Loading...
HomeMy WebLinkAboutAGMT - Southern California Gas Company (Attachment Agreement) AUG 1:0 2015 James R Asay The CITY CLERK Director-Corporate Tax Gas CITY OF SEAL BEACH _ 488 8-Avenue Company Mail Loc.H008N1 D San Diego,CA 92101 A Sempra Energy�tlllty tel:(619)696-4836 fax:(619)696-3060 J Asay @sem p ra.co m August 10, 2015 RE: Change of Address To All Recipients of Franchise Fee Payments: Please be advised that the mailing address for the Corporate Tax Department at Sempra Energy has changed from 101 Ash Street,San Diego,CA 92101. Please address any future correspondence to the following physical address: Southern California Gas Company Attn: State and Local Tax 488 8th Avenue HQ08N1 San Diego,CA 92101 ' If you have any questions,please feel free to contact me at your convenience. Thank you, James R Asay Director-Corporate Tax ATTACHMENT AGREEMENT BY AND BETWEEN THE CITY OF SEAL BEACH, CALIFORNIA AND SOUTHERN CALIFORNIA GAS COMPANY This Attachment Agreement ( "Agreement ") is entered into this _L1 day of a , 20 [4, by and between the City of Seal Beach, a California municipal corporation, herein a er referred to as the ("City ") and Southern California Gas Company, a California corporation hereinafter referred to as the ( "Gas Company "). Hereinafter the term "Parties" shall refer collectively to all the foregoing named Parties. The effective date of this Agreement shall be the date indicated hereinabove (the "Effective Date "). RECITALS WHEREAS, Gas Company is an investor -owned public utility that provides gas utility services to residents of City. WHEREAS, on March 22, 1965, City granted to Gas Company a franchise to use and lay pipes and appurtenances necessary and convenient for the operation of a gas utility under, along, across or upon public streets, ways, alleys and places (collectively, "Rights -of- Way ") in the City for transmitting and distributing gas (the "Franchise "). WHEREAS, Gas Company has been authorized by the California Public Utilities Commission ( "CPUC ") to implement its Advanced Meter Program, which consists of, among other things, the installation of advanced meter equipment, network communications devices, including but not limited to data collector units ( "DCU's), antennas, gas repeaters and /or radio frequency local area network ( "RFLAN ") range extenders, and other advanced meter facilities, in connection with and necessary for Gas Company's operation, transmission and distribution of gas in the City ( "Advanced Meter Facilities "). WHEREAS, the installation of Advanced Meter Facilities requires the use of existing or new infrastructure, such as poles, towers, streetlights or buildings of sufficient height and at appropriate locations in order to be effective. WHEREAS, In order to reduce the number of new Advanced Meter Facility installations with the City Rights -of -Way, City desires to allow the Gas Company to install its Advanced Meter Facilities, which are further described herein, upon property owned by City at one site identified on "Exhibit A" and incorporated herein by this reference ( "Installation Site "). WHEREAS, City and Gas Company have agreed to enter into this Agreement regarding Gas Company's use and attachment of Advanced Meter Facilities at the Installation Site upon the terms, conditions and other considerations set forth herein. A G R E E M E N T NOW THEREFORE, in consideration thereof and for other valuable consideration as set forth herein below the parties hereto do mutually agree as follows: 1. Effective Date. This Agreement shall become effective as of the date of its execution by or on behalf of all the Parties hereto ( "Effective Date "). 2. Term. The term shall be for 20 years from the Effective Date. 3. Authorization. Subject to the terms and conditions contained herein, City hereby authorizes Gas Company to install Advanced Meter Facilities upon property owned by City at one site identified on "Exhibit A" and to operate, use, maintain, repair, replace, improve, alter, inspect, test and remove such Advanced Meter Facilities on t S terms and conditions set forth herein. �In the event that Gas Company installs any Advanced Meter Facilities other than /the Advanced Meter Facility at the Installation Site anywhere in the City southwest of the intersection of Seal Beach Boulevard and Heron Pointe, which provides reasonably adequate coverage in reading existing meters, City shall have the option terminate this agreement upon 60 days' notice to Gas Company. Termination will result i removal of all facilities from premises and repair to the satisfaction of �Qj rn� the City. '^ f A Z7 All - 4. Scope of Agreement. This Agreement authorizesNke -P,as Company to attach the Advanced Meter Facilities in the general locations identified on Exhibit "A" attached hereto, and to undertake all activities related to the installation, maintenance, operation, use, repair, replacement, improvement, alteration. inspection, testing and removal of Advanced Meter Facilities. Nothing contained in this Agreement shall be deemed or construed to create the relationship of principal and agent or of partnership or of joint-venture or of any association whatsoever between City and Gas Company, it being expressly understood and agreed that neither the computation of fees nor any other provisions contained in this Agreement nor any act or acts of the parties hereto shall be deemed to create any relationship between City and Gas Company other than the relationship of City and Gas Company. Gas Company hereby acknowledges, agrees and covenants that this Agreement does not authorize or bestow any rights to Gas Company to provide cable television service or commercial telecommunications services. 