HomeMy WebLinkAboutAGMT - Southern California Gas Company (Attachment Agreement) AUG 1:0 2015
James R Asay
The CITY CLERK Director-Corporate Tax
Gas CITY OF SEAL BEACH
_ 488 8-Avenue
Company Mail Loc.H008N1
D San Diego,CA 92101
A Sempra Energy�tlllty tel:(619)696-4836
fax:(619)696-3060
J Asay @sem p ra.co m
August 10, 2015
RE: Change of Address
To All Recipients of Franchise Fee Payments:
Please be advised that the mailing address for the Corporate Tax Department at Sempra Energy
has changed from 101 Ash Street,San Diego,CA 92101. Please address any future correspondence
to the following physical address:
Southern California Gas Company
Attn: State and Local Tax
488 8th Avenue
HQ08N1
San Diego,CA 92101 '
If you have any questions,please feel free to contact me at your convenience.
Thank you,
James R Asay
Director-Corporate Tax
ATTACHMENT AGREEMENT
BY AND BETWEEN
THE CITY OF SEAL BEACH, CALIFORNIA
AND
SOUTHERN CALIFORNIA GAS COMPANY
This Attachment Agreement ( "Agreement ") is entered into this _L1 day of a , 20 [4,
by and between the City of Seal Beach, a California municipal corporation, herein a er referred to
as the ("City ") and Southern California Gas Company, a California corporation hereinafter
referred to as the ( "Gas Company "). Hereinafter the term "Parties" shall refer collectively to all
the foregoing named Parties. The effective date of this Agreement shall be the date indicated
hereinabove (the "Effective Date ").
RECITALS
WHEREAS, Gas Company is an investor -owned public utility that provides gas utility services to
residents of City.
WHEREAS, on March 22, 1965, City granted to Gas Company a franchise to use and lay pipes
and appurtenances necessary and convenient for the operation of a gas utility under, along, across
or upon public streets, ways, alleys and places (collectively, "Rights -of- Way ") in the City for
transmitting and distributing gas (the "Franchise ").
WHEREAS, Gas Company has been authorized by the California Public Utilities Commission
( "CPUC ") to implement its Advanced Meter Program, which consists of, among other things, the
installation of advanced meter equipment, network communications devices, including but not
limited to data collector units ( "DCU's), antennas, gas repeaters and /or radio frequency local area
network ( "RFLAN ") range extenders, and other advanced meter facilities, in connection with and
necessary for Gas Company's operation, transmission and distribution of gas in the City
( "Advanced Meter Facilities ").
WHEREAS, the installation of Advanced Meter Facilities requires the use of existing or new
infrastructure, such as poles, towers, streetlights or buildings of sufficient height and at
appropriate locations in order to be effective.
WHEREAS, In order to reduce the number of new Advanced Meter Facility installations with the
City Rights -of -Way, City desires to allow the Gas Company to install its Advanced Meter
Facilities, which are further described herein, upon property owned by City at one site identified
on "Exhibit A" and incorporated herein by this reference ( "Installation Site ").
WHEREAS, City and Gas Company have agreed to enter into this Agreement regarding Gas
Company's use and attachment of Advanced Meter Facilities at the Installation Site upon the
terms, conditions and other considerations set forth herein.
A G R E E M E N T
NOW THEREFORE, in consideration thereof and for other valuable consideration as set forth
herein below the parties hereto do mutually agree as follows:
1. Effective Date. This Agreement shall become effective as of the date of its
execution by or on behalf of all the Parties hereto ( "Effective Date ").
2. Term. The term shall be for 20 years from the Effective Date.
3. Authorization. Subject to the terms and conditions contained herein, City hereby
authorizes Gas Company to install Advanced Meter Facilities upon property owned
by City at one site identified on "Exhibit A" and to operate, use, maintain, repair,
replace, improve, alter, inspect, test and remove such Advanced Meter Facilities on
t S terms and conditions set forth herein.
�In the event that Gas Company installs any Advanced Meter Facilities other than
/the Advanced Meter Facility at the Installation Site anywhere in the City southwest
of the intersection of Seal Beach Boulevard and Heron Pointe, which provides
reasonably adequate coverage in reading existing meters, City shall have the option
terminate this agreement upon 60 days' notice to Gas Company. Termination
will result i removal of all facilities from premises and repair to the satisfaction of
�Qj rn� the City. '^ f A Z7
All -
4. Scope of Agreement. This Agreement authorizesNke -P,as Company to attach the
Advanced Meter Facilities in the general locations identified on Exhibit "A"
attached hereto, and to undertake all activities related to the installation,
maintenance, operation, use, repair, replacement, improvement, alteration.
inspection, testing and removal of Advanced Meter Facilities.
Nothing contained in this Agreement shall be deemed or construed to create the
relationship of principal and agent or of partnership or of joint-venture or of any
association whatsoever between City and Gas Company, it being expressly
understood and agreed that neither the computation of fees nor any other provisions
contained in this Agreement nor any act or acts of the parties hereto shall be
deemed to create any relationship between City and Gas Company other than the
relationship of City and Gas Company.
Gas Company hereby acknowledges, agrees and covenants that this Agreement
does not authorize or bestow any rights to Gas Company to provide cable television
service or commercial telecommunications services.
5. Compensation - Rent.
a. The Gas Company shall pay to the City a one -time fee of $780 ($39 x 20
years) (as compensation for the Gas Company's use of the Leased Property. The
Fee shall be due within thirty (30) days of the Effective Date.
b. If the Gas Company fails to timely pay the Fee in a timely manner, the term
of the Agreement, a delinquent payment charge on any unpaid amount shall accrue
from the due date until paid at the lower of the rate of one and one -half percent (1
%) per month or the maximum rate allowable by Law until paid.
C. Delinquent Payment. Gas Company assumes all risk of loss and
responsibility for delinquent payments. If Gas Company fails to make payments
when due a delinquent payment charge on any unpaid amount shall accrue from the
due date until paid at the lower of a rate of one and one -half percent (1% %) per
month or the maximum rate allowable by Law until paid.
6. Authority to Allow Attachments. The City hereby represents and warrants to the
Gas Company that it has all rights necessary to allow for the installation of the
Advanced Meter Facilities at the Installation Site, and agrees to indemnify, defend
and hold harmless the Gas Company from and against losses, liability or claims
from owner of the real property where the Installation Site is located and that are
related to the rights conferred to the Gas Company under this Agreement.
7. Access. The City shall provide the Gas Company no later than next business day
access to the subject property allowing the Gas Company to undertake all activities
related to the installation, maintenance, operation, use, repair, replacement,
improvement, alteration, inspection, testing and removal of Advanced Meter
Facilities.
8. Workmanship and Responsibility of Gas Company. All of Gas Company's
construction and installation work shall be performed at Gas Company's sole cost
and expense and in a good and workmanlike manner and in accordance with the
rules and regulation of the CPUC and the Improvement Plans reviewed by the City
Engineer, and in compliance with all applicable ordinances, regulations or law (to
the extent not inconsistent with or preempted by the jurisdiction of the CPUC).
