Loading...
HomeMy WebLinkAboutCC AG PKT 2013-06-24 #J ..srZ*,�, AGENDA STAFF REPORT r- DATE: June 24, 2013 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Sean P. Crumby, Director of Public Works SUBJECT: AWARD A CONTRACT FOR (1) CITY HALL ADA REMODEL PROJECT BG1204 AND (2) MARINE SAFETY BUILDING IMPROVEMENT PROJECT BG1201 SUMMARY OF REQUEST: It is requested that the City Council adopt Resolution No. 6385 for (1) City Hall ADA Remodel Project BG1204 and (2) Marine Safety Building Project BG1201 with the following actions: 1. Approve the plans and specifications; 2. Award a construction contract to Ramco General Engineering Contractors for $60,000 for City Hall ADA Remodel Project BG1204 and $30,475 for Marine Safety Building Project BG1201; 3. Authorize the City Manager to execute the contract on behalf of the City and approve contract changes not to exceed $9,000; 4. Authorize award of bid for furniture to Corporate Business Interiors for $43,882.39; 5. Authorize award of bid for locker purchase to McMurray Stern for $38,745; and 6. Authorize $9,000 for inspection services by Casulas Construction Services. BACKGROUND AND ANALYSIS: The FY 2012/13 Budget has funding for the City Hall Remodel Project BG1204 and Marine Safety Building Improvements Project 1201 for $200,000 and $25,000 respectively. City Hall Remodel Project BG1204 GPA Architects prepared plans, specifications and an estimate for the City Hall Remodel Project. GPA evaluated the project and prepared recommendations to bring City Hall into compliance with the Americans with Disabilities Act (ADA), specifically with respect to the public counters on the 1s' and 2nd -Floor, and Agenda Item i installing security access improvements within the building. The ADA improvements include addition of one ADA counter at the Finance Department and a second at the Recreation Department. The layout of the Finance Department is not ADA compliant and requires reconfiguration of the area. The existing furniture could not be modified to accommodate the changes to the configuration, and will need to be replaced. The existing furniture will be recycled and used by other departments within the City. Corporate Business Interiors has provided a quote based on the California Multiple Award Schedules (CMAS). CMAS offers a wide variety of commodities, non-IT services and information technology products and services at prices which have been assessed to be fair, reasonable and competitive. The City is not required to advertise for bids for the furniture because: (1) the City is a charter city; and (2) the quotes on the CMAS list are the product of statewide competitive bidding. The scope of work includes: A. Adding ADA access to the public counters on the 1St floor and 2nd floor of City Hall; B. Remodeling the 1 st floor to accommodate the new ADA counter; C. New cubical furniture; D. Security Improvements to the City Manager's Department; E. New security door entrance; and F. Fire safety improvements. The City advertised for bids on May 2nd and May 9th. On June 6, 2013, the City Clerk's office received and publicly opened one bid from Ramco General Engineering Contractors for $60,000 for the City Hall Remodel Project BG1204. References were checked for Ramco and it has successfully completed projects similar in scope to this project. Marine Safety Building Improvement Project BG1201 D. Michael Hamner Architects (DMHA) prepared plans, specifications and cost estimate to improve interior and exterior items at the Marine Safety Building. During the design process, the lifeguards indicated the existing locker facilities were failing. Due to the salt water and marine environment, many of the particle board lockers were deteriorating and were determined to be replaced with appropriate lockers for this environment. The proposed new lockers are from the same manufacturer, McMurray Stern, as the ones located in Police Department. The scope of work includes: A. Replace exterior flashing to the building; B. Replace doorway; and C. Replace lockers and carpet. The City advertised for bids on May 23 and May 30 for the Marine Safety Building Project BG1201. At the bid opening on June 13, 2013, the City Clerk's office did not receive any bids for Project BG1201. Pursuant to its authority as a charter city, the City requested that Ramco submit a proposal to construct improvements at the Marine Safety Building per the plans in BG1201. Ramco Page 2 submitted a proposal for $30,475 which is in line with the engineer's estimate of $32,000. The proposed agreement for Council consideration combines both projects to efficiently deliver the City Hall Remodel and Marine Safety Building projects. The lockers are a sole source product with a specified vendor, McMurray Stern. McMurray Stern is the current vendor for the lockers in the Police Department and is on an on-call contract for maintenance and repairs. It is more economical to keep the same vendor for on-going repairs and maintenance at both facilities. Pursuant to City Charter Section 1010, the City Council may determine 'that, in its opinion, Project BG1201, including the purchase of the lockers, may be done more economically on the open market. ENVIRONMENTAL IMPACT: Staff has determined that the project is categorically exempt From review under California Environmental Quality Act ("CEQA") pursuant to Section 15301 of the State CEQA Guidelines, which exempts the minor alteration of existing public structures such as the proposed remodeling of City Hall and Marine Safety Building. LEGAL ANALYSIS: The City Attorney has reviewed and approved as to form. FINANCIAL IMPACT: In the approved FY 2012/13 Budget, two projects have been approved as follows: Project Budget City Hall Remodel Project BG1204 $200,000.00 Marine Safe Building Improvements Proip_ct_BG1201 Total $225,000.00 The projects are being funded from the General Fund Building Assigned Fund. A breakdown of the expenses for the two projects are as follows: City Hall Remodel Project BG1 204 Design — GPA Architects $24,000.00 Furniture—Corporate Business Interiors $43,882.39 Construction Contract—Ramco $60,000.00 