PROFESSIONAL SERVICES AGREEMENT
for
Eisenhower Park Playground and ADA Improvements
Project CIP No. PR1602
Between
City of Seal Beach
211 - 8th Street
Seal Beach, CA 90740
0
David Volz Design, Inc.
151 Kalmus Drive, Suite M8
Costa Mesa, CA 92626
(714) 641 -1300
This Professional Service Agreement ( "the Agreement') is made as of October 12, 2015
(the "Effective Date "), by and between David Volz Design, Inc. ( "Consultant'), a
Corporation, and the City of Seal Beach ( "City "), a California charter city, (collectively,
"the Parties ").
0
RECITALS
A. City desires certain professional services.
41
B. Consultant represents that it is qualified and able to provide City with such
services.
NOW THEREFORE, in consideration of the Parties' performance of the
promises, covenants, and conditions stated herein, the Parties hereto agree as
follows.
AGREEMENT
1.0 Scope of Services
1.1. Consultant shall provide those services ( "Services ") set forth in the
attached Exhibit A, which is hereby incorporated by this reference. To the extent
that there is any conflict between Exhibit A and this Agreement, this Agreement
shall control.
1.2. Consultant shall perform all Services under this Agreement in
accordance with the standard of care generally exercised by like professionals
under similar circumstances and in a manner reasonably satisfactory to City.
1.3. In performing this Agreement, Consultant shall comply with all
applicable provisions of federal, state, and local law.
1.4. Consultant will not be compensated for any work performed not
specified in the Scope of Services unless the City authorizes such work in
advance and in writing. The City Manger may authorize extra work to fund
unforeseen conditions up to the amount approved at the time of award by the
City Council. Payment for additional work in excess of this amount requires prior
City Council authorization.
2.0 Term
This term of this Agreement shall commence as of the Effective Date and shall
continue for a term of 1 year unless previously terminated as provided by this
Agreement.
3.0 Consultant's Compensation
City will pay Consultant in accordance with the hourly rates shown on the fee
schedule set forth in Exhibit A for Services but in no event will the City pay more
than $53,286. Any additional work authorized by the City pursuant to Section 1.4
will be compensated in accordance with the fee schedule set forth in Exhibit A
2of10
0 0
4.0 Method of Payment
4.1. Consultant shall submit to City monthly invoices for all services
rendered pursuant to this Agreement. Such invoices shall be submitted within 15
days of the end of the month during which the services were rendered and shall
describe in detail the services rendered during the period, the days worked,
number of hours worked, the hourly rates charged, and the services performed
for each day in the period. City will pay Consultant within 30 days of receiving
Consultant's invoice. City will not withhold any applicable federal or state payroll
and other required taxes, or other authorized deductions from payments made to
Consultant.
4.2. Upon 24 -hour notice from City, Consultant shall allow City or City's
agents or representatives to inspect at Consultant's offices during reasonable
business hours all records, invoices, time cards, cost control sheets and other
records maintained by Consultant in connection with this Agreement. City's
rights under this Section 4.2 shall survive for two years following the termination
of this Agreement.
5.0 Termination
5.1. This Agreement may be terminated by City, without cause, or by
Consultant based on reasonable cause, upon giving the other party written notice
thereof not less than 30 days prior to the date of termination.
5.2. This Agreement may be terminated by City upon 10 days' notice to
Consultant if Consultant fails to provide satisfactory evidence of renewal or
replacement of comprehensive general liability insurance as required by this
Agreement at least 20 days before the expiration date of the previous policy.
6.0 Party Representatives
6.1. The City Manager is the City's representative for purposes of this
Agreement.
6.2. David J. Volz is the Consultant's primary representative for
purposes of this Agreement.
7.0 Notices
7.1. All notices permitted or required under this Agreement shall be
deemed made when personally delivered or when mailed 48 hours after deposit
in the United States Mail, first class postage prepaid and addressed to the party
at the following addresses:
3of10
To City: City of Seal Beach
211 -8th Street
Seal Beach, California 90740
Attn: City Manager
To Consultant: David Volz Design, Inc.
151 Kalmus Drive, Suite M8
Costa Mesa, CA 92626
Attn: David J. Volz
7.2. Actual notice shall be deemed adequate notice on the date actual
notice occurred, regardless of the method of service.
8.0 Independent Contractor
8.1. Consultant is an independent contractor and not an employee of
the City. All services provided pursuant to this Agreement shall be performed by
Consultant or under its supervision. Consultant will determine the means,
methods, and details of performing the services. Any additional personnel
performing services under this Agreement on behalf of Consultant shall also not
be employees of City and shall at all times be under Consultant's exclusive
direction and control. Consultant shall pay all wages, salaries, and other
amounts due such personnel in connection with their performance of services
under this Agreement and as required by law. Consultant shall be responsible
for all reports and obligations respecting such additional personnel, including, but
not limited to: social security taxes, income tax withholding, unemployment
insurance, disability insurance, and workers' compensation insurance.
8.2. Consultant shall indemnify and hold harmless City and its elected
officials, officers, employees, servants, designated volunteers, and agents
serving as independent contractors in the role of City officials, from any and all
liability, damages, claims, costs and expenses of any nature to the extent arising
from Consultant's personnel practices. City shall have the right to offset against
the amount of any fees due to Consultant under this Agreement any amount due
to City from Consultant as a result of Consultant's failure to promptly pay to City
any reimbursement or indemnification arising under this Section.