Gas Company shall remove Advanced Meter Facilities at its sole expense within
one hundred eighty (180) days after the termination of the Agreement, unless an
agreement is otherwise reached between the City and Gas Company to abandon the
Advanced Meter Facilities in place. Gas Company shall bear full responsibility for
repairs to any damage to the Rights -of -Way caused by Gas Company's or its
employees% contractors', subcontractors' or agents' installation, construction,
maintenance, repair, operation and removal of the Advanced Meter Facilities.
9. Gas Company to Bear All Costs. The Gas Company, or any successor or
authorized assign, shall bear all costs incurred in connection with Gas Company's
or its employees', contractors', subcontractors' or agents' planning, design,
installation, construction, maintenance, repair, operation and removal of Advanced
Meter Facilities. City shall not be responsible or bear any cost for repair of any
damage or movement of the Advanced Meter Facilities due to repair, maintenance
and/or failure /collapse of any existing gas, water and sewer lines or any other
improvements or works approximate to Advanced Meter Facilities, except for the
active negligence or willful misconduct of the City, its officers, agents, employees,
3
contractors or subcontractors.
10. Interference. The Gas Company installation and use of its Advanced Meter
Facilities under this Agreement shall not damage or interfere in any way with
City's property identified on Exhibit "A." The City at all times during this
Agreement, reserves the right to take any action it deems necessary, in its sole
discretion, to repair, maintain, alter, or improve the subject property, which may
temporarily interfere with the Gas Company's leasehold improvements as may be
necessary in order to carry out any of such activities. The City agrees to give 30
day advance notice of such interference to the Gas Company and to reasonably
cooperate with the Gas Company to carry out such activities with a minimum
amount of interference with the Gas Company's operations.
The City shall not install or allow another party to install any telecommunications
equipment within a three (3) foot radius of Advanced Meter Facilities. Regardless
of proximity to Advanced Meter Facilities, City shall not allow any
telecommunications equipment either owned by the City or by a third party located
on the subject property to interfere with the operations of Advanced Meter
Facilities. Upon notification by the Gas Company to the City of such interference,
the City shall take immediate action to cease such interference.
11. Indemnification of City. Gas Company shall defend, indemnify and hold harmless
the City and its council members, officers, agents and employees against all claims,
losses, damages, costs, expenses, liabilities, causes of action, fines or penalties,
including but not limited to reasonable attorney's fees (collectively, "Claims "), for
injury to or death of persons or damage to property incurred by City arising from
Advanced Meter Facilities being located on subject property, except to the extent such
Claim arise from the sole negligence or willful misconduct of the City, its officers,
agents, or employees, provided, however, that Gas Company's indemnification
obligations shall not include.any punitive, consequential or special damages, except to
the extent asserted by a third party against the City arising from a Claim for which
Gas Company is obligated to indemnify the City under this paragraph.
12. Governing Law; Jurisdiction. This Agreement shall be governed and construed
by and in accordance with the Laws of the State of California. Nothing in this
section shall be interpreted to preclude either party's right to seek redress from the
CPUC.
13. Amendment of Agreement. This Agreement may not be amended except pursuant
to a written instrument signed by both parties.
14. Notices. All notices, demands, requests, consents or other communications that this
Agreement contemplates or authorizes, or requires or permits either party to give to
the other, shall be in writing and shall be personally delivered or mailed or sent by
reputable overnight courier, such as FedEx, to the respective party as follows:
IH
TO CITY:
City of Seal Beach
211 8h Street
Seal Beach, CA 90740 -6305
Attn: Patrick Gallegos
Tel: (562) 431- 2527x1308
TO THE GAS CO.:
Southern California Gas Company
555 West Fifth Street
Los Angeles, CA 90013
Attn: David Mercer, Network Technology Manager
Tel: (213) 244 -5415
Either party may change its address by notice to the other party as provided herein.
Communications shall be deemed to have been given and received on the first to
occur of (i) actual receipt at the offices of the party to whom the communication is
to be sent, as designated above, or (ii) three working days following the deposit in
the United States Mail of registered or certified mail, postage prepaid, return receipt
requested, or with reputable overnight courier, such as FedEx, addressed to the
offices of the party to whom the communication is to be sent, as designated above.
15. Other Regulations. All Gas Company's use of the Rights -of -Way under this
Agreement shall be in accordance with the laws of the United States of America,
the State of California and in accordance with all applicable rules and regulations
and ordinances of the City now in force, or hereinafter prescribed or promulgated
by resolution or ordinance or by State or Federal law (to the extent that the same
are not inconsistent with or preempted by the jurisdiction of the CPUC).
16. Powers to Enter into Agreement. The individuals executing this Agreement
represent and warrant that they have the right, power, legal capacity and authority
to enter into and to execute this Agreement on behalf of the respective legal entities
of the Gas Company and the City.
17. Assignment or Transfer of Authorization. This Agreement may be assigned or
transferred to any qualified person or entity subject to the prior written approval of
the City, which shall not be unreasonably withheld, conditioned or delayed.
Notwithstanding the foregoing, City's prior written consent shall not be required
for any of the following: (a) the transfer of any shares or stock in or change in
control of Gas Company's parent company, or (b) any merger, consolidation or
reorganization of, by or with Gas Company or transfer of all or substantially all of
the stock or shares in Gas Company or assets of Gas Company.
18. Entire Agreement; Successors and Assigns. This Agreement contains the entire
understanding between the parties with respect to the subject matter herein. There
5
are no representations, agreements, or understandings, whether oral or written,
between or among the parties relating to the subject matter of this Agreement
which are not fully expressed herein. Each party has relied on advice from its own
attorneys, and the warranties, representations, and covenants of this Agreement
itself This Agreement shall inure to the benefit of and be binding upon the parties
hereto and their respective successors and assigns.
IN WITNESS WHEREOF the parties hereto for themselves, their heirs, executors,
administrators, successors, and assigns do hereby agree to the full performance of the covenants
herein contained and have caused this Agreement to be executed by setting hereunto their
signatures on the day and year respectively written herein below.
THE CITY OF SEAL BEACH
DATE: I I
By: l tYl
City Ma ag
APPROVED AS TO F RM:
By:
City Attorney
SOUTHERN CALIFORNIA GAS COMPANY
DATE: S� S �� By: !2�W- e�o�
Tina M. Costa
Contracts & Special Projects Manager
Advanced Meter Project
6
REVISIONS'.
REV.
BATE
REV ISEB BY
INITIAL
1
12/04/13
ADONIS V. JAVIER
A.J.
PROPRIETARY INFORMATION:
CITY: SEAL BEACH, CA.
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRIETARY
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
COMPANY IS STRICTLY PROHIBITED.