5. Compensation - Rent. a. The Gas Company shall pay to the City a one -time fee of $780 ($39 x 20 years) (as compensation for the Gas Company's use of the Leased Property. The Fee shall be due within thirty (30) days of the Effective Date. b. If the Gas Company fails to timely pay the Fee in a timely manner, the term of the Agreement, a delinquent payment charge on any unpaid amount shall accrue from the due date until paid at the lower of the rate of one and one -half percent (1 %) per month or the maximum rate allowable by Law until paid. C. Delinquent Payment. Gas Company assumes all risk of loss and responsibility for delinquent payments. If Gas Company fails to make payments when due a delinquent payment charge on any unpaid amount shall accrue from the due date until paid at the lower of a rate of one and one -half percent (1% %) per month or the maximum rate allowable by Law until paid. 6. Authority to Allow Attachments. The City hereby represents and warrants to the Gas Company that it has all rights necessary to allow for the installation of the Advanced Meter Facilities at the Installation Site, and agrees to indemnify, defend and hold harmless the Gas Company from and against losses, liability or claims from owner of the real property where the Installation Site is located and that are related to the rights conferred to the Gas Company under this Agreement. 7. Access. The City shall provide the Gas Company no later than next business day access to the subject property allowing the Gas Company to undertake all activities related to the installation, maintenance, operation, use, repair, replacement, improvement, alteration, inspection, testing and removal of Advanced Meter Facilities. 8. Workmanship and Responsibility of Gas Company. All of Gas Company's construction and installation work shall be performed at Gas Company's sole cost and expense and in a good and workmanlike manner and in accordance with the rules and regulation of the CPUC and the Improvement Plans reviewed by the City Engineer, and in compliance with all applicable ordinances, regulations or law (to the extent not inconsistent with or preempted by the jurisdiction of the CPUC). Gas Company shall remove Advanced Meter Facilities at its sole expense within one hundred eighty (180) days after the termination of the Agreement, unless an agreement is otherwise reached between the City and Gas Company to abandon the Advanced Meter Facilities in place. Gas Company shall bear full responsibility for repairs to any damage to the Rights -of -Way caused by Gas Company's or its employees% contractors', subcontractors' or agents' installation, construction, maintenance, repair, operation and removal of the Advanced Meter Facilities. 9. Gas Company to Bear All Costs. The Gas Company, or any successor or authorized assign, shall bear all costs incurred in connection with Gas Company's or its employees', contractors', subcontractors' or agents' planning, design, installation, construction, maintenance, repair, operation and removal of Advanced Meter Facilities. City shall not be responsible or bear any cost for repair of any damage or movement of the Advanced Meter Facilities due to repair, maintenance and/or failure /collapse of any existing gas, water and sewer lines or any other improvements or works approximate to Advanced Meter Facilities, except for the active negligence or willful misconduct of the City, its officers, agents, employees, 3 contractors or subcontractors. 10. Interference. The Gas Company installation and use of its Advanced Meter Facilities under this Agreement shall not damage or interfere in any way with City's property identified on Exhibit "A." The City at all times during this Agreement, reserves the right to take any action it deems necessary, in its sole discretion, to repair, maintain, alter, or improve the subject property, which may temporarily interfere with the Gas Company's leasehold improvements as may be necessary in order to carry out any of such activities. The City agrees to give 30 day advance notice of such interference to the Gas Company and to reasonably cooperate with the Gas Company to carry out such activities with a minimum amount of interference with the Gas Company's operations. The City shall not install or allow another party to install any telecommunications equipment within a three (3) foot radius of Advanced Meter Facilities. Regardless of proximity to Advanced Meter Facilities, City shall not allow any telecommunications equipment either owned by the City or by a third party located on the subject property to interfere with the operations of Advanced Meter Facilities. Upon notification by the Gas Company to the City of such interference, the City shall take immediate action to cease such interference. 