9.0 Subcontractors
No portion of this Agreement shall be subcontracted without the prior written
approval of the City. Consultant is fully responsible to City for the performance of
any and all subcontractors.
4of10
10.0 Assignment
Consultant shall not assign or transfer any interest in this Agreement whether by
assignment or novation, without the prior written consent of City. Any purported
assignment without such consent shall be void and without effect.
11.0 Insurance
11.1. Consultant shall not commence work under this Agreement until it
has provided evidence satisfactory to the City that Consultant has secured all
insurance required under this Section. Consultant shall furnish City with original
certificates of insurance and endorsements effecting coverage required by this
Agreement on forms satisfactory to the City. The certificates and endorsements
for each insurance policy shall be signed by a person authorized by that insurer
to bind coverage on its behalf, and shall be on forms provided by the City if
requested. All certificates and endorsements shall be received and approved by
the City before work commences. The City reserves the right to require
complete, certified copies of all required insurance policies, at any time.
11.2. Consultant shall, at its expense, procure and maintain for the
duration of the Agreement, insurance against claims for injuries to persons or
damages to property that may arise from or in connection with the performance
of this Agreement. Insurance is to be placed with insurers with a current A.M.
Best's rating no less than A:VIII, licensed to do business in California, and
satisfactory to the City. Coverage shall be at least as broad as the latest version
of the following: (1) General Liability: Insurance Services Office Commercial
General Liability coverage (occurrence form CG 0001); (2) Automobile Liability:
Insurance Services Office Business Auto Coverage form number CA 0001, code
1 (any auto); and, if required by the City, (3) Professional Liability. Consultant
shall maintain limits no less than: (1) General Liability: $2,000,000 per
occurrence for bodily injury, personal injury and property damage and if
Commercial General Liability Insurance or other form with a general aggregate
limit is used, either the general aggregate limit shall apply separately to this
Agreement/location or the general aggregate limit shall be twice the required
occurrence limit; (2) Automobile Liability: $1,000,000 per accident for bodily injury
and property damage; and (3) Professional Liability: $1,000,000 per
claim /aggregate.
11.3. The insurance policies shall contain the following provisions, or
Consultant shall provide endorsements on forms supplied or approved by the
City to state: (1) coverage shall not be suspended, voided, reduced or canceled
except after 30 days prior written notice by certified mail, return receipt
requested, has been given to the City; (2) any failure to comply with reporting or
other provisions of the policies, including breaches of warranties, shall not affect
coverage provided to the City, its directors, officials, officers, (3) coverage shall
be primary insurance as respects the City, its directors, officials, officers,
5of10
• •
employees, agents and volunteers, or if excess, shall stand in an unbroken chain
of coverage excess of the Consultant's scheduled underlying coverage and that
any insurance or self- insurance maintained by the City, its directors, officials,
officers, employees, agents and volunteers shall be excess of the Consultant's
insurance and shall not be called upon to contribute with it; (4) for general liability
insurance, that the City, its directors, officials, officers, employees, agents and
volunteers shall be covered as additional insureds with respect to the services or
operations performed by or on behalf of the Consultant, including materials, parts
or equipment furnished in connection with such work; and (5) for automobile
liability, that the City, its directors, officials, officers, employees, agents and
volunteers shall be covered as additional insureds with respect to the ownership,
operation, maintenance, use, loading or unloading of any auto owned, leased,
hired or borrowed by the Consultant or for which the Consultant is responsible.
11.4. All insurance required by this Section shall contain standard
separation of insureds provisions and shall not contain any special limitations on
the scope of protection afforded to the City, its directors, officials, officers,
employees, agents, and volunteers.
11.5. Any deductibles or self- insured retentions shall be declared to and
approved by the City. Consultant guarantees that, at the option of the City,
either: (1) the insurer shall reduce or eliminate such deductibles or self- insured
retentions as respects the City, its directors, officials, officers, employees,
agents, and volunteers; or (2) the Consultant shall procure a bond guaranteeing
payment of losses and related investigation costs, claims and administrative and
defense expenses.
12.0 Indemnification, Hold Harmless, and Duty to Defend
Consultant shall defend, indemnify, and hold the City, its officials, officers,
employees, volunteers and agents serving as independent contractors in the role
of city officials (collectively "Indemnitees ") free and harmless from any and all
claims, demands, causes of action, costs, expenses, liability, loss, damage or
injury, in law or equity, to property or persons, including wrongful death, in any
manner arising out of or incident to any acts or omissions of Consultant, its
employees, or its agents in connection with the performance of this Agreement,
including without limitation the payment of all consequential damages and
attorneys' fees and other related costs and expenses, except for such loss or
damage arising from the sole negligence or willful misconduct of the City. With
respect to any and all such aforesaid suits, actions, or other legal proceedings of
every kind that may be brought or instituted against Indemnitees, Consultant
shall defend Indemnitees, at Consultant's own cost, expense, and risk, and shall
pay and satisfy any judgment, award, or decree that may be rendered against
Indemnitees. Consultant shall reimburse City and its directors, officials, officers,
employees, agents and /or volunteers, for any and all legal expenses and costs
incurred by each of them in connection therewith or in enforcing the indemnity
6of10
0 0
herein provided. Consultant's obligation to indemnify shall not be restricted to
insurance proceeds, if any, received by Consultant, the City, its directors,
officials, officers, employees, agents or volunteers. All duties of Consultant
under this Section shall survive termination of this Agreement.
