARD THE CONTRACT Award the contract to the lowest responsible bidder, AAA at a contract price of $1,131,131. With all of the construction, inspection, testing, contingency and construction management, the total estimated cost is $1,357,000. The City is attempting to secure additional funding from either Caltrans or OCTA. Staff has already begun the process for requesting for additional funding. If additional funding is not secured, the City may reduce the scope of the project. Caltrans has indicated that the City may reduce the scope of the project to fall within the approved budgeted amount of $857,000 after it awards the contract to the lowest responsible bidder at the bid amount. The project may be reduced as follows: • Reduce the amount of landscaping, utilization of existing irrigation system, and the amount of soil replacement within the project for the entire project limits. • Reduce the linear feet of the project so that the entire project is within the area between Basswood Avenue and the Arbor Park Entry. Page 2 2. AWARD CONTRACT AND AMEND (INCREASE) BUDGET Award the contract to the lowest responsible bidder, AAA at a contract price of $1,131,131, and adopt a budget amendment to allocate additional City funds to the project. As noted above, with all of the construction, inspection, testing, contingency and construction management, the total estimated cost is $1,357,000. The City can proceed with constructing the entire project per the approved plans and augment the budget for the project. In order to proceed with construction, the project's budget will need to be augmented by approximately $500,000. Potential funding sources for augmenting the project's budget include Gas Tax, Measure M Turnback (Fair Share), Traffic Impact Fees, and General Fund. Currently there are no funds available in Gas Tax and Measure M turnback accounts. The Traffic Impact fees have a current unappropriated balance of approximately $179,000. 3. DELAY OF PROJECT The City of Seal Beach can reject all bids and advertise a reduced project. The California Transportation Commission (CTC) approved the project in March 2011, contingent on the City awarding a contract to a contractor within six months of the date of approval. It has been difficult to coordinate the construction of this project with the West County Connectors project, Seal Beach Boulevard Realignment project, Lampson Avenue Well Projects, and Elder Avenue Sewer Rehabilitation projects, all under construction at this time. In an attempt to mitigate the impacts on city residents, staff requested in July an extension from CTC of the deadline within which to award a contract. The CTC staff has agreed to place the item on the agenda for their upcoming meeting scheduled for the end of October 2011. Local Caltrans staff will be recommending approval of an extension for six months. If approved by the CTC, the City can assess its options without losing its federal funding. There is considerable risk to proceeding with this option however. If the City of Seal Beach rejects all bids and the CTC does not approve the request, the City will lose the grant for this project. Caltrans staff has indicated that, typically, the CTC will honor the local entity's request. However, there is no guarantee that the CTC will honor the request. ENVIRONMENTAL IMPACT In that the grant is for federal funds, the City was required to obtain California Environmental Quality Act (CEQA) and National Environmental Protection Act (NEPA) compliance. In December 2010, both CEQA and NEPA compliance documents were approved. Page 3 LEGAL ANALYSIS The City Attorney has prepared the draft contract and reviewed the staff report and approves as to form. FINANCIAL IMPACT In the approved FY 2011 -12 Budget the Council approved $857,000 for this project, including $500,000 of grant funds and $357,000 of general funds (matching contribution). If the Council adopts Option 2, staff will place a budget adjustment on a future agenda. RECOMMENDATION It is requested that the City Council adopt Resolution No. 6188 awarding a contract for the Lampson Avenue Median Project No. ST1108 to All American Asphalt, Inc. in the amount of $1,131,131. SUBMITTED BY: Sean P. Crumby, P.E. Assistant City Manager /Public orks NOTED AND APPROVED: I T A. Ingram.•- Prepared by: Michael Ho, City Engineer Attachments: A. Resolution No. 6188 B. Agreement C. All American Asphalt Bid Page 4 RESOLUTION NUMBER 6188 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL AWARDING A CONTRACT FOR CONSTRUCTION OF LAMPSON AVENUE MEDIAN IMPROVEMENT PROJECT NO. ST1108 RECITALS A. In November, 2010, the Orange County Transportation Authority ( "OCTA ") approved the Transportation Enhancement 2010 Proposed List of Projects and allocated $500,000 to the City of Seal Beach ( "City ") for Lampson Avenue Median Improvement Project No. ST1108 (the 'Project'). B. In reliance upon the grant, the City solicited bids for the Project. C. All American Asphalt submitted the lowest responsive bid. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE: Section 1. The City Council hereby awards a contract in the amount of $1,131,131 to All American Asphalt for Lampson Avenue Median Improvement Project No. ST1108. Section 2. The Council hereby authorizes and directs the City Manager to execute the contract for the Lampson Avenue Median Improvement Project No. ST1108. Section 3. The Council hereby authorizes and directs the City Manager to approve, execute and sign the Program Supplemental Agreement between the California Department of Transportation and the City and to do any and all things and take any and all actions and execute and deliver any and all agreements and other documents, which she may deem necessary or advisable for carrying out the purpose of this Resolution. PASSED, APPROVED AND ADOPTED by the Seal Beach City Council at a regular meeting held on the 26th day of September. 2011 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk Resolution Number 6188 STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6188 on file in the office of the City Clerk, passed, approved, and adopted by the City Council at a regular meeting held on the 26th day of September , 2011. City Clerk PUBLIC WORKS AGREEMENT FOR LAMPSON AVENUE MEDIAN IMPROVEMENT PROJECT CIP NO. ST1108 Federal Project No. RPSTPLE 5229 (012) between City of Seal Beach 211 - 8th Street Seal Beach, CA 90740 All American Asphalt 400 E. Sixth Street P.O. Box 2229 Corona, CA 92878 -2229 THIS AGREEMENT is made and entered into this 26 day of September, 2011, by and between the City of Seal Beach, a California charter city ( "City "), and All American Asphalt American Asphalt, a General Contractor ( "Contractor "). 1 of 10 S 7296- 020011391880v2.doc RECITALS A. WHEREAS, the City Council has approved the plans and specifications for the Lampson Avenue Median Improvement Project, CIP No. ST1108 ( "Project ") with respect to design criteria; and B. WHEREAS, Contractor has submitted a bid to City for the Project dated August 30, 2011 in the amount of $1,131,131.00, ( "Accepted Proposal" hereinafter). The Accepted Proposal is attached hereto as Exhibit G and contains, among other things, provisions defining the Project scope. NOW, THEREFORE, in consideration of performance by the parties of the mutual promises, covenants, and conditions herein contained, the parties hereto agree as follows: AGREEMENT 1. Contractor's Services 1.1 Scope and Level of Services For and in consideration of the mutual promises set forth herein, and subject to the terms and conditions set forth in this Agreement, Contractor shall perform and complete in good and workmanlike manner all work ( "Work ") required by this Agreement and the documents listed in Subsection 1.2 for the Project. 1.2 Contract Documents The "Contract Documents" that comprise the agreement between the City and the Contractor are the: Notice Inviting Bids, Instructions to Bidders, Accepted Proposal, Non - Collusion Affidavit, Bid Schedule(s), List of Subcontractors, Contractor's Industrial Safety Record, Contractor's Qualification Statement, Bid Security Forms for Check or Bond, Specifications, General and Special Provisions and documents referenced therein, all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any of said documents, this Agreement, Exhibits attached to this Agreement, including but not limited to the Performance Bond (Exhibit A), Payment Bond (Exhibit B), Workers' Compensation Insurance Certificate (Exhibit C), Insurance Endorsements (Exhibit D), Acknowledgment of Penal and Civil Penalties Concerning Contractor Licensing Laws (Exhibit E), Labor Law Requirements (Exhibit F), Accepted Proposal (Exhibit G) and any and all supplemental agreements executed amending or extending the Work contemplated and that may be required to complete the Work in a substantial and acceptable manner. These Contract Documents are hereby incorporated into this Agreement. 1.3 The Work shall be performed in accordance with the Plans, Specifications and other Contract Documents. Contractor shall furnish at its own expense all labor, materials, equipment and services necessary therefor, except such labor, materials, equipment and services as are specified in the Contract Documents to be furnished by City. 2of10 S7296- 0200 \139188M.doc 1.4 In the event of any material discrepancy between the express provisions of this Agreement and the provisions of the other Contract Documents, the provisions of this Agreement shall prevail. 2. Effective Date This Agreement is effective as of September 26, 2011 (the "Effective Date "), and shall remain in full force and effect until Contractor has rendered the services required by this Agreement or earlier terminated by the City. City shall have the absolute and sole discretion to terminate this Agreement at any time provided that City shall pay the Contractor for all work Contractor has satisfactorily performed up until the date of termination. 