Contingency(10%) $6,000.00 Inspection $7,000.00 BG 1204 Total $140,882.39 Page 3 Marine Safety Building Improvements Project BG1201 Design - DMHA $3,650.00 Procurement of Lockers— McMurray Stern $38,745.00 Construction Contract— Ramco $30,475.00 Contingency (10%) $3,000.00 Inspection $2.000.00 BG1201 Total $77,870.00 Total Cost $218,752.39 RECOMMENDATION: That the City Council adopt Resolution No. 6385 awarding multiple contracts for the City Hall ADA Remodel Project BG1204 and Marine Safety Building Project BG1201 with the following actions: 1. Approve the plans and specifications; 2. Award a construction contract to Ramco General Engineering Contractors for $60,000 for City Hall ADA Remodel Project BG1204 and $30,475 for Marine Safety Building Project BG1201; 3. Authorize the City Manager to execute the contract on behalf of the City and approve contract changes not to exceed $9,000; 4. Authorize award of bid for furniture to Corporate Business Interiors for $43,882.39; 5. Authorize award of bid for locker purchase to McMurray Stern for $38,745; and 6. Authorize $9,000 for inspection services by Casulas Construction Services. SUBMIT-FED BY: NOTED AND APPROVED: ( 2 � . Sean P. Crun-iby, .E. ill . Ingram, Cit M nager Director of Public Work Prepared by: Michael Ho, Deputy DPW/City Engineer Attachments: A. Resolution No. 6385 B. Construction Agreement Ramco C. Furniture Proposal —Corporate Business Interiors D. Locker Proposal— McMurray Stern Page 4 ATTACHMENT A RESOLUTION NUMBER A RESOLUTION OF THE SEAL BEACH CITY COUNCIL AWARDING A CONTRACT FOR CITY HALL REMODEL PROJECTBG1204 AND MARINE SAFETY BUILDING PROJECT BG1201 THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE, FIND AND DETERMINE AGFOLLOWS: Section 1. In its assessment ofthe condition of City owned propady. City staff determined that City Ho|| and the yWahn* Safety Building needed improvements. Accordingly, in the City Budget for FY 2012/13, the City Council allocated funding for"City Hall Remodel Project No. BG1204"and "Marine Safety Building Improvements Project No. BGi201.^ Section 2. GPA Architects prepared plans, specifications and an estimate for City Hall Remodel Project No. BG1204. GP4eva|uotad the project and prepared recommendations based upon bringing City Hall into compliance with the Americans with Disabilities Act (A[V\) and installing security improvements within the building. ThmADA improvements include addition of one AOA counter mt the Finance Department and a second counter atthe Parks and Recreation Department, reconfiguring the layout of the finance depodmant, and replacing existing furniture to accommodate the changes to the configuration. The scope of work includes: A. Adding A0A aouomm to the public counters on the 1 s floor and 2nd floor of City Hall; B. Remodeling the 1st floor Vz accommodate the new widen ADA counter; O. Installing cubical furniture; D. Installing security improvements bz the City Manager's Department; E. Installing a security door entrance; and F. Installing fire safety improvements, SectioDl3. In connection with Marine Safety Building Improvement Project No. B81201, K4iohao| Hamner Architects (DN1HA) prepared p|enn, specifications and cost eoUmabao to improve interior and exterior items at the Marine Safety Building. During the design process, the lifeguards indicated the existing lockers facilities are failing. Due to the salt water and marine environmont, many of the particle board lockers were deteriorating and were determined tnbe replaced with typical lockers for this environment. The scope of work includes: A. Replacing exterior flashing to the building; B. Replacing the doorway; and C. Replacing lockers and carpet. Section 4. The City Council hereby approves the plans and specifications for City Hall ADA Remodel Project Nn. BS1204 and Marine Safety Building Project No. DG1201. Resolution Number 6385 Section 5. The City advertised for bids on May 2 and May 9, 2013 for City Hall Remodel Project No. BG1204. On June 6, 2013 the City Clerk's office received and publicly opened all bids received on the project. The City received a bid from Ramco General Engineering Contractors ("Ramco") for $60,000 for the project. Thus, Ramco is the lowest responsive bidder. Staff checked references for Ramco and found out that Ramco has successfully completed projects similar in scope to this project. For the new furniture, the City obtained a quote from Corporate Business Interiors ("CBI") based on the California Multiple Award Schedules(CMAS). CMAS offers a wide variety of commodities, services and information technology products, and services at prices which the state of California has assessed to be fair, reasonable and competitive. The quotes on the CMAS, including CBI's quote of $43,882.39, are the product of statewide competitive bidding. Section 6. The City advertised for bids on May 23 and May 30,2013 for Marine Safety Building Project No. BG1201. At the bid opening on June 13, 2013, the City Clerk's office did not receive any bids for the Project. City staff requested that Ramco, the lowest bidder on the City Hall Remodel Project No. BG1204, submit a proposal. In that Ramco will be at City Hall on that project, the City could receive the benefit of reduced costs for a number of reasons. Ramco submitted a proposal for $30,475. In addition, the City received a bid for the lockers from McMurray Stern for$38,745. McMurray Stern is the current vendor for the lockers in the Police Department and is on an on-call contract for maintenance and repairs. It is more economical to contract with the same vendor for on-going repairs and maintenance at both facilities. Section 7. City Charter Section 1010 provides that the City Council may let contracts without advertising for bids or where no bids are received provided it makes certain findings. With respect to the contracts with CBI and McMurray Stern, the City Council hereby declares and determines that the City Hall furniture and Marine Safety Building lockers may be purchased more economically on the open market. Further, in view of the absence of bids, the City Council hereby declares and determines