Loading...
HomeMy WebLinkAboutCC AG PKT 2012-10-22 #H95.1 AGENDA STAFF REPORT t DATE: October 22, 2012 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Sean P. Crumby P.E., Assistant City Manager /Public Works SUBJECT: AUTHORIZING APPLICATION FOR FUNDS THROUGH ORANGE COUNTY TRANSPORTATION AUTHORITY SUMMARY OF REQUEST: It is requested that the City Council adopt Resolution No. 6922 authorizing application for grant funds from Orange County Transportation Authority (OCTA) for the Regional Transportation Signal Synchronization Program. BACKGROUND AND ANALYSIS: OCTA has opened the 2013 Call for Projects through the Combined Transportation Funding Program (CTFP) funded by Measure M2. This CTFP has a funding opportunity for the Seal Beach related to the Regional Transportation Signal Synchronization Program. Staff identified a project to submit for this current Call for Projects. Project Details The project scope of work is to relocate the City's Traffic Management Center (TMC) located at the City Corporation Yard on Adolfo Lopez Drive to City Hall. The TMC controls all the traffic signals on Seal Beach Boulevard from the 1 -405 Freeway to Bolsa Avenue which is approximately 11,700 feet or almost 2.5 miles. The connectivity between all the traffic signals uses fiber optic cables. The fiber optic cables are then brought into the Corporation Yard on Adolfo Lopez Drive. The current TMC allows staff to monitor or change in real time. The TMC also allows staff to visually see in real time two signalized intersections on Seal Beach Blvd at, 1.Golden Rain and 2. Westminster Avenue. By relocating the existing TMC to City Hall, it will allow engineering staff to: 1. Monitor the traffic in real time, 2. Adjust signal timing as needed, 3. Upgrade the communications in field, and 4. Increase the bandwidth between City Hall, Corporation Yard and Police Department. The proposed project intends to fund the complete relocation of the TMC, add state of the art fiber optic cable from the Corporation Yard to City Hall by Agenda Item H underground cables and overhead where possible. In addition to the cabling, the project calls for an upgrade of the TMC with new monitors, computers, servers and other necessary appurtenances. The grant will also allow for future ongoing maintenance of the equipment, computers and monitoring of the entire system. Grant Details This 2013 Call for Projects is a competitive grant that the City of Seal Beach has successfully been awarded to in the past for other types of projects. Measure M2 funding is a great opportunity for Seal Beach to apply. The TMC Project staff intends to apply for a rough order of magnitude of $600,000. This grant requires a 20% match or $120,000 from the City. The project timeline is 12 months from the date of award. OCTA will notify Seal Beach approximately early 2013. Staff will have 12 months to substantially complete this project. Staff is dedicated to meet this vigorous schedule. ENVIRONMENTAL IMPACT: Submittal of the grant applications are not identified as a project within the California Environmental Quality Act (CEQA). If the projects move forward they will all comply with requirements of the California Environmental Quality Act (CEQA). Detailed information will be presented at the appropriate time. LEGAL ANALYSIS: No legal analysis is required for this item. FINANCIAL IMPACT: The Call for Projects requires a 20% minimum local match. The project total cost is $600,000 and the City's contribution is $120,000. Funds have not yet been budgeted for this project. Funding options will be presented if the grant is awarded to the City prior to moving forward with the project. RECOMMENDATION: It is recommended the City Council adopt Resolution No. 6922 authorizing application for grant funds from Orange County Transportation Authority (OCTA) for the Regional Transportation Signal Synchronization Program. SUBMITTED BY: Sean P. Crumby, E. Assistant City Manager/Puba Works NOTED AND APPROVED: C, R .