Loading...
HomeMy WebLinkAboutCC AG PKT 2013-06-10 #EAGENDA STAFF REPORT DATE: June 10, 2013 THRU: Jill R. Ingram, 4010111& SUMMARY OF REQUEST: It is requested that the City Council: 1. Adopt Resolution No. 6378 Concerning the Status of the Circulation Element for the City of Seal Beach; 2. Adopt the 7-year Measure M2 Capital Improvement Program {GIP) for fiscal years 2013/14 through 2019/20; 3. Submit Maintenance of Effort Reporting Form and Supporting Documentation for the City of Seal Beach to Orange County Transportation Authority (OCTA); 4. Submit Congestion Mitigation Program (CMP) Monitoring checklists for the City of Seal Beach to the OCTA; 5. Submit Measure M2 Eligibility Checklist to OCTA; and 6. Direct the City Engineer to file the adopted CIP and the Measure M2 eligibility documents with the OCTA in compliance with the requirements of OCTA. gum In November of 1990, the voters of Orange County approved Measure M, the Revised Traffic Improvement and Growth Management Ordinance. Measure M created a fund for transportation improvements to mitigate traffic impacts generated by existing and proposed development. Measure M authorizes the imposition of an additional half-cent retail transaction and use tax for a period of twenty (20) years. In November of 2006, Measure M was renewed by the voters of Orange County for an additional twenty (20) years and is now referred to as Measure M2. Funds identified as Measure M2 "turnback" funds are used on local and regional transportation improvement and maintenance projects. Other Measure M2 funds, for transportation related projects, are made available through several Agenda Item E competitive programs included in the Combined Transportation Funding Program (CTFP). To be eligible to receive Measure M2 "turnback" and CTFP funds, the Local Transportation Authority (LTA) must find that the City has satisfied specific requirements which change every year (adopted by the City Council on or before June 30th). The Board of Supervisors of Orange County has designated Orange County Transportation Authority (OCTA) as the Local Transportation Authority. The City of Seal Beach has fulfilled the following initial requirements: 1. Demonstrated compliance with the County's Congestion Management Program. 2. Maintained a mitigation impact fee schedule. 3. Adopted a seven -year Capital Improvement Program that includes all transportation projects Funded partially or wholly by Measure M dollars. 4. Adopted and adequately funded a Local Pavement Management Plan (PMP). 5. Adopted a Traffic Demand Management Ordinance. 6. Satisfied Maintenance of Effort (MOE) Requirements. 7. Agreed to expend all Measure M and M2 revenues within three (3) years of receipt. All of these items must be maintained to retain eligibility. Not all of the requirements are needed every year. Some items must be renewed or resubmitted annually and some biannually. The Eligibility package is due to OCTA by June 30, 2013. This year's package will include: 1. Measure M2 seven -year Capital Improvement Program 2. Maintenance of Effort (MOE) Reporting Form 3. Congestion Management Program compliance Checklists 4. General Plan Compliance Documentation 5. Measure M2 Eligibility Checklist A summary explanation of each listed item is included below: 1. MEASURE M2, SEVEN -YEAR CAPITAL IMPROVEMENT PROGRAM The City Council adopts a comprehensive seven -year CIP each year. Staff has prepared an updated seven -year CIP specifically for the transportation facility improvement projects in a form consistent with the latest requirements of OCTA. The updated seven -year CIP is attached. 2. MAINTENANCE OF EFFORT REPORTING FORM One of the requirements that went into effect when the voters approved Measure M, and reapproved Measure M2 was that the transportation revenue stream supplement and not replace the general fund investment that local agencies spend on roadway maintenance. In fact the Measure M program compiled the average Page 2 annual maintenance investment that each city made between FY 1985/86 through Fyl 989/90 and requires that local agencies continue to invest into the infrastructure with a minimum of that funding level. The Maintenance of Effort form indicates that this is being done for each local jurisdiction. The average annual MOE General Fund expenditure required for the City of Seal Beach, as determined for the Measure M Program, is $505,000. The adopted FY2013/14 budget contains a General Fund expenditure for public works/transportation related costs, which exceeds the baseline MOE requirements, R3 0 0 0 EST*] He-] *M rel"k, I T, The Congestion Management Program (CMP) is a plan to relieve congestion and air pollution. The CMP supports regional mobility and air quality objectives by reducing traffic congestion, provide a mechanism for coordinating land use and development decisions that support the regional economy. This checklist is updated every two years as required by OCTA. A participating city must consider, as part of its General Plan, land use planning strategies that accommodate transit and non-motorized transportation. The City of Seal Beach has met these requirements within the currently adopted General Plan. A letter will be submitted to OCTA identifying these strategies. 5. MEASURE M2 ELIGIBILITY CHECKLIST To assist agencies in complying with Measure M2, OCTA has developed checklists to clarify requirements. The checklist has been filled out and it will be transmitted with all other documents as required by OCTA. It is recommended that these checklists be received and filed for transmitting with other required Measure M2 documents. Based on staffs analysis, this comprehensive package of required documents will maintain the City's compliance with the requirements of Measure M2 for fiscal year 2013/2014. Upon approval, the attached documents will be submitted to OCTA. Adoption and submission of the CIP developed by the Public Works Department will permit the City of Seal Beach to continue to receive the City's portion of the Measure M2 revenue funds. The submittal of the Measure M2 Eligibility Package is not a project within the California Environmental Quality Act. The City Attorney has review and approved as to form. FINANCIAL IMPACT: The City of Seal Beach receives funding from the Measure M2 program through OCTA. A requirement to receive this funding is submittal of the enclosed eligibility package. The City of Seal Beach annually receives approximately $350,000 and this year has $370,623 budgeted in revenue. The City also applies for a host of competitive grants and on average receives $500,000 in grant funds. This year projects such as the Seal Beach Traffic Management Center (TMC) Relocation ($586,000), Westminster Avenue Bicycle Improvement ($1 M), and Filter Inserts Installation ($10,000) were all funded competitive grant funding. With adoption of the resolution ensures that the City will continue to be eligible to fund maintenance activities and compete for needed infrastructure funding. It is recommended that the City Council adopt Resolution No. 6380: 1. Adopt Resolution No. 6378 Concerning the Status of the Circulation Element for the City of Seal Beach; 2. Adopt the 7-year Measure M2 Capital Improvement Program (CIP) for fiscal years 2013114 through 2019/20; 3. Submit Maintenance of Effort Reporting Form and Supporting Documentation for the City of Seal Beach to Orange County Transportation Authority (OCTA); 4. Submit Congestion Mitigation Program (CMP) Monitoring checklists for the City of Seal Beach to the OCTA; 5. Submit Measure M2 Eligibility Checklist to OCTA; and 6. Direct the City Engineer to file the adopted CIP and the Measure M2 eligibility documents with the OCTA in compliance with the requirements of OCTA. 1A Se—an P. C'rumby, P.E. Director • Public Works 1043HIAIRKAHNITTAIUZI I R. ng ram, Attachments: A. Resolution No. 6378 B. Measure M2 7-year Capital Improvement Program C. MOE and Supporting Documentation D. Congestion Management Program Checklist E. Measure M2 Eligibility Checklist F. OCTA Letter and Supporting Documents G. Land Use Element and Fee Schedule ATTAC H M E N T «A„ '" i i i • i RESOLUTION NUMBER A RESOLUTION OF THE SEAL BEACH CITY COUNCIL CONCERNING THE STATUS OF THE CIRCULATION ELEMENT FOR THE CITY OF SEAL BEACH WHEREAS, the City of Seal Beach desired to maintain and improve the streets within its jurisdiction, including those odeho|o contained in the Master Plan of Arterial Highways ([NPAH);and WHEREAS, the Oih/ of 3oa| Beach has endorsed a definition of and o process for determining consistency ofthe City's Traffic Circulation Fqon with the yWpAH; and WHEREAS, the City has adopted e General Man Circulation Element which does not preclude implementation of the yNPAH with its jurisdiction; and VVHERE/\8. the City is required to adopt resolution every year informing the Orange County Transportation Authority (0CTA) that the City's Circulation Element isin conformance with the K4P4H and whether any changes tu any arterial highways ofsaid Circulation Element have been adopted by the City during Fiscal Years 2O12-13 and 2O1344;and WHEREAS, the Qb/ is required to mend every year to the OCTA all recommended changes to the City Circulation Baman( and the YNPAH for the purposes of nequa|ifying for participation in the Combined Transportation Funding Programs. NOW, THEREFDRE, THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE: Section 1. The adoho| highway portion of the C|b/ Circulation Element of the City ioin conformance with the Master Plan of Arterial Highways. Section 2. The City attests that no uni|eiens| reduction in through lanes has been made on any MPAH arterials during the Fiscal Years 2010-11 and 2012-13. Section 3. The City has adopted a uniform setback ordinance providing for the preservation of rights-of-way consistent with the K8PAH arterial highway classification. Section 4. The City has adopted provisions for the limitation of au000u to arterial highways in order ho protect the integrity cf the system. (intentionally Left Blank Resolution Number 6378 PASSED, APPROVED and ADOPTED by the Seal Beach City Council ate regular meeting held on the 10th dayof June , 2013 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members ATTEST: City Clerk STATE OF CALIFORNIA COUNTY QFORANGE }SS CITY OF SEAL BEACH |. Linda Devine City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6378 on file in the office of the City Clerk, passed, approved, and adopted by the City Council ato regular meeting held un the __1{UtL___ day mf__� June �___.2O13. City Clerk Measure 7-year Capital Improvement Program 5/30/2013 Agency: Seal Beach Project Name: Annual Concrete Repair Program Project Limits: City Wide Type of Work: Pedestrian Additional TOW: Reconstruction or rehabilitation of sidewalk Project Description: Reconstruct sidewalks, driveways, ADA ramps, $0 curb and gutter. Measure M and Renewed Measure M (M2) Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2013/2014 through 2019/2020 FUND NAME PERCENT ESTIMATED COST PROJECTED COST Gas Tax 100 $350,000 $ 381,965 $350,000 $381,965 Protect Phase 13/14 14/15 15/16 16117 17/18 18/19 19/20 Estimated Cost P E $0 $0 $0 $0 $0 $0 $0 $0 $ R $0 $0 $0 $0 $0 $0 $0 $0 $ C/I $50.000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $350.000 $ O &M $0 $0 $0 $0 $0 $0 $0 $0 $ $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $350,000 $ Agency: Seal Beach Project Name: Annual Local Street Resurfacing Program FUND NAME PERCENT ESTIMATED COST PROJECTED COST M2 Fairshare 100 $1,925,000 $ 2,100,808 Project Limits: Various Streets $1,925,000 $2,100,808 Type of Work: Road Maintenance Additional TOW: Rehabilitation of roadway Project Description: Rehabilitation of various local roadways. PfoiectPhase= 13/14 14/15 15/16 16/17 /1 18/19 19/20 Estimated Cost Pi E $0 $0 $0 $0 $0 $0 $0 $0 $ R $0 $0 $0 $0 $0 $0 $0 $0 $ C/I $275,000 $275,000 $275,000 $275,000 $275,000 $275,000 $275,000 $1,925,000 $ O &M $0 $0 $0 $0 $0 $0 $0 $0 $ $275,000 $275,000 $275,000 $275,000 $275,000 $275,000 $275,000 $1,925,000 $ 5/30/2013 Agency: Seal Beach Project Name: Annual Signage Replacement Program Project Limits: City wide Type of Work: Other Additional TOW: Other Project Description: This project will replace damaged or missing signs. Measure M and Renewed Measure M (M2) Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2013/2014 through 2019/2020 FUND NAME P C NT 9SAMATFID COST PR0J Gas Tax 100.00 $70,000 $76,393 $70,000 $76,393 Proiecteum 11114 141`15 15116 16117 17,413 18119 19120 Estimated Cost Pr E $0 $0 $0 $0 $0 $0 $0 $0 $( R $0 $o $0 $0 $0 $0 $0 $0 $( C/1 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $70,000 $-, O&M $0 $0 $0 $0 $0 $0 $0 $0 $( 1 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $70,000 $ Agency: Seal Beach Project Name: Annual Slurry Seal Project FUND NAME PERCENT ESTIMATED COST PROJECTED COST I Gas Tax 100 $700,000 $763,930 1 Project Limits: City Wide $700,000 $763,930 Type of Work: Road Maintenance Additional TOW: Slurry seal of roadway Project Description: Slurry Seal Local Streets City Wide Project Phase 1 14 14115 15116 16117 17118 18118 19120 Estimated Cost Pr E $0 $0 $0 $0 $0 $0 $0 $0 V R $0 $0 $0 $0 $0 $0 $0 $0 V C/I $100,000 $100.000 $100,000 $100,000 $100,000 $100,000 $100,000 $700,000 $" O&M $0 $0 $0 $0 $0 $0 $0 $0 $( $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $700,000 $ 5/3012013 Agency: Seal Beach Project Name: Annual Striping Program Project Limits: City wide Type of Work: Safety Additional TOW: Restripe roadway Project Description: This project will restripe worn pavement markings, bike lanes and traffic lanes. Measure M and Renewed Measure M (M2) Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2013/2014 through 201912020 FUND NAME PERCENT ESTIMATED COST MjEC1 Gas Tax 100.00 $200,000 $215,963 $200,000 $216,983 Project Phase 43114 14115 15116 16117 17/18 181`119 19/20 Estimated Cost Prt E $0 $0 $0 $0 $0 $0 $0 $0 $C R $0 $0 $0 $0 $0 $0 $0 $0 $C C111 $50,000 $25,000 $25.000 $25,000 $25,000 $25,000 $25,000 $200.000 $2 O&M $0 $0 $0 $0 $0 $0 $0 $0 $C 1 $60,000 $26,000 $25,000 $25,000 $26,000 $26,000 $26,000 $200,000 $ � Agency: Seal Beach Project Name; Comprehensive Parking Management Plan FUND NAME PERCENT ESTIMATED COST PROJECTED COST h General 100 $140,000 $140,000 F Project Limits: City Wide $140,000 $140,000 Type of Work: Other Additional Tow: Other Project Description: Provide a city wide comprehensive parking management plan. This plan is intended to identify the parking needs for the entire city and help determine a permit/fee system to address these parking needs. ProiectPhase 13114 ILIA i§a 16/17 17/16 1E2 19120 Esfimated Cost Prc E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 Gil $140,000 $0 $0 $0 $0 $0 $0 $140.000 $1 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 1 $140,000 $0 $0 $0 $0 $0 $0 $140,000 $ 1 5/30/2013 Measure M and Renewed Measure M (M2) Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 201312014 through 2019/2020 Agency: Seal Beach Project Name: Filter inserts & Screen Installation Project EURP N AME CEUT PER 9JnMATEQC9 AT PROJECTED – General 25.5 $12,914 $12.914 Project Limits: City wide ECP - Env Cleanup 74.5 $37,731 $37,731 Type of Work: Storm Water Pollution Mitigation $60,646 $50,645 Additional TOW: Automatic Retractable Screen and other debris screens or inserts Project Description: Install filter inserts and screens on city wide catch basins Project Phase 13/14 14/15 15116 16117 17118 18119 19/20 Estimated Cost Pri E $0 $0 $0 $0 $0 $0 $0 $0 $C R $0 $0 $0 $0 $0 $0 $0 $0 $C CA $50.645 $0 $0 $0 $0 $0 $0 $50,645 $5 O&M $0 $0 $0 $0 $0 $0 $0 $0 $C 1 $50,645 $0 $0 $0 $0 $0 $0 $50,645 $ Agency: Seal Beach Project Name: Main Street Lighting Improvements FUND NAME PERCENT ESTIMATED COST PROJECTED-C - 0 - S - T I General 74.5 $490,210 $490,210 F Project Limits: Main Street from PCH to Ocean Other 25.5 $167,790 $167,790 F Type of Work; Safety $668,00 $658,000 Additional TOW: Improve fighting of roadway I Project Description: Change out street lights and add new street lights to improve lighting on Main Street ftjRct Phase 13/14 14/15 15/16 16—/17 17118 18/19 19/20 Estimated Cost Ion E $0 $0 $0 $0 $0 $0 $0 $0 $C R $0 $0 $0 $0 $0 $0 $0 $0 $C C/I $658,000 $0 $0 $0 $0 $0 $0 $658,000 $E O&M $o $0 $0 $0 $0 $0 $0 $0 $C 1 $668,000 $0 $0 $0 $0 $0 $0 $668,000 $ , 5/30/2013 Agency: Seal Beach Project Name: Street Tree Planting Program Project Limits: City Wide Type of Work: Aesthetics Additional TOW: Landscaping of roadway Project Description: Install street trees in parkways based on street $0 tree master plan. Measure M and Renewed Measure M (M2) Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2013/2014 through 2019/2020 FUND NAME "` PERCENT ESTIMATED COST PROJECT General 100 $140.000 $ 152,786 $140,000 $152,786 Project Phase 13114 14115 15116 16/17 17118 18119, 19120 Estimated Cost Pr E $0 $0 $0 $0 $0 $0 $0 $0 $( R $0 $0 $0 $0 $0 $0 $0 $0 $( C/I $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $140,000 $' 08M $0 $0 $0 $0 $0 $0 $0 $0 $( $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $140,000 $ Agency: Seal Beach Project Name: Traffic Management Center Upgrade FUND NAME PERCENT ESTIMATED COST PROJECTED COST M2 Fairshare 11.3 $74,774 $ 74,774 1 Project Limits: City Yard to City Hall relocation TSSP 88.7 $586,946 $ 586,946 I Type of Work: Other $661,720 $661,720 Additional TOW: Other Project Description: To relocate the existing TMC from the City Yard to City Hall. Proiect Phase 13/14 14/15 15/16 16/17 17/1 -8 18 ^119 19120 Estimated Cost Pr, E $0 $0 $0 $0 $0 $0 $0 $0 $( R $0 $0 $0 $0 $0 $0 $0 $0 $C C/I $575,320 $0 $0 $0 $0 $0 $0 $575,320 $`. 