11. Indemnification of City. Gas Company shall defend, indemnify and hold harmless the City and its council members, officers, agents and employees against all claims, losses, damages, costs, expenses, liabilities, causes of action, fines or penalties, including but not limited to reasonable attorney's fees (collectively, "Claims "), for injury to or death of persons or damage to property incurred by City arising from Advanced Meter Facilities being located on subject property, except to the extent such Claim arise from the sole negligence or willful misconduct of the City, its officers, agents, or employees, provided, however, that Gas Company's indemnification obligations shall not include.any punitive, consequential or special damages, except to the extent asserted by a third party against the City arising from a Claim for which Gas Company is obligated to indemnify the City under this paragraph. 12. Governing Law; Jurisdiction. This Agreement shall be governed and construed by and in accordance with the Laws of the State of California. Nothing in this section shall be interpreted to preclude either party's right to seek redress from the CPUC. 13. Amendment of Agreement. This Agreement may not be amended except pursuant to a written instrument signed by both parties. 14. Notices. All notices, demands, requests, consents or other communications that this Agreement contemplates or authorizes, or requires or permits either party to give to the other, shall be in writing and shall be personally delivered or mailed or sent by reputable overnight courier, such as FedEx, to the respective party as follows: IH TO CITY: City of Seal Beach 211 8h Street Seal Beach, CA 90740 -6305 Attn: Patrick Gallegos Tel: (562) 431- 2527x1308 TO THE GAS CO.: Southern California Gas Company 555 West Fifth Street Los Angeles, CA 90013 Attn: David Mercer, Network Technology Manager Tel: (213) 244 -5415 Either party may change its address by notice to the other party as provided herein. Communications shall be deemed to have been given and received on the first to occur of (i) actual receipt at the offices of the party to whom the communication is to be sent, as designated above, or (ii) three working days following the deposit in the United States Mail of registered or certified mail, postage prepaid, return receipt requested, or with reputable overnight courier, such as FedEx, addressed to the offices of the party to whom the communication is to be sent, as designated above. 15. Other Regulations. All Gas Company's use of the Rights -of -Way under this Agreement shall be in accordance with the laws of the United States of America, the State of California and in accordance with all applicable rules and regulations and ordinances of the City now in force, or hereinafter prescribed or promulgated by resolution or ordinance or by State or Federal law (to the extent that the same are not inconsistent with or preempted by the jurisdiction of the CPUC). 16. Powers to Enter into Agreement. The individuals executing this Agreement represent and warrant that they have the right, power, legal capacity and authority to enter into and to execute this Agreement on behalf of the respective legal entities of the Gas Company and the City. 17. Assignment or Transfer of Authorization. This Agreement may be assigned or transferred to any qualified person or entity subject to the prior written approval of the City, which shall not be unreasonably withheld, conditioned or delayed. Notwithstanding the foregoing, City's prior written consent shall not be required for any of the following: (a) the transfer of any shares or stock in or change in control of Gas Company's parent company, or (b) any merger, consolidation or reorganization of, by or with Gas Company or transfer of all or substantially all of the stock or shares in Gas Company or assets of Gas Company. 18. Entire Agreement; Successors and Assigns. This Agreement contains the entire understanding between the parties with respect to the subject matter herein. There 5 are no representations, agreements, or understandings, whether oral or written, between or among the parties relating to the subject matter of this Agreement which are not fully expressed herein. Each party has relied on advice from its own attorneys, and the warranties, representations, and covenants of this Agreement itself This Agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns. IN WITNESS WHEREOF the parties hereto for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this Agreement to be executed by setting hereunto their signatures on the day and year respectively written herein below. THE CITY OF SEAL BEACH DATE: I I By: l tYl City Ma ag APPROVED AS TO F RM: By: City Attorney SOUTHERN CALIFORNIA GAS COMPANY DATE: S� S �� By: !2�W- e�o� Tina M. Costa Contracts & Special Projects Manager Advanced Meter Project 6 REVISIONS'. REV. BATE REV ISEB BY INITIAL 1 12/04/13 ADONIS V. JAVIER A.J. PROPRIETARY INFORMATION: CITY: SEAL BEACH, CA. THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS COMPANY IS STRICTLY PROHIBITED. The COUNTY: ORANGE COUNTY JURISDICTION: COUNTY OF ORANGE Gas SITE NUMBER /ID: 2109350 / MH056 -B The Company SITE TYPE: (N) ROOF MOUNT, SOLAR POWER Gas Company A Sempra Energy Utility A Sempra Energy llfllity ADVANCED METER PROJECT SUMMARY: SHEET INDEX: THE GAS COMPANY TOWER Legg 93each a'� �'�y+ CnWwell Banker E E Consultin4 ° Sa �AannFsh 555 W. 5TH STREET LOS ANGELES, CA 90013 SITE ADDRESS: SHEET NO: DESCRIPTION: ^n g 211 8TH STREET, SEAL BEACH, CA 90740 �srLtw�d Ave d c aa�nrrq PROJECT INFORMATION: APPLICANT: T -1 TITLE SHEET Corsair � "�' Palhpm Ave Trarel SOUTHERN CALIFORNIA GAS CO. T GENERAL NOTES each - 555 W. 5TH ST., SUITE 3RD., LOS ANGELES, CA 90013 -2 ,q #; CllppnrWay Coasllia<Dr REPRESENTATIVE: ANABEL MARTINEZ A AERIAL VIEW/ PLANS �m asariaa � PHONE: (213) 4 -2333 -1 = Commurriry firrk Mauna or 6olsaAvc ROOF TOP MOUNT PROPERTY OWNER: A -2 DCU DETAILS F'�eificrn^ .rla wl�lca 9m SOLAR POWER CITY OF SEAL BEACH Elememnry a school 211 8TH STREET, SEAL BEACH, CA 90740 A -3 ANTENNA &SOLAR PANEL DETAILS � } � CONTACT: BUILDING DIVISION PHONE: 493 A -4 EQUIPMENT DETAILS y C � S Q Bay Thealre �. � °raf � �r �aseen�n (562) -9857 y ti yy Anne9le Dnri, � Curs PUBLIC RIGHT OF WAY A -5 MATERIALS LIST SHEET TITLE: LATITUDE: 33.74240000 E -1 ELECTRICAL DIAGRAM EnoAess p` qq`� Medical � 1] � �� �� c .- i+irerc r1 _ ealB � Seaf Beach Z-° lerFacld.�F,,_ Chevron s[ali4n �; _ ,� e .�� Lifeguards - seal Beach' LONGITUDE: - 118.10565000 TODD End Cak Niabncnt ANSI /EIA -222 -F LIFE SAFETY CODE NFPA -101 DATE: 04 -19 -13 OCCUPANCY CLASSIFICATION: UNMANNED TELECOMMUNICATION FACILITY 2012 UNIFORM PLUMBING CODE cQYV, �` •� 1VaksWharf'ri nr '+srhstrrrt.•I yyg'1 2012 NATIONAL ELECTRIC CODE `� Y, Garage - LOCAL BUILDING CODES ZONING CLASSIFICATION: CITY /COUNTY ORDINANCES n� 9� CONSTRUCTION TYPE: Beacrirrucd 11 cea TITLE SHEET �Fe 4ari�P ogaCa � ' R PROJECT DESCRIPTION: � Raja °c,,f ErseriTOwer a 1t SOUTHERN CALIFORNIA GAS CO. PROPOSES TO INSTALL Park w THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE ADVANCED METER ANTENNA, SOLAR AND DCU ASSEMBLIES � TO THE EXISTING BUILDING ROOF TOP /PARAPET. PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE ��� Btach Pier se�Playgrcu^d WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. Brendel CONSULTING TEAM: APPROVALS: �`" � MlrheieAf?Ii0 MartncP A kempra Energy utilities` itdphin THE FOLLOWING PARTIES HEREBY APPROVE AND ACCEPT THESE DOCUMENTS AND LICENSURE: AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE CONSTRUCTION DESCRIBED N HEREIN. ALL CONSTRUCTION DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL VICINITY MAP SAC /ZONING /PERMITTING: CONSTRUCTION PROJECT MANAGER BUILDING DEPARTMENT AND ANY CHANGES AND MODIFICATIONS THEY MAY IMPOSE. NOT TO SCALE SOUTHERN CALIFORNIA GAS CO. SOUTHERN CALIFORNIA GAS CO. PRINT NAME SIGNATURE DATE ANABEL MARTINEZ /MIRIAM NAVARRO ROBERT SHY 555 W. 5TH ST. 3RD FLOOR 555 W. 5TH ST. 3RD FLOOR PERMIT #: REVISION HISTORY LOS ANGELES, CA 90013 LOS ANGELES, CA 90013 LANDLORD PUBLIC R.O.W. (213)244 -2333 (213)244 -2195 PRECON. MGR REVISION 1: INITIAL DESIGN. CONTRACTOR NETWORK CONSTRUCTION ENGINEER DEVELOP. MGR REVISION 0: TIMELINE FOR PERMIT ISSUE. CONST. MGR DATE'. HEN KELS & MCCOY SOUTHERN CALIFORNIA GAS CO. DESIGNER'. K.H. &A.J. ERIC TODD JUAN MALDONADO PROJECT. MGR APPLICABLE CODES: CAB DRAFTING: A.J. 1204/13 555 W. 5TH ST., 3RD FLOOR 2540 FICUS STREET LOS ANGELES, CA 90013 SR. RF ENGINEER CHECKED BY'. K.H. POMONA, CA 91766 (213) 244 -2324 CALIFORNIA ADMINISTRATIVE CODE SCALE'. ASSHOWN PHONE: (909)270 -7580 RF ENGINEER 2013 CALIFORNIA BUILDING CODE SHEET NUMBER'. REVISION'. FAX: (909)545 -6664 2012 UNIFORM MECHANICAL CODE CONTACT ERIC T -1 TODD OPERATIONS ANSI /EIA -222 -F LIFE SAFETY CODE NFPA -101 DATE: 04 -19 -13 2012 UNIFORM PLUMBING CODE 2012 NATIONAL ELECTRIC CODE SAC REP. LOCAL BUILDING CODES CITY /COUNTY ORDINANCES REVISIONS. GENERAL NOTES AND CONDITIONS REV DATE REVISED BY INITIAL 1 12104/13 ADONIS V. JAVIER AJ. INTENT GENERAL NOTES CONFLICTS STANDARD SYMBOLS 1. THIS CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE DONE 1. IDEMNIFICATION CLAUSE: THE CONTRACTOR AGREES AND SHALL: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL AND THE MATERIALS TO BE FURNISHED FOR CONSTRUCTION. MEASUREMENTS AT THE SITE BEFORE ORDERING ANY MATERIALS OR ASSUME SOLE AND COMPLETE RESPONSIBILITY OF THE JOBSITE CONDITIONS DOING ANY WORK. NO EXTRA CHARGE OR COMPENSATION SHALL BE BUILDING 2. THE INTENTION OF THE DOCUMENT IS TO INCLUDE ALL LABOR AND DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE ALLOWED DUE TO DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND ABLY NECESSARY FOR THE PROPER EXECUTION MATERIALS REASONABLY O O SAFETY OF ALL PERSONS AND PROPERTIES. THAT THESE REQUIREMENTS DIMENSIONS INDICATED IN THE CONSTRUCTION DRAWINGS. ANY SUCH ® BOLLARD AND COMPLETION THE WORK AS STIPULATED THE CONTRACT. SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING DISCREPANCY IN DIMENSION WHICH MAY BE FOUND SHALL BE PROPRIETARY INFORMATION: 3. MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE ANTICIPATED AND HOURS AND CONDITIONS. THE CONTRACTOR FURTHER AGREES TO DEFEND SUBMITTED TO THE OWNER FOR CONSIDERATION BEFORE THE CAN CABLE TV LINE THEINFORMATION CONTAINED INTHIS SETOF SHALL BE CONSIDERED AS PART OF THE WORK. NO CHANGES THAT INDEMNITY AND HOLD SOCAL GAS REPRESENTATIVES AND ENGINEERS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONTRACTOR PROCEEDS WITH THE WORK IN THE AFFECTED AREAS. - - - -- - - - -- CENTER LINE BYNSTURE. AN USE OR DISCLOSURE OTHER av NATURE.AW USEORDTESTOTHEGAS ALTER THE CHARACTER OF THE WORK WILL BE MADE OR PERMITTED CONNECTION WITH THE PERFORMANCE OF THE WORK ON THIS PROJECT. 