SUMMARY OF REQUEST:
It is requested that the City Council adopt Resolution No. 6351 accepting the
Environmental Cleanup Program Project by United Storm Water, Inc. in the
amount of $14,228.26, and direct the City Clerk to file a "Notice of Completion"
with the Orange County Clerk-Recorder within ten (10) days from the date of
acceptance and release retention in 35 days.
BACKGROUND AND ANALYSIS:
The Environmental Cleanup, Tier I Grant Program (ECP Tier 1) is a grant that is
offered by the Orange County Transportation Authority (OCTA) as part of the
Measure M program that provides grant funds to local agencies to improve
overall water quality in Orange County from transportation-generated pollution.
Projects eligible for ECP Tier 1 include equipment purchases and upgrades to
existing catch basins and related best management practices such as screens,
filters, inserts and other street-scale low flow diversion projects.
The ECP Tier 1 allows local agencies to utilize the County of Orange's Vendor
Master Agreements, which allows the City to take advantage of inclusive and
competitive pricing for equipment and installation. The vendors that were
selected through the County's request include Bio Clean Environmental Services,
Inc., United Storm Water, Inc., and West Coast Storm.
On June 11, 2012, City Council authorized an application for grant funds under
the ECP Tier 1 and selected United Storm Water, Inc. to install the DrainPacs
(filter inserts) at various citywide locations.
On August 13, 2012, OCTA Board approved the ECP Tier 1 and the City was
awarded grant funding in the amount of$10,700.
Agenda Item E
Based upon the specific grant criteria, the project consisted of installing forty-
eight (48) DrainPacs at various citywide catch basin locations. These locations
were identified as being potential contributors of litter, debris, and other pollutants
which could enter into the City's storm drain system and drain to the ocean.
DrainPacs capture and treat urban runoff before entering the municipal storm
drain system. Currently, 90% of the City's catch basins have DrainPacs installed
by United Storm Water, Inc. Our in house maintenance crews clean and
maintain these devices.
The project is now complete to the satisfaction of the City Engineer. The project
was inspected and it meets all standards and requirements within the project
specifications. It is required to formally accept the project and 'file a notice of
completion with the Orange County Clerk.
ENVIRONMENTAL IMPACT:
This project has corriplied with the California Environmental Quality Act.
LEGAL ANALYSIS:
The City Attorney has review and approved as to form.
FINANCIAL IMPACT:
The ECP Tier 1 requires a 25% minimum local match. OCTA awarded the City
$10,700 of grant funds, the City's contribution is $3,600 totaling to $14,300. This
project will use account number 001-043-44000 to pay the City's contribution of
$3,600. The total cost paid to United Storm Water, Inc. for construction is
$14,228.26.
RECOMMENDATION:
It is recommended that the City Council adopt Resolution No. 6351 accepting the
Environmental Cleanup Program Project by United Storm Water, Inc. in the
amount of $14,228.26, and direct the City Clerk to file a "Notice of Completion"
with the Orange County Clerk-Recorder within ten (10) days from the date of
acceptance and release retention in 35 days.
SUBMITTED BY: NOTED AND APPROVED:
Sean P. Crumby, *ill . ram, Ci Man ger
Assistant City Manager/Di ctor
Prepared by: Cesar Rangel, Assistant Engineer
Page 2
RESOLUTION NUMBER
A RESOLUTION Of THE SEAL BEACH CITY COUNCIL
DECLARING WORK TO BE COMPLETED PER CONTRACT
DOCUMENTS FOR ENVIRONMENTAL CLEANUP PROGRAM
PROJECT
WHEREAS, on June 11. 2012 the City ofSeal Beach selected United Storm
Water, Inc. to install the DnainPaoa (filter inserts) at various citywide locations.;
and
WHEREAS, the {]h/ Engineer has determined that the work has been
substantially completed in accordance with the contract documents.
NDVV. THEREFORE, THE SEAL BEACH CITY COUNCIL DOES HEREBY
RESOLVE:
Section 1. That the work required to be pedbonmd by United Storm VVnher.
Inc. has been completed and accepted.
Section 2. That the total cost of amount tm be paid to United Storm Water, Inc.
io$14.228.20 for the work performed.
Section 3. That a ^NoUoa of Completion" be D|od on behalf ofthe City in the
Office of the Orange County Recorder within 10 days of the doha of
this resolution.
PASSED. APPROVED and ADOPTED by the Seal Beach City Council at o
regular meeting held on the_1 1th_day of1February . 2O13by the following vote:
AYES: Council Members
NOES: Council Members
ABSENT: Council Members
ABSTAIN: Council Members
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA }
COUNTY OF ORANGE GG
CITY OF SEAL BEACH �
|. Linde Dmwine, City Clerk of the City of Sme| Beauh, do hereby certify that the
foregoing resolution in the original copy of Resolution Number _6D51_on file in
the office of the City C|erk, paooed, approved, and adopted by the 8eo| Beach
City Council ata regular meeting held on the_11th_dayof_February__. 2U13.
City Clerk
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO
CITY OF SEAL BEACH
Attn: City Clerk
211 - 8th Street
Seal Beach, CA 90740
Space of above this line for Recorder's use.
No Recording Fee Pursuant to Government Code Section 6103, 27383
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion.
Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated
below in the property hereinafter described:
2. The full name of the owner is: City of Seal Beach.
3. The address of the owner is'. 211 —8th Street, Seal Beach, CA 907404
4. The nature of the interest or estate of the owner is: In Fee. The City of Seal Beach.
5. A work of improvement on the property hereinafter is described as substantially completed on
January 18, 2013. The work was Environmental Cleanup Program Project (Filter Inserts
Installation).
6. The name of the contractor(s), if any, for such improvement was: United Storm Water, Inc.
The date of the Contract Award was June 11, 2012.
7. The property on which said work of improvement was completed in the City of Seal Beach,
County of Orange, State of California, and is described as follows: Citywide, City of Seal
Beach.
Date:
Director of Public Works, City of Seal Beach
Signature of owner or corporate officer of owner
named in paragraph 2 or agent.
VERIFICATION
1, the undersigned, say: the Director of Public Works declarant of the foregoing notice of
completion; have read said notice of completion and know the contents thereof; the same is true
of my own knowledge.
I declare under penalty of perjury the foregoing is true and correct.
Executed on 2013, at Seal Beach, California.