The COUNTY: ORANGE COUNTY
JURISDICTION: COUNTY OF ORANGE
Gas
SITE NUMBER /ID: 2109350 / MH056 -B
The
Company SITE TYPE: (N) ROOF MOUNT, SOLAR POWER
Gas
Company
A Sempra Energy Utility
A Sempra Energy llfllity
ADVANCED METER
PROJECT SUMMARY:
SHEET INDEX:
THE GAS COMPANY TOWER
Legg 93each a'� �'�y+ CnWwell Banker E E Consultin4 ° Sa
�AannFsh
555 W. 5TH STREET
LOS ANGELES, CA 90013
SITE ADDRESS:
SHEET NO: DESCRIPTION:
^n
g
211 8TH STREET, SEAL BEACH, CA 90740
�srLtw�d Ave d c aa�nrrq
PROJECT INFORMATION:
APPLICANT:
T -1 TITLE SHEET
Corsair � "�'
Palhpm Ave Trarel
SOUTHERN CALIFORNIA GAS CO.
T GENERAL NOTES
each
-
555 W. 5TH ST., SUITE 3RD., LOS ANGELES, CA 90013
-2
,q #; CllppnrWay Coasllia<Dr
REPRESENTATIVE: ANABEL MARTINEZ
A AERIAL VIEW/ PLANS
�m asariaa �
PHONE: (213) 4 -2333
-1
= Commurriry
firrk Mauna or 6olsaAvc
ROOF TOP MOUNT
PROPERTY OWNER:
A -2 DCU DETAILS
F'�eificrn^
.rla wl�lca 9m
SOLAR POWER
CITY OF SEAL BEACH
Elememnry a
school
211 8TH STREET, SEAL BEACH, CA 90740
A -3 ANTENNA &SOLAR PANEL DETAILS
� } �
CONTACT: BUILDING DIVISION
PHONE: 493
A -4 EQUIPMENT DETAILS
y C � S Q Bay Thealre �.
� °raf � �r �aseen�n
(562) -9857
y ti yy Anne9le Dnri, � Curs
PUBLIC RIGHT OF WAY
A -5 MATERIALS LIST
SHEET TITLE:
LATITUDE: 33.74240000
E -1 ELECTRICAL DIAGRAM
EnoAess p`
qq`� Medical � 1] � �� �� c
.-
i+irerc r1 _ ealB � Seaf Beach Z-° lerFacld.�F,,_ Chevron s[ali4n �; _ ,� e
.�� Lifeguards - seal Beach'
LONGITUDE: - 118.10565000
TODD
End Cak Niabncnt
ANSI /EIA -222 -F LIFE SAFETY CODE NFPA -101
DATE: 04 -19 -13
OCCUPANCY CLASSIFICATION: UNMANNED TELECOMMUNICATION FACILITY
2012 UNIFORM PLUMBING CODE
cQYV,
�` •� 1VaksWharf'ri nr '+srhstrrrt.•I yyg'1
2012 NATIONAL ELECTRIC CODE
`�
Y, Garage -
LOCAL BUILDING CODES
ZONING CLASSIFICATION:
CITY /COUNTY ORDINANCES
n�
9�
CONSTRUCTION TYPE:
Beacrirrucd 11
cea
TITLE SHEET
�Fe 4ari�P ogaCa � ' R
PROJECT DESCRIPTION:
� Raja °c,,f
ErseriTOwer a 1t
SOUTHERN CALIFORNIA GAS CO. PROPOSES TO INSTALL
Park
w
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
ADVANCED METER ANTENNA, SOLAR AND DCU ASSEMBLIES
�
TO THE EXISTING BUILDING ROOF TOP /PARAPET.
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
���
Btach Pier
se�Playgrcu^d
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
Brendel
CONSULTING TEAM:
APPROVALS:
�`" � MlrheieAf?Ii0
MartncP
A kempra Energy utilities`
itdphin
THE FOLLOWING PARTIES HEREBY APPROVE AND ACCEPT THESE DOCUMENTS AND
LICENSURE:
AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE CONSTRUCTION DESCRIBED
N
HEREIN. ALL CONSTRUCTION DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL
VICINITY MAP
SAC /ZONING /PERMITTING: CONSTRUCTION PROJECT MANAGER
BUILDING DEPARTMENT AND ANY CHANGES AND MODIFICATIONS THEY MAY IMPOSE.
NOT TO SCALE
SOUTHERN CALIFORNIA GAS CO. SOUTHERN CALIFORNIA GAS CO.
PRINT NAME SIGNATURE DATE
ANABEL MARTINEZ /MIRIAM NAVARRO ROBERT SHY
555 W. 5TH ST. 3RD FLOOR 555 W. 5TH ST. 3RD FLOOR
PERMIT #:
REVISION HISTORY
LOS ANGELES, CA 90013 LOS ANGELES, CA 90013
LANDLORD PUBLIC R.O.W.
(213)244 -2333 (213)244 -2195
PRECON. MGR
REVISION 1: INITIAL DESIGN.
CONTRACTOR NETWORK CONSTRUCTION ENGINEER
DEVELOP. MGR
REVISION 0: TIMELINE FOR PERMIT ISSUE.
CONST. MGR
DATE'.
HEN KELS & MCCOY SOUTHERN CALIFORNIA GAS CO.
DESIGNER'. K.H. &A.J.
ERIC TODD JUAN MALDONADO
PROJECT. MGR
APPLICABLE CODES:
CAB DRAFTING: A.J. 1204/13
555 W. 5TH ST., 3RD FLOOR
2540 FICUS STREET LOS ANGELES, CA 90013
SR. RF ENGINEER
CHECKED BY'. K.H.
POMONA, CA 91766 (213) 244 -2324
CALIFORNIA ADMINISTRATIVE CODE
SCALE'. ASSHOWN
PHONE: (909)270 -7580
RF ENGINEER
2013 CALIFORNIA BUILDING CODE
SHEET NUMBER'.
REVISION'.
FAX: (909)545 -6664
2012 UNIFORM MECHANICAL CODE
CONTACT ERIC
T -1
TODD
OPERATIONS
ANSI /EIA -222 -F LIFE SAFETY CODE NFPA -101
DATE: 04 -19 -13
2012 UNIFORM PLUMBING CODE
2012 NATIONAL ELECTRIC CODE
SAC REP.
LOCAL BUILDING CODES
CITY /COUNTY ORDINANCES
REVISIONS.
GENERAL NOTES AND CONDITIONS
REV
DATE
REVISED BY
INITIAL
1
12104/13
ADONIS V. JAVIER
AJ.
INTENT
GENERAL NOTES
CONFLICTS
STANDARD SYMBOLS
1. THIS CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE DONE
1. IDEMNIFICATION CLAUSE: THE CONTRACTOR AGREES AND SHALL:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL
AND THE MATERIALS TO BE FURNISHED FOR CONSTRUCTION.