13.0 Equal Opportunity
Consultant affirmatively represents that it is an equal opportunity employer.
Consultant shall not discriminate against any subcontractor, employee, or
applicant for employment because of race, religion, color, national origin,
handicap, ancestry, sex, sexual orientation, or age. Such non - discrimination
includes, but is not limited to, all activities related to initial employment,
upgrading, demotion, transfer, recruitment or recruitment advertising, layoff, or
termination.
14.0 Labor Certification
By its signature hereunder, Consultant certifies that it is aware of the provisions
of Section 3700 of the California Labor Code that require every employer to be
insured against liability for Workers' Compensation or to undertake self- insurance
in accordance with the provisions of that Code, and agrees to comply with such
provisions before commencing the performance of the Services.
15.0 Entire Agreement
This Agreement contains the entire agreement of the parties with respect to the
subject matter hereof, and supersedes all prior negotiations, understandings, or
agreements. This Agreement may only be modified by a writing signed by both
parties.
16.0 Severability
The invalidity in whole or in part of any provisions of this Agreement shall not
void or affect the validity of the other provisions of this Agreement.
17.0 Governing Law
This Agreement shall be governed by and construed in accordance with the laws
of the State of California.
18.0 No Third Party Rights
No third party shall be deemed to have any rights hereunder against either party
as a result of this Agreement.
7of10
0
fiklrl h'F=- I
Ll
No waiver of any default shall constitute a waiver of any other default or breach,
whether of the same or other covenant or condition. No waiver, benefit, privilege,
or service voluntarily given or performed by a party shall give the other party any
contractual rights by custom, estoppel, or otherwise.
20.0 Prohibited Interests; Conflict of Interest
20.1. Consultant covenants that it presently has no interest and shall not
acquire any interest, direct or indirect, which may be affected by the Services, or
which would conflict in any manner with the performance of the Services.
Consultant further covenants that, in performance of this Agreement, no person
having any such interest shall be employed by it. Furthermore, Consultant shall
avoid the appearance of having any interest, which would conflict in any manner
with the performance of the Services. Consultant shall not accept any
employment or representation during the term of this Agreement which is or may
likely make Consultant "financially interested" (as provided in California
Government Code § §1090 and 87100) in any decision made by City on any
matter in connection with which Consultant has been retained.
20.2. Consultant further warrants and maintains that it has not employed
or retained any person or entity, other than a bona fide employee working
exclusively for Consultant, to solicit or obtain this Agreement. Nor has
Consultant paid or agreed to pay any person or entity, other than a bona fide
employee working exclusively for Consultant, any fee, commission, gift,
percentage, or any other consideration contingent upon the execution of this
Agreement. Upon any breach or violation of this warranty, City shall have the
right, at its sole and absolute discretion, to terminate this Agreement without
further liability, or to deduct from any sums payable to Consultant hereunder the
full amount or value of any such fee, commission, percentage or gift.
20.3. Consultant warrants and maintains that it has no knowledge that
any officer or employee of City has any interest, whether contractual, non -
contractual, financial, proprietary, or otherwise, in this transaction or in the
business of Consultant, and that if any such interest comes to the knowledge of
Consultant at any time during the term of this Agreement, Consultant shall
immediately make a complete, written disclosure of such interest to City, even if
such interest would not be deemed a prohibited "conflict of interest" under
applicable laws as described in this subsection.
21.0 Attorneys' Fees
If either party commences an action against the other party, either legal,
administrative or otherwise, arising out of or in connection with this Agreement,
the prevailing party in such litigation shall be entitled to have and recover from
8of10
the losing party all of its attorneys' fees and other costs incurred in connection
therewith.
22.0 Exhibits
All exhibits referenced in this Agreement are hereby incorporated into the
Agreement as if set forth in full herein. In the event of any material discrepancy
between the terms of any exhibit so incorporated and the terms of this
Agreement, the terms of this Agreement shall control.
23.0 Corporate Authority
The person executing this Agreement on behalf of Consultant warrants that he or
she is duly authorized to execute this Agreement on behalf of said Party and that
by his or her execution, the Consultant is formally bound to the provisions of this
Agreement.
IN WITNESS WHEREOF, the Parties hereto, through their respective authorized
representatives have executed this Agreement as of the date and year first
above written.
CITY OF SEAL BEACH
S- .-:•-
By:Kwda
• M City Clerk
Approved as t oI
By:
ai S ele, City Attorney
CONSULTANT
Davi z Design Landscape Architects, Inc.
By:
Name: David J. Volz 10/1/2015
Its: President
B
Name: �OtnH�� .y0�2 �b -1 ^�5�
Its: _g:C-rz-lwY"1
9of10
EXHIBIT A
0
David Volz Design, Inc. Proposal
10 of 10
......................................... ............................... • August 27,. 2015
_ . _........ _.....
PROPOSAL
City of Seal Beach
To Provide Professional Landscape Architectural Design Services for
Eisenhower Park Playground & ADA Improvement Project
P "V-
... .. .. .. .. ....................................................... .................._............
Designing landscapes that create community ...Yr1
.�dsaep[RrcM[btts eral4ark vlaw.ns
August 27, 2015
t.aadswpe ArOlitccts and Park Ka".M
www dvoizoes,gr com
Dear Mr. Estevez,
Eisenhower Park is a special public space for your residents and for visitors to Seal Beach. The green
space, the walkways, the views, the pier and access to the parking lot and play lot are all important
components of this park. Better pedestrian access to parking lots and the playground from Ocean
Avenue are needed improvements. The replacement of the play equipment and lighting upgrades to the
parking lots are also important elements of this improvement project. David Volz Design will put forward
creative and thoughtful concept plans that highlight solutions that fit the character and importance of
this public space. We will draw inspiration from the existing site conditions and the new memorial and
walkway we designed for this park last year.