3. Force Majeure 3.1 Except as provided below, any prevention, delay or stoppage due to any of the events included in the definition of Force Majeure set forth in this paragraph, shall excuse the performance by such Party for a period equal to any such prevention, delay or stoppage. "Force Majeure" means any act of God, strike, war, lockout, labor trouble, or inability to secure materials, litigation (other than litigation initiated by the party claiming the Force Majeure delay), governmental action, or any other circumstance or event beyond a party's reasonable control. Additionally, as to City only, the term "Force Majeure" includes (i) any action by the United States of America (whether the executive branch, legislative branch or otherwise) or by the State of California (whether by the Governor, the Legislature, or otherwise) that materially affects City's revenue stream; (ii) any action by the State of California (whether by the Governor, the Legislature, or otherwise), by Orange County or the Orange County Transportation Authority that rescinds, disgorges, reduces or otherwise materially affects the funding for the Project; and (iii) the City's good faith re- allocation of funds, personnel, or both in response to any Force Majeure event. 3.2 Either Party encountering such Force Majeure delays shall send written notice thereof to the other Party no later than fifteen (15) days after the commencement of such Force Majeure delay. If the Party encountering such Force Majeure delay fails to send notice thereof to the other Party within fifteen (15) days after the commencement of such delay, then any alleged delay occurring more than fifteen (15) days prior to the date of such notice shall not be deemed to extend any time for performance set forth herein. 4. Payment For performing and completing the Work in accordance with the Contract Documents, City shall pay Contractor, in full compensation therefor, the amount of $1,131,131.00, subject to any additions and deletions pursuant to the terms of the Contract Documents. Said sum shall constitute payment in full for all work performed hereunder, including, without limitation, all labor, materials, equipment, tools and services used or incorporated in the Work, supervision, administration, overhead, expenses and any and all other things required, furnished or incurred for completion of the Work as specified in the Contract Documents. City shall make payments to Contractor on account of the contract sum at the time, in the manner, and upon the conditions specified in the Contract Documents. 3of10 S7296-0200\1 39188M.doc 5. Contractor's Personnel 5.1 All Work shall be performed by Contractor or under Contractor's direct supervision, and all personnel shall possess the qualifications, permits, and licenses required by state and local law and by the Notice Inviting Bids /Instructions to Bidders to perform such Services, including, without limitation, a City of Seal Beach business license as required by the Seal Beach Municipal Code. 5.2 Contractor shall be responsible for payment of all employees' wages and benefits, and shall comply with all requirements pertaining to employer's liability, workers' compensation, unemployment insurance, and Social Security. Contractor shall fully comply with the workers' compensation law regarding Contractor and Contractor's employees. 5.3 Contractor shall indemnify and hold harmless City and its elected officials, officers, employees, servants, designated volunteers, and agents serving as independent contractors in the role of city officials, from any and all liabilities, damages, claims, costs and expenses of any nature to the extent arising from Contractor's alleged violations of personnel practices. 5.4 Contractor is, and shall at all times remain as to City, a wholly independent contractor. Contractor shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Contractor or any of Contractor's employees, except as set forth in this Agreement. Contractor shall not, at any time, or in any manner, represent that it or any of its officers, agents, or employees are in any manner employees of City. Contractor shall pay all required taxes on amounts paid to Contractor under this Agreement, and indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the work performed pursuant to this Agreement. 5.5 City shall have the right to offset against the amount of any fees due to Contractor under this Agreement any amount due to City from Contractor as a result of Contractor's failure to promptly pay to City any reimbursement or indemnification arising under this Section 4. 