MEASUREMENTS AT THE SITE BEFORE ORDERING ANY MATERIALS OR
ASSUME SOLE AND COMPLETE RESPONSIBILITY OF THE JOBSITE CONDITIONS
DOING ANY WORK. NO EXTRA CHARGE OR COMPENSATION SHALL BE
BUILDING
2. THE INTENTION OF THE DOCUMENT IS TO INCLUDE ALL LABOR AND
DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE
ALLOWED DUE TO DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND
ABLY NECESSARY FOR THE PROPER EXECUTION
MATERIALS REASONABLY O
O
SAFETY OF ALL PERSONS AND PROPERTIES. THAT THESE REQUIREMENTS
DIMENSIONS INDICATED IN THE CONSTRUCTION DRAWINGS. ANY SUCH
® BOLLARD
AND COMPLETION THE WORK AS STIPULATED THE CONTRACT.
SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
DISCREPANCY IN DIMENSION WHICH MAY BE FOUND SHALL BE
PROPRIETARY INFORMATION:
3. MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE ANTICIPATED AND
HOURS AND CONDITIONS. THE CONTRACTOR FURTHER AGREES TO DEFEND
SUBMITTED TO THE OWNER FOR CONSIDERATION BEFORE THE
CAN CABLE TV LINE
THEINFORMATION CONTAINED INTHIS SETOF
SHALL BE CONSIDERED AS PART OF THE WORK. NO CHANGES THAT
INDEMNITY AND HOLD SOCAL GAS REPRESENTATIVES AND ENGINEERS
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN
CONTRACTOR PROCEEDS WITH THE WORK IN THE AFFECTED AREAS.
- - - -- - - - -- CENTER LINE
BYNSTURE. AN USE OR DISCLOSURE OTHER
av NATURE.AW USEORDTESTOTHEGAS
ALTER THE CHARACTER OF THE WORK WILL BE MADE OR PERMITTED
CONNECTION WITH THE PERFORMANCE OF THE WORK ON THIS PROJECT.
2. THE BIDDER, IF AWARDED THE CONTRACT, WILL NOT BE ALLOWED ANY
THCOMPANY
BY THE OWNER WITHOUT ISSUING A CHANGE ORDER.
EXTRA COMPENSATION BY REASON OF ANY MATTER OR THING
® CONCRETE BLOCK WALL
ISSraRCCC PROHIBITED.
2• PRIOR TO THE BEGINNING OF ANY CONSTRUCTION AND THROUGHOUT THE
CONCERNING WHICH BIDDER MIGHT HAVE FULLY INFORMED THEMSELVES
4. THE DRAWINGS ARE GRAPHIC AND PICTORIAL PORTIONS OF THE CONTRACT
COURSE OF CONSTRUCTION WORK, THE CONTRACTOR SHALL FULLY COMPLY
PRIOR TO THE BIDDING.
DOCUMENTS SHOWING THE DESIGN, LOCATION AND DIMENSIONS OF THE WORK,
GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES
WITH "CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH" ACT OF 1973
= CURB, GUTTER & SIDEWALK
AND DIAGRAMS.
INCLUDING ALL REVISIONS AND AMENDMENTS THERETO.
3. NO PLEA OF IGNORANCE OF CONDITIONS THAT EXIST, OR OF
DIFFICULTIES OR CONDITIONS THAT MAY BE ENCOUNTERED OR OF ANY
5. IN CASE OF INCONSISTENCY BETWEEN OTHER PARTS THE CONTRACT, THE
3. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF GO 95, 128, AND
OTHER RELEVANT MATTER CONCERNING THE WORK TO BE PERFORMED
DRIVEWAY
CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH THE OWNER'S
THE STANDARD "SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION", AS
IN THE EXECUTION OF THE WORK WILL BE ACCEPTED AS AS EXCUSE
ADOPTED BY THE CITY, COUNTY OR STATE AS MODIFIED BY STANDARD
FOR ANY FAILURE OR OMISSION ON THE PART OF THE CONTRACTOR
INTERPRETATION.
PLANS AND ADDENDUM.
TO FULFILL EVERY DETAIL OF ALL REQUIREMENTS OF THE CONTRACT
- -EDP- - EDGE OF PAVEMENT
DOCUMENTS GOVERNING THE WORK.
6 SPECIFICATIONS, THE LATEST OR MOST
4. THE EXISTENCE AND LOCATION OF UTILITIES AND OTHER AGENCIES
- -EOD- - - EDGE OF DIRT
SCENT EDITION SHALLEAPPLYSTANDARD
FACILITIES AS SHOWN HEREON ARE OBTAINED BY A SEARCH OF AVAILABLE
The
CHANGE ORDER PROCEDURE
RECORDS. OTHER FACILITIES MAY EXIST, THE CONTRACTOR SHALL VERIFY
Ev ELECTRIC VAULT
PRIOR TO THE START OF CONSTRUCTION AND SHALL USE EXTREME CARE
Gas
AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO THESE FACILITIES.
FENCE
1
RESPONSIBLE
STRUCTURAL NOTES
Company
CONTRACTORDINVOLVED. THE CONTRACTOR, UPON VERBAL REQUEST FROM
RE AGENCY FACILITIES WITHIN THE LIMITS OF WORK, WHETHER THEY ARE
-, -,-CHAINLINK FENCE
THE OWNER SHALL PREPARE A WRITTEN PROPOSAL DESCRIBING THE
SHOWN ON THIS PLAN OR NOT.
CHANGE IN WORK OR MATERIALS AND ANY CHANGES IN THE CONTRACT
1. DESIGN CRITERIA:
FIRE HYDRANT
A Sempra Energy Utility
AMOUNT AND PRESENT TO THE OWNER WITHIN 72 HOURS FOR APPROVAL
5. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (800)
SUBMIT REQUESTS FOR SUBSTITUTIONS IN THE FORM AND IN
227 -2600, AT LEAST TWO WORKING DAYS PRIOR TO THE START OF
2010 CALIFORNIA BUILDING CODE.
-GAS GAS LINE
ACCORDANCE WITH PROCEDURES REQUIRED FOR CHANGE ORDER
ANY EXCAVATION.
ASCE 7 -05 MINIMUM DESIGN LOADS FOR BUILDINGS
PROPOSALS. ANY CHANGES IN THE SCOPE OF WORK OR MATERIALS
OTHER STRUCTURES.
GAS VALVE
WHICH ARE PERFORMED BY THE CONTRACTOR WITHOUT A WRITTEN
6. THE CONTRACTOR SHALL NOTIFY THE CITY, COUNTY OR STATE ENGINEER
TIA -222 G STANDARD.
ADVANCED METER
CHANGE ORDER AS DESCRIBED AND APPROVED BY THE OWNER SHALL
INSPECTION DEPARTMENT (213) 482 -7030, AT LEAST TWO WORKING DAYS
2009 AASHTO LTS - 5TH EDITION.
GV GATE VALVE
THE GAS COMPANY TOWER
PLACE FULL RESPONSIBILITY OF THESE ACTIONS ON THE CONTRACTOR.
BEFORE THE START OF ANY WORK REQUIRING THEIR INVOLVEMENT.