that contracting with Ramco to complete the improvements for Marine Safety Building Project No. BG1201 is more economical and efficient than re-advertising for bids. Section 8. Based upon the foregoing, the City Council hereby: A. Awards a construction contract to Ramco in the amount of $90,475.00 for City Hall Remodel Project No. BG1204 and Marine Safety Building Project No. 1201; B. Authorizes and directs the City Manager to purchase furniture from CBI at the cost of$43,882.39; C. Authorizes and directs the City Manager to purchase lockers from McMurray Stern at the cost of$38,745.00; and D. Authorizes and directs the City Manager to execute all necessary agreements, contracts and purchase orders. (Intentionally Left Blank) Resolution Number S385 PASSED, APPROVED AND ADOPTED by the Seal Beach City Council at a regular meeting held on the 24th day of June ,2013 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk STATE OFCALIFORNIA � COUNTY OFORANGE } SS CITY OF SEAL BEACH } |. Linda Devine, City Clerk of the City of Sco| Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number_{3KB5 _on file in the office of the City Clerk, passed, approved, and adopted bythe City Council at a regular meeting held on the 24th L day uf_ JunUe . 2013. City Clerk ATTACHMENT B PUBLIC WORKS AGREEMENT City Hall Remodel and urine Safety Building CIP NO. BG 1204 & BG 1201 between SEAL Qarl 9�y o g yCFBFq y QUMTY, City of Seal Beach 211 - 8th Street Seal Beach, CA 90740 Ramco General Engineering Contractors 14545 Dale Road Agua Dulce, CA 91390 (818) 272-4221 THIS AGREEMENT is made as of June 24, 2413, by and between the City of Seal Beach, a California charter city ("City"), and Ramco General Engineer Contractor, a General Contractor ("Contractor"). RECITALS A. WHEREAS, the City Council has approved the plans and specifications for the City Hall Remodel Project No. BG1204 and Marine Safety Building Project No. BG1201 ("Project") with respect to design criteria; and B. WHEREAS, Contractor has submitted a bid for the Project dated June 6, 2013 in the amount of$60,000.00 for Project No. BG1204 ("Bid") and a proposal dated June 14, 2013 in the amount of$30,475.00 for Project No. BG1201 ("Accepted Proposal"). The Accepted Proposal is attached hereto as Exhibit G and contains, among other things, provisions defining the scope of Project No. BG1201. NOW, THEREFORE, in consideration of performance by the parties of the mutual promises, covenants, and conditions herein contained, the parties hereto agree as follows: AGREEMENT 1. Contractor's Services. 1.1 Scope and Level of Services. For and in consideration of the mutual promises set forth herein, and subject to the teens and conditions set forth in this Agreement, Contractor shall perform and complete in good and workmanlike manner all work ("Work") required by this Agreement and the documents listed in Subsection 1.2 for the Project. 1.2 Contract Documents. The "Contract Documents" that comprise the agreement between the City and the Contractor are the: Notice Inviting Bids, Instructions to Bidders, Accepted Proposal, Non-Collusion Affidavit, Bid Schedule(s), List of Subcontractors, Contractor's Industrial Safety Record, Contractor's Qualification Statement, Bid Security Forms for Check or Bond, Specifications, General and Special Provisions and documents referenced therein, all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any of said documents, this Agreement, Exhibits attached to this Agreement, including but not limited to the Performance Bond (Exhibit A), Payment Bond (Exhibit B), Workers' Compensation Insurance Certificate (Exhibit C), Insurance Endorsements (Exhibit D), Acknowledgment of Penal and Civil Penalties Concerning Contractor Licensing Laws (Exhibit E), Labor Law Requirements (Exhibit F), Accepted Proposal (Exhibit G) and any and all supplemental agreements executed amending or extending the Work contemplated and that may be required to complete the Work in a substantial and acceptable manner. These Contract Documents are hereby incorporated into this Agreement. 1.3 The Work shall be performed in accordance with the Plans, Specifications and other Contract Documents. Contractor shall furnish at its own expense all labor, materials, equipment and services necessary therefor, except such labor, materials, equipment and services as are specified in the Contract Documents to be furnished by City. 1.4 In the event of any material discrepancy between the express provisions of this Agreement and the provisions of the other Contract Documents, the provisions of this Agreement shall prevail. 2. Effective Date. This Agreement is effective as of June 24, 2013 (the "Effective Date"), and shall remain in full force and effect until Contractor has rendered the services required by this Agreement. 3. Payment. For performing and completing the Work in accordance with the Contract Documents, City shall pay Contractor, in full compensation therefor, the amount of $90,475.00 subject to any additions and deletions pursuant to the terms of the Contract Documents. Said sum shall constitute payment in full for all work performed hereunder, including, without limitation, all labor, materials, equipment, tools and services used or incorporated in the Work, supervision, administration, overhead, expenses and any and all other things required, furnished or incurred for completion of the Work as specified in the Contract Documents. City shall make payments to Contractor on account of the contract sum at the time, in the manner, and upon the conditions specified in the Contract Documents. The City Manger may authorize extra work to fund unforeseen conditions up to the amount approved at the time of award by the City Council. Payment for additional work in excess of this amount requires prior City Council authorization. 4. Contractor's Personnel. 