�� Au Jil R. Ingram, Ci M pager Prepared by: Michael Ho, Deputy Director of PW /City Engineer Page 2 RESOLUTION NUMBER 6922 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL APPROVING THE SUBMITTAL OF TRAFFIC MANAGEMENT CENTER RELOCATION PROJECT TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY FOR FUNDING UNDER THE COMPETITIVE MEASURE M2 REGIONAL TRANSPORTATION SIGNAL SYNCHRONIZATION PROGRAM WHEREAS, the Measure M2 Regional Traffic Signal Synchronization Program targets over 2,000 signalized intersections across Orange County to maintain traffic signal synchronization, improve traffic flow, and reduce congestion across jurisdictions; and WHEREAS, the City of Seal Beach has been declared by the Orange County Transportation Authority to meet the eligibility requirements to receive revenues as part of Measure M2 ; and WHEREAS, the City of Seal Beach has a currently adopted a Local Signal Synchronization Plan consistent with the Regional Traffic Signal Synchronization Master Plan as a key component of local agencies' efforts to synchronizing traffic signals across local agencies' boundaries WHEREAS, the City of Seal Beach will provide matching funds for each project as required by the Orange County Comprehensive Transportation Funding Programs Procedures Manual; and WHEREAS, the City of Seal Beach will not use Measure M funds to supplant Developer Fees or other commitments; and WHEREAS, the City of Seal Beach desires to implement multi - jurisdictional signal synchronization listed below. THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE: Section 1. The City Council of the City of Seal Beach hereby requests the Orange County Transportation Authority allocate funds in the amounts specified in the City's application to said City from the Regional Transportation Signal Synchronization Program to implement regional signal synchronization throughout various streets within Seal Beach. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 22nd day of October 2012 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk Resolution Number 6922 STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6922 on file in the office of the City Clerk, passed, approved, and adopted by the City Council at a regular meeting held on the 22nd day of October 2012. City Clerk FY 2013 Call for Projects Regional Traffic Signal Synchronization Program Project P Supplemental Application Information Seal Beach TMC Relocation and Fiber Bridge Gap 10/12/2012 Agency: City of Seal Beach Contact Name: Michael Ho Contact Number: (562) 431 -2527 x1322 Contact Email: mho(a�sealbeachca.gov Project P Regional Traffic Signal Synchronization Program Application Checklist Project P Application Checklist Included RTSSP Online Application — submitted through OCFundTracker Online 1. Vehicle Miles Traveled 2. Benefic Cost Ratio 3. Project Characteristics 4. Transportation Significance 5. Maintenance of Effort 6. Project Scale 7. Number of Jurisdictions 8. Current Project Readiness 9. Funding Over -Match Section 1: Key technical information a. Project limits of the corridor to synchronize Pg. 2 -4 b. Designation of the corridor to synchronize: priority corridor, signal synchronization network corridor, or master plan of arterial highways corridor c. Project start date and end date, including any commitment to operate signal synchronization beyond the three year grant period d. Signalized intersections that are part of the project e. Traffic Forum members: None Section 2: Lead agency Pg. 4 Section 3: Resolutions of support from the project's Traffic Forum members Pg. 3 -4 Section 4: Preliminary plans for the proposed project by task (detail below) The plans shall include details about both phases of the project: Primary Implementation and the Ongoing Maintenance and Operation. The plan should be organized using the following setup. Primary Implementation shall include details about the following: Pg. 5 -6 a. Project Administration (required) b. Developing and implementing optimized signal synchronization timing (required) c. Producing a Before and After Study for the proposed project (required) d. Engineering design of signal system improvements (optional) e. System integration (optional) f. Proposed signal improvements (optional) g. Contingencies (optional) h. Construction management (optional) Ongoing Maintenance and Operation will begin after the Primary Implementation of the project is completed. It shall include details about the following: a. Monitoring and improving optimized signal timing (required) b. Communications and detection support (optional) c. Project final report (required) Section 5: Total proposed project cost by task Pg. 7 -8 Section 6: Project schedule for the 3 year grant period by task Pg. 8 Section 7: Matching funds Pg. 9 Section 8: Environmental clearances and other permits Pg. 10 Section 9: Calculations