G.0.95
W. 5TH STREET
X GUY POLE
S ANGELES, CA 90013
LOS
CODE COMPLIANCE
7. ALL WORK AREA AND STREET TRAFFIC CONTROL SHALL BE IN ACCORDANCE
2. DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
WITH THE SPECIFICATIONS OF THE WORK AREA TRAFFIC CONTROL BOOK
OF ANY UNUSUAL OR UNFORESEEN CONDITION PRIOR TO CONTINUING
® JOINT POLE
1. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE
AND SPECIFICATIONS FROM THE CITY, COUNTY OR STATE.
WITH CONSTRUCTION. SHOULD ANY CONDITION ARISE WHERE THE INTENT
OF THE DRAWINGS IS IN DOUBT, OR WHERE THERE APPEARS TO BE
MANHOLE
8
PROJECT INFORMATION:
AND FEDERAL REGULATIONS. THESE SHALL INCLUDE BUT NOT BE LIMITED
8, THE CITY, COUNTY OR STATE SHALL SPECIFY THE EXPIRATION PERIOD OF
DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION IN THE
TO THE LATEST VERSION OF THE FOLLOWING:
THE PERMIT FOR THIS CONSTRUCTION PROJECT.
FIELD, THE ENGINEER SHALL BE NOTIFIED PRIOR TO CONTINUING
OIL OIL LINE
CALIFORNIA ADMINISTRATIVE CODE
THE WORK.
PWR POWER LINE
2011 CALIFORNIA BUILDING CODE
9. THE MINIMUM COVER FOR ALL CONDUITS PLACED UNDERGROUND SHALL BE
36 INCHES TO THE FINISHED GRADE AT ALL TIMES.
3. PORTLAND CEMENT SHALL CONFORM TO ASTM C -150 TYPE II.
ROOF TOP MOUNT
2010 UNIFORM PLUMBING CODE
AGGREGATE FOR STONE CONCRETE SHALL CONFORM TO ASTM C -33.
-__ PROPERTY LINE
- R
2010 NATIONAL ELECTRIC CODE
2010 UNIFORM MECHANICAL CODE
10. ALL SHRUBS, PLANTS OR TREES THAT HAVE BEEN DAMAGED OR DISTURBED
AGGREGATE FOR LIGHTWEIGHT CONCRETE SHALL CONFORM TO ASTM C -330.
Pe PULLeox
SOLAR POWER
ANSI EIA -222 -F LIFE SAFETY CODE NFPA -101
DURING THE COURSE OF THE WORK, SHALL BE REPLANTED AND /OR
AGGREGATE ASTM C -33: MAXIMUM SIZE 1 h" FOR FOOTINGS AND
LOCAL BUILDING CODE
REPLACED SO AS TO RESTORE THE WORK SITE TO ITS ORIGINAL CONDITION.
1" FOR ALL OTHER WORK.+
RAILROAD TRACK
CITY AND COUNTY ORDINANCES
11. VAULTS, PEDESTALS, CONDUITS AND OTHER TYPES OF SUBSTRUCTURE ARE
4. ALL REINFORCING BARS, ANCHOR BOLTS, PRESTRESSING TENDONS AND
® RETAINING WALL
EENGINEER. SANY
ES SHALL BE WELL SECURED IN POSITION
ADMINISTRATION
CONSTRUCTION ANDRALL DEVIATIONS FROM THE SPECIFIED
PRIOR TORPLACING CONCRETE.
- - -- ROW ---- RIGHT OF WAY
SHEETTITLE:
TYPES OF MATERIAL MUST BE APPROVED BY THE SYSTEM ENGINEER, IN
1. BEFORE THE COMMENCEMENT OF ANY WORK, THE CONTRACTOR WILL
WRITING BEFORE INSTALLATION THEREOF.
5. THE MAXIMUM SLUMP SHALL BE BETWEEN THE RANGE OF 3" TO 5"
S SANITARY SEWER
ASSIGN A PROJECT MANAGER WHO WILL ACT AS A SINGLE POINT OF
FOR FOOTINGS, SLABS ON EARTH AND MASS CONCRETE.
CONTACT FOR ALL PERSONNEL INVOLVED IN THIS PROJECT. THIS
12. ALL RECONSTRUCTION, RESURFACING, PAVEMENT DELINEATION AND OTHER
SD STORM DRAIN LINE
PROJECT MANAGER WILL BE DEVELOPING A MASTER SCHEDULE FOR THE
IMPROVEMENTS ARE TO BE RESTORED TO THE SAME OR IMPROVED CONDITION
PROJECT WHICH WILL BE SUBMITTED TO THE OWNER PRIOR TO THE
BASED ON GENERAL NOTE NO. 3 ABOVE.
STL STREET LIGHT LINE
COMMENCEMENT OF ANY WORK.
GENERAL
INSURANCE AND BONDS
STREET SIGN
2. SUBMIT A BAR TYPE PROGRESS CHART NOT MORE THAN THREE (3) DAYS
NOTES &
AFTER THE DATE ESTABLISHED FOR COMMENCEMENT OF THE WORK ON
1. THE CONTRACTOR SHALL AT THEIR OWN EXPENSE CARRY AND MAINTAIN FOR
B SERVICE PEDESTAL
GAT A TIME OF
THE DURATION OF THE PROJECT ALL INSURANCE AS REQUIRED AND LISTED.
SYMBOLS
WORK TOEBEL PERFORMED THE SITE, PROPERLY SEQUENCED ANDY
TEL TELCO LINE
COORDINATED WITH OTHER ELEMENTS OF WORK AND SHOWING COMPLETION
2• THE CONTRACTOR SHALL NOT COMMENCE WITH THEIR WORK UNTIL THEY
W
OF THE WORK SUFFICIENTLY IN ADVANCE OF THE DATE ESTABLISHED FOR
HAVE PRESENTED AN ORIGINAL CERTIFICATE OF INSURANCE STATING ALL
WATER LINE
SUBSTANTIAL COMPLETION OF THE SITE.
COVERAGES TO THE OWNER.
QM WATER METER
3. PRIOR TO COMMENCING CONSTRUCTION, THE OWNER SHALL SCHEDULE AN
3. THE OWNER SHALL BE NAMED AS AN ADDITIONAL INSURED ON ALL POLICIES.
ON -SITE MEETING WITH ALL MAJOR PARTIES. THIS WOULD INCLUDE BUT
A Energy
NOT LIMITED TO, THE OWNER, PROJECT MANAGER, CONTRACTOR, AND LAND
OWNER REPRESENTATIVE.
4. REFER TO THE MASTER AGREEMENT FOR REQUIRED INSURANCE LIMITS.
CLEAN UP
�Seffl(Jl'a UlIIlIIBS
4. THE CONTRACTOR SHALL BE EQUIPPED WITH SOME MEANS OF CONSTANT
COMMUNICATIONS, SUCH AS A MOBILE PHONE OR BEEPER. THIS
LICENSURE:
EQUIPMENT WILL NOT BE SUPPLIED BY THE OWNER, NOR WILL
1. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE SITE FREE FROM
WIRELESS SERVICE BE ARRANGED.
ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR
EMPLOYEES AT WORK. AT THE COMPLETION OF THE WORK, THEY SHALL
5. DURING CONSTRUCTION, THE CONTRACTOR MUST ENSURE THAT EMPLOYEES
REMOVE ALL RUBBISH FROM AND ABOUT THE BUILDING AREA,
AND SUBCONTRACTORS WEAR HARD HATS AT ALL TIMES. THE CONTRACTOR
INCLUDING ALL THEIR TOOLS, SCAFFOLDING AND SURPLUS MATERIALS
WILL COMPLY WITH ALL SCG SAFETY REQUIREMENTS IN THEIR
AND SHALL LEAVE THEIR WORK CLEAN AND READY FOR USE.
AGREEMENT.
2. VISUALLY INSPECT EXTERIOR SURFACES AND REMOVE ALL TRACES OF
6. PROVIDE WRITTEN DAILY UPDATES AND PHOTOGRAPHS OF ON -SITE
SOIL, WASTE MATERIALS, SMUDGES AND OTHER FOREIGN MATTER.
PROGRESS TO THE PROJECT MANAGER VIA E -MAIL
3. REMOVE ALL TRACES OF SPLASHED MATERIALS FROM ADJACENT
7. A COMPLETE INVENTORY OF CONSTRUCTION MATERIALS AND EQUIPMENT
SURFACES.
IS REQUIRED PRIOR TO THE START OF CONSTRUCTION.
4. IF NECESSARY TO ACHIEVE A UNIFORM DEGREE OF CLEANLINESS,
8. NOTIFY THE OWNER / PROJECT MANAGER IN WRITING NO LESS THAN
HOSE DOWN THE EXTERIOR OF THE STRUCTURE.
48 HOURS IN ADVANCE OF CONCRETE POURS, TOWER ERECTIONS, AND
DATE.
EQUIPMENT CABINET PLACEMENTS.
SUBSTANTIAL COMPLETION
DESIGNER. K.H. BA.J .
9. CLOSEOUT PACKAGE IS DUE COMPLETE WITH DETAILED TOP PHOTOS
1. SUBSTANTIAL COMPLETION IS THE STAGE OF WORK SUFFICIENTLY COMPLETE
CAD 12J04113
UPON SITE PUNCHWALK WITH PROJECT MANAGER ( SEE PROJECT MANAGER
IN ACCORDANCE EITH THE CONTRACT SO THE OWNER CAN FULLY UTWZE THE
CHECKED BY K.H.
FOR SAMPLE CLOSEOUT PACKAGE).
WORK FOR ITS INTENDED USE. SUCH TIME, CONTRACTOR SHALL SUBMIT TO
OWNER A FOR FINAL
REQUEST REPORT
SCALE. AS SHOWN
WARRANTIES AND BONDS
ITEMIZING AND INVENTORY OFT WORK TO COMPLETIONDAND
SHEET NUMBER.
REVISION.
AS -BUILT DOCUMENTS /DRAWINGS.
1. THE CONTRACTOR IS RESPONSIBLE FOR APPLICATION AND PAYMENT
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
OF CONTRACTOR LICENSES AND BONDS.
2. OWNER WILL ONLY RELEASE FINAL PAYMENT UPON SATISFACTORY REVIEW AND
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
CONTRACTOR COMPLIANCE OF THE FINAL PAYMENT REQUIREMENTS.
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
/'�
2. SEE MASTER CONTRACTOR SERVICES AGREEMENT FOR ADDITIONAL DETAILS.
T -L
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
,�
REVISIONS.
REV.
DATE
REVISED BY
INITIAL
1
12104113
ADONIS V. WAVIER
AJ.
t
1 E) LEASE AREA ON TOP OF
CITY OF SEAL BEACH CITY HALL
BUILDING WITH PROPOSED (N)
ANTENNA, SOLAR AND DCU EQUIPMENT.
r
1
PROPRIETARY INFORMATION:
A
V }
■
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRIETARY
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
1
r
COMPANY IS STRICTLY PROHIBITED.
�
''"►
1
The
Gas
Company
'
k
F
A Sempra Energy Utility
ADVANCED METER
THEGAS COMPANYTOWER
555 W. 5TH STREET
LOS ANGELES, CA 90013
PROJECT INFORMATION:
' 1
1
AERIAL VIEW 1
ROOF TOP MOUNT
SOLAR POWER
SEE PARTIAL DETAIL
9
PLAN @ RIGHT
4 - 2'-6"�
(N) 2 %" 0 X 6'H G.I. POLE
SHEETTITLE:
ANTENNA BOOM, 4 FT.
(N) 2 %" 0 X 6'H G.I. POLE
P /N: 056 -9975M
1 V X 12" UNISTRUT
DCU
HORIZONTAL BRACE
PLAN VIEWS
E) 6" THK. X 6' WALL
ENCLOSURE
HVAC
Q► B
Al 2 Al 2 !
SOLAR
PANEL
ANTENNA BOOM, 4 FT.
P /N: 056 -9975M
A kSempra Energy utilities®
Lc
2 %" U -BOLT, % " -16
W/ HARDWARE, SS
LICENSURE:
P /N: 069 -0040
(E) BRACE v
CLOCK
TOWER
DATE.
(E) EDGE OF
DESIGNER KH BAJ.
CAD DRAFTING. A . 12104/13
'I
PLATFORM
CHECKED B K.H.
SCALE. AS SHOWN
SHEET T NUMBER.
REVISION.
2
INDEX PLAN
APPROX. SCALE: %s' = 1' -0"
PARTIAL DETAIL PLAN
SCALE: % " = 1' -0"
ANTENNA PLAN VIEW
SCALE: %" = 1' -0'
A'
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
DCU (SEE
DETAIL "C ")
ANTENNA BOOM, 4 FT.
P /N: 056 -9975M
(SEE DETAIL "G ")
TOP OF WALL ENCLOSURE
rily �0
FLOOR LINE
=L
"E ")
'C`G "THK.X6'H-
LENCLOSURE
X V DOUBLE -
TRUT
q
(E) BRACE (E) BRACE
NORTHWEST ELEVATION NORTHEAST ELEVATION
A2 Al SCALE: % " = l' -0" A2 Al SCALE: % " = l' -0"
NOTE: SCH. 80 PVC PIPES ARE NOT
SHOWN ON THESE ELEVATION
DRAWINGS FOR CLARITY.
DCU PARTIAL ISOMETRIC VIEW
NOTES:
TOP OF WALL
1" 0 SCHEDULE 80
PVC PIPE
1 %" 0 SCHEDULE 80
PVC PIPE
COAX TO ANTENNA
CABLE AND GROUND WIRE
TO SOLAR PANEL TOP OF
TOP OF WALL
C\
1 %" 0 SCHEDULE 80
PVC PIPE
PVC PIPE STRAP
1. AMI EQUIPMENT SHALL BE MOUNTED USING UNISTRUT METAL FRAMING 1"
CHANNEL 14 GA. CONNECTIONS PER MANUFACTURER'S RECOMMENDATION.