2. THE BIDDER, IF AWARDED THE CONTRACT, WILL NOT BE ALLOWED ANY THCOMPANY BY THE OWNER WITHOUT ISSUING A CHANGE ORDER. EXTRA COMPENSATION BY REASON OF ANY MATTER OR THING ® CONCRETE BLOCK WALL ISSraRCCC PROHIBITED. 2• PRIOR TO THE BEGINNING OF ANY CONSTRUCTION AND THROUGHOUT THE CONCERNING WHICH BIDDER MIGHT HAVE FULLY INFORMED THEMSELVES 4. THE DRAWINGS ARE GRAPHIC AND PICTORIAL PORTIONS OF THE CONTRACT COURSE OF CONSTRUCTION WORK, THE CONTRACTOR SHALL FULLY COMPLY PRIOR TO THE BIDDING. DOCUMENTS SHOWING THE DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES WITH "CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH" ACT OF 1973 = CURB, GUTTER & SIDEWALK AND DIAGRAMS. INCLUDING ALL REVISIONS AND AMENDMENTS THERETO. 3. NO PLEA OF IGNORANCE OF CONDITIONS THAT EXIST, OR OF DIFFICULTIES OR CONDITIONS THAT MAY BE ENCOUNTERED OR OF ANY 5. IN CASE OF INCONSISTENCY BETWEEN OTHER PARTS THE CONTRACT, THE 3. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF GO 95, 128, AND OTHER RELEVANT MATTER CONCERNING THE WORK TO BE PERFORMED DRIVEWAY CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH THE OWNER'S THE STANDARD "SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION", AS IN THE EXECUTION OF THE WORK WILL BE ACCEPTED AS AS EXCUSE ADOPTED BY THE CITY, COUNTY OR STATE AS MODIFIED BY STANDARD FOR ANY FAILURE OR OMISSION ON THE PART OF THE CONTRACTOR INTERPRETATION. PLANS AND ADDENDUM. TO FULFILL EVERY DETAIL OF ALL REQUIREMENTS OF THE CONTRACT - -EDP- - EDGE OF PAVEMENT DOCUMENTS GOVERNING THE WORK. 6 SPECIFICATIONS, THE LATEST OR MOST 4. THE EXISTENCE AND LOCATION OF UTILITIES AND OTHER AGENCIES - -EOD- - - EDGE OF DIRT SCENT EDITION SHALLEAPPLYSTANDARD FACILITIES AS SHOWN HEREON ARE OBTAINED BY A SEARCH OF AVAILABLE The CHANGE ORDER PROCEDURE RECORDS. OTHER FACILITIES MAY EXIST, THE CONTRACTOR SHALL VERIFY Ev ELECTRIC VAULT PRIOR TO THE START OF CONSTRUCTION AND SHALL USE EXTREME CARE Gas AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO THESE FACILITIES. FENCE 1 RESPONSIBLE STRUCTURAL NOTES Company CONTRACTORDINVOLVED. THE CONTRACTOR, UPON VERBAL REQUEST FROM RE AGENCY FACILITIES WITHIN THE LIMITS OF WORK, WHETHER THEY ARE -, -,-CHAINLINK FENCE THE OWNER SHALL PREPARE A WRITTEN PROPOSAL DESCRIBING THE SHOWN ON THIS PLAN OR NOT. CHANGE IN WORK OR MATERIALS AND ANY CHANGES IN THE CONTRACT 1. DESIGN CRITERIA: FIRE HYDRANT A Sempra Energy Utility AMOUNT AND PRESENT TO THE OWNER WITHIN 72 HOURS FOR APPROVAL 5. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (800) SUBMIT REQUESTS FOR SUBSTITUTIONS IN THE FORM AND IN 227 -2600, AT LEAST TWO WORKING DAYS PRIOR TO THE START OF 2010 CALIFORNIA BUILDING CODE. -GAS GAS LINE ACCORDANCE WITH PROCEDURES REQUIRED FOR CHANGE ORDER ANY EXCAVATION. ASCE 7 -05 MINIMUM DESIGN LOADS FOR BUILDINGS PROPOSALS. ANY CHANGES IN THE SCOPE OF WORK OR MATERIALS OTHER STRUCTURES. GAS VALVE WHICH ARE PERFORMED BY THE CONTRACTOR WITHOUT A WRITTEN 6. THE CONTRACTOR SHALL NOTIFY THE CITY, COUNTY OR STATE ENGINEER TIA -222 G STANDARD. ADVANCED METER CHANGE ORDER AS DESCRIBED AND APPROVED BY THE OWNER SHALL INSPECTION DEPARTMENT (213) 482 -7030, AT LEAST TWO WORKING DAYS 2009 AASHTO LTS - 5TH EDITION. GV GATE VALVE THE GAS COMPANY TOWER PLACE FULL RESPONSIBILITY OF THESE ACTIONS ON THE CONTRACTOR. BEFORE THE START OF ANY WORK REQUIRING THEIR INVOLVEMENT. G.0.95 W. 5TH STREET X GUY POLE S ANGELES, CA 90013 LOS CODE COMPLIANCE 7. ALL WORK AREA AND STREET TRAFFIC CONTROL SHALL BE IN ACCORDANCE 2. DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER WITH THE SPECIFICATIONS OF THE WORK AREA TRAFFIC CONTROL BOOK OF ANY UNUSUAL OR UNFORESEEN CONDITION PRIOR TO CONTINUING ® JOINT POLE 1. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND SPECIFICATIONS FROM THE CITY, COUNTY OR STATE. WITH CONSTRUCTION. SHOULD ANY CONDITION ARISE WHERE THE INTENT OF THE DRAWINGS IS IN DOUBT, OR WHERE THERE APPEARS TO BE MANHOLE 8 PROJECT INFORMATION: AND FEDERAL REGULATIONS. THESE SHALL INCLUDE BUT NOT BE LIMITED 8, THE CITY, COUNTY OR STATE SHALL SPECIFY THE EXPIRATION PERIOD OF DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION IN THE TO THE LATEST VERSION OF THE FOLLOWING: THE PERMIT FOR THIS CONSTRUCTION PROJECT. FIELD, THE ENGINEER SHALL BE NOTIFIED PRIOR TO CONTINUING OIL OIL LINE CALIFORNIA ADMINISTRATIVE CODE THE WORK. PWR POWER LINE 2011 CALIFORNIA BUILDING CODE 9. THE MINIMUM COVER FOR ALL CONDUITS PLACED UNDERGROUND SHALL BE 36 INCHES TO THE FINISHED GRADE AT ALL TIMES. 