08M $0 $43,200 $43.200 $0 $0 $0 $0 $86,400 $E $575,320 $43,200 $43,200 $0 $0 $0 $0 $661,720 $ 5130/2013 Measure M and Renewed Measure M (M2) Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 201312014 through 201912020 Agency: Seal Beach 13/14 14/15 15/16 16117 Project Name: Westminster Avenue Rehabilitation Project 18119 FUND NAME PERCENT ESTIMATED COST 1PRQJECTE $0 $0 CMAQ 50-.00 $1,000,000 $ 1,000,000 Project Limits: Westminster Ave. between Seal Beach Blvd, and R M2 Fairshare 31.00 $620,000 $620,000 East City Limits $0 $0 $0 $0 C/I $2,000,000 Type of Work: Bikeways $0 Prop 42 19.00 $380,000 $380,000 Additional Tow: Reconstructiontrehabilitation of existing bike route O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Description: This project will resurface and stripe a class 11 $2,000,000 $2,000,000 bike path on Westminster Ave. between Seal Beach Blvd, and East City Limits. Project Phase 13/14 14/15 15/16 16117 17118 18119 19120 Estimated! Cost Pr( E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 so $0 $0 $0 $0 $0 $0 C/I $2,000,000 $0 $0 $0 $0 $0 $0 $2,000,000 $2 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 1 $2,000,000 $0 $0 $0 $0 $0 $0 $2,000,000 $ : ATTACHMENT "C" Maintenance Of EiVort Reporting For and Supporting Documentation Reporting Jurisdiction: City of Seal Beach Type of GENERAL FUND Transportation Expenditures: (please attach supporting budget documentation for each line item listed below, and record separately in CIP software) ivimill 1 Subtotal CONSTRUCTION ADMINISTRATIVEIOTHER "lir-10 liq1to11qu1l Engineering/Public Works $109,500 Subtotal Other $109,500 Total General Fund Transportation Expenditures (less Total MOE Exclusions*) MOE Expenditures MOE Benchmark Requirement (Shortfall)/ Surplus $749,424 (-) $ 749,424 $ 505,000 $ 244,424 Certification: I hereby certif e City of Seal Beach has budgeted and wil :tee the Mai s nce of Effort requirement for Fiscal Year 2013/2014. C) I Signature (Finance Director) Date Director of Finance /City Treasurer Title GENERAL FUND: Engineering /Public Works Storm Drains Street Maintenance CITY OF SEAL BEACH FY 2013/2014 MOE CALCULATION Less Gas Dew Budget Tax Transfer 042 $ 109,500 043 $ 381,400 044 $ 943,000 $ (763,100) Add per State Audit Allowable Discretionary Costs: Landscape Maintenance 049 $ 296,800 Less Measure M Threshold Requirement Excess (Deficiency) Coverage Less 57% Less (non- street Intergov Adjusted related ) Payments Actual 109,500 (49,000) 332,400 ..00 $ (169,176) $ 127,624 Subtotal $ 749,424 $ (505,000) $ 244,424 ON O f I• f A FY 2013 -2014 DEPARTMENT: Public Works Employee salaries costs Account Code: 001 -042 FUND: 001 General Fund - Administration and Engineering Employee benefits costs 40008 Auto Allowance Employee benefits costs 2012 -2013 Cell Phone Allowance 2013 -2014 40010 2011 -2012 Amended 2012 -2013 Proposed Employee benefits costs Actual Budget Estimated Budget _ Personnel Services $ 57,437 $ 57,577 $ 59,500 $ 72,600 Maintenance and (Operations 165,495 128,900 128,900 36,900 TOTAL $ 222,932 $ 186,477 $ 188,400 $ 109,500 ACCOUNT NUMBER EXPLANATION 40001 Full -time Salaries Employee salaries costs 40003 fiver -time Employee salaries costs 40007 Tuition Reimbursement Employee benefits costs 40008 Auto Allowance Employee benefits costs 40009 Cell Phone Allowance Employee benefits costs 40010 Deferred Comp - Cafeteria Employee benefits costs 40011 Deferred Compensation Employee benefits costs 40012 PERS Retirement Employee benefits costs 40013 PARS Retirement Employee benefits costs 40014 Medical Insurance Employee benefits costs 40015 AFLAC Cafeteria Employee benefits costs 40017 Medicare Insurance Employee benefits costs 40018 Life and Disability Employee benefits costs 40100 Office Supplies Office supplies 40300 Memberships and Dues APWA, ASCE, CA PE License, ITE, NWOCPWD, CEADOC 40400 Training and Meetings League of Cities, Traffic Engineering Course, report writing, map act, inspection courses, EIT training, water certification, professional engineering license 40802 Special Exp. - Comm. Input Proj Entry monument, and helicopter and noise study 44000 Contract Professional Svcs Miscellaneous Professional Engineering, Development Engineering Support, AutcCAD software subscription, Grant submission support, and GIS upgrade. 106 City of Seal Beach I FY 2013 -2014 DEPARTMENT: Public Works Account Code: 001 -042 FUND: 001 General Fund - Administration and Engineering 2012 -2013 2013 -2014 Account 2011 -2012 Amended 2012 -2013 Proposed Description Number Actual Budget Estimated Budget PERSONNEL SERVICES Full -time Salaries 001 - 042 -40001 $ 35,879 $ 35,735 $ 36,300 $ 36,800 Over -time 001 - 042 -40003 163 - - - Part -time 001- 042 -40004 2,334 3,000 1,000 18,100 Tuition Reimbursement 001- 042 -40007 - - 2,600 1,900 Auto Allowance 001- 042 -40008 4,362 4,200 4,200 - Cell Phone Allowance 001- 042 -40009 2,804 2,700 3,200 3,600 Deferred Comp - Cafeteria 001 - 042 -40010 95 63 300 400 Deferred Comp 001 - 042 -40011 851 809 900 900 PERS Retirement 001 - 042 -40012 6,050 5,888 5,600 4,800 PARS Retirement 001 - 042 -40013 80 100 100 300 Medical Insurance 001- 042 -40014 3,771 3,859 4,200 4,500 AFLAC Cafeteria 001- 042 -40015 - Medicare Insurance 001 - 042 -40017 538 714 500 900 Life and Disability 001 - 042 -40018 337 336 400 400 Vacation Buy /Payout 001 - 042 -40027 173 173 200 - TOTAL PERSONNEL SERVICES $ 57,437 $ 57,577 $ 59,500 $ 72,600 MAINTENANCE AND OPERATIONS Office Supplies 001-042-40100 $ 2,642 $ 2,800 $ 2,800 $ 2,800 Memberships and Dues 001 - 042 -40300 642 2,600 2,600 2,600 Training and Meetings 001 - 042 -40400 3,012 3,500 3,500 3,500 Special Departmental 001- 042 -40800 328 - - - Special Exp. -Comm. Input Prj 001 - 042 -40802 - 30,000 30,000 - Telephone Engineer 001 - 042 -41000 34 - - - Contract Professional 001 - 042 -44000 158,837 90,000 90,000 28,000 TOTAL MAINTENANCE AND OPERATIONS $ 165,495 $ 128,900 $ 128,900 $ 36,900 TOTAL EXPENDITURES $ 222,932 $ 186,477 $ 188,400 $ 109,500 107 City of Seal Beach FY 2013-2014 DEPARTMENT: Public Works Full-time Salaries Accounf Code: 001-043 FUND; 001 General Fund - Storm Drains Employee salaries costs 40004 Part-time Employee salaries costs 2012-2013 Deferred Comp - Cafeteria 2013-2014 2011-2012 Amended 2012-2013 Proposed Actual Budget Estimated Budget Personnel Services $ 188,380 189,550 $ 191,100 $ 215,300 Maintenance and Operations 122,409 162,600 162,600 166,100 TOTAL 310,790 $ 352,150 $ 353,700 $ 381,400 ACCOUNT NUMBER EXPLANATION 40001 Full-time Salaries Employee salaries costs 40003 Over-time Employee salaries costs 40004 Part-time Employee salaries costs 40010 Deferred Comp - Cafeteria Employee salaries costs 40011 Deferred Compensation Employee salaries costs 40012 PERS Retirement Employee salaries costs 40013 PARS Retirement Employee salaries costs 40014 Medical Insurance Employee salaries costs 40015 AFLAC Cafeteria Employee salaries costs 40017 Medicare Insurance Employee salaries costs 40018 Life and Disability Employee salaries costs 40400 Training and Meetings Staff trainings 40700 Equipment/Materials Materials for West End Pump Station 41020 Electricity Electricity for West End Pump Station 44000 Contract Professional Svcs NPDES program consultant, catch basin maint., NPIDES advertising, catch basin testing, storm drain video inspection, catch basin filter replacement, professional engineering services, winter storm pump rental, storm preparation flyers, and employee uniforms 45000 Intergovernmental State Water Resources Control Board, NPIDES permit County Orange, AQMD permit fee and LA County property tax City of Seal Beach FY 2013-2014 DEPARTMENT: Public Works Account Code: om*o pomo: mn General Fund ' Storm Drains 2012-2013 e013'2014 Account 2011-2012 Amended 2012a013 pm»oxeu Description Number Actual Budget Estimated Budget PERSONNEL SERVICES Full-time Salaries 001o13-40001 $ 137.8e5 $ 139.154 $ 137.200 $ 1*3.200 owa=ump 001-0*340003 117 ' 400 5.000 Part-time 001*43-*0004 3,377 *.smo 7.300 21.500 Deferred Comp 'Cafeteria 001-0*340010 161 418 000 1.000 oefenuuCompeosauon 001'0*340011 z.so* 2,825 2,800 2,900 peRoRau,empot 001-0*3-40012 23.284 22.e30 21'700 18.300 PARS Retirement 001*4340013 er zoV 200 ano Medical Insurance 001o4348014 15.264 15.494 15.900 18.700 Medicare Insurance 001-04310017 1.931 z.z/r 2,000 2,600 Life anuoisaui|oy 001-04340018 1.431 1.43* 1.500 1.600 comptimeau»/Payom 001-043-4002e 236 ' 200 vocauonc"y/puyom 001-0*3-40027 961 318 1.100 zno Sick Payout 001'0*3-40028 oen - TOTAL PERSONNEL SERVICES MAINTENANCE AND OPERATIONS Training and wucmnox 001-043-40400 $ $ - $ * 1.000 Equ/pmanmwateria|x 001'04340700 ara 3.000 3,000 o'nnn u=udmty 001*4341020 14.824 15.000 15.000 15.000 Contract Professional 001-04344000 68.818 95,600 95.600 e8.100 Intergovernmental 001'04345000 37894 4e0 4900 *ouou TOTAL MAINTENANCE AND OPERATIONS TOTAL EXpemo|ruRso 110 City of Seal Beach Employee salaries costs 40003 IFY 2013 -2014 Employee salaries costs DEPARTMENT: Public Works Employee salaries costs 40010 Account Code: 001 -044 FUND: 001 General Fund -Street Maintenance Employee benefits costs 40012 PERS Retirement Employee benefits costs 40013 PARS Retirement 2012 -2013 40014 2013 -2014 Employee benefits costs 40015 2011 -2012 Amended 2012 -2013 Proposed Employee benefits costs 40018 Actual Budget Estimated Budget Personnel Services $ 564,888 $ 565,309 $ 569,100 $ 505,100 Maintenance and Operations 347,097 405,532 406,632 437,900 TOTAL $ 911,985 $ 970,841 $ 975,732 $ 943,000 ACCOUNT NUMBER EXPLANATfON 40001 Full -time Salaries Employee salaries costs 40003 Over -time Employee salaries costs 40004 Part -time Employee salaries costs 40010 Deferred Comp - Cafeteria Employee benefits costs 40011 Deferred Compensation Employee benefits costs 40012 PERS Retirement Employee benefits costs 40013 PARS Retirement Employee benefits costs 40014 Medical insurance Employee benefits costs 40015 AFLAC Cafeteria Employee benefits costs 40017 Medicare Insurance Employee benefits costs 40018 Life and Disability Employee benefits costs 40022 Flexible Spending - Cafeteria Employee benefits costs 40300 Membership Dues Annual membership 40700 Equipment/Materials Asphalt hot/cold mix, traffic signs, graffiti abatement, pavers, sand bags, equipment, materials, and tools 40800 Special Departmental Trimming of parkway and median trees 40801 Street Sweeping Provides street sweeping 40802 Special Exp. - Comm Input Proj Pavers in Parkway at Gidscout house 41000 Telephone Verizon cell phone costs 41020 Electricity Electricity costs 44000 Contract Professional Svcs Traffic signal maint., plant/shrub replacement, Main St. sidewalk pressure washing, citywide pavement rehab., lighting maint. Contract, concrete rehab., landscape maint. Of medians/tract, employee uniforms, irrigation system repairs, traffic engineer services, and Citywide traffic counts 112 City of Seal Beach FY 2013 -2014 DEPARTMENT: Public Works Account Code: 001 -044 FUND: 001 General Fund - Street Maintenance 2012 -2013 2013 -2014 Account 2011 -2012 Amended 2012 -2013 Proposed Description Number Actual Budget Estimated Budget PERSONNEL SERVICES Full -time Salaries 001 -044 -40001 $ 412,792 $ 417,826 $ 408,100 $ 375,900 Over -time 001 - 044 -40003 605 - 1,100 5,000 Part -time 001 - 044 -40004 6,672 8,000 21,300 5,800 DeferredComp - Cafeteria 001 - 04440010 1,317 1,106 2,100 2,600 Deferred Compensation 001 - 044 -40011 8,260 7,956 7,600 7,600 PERS Retirement 001 - 044 -40012 69,733 68,849 64,500 48,000 PARS Retirement 001 - 044 -40013 130 200 400 100 Medical Insurance 001 - 04440014 47,722 48,513 50,500 49,600 AFLAC Cafeteria 001 - 044 -40015 - - - - Medicare Insurance 001 -044 -40017 5,390 6,751 5,800 6,000 Life and Disability 001 - 04440018 4,283 4,300 4,400 4,100 Comptime Buy /Payout 001 - 044 -40022 1,180 - 400 - Vacation Buy /Payout 001 - 044 -40027 4,840 1,808 2,900 400 Sick Payout 001 - 044 -40028 1,963 - - - TOTAL PERSONNEL SERVICES $ 564,888 $ 565,309 $ 569,100 $ 505,100 MAINTENANCE AND OPERATIONS Membership 001 - 044 -40300 $ - $ - $ - $ 500 Training and Meetings 001 - 044 -40400 - 1,500 Telephone 001 - 04441000 - - - 1,200 Equipment/Materials 001 - 044 -40700 24,252 36,000 36,000 36,000 Special Departmental 001 - 044 -40800 59,033 70,000 70,000 106,000 Street Sweeping 001 - 044 -40801 50,333 50,132 50,132 53,200 Special Exp. - Comm Input Prj 001 - 044 -40802 - 3,500 3,500 - Telephone 001 - 044 -41000 - - 1,100 - Electricity 001 - 044 -41020 14,628 16,000 16,000 16,000 Contract Professional 001 - 044 -44000 198,851 229,900 229,900 223,500 TOTAL MAINTENANCE AND OPERATIONS $ 347,097 $ 405,532 $ 406,632 $ 437,900 TOTAL EXPENDITURES $ 911,985 $ 970,841 $ 975,732 $ 943,000 113 REVENUE SUMMARY BY FUND I FY 2013-2014 Account Number Gas Tax - 040: 040-000-30420 040-000-32499 040-000-32500 040-000-32525 040-000-32530 040-000-32535 Total Gas Tax Measure M - 041: 041-000-30420 041-000-33500 Total Measure M Measure M2 - 042: 042-000-30420 042-000-33500 Total Measure M2 Parking-in-Lieu - 048 048-000-30865 Parking-in-Lieu $ 22,075 $ 2012-2013 16,200 $ Total Parking In-Lieu 2013-2014 Revenue $ 2011-2012 16,200 Amended Seal Beach Cable -SO: 2012-2013 Property Rental Proposed Source Actual 050-000-30131 PEG Fees Publ Access, Edu, Gov Budget 89,132 Estimated - $ Budget $ 90,000 050-000-30420 Interest On Investments 1,951 - Interest On Investments $ 3,089 - $ 1,300 $ 1,500 $ 1,300 Gas Tax 2103 346,527 282,329 282,329 368,100 Gas Tax 2105 119,578 125,718 139,000 121,500 Gas Tax 2106 86,235 88,886 92,200 85,300 Gas Tax 2107 176,580 180,423 186,200 180,900 Gas Tax 2107.5 6,000 6,000 6,000 6,000 738,009 $ 684,656 $ 707,229 $ 763,100 Interest On Investments $ 4,665 $ 2,000 $ 2,500 $ 2,000 Local Tumback 362,702 370,623 - - 367,367 $ 372,623 $ 2,500 $ 2,000 Interest On Investments $ - $ - $ 775 $ 1,000 Local Fairshare 370,623 370,600 $ $ $ 371,398 $ 371,600 048-000-30865 Parking-in-Lieu $ 22,075 $ - $ 16,200 $ Total Parking In-Lieu $ 22,075 $ - $ 16,200 067-000-30423 Seal Beach Cable -SO: 067-000-31650 Property Rental Total Riverfront Tax Increment 050-000-30131 PEG Fees Publ Access, Edu, Gov $ 89,132 $ - $ 90,000 $ 90,000 050-000-30420 Interest On Investments 1,951 - 1,100 1,100 Total Seal Beach Cable - $ 91,083 $ - $ 91,100 $ 91,100. Riverfront Low/Mod Housing - 061: 061-000-30420 Interest On Investments 061-000-38555 Low/Mod Housing Set Aside Total Riverfront LowlMod Housing Riverfront Project Area - 063: 063-000-30420 Interest On Investments Total Riverfront Project Riverfront Debt Service - 065: 065-000-30420 Interest On Investments 065-000-31500 Transfers In Total Riverfront Debt Service Riverfront Tax Increment - 067; 067-000-30001 Property Taxes Secured 067-000-30002 Property Taxes Unsecured 067-000-30003 Homeowners Exemption 067-000-30005 Property Tax Other 067-000-30006 Supplemental Tax Secure/Unsecure 067-000-30420 Interest On Investments 067-000-30423 Unrealized Gain/Loss On Investment 067-000-31650 Property Rental Total Riverfront Tax Increment Roberti-ZBerg Urban Open Space - 070: 070-000-30975 Grant Reimbursement Total Roberti-Z'Berg Urban Open Space $ 2,841 $ $ $ 258,674 $ 261,515 $ $ $ $ 8,194 $ $ $ 8,194 $ $ $ 45 $ 594,489 $ 594,534 $ 1,229,456 $ 40,811 7,556 9,864 5,682 990 (9,652) 425 $ 1,286,132 $ $ 12,081 $ $ $ 12,081 $ $ ifi City of Sea[ Beach Employee salaries costs 40003 I FY 2013-2014 DEPARTMENT: Public Works Deferred Comp - Cafeteria Employee benefits costs Account Code: 001-049 FUND: 001 General Fund - Landscape Maintenance PERS Retirement Employee benefits costs 40014 Medical Insurance Employee benefits costs 2012-2013 Medicare Insurance 2013-2014 40018 Life and Disability 2011-2012 Amended 2012-2013 Proposed 40700 Equipment/materials Actual Budget Estimated Budget Personnel Services $ 33,524 $ 33,497 $ 34,200 $ 34,400 Maintenance and Operations Electricity 215,654 