DVD has a resume of hundreds of outstanding park designs including several beach adjacent projects.
We have identified in this proposal several recent and ongoing projects for you to review. We have
tailored our proven community- inspired design program for this planning process and your community.
DVD will deliver a comprehensive access and refurbishment plan that brings forward the community
consensus and that will meet the expectations of your civic leaders. As you review our expertise and
experience, please consider the unique and proven benefits of David Volz Design.
2.
EXPERIENCE ON SIMILAR PROJECTS — DVD has been commissioned
to lead hundreds of public park planning projects. This body of work has
resulted in accolades from community groups and design awards. The
public projects we have been working on recently include: refurbishment
of four parks for Irvine, the design of two parks in Lawndale, a new park in
Anaheim, four parks in Lynwood, San Juan Capistrano's Los Rios Park, a
new sports complex in Stanton, a new park in Diamond Bar, and beautiful
new pathways, infrastructure and gardens for South Gate's community
center park. Also, the City of Long Beach recently opened the DVD designed
Admiral Kidd Park. This park was a featured stop on the CPRS Park
Operations Tour.
QUALIFICATIONS OF THE DESIGN TEAM - I, David Volz, will lead the
design input process. My firm has specialized in the delivery of public
projects including dozens of CPRS Award- winning parks. Mr. Gary Vasquez,
DVD's Director of Design, will provide the creative flair that
makes DVD's parks special places for play and recreation. IL f
................................................................ ............................... d
San Jose Office
111 N. Market Street, Suite 300
San Jose. CA 95113
Luis Estevez
phone 760580.5165
City of Seal Beach
fax 760 564 0369
Public Works Department
Corporate Office
211 Bth Street
151 K Drive, Suite M8
Costa Mesa. CA 92626
Seal Beach, CA 90740
phone 714.641.1300
-.
fax 714 6411323
RE: PROPOSAL TO PROVIDE PROFESSIONAL LANDSCAPE ARCHITECTURAL DESIGN SERIVCES
FOR EISENHOWER PARK PLAYGROUND & ADA IMPROVEMENTS PROJECT
Dear Mr. Estevez,
Eisenhower Park is a special public space for your residents and for visitors to Seal Beach. The green
space, the walkways, the views, the pier and access to the parking lot and play lot are all important
components of this park. Better pedestrian access to parking lots and the playground from Ocean
Avenue are needed improvements. The replacement of the play equipment and lighting upgrades to the
parking lots are also important elements of this improvement project. David Volz Design will put forward
creative and thoughtful concept plans that highlight solutions that fit the character and importance of
this public space. We will draw inspiration from the existing site conditions and the new memorial and
walkway we designed for this park last year.
DVD has a resume of hundreds of outstanding park designs including several beach adjacent projects.
We have identified in this proposal several recent and ongoing projects for you to review. We have
tailored our proven community- inspired design program for this planning process and your community.
DVD will deliver a comprehensive access and refurbishment plan that brings forward the community
consensus and that will meet the expectations of your civic leaders. As you review our expertise and
experience, please consider the unique and proven benefits of David Volz Design.
2.
EXPERIENCE ON SIMILAR PROJECTS — DVD has been commissioned
to lead hundreds of public park planning projects. This body of work has
resulted in accolades from community groups and design awards. The
public projects we have been working on recently include: refurbishment
of four parks for Irvine, the design of two parks in Lawndale, a new park in
Anaheim, four parks in Lynwood, San Juan Capistrano's Los Rios Park, a
new sports complex in Stanton, a new park in Diamond Bar, and beautiful
new pathways, infrastructure and gardens for South Gate's community
center park. Also, the City of Long Beach recently opened the DVD designed
Admiral Kidd Park. This park was a featured stop on the CPRS Park
Operations Tour.
QUALIFICATIONS OF THE DESIGN TEAM - I, David Volz, will lead the
design input process. My firm has specialized in the delivery of public
projects including dozens of CPRS Award- winning parks. Mr. Gary Vasquez,
DVD's Director of Design, will provide the creative flair that
makes DVD's parks special places for play and recreation. IL f
................................................................ ............................... d
0 0
....................................................................... ............................... I .......
Together, we will lead a team of landscape architects who are dedicated to
public landscape design and who have extensive park planning experience.
3. REFERENCES - We have included ten specific client references, city
officials who have direct experience with the Di team on similar projects.
Also, in the appendix section, we have included letters and quotes of
recommendations from recent public agency clients who have high praises
for our firm.
4. RESPONSE TO THE PROJECT CHALLENGES - The design expertise
required for this important park improvement project is matched by DVD's
offerings in this proposal. Our team has carefully reviewed the site, identified
development opportunities and provided, in this proposal, a proven
strategy for developing a community inspired program to refurbish and
upgrade Eisenhower Park. Park planning is our passion and we will provide
outstanding service on this important commission.
David Volz Design has a very creative park planning team, we have designed hundreds of community
parks and public landscapes. Our desire to be Seal Beach's design partner for the development of the
Site Design for this Eisenhower Park project will be evidenced in our energy and enthusiasm every step
of the way.