3. PORTLAND CEMENT SHALL CONFORM TO ASTM C -150 TYPE II. ROOF TOP MOUNT 2010 UNIFORM PLUMBING CODE AGGREGATE FOR STONE CONCRETE SHALL CONFORM TO ASTM C -33. -__ PROPERTY LINE - R 2010 NATIONAL ELECTRIC CODE 2010 UNIFORM MECHANICAL CODE 10. ALL SHRUBS, PLANTS OR TREES THAT HAVE BEEN DAMAGED OR DISTURBED AGGREGATE FOR LIGHTWEIGHT CONCRETE SHALL CONFORM TO ASTM C -330. Pe PULLeox SOLAR POWER ANSI EIA -222 -F LIFE SAFETY CODE NFPA -101 DURING THE COURSE OF THE WORK, SHALL BE REPLANTED AND /OR AGGREGATE ASTM C -33: MAXIMUM SIZE 1 h" FOR FOOTINGS AND LOCAL BUILDING CODE REPLACED SO AS TO RESTORE THE WORK SITE TO ITS ORIGINAL CONDITION. 1" FOR ALL OTHER WORK.+ RAILROAD TRACK CITY AND COUNTY ORDINANCES 11. VAULTS, PEDESTALS, CONDUITS AND OTHER TYPES OF SUBSTRUCTURE ARE 4. ALL REINFORCING BARS, ANCHOR BOLTS, PRESTRESSING TENDONS AND ® RETAINING WALL EENGINEER. SANY ES SHALL BE WELL SECURED IN POSITION ADMINISTRATION CONSTRUCTION ANDRALL DEVIATIONS FROM THE SPECIFIED PRIOR TORPLACING CONCRETE. - - -- ROW ---- RIGHT OF WAY SHEETTITLE: TYPES OF MATERIAL MUST BE APPROVED BY THE SYSTEM ENGINEER, IN 1. BEFORE THE COMMENCEMENT OF ANY WORK, THE CONTRACTOR WILL WRITING BEFORE INSTALLATION THEREOF. 5. THE MAXIMUM SLUMP SHALL BE BETWEEN THE RANGE OF 3" TO 5" S SANITARY SEWER ASSIGN A PROJECT MANAGER WHO WILL ACT AS A SINGLE POINT OF FOR FOOTINGS, SLABS ON EARTH AND MASS CONCRETE. CONTACT FOR ALL PERSONNEL INVOLVED IN THIS PROJECT. THIS 12. ALL RECONSTRUCTION, RESURFACING, PAVEMENT DELINEATION AND OTHER SD STORM DRAIN LINE PROJECT MANAGER WILL BE DEVELOPING A MASTER SCHEDULE FOR THE IMPROVEMENTS ARE TO BE RESTORED TO THE SAME OR IMPROVED CONDITION PROJECT WHICH WILL BE SUBMITTED TO THE OWNER PRIOR TO THE BASED ON GENERAL NOTE NO. 3 ABOVE. STL STREET LIGHT LINE COMMENCEMENT OF ANY WORK. GENERAL INSURANCE AND BONDS STREET SIGN 2. SUBMIT A BAR TYPE PROGRESS CHART NOT MORE THAN THREE (3) DAYS NOTES & AFTER THE DATE ESTABLISHED FOR COMMENCEMENT OF THE WORK ON 1. THE CONTRACTOR SHALL AT THEIR OWN EXPENSE CARRY AND MAINTAIN FOR B SERVICE PEDESTAL GAT A TIME OF THE DURATION OF THE PROJECT ALL INSURANCE AS REQUIRED AND LISTED. SYMBOLS WORK TOEBEL PERFORMED THE SITE, PROPERLY SEQUENCED ANDY TEL TELCO LINE COORDINATED WITH OTHER ELEMENTS OF WORK AND SHOWING COMPLETION 2• THE CONTRACTOR SHALL NOT COMMENCE WITH THEIR WORK UNTIL THEY W OF THE WORK SUFFICIENTLY IN ADVANCE OF THE DATE ESTABLISHED FOR HAVE PRESENTED AN ORIGINAL CERTIFICATE OF INSURANCE STATING ALL WATER LINE SUBSTANTIAL COMPLETION OF THE SITE. COVERAGES TO THE OWNER. QM WATER METER 3. PRIOR TO COMMENCING CONSTRUCTION, THE OWNER SHALL SCHEDULE AN 3. THE OWNER SHALL BE NAMED AS AN ADDITIONAL INSURED ON ALL POLICIES. ON -SITE MEETING WITH ALL MAJOR PARTIES. THIS WOULD INCLUDE BUT A Energy NOT LIMITED TO, THE OWNER, PROJECT MANAGER, CONTRACTOR, AND LAND OWNER REPRESENTATIVE. 4. REFER TO THE MASTER AGREEMENT FOR REQUIRED INSURANCE LIMITS. CLEAN UP �Seffl(Jl'a UlIIlIIBS 4. THE CONTRACTOR SHALL BE EQUIPPED WITH SOME MEANS OF CONSTANT COMMUNICATIONS, SUCH AS A MOBILE PHONE OR BEEPER. THIS LICENSURE: EQUIPMENT WILL NOT BE SUPPLIED BY THE OWNER, NOR WILL 1. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE SITE FREE FROM WIRELESS SERVICE BE ARRANGED. ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR EMPLOYEES AT WORK. AT THE COMPLETION OF THE WORK, THEY SHALL 5. DURING CONSTRUCTION, THE CONTRACTOR MUST ENSURE THAT EMPLOYEES REMOVE ALL RUBBISH FROM AND ABOUT THE BUILDING AREA, AND SUBCONTRACTORS WEAR HARD HATS AT ALL TIMES. THE CONTRACTOR INCLUDING ALL THEIR TOOLS, SCAFFOLDING AND SURPLUS MATERIALS WILL COMPLY WITH ALL SCG SAFETY REQUIREMENTS IN THEIR AND SHALL LEAVE THEIR WORK CLEAN AND READY FOR USE. AGREEMENT. 2. VISUALLY INSPECT EXTERIOR SURFACES AND REMOVE ALL TRACES OF 6. PROVIDE WRITTEN DAILY UPDATES AND PHOTOGRAPHS OF ON -SITE SOIL, WASTE MATERIALS, SMUDGES AND OTHER FOREIGN MATTER. PROGRESS TO THE PROJECT MANAGER VIA E -MAIL 3. REMOVE ALL TRACES OF SPLASHED MATERIALS FROM ADJACENT 7. A COMPLETE INVENTORY OF CONSTRUCTION MATERIALS AND EQUIPMENT SURFACES. IS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 4. IF NECESSARY TO ACHIEVE A UNIFORM DEGREE OF CLEANLINESS, 8. NOTIFY THE OWNER / PROJECT MANAGER IN WRITING NO LESS THAN HOSE DOWN THE EXTERIOR OF THE STRUCTURE. 48 HOURS IN ADVANCE OF CONCRETE POURS, TOWER ERECTIONS, AND DATE. EQUIPMENT CABINET PLACEMENTS. SUBSTANTIAL COMPLETION DESIGNER. K.H. BA.J . 9. CLOSEOUT PACKAGE IS DUE COMPLETE WITH DETAILED TOP PHOTOS 1. SUBSTANTIAL COMPLETION IS THE STAGE OF WORK SUFFICIENTLY COMPLETE CAD 12J04113 UPON SITE PUNCHWALK WITH PROJECT MANAGER ( SEE PROJECT MANAGER IN ACCORDANCE EITH THE CONTRACT SO THE OWNER CAN FULLY UTWZE THE CHECKED BY K.H. FOR SAMPLE CLOSEOUT PACKAGE). WORK FOR ITS INTENDED USE. SUCH TIME, CONTRACTOR SHALL SUBMIT TO OWNER A FOR FINAL REQUEST REPORT SCALE. AS SHOWN WARRANTIES AND BONDS ITEMIZING AND INVENTORY OFT WORK TO COMPLETIONDAND SHEET NUMBER. REVISION. AS -BUILT DOCUMENTS /DRAWINGS. 1. THE CONTRACTOR IS RESPONSIBLE FOR APPLICATION AND PAYMENT THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE OF CONTRACTOR LICENSES AND BONDS. 