4.1 All Work shall be performed by Contractor or under Contractor's direct supervision, and all personnel shall possess the qualifications, permits, and licenses required by state and local law and by the Notice Inviting Bids/Instructions to Bidders to perform such Services, including, without limitation, a City of Seal Beach business license as required by the Seal Beach Municipal Code. 4.2 Contractor shall be responsible for payment of all employees' wages and benefits, and shall comply with all requirements pertaining to employer's liability, workers' compensation, unemployment insurance, and Social Security. Contractor shall fully comply with the workers' compensation law regarding Contractor and Contractor's employees. 4.3 Contractor shall indemnify and hold harmless City and its elected officials, officers, employees, servants, designated volunteers, and agents serving as independent contractors in the role of city officials, from any and all liabilities, damages, claims, costs and expenses of any nature to the extent arising from Contractor's alleged violations of personnel practices. 4.4 Contractor is, and shall at all times remain as to City, a wholly independent contractor. Contractor shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Contractor or any of Contractor's employees, except as set forth in this Agreement. Contractor shall not, at any time, or in any manner, represent that it or any of its officers, agents, or employees are in any manner employees of City. Contractor shall pay all required taxes on amounts paid to Contractor under this Agreement, and indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the work performed pursuant to this Agreement. 4.5 City shall have the right to offset against the amount of any fees due to Contractor under this Agreement any amount due to City from Contractor as a result of Contractor's failure to promptly pay to City any reimbursement or indemnification arising under this Section 4. 5. Indemnification. 5.1 Contractor's Duty. Contractor shall defend, indemnify, and hold the City, its elected officials, officers, employees, volunteers, agents, and those City agents serving as independent contractors in the role of City officials (collectively "Indemnitees") free and harmless from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, bid protests, stop notices,judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever (individually, a"Claim," collectively, "Claims"), in any manner arising out of or incident to the performance of the Agreement, including without limitation, the payment of all consequential damages and attorneys' fees and other related costs and expenses. Further, Contractor shall appoint competent defense counsel, at Contractor's own cost, expense and risk, to defend any and all such suits, actions or other legal proceedings of every kind arising out of or incident to the performance of the Agreement that may be brought or instituted against Indemnitees. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit, action, or other legal proceeding arising out of or incident to the performance of the Agreement. Contractor shall reimburse the City and the other Indemnitees, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Contractor or Indemnitees. This indemnity shall apply to all Claims and liability regardless of whether any insurance policies are applicable. 5.2 Bid Protests. In addition to its obligations pursuant to Section 5.1, Contractor shall reimburse the City for all attorneys' fees and costs incurred by City in connection with, arising out of or incident to any bid protest. 5.3 City's Sole Negligence. Nothing in Section 5.1 shall be construed to require Contractor to indemnify Indemnitees for that portion of any Claim to the extent arising from the sole negligence or willful misconduct of the Indemnitees. 5.4 Nonwaiver of Rights. Indemnitees do not, and shall not, waive any rights that they may possess against Contractor because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. 5.5 Waiver of Right of Subrogation. Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses, and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor. 5.6 Survival. The provisions of this Section 5 shall survive the termination of the Agreement and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee's right to recover under this indemnity provision, and an entry of judgment against a Contractor shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provision. 6. Insurance. 6.1 Liability Insurance. Contractor shall procure and maintain in fall force and effect for the duration of this Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the services hereunder by Contractor, and its agents, representatives, employees and subcontractors. The policy limits set forth below do not act as a limitation upon the amount of indemnification to be provided by Contractor. Contractor shall complete and execute the following documents attached as Exhibits hereto and incorporated herein by this reference: 6.1.1 Exhibit D-1: Additional Insured Endorsement - Commercial General Liability. 6.1.2 Exhibit D-2: Additional Insured Endorsement - Automobile Liability. 6.1.3 Exhibit D-3: Additional Insured Endorsement. 6.2 Minimum Scope of Insurance. Unless otherwise approved by City, coverage shall be at least as broad as: 6.2.1 Insurance Services Office Commercial General Liability coverage(occurrence form CG 0001). 6.2.2 Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code I (any auto). 6.2.3 Insurance Services Office form number CG 20 10 11 85 (Ed. 11/85) covering Additional Insured—Owners, Lessees or Contactors (Form B). 6.2.4 Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. 6.3 Minimum Limits of Insurance. Contractor shall maintain limits no less than: 6.3.1 General Liability: $2,000,000 per occurrence and in the aggregate for bodily injury, personal injury and property damage. Commercial General Liability Insurance or other form with a general aggregate limit shall apply separately to this Agreement or the general limit shall be twice the required occurrence limit. 6.3.2 Automobile Liability: $2,000,000 per occurrence for bodily injury and property damage. 6.3.3 Employer's Liability: $1,000,000 per occurrence and in the aggregate for bodily injury or disease and Workers' Compensation Insurance in the amount required by law. 6.4 Deductibles and Self-Insured Retentions, Contractor shall inform City of any deductibles or self-insured retentions except with respect to any professional liability insurance. 