My firm and I look forward to working the citizens and civic leaders of Seal Beach on this exciting and
important park project.
Very truly yours,
UAVIS VSLM DEMSE
David J. Volz, L.A. # 2375
LEED Accredited Professional, QSD /QSI
Tustin Branch Traps City of Tustin
�1��1�
0
TABLE OF CONTENTS
Las Rlus Perk, City of Sen ]uen Cap,s'r
Firm Structure & History
Firm Profile
Project Experience
Project Team
Key Personnel
Resumes
Approach of Work
Understanding & Approach
Scope of Services
Sustainability
Quality Control
Abiltiy to Stay on Budget
Project Schedule
Subconsultants
Firm Profile
Resumes
References
Hourly Rate Schedule
Conflict of Interest
Appendix
Insurance Certification
SIRE & LEED Certification
QSD /P Certification
Letters of Recommendation
Cost Proposal (Separate Envelope)
own
De"s,i....._ ..... .............tcre-............. nity.............._................................ ........_...................... _................... -,��`�
Designing landscape that create community...
0 0
DAVID VOLZ DESIGN FIRM PROFILE
UTM1 LIZ Ij I
tltndscapeAroK ects and ParlePLanNtrs
PLANS, DESIGNS + MANAGES THESE
PROJECT TYPES:
Demonstration gardens, mitigation +restoration landscapes
Nature parks, interpretive gardens +wilderness camps
Streetscape development + redevelopment
Community, neighborhood + mini -parks
Facility master plans +feasibility studies
School fields + campus planning
Irrigation renovation + redesign
Design guidelines + standards
Sports parks + stadiums
Grant applications
"DVD continues to build its
LEED Accredited
reputation on creativity and service in the design
of outstanding public spaces. We strive to create
the highest quality environments for our clients'
communities and neighborhoods. We work with
public agencies and the people they serve to
develop innovative landscapes of outstanding
beauty."
David Volz, President
RLA, LEED AP, QSD /QSI
DAVID VOLZ DESIGN
LANDSCAPE ARCHITECTS, INC.
www.dvolzdesign.com I Founded in 19971 SBE
S- Corporation I David Volz, President
Years of business: 18
Corporate Office:
151 Kalmus Drive, Suite M8
Costa Mesa, CA 92626
Phone: 714 - 641 -1300
Fax: 714 -641 -1323
Email: dvd @dvolzdesign.com
La Quinta Office:
San Jose Office:
78060 Calle Estado
111 N. Market Street,
La Qunita, CA 92253
Suite 300
Phone: 760 -580 -5165
San Jose, CA 95113
f
j ACEC CpYS 4-
F
E
Designing landscapes that create community
David Volz Design (DVD) is committed to the creative
design of outstanding public spaces. We develop
landscapes, parks, sports fields and streetscapes to meet
the specific needs of their communities. DVD designs
special environments for those who seek recreation in
a beautiful setting: wonderful natural environments for
those who are simply looking for respite, and for those who
pursue recreation and competitive athletic endeavors on
the playing field. Our firm capitalizes on what the site and
nature has to offer. For all of our commissions, we work
to enhance the site's use, working within environmentally
sound parameters while taking full advantage of the site
and its surroundings to best service the community's
needs.
Ever mindful of our role as stewards of the land, DVD's
design philosophy includes careful consideration for
realistic maintenance requirements and construction
cost parameters. Our company understands the
importance of protecting the environment, protecting
our resources and the health of future generations. DVD
is proud to be a LEED Accredited and a Qualified
Stormwater Designer QSD company. We understand
the commitment we have to the public to deliver quality
projects that offer a high return for the public funds
invested: projects that can be maintained and deliver a
lifetime of service to the communities they are built for.
Our philosophy also embraces any opportunity to interact
with the public to create environments that meet their
needs. DVD's proven outreach approach has often been
the catalyst for our most successful projects. Our proven
approach and input we receive provides the inspiration
that leads to creative and innovative solutions.
Parks and greenspaces designed by our firm have
received awards and accolades from community
groups, civic organizations, the American Public Works
Association, the California Parks and Recreation Society
and the National Recreation and Park's Society. In fact,
lastyeartwo of our park projects won Award of Excellence
honors from CPRS — the highest award given in their
categories.
Pioneer Park City of Tustin
10VID
9
0
DAVID VOLZ DESIGN PROJECT EXPERIENCE
DVD is proud of our many completed projects and our reputation in
public sector work. In fact, we have specifically limited our business to
include only public agency clients! Our public works portfolio includes
thousands of projects from city wide park master plans to construction
documents for multi - million dollar sports complexes. The following
projects are just a few examples of the facilities we have recently
designed. As you will see, parks and green spaces designed by our
firm have received awards and accolades from community groups,
civic organizations, the California Parks and Recreation Society,
American Public Works Association, Southern California Municipal
Athletic Association and several other state and national organizations.
We currently provide dozens of cities in Southern California with on-
call and on staff services. We are active and supporting members of
several professional organizations. Below is a sampling of our recent
experience which demonstrates our expertise and experience.