2. OWNER WILL ONLY RELEASE FINAL PAYMENT UPON SATISFACTORY REVIEW AND PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE CONTRACTOR COMPLIANCE OF THE FINAL PAYMENT REQUIREMENTS. WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. /'� 2. SEE MASTER CONTRACTOR SERVICES AGREEMENT FOR ADDITIONAL DETAILS. T -L THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. ,� REVISIONS. REV. DATE REVISED BY INITIAL 1 12104113 ADONIS V. WAVIER AJ. t 1 E) LEASE AREA ON TOP OF CITY OF SEAL BEACH CITY HALL BUILDING WITH PROPOSED (N) ANTENNA, SOLAR AND DCU EQUIPMENT. r 1 PROPRIETARY INFORMATION: A V } ■ THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS 1 r COMPANY IS STRICTLY PROHIBITED. � ''"► 1 The Gas Company ' k F A Sempra Energy Utility ADVANCED METER THEGAS COMPANYTOWER 555 W. 5TH STREET LOS ANGELES, CA 90013 PROJECT INFORMATION: ' 1 1 AERIAL VIEW 1 ROOF TOP MOUNT SOLAR POWER SEE PARTIAL DETAIL 9 PLAN @ RIGHT 4 - 2'-6"� (N) 2 %" 0 X 6'H G.I. POLE SHEETTITLE: ANTENNA BOOM, 4 FT. (N) 2 %" 0 X 6'H G.I. POLE P /N: 056 -9975M 1 V X 12" UNISTRUT DCU HORIZONTAL BRACE PLAN VIEWS E) 6" THK. X 6' WALL ENCLOSURE HVAC Q► B Al 2 Al 2 ! SOLAR PANEL ANTENNA BOOM, 4 FT. P /N: 056 -9975M A kSempra Energy utilities® Lc 2 %" U -BOLT, % " -16 W/ HARDWARE, SS LICENSURE: P /N: 069 -0040 (E) BRACE v CLOCK TOWER DATE. (E) EDGE OF DESIGNER KH BAJ. CAD DRAFTING. A . 12104/13 'I PLATFORM CHECKED B K.H. SCALE. AS SHOWN SHEET T NUMBER. REVISION. 2 INDEX PLAN APPROX. SCALE: %s' = 1' -0" PARTIAL DETAIL PLAN SCALE: % " = 1' -0" ANTENNA PLAN VIEW SCALE: %" = 1' -0' A' THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. DCU (SEE DETAIL "C ") ANTENNA BOOM, 4 FT. P /N: 056 -9975M (SEE DETAIL "G ") TOP OF WALL ENCLOSURE rily �0 FLOOR LINE =L "E ") 'C`G "THK.X6'H- LENCLOSURE X V DOUBLE - TRUT q (E) BRACE (E) BRACE NORTHWEST ELEVATION NORTHEAST ELEVATION A2 Al SCALE: % " = l' -0" A2 Al SCALE: % " = l' -0" NOTE: SCH. 80 PVC PIPES ARE NOT SHOWN ON THESE ELEVATION DRAWINGS FOR CLARITY. DCU PARTIAL ISOMETRIC VIEW NOTES: TOP OF WALL 1" 0 SCHEDULE 80 PVC PIPE 1 %" 0 SCHEDULE 80 PVC PIPE COAX TO ANTENNA CABLE AND GROUND WIRE TO SOLAR PANEL TOP OF TOP OF WALL C\ 1 %" 0 SCHEDULE 80 PVC PIPE PVC PIPE STRAP 1. AMI EQUIPMENT SHALL BE MOUNTED USING UNISTRUT METAL FRAMING 1" CHANNEL 14 GA. CONNECTIONS PER MANUFACTURER'S RECOMMENDATION. 2. NO ROOF DECK PENETRATIONS SHALL BE ALLOWED. 3. DIMENSIONS SHOWN ARE FIELD MEASUREMENTS. 4. DRAWINGS ARE APPROXIMATE AND NOT MEANT TO WARRANT STRUCTURAL INTEGRITY OF EXISTING ROOF MEMBERS. 5. WALL ANCHORING SHALL BE ON EXISTING WALL STUDS. TYP. PVC PIPE TO WALL CONNECTION FLOOR LINE TOP OF WALL ENCLOSURE AOUNTED TO 1 c JBLE UNISTRUT X V DOUBLE / � RF CONNECTIONS TO BE TRUT / WEATHERPROOFED USING SILICONE ELECTRICAL TAPE (3M/70, CLASS "H" INSULATION) P /N: 084 -0119 X 5' -1" TRUT MACHINE BOLT --E DETAIL "D ") NORTHWEST NORTHEAST DCU ELEV. DETAILS A2 A2 SCALE: 3/" = l' -0" 1 6/" X 5' -1" UNISTRUT 6/6Yd MACHINE FRONT VIEW (N)2 % "0X 6'H G.I. POLE FOR ANTENNA P1118 UNISTRUT PIPE CLAMP 1 %" X 12" CHANNEL SECTION SECTION (E) 6" WALL 6/6" X 3 %" FLATHEAD SLEEVE ANCHORS, SS TYPICAL UNISTRUT TO WALL CONNECTION A2 SCALE: 1 %" = l' -0" REVISIONS. REVISED BY ADONIS V. JAVIER PROPRIETARY INFORMATION: THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRI -- BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS COMPANY IS STRICTLY PROHIBITED. The Gas Company A Sempra Energy Utility ADVANCED METER THE GAS COMPANY TOWER 555 W. 5TH STREET LOS ANGELES, CA 90013 PROJECT INFORMATION ROOF TOP MOUNT SOLAR POWER SHEETTITLE: DCU DETAILS & ELEVATIONS A (kSempra Energy utilities® LICENSURE: DATE. DESIGNER. K.H. BA .J. CAD DRAFTING. A . 3W33fi3 CHECKED BY K.H. SCALE. AS SHOWN SHEET NUMBER. REVISION. � wll THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. F F F [I SOLAR PANEL PARTIAL ISOMETRIC VIEW 3ROUND WIRE TO SOLAR PANEL IN 1" r0 SCH. 80 PVC PIPE ANTENNA PARTIAL ISOMETRIC VIEW 70 MHz ANT., DC P /N: 073 -0010 TOP OF WALL ENCLI (N)2 % "r0X G.I. POLE P1118 UNISI 1% "X12 "CI NORTHEAST ELEVATION NORTHWEST ELEVATION ANTENNA ELEV. DETAILS A3 A2 SCALE: %" = 1' -0" BOOM, 4 FT. 975M CQ —N �C) O Inn. A O F7 WALLENCLOSUF 1 %" X 3' UNISTR WITH HEAVY DUI CHANNEL NUTS (TYPICAL) SOLAR PANEL B P /N: 056 -0502A PANEL MOUNTE[ !G SOUTHWEST ROVIDE P1062 UN _AT PLATE FITTIN DES (TYPICAL) OT SHOWN ON D %"X3' UNISTRL VITH HEAVY DUT' 'HANNELNUTS TYPICAL) R SOLAR PANEL 65W; P /N: 056 -05 516'.0 MACHINE B (SEE DETAIL "I FLOOR LINE NORTHEAST SOLAR PANEL ELEV. DETAII A3 A2 SCALE: 3/" = 1' -0" NOTE: SCH. 80 PVC PIPES ARE NOT SHOWN ON THESE ELEVATION DRAWINGS FOR CLARITY. 