6.5 Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 6.5.1 City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of City officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Contractor; products and completed operations of Contractor; premises owned, occupied or used by Contractor; or automobiles owned, leased, hired or borrowed by Contractor. The coverage shall contain no limitations on the scope of protection afforded to City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials which are not also limitations applicable to the named insured. 6.5.2 For any claims related to this Agreement, Contractor's insurance coverage shall be primary insurance as respects City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of City officials. Any insurance or self-insurance maintained by City, their officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials shall be excess of Contractor's insurance and shall not contribute with it. 6.5.3 Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 6.5.4 Each insurance policy required by this Section 6 shall be endorsed to state that coverage shall not be canceled or materially modified except after 30 days prior written notice by first class mail has been given to City. 6.5.5 Each insurance policy, except for any professional liability policy, required by this Section 6 shall expressly waive the insurer's right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city or agency officials. 6.6 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VlII unless waived in writing by City's Risk Manager. 6.7 Verification of Coverage. All insurance coverages shall be confirmed by execution of endorsements on forms approved by the City. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf All endorsements are to be received and approved by City before services commence. As an alternative to City forms, Contractor's insurer may provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications. 7. Liquidated Damages. Should the Contractor fail to complete the project, or any part thereof, in the time agreed upon in the Contract, the Contractor shall reimburse the City for the additional expense and damage for each calendar day that the Contract remains uncompleted after the Contract completion date. It is agreed that the amount of such additional expense and damage incurred by reason of failure to complete the Contract is the per them rate of$750.00 per calendar day. Such amount is hereby agreed upon as liquidated damages for the loss to the City resulting from the failure of the Contractor to complete the project within the allotted time and to the value of the operation of the works dependent thereon. It is expressly understood and agreed that this amount is a reasonable amount and is established in lieu of damages that are incapable of calculation at the inception hereof; and this amount is not to be considered in the nature of a penalty. The City shall have the right to deduct such damages from any amount due, or that may become due to the Contractor, or the amount of such damages shall be due and collectible from the Contractor or the Contractor's Surety. Progress payments made after the scheduled completion date shall not constitute a waiver of liquidated damages. 8. Suspension. City may, in writing, order Contractor to suspend all or any part of the Contractor's Services for the convenience of City or for work stoppages beyond the control of City or Contractor. A suspension of the Services does not void this Agreement. 9. Notices. Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Contractor's and City's regular business hours or by facsimile before or during Contractor's regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses heretofore set forth in the Agreement, or to such other addresses as the parties may, from time to time, designate in writing pursuant to the provisions of this Section. All notices shall be addressed as follows: If to City: City Clerk City of Seal Beach 211-8th Street Seal Beach, California 90740 Telephone: (562) 431-2527 Fax: (562) 493-9857 With a copy to: Public Works Director City of Seal Beach 211-8th Street Seal Beach, California 90740 If to Contractor: Ramco, General Engineering Contractor 10545 Dale Rd Agua Dulce, CA 91390 Telephone: (818) 272-4221 Attn: Emilo Rameriz 10. Non-Assi ng ability Subcontracting. Contractor shall not assign, transfer, or subcontract any interest in this Agreement or the performance of any of Contractor's obligations hereunder. Any attempt by Contractor to so assign, transfer, or subcontract any rights, duties, or obligations arising hereunder shall be null, void and of no effect. 11. Compliance with Laws. Contractor shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Contractor performs the Services. 12. Non-Waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by City of any payment to Contractor constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Contractor, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. 13. Attorneys' Fees. In the event that either party to this Agreement shall commence any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action or proceeding shall be entitled to recover its costs of suit, including all attorneys' fees incurred in connection therewith. 14. Construction. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 15. Entire Agreement. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between Contractor and City. This Agreement supersedes all prior oral or written negotiations, representations, or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement. 16. Severability. The invalidity in whole or in part of any provisions of this Agreement shall not void or affect the validity of the other provisions of this Agreement. IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above. (Intentionally Left Blank) CITY OF SEAL BEACH CONTRACTOR: By: By: --Q= , �?