2. NO ROOF DECK PENETRATIONS SHALL BE ALLOWED.
3. DIMENSIONS SHOWN ARE FIELD MEASUREMENTS.
4. DRAWINGS ARE APPROXIMATE AND NOT MEANT TO WARRANT STRUCTURAL
INTEGRITY OF EXISTING ROOF MEMBERS.
5. WALL ANCHORING SHALL BE ON EXISTING WALL STUDS.
TYP. PVC PIPE TO WALL CONNECTION
FLOOR LINE
TOP OF WALL ENCLOSURE
AOUNTED TO 1 c
JBLE UNISTRUT
X V DOUBLE / � RF CONNECTIONS TO BE
TRUT / WEATHERPROOFED USING SILICONE
ELECTRICAL TAPE
(3M/70, CLASS "H" INSULATION)
P /N: 084 -0119
X 5' -1"
TRUT
MACHINE BOLT
--E DETAIL "D ")
NORTHWEST NORTHEAST
DCU ELEV. DETAILS
A2 A2 SCALE: 3/" = l' -0"
1 6/" X 5' -1"
UNISTRUT
6/6Yd MACHINE
FRONT VIEW
(N)2 % "0X 6'H
G.I. POLE FOR
ANTENNA
P1118 UNISTRUT PIPE CLAMP
1 %" X 12" CHANNEL SECTION
SECTION
(E) 6" WALL
6/6" X 3 %" FLATHEAD
SLEEVE ANCHORS, SS
TYPICAL UNISTRUT TO WALL CONNECTION
A2 SCALE: 1 %" = l' -0"
REVISIONS.
REVISED BY
ADONIS V. JAVIER
PROPRIETARY INFORMATION:
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRI --
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
COMPANY IS STRICTLY PROHIBITED.
The
Gas
Company
A Sempra Energy Utility
ADVANCED METER
THE GAS COMPANY TOWER
555 W. 5TH STREET
LOS ANGELES, CA 90013
PROJECT INFORMATION
ROOF TOP MOUNT
SOLAR POWER
SHEETTITLE:
DCU DETAILS
& ELEVATIONS
A (kSempra Energy utilities®
LICENSURE:
DATE.
DESIGNER. K.H. BA .J.
CAD DRAFTING. A . 3W33fi3
CHECKED BY K.H.
SCALE. AS SHOWN
SHEET NUMBER. REVISION.
� wll
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
F
F
F
[I
SOLAR PANEL PARTIAL ISOMETRIC VIEW
3ROUND WIRE TO SOLAR PANEL IN 1" r0 SCH. 80 PVC PIPE
ANTENNA PARTIAL ISOMETRIC VIEW
70 MHz ANT., DC
P /N: 073 -0010
TOP OF WALL ENCLI
(N)2 % "r0X
G.I. POLE
P1118 UNISI
1% "X12 "CI
NORTHEAST ELEVATION NORTHWEST ELEVATION
ANTENNA ELEV. DETAILS
A3 A2 SCALE: %" = 1' -0"
BOOM, 4 FT.
975M
CQ
—N
�C) O Inn. A O F7
WALLENCLOSUF
1 %" X 3' UNISTR
WITH HEAVY DUI
CHANNEL NUTS
(TYPICAL)
SOLAR PANEL B
P /N: 056 -0502A
PANEL MOUNTE[
!G SOUTHWEST
ROVIDE P1062 UN
_AT PLATE FITTIN
DES (TYPICAL)
OT SHOWN ON D
%"X3' UNISTRL
VITH HEAVY DUT'
'HANNELNUTS
TYPICAL)
R SOLAR PANEL
65W; P /N: 056 -05
516'.0 MACHINE B
(SEE DETAIL "I
FLOOR LINE
NORTHEAST
SOLAR PANEL ELEV. DETAII
A3 A2 SCALE: 3/" = 1' -0"
NOTE: SCH. 80 PVC PIPES ARE NOT
SHOWN ON THESE ELEVATION
DRAWINGS FOR CLARITY.
455 -470 MHz ANT., DCUII
P /N: 073 -0010
2 %" U -BOLT, % " -16 W/
HARDWARE, SS
P /N: 069 -0040
1 5/" X 12" CHANNEL SE—. I-
NOT TO SCALE
NORTHWEST
REVISIONS.
REVISED BY
ADONIS V. JAVIER
PROPRIETARY INFORMATION:
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRI --
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
COMPANY IS STRICTLY PROHIBITED.
The
Gas
Company
A Sempra Energy Utility
ADVANCED METER
THE GAS COMPANY TOWER
555 W. 5TH STREET
LOS ANGELES, CA 90013
PROJECT INFORMATION
ROOF TOP MOUNT
SOLAR POWER
SHEETTITLE:
ANTENNA &
SOLAR PANEL
DETAILS
(N) 2 %" 0 X 6'H G.I. POLE
516" FW, 2" OD, .0110 THK., SS
P /N: 056 -9975M
ANTENNA BOOM, 4 FT.
P /N: 056 -9975M
518' SPR. LW, .32 ID X.59 OD, 18 -8 SS
P /N: 069 -3304
518'- 18 X 1 ", HEX HEAD BOLT, SS
518'- 18 SPRING NUT, 1 5/" CHANNEL, SS
P /N: 069 -3613
P1118 UNISTRUT PIPE CLAMP
A (kSempra Energy utilities®
LICENSURE:
DATE.
DESIGNER KH BAJ.
CAD DRAFTING A 3W33 /13
CHECKED BY K.H.
SCALE AS SHOWN
SHEET NUMBER.
A -3
REVISION.
A
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
c
1 1 (D.C.U.) DATA COLLECTOR UNIT (55 LBS)
48"
3 ALUMINUM ANTENNA ARM
M
01
2 1 SOLAR PANEL (14.11 LBS)
N
4 455 -470 MHz ANTENNAS (WHIP)
N
REVISIONS.
REVISED BY
ADONIS V. JAVIER
PROPRIETARY INFORMATION:
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRI --
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
COMPANY IS STRICTLY PROHIBITED.
The
Gas
Company
A Sempra Energy Utility
ADVANCED METER
THE GAS COMPANY TOWER
555 W. 5TH STREET
LOS ANGELES, CA 90013
PROJECT INFORMATION
ROOF TOP MOUNT
SOLAR POWER
SHEETTITLE:
EQUIPMENT
DETAILS
A (kSempra Energy utilities®
LICENSURE:
DATE.
DESIGNER. K.H. BA .J.
CAD DRAFTING. A . 12104/13
CHECKED BY K.H.
SCALE. AS SHOWN
SHEET NUMBER. REVISION.
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
ANTENNA MATERIALS LIST
ITEM NO.
PART NUMBER
DESCRIPTION
QTY.