455 -470 MHz ANT., DCUII P /N: 073 -0010 2 %" U -BOLT, % " -16 W/ HARDWARE, SS P /N: 069 -0040 1 5/" X 12" CHANNEL SE—. I- NOT TO SCALE NORTHWEST REVISIONS. REVISED BY ADONIS V. JAVIER PROPRIETARY INFORMATION: THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRI -- BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS COMPANY IS STRICTLY PROHIBITED. The Gas Company A Sempra Energy Utility ADVANCED METER THE GAS COMPANY TOWER 555 W. 5TH STREET LOS ANGELES, CA 90013 PROJECT INFORMATION ROOF TOP MOUNT SOLAR POWER SHEETTITLE: ANTENNA & SOLAR PANEL DETAILS (N) 2 %" 0 X 6'H G.I. POLE 516" FW, 2" OD, .0110 THK., SS P /N: 056 -9975M ANTENNA BOOM, 4 FT. P /N: 056 -9975M 518' SPR. LW, .32 ID X.59 OD, 18 -8 SS P /N: 069 -3304 518'- 18 X 1 ", HEX HEAD BOLT, SS 518'- 18 SPRING NUT, 1 5/" CHANNEL, SS P /N: 069 -3613 P1118 UNISTRUT PIPE CLAMP A (kSempra Energy utilities® LICENSURE: DATE. DESIGNER KH BAJ. CAD DRAFTING A 3W33 /13 CHECKED BY K.H. SCALE AS SHOWN SHEET NUMBER. A -3 REVISION. A THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. c 1 1 (D.C.U.) DATA COLLECTOR UNIT (55 LBS) 48" 3 ALUMINUM ANTENNA ARM M 01 2 1 SOLAR PANEL (14.11 LBS) N 4 455 -470 MHz ANTENNAS (WHIP) N REVISIONS. REVISED BY ADONIS V. JAVIER PROPRIETARY INFORMATION: THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRI -- BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS COMPANY IS STRICTLY PROHIBITED. The Gas Company A Sempra Energy Utility ADVANCED METER THE GAS COMPANY TOWER 555 W. 5TH STREET LOS ANGELES, CA 90013 PROJECT INFORMATION ROOF TOP MOUNT SOLAR POWER SHEETTITLE: EQUIPMENT DETAILS A (kSempra Energy utilities® LICENSURE: DATE. DESIGNER. K.H. BA .J. CAD DRAFTING. A . 12104/13 CHECKED BY K.H. SCALE. AS SHOWN SHEET NUMBER. REVISION. THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. ANTENNA MATERIALS LIST ITEM NO. PART NUMBER DESCRIPTION QTY. 1 109 -9975D UHF ANT BASE ASSY 2 2 056 -9975P UHF. ANT. BASE BRACKET, NMO 1 3 073 -0300 NMO TYPE N -F BULKHEAD 1 4 068 -0035 5/8 X.258 NYLON SPCR 1 5 069 -3510 5/8 LW,INT,SS 1 6 069 -3305 5/16 F/WASH METAL,SS 2 7 069- 561832LS 5/16 -18 X 1 ", HEX HEAD BOLT,SS 2 8 069 -0120 STRUT PIPE CLAMP, 2 -3/8 OD 1 9 069 -0040 2 1/2" U- BOLT,3 /8- 16,W /HDWR,SS 2 10 073 -0010 455 -470 MHz ANTENNA, DCUII 2 11 056 -9975M ANTENNA BOOM, 4 FT 1 12 069 -3322 5/16" FW, 2" OD, 0.110 THK, SS 2 13 056 -9020 STRUT SECT., 1 5/8 "X3 1/4 "X12 ", SS 1 14 069 -3304 6/6" SPR LW, .32 ID X.59 OD, 18 -8, SS 2 15 070 - 2570 -06 10' LOW LOSS N -M TO N -M 2 16 069 -3613 16 -18 SPRING NUT, 18 CHANNEL, SS 2 17 069- 561832LS 5/16 -18 X 1 ", HEX HEAD BOLT,SS 2 18 TBD 2 %" 0 X 6' -0" G. 1. POLE 1 19 TBD 1 %" X 6' -0" CHANNEL, SS 1 20 P1062 UNISTRUT FLAT PLATE FITTING 6 21 TBD 5 /6" CHANNEL NUT, HEAVY DUTY 6 22 P1118 UNISTRUT 2 %" 0 PIPE CLAMP 3 23 SL31312PF 6/6" X 3 %" SIMPSON FLAT HEAD SLEEVE ANCHORS, SS 6 `24 098 -0054 CABLE MGMT BRACKETS, (TRAP BOX) AS NEEDED `CONTRACTOR SUPPLIED MATERIALS NOTES: 1. MAXIMUM DCU CABINET WEIGHT NOT TO EXCEED 55# WITH BATTERIES. 2. ENCLOSURE RATED NEMA 3R. 3. DRAWING NOT TO SCALE. 4. RF COAXIAL CABLES ARE TO BE SECURED USING TRAP BOXES, STAINLESS STEEL BANDING, SNAP LOCKS, ETC. 5. DRAWING DEPICTS A SOCAL GAS RECOMMENDED INSTALLATION, LOCAL CODES AND INDEPENDENT EVALUATION SHOULD BE USED TO CERTIFY THE METHOD OF INSTALLATION AT THE SPECIFIC SITE. DCU AND SOLAR PANEL MATERIALS LIST ITEM NO. PART NUMBER DESCRIPTION QTY. 1 11700 - CELL -SOL -SCG DCU, CELL, SOLAR POWER, SCG 1 2 042 -9975 BATTERY, 26 AMP. HOUR, DCU 9975 1 3 109- 9975F65 65W SOLAR PANEL W/ MOUNTING 1 4 069 -3304 6/6" SPR LW, .32 ID X.59 OD, 18 -8, SS 2 5 069 -3306 6/6" -18 HEX NUT, SS 2 6 TBD 1 %" X 6' -0" CHANNEL 6 7 TBD 6/s Yd X 3" MACH. BOLT, W/ HWARE, SS 12 8 TBD 6/6" CHANNEL NUT, HEAVY DUTY AS NEEDED 9 SL31312PF Y16" X 3 %" SIMPSON FLAT HEAD SLEEVE ANCHORS, SS 12 10 P1062 UNISTRUT FLAT PLATE FITTING 12 `11 TBD SNAP -IN CLAMP AS NEEDED `12 084 -0119 FUSION TAPE AS NEEDED `CONTRACTOR SUPPLIED MATERIALS NOTE: LENGTH OF POWER CABLE FROM DCU TO SOLAR PANEL: 16' -0" LENGTH OF COAX CABLES FROM DCU TO ANTENNA : 12' -0" REVISIONS. REVISED BY ADONIS V. JAVIER PROPRIETARY INFORMATION: THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRI -- BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS COMPANY IS STRICTLY PROHIBITED. The Gas Company A Sempra Energy Utility ADVANCED METER THE GAS COMPANY TOWER 555 W. 5TH STREET LOS ANGELES, CA 90013 PROJECT INFORMATION: ROOF TOP MOUNT SOLAR POWER SHEETTITLE: MATERIALS LIST A (kSempra Energy utilities® LICENSURE: DATE. DESIGNER. K.H. BA .J. CAD DRAFTING. A . 3W33fi3 CHECKED BY K.H. SCALE. AS SHOWN SHEET NUMBER. REVISION. W&MM THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SOCAL GAS. ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF SOCAL GAS IS PROHIBITED. NOTES: 1. LOAD AND VOLTAGE DROP CALCULATIONS MUST BE PERFORMED FOR SPECIFIC SITE DESIGN. 2. AERATE CONDUCTORS AS REQUIRED BY NEC. 3. ALL CONDUCTORS SHALL BE INSTALLED IN AN APPROVED RACEWAY. 4. ALL CONDUCTORS SHALL BE COPPER AND THHN /THWN RATED INSULATION 5. ALL OUTDOOR INSTALLATION SHALL BE IN AN OUTDOOR RATED ENCLOSURE. 6. GROUND RESISTANCES SHALL BE 25 OHMS OR LESS. PROVIDE THE NECESSARY GROUND ROD QUANTITIES TO ACHIEVE THE REQUIRED GROUND RESISTANCE. 65W SOLAR PANEL I #14 THHN /THWN (TYP.) #8 AWG STRANDED CU GREEN INSULATION F-- — I 40 WATTS DCU #8 BTCW GROUND RING /ROD (5/8" DIA, X 8 FT. LONG) SOLAR POWER SOURCE REVISIONS. REVISED BY ADONIS V. JAVIER PROPRIETARY INFORMATION: THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRI -- BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO THE GAS COMPANY IS STRICTLY PROHIBITED. The Gas Company A Sempra Energy Utility ADVANCED METER THE GAS COMPANY TOWER 555 W. 5TH STREET LOS ANGELES, CA 90013 PROJECT INFORMATION: ROOF TOP MOUNT SOLAR POWER SHEETTITLE: ELECTRICAL A (kSempra Energy utilities® LICENSURE: DATE. DESIGNER. J.M. CAD DRAFTING. A . 12104/13 CHECKED BY K.H. SCALE. AS SHOWN SHEET NUMBER. REVISION. E -1 I A