---If Jill R. Ingram, City Manager Name: L-1••tt 1.Vn fL^-AAk +t/c--Ar Attest: Title: O–W By: Linda Devine, City Clerk Approved as to Form: By: Quinn M. Barrow, City Attorney ATTACHMENT C P R 0 P 0 S AL DATE PROPOSAL# 06/14/13 51994 <.+:xxpss>xretca t?xr rt *x Irit rig:>r c PRO,=T#` 2-849 *S`r'1 ,la�rrtlzx>tc°t 12,.raa ta, t (3, lix,l,ar! !a•^:er:fr.Ckx11C:'af i I7t txx:X3 1 .;3°:if:9f'k F;'?x 714671,1814 .cx.m CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 87-H STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 94740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND ALLSTEEL PURCHASE ORDERS SHOULD BE ISSUED TO: ALLSTEEL C/O CORPORATE BUSINESS INTERIORS 2210 SECOND AVENUE MUSCATINE, IA 52761-5257 CONTRACT NUMBER: 4-09-71-0087A. PLEASE MAKE "SHIP TO" READ: CBI/COI 8513 ROCHESTER AVE. RANCHO CUCAMONGA, CA 91730 1 1 ALM3696R 36"x96" Reet Top, Lam, Flat 362. 16 362 . 16 E Edg $ (LICORE) Ll Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil .00 No Grommets Tag (s) : 111 PAGE I PROPOSAL DATE PROPOSAL# 06/14/13 51994 PROJECT#: 2-849 w.'� # Y€4rrxal'ce .•�RL "I I Sto'400'Hotpu�Jr It Ede-:wh CA °1',660 949,22,1','1.;1140 0 Fax i 14,671,1814 CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 2 1 Z5SC84 72W External Supt Channel 22 .53 22.53 for 84W W/S Tag(s) : 111 3 6 RLM--MUCO Relate Side Std Mesh 227 .25 1,363 . 54 Back/Uph Seat/Casters/Arms . 3 Multi-surface Caster Undecided FRAME Option $ (A) GRD A UPH M Undecided FABRIC Option Tag(s) : 111 4 1 ABT24FC T Base Med, 1 Pr. , Fixed Hgt 171 .36 171 . 36 w/Casters $ (CORE) Core Clr Opts . P28 CLR: Fossil Tag(s) : 111 5 8 TK365E "E" End Trim Connector Kit 20.44 163.52 65H $ (COREPl) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 6 4 TK365L "L" 90-Degree Connector Kit 34 .06 136.24 65H $ (COREPl) Core Clr Opts .P28 CLR: Fossil Tag(s) : 113 PAGE 2 PROPOSAL DATE PROPOSAL#. 06114/13 51994 rasp »u,# rirr � rtarFarti PROJECT#: 2-849 31"01 ,."wfl jolf^c^. N r+rrpoif E.,,,irat.CA 92 tlrrJ CUSTOMER: INSTAL AT: CITY OF SEAT BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote 41 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 7 2 TK365T "T" 3-way Connector Kit 65H 34 . 06 68 . 12 $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag(s) : 113 8 6 TK365W "W" Wall Mount Kit 65L 35. 63 213. 78 $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 9 2 OH1530FO 15H x30W Flipper Door 131 . 52 263.04 Overhead-No Pull .YZ Sys:Stride-Align-Terr-Concnsys $ (CORE) Core Clr Opts . P28 CLR: Fossil .STD Standard Random key Tag (s) : 113 10 10 OH1536FD 15H x36W Flipper Door 137 . 81 1, 378 . 10 Overhead-No Pull .YZ Sys:Stride-Align-Terr-Concnsys $ (CORE) Core Clr Opts .P28 CLR: Fossil .STD Standard Random key Tag(s) : 113 11 2 T6CB18L Cantilever Bracket 18D LH 11 .27 22 .54 Terrace $ (CORE) Core Clr Opts . P28 CLR: Fossil Tag(s) : 113 PAGE 3 PROPOSAL DATE PROPOSAL# 06114/13 51994 €xrtartrssFrro« s $rxca'6taq� PROJECT#: 2-849 1-'Ik?ric 949= 2"5,30-00 F nx' 7 14,6*'t 4 A 1 3 wow brr»rr,.�evi CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211-1 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 12 5 T6CB18R Cantilever Bracket 18D RH 11.27 56. 35 Terrace $ (CORE) Core Clr Opts .P28 CLR: Fossil Tag(s) : 113 13 5 ELF830NA Ess Lat 30W 28H 2-12" Drws 261 .54 1, 307 .70 Arch Pull $ (CORE) Care Clr Opts . P28 CLR: Fossil .EL PULL: Matte Silver .STD Standard Random key Tag(s) : 113 14 2 ELF836NA Ess Lat 36W 28H 2-12" Drws 288 . 99 577 . 98 Arch Pull $ (CORE) Core Clr Opts .P28 CLR: Fossil .EL PULL: Matte Silver .STD Standard Random key Tag (s) : 113 15 1 ELF536NA Ess Lat 36W 64-1/4H 12" R/O 617 . 41 61`7.41 4-12" Drws Arch Pull $ (CORE) Core Clr Opts . P28 CLR: Fossil .EL PULL: Matte Silver .STD Standard Random key Tag(s) : 113 PAGE 4 PROPOSAL DATE PROPOSAL# 06/14/13 51994 C,cea•�atfiaa's^ 19trasirta� '€acr-icrr PROJECT#: 2-849 s°aC11 :}amb tee R( 1,1. *.A�400' f ov'pei;t .rr�+?ir,ly,CA 92660 Pl to E 4, S}+1r.1.22:'5,31.,)00 1'-sv- i 14,67,9_'1814 tol"O"om CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 16 1 EPF23018 Ess Personal File BBF 1 369. 07 369. 07 I Lateral Drw Integral Pull $ (CORE) Core Clr Opts .P28 CLR: Fossil .STD Standard Random key Tag(s) : 113 17 7 PF197-20 Ess Support Ped BBF 28H 143.05 1, 001 . 35 3A 19-7/8D Arch Pull $ (CORE) Core Clr Opts . P28 CLR: Fossil .EL PULL: Matte Silver . STD Standard Random key Tag(s) : 113 18 3 PF198-20 Ess Support Ped FF 28H 143 . 05 429. 15 2A 19-7/8D Arch. Pull $ (CORE) Core Clr Opts .P28 CLR: Fossil .EL PULL: Matte Silver .STD Standard Random key Tag(s) : 113 19 8 Z6PL29FR Fixed Post Leg 29-1/2H RH 45. 65 365.20 for Flat/Sq Eg $ (CORE) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 20 6 T624FB Flat Bracket 24D 10 . 48 62. 88 Tag(s) : 113 PAGE 5 PR C, P (DS L DATE PROPOSAL# 06/14/13 51994 Ewa°t>r>r<.�i : 3rr:�rrah=.s:• �4r+ta*��r�r� PROJECT# : 2-849 .35 11 loera<_Szce a,{, ,. 4t, 1Ci;`S, hlF+,•rfa3,:>r4 C-$a;z.<e<:I r;X_ ':.1 t°r!i�7 CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote 41 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 21 21 SASS Paper Wave 25 . 41 533. 61 $ (COREPNT) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 22 1 SC236I Persona 27-3/4Hx36W Storage 317 . 63 317 . 63 Cab 1 Adj Shelf Int Pull $ (COREP3) Core Clr Opts .P28 CLR: Fossil .STD Standard Random key Tag(s) : 113 23 8 EPDPT Power/Data Port for table 106.20 849. 60 cut out .E9 CLR: Flint Tag (s) : 113 24 3 T52060SN Primary 20Dx60W Flat Eg Lam 98 . 51 295 . 53 w/o Grom $ (LICORE) Ll Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil Tag (s) : 113 25 3 T52466S Primary 24Dx66W Flat Eg Lam 112 . 66 337 . 98 w/Grommets $ (LICORE) Ll Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil . P Plastic Grommet Tag (s) : 113 PAGE 6 P R0 PS A L DATE PROPOSAL# 06/14/13 51994 PROJECT4 : 2-849 dD'A-i'f Rood, S,1,400, Ner. vp ,,:)iI L-, ie;h, <--f CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 26 1 T52466SN Primary 24Dx66W Flat Eg Lam 112. 66 112 . 66 w/o Grom $ (LICORE) Ll Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil Tag (s) : 113 27 4 T52472SN Primary 24Dx72W Flat Eg Lam 117 . 38 469.52 w/o Grom $ (LICORE) L1 Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil Tag(s) : 113 28 7 RL-MHW Relate Std Mesh High-Bk/Adj 427 .88 2, 995. 