HomeMy WebLinkAboutCC AG PKT 2012-02-27 #JDATE: February 27, 2012
TO: Honorable Mayor and City Council
THRU: Jill R. Ingram, City Manager
FROM: Sean P. Crumby P.E., Assistant City Manager /Public Works
SUBJECT: DESIGN AGREEMENT AMENDMENT NO. 2 FOR
RIVER'S END STAGING AREA AND BIKEWAY
ENHANCEMENT PROJECT NO. BP0901.
SUMMARY OF REQUEST:
That the City Council adopt Resolution No. 6228 approving Amendment No. 2 to
Agreement to RBF Consulting for additional design, permitting, as- built, and
construction support services in the amount of $88,348.
BACKGROUND AND ANALYSIS:
AGENDA STAFF REPORT
At the November 11, 2007 City Council Meeting, Council authorized the City
Manager to sign an agreement with the Rivers and Mountains Conservancy
(RMC). This agreement provides $2,000,000 to the City to provide
enhancements to portions of the San Gabriel River trail system. Some of these
enhancements include; a new paved surface for the bike trail, new pavement for
the terminus of the River Trail at 1 Street and Ocean Avenue, seating, bike
racks, redesigned parking with new landscaping and lighting and restroom
upgrades. The majority of the grant funds are set to expire by the end of the
Fiscal Year 2011/2012.
At the October 13, 2008 City Council Meeting, Council authorized the City to
enter into an agreement with RBF Consulting for $240,032 to provide
construction drawings and specifications, environmental documentation and to
secure necessary permits.
At the September 26, 2011 City Council Meeting, Council approved Amendment
No. 1 authorizing an additional $31,620 to prepare a Coastal Commission Permit
application.
Agenda Item J
This agenda item request is for an additional $88,348 to the consultant, RBF for
the following services:
1. Additional design and redesign work for bathroom remodeling
2. Additional environmental clearance permitting work
3. Geotechnical investigations
4. Prepare final as -built plans
5. Construction support services which includes submittal review, site
meetings with contractors, design modifications due to changed field
conditions and technical support during construction
The above additional services are needed to redesign the plans to satisfy the
Coastal Commission permit requirement and lower the construction cost. The
awarded construction amount to the lowest bidder was $1,629,000. After award
of the construction contract, some items were deleted to remain within the
$2,000,000 budget and not impact the General Fund.
ENVIRONMENTAL IMPACT:
This project complies with all requirements of the California Environmental
Quality Act (CEQA). A Mitigated Negative Declaration document was prepared
for the project and approved under Resolution #6111 on February 14, 2011.
LEGAL ANALYSIS:
The City Attorney has reviewed and approved the City's standard Design
Professional Services Agreement.
FINANCIAL IMPACT:
This project is funded through the Water Security, Clean Drinking Water, Coastal
and Beach Protection Act of 2002 (Proposition 50) and administered to the City
by the RMC. The City was awarded grants funds of $2,000,000 for design,
construction, and inspection cost. There is no City match requirement.
This agenda item is requesting an additional $88,348 for the consultant, RBF. If
approved the estimated total project cost are as follows:
Design, Construction Management and permitting $360,000
Inspection $40,000
Construction $1,600,000
$2,000,000
The grant funds are sufficient to complete this project.
Page 2
RECOMMENDATION:
It is recommended that the City Council adopt Resolution No. 6228 approving
Amendment No. 2 to agreement with RBF Consulting for additional Coastal
Commission permitting submission requirements in the amount of $88,348.
SUBMITTED BY:
Sean P. Crumby, P.E.
Assistant City Manager /Publ c Works
Prepared by: David Spitz, Associate Engineer
Attachments:
A. Resolution No. 6228
B. RBF - Amendment No. 2
Page 3
NOTED AND APPROVED:
. Ingram, Cit ager
THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE:
SECTION 1. The City Council hereby approves that certain Amendment No. 2 to
the agreement between the City and RBF Consulting, dated October 13, 2008,
adding an additional $88,348 for additional design, permitting, as -built and
construction support services.
SECTION 2. The City Council hereby authorizes and directs the City Manager to
execute the amendment on behalf of the City.
SECTION 3. The City Clerk shall certify to the passage and adoption of this
resolution.
PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a
regular meeting held on the 27th day of February, 2012 by the following vote:
AYES: Council Members:
NOES: Council Members:
ABSENT: Council Members:
ABSTAIN: Council Members:
ATTEST:
City Clerk
STATE OF CALIFORNIA }
COUNTY OF ORANGE } SS
CITY OF SEAL BEACH }
I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the
foregoing resolution is the original copy of Resolution Number 6228 on file in
the office of the City Clerk, passed, approved, and adopted by the Seal Beach
City Council at a regular meeting held on the 27th day of February, 2011.