1
109 -9975D
UHF ANT BASE ASSY
2
2
056 -9975P
UHF. ANT. BASE BRACKET, NMO
1
3
073 -0300
NMO TYPE N -F BULKHEAD
1
4
068 -0035
5/8 X.258 NYLON SPCR
1
5
069 -3510
5/8 LW,INT,SS
1
6
069 -3305
5/16 F/WASH METAL,SS
2
7
069- 561832LS
5/16 -18 X 1 ", HEX HEAD BOLT,SS
2
8
069 -0120
STRUT PIPE CLAMP, 2 -3/8 OD
1
9
069 -0040
2 1/2" U- BOLT,3 /8- 16,W /HDWR,SS
2
10
073 -0010
455 -470 MHz ANTENNA, DCUII
2
11
056 -9975M
ANTENNA BOOM, 4 FT
1
12
069 -3322
5/16" FW, 2" OD, 0.110 THK, SS
2
13
056 -9020
STRUT SECT., 1 5/8 "X3 1/4 "X12 ", SS
1
14
069 -3304
6/6" SPR LW, .32 ID X.59 OD, 18 -8, SS
2
15
070 - 2570 -06
10' LOW LOSS N -M TO N -M
2
16
069 -3613
16 -18 SPRING NUT, 18 CHANNEL, SS
2
17
069- 561832LS
5/16 -18 X 1 ", HEX HEAD BOLT,SS
2
18
TBD
2 %" 0 X 6' -0" G. 1. POLE
1
19
TBD
1 %" X 6' -0" CHANNEL, SS
1
20
P1062
UNISTRUT FLAT PLATE FITTING
6
21
TBD
5 /6" CHANNEL NUT, HEAVY DUTY
6
22
P1118
UNISTRUT 2 %" 0 PIPE CLAMP
3
23
SL31312PF
6/6" X 3 %" SIMPSON FLAT HEAD
SLEEVE ANCHORS, SS
6
`24
098 -0054
CABLE MGMT BRACKETS, (TRAP BOX)
AS NEEDED
`CONTRACTOR SUPPLIED MATERIALS
NOTES:
1. MAXIMUM DCU CABINET WEIGHT NOT TO EXCEED 55# WITH BATTERIES.
2. ENCLOSURE RATED NEMA 3R.
3. DRAWING NOT TO SCALE.
4. RF COAXIAL CABLES ARE TO BE SECURED USING TRAP BOXES,
STAINLESS STEEL BANDING, SNAP LOCKS, ETC.
5. DRAWING DEPICTS A SOCAL GAS RECOMMENDED INSTALLATION, LOCAL CODES AND INDEPENDENT
EVALUATION SHOULD BE USED TO CERTIFY THE METHOD OF INSTALLATION AT THE SPECIFIC SITE.
DCU AND SOLAR PANEL MATERIALS LIST
ITEM NO.
PART NUMBER
DESCRIPTION
QTY.
1
11700 - CELL -SOL -SCG
DCU, CELL, SOLAR POWER, SCG
1
2
042 -9975
BATTERY, 26 AMP. HOUR, DCU 9975
1
3
109- 9975F65
65W SOLAR PANEL W/ MOUNTING
1
4
069 -3304
6/6" SPR LW, .32 ID X.59 OD, 18 -8, SS
2
5
069 -3306
6/6" -18 HEX NUT, SS
2
6
TBD
1 %" X 6' -0" CHANNEL
6
7
TBD
6/s Yd X 3" MACH. BOLT, W/ HWARE, SS
12
8
TBD
6/6" CHANNEL NUT, HEAVY DUTY
AS NEEDED
9
SL31312PF
Y16" X 3 %" SIMPSON FLAT HEAD
SLEEVE ANCHORS, SS
12
10
P1062
UNISTRUT FLAT PLATE FITTING
12
`11
TBD
SNAP -IN CLAMP
AS NEEDED
`12
084 -0119
FUSION TAPE
AS NEEDED
`CONTRACTOR SUPPLIED MATERIALS
NOTE:
LENGTH OF POWER CABLE FROM DCU TO SOLAR PANEL: 16' -0"
LENGTH OF COAX CABLES FROM DCU TO ANTENNA : 12' -0"
REVISIONS.
REVISED BY
ADONIS V. JAVIER
PROPRIETARY INFORMATION:
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRI --
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
COMPANY IS STRICTLY PROHIBITED.
The
Gas
Company
A Sempra Energy Utility
ADVANCED METER
THE GAS COMPANY TOWER
555 W. 5TH STREET
LOS ANGELES, CA 90013
PROJECT INFORMATION:
ROOF TOP MOUNT
SOLAR POWER
SHEETTITLE:
MATERIALS
LIST
A (kSempra Energy utilities®
LICENSURE:
DATE.
DESIGNER. K.H. BA .J.
CAD DRAFTING. A . 3W33fi3
CHECKED BY K.H.
SCALE. AS SHOWN
SHEET NUMBER. REVISION.
W&MM
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE
WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED.
NOTES:
1. LOAD AND VOLTAGE DROP CALCULATIONS MUST BE PERFORMED FOR SPECIFIC SITE DESIGN.
2. AERATE CONDUCTORS AS REQUIRED BY NEC.
3. ALL CONDUCTORS SHALL BE INSTALLED IN AN APPROVED RACEWAY.
4. ALL CONDUCTORS SHALL BE COPPER AND THHN /THWN RATED INSULATION
5. ALL OUTDOOR INSTALLATION SHALL BE IN AN OUTDOOR RATED ENCLOSURE.
6. GROUND RESISTANCES SHALL BE 25 OHMS OR LESS. PROVIDE THE NECESSARY GROUND ROD
QUANTITIES TO ACHIEVE THE REQUIRED GROUND RESISTANCE.
65W SOLAR PANEL
I
#14 THHN /THWN (TYP.)
#8 AWG STRANDED CU
GREEN INSULATION
F-- —
I
40 WATTS
DCU
#8 BTCW GROUND RING /ROD
(5/8" DIA, X 8 FT. LONG)
SOLAR POWER SOURCE
REVISIONS.
REVISED BY
ADONIS V. JAVIER
PROPRIETARY INFORMATION:
THE INFORMATION CONTAINED IN THIS SET OF
CONSTRUCTION DOCUMENTS IS PROPRI --
BY NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO THE GAS
COMPANY IS STRICTLY PROHIBITED.
The
Gas
Company
A Sempra Energy Utility
ADVANCED METER
THE GAS COMPANY TOWER
555 W. 5TH STREET
LOS ANGELES, CA 90013
PROJECT INFORMATION:
ROOF TOP MOUNT
SOLAR POWER
SHEETTITLE:
ELECTRICAL
A (kSempra Energy utilities®
LICENSURE:
DATE.
DESIGNER. J.M.
CAD DRAFTING. A . 12104/13
CHECKED BY K.H.
SCALE. AS SHOWN
SHEET NUMBER. REVISION.
E -1 I A