16 Arms .2 Standard cylinder . 0 Hard Casters .L Lumbar Undecided FRAME Option $ (A) GRD A UPH N Undecided FABRIC Option Tag(s) : 113 29 1 912OR962 Spcl Size 214 . 84 214 . 84 4 84-1/8-96Wxl8-1/8-24D Flat Eg .GO No groin $ (LICORE) Ll Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil .940W 94" W CONTINUED. . . PACE 7 PROPOSAL DATE PROPOSAL# �s 06/14113 5--994 C tar s,€ aCr k3s r �s Into-r✓<. is PROJECT#' 2-849 } ,tzisrtl eai�r F I St-.400.Ids=�sp�aet Boesch,CA 2#3t�q 449.22i,3900 714,611,1�,1,14 Ph—t 1'CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #_ FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRTPTTON SELL EACH SELL EXTEND X200D 20" Depth Tag(s) : 113 30 1 912OR108 Spcl Size 237 .90 237 . 90 18 96-1/8-108Wxl7-1/2-18D Flat Eg .GO No gram $ (LICORE) L1 Core Lam Opts .LTSD Lam: Misted Zephyr .EH Edg: Fossil . 1080W 108 11W X180D 18" Depth Tag(s) : 113 31 2 TK06524W Structural Raceway Pnl Fr-No 60 . 78 121.56 R Top Trim 65Hx24W $ (COREPI) Core Clr Opts . P28 CLR: Fossil Tag(s) : 113 32 3 TK06530W Structural Raceway Pnl Fr-No 62. 62 187 .86 R Top Trim 65Hx3OW $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 33 3 TK06536W Structural Raceway Pnl Fr-No 64 . 98 194 .94 R Top Trim 65Hx36W $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 PACE 8 PROPOSAL DATE PROPOSAL# 06/14/13 51994 :axaF>rn°.ate C3aicae� r.; :Sas *�rirr a PROJECT#: 2-849 I .Iran+bow F'� n 6 ,`'i:4..';4C1F'9,f 9r v')p ft E.S .u;l e,CA 926r."'.0 J Gann+' 949,2­25 3900 F''vu 71,t6-73_1 A14 CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 34 5 TK06536W Structural Raceway Pnl Fr-No 64 . 98 324 . 90 R Top Trim 65Hx36W $ (COREPl) Core Clr Opts . P28 CLR: Fossil Tag (s) : 113 35 6 TK06536W Structural Raceway Pnl Fr-No 64 . 98 389. 88 R Top Trim 65Hx36W $ (COREPl) Core Clr Opts . P28 CLR: Fossil Tag (s) : 113 36 1 TK06536W Structural Raceway Pnl Fr-No 64 . 98 64 . 98 R Top Trim 65Hx36W $ (COREPl) Core Clr Opts . P28 CLR: Fossil Tag (s) : 113 37 12 870824 Tasklight w/electronic 56. 85 682 .20 Ballast for 24W .X CLR: No Color Choice Tag (s) : 113 38 4 TKSK24 Ter DNA 24W Segment Kit 3 . 41 13. 64 Tag (s) : 113 39 10 TKSK36 Ter DNA 36W Segment Kit 3 . 67 36. 70 Tag (s) : 113 PAGE 9 PROP L. DATE PROPOSAL# 06114113 51994 cs'E�catr�4r t � xfvtc?sr°i+ws " PROJECT#: 2-849 1501 ..lamla; l- RIfq'O ','Af 400, tlfovrpt it Ek?e wh,CA 026(30 �fFrF6cy.C1� ',a,wi��'1.�C7 1" %- f1 &�A"�.i�i9� v.;+r.-R,oEAeiracv CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote 41 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 40 12 TKSK36 Ter DNA 36W Segment Kit 3. 67 44 . 04 Tag (s) : 113 41 4 TKSK36 Ter DNA 36W Segment Kit 3. 67 14 . 68 Tag (s) : 113 42 2 TK41524G Ter DNA Glazed Tile Kit 15H 101. 13 202 .26 K x 24W $ (CORFPI) Core Clr Opts .P28 CLR: Fossil .0 Clear Glass Tag (s) : 113 43 6 TK41536G Ter DNA Glazed Tile Kit 15H 113.71 682.26 K x 36W $ (COREPl) Core Clr Opts . P28 CLR: Fossil .0 Clear Glass Tag (s) : 113 44 5 TK41536T Ter DNA Tackable Acoustic 20. 70 103 .50 Tile 15H x 36W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 45 2 TK41536T Ter DNA Tackable Acoustic 20 . 70 41 . 40 Tile 15H x 36W $ (2) GRD 2 FAB CONTINUED. . . PAGE 10 PROPOSAL DATE PROPOSAL#) ' 06114/13 51994 corptirk-vt" Esw+aiwann ,xttt"'S-3flr� PROJECT#: 2-849 1501 ,E,>areolre l—, rRc.;id ,Srvr 400,Ner";prant C.f.:tclo.ACA, 924560 f-hotw'' Fax- 7 3 9 67 3-1.' € # CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND .COA FAB: Coast 908 CLR: Tide Tag (s) : 113 46 5 TK43036T Ter DNA Tackable Acoustic 30. 13 150. 65 Tile 30H x 36W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag (s) : 113 47 2 TK43036T Ter DNA Tackable Acoustic 30 . 13 60.26 Tile 30H x 36W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 48 4 TK45024T Ter DNA Tackable Acoustic 36. 68 146.72 Tile 50H x 24W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 49 12 TK45036T Ter DNA Tackable Acoustic 47 . 42 569,04 Tile 50H x 36W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 PAGE 11 DATE PROPOSAL# 06/14113 51994 avrr�x�xc�Re� Er.;ixxa;x [sntFrs PROJECT#: 2-849 ::5�'t7 I ,I;areaA#larakh<A f"(t:,.a3.;fit:���'sL7.Idr>s•rNa�+rt F .a< .,R €w,� ���.�_«<1a� (=hoi a�' 9 9 y w 7.:3g0O Fix' 7 14 ti7I.143'I4 w_r45stzr3x+=ss CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH S7REE7 SEAL BEACH CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 50 6 TK46530T Ter DNA Tackable Acoustic 55.28 331 . 68 Tile 65H x 30W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 51 6 TK46536T Ter DNA Tackable Acoustic 60.78 364 . 68 Tile 65H x 36W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 52 5 TK46536T Ter DNA Tackable Acoustic 60.78 303.90 Tile 65H x 36W $ (2) GRD 2 FAB .COA FAB: Coast 908 CLR: Tide Tag(s) : 113 53 5 TK41536S Ter DNA Tool Tile 15H x 36W 65. 50 327. 50 W $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 54 2 TK41536S Ter DNA Tool Tile 15H x 36W 65. 50 131.00 W $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag(s) : 113 PAGE 12 P R O F O S A L DATE PROPOSAL# W 'ilk 06/14113 51994 Ccfr°�fa atr �➢ r�s PROJECT#: 2-849 501 „4e.:imbcme'S(�Rood Stt, 400.t#r tars:*rt b,,ttAi,GA 92k3(ti0 6:-horl-: X149,725,390(4 F=t 14,6 77,18,! t CUSTOMER: INSTALL AT: CITY OF' SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 55 2 TK324PT Top Trim 24W 7 . 07 14 . 14 $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 56 3 TK330PT Top Trim 30W 8 . 38 25. 14 $ (COREPI) Core Clr Opts . P28 CLR: Fossil Tag (s) : 113 57 3 TK336PT Top Trim 36W 9. 96 29. 88 $ (COREPl) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 58 5 TK336PT Top Trim 36W 9. 96 49. 80 $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 59 6 TK336PT Top Trim 36W 9. 96 59.76 $ (COREPI) Core Clr Opts . P28 CLR: Fossil Tag (s) : 113 60 1 TK336PT Top Trim 36W 9. 96 9. 96 $ (COREPI) Core Clr Opts .P28 CLR: Fossil Tag (s) : 113 PAGE 13 PROPOSAL DATE PROPOSAL# 06114/13 51994 ea'pacr TM ft E3tir rre r� e*t F.na PROJECT# : 2-849 3t', )# ,Jurrx9lae.,ocKi R, id, �31 •400, 69ov pt,"T C catEK'al�.f.."A 926560 !'Ifwt ' 4 11?1�m �717 F t r } vtmw.,•piarn�.rrsn CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL, BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 61 8 T6BK Worksurface Bracket Kit 10.48 83.84 $ (CORE) Core Clr Opts .P28 CLR: Fossil Tag(s) : 113 62 3 ESC336A Essentials 39-1/8Hx36W 253. 