201,200 206,100 262,400 TOTAL $ 249,178 $ 234,697 $ 240,300 $ 296,800 ACCOUNT NUMBER EXPLANATION 40001 Full-time Salaries Employee salaries costs 40003 Over-time Employee salaries costs 40010 Deferred Comp - Cafeteria Employee benefits costs 40011 Deferred Compensation Employee benefits costs 40012 PERS Retirement Employee benefits costs 40014 Medical Insurance Employee benefits costs 40017 Medicare Insurance Employee benefits costs 40018 Life and Disability Employee benefits costs 40022 Flexible Spending - Cafeteria Employee benefits costs 40700 Equipment/materials Arbor Park support (doggie bags and fencing), Gurrigrove Park support (doggie bags and etc), misc playground equipment (Beach Tot Lot), Heather Park, Almond Park, and Manna Center 41000 Telephone phone costs 41020 Electricity Electricity at Parks 44000 Contract Professional Svcs Park landscape maint., Heather/Edison Park portable restrooms, pest control, tree trimming, fighting repairs, certified playground safety inspections, park irrigation repairs, park fencing repairs, Zoeter Park sports field maint,, and plant/shrub replacement 115 City of Seal Beach FY 2013-2014 ospxmTMEwr Public Works Account Code: 001-049 FUND: 001 General Fund - Landscape Maintenance TOTAL EXPENDITURES 2012-2013 2013-20* ^opoum 2011-20 12 mnr^ueu 2012-2013 Proposed Description Number Actual Budget Estimated Budget PERSONNEL SERVICES Full-time Salaries 001'04e-40001 $ 25,693 % 25'713 $ 26.100 $ 26'800 Deferred Comp 'Cafeteria 001-0*9-40010 45 10 zuo ano Defen=d Comp 001-049-40011 urc snr 700 700 PARS Retirement 001*49-40012 4.332 4.e37 4.100 3,500 Medical Insurance 001-049-*0014 2,030 2,065 2.100 c^oon womcv":msun^nm 001'04e-40017 oss 411 400 ano Life and Disability 001-049'*0018 ozo 221 ono soo nompumeuvy/royovt 001-0*9-4002e ' 100 varauonowvp^yvu/ 001-0*eAo027 173 173 zou TOTAL PERSONNEL SERVICES MAINTENANCE AND OPERATIONS Equipment/Materials 001'0*94o700 $ 3,588 $ 4.700 $ 8,000 $ 12.008 Telephone 001-049-11000 ' ' nno 13.400 Electricity 001-04e41020 18.ee2 13.000 14.300 13.000 Contract Professional 001'0*9-44000 1933e3 1e3500 183500 224000 TOTAL MAINTENANCE AND OPERATIONS TOTAL EXPENDITURES Congestion Management Program. Monitoring CMP MONITORING CHECKLIST LEVEL OF SERVICE Jurisdiction: City of Seal Beach CMP CHECKLIST YES NO N/A 1. Check "Yes" if either of the following apply: • There are no CMP intersections in your jurisdiction. • Factoring out statutorily-exempt activities', all CMP X El intersections within your jurisdiction are operating at LOS E (or the baseline level, if worse -than E) or better. N1551) To ANSWERTHE-REMAINING QUESTIONS. 2. If any, please list those intersections that are not operating at the CMP LOS standards. El 3. Will deficient intersections, if any, be improved by mitigation measures to be implemented in the next 18 months or improvements El F El programmed in the first year of any recent funding program (i.e., local a. If not, has a deficiency plan been developed for each intersection that will be operating below the CMP LOS E] El F Additional Comments: I certify that the i or ion containediftlhis checklist is true. , The following activities are statutorily-exempt from deficiency determinations: interregional travel, traffic generated by the pn»viakm of low and very kmv income houming, construction rehabilitation or maintenance of facilities that impact the aystem, freeway ramp meterng, traffic signal coordination by the state or multi- jurisdictional agenoies, traffic generated by high-density residential development within }{ mile of o fixed-rail passenger station, tnaffiogenerated by mixed-use residential development within % mile ofa fixed-rail passenger CMP MONITORING CHECKLIST DEFICIENCY PLANS Jurisdiction: City of Seal Beach CMP CHECKLIST YES No N/A 1. Check "Yes" if either of the following apply: • There are no CHIP intersections in your jurisdiction. • Factoring out statutorily- exempt activities2, all CIVIPHS X ❑ intersections are operating at LOS E (or baseline, if worse than E) or better. NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION NEED TO ANSWER °THE REMAINING QUESTIONS. 2. If any, please list those intersections found to not meet the CMP LOS standards. El 3. Are there improvements to bring these intersections to the CMP LOS standard scheduled for completion during the next ❑ ❑ X 18 months or programmed in the first year of the CIP? NOTE: C1NI..Y.THOSE„ AGENCIES THAT CHECKED Y`NW FOR QUESTION 3 NEED TO ANSWEk THE REMAINING QUESTIONS. 4. Has a deficiency plan or a schedule for preparing a deficiency ❑ ❑ ❑ plan been submitted to OCTA? 5. Does the deficiency plan fulfill the following statutory requirements: a. include an analysis of the causes of the deficiency? ❑ ❑ ❑ b. include a list of improvements necessary to maintain minimum LOS standards on the CMPHS and the ❑ ❑ ❑ estimated costs of the improvements? z The following activities are statutorily- exempt from deficiency determinations: interregional travel, traffic generated by the provision of low and very low income housing, construction rehabilitation or maintenance of facilities that impact the system, freeway ramp metering, traffic signal coordination by the state or multi - jurisdictional agencies, traffic generated by high - density residential development within' /4 mile of a fixed -rail passenger station, traffic generated by mixed -use residential development within % mile of a fixed -rail passenger station. CIVIP CHECKLIST continued YES NO N/A c. include a list of improvements, programs, or actions, and estimates of their costs, which will improve LOS on El F-1 F-1 the CMPHS and improve air quality? i. do the improvements, programs, or actions meet the criteria established by SCAQMD (see the CMP Preparation Manual)? 6. Are the capital improvements identified in the deficiency plan F-1 F-1 F-1 programmed in your seven-year CMP CIP? 7. Does the deficiency plan include a monitoring program that will F-1 R R ensure its implementation? 8. Does the deficiency plan include a process to allow some level of development to proceed pending correction of the El El El deficiency? 9. Has necessary inter-jurisdictional coordination occurred? El El El 10. Please describe any innovative programs, if any, included in the deficiency plan: F-1 Additional Comments: I certify that the i tio� i is checklist is true. Signature: V z 6,�40ciatwEna i nee 0�v Title: CMP MONITORING CHECKLIST LAND USE COORDINATION Jurisdiction: City of Seal Beach CMP CHECKLIST YES NO N/A 1. Have you maintained the CIVIP traffic impact analysis (TIA) process F-1 El X you selected for the previous CMP? a. If not, have you submitted the revised TIA approach and methodology to OCTA for review and approval? 2. Did any development projects require a CMP TIA during this F-1 n CIVIP cycle ON'LYTHOSE AGENCIES THAT WERE" "fMQUESTION, AN eD YES" 4. Please list any CIVIPHS links & intersections that were projected to not meet the CMP LOS standards (indicate whether any are outside of your jurisdiction). 1K a. Were mitigation measures and costs identified for each and included in your seven-year CIP? b. If any impacted links & intersections were outside your jurisdiction, did your agency coordinate with other n F jurisdictions to develop a mitigation strategy? Exemptions include: — any development generating less than 2,400 daily trips — any development generating |euu than 1,600 daily trips (if it directly aooeaaea a CK8P highway) — final tract and parcel maps, — issuance of building permits, — issuance of certificate of use and occupancy, — minor modifications toapproved developments where the location and intensity of project uses have been approved through previous and separate local government actions prior to January 1, 1992. 4 CMP CHECKLIST continued YES No N/A 5. If a local traffic model was /will be used, did you follow the data and modeling consistency requirements as described in the CMP ❑ ❑ 1K Preparation Manual (available online at http: / /www.octa.net)? Additional Comments: I certify that the info at' n c is checklist is true. Signature: Title: A ciate nginee' CMP MONITORING CHECKLIST CAPITAL IMPROVEMENT PROGRAM Jurisdiction: City of Seal Beach CMP CHECKLIST YES NO N/A 1. Did you submit a seven-year Capital Improvement Program (CIP) to OCTA by June 30? 2. Does the CIP include projects to maintain or improve the performance of the CMPHS (including capacity expansion, safety, maintenance, and rehabilitation)? 3. Is it consistent with air quality mitigation measures for 0 transportation-related vehicle emissions? 4. Was the CIP database computer application provided by OCTA 1:1 D used to prepare the CMP CIP? Additional Comments: I certify that the infor c ained in this -checklist is true. Signature: Title: A e EW019& ATTACHMENT "E" Measure M2 Eligibility Checklist MEASURE M ELIGIBILITY CHECKLIST Responsibility: Cities, County MEASURE M CHECKLIST Capital Improvement Program 1. Did you submit your draft Measure M seven-year Capital rX__1 1- Im Improvement Program (CIP) to OCTA by June 30? a. Did you utilize the required CIP development software? 177-1 r7 V, I b. Have you indicated what percentage of funding will come from M M each source for each of the projects? M C, Have you listed projects in current year dollars? JA M-1 I d, Did you include all projects that are partially, fully or potentially 771 M funded by Measure M? e. The council approval date to adopt the final 7-Year CIP is June 10, 2013 (Must be prior to July 31) Maintenance of Effort YES NO 2. Did you submit your Maintenance of Effort certification and Fx_1 E3 supporting budget documentation to OCTA by June 30? a. Did you use the Maintenance of Effort Reporting Form MX F� included in the Eligibility Guidelines? Pavement Management Program YES NO NIA 1 Did you submit a Pavement Management Program (PMP) Update to OCTA for this eligibility cycle? a. Did you use the current PMP Certification form? b. Is the PMP consistent with the OCTA Countywide Pavement Management Program? 4. If you answered "no" to question #3, did you submit a PMP Update to OCTA through the previous eligibility cycle by June 30? Page 1 of 3 M mmm MMM E Resolution of Master Plan of Arterial Highways (MPAH) Consistency YES NO N/A 5. Did you submit a resolution demonstrating consistency with the F-1 0 r7 MPAH. 6• Have you enclosed a figure representing your most current F-1 M M circulation element? 7. Do you have a current Local Signal Synchronization Plan that is JA 1 F-1 F-1 consistent to the Regional Traffic Signal Synchronization Master Plan? Mitigation Fee Program YES NO N/A 8- Does your jurisdiction currently have a defined development impact 177 ED 71 mitigation fee program in place? a. If you answered yes to #8, have you included a copy of your JA I current impact fee schedule; or b. If you answered yes to #8, have you provided OCTA with a ED ED copy of your mitigation fee nexus study; or C. If you answered yes to #8, have you included a copy of your ED F-1 ED council approved policy; or d. If you answered yes to #8, have you provided OCTA with a ED ED copy of your council resolution approving the mitigation fee program? Time Limits For Use of Net Revenues YES NO 9. Has your jurisdiction observed the time limits for the use of net F-1 F-1 revenues over the last year per the requirements outlined in the ordinance? Supplanting of Developer Commitments YES NO 10• Has your jurisdiction insured they have not supplanted developer commitments for transportation projects and funding with Measure M funds? Planning Strategies YES NO Does your jurisdiction consider as part of its General Plan, land use planning strategies that accommodate transit and non-motorized transportation? 12. Have you provided a letter identifying land use planning strategies that accommodate transit and non-motorized transportation consideration in the general plan? Page 2 of 3 Traffic Forums 13. Did representatives of your jurisdiction participate in the regional traffic forum(s)? a. If you answered yes, provide date of attendance: ITS Roundtable - 10/17/2012 & 2/20/2013 Congestion Management Program 14. Has your jurisdiction completed the required CMP checklist? Submitted By: David Spitz Name (Print) YES NO 0 0 YES NO N/A 0 0 0 Associate Engineer Title City of Seal Beach (562) 431 -2527 ext. 1331 6/11/2013 Jurisdiction Phone Number Date Page 3 of 3 ATTACHMENT "F" June 11, 2013 May flout Orange County Transportation Authority 600 South Main Street Orange, CA 92868 Measure M2 Eligibility for Fiscal Year 2013/2014 May Ilout: In order to maintain compliance with the requirements for Measure M2 Eligibility, the City of Seal Beach is required to "Consider, as part of the Eligible Jurisdiction's General Plan, land use strategies that accommodate transit and non-motorized transportation." The City's General Plan, first adopted in 1973 and most recently amended in 2003, incorporates goals and strategies within both its Circulation Element and Land Use Element that specifically target these areas of importance. In the City's Land Use Element of the General Plan, A major goal of the City is stated on page LU-39, with regard to incorporating transportation systems into physical development: "Seal Beach should carefully consider the development of freeways, and/or rapid transit systems and endorse such proposals only when it is considered to be in the community's best interests. Efforts should be made to improve traffic circulation in the coastal section of the City and along major arterial streets, but not exclusively private auto vehicular traffic." Within the Circulation Element of the City's General Plan, on page C-53, the City outlines its goals and objectives for Public Transportation. More specifically, the City's main goal is to "Maintain participation in a public transit system that provides mobility to City residents and employees as a logical alternative to automobile travel." One policy of this goal is to "Coordinate with OCTA and other appropriate entities to improve bus service to and within the City." Another policy is to "Implement and expand, whenever feasible, programs aimed at enhancing the mobility of senior citizens and disabled persons." A third policy under this goal is to "require proposed developments to include transit facilities, such as park-and-ride sites, bus benches, shelters, pads or turnouts, where appropriate, in their improvement plans or as needed in proximity to their development." Continuing on Page C-54 of the City's General Plan, the City has laid out goals and objectives for Bicycle and Pedestrian Facilities. The main goal is to "Provide a citywide system of safe, efficient, and attractive bicycle and pedestrian routes for commuter, school, and recreational use." The City's policies include provisions to: "Develop and adopt a planned bikeway system that is consistent with the County of Orange Master Plan of County-wide Bikeways, and other adopted Master Plans, to assure that local bicycle routes will be compatible with routes of neighboring jurisdictions,", "Develop programs that encourage the safe utilization of easements and/or rights-of-way along flood control channels, public utilities, railroads, and streets wherever possible for the use of bicycles and/or pedestrians", and "Ensure accessibility of pedestrian facilities to the elderly and disabled." These are some of the elements within the City's General Plan which show that the City provides goals and policies to accommodate transit and non-motorized transit. Should you have any questions or require further information, please contact me at (562) 431- 2527 ext 1331. Sincerely, David VSZ, P.1 ate Engineer Asso ate Engineer City of Seal Beach Cc Public Works Director, City of Seal Beach City Engineer, City of Seal Beach Circulation Element Figure Figure 15 City of Seal Beach General Plan Circulation dement 1-405 Freeway 1-605 Freeway Bra Rood A- cot4r way Avenue Harvard Lone St.' — Wlew Fork ve sonwood street SR-22 SR-22 Freeway �405 Fraway, 1-405 Freeway US. Naval Weapons Station Monterey Rood Thundv*d Drive Owth plate 11061,611#1 tooj ,jjVfpjjer,A ple as Mlso 1166441114 Cioaffine Dri on Drive Mark Or*. Avenue U4 Naval Weopcor Station 00 venue "#** Oofboa Drive street Moh street 12th Street Fries Central Avenue Edinger AVer" LWd Pacific Oman SW Beach Oty Unit Major (120' Riot of Way) Ismosset = Primary (IW Right of Way) - Secondary (W Right of Kunzman Associates 2568/36 Circulation - Figure 15 - General Plan Circulation Element City of Seal Beach General Plan C-28 (12/03) ATTACHMENT "G" Land Use Element and Fee Schedule D. P J U U Land Use Element Circulation F."MIT-MrMTS Seal Beach should carefully consider the development of freeways, and/or rapid transit systems and endorse such proposals only