6. Indemnification 6.1 Contractor's Duty Contractor shall defend, indemnify, and hold the City, its elected officials, officers, employees, volunteers, agents, and those City agents serving as independent contractors in the role of City officials (collectively "Indemnitees ") free and harmless from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, bid protests, stop notices, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever (individually, a "Claim," collectively, "Claims "), in any manner arising out of or incident to the performance of the Agreement, including without limitation, the payment of all 4of10 S7296- 0200 \1391880x2. doc consequential damages and attorneys' fees and other related costs and expenses. Further, Contractor shall appoint competent defense counsel, at Contractor's own cost, expense and risk, to defend any and all such suits, actions or other legal proceedings of every kind arising out of or incident to the performance of the Agreement that may be brought or instituted against Indemnitees. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit, action, or other legal proceeding arising out of or incident to the performance of the Agreement. Contractor shall reimburse the City and the other Indemnitees, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Contractor or Indemnitees. This indemnity shall apply to all Claims and liability regardless of whether any insurance policies are applicable. 6.2 Bid Protests In addition to its obligations pursuant to Section 5. 1, Contractor shall reimburse the City for all attorneys' fees and costs incurred by City in connection with, arising out of or incident to any bid protest. 6.3 City's Sole Negligence Nothing in Section 5.1 shall be construed to require Contractor to indemnify Indemnities for that portion of any Claim to the extent arising from the sole negligence or willful misconduct of the Indemnities. 6.4 Nonwaiver of Rights Indemnitees do not, and shall not, waive any rights that they may possess against Contractor because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. 6.5 Waiver of Right of Subrogation Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses, and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor. 6.6 Survival The provisions of this Section 5 shall survive the termination of the Agreement and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee's right to recover under this indemnity provision, and an entry of judgment against a Contractor shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provision. 7. Insurance 7.1 Liability Insurance Contractor shall procure and maintain in full force and effect for the duration of this Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the services hereunder by Contractor, and its agents, representatives, employees and subcontractors. The policy limits set forth below do not act as a limitation upon the amount of indemnification to be provided by Contractor. Contractor 5of10 S7296- 0200 \139188M.doc shall complete and execute the following documents attached as Exhibits. hereto and incorporated herein by this reference: 7.1.1 Exhibit D -1: Commercial General Liability. Additional Insured Endorsement - 7.1.2 Exhibit D -2 Automobile Liability. Additional Insured Endorsement - 7.1.3 Exhibit D -3: Additional Insured Endorsement. 7.2 Minimum Scope of Insurance Unless otherwise approved by City, coverage shall be at least as broad as: 7.2.1 Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001). 7.2.2 Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). 7.2.3 Insurance Services Office form number CG 20 10 11 85 (Ed. 11/85) covering Additional Insured — Owners, Lessees or Contactors (Form B). 7.2.4 Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. 7.3 Minimum Limits of Insurance Contractor shall maintain limits no less than: 7.3.1 General Liability $2,000,000 per occurrence and in the aggregate for bodily injury, personal injury and property damage. Commercial General Liability Insurance or other form with a general aggregate limit shall apply separately to this Agreement or the general limit shall be twice the required occurrence limit. 7.3.2 Automobile Liability $2,000,000 per occurrence for bodily injury and property damage. 7.3.3 Employer's Liability $1,000,000 per occurrence and in the aggregate for bodily injury or disease and Workers' Compensation Insurance in the amount required by law. 7.4 Deductibles and Self- Insured Retentions Contractor shall inform City of any deductibles or self- insured retentions except with respect to any professional liability insurance. 7.5 Other Insurance Provisions The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 6of10 S7296- 0200 \1391880x2. doc 7.5.1 City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of City officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Contractor; products and completed operations of Contractor; premises owned, occupied or used by Contractor; or automobiles owned, leased, hired or borrowed by Contractor. The coverage shall contain no limitations on the scope of protection afforded to City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials which are not also limitations applicable to the named insured. 