84 761 .52 StorageCabinet Arch $ (CORE) Core Clr Opts . P28 CLR: Fossil .EL PULL: Matte Silver .STD Standard Random key Tag (s) : Storage rm 63 1 AFNLFTP- Lateral File Top 36Wxl8D 90 . 82 90 . 82 3618L Laminate $ (LICORE) L1 Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil Tag(s) : Storage rm 64 1 AFNLFTP- Lateral File Top 72Wx18D 123.20 123.20 7218L Laminate $ (LICORE) Ll Core Lam Opts .LT5D Lam: Misted Zephyr .EH Edg: Fossil Tag(s) : Storage rm 65 1 LABOR Receive, deliver and install 5, 750.00 5, 750 . 00 all product during after hours. Product: * 7 workstations, 7 chairs, * 1 conference table, 6 conference CONTINUED. . . PAGE 14 P R C) POS AL DATE PROPOSAL# 06/14/13 51994 turkrp»>r a s c sra� Irst r +r PROJECT#: 2-849 ;350'1 JI,f mlaowf—%Rod Si",400, (t3ra�p5�.r9 f ��nr<t ,CA 5}6�i (as:} Phone 94r) i 14 67 1.181 3 ;tn;aq..xa,n CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAT, BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.Q.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND * chairs, 3 storage cabinets * 2 mail sorters, 1 double pedestal * desk * * * * * Pricing is based on two trips one to * disassemble, one trip to reassemble * the existing * Tag (s) : New Product 66 1 LABOR Disassemble existing 7 2, 000.00 2, 000.00 workstations and move to client 's storage on * site for future reassembly * take an inventory for future re install * so CBI can generate installation * drawings. Tag(s) : Disassemble 67 1 Project CBI Project management on 3, 360. 00 3, 360 . 00 manageme site for duration of nt installation. 68 1 LABOR return and reassemble 7 4, 200.00 4,200.00 workstations Tag (s) : reassemble PAGE 15 PROPOSAL DATE PROPOSAL# ' 06/14/13 51994 cespst«ate3arsl��a < rttaae» PROJECT#: 2-849 imil orv'�,94 225,1900 Fox 714671.1314 eho�.p.ee.y.t,vavi CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# Quote #1 FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA CMAS TERMS # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND BY SIGNING BELOW YOU AGREE TO TERMS AND CONDITIONS OF CBI. PRICING VALID FOR 15 DAYS. SUBTOTAL 25, 414 .70 DEPOSIT REQUIRED 0.00 DELIVERYJINSTALLATION 11, 950.00 ACCEPTED BY TAX 2, 720.41 DATE ACCEPTED TOTAL 40, 085. 11 PAGE 16 OF 16 PROPOSAL DATE PROPOSAL# 06/14113 51987A 2_car ea s'aRc^ E3 ax.aat: <s 7aataat°aea° PROJECT#' 2-849 t31 .J,srs4 d vI "'Ao 400, h9-ovp,_r0 CA 02C-ki 94 2_ ,.31 D(I k'cv, 714.1571,V-114 tretse r rn CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# FAX NUMBER# CUSTOMER P.O.* SALESPERSON TERMS SHIP VIA LYN VERNAZZA NET 30 # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND 1 2 Mail sorter, to be mounted 1, 600.00 3, 200.00 on Allsteel two door storage cabinets. Size 35 172" wide x 15 314" deep x 28 118 * high. * 24 adjustable slots per sorter * * Tag(s) : Storage TERMS: Late Payment penalty of 1 1J2a per month will be applied on balances. By signing this proposal you are agreeing to the Terms & Conditions of Corporate Business Interiors and the items below. Drawings & Finishes Are Correct and Complete. Payment Terms: NET 30 Days Billing Address Is Correct. CONTINUED. . . PAGE 1 PROPOSAL DATE PROP„O„SAL#_ 06/14/13 51987A .ar�rt,c to r+ r r°ier PROJECT#: 2-849 RozAd Stt 0,t Ievvpt >rt E3€.+ tx. 92660 iii z;t6? 91 2 5-'N O F,,ay” 714,671,1f',14 �✓rrcgs3r t�.<. rn CUSTOMER: INSTALL AT: CITY OF SEAL BEACH CITY OF SEAL BEACH 211 8TH STREET 211 8TH STREET SEAL BEACH, CA 90740 SEAL BEACH, CA 90740 PH# FAX NUMBER# CUSTOMER P.O.# SALESPERSON TERMS SHIP VIA LYN VERNAZZA NET 30 # QTY PRODUCT DESCRIPTION SELL EACH SELL EXTEND If Different, Please Note Below. STORAGE CHARGES CBI will make every effort to schedule deliveries based on construction schedules communicated to CBI by the client and/or General Contractor. If delivery schedule changes due to construction delays or delays not related to CBI, and changes to delivery dates cannot be accomodated by the manufacturer, product may need to be stored and/or double handled; additional charges will apply. In addition, if product must be stored longer than 15 days at our warehouse or jobsite, manufacturer & CBI will not be responsible for concealed freight damage. BY SIGNING BELOW YOU AGREE TO TERMS AND CONDITIONS OF CBI. PRICING VALID FOR 15 DAYS. SUBTOTAL 3,200.00 FREIGHT 316.00 ACCEPTED BY TAX 281.28 DATE ACCEPTED TOTAL 3,797.28 PAGE 2 OF 2 ATTACHMENT D April 24,2013 Seal Beach Lifeguard Station City of Seal Beach 888 Ocean Avenue Seal Beach, CA 90740 RE: Preliminary Planning Proposal#22524—Custom Lifeguard Lockers Thank you for the opportunity to present this Preliminary Proposal for custom designed lifeguard lockers. Syltem Description McMurray Stern is to provide options for the selected custom lifeguard locker design, Two manufacturers differing in locker construction are presented for consideration. • Option One-Columbia Phenolic Lockers o Five lockers per selected scheme. Lump Sum Price: $38,745.00. ■ Optional Add—Digilock brand digital lock*: $2,365.00. • Optional Add—Zephyr brand digital lock*: $2,365.00. • *Not recommended for wet areas. • Option Two—IOPC Modular Millwork Laminate Lockers o Five lockers per selected scheme. Lump Sum Price: $28,385.00. ■ Optional Add—Digilock brand digital lock*: $2,365.00. ■ Optional Add—Zephyr brand digital lock*: $2,365,00. • *Not recommended for wet areas. Terms Prices shown above are Jump sum and include all applicable material/equipment, freight, installation and sales tax. Project is payable with a fifty percent deposit, balance due net 15 after installation. The area is to be clear prior to the arrival of the McMurray Stern Installation Team. Pricing and terms are effective for 60 days. Please call me at (562) 623-3012 or my cell at (714) 856-1928 should you have any questions regarding the above information. Sincerely, -12, Laura Borda Design Consultant 15511 Carmenita Road I Santa Fe Springs I CA 90670-5609 I p 562-623-3012 1 f 562-293-9812 1 lborda@mcstem.com