when it is considered to be in the commu- nity's best interest. Efforts should be made to improve traffic circulation in the coastal section of the City and along major arterial streets, but not exclusively private auto vehicular traf- fic. In the event annexation issues were to arise in the future, the City of Seal Beach shall only consider the annexation of un- incorporated territories, or requests by unincorporated areas for annexation, when such action would be beneficial to all parties involved. Currently, the City has no officially desig- nated "sphere of influence" land use areas and there are no current plans to annex any adjoining unincorporated -areas from the County of Orange or from its neighboring munici- palities. Planning Area 1 - Old Town/Surfs[de Downtown Seal Beach/Main Street Specific Plan City of Seal Beach General Plan (12/03) Encourage a mix of land uses, including off ces, busi- nesses, and retail stores to serve local residents and visi- tors. • Regulate visitor-serving uses so as to not overwhelm the area at the expense of small town character. • Prepare building and design provisions to enhance the pedestrian orientation of Main Street and ensure that the surrounding area is maintained. • Encourage a hitectural and economic diversity. • Develop standards and processes to ensure compatibility and balance between residential and commercial uses. • Establish a parking program to address local resident and visitor needs to ensure and to minimize potential traffic safety impacts, pedestrian-vehicle conflicts, and parking impacts. LU-39 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL ESTABLISHING FEES AND CHARGES FOR GOODS, SERVICES AND FACILITIES PROVIDED BY THE CITY OF SEAL BEACH WHEREAS, the City Council is empowered to impose reasonable fees, rates, and I charges for municipal services; and WHEREAS, the City Council has determined that the fees, rates, and charges should cover the costs reasonably borne or a substantial portion of the actual costs of the goods and services provided by the City; and WHEREAS, the City Council has determined that fees, rates, and charges for municipal services do not cover the actual costs under the current fee schedule. NOW, THEREFORE, the Seal Beach City Council hereby establishes the amount of certain fees, rates and charges using the recommendations stated in the 2012 Full Cost Allocation Plan and Cost of Services Study provided by Matrix Consulting Group; and restates that amount of other fees, rates, charges and taxes as currently set forth in Resolution Numbers 5898 as follows: SECTION 1. ADMINISTRATIVE FEES A. Documents The following fees are established to reimburse the City for costs relative to filling public requests for copies of non-confidential records; codes, brochures, booklets, and patent materials not marked for general distribution. Most documents listed are available on the City's website: www.sealbeacica.gov 1. Copy Charge a. 8V2x11 .......... ............ ....... .................... ................. $.25 per page b. 81/2 x14 and 11 x17 ...................... ............................... $.50 per page c. color copies............... .................................................. $.50 per page 2. Preparation of Compact Disc ................... ..........................$8.00 per copy 3. City Charter .................................................................................... $10.50 4. Municipal Code (Title 1-12) ................................................. $250.00 a. Titles 1-9 ................................................ __ ................. __ .... $100-00 b. Development Code - Titles 10, 11, and 12 ........................... $150.00 5. Master Plans, Budget, Reports, etc ......................................... Actual Cost 6. Economic Interest Disclosure and Campaign Statements (As required by State Law) .......................................... $.10 per page 7. Candidates Filing Fee (non-refundable) ........ ............................... $288.00 8. Certified Copy of City Documents/Records ....... ............................... $8.00 9. Residency Verification .............. ............... ..................................... .. $&W POSTAGE: All mail requests shall have the cost of postage added to the fees set forth. B. Returned Check Fee Any person issuing a bank draft, note or check that is returned by a financial institution due to insufficient funds, a closed account, or is otherwise dishonored, shall be charged the sum of $26.00 for processing each such check. Said amount shall be included in the total sum of all bills, charges, or fees otherwise due and owing to the City. C. Infraction/Administrative Penalty Fees 1. Infraction Penalty — in a 12 month time period a. First Offense ...... ................................................................. $500.00 b. Second Offense .... ............ ................................................. $750.00 c. Third Offense ............. ................................................... _ $11,000Z0 Resolution Number G272 2. Administrative Penalty -ina12 month time period u. First Offense ........................ .............. ......... ..................... $1UU10 b Second Offense .................................. ........................ ........ $20O10 c Third Offense ............................................... .. ........... ....... $5DO.UO SECTION 2. BUILDING FEES A.LamerficYe Fee 1. For each sheet upVn8\6"x11^insize (At time of permit issuance) ........ --- ........... ............ .$.75 per sheet 2. For each sheet larger than x11^in size ................... $1.GO per sheet 8. Copy of microfiche documents ... ......................................... $.2S per page B. Permit Issuance Fees .... ............. ............................. .......................... $TD.0O C. Building Permit Fees 1. Building Permit fees based on valuation shall be collected according to the following schedule: TABLE A Total Valuation Fee $1.D0 to $500l0-...... .......... Fee of 10% of the permit valuation $5O1I0ho$2,0OOOO ....... ........... Fee of$81.65 for the first $5ODDOplus $3.05 for each additional V100I0 or fmxtion thereof, to and including $2000.00 $20O1.DOhn$2S.00U.00 .............. .Fee of $127.40 for the first 82.000.00 plus $14.50 for each additional 81.000.00 or fraction hereod, to and including $25,000.00 u26.001.00 to $5O,OOO.8O .......... Fee of *449.40 for the first *25.000.00 plus 010.10 for each additional $1.000.00 or fraction thereof, to and including $50,000.00 $50I01I0|n*1OO,0QOI0 .......... Fee of $701.90 for the first $50,000i0 plus $7.00 for each additional $1,0UO.00 or fraction thenaof, to and including $100.000.00 $1OO.001.00to$5O0.00O.00 ........ Fee of $1.051.90 for the first $100.000.00 plus $5.60 for each additional $1'DOU.0Opnfraction thereof, to and including $5UO.OUO.UO $50U.0U1.DOto$1.DOU.UOO.0O ..... Fee of $3.291.90 for the first $500.000.00 plus $4.75 for each additional $1.DOO.DOorfraction thereof, Ko and including $1.000.000.00 $1.00O.00O.00 and up ......... - .... Fee of $5.806.90 for the first $1.000.00000 plus $3.65 for each additional $1,000.00or fraction thereof 2. Building valuation data sheet shall be used in conjunction with the fee schedule established in Section 2.C.1. The source of that sheet shall bethe most current Building Valuation Data posted and updated bi-yearly on the webudeof the International Code Council webaite: Resolution Number 8272 3. General Plan and Geographic Information System Update ' Surcharge cf $-0015 x value of building levied with building permit. 4. Miscellaneous Valuation Table a. Pool Fee 1) Swimming Pool ...................... .... $2\DDU.8U+$13.50 per sq. M' +$55U.0O for heater 2) Spa ..................... .................... $1,4OO.00+$11.25 per sq. ft. +$55O0O for heater b. Patio Fee 1) Open ...... ............. ...... .................. .............. .$1125 per sq. ft. 2) 8nnaened ...................................................... $22.5O per sq. ft. c Fanowe& Block Walls ................................. - .......... $22SO linear ft. d. Signs 1) Fee Standing ............. $33.75 per sq. ft, $30010 2) Wall Signs. ..................................................... $22.5D per sq. ft. a Roofing 1) Composition & Gravel .................................... .$|O1.25 per sq. 20 Composition Shingles ............. .. .................... $1O1.25 per sq. 3) Wood Shingles ............... ............................ —.$14G.25 per sq. 4) Wood Shakes ................................................... $2{7.5D per sq. 5) ................ ................................... $D7O.0Q per sq. 5. Plan Check Fees a Valuation exceeds $1,000.00 and o plan ha required ........................ 65% of the building permit fee b. Mechanical, Electrical, or Plumbing when a plan or other data is required to be submitted for such work ................... 65% of the total permit fee (excluding initial permit fees) n. Expedited Plan Check ................................ . .................... .............. — ..................................... Additional 5D%cf standard plan check fee EXCEPTION: The expedited plan check fee shall be waived by the Building Official m the case N� ofmconstruclion due ma disaster-related occurrence. 0. Miscellaneous Fees a. Swimming Pool Fee ............................. Table A. Based onValuation b. Spa Fee .......................... ................... .TableA. Based onValuation *Public Works Bond for Damages to Public Improvements.. $385.0¢ *Public Works Street Permit/Rubbish Container .................... $25.O0 c Patio Fee ..................................... ........ Table A, Based onValuation d. Fences and Block Walls .................. .... Table A, Based onValuation o, g. b Tent Fee 1,0OU sq. fL—........... —................ ......... $38.00 Each additional 1,00U sq. ft. or fraction thereof ...................... $12.75 i Renewal of Expired Permits - a fee of Y2 the total amount for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work; and provided that such suspension or abandonment has not exceeded one full year, in which case a full fee shall be required, �. Temporary Certificate of Occupancy ...................................... $64.00 k. |. Demolition Permit Fee .... Table A. Contract price for demolition work Moving Permit Fee ......... Table A+ Valuation based on contract price (Special investigative fee required) m. Contractor Business License Fee ...................... ................. $2O7.O0 n. Deputy Inspector Contractor Fee--.—.. $16.00 o. Standard Residential Photo-Voltaic Installation Fee ............... no fee Resolution Number G272 7. Special Service Fees a. Charged for a special inspection bya City Building Inspector Affected Floor Area Fee O'2.5UO sq. ft ...................................... ............................... .$1B0.00 2,5O1'5.8O0 sq. fL.._..--- ........... ............................. $88O.00 5,001-7,500 sq. ft.— .................... —................................... $57S.0D 7,5O1'1O,0OD sq. ft . ............................................................. $7G5.00 Each additional 1D.DOO sq. ft. or fraction thereof ................. $2OOl0 b. Non-Business Hour Inspections —requested byapennittme............. ................... $GO.00 per hour plus all other fees (minimum one hour) n. Exoeemkm |napoctionu — hzr inspections determined by the Building Cffidatobeexceohve and beyond at least one re-inspection of an item of work caused by faulty workmanship or work not ready for inspection «¢ time of request ............. $5O.00 per hour per inspection d. Additional Plan Check Review bychanges, addibmnm, or revisions to approved plans ................... $5O.00 per hour (minimum one hour) e. Inspection for any change of occupancy classification, use type (as indicated in Table 5mcdthe Uniform Building Code) or certification of compliance with Building Codes and ordinances not otherwise provided for above .............................. ......... $1DQ,OO per inspection [ Inspections for which nu fee is specifically indicated ...--..—... ............... — ............................. $4O.00 per 1/2 hour (minimum }6hour) _ Electrical Code Fees a. Electrical Services 1) Each service switch 30O volts ur less ...................... $.O 2) Each service switch 8018n6U0 volts ........................ 3) Each service switch over 8OO volts ......................... b. Electrical 8yubame in new structures or building additions — the following fees shall apply Vu electrical systems contained within or on any t ct including new additions to existing structures 1) u) Warehouse — that part which is over 5.00O sq. ft. Storage garages where no repair work is done -- c) Aircraft hangers where no repair work is done 2) a) Residential accessory buildings attached or detached such as garages carports, h d etc. b) Garages and carports for motels, hote|a, and commercial parking o) Warehouses upho and including 5.000 mq�t. d) All other occupancies not listed, area that is over 5,000 aq.ft. 3) $-028 per sq. ft. - for all other occupancies not listed up to and including 5,000 sq. ft, 4) - for temporary wiring during construction c. Temporary Service 1) Temporary for construction eewk:e, including poles or pedestals ........ ................. ....................................... $17.UUeach 2) Approval for temporary use of permanent service equipment prior ho completion of structure or final inepod|on..G1TOOeach 3 Additional supporting poles .................... ................. $G.00each 4) Temporary service for decorative |iQhUng. Christmas sales lot, etc. ....................... ................................................... $9.0Oeach d. Miscellaneous 1) Area lighting standards upbm and including 10omm site ................. ___ ................. —.............. $5.00each Over 1Ommo site .......... ....................... —.............. $2.5Oeach 2) Private residential swimming pools including supply lights, ................................... ..$84I0each Commercial swimming p000— .............................. ........ $68l0 4) Inspection for reinstallation of idle meter (removed by utility N3 [ a Resolution Number G272 Illuminated Signs, New, Relocated, urAltered Square Feet Fee Uotmand including 5 .... ..................... ................................ $12,75 Over 5, not over 25—.. .................................................. .... —$U5.25 Over 25, not over 5O ............ ............................. ......... ......... $2O5O Over Bl not over 1OU ........ ............................. . .................. .$28.0O Over 10I not over 2O ........................ .................................... $3MO Over 200, not over 3OO— ........ ....... ..................................... $38.25 Over3OO ......................... ................................. —... $.125 per sq. ft. Overhead Line Construction ' poles and anohom_ ........ $5.0Oeach Alternate Fee Schedule 1) Alterations, additions and now construction where no structural work is being done orwhere it is impractical to use a square footage schedule; convert hm units an follows, charging ------.'-----_--'—.—..—.----.$3.8O each unh 2) For eauh5oud�oorfma��nthenamf where ounent is used ur controlled ......... ................ . ......................... _charged —1 unit 3) For each S lighting fixtures Vr fraction thereof where current io used or controlled ......... ...... ........ ---........ charged —1unit 4) For multi-assembly (festoon type plug mold etc.) - each 20 feet or fraction thanmof... .................................. .............. 1unit Power Apparatus For equipment rated in horsepower (HF). kilowatts (KW).or kilovolt- amperes (K\A), the fee for each motor' transformer, and/or appliance shall be Unit Fee Oto 1 ............. .................. ....................................... ............ $3.G5 Over 1 and not over 1O ................... ........................................ $Q.5O Over 1O and not over 5O — ... Over 5O and not over 1D0 ............... ................. ................. $84.00 Over10lemoh ............. ................. ................... ................. $S1l0 NOTIE: For equipment or appliances having more than one motor or heater, the sum of the combined ratings may be used to compute the fee. These fees include all switches, circuit breakers, contractors, relays and other directly related control equipment, j. Other Inspections and Fees 1) Inspections outside /f normal business houm..— Section 2.C.7 2) Re-inspection .................... ................................ Section 2.C.7 3) Additional Plan Check Review ........................... Seobmn2.C.5 4) Miscellaneous apparatus, conduits, and conductors for electrical apparotus, conduits and conductors for which a permit is required but for which no fee ieherein sedforth.--- ---_..-----....._._----..-----.----$12.5O — a. Miscellaneous Services 1) Plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and back flow protection).....$7.00 each 3) Rainwater system - per drain (inside building) . ........ $7.00 each U� Gas . $5.00 each 8) Additional gas piping system per outlet .................... $1.25 each 9) Industrial waste pre-treatment interceptor, including its trap and vent, except kitchen type grease interceptors functioning 10) Water piping and/or water treating equipment - 'installation, alteration or repair ............. —.......................... ...... $7.00 each 11 vent repair or alteration of piping ............. $7ODeach 12) Lawn sprinkler system or any one meter including 13) Atmospheric type not included |n Item 12 1to5........................................................................ $7I0 b) 6or more ....... ...................................... ................... $1I0 14) Back flow protective devices other than atmospheric type vacuum breakers 2 inch diameter or less .......................... .. ............... $7.00 Over 2 inch diameter .............................................. 015.OD 15) Gray water aymtem............................................... $40.00 each 16) Reclaimed water system inhia|inoballadionondbesbng ----. ............................. .............. ............................ $30l0 per hour 17) Reclaimed water system annual testing~� U� (excluding initial test) ....................................... $30l0 per hour b. Other Inspection and Foe 1) For inspection business hour ..Section2.C7 28 For re-inspection ......................... ............. —. ....... Section 21}.7 3) For additional plan review ........... ........................ Section 2.C.7 o. Sewer connection permit fee ......................................... upto$25I0 10. Mechanical Code Fees a. Miscellaneous Services 1) Forced air or gravity-type furnace or burner, including ducts and vents attached to suchoppliance - eachinstallatiu or relocation Tu and including 1OU'OOOBTU/H ................................... $13.25 Over 100,0OOBTU/H ............ ................ .................... $1G.25 2) Floor fumnce, including wall heater mfloonnounted unit heater- each installation or relocation ........................... $13.25 3) Suspended heater, recessed wall heater or floor mounted unit heater - each installation, relocation or replacement ...... $13.25 4) Appliance vent installed and not included in an appliance pennit — eanh|nstaUallo relocation or | t $650 5) Heating epp|ianna, refrigeration unit, cooling uni1, absorption unit — each repair, alteration or addition to and including 1DO.000BTU/H .............................................................. $12.25 -- G) Boiler or compressor to and including three horsepower, or absorption system tn and including 10O,OOOBTU/H ...... $13.25 Installation orrelocation 7) Boiler or compressor over three horsepower to and including 15 horsepower, or each n system over 100.000 BTU/H and including 580.0OUBTU/H ............................ $24.25 Installation orrelocation 8) Boiler mr compressor over 15 horsepower bo and including 3O horsepower, or each absorption system over 500,000 8TU/H to and including 1.O00,OODBTU/H ................................ $33.25 Installation orrelocation S) Boiler nrcompressor over 30 horsepower to and including 50 horsepower, or each absorption over 1.00O,0OOBTU/Htoand including 1.750.DOOBTU/H ........................... —............ $49.SO Installation orrelocation 10) Boiler nr refrigerator compressor over 5O horsepower, oreach absorption system over 1'75O.UO0BTLVH ...... —. ........... $82.75 Installation orrelocation 11) Air-handling unit to and including 1O.OUU cubic feet per minute, NOTE: This fee shall not apply m mm that is a portion of a factory assembled appliance, cooling unit, evaporative cooler mabsorption unit for which a permit Isrequired elsewhere In this Resolution. 1 For each air handling unit over 1O,0ODCFN ....... .$1G.15 each 13) For each evaporative cooler other than portable type ...... ........ .. ............. .~_ ............. ............. ............ ................ $9.50 each Resolution Number 6272 14) For each ventilation system which is not a portion of any been performed. A refund of 80% of the plan check fee will be returned if the plan check service has not been performed. D. Construction Excise Tax 1. Rates a. Residential Units Type Fee Single Family ...................................... .................................. $85.00 Duplex (each) ... ..... __ ............................................................ $85.00 Apartment(each) ...... ................................................... ........ $62.50 Bachelor (each), .... .............. _ ............................ _ ....... ........ $62.50 Mobile Home Space (each) .................................................... $51.00 b. Commercial - per square foot ..................... ............................... $.05 c. Industrial - per square foot .......................... ............................... $.05 2. Delinquency Charge..... 25% of tax plus interest cost of 1.00°/4 per month E. Environmental Reserve Tax — For new residential living unit construction 1. Conforming unit — first three floors ...... ............................... $15 per sq. ft. 2. Non-conforming unit — first three floors .............................. $35 per sq. ft. F. Non-Subdivision Park and Recreation Fees 1. Single-Family Dwelling - A fee of $10,000 is imposed upon the construction and occupancy of each single-family dwelling, which results in a net increase to the City's housing stock. Said fee is imposed to offset impacts to the City's existing park and recreation facilities caused by the additional single-family dwelling. 2. Other Residential uses - A fee of $5,000 is imposed upon the construction and occupancy of each residential dwelling unit, other than a single-family dwelling, which results in a net increase in the City's housing stock. Said fee is imposed to offset impacts to the City's existing park and recreation facilities causes by the additional dwelling unit. heating or air conditioning system authorized by a permit ..... ­ ..................................... ................... ....................... $9.50 each 15) For each ventilation fan connected to a single duct .................. ..1.1 .... I .... ­­ ....... .............. ............ ................ $6.50 each 16) For the installation or relocation of each domestic type incinerator .... ............................ ............................ $16.25 each 17) For the installation of each hood that is served by mechanical 18) exhaust, including ducts for such hood ....................$9.50 each For the installation or relocation of each commercial or industrial type incinerator .............. .........................$66.50 each 19) For each appliance or piece of equipment regulated by the California Mechanical Code but not classified in other appliance categories or for which no other fee is listed in this Code........................................................................ $9.50 each 20) Duct extensions, other than those attached .............$5.00 each 21) Permit fees for fuel-gas piping shall be as follows when Chapter 12 of the California Plumbing Code is applicable a) For each gas piping system of 1 to 4 outlets............ $5.50 b) For each gas-piping system of 5 or more outlets.... .......... *******'***** ............. ............. ­*­ $1.00 per outlet b. Other Inspection Fees 1) After normal hour inspection........ ........................Section 2.C.7 2) Re-inspection... .................................................... Section 2.C.7 3) Additional Plan Reviews ........ ............................... Section 2.C.5 11. Refunds If construction has not commenced, a refund of 80% of the permit will be returned when permits are cancelled at the request of the permittee. No permit fee will be refunded for any permit that has expired. No refund will be made of the plan check fee when the plan check service has been performed. A refund of 80% of the plan check fee will be returned if the plan check service has not been performed. D. Construction Excise Tax 1. Rates a. Residential Units Type Fee Single Family ...................................... .................................. $85.00 Duplex (each) ... ..... __ ............................................................ $85.00 Apartment(each) ...... ................................................... ........ $62.50 Bachelor (each), .... .............. _ ............................ _ ....... ........ $62.50 Mobile Home Space (each) .................................................... $51.00 b. Commercial - per square foot ..................... ............................... $.05 c. Industrial - per square foot .......................... ............................... $.05 2. Delinquency Charge..... 25% of tax plus interest cost of 1.00°/4 per month E. Environmental Reserve Tax — For new residential living unit construction 1. Conforming unit — first three floors ...... ............................... $15 per sq. ft. 2. Non-conforming unit — first three floors .............................. $35 per sq. ft. F. Non-Subdivision Park and Recreation Fees 1. Single-Family Dwelling - A fee of $10,000 is imposed upon the construction and occupancy of each single-family dwelling, which results in a net increase to the City's housing stock. Said fee is imposed to offset impacts to the City's existing park and recreation facilities caused by the additional single-family dwelling. 2. Other Residential uses - A fee of $5,000 is imposed upon the construction and occupancy of each residential dwelling unit, other than a single-family dwelling, which results in a net increase in the City's housing stock. Said fee is imposed to offset impacts to the City's existing park and recreation facilities causes by the additional dwelling unit. Resolution Number 620 G. Recycling and Diversion wf Construction and Demolition Waste Program 1. Administrative fee .............................. ...... $8.05 sq. ft. of Covered Project 2. Fee deposit ........... ............................ .... .$1.8O sq. ft. cf Covered Project 3. Residential re-roof permits fee deposit .... - ...................... $5O0l0 4. Administrative fee for residential re-roof permits ............... ........ $40.00 SECTION 3. PLANNING FEES The following fees are charged to individuals submitting the described to the City Community Development Department. Payment in full is required before issuance of necessary Grading, Building, Plumbing, Electrical, Mechanical, or any other appropriate permit. A. Filing Fees I CunddionuUsePennit.-.-..----.__.---.-----$1,250l0 2. Variance ............... ....... ............................................................ $1,25D.0O 3. Zone ....... -................... ....... .................. $3/300.0O 4` General Plan Amendment ................ ............... ......................... $3/UOO-0O [i Planned Unit Development ..................... ....... ................. ..... $2,75O.0O 8. Minor Use Pennb.- ....... --- ....... ....._._..-----..... $5OO.08 7. Major Site Plan Review. ..................................................... ...... s1,0OODO 8. $1 9. 10. 11. 12. 13. Property Profile .................................... ....... ................... ........... $125.0O 14. Planning Commission Interpretation .................... ....................... $4OO.00 15. Sober Living .................................... ................ $50lDD 16. Tentative/Final Parcel Map ............. .......................... ............... $1.25U.0U 17. Tentative/Final Tract Map ......................................................... $2.DOOI0 18. -- a. 1 event per ........................ ............................ $15O.0O k 2 events per application .................................... - ............... $225.UO c 3'4 events per application ........ ......................................... $325l0 B. Environmental rees/Deposit 1. Minor Environmental Assessment $50.00 _ Major Environmental _--_._-_-_.-_-,-_._ . 3. Negative Declaration ........... Actual Processing Costs '$1,800.0Odeposit ' Environmental _-_-,__._p__--_.~----.---_---.-~...--.. ........... ................... -...... Actual Processing Costs -$2OOUO.O0deposit NOTE: Regarding the asterisked These items will bereviewed by the Public Works Department and proposed fee changes will besubmitted atolater date. °C. Transportation Facilities and Programs Development Fees Land Use Type Fee/Unit Shopping Center (up to 175,000 sq. ft.)... $12,15 per sq. ft. of gross leasable area Shopping Center (over 175,000 sq. ft.) ...... $3.77 per sq. ft. of gross leasable area Multi Family Attached Housing (Apartment) ... ................ $952.99 per dwelling unit Multi Family Attached Housing (Condominium) ............... $783.00 per dwelling unit Resolution Number G272 °D. Transportation Facilities and Programs Development Application Fee Land Use Type Fee/Unit Shopping Center (up to 175,000 sq. ft.) ..... $1.81 per sq. ft. of gross leasable area Shopping Center (over 175,000 sq. ft.) ........ $.55 per sq. ft. of gross leasable area Multi Family Attached Housing (Apartment) .................... $142J}2 per dwelling unit Multi --.. ��11G�B dwelling unit ' -, . . ~ �~ —.............. —................................. ..... — .......... ...... *7OS.21 per acre *E. Main Street Specific PlmmZonin - Lieu Parking Fees The following per space in-lieu parking fee is hereby established for uses on commercially zoned parcels located within the Main Street Specific Plan Zone 1. $3,500.00 fee per deficient space for all such uses established on or after September 1.10Q6. Such fee shall be calculated by multiplying the number of parking spaces required, for the use that isnot provided either on-site or within 380 feet of the parcel on which the use is situated, by $3,500.00. 2. An annual fee of $100.00 per deficient space for all such uses established prior toSeptember 1. 1996 which are currently operating under an existing land-use entitlement wherein as e condition of approval the applicant agreed 10 participate inthe City's in lieu parking program, except for those uses governed by Section 3hereinafter. Such annual fee shall be me|uu|aded by multiplying the number of parking spaces required, for the use that is not provided either on-site or within 3OO feet of the parcel on which the use ia situated, by$1OQ.00. 3. For all such uses established prior Vo September 991' pursuant hoa development agreement wherein the applicant agreed to participate in the City's |n lieu parking program, the fee per deficient space shall bea specified in the applicable development agreement for the subject property. SECTION 4. POLICE FEES A. Alarm System Application Fees The following will be charged for alarm system applications (July 1 - June 3N: 1. Indirect Alarm - Business Permit ....... ................................... ........ $30JD0 2. Indirect Alarm - Resident Permit ............................................. ...... $26DO 3. False Alarm - penalties Will bm assessed hn the event of the Per Call Fee 1st and 2nd false alarms ......................................................... NoCharge 3rd false alarm .................................................... — ...... ......... ...... $51.OD 4th false alarm .... ........................................................................... $77.0O 5th false alarm ............. ....................................................... ........ $127.00 Qor more false alarms ....................................... ................. $17Ql0each B. Animal Control Fees 1. Anms|imansespunmuantto0ecUun7.O5.O4O.Aofthe Code a. D .--------....---.una8enad$8G.00; altered b. Sr. Citizen Discount .—._--------------------5O% $12.00 2. Impound of small animals (nets, dogs, etc.): Seal Beach Animal Came Center a. Impound Fee-- ................................... ................ ............... $26.00 b Daily Care and Feed .... .................................... ...................... $5.DO O. Quarantine nf small animals: a. Impound Fee-----..----------...--..---'$4GI0 b Daily Care and Feed ..... ................................ ............ .......... $1Ul0 ResolutioNumber6272 5. Veterinary Se a. Rabies Vaccination ................... ..................................... Actual Cost b Relative Value unit .................................................. ....... Actual Cost c. Other (x-ray, lab etcj .......... —.................... Actual Cost d. Medical ...................................... Actual Cost a Euthanasia (request by owner) ..................... $25.OD plus actual cost 6. Dog Park Fees: a. Non-naoidem¢use — annuaheo — abenadd ......................... $12.00 b. o. Non-resident use — annual fee — unaltered dog .................. Failure bo lock gate ................................................................. —$28l0 $51l0 d. Exceeding 3 dog limit in park — per additional dog ................. $28.0O a. Attack/bite or attempt person or dog ................... ...... $31J0 [ Vicious animal by definition ............ ___ ................................. $51l0 D. A quarantined animal .................... ............ ......... ............... .$77.0O b Failure hx remove feces .............. ........................................... $20.0O 7. Non-domestic Animal: a. Permit ........................ ................................. . ........................ 846.00 NOTE: Beach Parking Services Fees VC**, Violations pouu (Section L°. page 20) will uo revised upon the completion m the Parking Master Study Plan. **C. Beach Parking Services 1. Beach parking lots daily rates a. Automobiles/motorcycles ......................................................... $6.00 b Buses, motor homes, and other vehicles over 25 Faet------- -------'---.—_.--'—....._—.. $G.00 per space used c. Rates for automobiles/motorcycles parking after 6:00 p.m. ..... $2.00 2, Annual day use only, entities the holder to daily parking in any beach lot and valid twelve months from date ofpurchase e. Sea] Beach remdonts ................ ... ..... ................... ......... $1OO.U0 b. Non-residents ........................................................ --.—.'$15O10 c. Non-resident senior citizen with annual gross income less than $3O,0OO annual beach pass ........................................... ....... $75.O8 d. Resident senior citizen with annual gross income less than $3O'00O annual beach pass ............................................. ................... $GO.00 *Serior citizens age 62 must provide proof of annual income. NOTE: The annual and vehicles over 25 feet in length. The passes do not cover trailers attached to vehicles. 3. Disabled parking - any disabled person displaying special identification license plates issued under California Vehicle Code Section 5007 or a distinguishing placard issued under California Vehicle Code Section 22511.55or22511.5Q shall be allowed Vopark in the 1mt, 8th and 1[Dh Street ocean-front Municipal Park Lots without b hg required to pay parking fees. The disabled parking exemption is only for vehicles under 25 feet in length and does not cover trailers, campers and or fifth wheelers attached to the vehicle, If more than one parking space is used the regular daily beach use charge must be paid for the second space used. 4. a The City Manager is uth hzed to charge amounts less than the m� rates speuif|ad, for certain days or certain Umnaa of day, if he or she determines that a lower rate ieappropriate. b. Beach ngea may fluctuate seasonally and may vary with times of the day. |nnn event shall the rates exceed $G.0O per automobile. c. Use and fees for beach parking for cim| events are subject to arrangements through AW1PCQparking. 0��* W D. Citation Sign-off. ............................... .........................$15.00 for each sign-off E. Fingerprint Cards 1. Resident ........................... ........................ ......... _ ........ .......... ... $10.00 2. Non-resident ................... ......................................................... .... $20,00 F. Parking Stickers The following fees are charged for annual parking permits: 1. Resident ............................. _ .......... .......................................... .... $14.00 2. Guest ............................... ............. .................... ___ ..... .......... .... $17,00 3. Business ....................... ............. ........ ......................................... $41.00 NOTE: Permits are issued each fiscal year (July 1st through June 30th) and are not prorated. G. Passport A P0.00 fee will be charged for the preparation of a letter attesting to an individual's lack of criminal contact with the Seal Beach Police Department that will be used to obtain a passport. H. Photographs 1. Digital reprints or digitally scanned photos.......... $25.00 plus actual costs 2. Digital audio file reproduction .............................. $25.00 plus actual costs 3. Video file reproduction ......... ............................... $25.00 plus actual costs 4. Reprints of 35 mm photos.......... .........................$25.00 plus actual costs 1. Traffic Collision Reports The following fees will be charged for copies of all investigative reports performed on traffic collisions: 1. Non-resident ....................................... ...................... .......... $40.00 2. Resident ........................................ .................... ...................... .... $10.00 3. Miscellaneous Police Reports ......................... ............................... $10.00 J. Vehicle Storage 1. Copy of signed vehicle storage release form ................................. $82.00 2. Copy of signed vehicle impound release and administrative overhead associated with a 30 day impound ................ ............................... $184.00 K. Massage Technician Permit Background Check An application fee of $511.00 will be charged for the investigation and report required for a massage technician permit. NOTE. Beach Parking Services Fees (Section **C)and Parking Violations Fees (Section L**) will be revised upon the completion of the Parking Master Study Plan. **L. Parking Violation Fees Section Violation Proposed Fee 21113 (A) CVC SCHUPUB PROP-FAIL OBEY RSTRCT 43.00 21211 (A) CVC PARKED IN BIKE LANE 43.00 22500.1 CVC FIRE LANE 68.00 22500 (A) CVC PARKED IN INTERSECTION 43.00 22500 (B) CVC PARKED ON CROSSWALK 43.00 22500 (E) CVC BLOCKING DRIVEWAY 43.00 22500 (F) CVC PARKED ON/ACROSS SIDEWALK 43.00 22500 (H) CVC DOUBLE PARKING 4100 22500 (1) CVC PRKD IN BUS STOP/LOADING ZONE 308.00 22500 (K) CVC PKG PROHIB-STATE HIWAY BRIDGE 43.00 22502 (A) CVC PARALLEL AND/OR WITHIN 18" 43.00 22505 (B) CVC NO PARKING - STATE HIGHWAY 4100 Resolution Number 6272 Section Violation Proposed Fee 22507.8(A) CVC HANDICAPPED PARKING ONLY 308.00 22507.8 (B-C)CVC OBSTRUCTION OF DISABLED SPACE 308.00 22507.8 (C) CVC OBSTRUCTION OF DISABLED S�A-CE 308.00 22514 CVC FIRE HYDRANT 68.00 22522 CVC PARKING - ACCESS RAMP 308.00 22523 CVC ABANDONED VEHICLE 108.00 126708 (A) CVC OBSTRUCTED VIEW THRU WNDSHLD 43.00 26710 CVC DEFECTIVE WINDSHIELD 33.00 27155 CVC GAS CP R0/$1 0 PRF OF CO 43.00 27465 (B) CVC UNSAFE TIRES-$10 W/PRF 21 DAYS 33.00 i 4462.5 CVC PRESENTING FALSE REGISTRATION 64.00 4462 (B) CVC DISPLAY FALSE REGISTRATION 108.00 446.4 CVC ALTERED LICENSE PLATE 68.00 8.15.010 (C) SBMC FAILURE TO OBEY PSTD SIGNS 43.00 8.15.010 SBMC NO PARKING CERTAIN AREAS 43.00 B. 15.010 (D & F) SBMG PKD OVER WHITE LINE-TRAFF HAZ 43.00 8.15.020 SBMC FAIL TO PARK IN MARKED STALL 43.00 8.15-025 SBMC 72 HOUR PARKING 43.00 8.10.105 SBMC PKG/DRIVING ON PRIVATE PROP 43.00 8.15,055 SBMC: SHORT TERM PARKING ZONES 43.00 8.15.065 SBMC CITY PROPERTY 43.00 8.15.070 SBMC CURB MARKINGS 43.00 8. 15.080 SBMC PKD IN OR OBSTRUCTING ALLEY 43.00 8.15.085 SBMC: PRKNG OF OVERSIZED VEH 43.00 8J5.100SBMC SURFSIDE COLONY FIRE HYDRANT 43.00 8.15.105 SBMC PARKING METER ZONES 43.00 8.20.010 (b)SBMC PARKED WITHOUT PAYING 4100 8.20.010 (c)SBMC PERMIT MUST BE DISP PROPERLY 43.00 8.20.015(A) SBMC NO PKG MARINA W/O PERMIT 43.00 8.20.015(B) SBMC NO CMPRIREC VEH/BOAT MARINA 43.00 SECTION 5. PUBLIC WORKS FEES A. Plots Copies 1. First sheet 3G^-...-----..---.-.---------..$5I0 �� Adddk�ndmheebs�4"u38^ ..... ...................................... $2.00 per sheet 3. Color Plots (24"x38^. .......................... ........ ........... .... $8l0 per sheet 8. Subdivision Plan Check Tentative Map ................... - $600 minimum deposit Resolution Number 6272 NOTE: If additional lots are added, the deposit shall be increased by $50.00 for the first five parcels, lots or units and $20.00 for each additional after the first five. If a revised map is substituted for an approved or conditionally approved map, the deposit shall be increased for processing the revised maps. [Following staff review, the City may require an additional cash deposit estimated by the City Engineer or Community Development Director to sufficiently cover the actual cost of any private consulting firm used by the City in the technical review of the tentative map submittals or in preparation of the EIR.] C. Final Filing Map 1. Final Subdivision Map Filing ......................... ............................... $175.00 NOTE: The Orange County Surveyor's Office will also require a fee deposit in an amount established by that office to cover the costs of the boundary check of the final map. 2. Final Map Plan Check ...............$600.00 minimum deposit plus $50.00 per parcel, lot or unit plus time and materials 3. Final Map Construction ............. Minimum deposit determined by engineering division by estimating 5% of construction costs plus time and materials NOTE: The deposit shall cover all actual costs for plan check, construction engineering, management and inspection for all required public improvements by City and/or private consulting firms. All deposits must be paid before the City Council approves the final map. All actual costs must be paid before acceptance of the public improvement and release of the subdivision bonds. 4. Lot Line Adjustment: a. Lot line adjustment ............................... ........................$150.00 each b. Certificate of Compliance ..................... ........................$150.00 each c. Map checking..... .................... ............................................. $350.00 (minimum deposit plus time and materials) d. Appeal of denial within 15 days of date of mailing of notice of action byCity .............................................................................. I... $100.00 5. Parcel Map Waiver a. Certificate of Compliance ...................... ............................... $200.00 (plus all required tentative map fees) b. Minimum deposit for review and plan check, and accompanying materials by City, City Attorney and /or private consulting firms ...... . ...............I............... ........................$500.00 plus time and materials D. Plan Check and Review 1. Grading/Drainage Plan Check (Single Family) ............................. $700.00 (per review, plus time, and materials) NOTE: Minimum deposit to cover cost of reviewing plans, hydrology, and hydraulics for construction of one new single family residential home. Additional deposits are required for applicant changes, revisions, additions to the plans or if more than 3 plan checks are necessary, 2. Grading/Drainage Plan Check .............. ........................Minimum deposit* (plus time and materials) NOTE: Minimum deposit to cover cost of reviewing plans, hydrology, and hydraulics for all other types of construction that require a grading permit. Additional deposits are required for applicant changes, revisions, additions to the plans or if more than *Minimum deposit shall be established by Engineering based upon size and scope of project. 3. Public and Utility Improvements Plan Check . ........................Minimum deposit* (plus time and materials) NOTE: For other than one Single Family Residential, plan checks will be billed on a time and material. *A minimum deposit will be collected from the developer in advance of any work performed and shall be established by Engineering based upon size and scope of project, Resolution Number 6272 4. Traffic Control Plan Review ....................... $ (per application plus time and materials, including 1 -hour minimum plan check) 5. VVOMP Plan Check ........................................ $7QO.00 (minimum deposit) E. General Construction Permits 1. Permit Issuance Fee (fee applies to all permits) ............... ..... $2O.0Oeach 2. Construction Parking Permit ............. ............... $1&8D per day per space for public right of way 3. Street Obstruction ...................... ......................... $45I0 each application for placement of du and storage in public right of way for o period of not more than 45days m� 4. Encroachment Permit Costs and Plan Check ............... $12O.ODminimum deposit per application plus time and materials NOTE: Minimum deposit to cover costs for only sidewalk, curb and gutter, dri curb cores, dirt excavations in parkways, street cuts. Valuation nf all work performed shall not exceed $5'0O0.00um determined by the Engineering Division. Avawh deposit will be collected mm determined by Engineering for the approximate value mthe work as guaranty that the work is performed property. G. Water Quality/Pollution Prevention Inspection .............. $15O.00minimum deposit per application plus time and materials 6. Grading Permit Inspection Type A ......--------. $150.00 minimum deposit per application plus time and materials NOTE: Minimum deposit to cover costs of inspection for single-family residence in accordance wuh grading plan. For other than one idemm, inspection will be billed ona time and material basis. A minimum deposit will bm collected from the developer inadvance of any performed and oxmU be established by Engineering based upon size and scope W project. 7. Utility Permits ................................................................ $128.O0minimum deposit plus time and materials for each occurrence in public right mfway NOTE: Any work done V a Utility will bo billed ona time and material basis, The minimum total deposit will be maintained in um account m cover costs of any work performed during the year. Additional deposits may be required depending upon the size and scope of the work. 8. Non-Standard Improvement ..................... ......... ........... $22O.00 filing fee NOTE: If permit /o approved, applicant shall also obtain a Class x public work permit. 9. Monitoring Well or Soil Boring (inspection depoo|0....... $1G0.00minimum deposit per location plus time and materials for each occurrence in public right ofway 18. Banner Permit (inspection deposit) .......................................... $4D.8Ofee NOTE- Deposit does not include Installation. Applicant must hire a licensed contractor to install the banner upon issuance of the permit and signing of the agreement. 11. ConnhuctiomSceffold $45.00 fee each 25 ft. of location 12. Street Tree Removal Application ....... ......... .................. $HO.OU filing fee 13. Street Tree Trimming (Inspection ..................... $75DOminimum ��u�u�m�� ��� N� ' . _ 14. Street Closure Permit (inspection D h) ................. $11O.ODminimum (plus time and materials for each occurrence in public right cdway) NOTE: Applicants will need to hire their own traffic control contractor to supply and place barricades as well as post for no parking for street closures. City barricades may be used only upon written permission from the Public Works Department in specific instances. Barricades would be rented at current market rates (usually $3.00 per barricade per day.) There will also be replacement charge for each non-returned or damaged barricade ($55.00). For any street closure at a signalized intersection or that directly affects traffic on an arterial roadway, a traffic plan review wH I be required. Resolution Number 6272 15. Street Closure (Refundable Guaranty) ............. o75O.0U minimum deposit (for each block of street closed to cover clean and/or damage costs) 16. City Crew Charge ..... ....................................... *2B1UO minimum charge (for any work performed by City crews) 17. Park Damage (Refundable Guaranty) .............. $75U.00 minimum deposit (for use of parks or beach for special events, Larger deposits may be conditioned depending upon the size and the scope of the event) 18. Crane Permit (inspection ................... $11O.00 minimum deposit (plus time and materials for each occurrence in public fight ofway) F. Sewer Utility Services 1. |napactionforSawerVVurkefnrNewDave|opmena -- YNinimumdepnsd (plus time and materials) NOTE: For other than Inspection will be billed on a time and material uasi&A minimum work performed and shall be established by Engineering based upon size and scope of project. 