7.5.2 For any claims related to this Agreement, Contractor's insurance coverage shall be primary insurance as respects City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of City officials. Any insurance or self - insurance maintained by City, their officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials shall be excess of Contractor's insurance and shall not contribute with it. 7.5.3 Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 7.5.4 Each insurance policy required by this Section 6 shall be endorsed to state that coverage shall not be canceled or materially modified except after 30 days prior written notice by first class mail has been given to City. 7.5.5 Each insurance policy, except for any professional liability policy, required by this Section 6 shall expressly waive the insurer's right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city or agency officials. 7.6 Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VIII unless waived in writing by City's Risk Manager. 7.7 Verification of Coverage All insurance coverages shall be confirmed by execution of endorsements on forms approved by the City. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before services commence. As an alternative to City forms, Contractor's insurer may provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications. 8. Liquidated Damages Should the Contractor fail to complete the project, or any part thereof, in the time agreed upon in the Contract, the Contractor shall reimburse the City for the additional expense and damage for each calendar day that the Contract remains uncompleted after the Contract completion date. It is agreed that 7of10 S7296-0200\1 391880Q. d oc the amount of such additional expense and damage incurred by reason of failure to complete the Contract is the per diem rate of $ 750 per calendar day. Such amount is hereby agreed upon as liquidated damages for the loss to the City resulting from the failure of the Contractor to complete the project within the allotted time and to the value of the operation of the works dependent thereon. It is expressly understood and agreed that this amount is a reasonable amount and is established in lieu of damages that are incapable of calculation at the inception hereof; and this amount is not to be considered in the nature of a penalty. The City shall have the right to deduct such damages from any amount due, or that may become due to the Contractor, or the amount of such damages shall be due and collectible from the Contractor or the Contractor's Surety. Progress payments made after the scheduled completion date shall not constitute a waiver of liquidated damages. 9. Suspension City may, in writing, order Contractor to suspend all or any part of the Contractor's Services for the convenience of City or for work stoppages beyond the control of City or Contractor. A suspension of the Services does not void this Agreement. 10. Notices Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Contractor's and City's regular business hours or by facsimile before or during Contractor's regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses heretofore set forth in the Agreement, or to such other addresses as the parties may, from time to time, designate in writing pursuant to the provisions of this Section. All notices shall be addressed as follows: If to City: City Clerk City of Seal Beach 211 -8th Street Seal Beach, California 90740 Telephone: (562) 431 -2527 Fax: (562) 493 -9857 With a copy to: Public Works Director City of Seal Beach 211 -8th Street Seal Beach, California 90740 If to Contractor: All American Asphalt 400 E. Sixth Street P.O. Box 2229 Corona, CA 92878 Telephone: (951) 736 -7600 Fax: (951) 736 -7646 Attn: Robert Bradley 8of10 S7296- 0200 \1391880Q.doc 11. Non - Assignability; Subcontractinq Contractor shall not assign, transfer, or subcontract any interest in this Agreement or the performance of any of Contractor's obligations hereunder. Any attempt by Contractor to so assign, transfer, or subcontract any rights, duties, or obligations arising hereunder shall be null, void and of no effect. 12. Compliance with Laws Contractor shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Contractor performs the Services. 13. Non - Waiver of Terms. Rights and Remedies Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by City of any payment to Contractor constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Contractor, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. 14. Attorneys' Fees In the event that either party to this Agreement shall commence any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action or proceeding shall be entitled to recover its costs of suit, including all attorneys' fees incurred in connection therewith. 15. Construction The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 16. Entire Agreement This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between Contractor and City. This Agreement supersedes all prior oral or written negotiations, representations, or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement. 17. Severability The invalidity in whole or in part of any provisions of this Agreement shall not void or affect the validity of the other provisions of this Agreement. 