EL CARISO REGIONAL PARK
County of Los Angeles
The new facilities now attract more than a million visitors to the park each
year. Soccer, handball, basketball and football enthusiasts stream to the park
to enjoy the weeknight and weekend competition. The play area includes a
wide variety of play opportunities, from simple sand and water - filling activities
for the youngest or those who need to work on motor skill development,
to those which challenge the body and encourage movement. All can be
enjoyed by both the able- bodied and those who face challenges in that
area. El Cariso is now used well by families into the evenings, as it feels so
much more secure. Walkways are now well lit as enhanced pathway lighting
illuminates the paths around the play structures and throughout the park,
allowing for peaceful evening strolls. A security camera system was discreetly
installed, monitoring all activity areas to ward off misdeeds. Special designed
handball courts provide playability while allowing security personnel visual
access into the playable spaces. This was achieved by using perforated metal
side walls instead of traditional solid side walls. Water use has been greatly
reduced through the removal of large swaths of under utilized turf grass and
the inclusion of new low -water use plantings. Residents are meeting each
other for the first time through special events, sporting events, and recreation
programs that are strengthening the community image and defining a new
Sylmar.
........................... ...............................
Designing landscape that create community ..
On -Call Contracts & Multiple Project Delivery
City of Anaheim
City of Coachella
City of Corona
City of El Monte
City of Fullerton
City of Huntington Beach
City of Irvine
City of Lake Elsinore
City of Lake Forest
City of Lawndale
City of Los Angeles
City of Lynwood
City of Orange
City of Pomona
City of Rancho Mirage
City of Seal Beach
City of South Gate
City of Stanton
City of Yorba Linda
Owner.
County of Los Angeles
Client
Ohno Construction
Jeff Byerly
Project Manager
16174 Boyle Ave.,
Fontana CA 92337
206 - 227 -6060
jeff@ohnoconstruction.com
DVD:
Landscape Architect of Record
Facility and Uses:
Universally accessible playground, 4
shaded play areas. Concession building,
Synthetic turf fields. Sensory garden
maze Shaded picnic areas,
Restrooms, Parking
Services provided:
Schematic Design, Design Development
Construction Documents, Permit and
Bidding Assistance, Construction Period
Services
Acreage: 80
Date of completion:
October 2014
Cost of Design:
$770,000
Cost of Construction
$13 million
staff:
David Volz, Gary Vasquez, Paul Cassar,
Angela Lee
0
DAVID VOLZ DESIGN PROJECT EXPERIENCE
Client:
City of Glendale
Shahen Begoumian
Park Development Manager
(818) 548 -3796
Sbegoumian@ci.glendale.ca.us
DVD:
Landscape Architect of Record
Facility and Usex
Community Park
Play structure
Historic Tropico District theme
Shaded picnic area
Chess tables
Public art
Neighborhood garden
Drought - tolerant plantings
Stormwater run -off basin
Services provided:
Community Outreach
Master Plan
Design Development
Construction Documents
Bidding Assistance
Construction Period Services
Awards:
CPRS Award of Excellence
APWA Project of the Year
Acreage: 1
Date of completion:
August 2014
Cost of Design:
$200,000
Cost of Construction:
$1.5 million
Staff.
David Volz
Gary Vasquez
Paul Cassar
Angela Lee
`DVD and their team ... have provided
leadership for community outreach,
have designed creative and fun play
spaces and have prepared high quality
construction documents."
- George Balteria
City of Glendale
Letter of Recommendation
....... ning........... e th' ............................
Designing landscape that create community ...
MARYLAND AVENUE PARK
City of Glendale
This special park is one of the hundred parks funded through the state
competitive grant program Proposition 84. Maryland Avenue Park
is located in the historic Tropico District The design team conducted
extensive community outreach to develop a park program including
opportunities for public art, historical and educational interpretive
pieces, and a partnership with the local grade school to co- manage a
neighborhood garden. Murals depicting historic Tropico fruit box labels,
plaques with history lessons, and beautiful artistic metal gates adorn the
new park. Built -in benches along a central boardwalk, an exercise area
with workout stations, a picnic pavilion, and a raised bed community
garden offer a great breadth of uses for this high - density, multi- ethnic
neighborhood tract. Neighbors of the community are meeting each other
for the first ti me in this wonderful park strengthening the community image
and defining a new Tropico District in the City of Glendale. Residents feel
safe with the park's beautiful entry gate and energy- efficient night lighting.
Environmental conservation practices are demonstrated in this half -acre
space. The formerly flat site has been graded to enhance visual interest
and guide water run -off to the new storm water collection basin below
the central boardwalk. Drought - tolerant plantings and sophisticated
irrigation systems keep the park's water use low despite the small patch
of luxurious grass.
ObVID
n
DAVID VOLZ DESIGN PROJECT EXPERIENCE
SOUTH GATE PARK
City of South Gate
South Gate Park underwent a multi -year $5 million update to existing
facilities, installed new facilities, and incorporate unifying design
elements to make this park a great community asset. A main focus of this
beautification project was to improve the circulation of the park. Now,
the park entry ways, vehicle parking areas and recreational facilities are
connected by a 16 ft. wide grand promenade that is a visually striking
amenity paved with beautiful colored interlocking stone that weaves
through stately mature trees. A new exercise trail surfaced with golden -
colored decomposed granite meanders off the main promenade for
walking and jogging. Public art, a band shelter, picnic spaces, volleyball
courts, and restrooms were installed. New plazas and gardens at the
auditorium, and the entrances of both the sports center and the natatorium
are welcoming outdoor spaces. Sustainability measures designed into
the improvements include a reduction of energy use with the park's newly
updated energy- efficient light fixtures. Water conservation practices
are achieved with the new planting choices and irrigation design. The
enhancements have turned this much used recreation space into a more
attractive, safer park for the citizens of South Gate.