used to develop selection criteria inputs Pg. 10 -11 Section 10: Any additional information deemed relevant by the applicant Pg. 12 Appendices Pg. 12 Section 1: Key Technical Information a. The proposed project would relocate the City's current TMC from the City Corporation Yard (1776 Adolfo Lopez Drive) to City Hall (211 8th Street) and bridge the gap of approximately 3,000 lineal feet of fiber optic. Figure 1 shows a map of the project. aotsasatooaa —7 a: IF SAM wrsairrtosi [,wrs rira a.r.. c.n..aw.x� crs E?1y_i_Z _TTY r S;:. New TMC Location IHroposeci Project l Ne:., Fiber Optic 1PAtGMO 013.12 f itvarrawo�roW sawoa Legend 0 Traffic Management Center at City Yard 40 Seal Beach Traf a Signal Existing Fiber Optic Communications * Caltrans - i -rafric Signal Existing Copper (llardwire) Communications Scat Beach /Los Alamitos its :Model 170/2070 Traffic Signal Controller Shared Traffic Signal ccry CCTV Camera weenve Proposed Project New Fiber Optic 2013 Call for Projects RTSSP Figure 1: Signalized intersection and proposed project limits 2 1" Bets Av Proposed Project ERA& RINIAV'$ V Ih Vile•: Fiber Optic {.IYllq C�MIY 9 �• YMM Mn1[r C .oft. Gr 1PAtGMO 013.12 f itvarrawo�roW sawoa Legend 0 Traffic Management Center at City Yard 40 Seal Beach Traf a Signal Existing Fiber Optic Communications * Caltrans - i -rafric Signal Existing Copper (llardwire) Communications Scat Beach /Los Alamitos its :Model 170/2070 Traffic Signal Controller Shared Traffic Signal ccry CCTV Camera weenve Proposed Project New Fiber Optic 2013 Call for Projects RTSSP Figure 1: Signalized intersection and proposed project limits 2 b. Designation of the corridor to synchronize: ® Priority Corridor ❑ Signal Synchronization Network Corridor ❑Master Plan of Arterial Highways Corridor c. Project start date: within 12 months of award Project end date: within 18 months of award. All agencies commit to operate signal synchronization beyond the three year grant period for: ❑0 years ❑1 year ❑2 years ❑ 3 years ® Other The City is committed to operate for the life of the proposed system d. Below signalized intersections are part of the project: 1 Seal Beach Blvd @ Bolsa Avenue 15 Westminster Ave @ Apollo Dr 2 Seal Beach Blvd @ Heron Point 16 Westminster Ave @ Road B 3 Seal Beach Blvd @ Adolfo Lopez Drive 17 Westminster Ave @ Kitts Hwy 4 Seal Beach Blvd @ Apollo Drive 18 Seal Beach Blvd. @ Bradbury 5 Seal Beach Blvd @ Road C 6 Seal Beach Blvd @ Westminster 7 Seal Beach Blvd @ St. Andrews 8 Seal Beach Blvd @ Golden Rain Rd 9 Seal Beach Blvd @ 1 -405 SB on /off ramp 10 Seal Beach Blvd @ 1 -405 NB on /off ramp 11 Seal Beach Blvd @ Lampson Ave 12 Seal Beach Blvd @ St. Cloud 13 Seal Beach Blvd @ Towne Center Dr 14 Seal Beach Blvd @ Rossmoor Center Way e. Traffic Forum members: None Section 2: Lead Agency ® City of Seal Beach will be the lead agency ❑ OCTA agency is requested to be the lead ❑ County of Orange will be the lead agency Section 3: City of Seal Beach Resolution: See Next Page 3 RESOLUTION NUMBER 6922 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL APPROVING THE SUBMITTAL OF TRAFFIC MANAGEMENT CENTER RELOCATION PROJECT TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY FOR FUNDING UNDER THE COMPETITIVE MEASURE M2 REGIONAL TRANSPORTATION SIGNAL SYNCHRONIZATION PROGRAM WHEREAS, the Measure M2 Regional Traffic Signal Synchronization Program targets over 2,000 signalized intersections across Orange County to maintain traffic signal synchronization, improve traffic flow, and reduce congestion across jurisdictions; and WHEREAS, the City of Seal Beach has been declared by the Orange County Transportation Authority to meet the eligibility requirements to receive revenues as part of Measure M2 ; and WHEREAS, the City of Seal Beach has a currently adopted a Local Signal Synchronization Plan consistent with the Regional Traffic Signal Synchronization Master Plan as a key component of local agencies' efforts to synchronizing traffic signals across local agencies' boundaries WHEREAS, the City of Seal Beach will provide matching funds for each project as required by the Orange County Comprehensive Transportation Funding Programs Procedures Manual; and WHEREAS, the City of Seal Beach will not use Measure M funds to supplant Developer Fees or other commitments; and WHEREAS, the City of Seal Beach desires to implement multi - jurisdictional signal synchronization listed below. THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE: Section 1. The City Council of the City of Seal Beach hereby requests the Orange County Transportation Authority allocate funds in the amounts specified in the City's application to said City from the Regional Transportation Signal Synchronization Program to implement regional signal synchronization throughout various streets within Seal Beach. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 22nd day of October 2012 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6922 on file in the office of the City Clerk, passed, approved, and adopted by the City Council at a regular meeting held on the 22nd day of October 2012. City Clerk S Section 4: Preliminary Plans for the Project Primary Implementation a. Project Administration The City of Seal Beach will lead the project using a contractor to install the overhead and underground fiber optic cable between the Corporation Yard and City Hall. The contractor will also install fiber to bridge the gap between Golden Rain Road and 1 -405 NB on /off ramp. Once completed with the fiber install, Seal Beach will hire a systems integrator to relocate the TMC. Shortly after, Seal Beach will hire separate systems integrator for ongoing maintenance. Seal Beach internal staff will be solely responsible for the future ongoing maintenance of the TMC and all signal operations. b. Developing and implementing optimized signal synchronization timing (required) Synchronization will be the sole responsibility of Seal Beach. Staff has forecasted that when this project is complete, immediate timing changings will be required to facilitate nearby construction activities, AM Peak, PM Peak, Mid -day Peak and Weekend Peak. In 2009, Seal Beach was successful in a multi- jurisdictional effort in synchronizing all the traffic signals on Seal Beach Blvd /Los Alamitos Blvd from PCH to north Los Alamitos city limits. This grant request will further optimize the corridor. c. Producing a Before and After Study for the project (required) Seal Beach will prepare a before and after study to include the following topics: • Project description: To discuss the current TMC system and communications gaps. Inventory all physical equipment, and identify the needs. • Data collection: To collect traffic counts at major intersections and two various locations during different parts of the year. • List of TMC improvements • Recommendations • Conclusion: a summary of the before and after study and its findings. d. Engineering design of signal improvements for the project (recommended if not existing) The City of Seal Beach will use select through the City's RFP process an engineering firm to prepare plans to install the new fiber optics and /or upgrade cameras as needed. 6i e. System integration (optional) The City of Seal Beach will assume system integration costs. f. Proposed signal improvements (optional) With the results of the before study, it will identify if the existing cameras at two signalized intersections will need to be upgraded. Other signal improvements will be in the cabinets. g. Contingencies (optional) The City of Seal Beach will assume a 10% contingency for the installation of fiber optics. h. Construction management (optional) The City of Seal Beach will assume 15% for construction management for the installation of fiber optics. Ongoing Maintenance and Operation The ongoing maintenance and operation period will start after once the new TMC is relocated and live. The City will select a new contractor or consultant as the City's systems integrator to monitor and perform routine maintenance. Staff will continue to use its current traffic signal maintenance company for field operations and to maintain City's traffic signal equipment. a. Final report Seal Beach will prepare the final report for the project. This report will be completed after the three year grant period. In addition to the CTFP Guideline requirements, the report will include the before and after report and an update of the results from the ongoing maintenance and operations phase (general findings from the monthly drives, timing updates, detection support, etc.). 