2. Sewer Service Connection Inspection .............. $2OODO minimum deposit per application plus time and materials 3. Sewer Service Connection Charge ' "Buy In" The fee is determined based on the size of the water service meter as applied kothe sewer rates. Sewer rates are calculated using the value of the existing system that is not subject to replacement through the existing Capital Improvement Project AC|P1 program and the total annual water use by sewer system customers in billing units. Beginning Jul 1 2002 and every July 1 thereafter, the fee will automatically increase by an amount calculated using the following formula - multiply the most recent fee in effect by the percentage increase over the previous 12 months immediately preceding the most recent publication of the Engineering News Record of Construction Cost Index existing on July 1 of the year of the increase, The previous ENR Construction Cost index was 8293. The ENR Construction Cost Index for June 2009 is 8578. Fees shall not decrease below the level oY rates existing on July 1'2OO2. Sewer Service Size Residential Commercial, Industrial, Gov't ---' 1" $316l0O .............. ..... . ..................... $5.11510 1.5" $G,475.00 ...................................... ..$11,52Q.0D 2- *9/77GI0 ......... — ............................ S2OJSQ8OO 8" $52,712.0O ...................................... $G2,085.00 4" $77,517.0D---------''— $181,452.0O G" N/A ......... ................ ___ ....... .$151,6RiOO 8^ N/A .................. ............................ $531,517l0 4. Fats, Oils & Wastewater Discharge Permits u. Permit issuance fee .......... —.................... ................. $5U.O0each b. Grease control device lid inspection fee ......................... $3OOOeach c. Bost Management Practices (]yNP} program inspection -- .............................. ....... ....... ----..................... $4O.0D each visit (2/year for FSE's with grease control devices) (4/year for FSE's without grease control devices) d. Grease Disposal a uMP inspection ................. $4uuu each return visit [ sewer cleaning fee ..................... $UBOl0 per hour g. Non-compliance sewer video inspection fee .......... $300.00 per hour Resolution Number 6272 NOTE: Any cost increases to the City, additional services, and materials provided by the City, not listed above such as spill response or additional sewer main line cleaning due to accumulation of FOG will be billed directly to the responsible party for actual costs incurred on a time and material basis. Any delinquencies, penalties, appeals, hearings, suspensions, revocations, violations, and enforcements are established by the FOG Ordinance, FSE's requesting a permit within a calendar year shall have the tees pro-rated on a month end basis. G. Water Utility Services 1. Water Service Connection Inspection .............. $20000 minimum de h (per application plus time and 2. Water Service Connection Materials ..................................... .AntumJcost (of any required materials and miscellaneous equipment for meter plus 2UY6administration) 3. Water Works Inspection for New Developments .................. —.................... minimum deposit plus time and materials NOTE: For other than one single-family residence, inspection will be billed on m time and material basis. A minimum deposit will be collected from the developer in advance cf any work performed and established by Engineering based upon size and scope of project. 4. Meter Testing Depooit$1O0.00 per test (refundable if meter isinaccurate) 5. Hydrant Water Meter Installation ... ......................... ........ .......... $125.O0 (to cover cost for labor, materials and equipment per each move o location) G. Hydrant Water Meter Deposit .................... ...... $600.QD minimum deposit NOTE: Water shall uo billed against deposit. x cash balance drops below $000x0.anadditional deposit will Uerequired. 7 Fire Hydrant Flow Test $250.{0 minimum deposit (per each application plus time and materials) 8. New Water Service Connection Charge ' "Buy |n^ For services that have never been connected or paid into the fees are calculated using the value of the existing system that is not subject to replacement through the existing Capital Improvement Project (C|P) program and the total annual water use by system mem in billing units. Beginning July 1.2OO2 and every July 1 thereafter, the fee will automatically formula - multiply the most recent fee in effect by the percentage increase over the previous 12 months immediately preceding the most recent publication of the Engineering News Record of Construction Cost Index existing on July 1 of the year of the increase, The previous ENR Construction Cost Index was 8293. The ENR Construction Cost Index for June 2009 is 8578. Fees shall not decrease below the level of rates existing on July 1.2OO2. Water Service Size Residential Pommercial, Industrial, Gov't 5/8"�� $4/*K]l0-------------...$4/4QI0 1^ $5,128J0 ......................................... $8,201l0 1.57 812,612I0 ...................................... $US73SI0 2~ $13,51G�0------------'$38�5Q�O 3^ ................. .—............... $G1,486l0 4^ $248958.00 ...... ........................... $32B'14110 8" NA ......................... ....................... $SG2,9G8l0 Greater than 6" Connection charges shall be determined by the City Engineer and approved by Council at the time of development or request. H. Transportation Permits - Oversize load permits .......... $16.00 per application i Call Outs For emergency or after hour call outs for public right of way or utility work performed due to action uf responsible party, a $250.00 minimum plus time and materials Vi||be charged. Resolution Number 6272 J. Multiplier .............................. ___ .................. ........................... 2D0/0multiplier will be used when calculating costs to cover administrative overhead for Public Works staff. K. Miscellaneous 1. Hourly Rates #. City ........................... ...... $80.00 per hour b. City ..................... ............ @176.0O per hour c Utilities - ' �' -----'--'$17UlW per hour d. Development Coordinator (Reg.) ........................... $16,5.DD per hour 9. Project ........................................ .8U2S.0O per hour L Construction Engineer (Reg.) ................................. $14G.0O per hour 2. City Engineer Variance Fee-------------------$47500 NOTE: All minimum deposits established above must be paid at the time of submittal of applications. The deposits shall cover the actual cost including but not limited to review, plan check, administration, coordination and construction administration, inspection and engineering by City, private consulting firms and/or outside contractors. Additional deposits will be collected it initial deposits are insufficient to cover actual costs. Any excess deposits over minimum amount will be returned to the applicant. Plan Check deposits for water, sewer, street, utility company work with pipeline/conduit lengths greater than 250, traffic signals, etc. are estimated per the following; $720.00 (8 hrs) for the first two sheets (includes general noteAltle sheet) and $270.00 (3 hrs) for each additional sheet. Plans must be 24" by 36" (22" by 34") and 1" = 40' scale without exception. Plan Check for Traffic Contra[ on Arterials/Intersections is estimated on $270.00 (3 hrs) per sheet. There will be additional deposits required after the third review and each plan revision after approval of the plans by the City Engineer, 3. Publications: n. Public Works Standard Conditions ofApproval for Vesting Tentative and Tentative Subdivision Maps ............ ........................ Q3.DO/bcmk b. Standard Plans for Water Facilities ........................ ......... $3.00/bonh c. Standard Plans for Sewer Facilities ............ - .................. S3.00/bonk d. Design Criteria for Sewer Facilities .................................. $3DO/bnok e. Standard Plans for Streets ................... ........................... X0.DU/book f. Grading and Gtormwater Pollution Prevention Implementation Manual ...... ............................................ $5.00/bonk Q, 5-Year Capital Improvement Program ................. ............ $@.00/book .. Special _.__.--_ a. Power Turn On location) ....... ........ $Q8.OU b. Pier Reobnom Cleaning .......................... $50.00 c. Building Facility Cleaning (each occurrence) ........................ $50.00 d Street Sweeping (after Special Events 2hr/minknum)...... $150.00 Ei Newsmacks: a. Newmnack Permit Fee - Non-Lottery Locations ........... .......... $71.00 b. Newsmack Permit Fee Lottery Locations .................... ..... $11O.0O c NewsnackS ................ --... ........ $12O.0O d. Newemaok Impound Fee ................................ $61.0O e. Newaraok Non-Summarily Impound Fee after Required ...... $1OOl0 SECTION 6. RECREATION FEES A. Community Center Facilities Resident ohm|| be those groups with at least 60% of their active membership p residing within the City of Seal Beach. Resident groups have preference over non-resident groups. Youth resident groups shall be those groups with at least 60% of their active membership residing within the City of 8em! Beach or having students attending a school within the Los Alamitos Unified School District system. Youth groups are also defined as being groups with all persons being age 18 and under. The following group categories are listed |n order of priority use. Resolution Number 6272 Resident meetings of civic or service organizations ..................... $1O08U annual cleaning fee 2. Resident activities: require a security deposit of $250.00. a. Large Room Fee ............................................... -'$ 3lUO per hour b Small Room Fee ......... ... ............ .......................... $2DDO per hour c. Cleaning Fee ............. . ........... .... $5O.08 to 15O.0O based on usage d. Staff Fee ........... ................. ...... ... $15.00 per hour per staff person a. Security Deposit ..... - ............ ........................... $25ODOur$5OOUU 3. Non-resident activities: a. Large Room Fee ........................... ................ ......... $5O.0O per hour b' Small Room Fee .......................... .......................... $3S.0O per hour c. Cleaning fee .......... .......... ........... $5O.0O to 15O.0O based on usage d Staff Fee ....................... ..... ........ $15.0O per hour per mbdff person e. Security Deposit .................... ............................ $25Ol0or$50OI0 4. Commercial or profit-making activities: a. Large Room Fee. ........... .... ................................. $1O0.U0 per hour b. Small Room Feo. .......... .............. .......................... $5O.0U per hour uCleaning fee .............................. .......................................... $15D80 d. Staff Fee .......... ........... ~ .............. $15.0O per hour per staff person e. Security Deposit ................................................. $25D.Uuor$500.O0 5. Alcoholic beverages served cdnon-city functions ............ $3O.00 per hour G. Liability /special event insurance.. ..... proof of certificate of insurance with b Cleaning fee ......... - .................. $5Ol0ho$15O.0O based onusage City additionally insured NOTE: Rentals ofmore than 75 people or having alcohol present require two staff members be present and a security deposit of $500.00, Rentals with less than 75 people and without alcohol require a security deposit of $250.00. B. Rental Fees - Senior Center and Fire Station 48 Community Room To qualify for use of the Senior Center facility on a regular reservation basis, m group must have 6O%of its membership age 62 years orolder. Resident groups shall bo those groups having md least 6O%of their active membership residing within the City of Seal Beach. Resident groups have preference over non-resident groups. Any requests for waiver offees by aQnzup will require City Council approval. The following group categories are listed in order of priority use. 1. Recreation sponsored or co-sponsored activities/meeting .... Nu rental fee a. Key Deposit --..--.....-------..----. ........ $10J.O0 2. Resident non-fundraising activities of civic nr service organizations a. Annual cleaning fee ................... ............................ ............ $100.00 b. Key Deposit ........ ___ .......... - ....................................... _01OD.UO 3. Reoidenfundnu|m|nguodvhesofciviooronrviceorganioabonm a. Perhour ... ..................................................... ........................ $25.UO b Cleaning fee ......... - .................. $5Ol0ho$15O.0O based onusage o. Key ----...__..--_---.- ........ 4. Non-resident non4undnehsing activities of civic or service organizations: a. Per hour .................................................. ............ - ............. $45l0 b. Cleaning fee .............. ................ $50.08ho*15I8O based onusage u. Key Deposit ......................... - ......................................... ..$1Oq.0O S. Non-resident fundmdsing activities of civic or service organizations: a. Per hour ............. ___ .............. ................................ ............. $50.00 $50.00 to $150.00 based on usage 6. Alcoholic beverages served at non-city functions .......... $30.00 additional 7. Liability/special event insurance ........... ... proof of certificate of insurance with City additionally insured C. Swimming Pool Fees Resident groups shall be those groups having at least 80% of their active membership residing within the City of Seal Beach. Resident groups have preference over non-resident groups. The following group oe1eQoMeo are listed in order of priority use. Resolution Number 6272 1. HocnaadmnmndFemUySwimSummerPass— -- . ---- $5000 per family (valid for the summer purchased) 2. Adult Lap Swim a Daily Fee ............................................. $3.00 per person per session i\ 1G Swim Pass .................................... ..................... $40.00 per pass c. 34 Swim Pass ................................ ....................................... $8O.0O d. AnnumSwhnP000---------------------$20Ol0 e. Lost Pass Replacement --------.----. $5l0 per lost pass 3. Swim Instruction: e- Remidmnheau------.—.---.—.--._-----.. $40.00 U� b. Nun-reoidenhen----------------------..$SO.0D 4. Weekend Pool Party Rentals ' two hour supervised pool parties at the following rental rates a. Resident rental -2U participants or less .................... .......... $15O.00 Am additional $15l0per hour is charged for parties with over 2Dswimmers b. Non-resident rental '2O participants nr less ......................... $1BO.00 An additional $15.00 per hour ischarged for parties with over 2Oswimmers 5. Liability/special event insurance ............... proof of certificate of insurance with City additionally insured D. Recreation The Recreation and Community Services Director shall establish fees for the various recreation programs. These fees shall be based on type of program, number of participants and instmuutory, off1ciols, etc., required in the program and shall be based on full cost recovery where feasible, including cost of administrative services. E. Fees for Use qfMunicipal Athletic Facilities The - shall be in effect for all reservations made through the Recreation Office. Youth Resident Groups are defined auagroup having 8O%of its membership residing in Seal Beach or having a student attending m Los Alamitos Unified School District. Youth Resident Groups are defined as persons age 18 and under. The following group categories are listed inorder of priority 1. All community parks, no use oylights: a. Youth resident groups with non-profit status ......... ... $5.0O per hour b. Youth non-resident gnnupm— .................................... $2O.00 per hour c. Adult resident groups ............................................... o2OI0 per hour d Adult non-resident groups ........................................ $4O.DO per hour e. Business Use .......................................................... $8O.0O per hour 2. All Community Parks, including a. Youth resident groups with non-profit status ............ $80.0O per hour b. Youth non-resident groups ............. ...... ................. $4Ol0 per hour c. Adult resident groups . ........ ................................... $5O.0O per hour d. Adult non-resident Qroups .......... ........................... $60OO per hour e. Business Use ............. .... ....... ....... ................... 