Client:
City of South Gate
Paul Adams
Director of Parks and Recreation
4900 Southern Avenue
South Gate, CA 90280 -3075
(323) 563 -5478
padams @sogate.org
Facility and Uses
Walking and access promenade one mile
long
Exercise trails
Community center gardens and shelter
Band shelter
Picnic shelters
Tiled artwork with pool, band,and historic
themes
Garden walls and park signs
Energy -wise LED lighting
Services provided:
Concept Design
Design Development
Construction Documents
Bidding Assistance
Construction Period Services
Acreage:
Improvements spread across the 500 acre
park
Date of completion
January 2014
Cost of Design:
$410,000
Cost of Construction:
$4.7 million
Staff.
David Volz
Gary Vasquez
Paul Cassar
......... . .............. _ . ...............................
Designing landscape that create community ...
0
0
DAVID VOLZ DESIGN PROJECT EXPERIENCE
Client
City of Long Beach
Anna Mendiola
Park Development Officer
(562) 570 -3165
anna.mendiola@longbeach.gov
Key Elements:
Community Park
Two play structures
Navy theme
Exercise equipment
Chess tables
Stormwater detention: bio - swales &
riparian corridor
Climate sensitive plantings
Basketball court with volleyball overlay
New and updated soccer fields
Services provided:
Community Outreach
Master Plan
Design Development
Construction Documents
Bidding Assistance
Construction Period Services
Awards
CPRS Award of Excellence
APWA Project of the Year
Acreage: 11.5
Date of completion:
March 2011
Cost of Design:
$271,340
Cost of Construction:
$2.6 million
Staff:
David Volz,
Gary Vasquez
Paul Cassar
"DVD has provided high quality design
and consulting services to the City of
Long Beach for over twelve years . they
have provided park planning, leadership
at public outreach meetings, creative
park design, developed construction
documents and provided construction
period services on dozens of large and
small park projects."
- Anna Mendiola
City of Long Beach
Letter of Recommendation
......................... ...............................
Designing landscape that create community
ADMIRAL KIDD PARK
City of Long Beach
In 2011, the City of Long Beach rededicated the newly renovated and
expanded Admiral Kidd Park. The park, which is named after Naval Rear
Admiral Isaac C. Kidd, features two play structures themed after two
naval destroyers which carried Admiral Kidd's namesake. A perimeter
trail connects the park's amenities, which include themed raised planter
areas and iconic tile in stone pilasters. This trail allows park visitors to
circumvent the park in a beautiful setting either on bikes or walking and
the pilasters frame the view into the park and draw inspiration from the
community's "plaza" vision forthe park. Designed with maintenance and
operational costs in mind, the existing irrigation system was expanded
and upgraded utilizing the city's existing standard smart controllers. In
addition, Admiral Kidd demonstrates a beautiful design approach to
storm water management. The undulating arroyos (bio - swales) move
like water through the park even when they are dry. This bio - swales
system collects and cleans water before it is allowed to percolate or
run -off from the site. The native trees, shrubs and meadow grasses
reminiscent of a riparian creek add to the character of the park.
1111VII)
10 0
DAVID VOLZ DESIGN PROJECT EXPERIENCE
LOS RIOS PARK
City of San Juan Capistrano
Located in the heart of San Juan Capistrano's Los Rios Historic District,
the Los Rios Park and on -site Montanez Adobe offers a centralized
location for visitors to enjoy the park's facilities. The Montanez Adobe
dates back to 1795 and is considered the oldest adobe in the Los Rios
Historic District. Because of its historic value, all excavation required a
certified archeologist to be on -site. An artfully designed Historic Depiction
Program Wall functions as an outdoor public gallery displaying 13
bronze plaques. The selection of construction materials complements
the architectural style of the historic district. Understanding the needs
and concerns of the community and the City, the design team created a
new park that looked old by blending in with its surroundings. A passive
park with walking trails, equestrian trails, a small tot lot, picnic area and
open "pasture- was created. As a LEED Accredited firm, the design team
used creative ways to implement environmentally sound standards to the
grounds and buildings. The spaces within the park balance recreation
for individuals and families and serves as an extension of the downtown
area. Los Rios Park is well themed to harmonize the tradition of the City
with outdoor activities that draw people in to experience its natural beauty
while promoting interest in exploring this historical area.
Client:
City of San Juan Capistrano
Khoon Tan
Project Engineer
(949) 443 -6353
ktan@sanjuancapistrano.org
DVD:
Landscape Architect of Record
Facility and Uses:
Community Park
Historical depiction wall
Play structure, themed
Stormwater detention: bio- swales
& riparian corridor,
Sustainable plantings and irrigation
Equestrian trails and rest area
Shaded picnic area
Decomposed granite parking lot
Services provided:
Community Outreach
Master Plan
Design Development
Construction Documents
Bidding Assistance
Construction Period Services
Awards:
CPRS Award of Excellence
APWA Project of the Year
APWA Planning Excellence
APA Award of Excellence
Acreage: 4.6
Date of completion
August 2009
Cost of Design:
$328.700
Cost of Construction
$2 million
Staff.
David Volz, Gary Vasquez, Paul Cassar
"DVD's ... construction oversight
played an important role to
maintain Los Rios Park's unique
historic character without impacting
the construction schedule or
sacrificing the intended design
appearance."
- Khoon Tan
City of San Juan Capistrano
Letter of Recommendation
........ ......... _ . _ _ .........
ova
Designing landscape that create community...