0 Section 5: Total Proposed Project Cost by Task Primary Implementation The Primary Implementation will last for one year and include the following elements (See Table 2). Table 2. Estimated Cost of Proposed TMC Relocation and Fiber Optic Bridge Gap a. Project Administration $20,000 b. Developing and Implementing Optimized Signal Synchronization Timing $72,000 c. Producing a Before and After Study for the proposed project $15,000 d. Engineering design of Signal Systems Improvements $100,000 Total 1 — Project Admin, Developing /Implement Timing, Final Report, and Engineering Design $207,000 e. System integration $50,000 f. Proposed Signal System Improvements Agency Location Description of Work at This Location Unit Price Unit Measure Total Seal Beach City Corporation Yard Decommission ex. TMC $30,000 LS $30,000 Seal Beach City Hall Construct new TMC $200,000 LS $200,000 Seal Beach Various Locations Construct new fiber optic $45 /LF 4,000LF $180,000 Seal Beach Various Locations Upgrade Field Equipment $4,000 /ea 18 $72,000 Subtotal: Estimated cost of "Proposed Signal System Improvements" (sum of above) $482,000 g. Contingency (up to 10% of the estimated costs of "Proposed Signal System Improvements ") $48,200 h. Construction management (uD to 15% of the estimated costs of "Proposed Signal System Improvements" for support and inspection costs $72,300 Total 2- Signal System Improvements, Construction Support/Inspection, and Contingency Costs $652,500 Totals 1 +2 $859,500 Please refer to Chapter 8 of the CTFP Guidelines for additional information about eligible and ineligible items as part of Project P. Examples of eligible signal synchronization improvements: new or upgraded detection, including inductive loops, video, and others; New or upgraded communication systems; Replacement of fiber optic or copper cabling; Software and hardware for system traffic control; Interconnect conduit; Intersection /field system modernization and replacement; Traffic signal controllers; Controller cabinets; CCTV, GPS, etc.; Minor signal improvements; Emergency vehicle preempt (signal equipment only); Transit signal priority (signal equipment only); Channelization improvements; Traffic signal phasing improvements; New or upgrades to existing Traffic Management Center (TMC) or Traffic Operations Center (TOC); Motorist information systems; and Adaptive traffic signal systems. 7 Ongoing Maintenance and Operation a. Monitoring and improving optimized signal timing Estimated Cost: $288,000 (see Table 3) b. Communications and detection support Estimated Cost: $57,60 0 (see Table 3) Table 3. Estimated Cost of Proposed Ongoing Maintenance and Operation for Seal Beach Blvd Description of Work Description Unit Unit Cost b. Developing and implementing optimized signal synchronization timing 3/13 Price Measure 3/13 Monitoring and Drive monthly and improve timing parameters along $500 per 24 signals $288,000 improving optimized 24 signals for 24 months after signal timing signal per for 24 9/14 signal timing 4/13 month months 12/13 Communications and Regularly monitor, maintain, and provide reports on $100 per 24 signals $57,600 detection support communication and detection issues along for 24 signal per for 24 signals for 24 months after signal timing is month months implemented City wide Project final report Project team will develop a final report for the project. Negligible Negligible $0 This report will be completed after the three year rant period. Proposed Ongoing Maintenance and Operation $345,600 Total Project Cost Including Primary Implementation and Ongoing Maintenance and Operation for Three Year Grant Period Total Estimated Cost: $1,205,100 (Table 2 + Table 3 = $859,500 +$345,600) Comments( if any): The number of signals include system wide and inter - jurisdictional connections to Caltrans and Los Alamitos. Section 6: Project Schedule by Task for the 3 Year Grant Period Project start date: March, 2013 Project end date: June, 2017 Primary Implementation Task Starting Date Ending Date a. Project Administration 3/13 3/16 b. Developing and implementing optimized signal synchronization timing 3/13 6/14 c. Producing a before and after stud 3/13 10/14 d. Engineering design of Signal Systems Improvement 3/13 12/13 e. System integration 8/14 11/14 f. Proposed Signal System Improvements, Construction Support/Inspection, and Contingency Costs 4/13 9/14 g. Contingency 4/13 11/14 h. Construction management 12/13 9/14 n Onaoina Maintenance and Operation Task Starting Date Ending Date a. Monitoring and improving optimized signal timing 6/14 6/17 b. Communications and detection support 6/14 6/17 c. Producing a Final Report 5/17 6/17 Section 7: Matching Funds Table 2 (Implementation): M2 