9of10 S7296- 0200 \1391880x2. doc IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above. CITY OF SEAL BEACH 0 Jill R. Ingram, City Manager CONTRACTOR: By: Name. Robert Bradley Title: Vice President . Attest: la Linda Devine, City Clerk Approved as to Form: 92 Quinn M. Barrow, City Attorney B Name: Mark Luer Title: Secretary S7296- 020011391880Q.doc EXHIBIT A FAITHFUL PERFORMANCE BOND EXHIBIT B PAYMENT BOND EXHIBIT C WORKERS' COMPENSATION INSURANCE CERTIFICATE EXHIBIT D -1 ADDITIONAL INSURED ENDORSEMENT (COMMERCIAL GENERAL LIABILITY) EXHIBIT D -2 ADDITIONAL INSURED ENDORSEMENT (AUTOMOBILE LIABILITY) EXHIBIT D -3 ADDITIONAL INSURED ENDORSEMENT EXHIBIT E ACKNOWLEDGMENT OF PENAL AND CIVIL PENALTIES CONCERNING CONTRACTOR LICENSING LAWS EXHIBIT F LABOR LAW REQUIREMENTS EXHIBIT G ACCEPTED PROPOSAL (NOTE: Exhibits will not be included with the contract at the time of award. The Contractor shall have 10 working days to submit all exhibits to the City after the award of contract. Failure to do so will result in voiding of the contract. The City will then have the right to cash the bid bond for the project and re- advertise for construction or award to the next lowest responsive bidder.) ADDENDUM NO. I Lampson Avenue Median Improvement Project Federal Project No. R.PSTPLB: 5229 (012) BID SHEET Item No, Quanti Unit Description complete and in place. per LS per Total (Fi t!Ee _ $) T fx) — Furnish new traffic control equipment and maintain, c rnpict and in lace o $ Z C) - (, j// f Figures per LS Total (Figures) $ 51 O a c) — I LS Surveying Constrr et 11 Staking, comp et nd In Lace, 1 0usard m i pa h un i j $ f I (o -- Words, per LS 0 O' igures per LS Total (Azures) $ 5. 3,000 CY rt t dol ar. Words, per CY G. 10,700 LF per LF Excavate AC Section, Base /Subgrade, complete and in place. Figures per CY Total (Figures) $ I I l i on — Construct Type AI -8 Median Curb including full depth AC, complete and hi place. $ 19 Figures per LF Total (Figures) $ 1 2 U 0 to • Page C - 3 Total (Figures) $ 5 3 Z 1 — I LS t lug, gi ebbing, complete and in place. - to> 44d �vl� $ jc� I boo Words, per LS Figures per LS Item No. Quallfit Unit Deswi �t� ion 7. 1,500 LF Construct 10" curb face curb, including full depth AC, . - -I- i i I r _ -^ complete and in place. _ 4i I b Words, per LF Figures per LF Total (Figures) $ 2 000 r S. 50 LF Sawcut, remove PCC and construct PCC curb and gutter, complete and in place. Vah4 61V11 S $ 39- ids, per LF Figures per LF Total (Figures) $ 10. 11550 (' �, � kll Words, per SF Pei- SF Total (Figures) $ jp g (q 2z - SaNvcut, remove PCC, replace with 4" sidewalk, complete and in p laco. .IV res per SF Page C »4 Total (Figures) $ ,5 — . If. 1. 23 BA Sawcut, remove PCC, replace with curb rimp, and Uistall ' �Wd bUSG�no� Sr eas m lace truncated domes, complete a 2. and in place. 06 $ 0(00 - Words, per LEA j Figures per HA Total (Figures) $ 12 1 LS Furnish and install traffic striping and pavement markers, G r ol�tplgt ad •n lace, O &r $10217— (� � W ords, per LS —� Figures per LS Total (Figures) $ 1 ) — _ / J Ac � --ftvk '` elech�ic pull box to grade, cot>� ! coin place. u� /! Woords, per EA Figures per BA Total (Figures) $ 2. S 0 O Page C »4 Item No, anti Unit Desgriotion ' +� 14. A 6100 Class "A" topsoil in median divider, complete and in place. ✓ a $ Words, per CY MIgures per CY 000 - per LS Total (Figures) $ 2 y ` g — ] 1 LS Landscape fulp ve 1e 1 s, complete and in place. a�9� lQf $ 1X5000 - Words, per DS Figures per LS Total (Figures) $J315000 — 17. 1 LS Post installa landscape and irrigation maintenance, lyW Dl�lsa/1 Gl SIX c te G� j a��� place ✓,r $ q u 00 - Words, per LS Figures per LS Total (Figures) $ to — 18. 50 TON Furnish and install 1" thick of Asphalt Rubber Hot Mix �� e ,• I� complete and in place. $ Words, P61. TON Fipres per TON Total (Figures) $ . oo 19. 7 SF i n iAJ_ aVI f Words, per SF 20. 1 LS :PV l II I'At Words, per LS Cold Plane I" thick of asphalt concrete, complete and in place. $ ' (0 Q Figures per SF Total (Figures) $ 51 " Report, implement and comply with the Construction General Permit and the City's NIMES permit, complete and in piaC0 � da' $ 52 - 1 I � Figures per LS Total (Figures) s Page C -5 Total (Figures) Item No. Q uanti Unit Descripfloi SF Amend Soil in the existing median d Words, per SF -� Figures per SF Total(Figures) $ 1 Total Biel Price (Ite ns #1 tlu� u li 21 m-K f t " 1 0'q o� u�tdee a o+u. t4s d o�c hu�rd�t'd � ;� o� lr�,f 1 1 l.o WORDS IP IGUPX , S Note: Contractor shall be aware of construction commencing after Jamiaiy 2412, ALTERNATIVE TOTAL BID PRICE Alternative Total Bid Price (Items #1 through 21) The City may elect in its sole discretion of delaying the commencement of construction after January 2014. Contractor shall adjust pricing to account For inflation, including but not limited to rising costs of labor, material, equipment and other construction market conditions (overhead and profit), mc. -tio do isr �q 000 WORDS FIGURES IN CASE OF DISCREPANCY BETWEEN WORDS AND FIGURES, THE WORDS 813ALL PREVAIL Page C -6