City Clerk
RESOLUTION NUMBER 6228
A RESOLUTION OF THE SEAL BEACH CITY COUNCIL
APPROVING AMENDMENT NO. 2 TO THE AGREEMENT WITH
RBF CONSULTING FOR PROFESSIONAL SERVICES FOR THE
RIVER'S END STAGING AREA & BIKEWAY ENHANCEMENT
PROJECT NO. BP0901
Mayor
AMENDMENT NO. 2 TO PROFESSIONAL SERVICES
AGREEMENT FOR SAN GABRIEL RIVER BIKEWAY &
RIVER'S END STAGING AREA IMPROVEMENTS
Between
City of Seal Beach
211 - 8th Street
Seal Beach, CA 90740
&
RBF Consulting
14725 Alton Parkway
Irvine, CA 92618
This Amendment No. 2 dated February 27, 2012, amends that certain agreement
( "Agreement ") between the City of Seal Beach, a California charter city ( "City ") and RBF
Consultant ( "Consultant ") dated October 13, 2008, as previously amended by
Amendment No. 1 dated September 26, 2011.
WHEREAS, City and Consultant entered into the Agreement on October 13,
2008 under which Consultant has provided professional services in connection with the
design and environmental review of the Rivers End Bikeway Improvements and Staging
Enhancement project ( "Project); and
WHEREAS, City and Consultant amended the Agreement on September 26,
2011 to provide for additional services necessitated by California Coastal Commission
conditions and requirements and to increase Consultant compensation by $31,621 to
compensate Consultant for such additional services (Amendment No. 1); and
WHEREAS, due to shortage of funding, the City has requested that Consultant
modify the Project; and
WHEREAS, the parties wish to further amend the Agreement to increase
Consultant compensation by $88,348 to compensate Consultant for such additional
services required in connection with modifying the Project.
NOW, THEREFORE and in consideration of the foregoing and of the mutual
covenants and promises herein set forth, the parties agree to amend the Agreement as
follows:
Section 1. Section 1.0 (Scope of Services) of the Agreement is hereby amended to
read as follows:
"1.0 Scope of Services
RECITALS
1.1. Consultant shall provide those services ( "Services ") set forth in the attached
Exhibit A.
1.2. Consultant shall provide those additional services ( "September 2011 Additional
Services ") set forth in the attached Exhibit B.
1.3. Consultant shall provide those additional services ( "February 2012 Additional
Services ") set forth in the attached Exhibit,C.
1.4. Consultant shall perform all services under this Agreement, as amended, in
accordance with the standard of care generally exercised by like professionals
under similar circumstances and in a manner reasonably satisfactory to the City.
1.5. In performing this Agreement, as amended, Consultant must comply with all
applicable provisions of federal, state, and local law.
1.6. Consultant will not be compensated for any work performed not specified in
Exhibits A -C unless the City authorizes such work in advance and in writing. The
City Manager may authorize payment for such work up to a cumulative maximum
of $10,000. Payment for additional work in excess of $10,000 requires prior City
Council authorization."
Section 2. Section 3.0 (Compensation) of the Agreement is hereby amended to read as
follows:
"3.0 Consultant's Compensation
3.1 City will pay Consultant in accordance with the fee schedule set forth in Exhibit A
for services. In no event will the City pay more than:
® $240,032.00 for the services identified in Exhibit A
o $31,621 for the additional services identified in Exhibit B
• $88,348 for the additional services identified in Exhibit C
3.2Any additional work authorized by the City pursuant to Section 1.6 will be
compensated in accordance with the rate schedule set forth in Exhibit A, Appendix
A."
Section 3. All other terms and provisions of the Agreement, as previously amended, shall
have full force and effect.
Section 4. The Council hereby authorizes the City Manager to execute on behalf of
the City Amendment No. 2 to the certain agreement dated October 13, 2008 between
the City and RBF Consulting as to the Project.
Section 5. The Council hereby directs the City Clerk to attach Amendments Nos. 1
and 2 and Exhibits B and C to the Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2
to be executed and attested by their proper officers thereunto:
CITY OF SEAL BEACH CONTRACTOR
Jill Ingram, City Manager President or Vice President
ATTEST:
Linda Devine, City Clerk Vice President or Secretary
APPROVED AS TO FORM:
Quinn M. Barrow, City Attorney
February 22, 2012 JN 10- 105896
Mr. David Spitz, P.E.
Associate Engineer
City of Seal Beach
City Hall — 211 Eighth Street
Seal Beach, CA 90740
Subject: Contract Amendment #2
Mr. Spitz:
Per your request, we are providing the following fee addendum to provide additional design services
for the San Gabriel River Bikeway and River's End Staging Area Improvements as described below:
Architectural Design Services
Initial Study /Mitigated Negative Declaration
Geotechnical Investigation
Pre - Construction Nesting Bird Clearance Survey
Storm Water Pollution Prevention Plan
Additional Construction Support
Additional As -Built Drawing Preparation
Please review to amend our current contract amount by a maximum additional $88,348.
Sincerely,
Je - y F = mini, PIfA #4514
Senior As ociate
RBF Consulting
H:\ pdata\ 101058961Admin \contrachAmendment No 2 RBF Scope.doc
CONSULTING
PLANNING • DESIGN • CONSTRUCTION
14725 Alton Parkway, Irvine, CA 92618 -2027 • P.O. Box 57057, Irvine, CA 92619 -7057 • 949.472.3505 • Fax 949.472.8373
Offices located throughout California, Arizona & Nevada • www.RBF.com