Funds Requested $687,600 Phase Match Amount Amount of In -kind match amount Funding Source Cash match amount $171,900 Total Phase Cost $859,500 Table 3 (Ongoing Activities): M2 Funds Requested $276,480 Phase Match Amount Amount of In -kind match amount Funding Source Cash match amount $69,120 Total Phase Cost $345,600 Project Total: M2 Funds Requested $964,080 Total Match Amount (min 20 %) Amount of In -kind match amount (max 20 %) Funding Source Cash match amount $241,020 Total Project Cost $1,205,100 Total Match Ratio (to total project cost) $241,020 / $1,205,100 = 20% Details of Matching Funds Direct Cash Match - Amount of Agency Funding Source Phase Contribution Seal Beach CIP Primary $171,900 Implementation On -Going Seal Beach CIP Maintenance and $69,100 Operations TOTAL $241,020 In -kind match (Improvements of equipment) Specific Improvements (List items and Cost) A enc Improvement Phase Date of Construction Expenditure Hourly Rate Agency Position $0 Phase Hours ** (fully Total $0 Project 25,672 2.0 $0 On Westminster btw TOTAL $0 In -kind match Staffing commitment * *Note - Staff hours should not exceed staffing and reasonable dedicated time Section 8: Environmental clearances and other permits A categorical exemption will be obtained for this project upon project award. Section 9: Calculations used to Develop Selection Criteria Inputs 1. Vehicle Miles Traveled (VIVIT): Segment Staff Type of VMT = ADT *D No. of Hourly Rate Agency Position Service to Phase Hours ** (fully Total Project 25,672 2.0 burdened On Westminster btw Seal Beach Blvd & $0 WCL 26,998 0.83 22,408 On Los Alamitos Blvd $0 btw Bradbury & Rossmoor Wy $0 0.33 TOTAL $0 * *Note - Staff hours should not exceed staffing and reasonable dedicated time Section 8: Environmental clearances and other permits A categorical exemption will be obtained for this project upon project award. Section 9: Calculations used to Develop Selection Criteria Inputs 1. Vehicle Miles Traveled (VIVIT): Segment Current Average Distance (mi) VMT = ADT *D Daily Traffic On Westminster btw Seal Beach Blvd & Bolsa Chica 25,672 2.0 51,344 On Westminster btw Seal Beach Blvd & WCL 26,998 0.83 22,408 On Los Alamitos Blvd btw Bradbury & Rossmoor Wy 41,725 0.33 13,769 On SBB btw Bradbury & Rossmoor Center Wy 41,264 0.21 8,665 On SBB btw Rossmoor Center Wy & St Cloud 49,035 0.28 13,729 On SBB btw St Cloud & Lampson 47,751 0.17 8,117 10 On SBB btw Lampson Calculations and Estimated Points Criteria & 405 Fwy 48,527 0.28 13,587 On SBB btw 405 fwy & Vehicle Miles Traveled (VMT) (20 points) Golden Rain 43,951 0.61 26,810 On SBB btw Golden Calculation for VMT/Total Project Cost = 220,237/$1,205,100 =0.18 Rain & Westminster 40,270 0.56 22,551 On SBB btw Signal Coordination; Communications and detection support; New or 10 upgraded communication systems; Intersection /field system modernization Westminster & Bolsa and replacement 4. Ave 24,687 1.35 33,327 On SBB btw Bolsa & 5. Maintenance of Effort: (5 points) 5 PCH 17,960 0.33 5,926 Project Scale: (10 points) Total Project VMT 220,237 Source of current average daily traffic: Most recent corridor counts dated March 2012 11 Calculations and Estimated Points Criteria Estimated Points 1. Vehicle Miles Traveled (VMT) (20 points) VMT = 220,237 (See above Table) 15 2. Benefit Cost Ratio: (15 points) 0 Calculation for VMT/Total Project Cost = 220,237/$1,205,100 =0.18 3. Project Characteristics: (10 points) Signal Coordination; Communications and detection support; New or 10 upgraded communication systems; Intersection /field system modernization and replacement 4. Transportation Significance: (10 points) Priority corridor 10 5. Maintenance of Effort: (5 points) 5 0 years beyond 3 year grant period 6. Project Scale: (10 points) a. Number of signals / Project length (mi) = 18/6.95mi = 2.5sig /mi 7 b. Number of signals being synchronized/ Total number of corridor signals= 100% 7. Number of Jurisdictions: (20 points) OC Public Works, Caltrans, Los Alamitos & Seal Beach 16 8. Current Project Readiness (5 points) 5 Project start date: March 2013 9, Funding Match: (5 points) $241,020 / $1,205,100 = 20% 0 Total Points 68 11 Section 10: Include any additional information or documentation deemed relevant by the applicant Project Summary ® All guidelines were met for this project ❑ Not all qualifications were met, provide an explanation below of why the guidelines were not met for this project. 12