8UOD.0O per hour 3` Maintenance of Zoeter ball diamond .... ____ .... ... $%l0Oa day per field 4, Rental of Bases ............. ....... $268O per day -$125.DO minimum deposit 5. Gymnasium a. Youth neoid groups ' �—.. $M5l0 per hour b Youth with ntatua—.. $25.00 per hour o. Youth resident groups for private use .......... ........... $2G.0O per hour d. Adult resident groups .... —.................. .................... $35.0D per hour e. Adult non-resident gmupa— .... .................. .......... $5U.UO per hour Resolution Number 6272 6. Heather and Marina Tennis Courts: a. Youth resident groups .............................................. $15.0O per hour b. Youth non-resident groups .................... .................. $2U.0O per hour c. Adult resident groups ............. ......................... ....... $3UOO per hour d. Adult non-resident groups ... ............. ...................... $35.0O per hour 7. event insurance .................... -..................... Actual cost ................... proof of certificate of insurance with City additionally insured F. Edison Community Garden Fees To quality for the use of an Edison Garden one must be able to prove that � they are a resident in the City of Seal Beach. If a gardener moves out of the City of Seal Beach, they must relinquish their plot by February 16th. Rental of a garden plot is for one calendar year. Applications must be returned with payment to the Recreation and Community Services office prior to January 16th of each year in order to be renewed, After the renewal deadline, any remaining plots will be assigned to those on the waiting list. 2. Rental of Garden Plot prior to June 2012 ............ $20.00 per year per plot G. Tennis Center Fees/Rates The City of Seal Beach Tennis Center provides ewide range of amenities which include u pro ohop, fitness center, locker roomo, and the following services: 1. Single membership ...................... $Q5I0 per month /$1.D45.00annually 2. Couple membership .................. $115.0O per month /$1.2G5.00annually 8. Family membership .................... $125.00 per month 1 $1,375.00 annually 4. Junior membership --...--_... $50 month /$55Ol0 annually with a $125.00 one-time administration fee 5. Fitness membership ... .................... $2U.00 per month /$22U.0O annually with a $50.00 one-time administration fee G. Guest fee with member ...................................... $1O,0U month) 7. Guest fee during general public hours ................................ $7.00 per day 8. Court fee ....................................... ........ .......... $1O.00 per hour per court during the hours o(12:00p.m.1o5:O0pxn. 9. Court fee ........................................................... $18l0 per hour per court during the hours of 5:00 p.m. to 9:30 10. Ball machine ..................... - .......................................... $1G.0O per hour .................................. ................. .......... ... .$8OQ per hour for members w«mEz Seal aomcx residents save $2.on per hour court and Junior rates are $aon per hour per court (17 years and under) - adult rates apply it junior and adult play together. (Please note that special event charges are imposed by the management and are not governed In this fee H. Special Activity All Special Activity Request Applications shall be accompanied with the appropriate application fee deposit as set forth below. The application fee shall be the full cost of all appropriate department review and approval. A reconciliation form shall be provided to the applicant with an invoice for additional payment or a refund of excess deposit, and all appropriate funds due to City or applicant shall be cleared before a Special Activity Request Permit is issued. 1' Weddings and wedding n*oeptions, memorial oorvinam, and other group activities involving 25 persons mr more (including City Hall Courtyard and public beach) - outdoor ceremonies are subject bm City scheduling: -- e. Resident -1$m2 hours ....................................... ................ $1OO.00 b. Resident -2hu4 hours ............ .......................... ................. $250.O0 u. Non-resident ~10o2 hours .................................................. $20O.00 d. Non-resident -2bm4 hours ............................................. .... $35O.00 2. Banner Placement Activities ......... ...... Actual costs plus $100.00 deposit I Resolution Number 6272 3. Booth space for special events sponsored by the Recreation Department: a. Non-Profit Group .................. __ .............. ...................... $50.00 b. For-Profit Group ................................................................... $100.00 NOTE: Application fees for certain charitable events, banner placement requests, etc. may be waived upon determination by Recreation and Community Services Director or designee. SECTION 7. FILMING CHARGES & FEES A. Commercial Still Photography: 1. Annual permit application fee.......................... ............................... $50.00 2. Business license .................... ............................ ............... $207.00 3. Location fee - general ...................... ............................... $100.00 per day B. Motion Picture Including Video: 1. Permit application fee ................................................................... $150.00 2. Expedited film permit ....... .............................. ......................... I ... $300.00 3. Business license .......................................................................... $207.00 4. Location fee - general ...................... ............................... $400.00 per day C. Use of City Property - In addition to general location fee: 1. Beach, Pier and Park Area ............... ............................... $300.00 per day 2. Lifeguard Station - interior ............................................... $200.00 per day 3. City Hall ........................................................................... $200.00 per day NOTE: Use of other city property will be charged per fees identified elsewhere in this Resolution or by determination of the City Managers Office. D. Use of Personnel 1. City Personnel ......................... ...................... Reimburse at burdened rate E. Use of City Equipment and Vehicle ......... .........................Market rental rates F. Use of City Parking Lots: 1. Winter period (September 16 thru May 14) ....................$12.00 per space 2. Summer period (May 15 thru September 15) .................$18.00 per space NOTE: Use and fees for beach parking lots subject to arrangements through Ampco Parking SECTION 8. WATER USE/BILLING FEES A. Water Turn-On (new customers) ............................ ............................... $21.00 B. Late Payment: Penalty for water bills paid after 35 days 10% of total water bill C. Water Turn-On 1. Turned off for non-payment of bill) ................................... $77.00 per hour 2. Turn on fee (after 5:00 pm) ........................... ............................... $150.00 D. Water Turn-On After Hours - Emergency Call ..................$250,00 minimum plus time and materials will be charged (Section 5.1- fees for call-outs) NOTE: After a customer's door is tagged more than two times for failure to pay water bill, a $30.00 fee will be added to the customer's water bill for each time door is tagged. SECTION 9. UNSPECIFIED FEES Whenever fees are charged for services provided by the City and no method for the calculation is specified through this Resolution, other City Council resolutions, the Code of the City of Seal Beach, or other state or federal rulings, the fees shall be the actual cost, including the proportionate part of the salaries, wages or other Resolution Number 6272 compensation of any deputy or employee, material and equipment costs and the cost of overhead at 33.12% of the total. SECTION 10. FINGERPRINT FEES The charge for taking M $78 This fee covers the cost of what the Department of Justice charges for processing the fingerprints. SECTION 11. BUSINESS LICENSE TAX& PERMITS NOTE: Per the City Municipal Code section 5.1V.030 the business license tax amount for all businesses other than those based umgross receipt taxes, shall adjusted annually nn July 1m of each year m accordance with the increase in the Consumer Price Index. A. Business license tax (Base Two) for all businesses except the businesses listed below is $212'00: 1. Advertising amusement parks, entertainment omhss. live or stuffed animal, fish and reti|eshowa; Commission merchants or brokers; tattooing business license tax is .......................................... .. ..... $423.00 2. Aircraft for hire ..... ............................................. $212.0O for one aircraft; and m41l0 for each additional aircraft 3. Beach umbrella and equipment nentastond.hnrOnst stendorpkana --.- $212.00 for each additional stand or place ............................. .... $41l0 4. Billiards and bowling alleys ................................................... ...... $212I0 and $2O.0CVund (alley uv table) if more than 1Ounits 5. Boat rental for each boat less than 25 ft. in $2 plus $17.00 per foot for each boat exceeding 25 ft. in length 6. Bottled water sales, excluding eating establishment, confectionery stores or similar businesses for the first delivery vehicle.. ...................... $212.00 l and $51.00 for each additional delivery vehicle Boxing matches (professional contest or exhibition) ................. $2'116.00 8. Carnivals and fairs, excluding those operated n nofdoqganizatk/nm for charitable purposes ..... ...................... $12.00 per day per each game, exhibition, show, recreational device, or booth including concession. Q. Circus $1482OD for the first day and *84GOO for each day thereafter 10. Fortune telling, physic reading for first year of operation .........$1589.DO and 31.O59.00 for each year thereafter 11. Grocery bus ....... ...... ....... .......................................... .-.... $2.118.O0 12. Herb doctors .................. $31&OO plus $41.00 for each additional partner 13. Milk distribution ....................................... s212.0O for first delivery vehicle and $2O.00 for each additional delivery vehicle 14. Money lenders ........................................................................... .$818.O0 15. Motion picture, noduohon or photoplay filming '$10.8Oper except persons with a fixed place of business inthe City; |f fixed place of business iain the City, the tax rate iu .................. *318.DO 16. Peddlers and itinerant vendors: a. For sale of foodstuffs ........................................................ -.$212.00 which includes the use of one vehicle, plus ....................... .$123.OD for each additional vehicle b. For sale of medicine ......................................................... $1,260DO o. All others, unless otherwise required hnbe licensed ............ $212I0 which includes the use wf one vehicle plus .......................... $212.00 for each additional vehicle U� 17. Smndariumo, including mat honne, convalescent home or home for the aged which provide care for more than 3 persons a1 one time ..... *212.DO plus $4l0 for each patient |n excess of8. based on the average number nf patients per day, computed monthly. 18. Selling club p|anm, including mm|e of membership in any club or cooperative association and sale wf discount coupon books ........ $847.00 19. So|iciUng, canvassing or taking orders for goods or advertising, excluding representatives ofsn established or fixed place cf business im the City who submits an affidavit to the collector not less than 48 hours Senior Citizen exception: All persons 62 and over engaged in any home occupation shall pay an annual tlat rate tax of $57.00, provided that the annual income derived from such home occupation does not exceed $10,000.00 in any calendar year. In order to qualify for this reduced rate, licensees shall submit a copy of his or her most recent tax return to substantiate that the annual income derived from the home occupation does not exceed $10,000.00 per year. 26. Massage permit establishment permit ................................ —..... $1O5.00 27. Massage Technician permit ....................................... ....... ......... $1O5l0 SECTION 12. LIFEGUARD FEES A. Junior Lifeguard Program 1. Resident. ............. ___ .................................................................. $51O.00 SECTION 13. ANNUAL ADJUSTMENTS The City Council adopted Resolution No. 6249 authorizing an annual adjustment in accordance with the increase in the Consumer Price Index (CPI) for the period from December 2010 to December 2011 and every period hereafter. SECTION 14. STATEMENT OF RESOLUTIONS The restatement of this Resolution of existing rates and amounts for revio imposed taxes, fees and charges is for the purpose of administrative convenience and is not intended, and mhoU not be construed, as the imposition. extension, or increase nf any such tax, fee orcharge. before such solicitation is ............................. $423l0plus $20.0O per day 20, Vehicles for hire: a. . Seating less than 16 people ............................... $212l0 per vehicle b. Seating more than 16 people ............................. $453I0 per vehicle o. Designed or used primarily for transportation of property where available for lease uv rental without the driver ... ................ .$1OG.08 for the first vehicle plus $41.00 for each additional vehicle d. Ambulances or invalid coaches .................... $10G.0D for first vehicle plus $41D0 for each additional vehicle U� e. Motor scooters ............................................. $212.00 for first scooter and $8.U8 for each additional scooter |n excess oY5scooters 21. New and used oar aalao. o license which also authorizes the holder to repair such vehicles and sell motor vehicle parts and aouesendes......... --_--..-----------------...~..--------$31810 22. Vending �ach a. Merchandise dispensing .................................... $41.00 per machine b. Jukebox, amusement, electronic games and pinball machines ........ —............................ -- ................................... $G1.O0 per machine c. ......................... $212.00 plus $4U.0U for each additional machine after the first 5mauhnes 23. VVmaad $ 24� Country Club golf courses ........... $0.41 per $1,000 of total gross receipts 25. Manufacturing, including every person, firm, corporation, firm or partnership, manufacturing, processing, fabricating, designing, engineering and product, commodity, airplane, ship, selling any such product at wholesale or to jobbers, or selling any such product at retail, or selling any such product at retail, or selling any such product at both wholesale and at retail, or any and every person contracting for or agreeing to manufacture, process, fabricate, design or engineer product, commodity, airplane, ship, machine, vehicle, instrumentality, tool or other thing for fee, charge, valuable consideration or otherwise agreed upon Senior Citizen exception: All persons 62 and over engaged in any home occupation shall pay an annual tlat rate tax of $57.00, provided that the annual income derived from such home occupation does not exceed $10,000.00 in any calendar year. In order to qualify for this reduced rate, licensees shall submit a copy of his or her most recent tax return to substantiate that the annual income derived from the home occupation does not exceed $10,000.00 per year. 26. Massage permit establishment permit ................................ —..... $1O5.00 27. Massage Technician permit ....................................... ....... ......... $1O5l0 SECTION 12. LIFEGUARD FEES A. Junior Lifeguard Program 1. Resident. ............. ___ .................................................................. $51O.00 SECTION 13. ANNUAL ADJUSTMENTS The City Council adopted Resolution No. 6249 authorizing an annual adjustment in accordance with the increase in the Consumer Price Index (CPI) for the period from December 2010 to December 2011 and every period hereafter. SECTION 14. STATEMENT OF RESOLUTIONS The restatement of this Resolution of existing rates and amounts for revio imposed taxes, fees and charges is for the purpose of administrative convenience and is not intended, and mhoU not be construed, as the imposition. extension, or increase nf any such tax, fee orcharge. Resolution Number 6272 SECTION 15. EFFECTIVE DATE This Resolution shall be effective July 1, 2012 except for any agreements, contract contracts, plans and specifications submitted to the City prior to the date of adoption. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the -25th day of June , 2012 by the following vote: AYES: Council Members" NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members ATTEST: STATE OF CALIFORNIA I COUNTY OF ORANGE SS CITY OF SEAL BEACH 1, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6272 on file in the office of the City Clerk, passed, approved, and adopted by the City Council at a regular meeting held on the 25th day of June , 2012. City Clerk 7