0 •
PROJECT TEAM
Our creative designers have the background
City of Seal Beach and expertise to deliver outstanding landscape
Eisenhower Park Playground architecture services for your city's project. For this
& ADA Improvements Project work, we have assembled a highly qualified team
of landscape architects and specialized design
consultants. The team will deliver:
CREATIVITY - We will provide you with unique and
David Volz Design Landscape Architects, Inc
innovative solutions which will meet and exceed the
Landscape Architecture
expectations of the city. The project designs we put
David Volz
forward will creatively address the sites' development
RLA #2375, LEED AP. QSD /P
requirements, sustainability, the unique relationship to
Principal in charge
the nearby neighbors, program priorities, accessibility
and recreation balance.
Gary Vasquez
RLA #3883
COMMUNICATION - DVD will continually keep
Senior Project Manager/ Director ofdesign
you and your staff informed from the start and
Paul Cassar
throughout all the projects' phases. Communication
Project Manager
will be consistent and clear with all parties through
completion of project.
Angela Lee
Project Designer
EXPERIENCE - DVD will provide a design team that
has a history of working successfully with cities as an
extension of Staff and providing project design and
coordination in the development of dozens of award
winning projects.
DMS Consultants, Inc.
Civil Engineer
INTEREST IN YOUR PROJECT - DVD is ready to
take on your projects and bring them to successful
Surender Dewan, P.E.
completion. DVD is focused on delivering outstanding
RICE 34559
public facilities to communities throughout California.
Project Manager/ President
Our team is dedicated to the success of your projects!
David Volz Design looks forward to a long relationship
with your city. We are committed to delivering high
Design West Engineering
quality services, designs, reports, documents, and
Electrical Engineer
support to the city. The DVD key team members are
experienced and talented professionals and they
will be supported by a team of licensed landscape
Leo Maya, P.E. Roy Morales, P.E.
E19480 Project Manager /Senior
architects, several very capable designers, sub
Senior Electrical Engineer Electrical Designer
consultants, and support staff.
land Nov*
............................................................................... ...............................
Designing scape the[ create co mmun ity ...
0 0
DAVID Vi RESUME
PRINCIPAL IN CHARGE
DAVID VOLZ, Principal in Charge, has over 30 years
of experience in the design of successful public
landscapes, streetscapes and parks. He has managed
public design projects including the master planning,
design, and construction of municipal projects for
more than 100 public agencies in California.
Mr. Volz has a broad base of experience focused in
the development process from inception through
master plan development, construction document
preparation, contract administration, and on -site
inspection. His extensive knowledge of landscaping
materials and vegetation is often called for at
commission meetings and in council reports for
agencies he has served. He has comprehensive
experience in storm water treatments, habitat
restoration, walking trails and water conservation.
He has an excellent reputation for facilitating
community outreach programs for park design
through the public input process. The public
workshop process for park design is a concept that
he always encourages. The opportunity to get first
hand insights from users, neighbors, and the public
in general is always beneficial in the design of public
projects. Several of Mr. Volz's most successful park
projects have benefited from the ideas and energy
that were put forth at public input sessions.
Public landscape, streetscape and park project
experience is Mr. Volz's design focus. Serving in
various capacities from principal -in- charge to
designer, he has overseen scores of award winning
projectsfor cities, school districts and public agencies
throughout California.
EDUCATION
BS, Landscape Architecture, 1981
California State Polytechnic University, Pomona
Graduate Studies, Computer Applications for
Landscape Architecture, 1981
California State Polytechnic University, Pomona
REGISTRATION
Landscape Architect, California #2375, 1983
Landscape Architect, Nevada #499, 1996
LEED Certified, 2008
Qualified Stormwater Professional, QSD /QSP, 2011
.......nin' .. ......ca-p.....atcr.a'ie.c.om*. unit....
Designing landscapes that create community _..
RECENT PROJECT EXPERIENCE
Maryland Avenue Park, City of Glendale
CPRS AWARD OF EXCELLENCE. March 2015
Balboa Boulevard Enhancements,
City of Newport Beach
APWA COMMUNITY IMPROVEMENT PROJECT OF THE
YEAR, February 2015
Hogan Park, City of Lawndale
State Street Park, City of South Gate
El Canso Regional Park, County of Los Angeles
Pacific Park Artificial Turf Fields, City of Glendale
South Gate Park, City of South Gate
Admiral Kidd Park, City of Long Beach
CPRS AWARD OF EXCELLENCE
Washington Street Mini Park, City of Diamond Bar
CPRS AWARD OF EXCELLENCE
Veteran's Park, City of Stanton
APWA PROJECT OF THE YEAR
Harry M. Dotson Park, City of Stanton
CPRS AWARD OF EXCELLENCE
Los Rios Park, City of San Juan Capistrano
CPRS AWARD OF EXCELLENCE
APWA PLANNING EXCELLENCE AWARD
APA AWARD OF EXCELLENCE
Pioneer Road Park, City of Tustin
OC PLAYGROUND OF THE YEAR 2012
NRPA PARK DESIGN AWARD
APWA PROJECT AWARD
Heritage Island Park Rehabilitation Project,
City of Cerritos
CPRS AWARD OF MERIT
George Washington Park, City of Anaheim
CPRS AWARD OF EXCELLENCE
Laguna Hills Community Center, City of Laguna Hills
CPRS AWARD OF EXCELLENCE
Rancho Mirage City Hall, City of Rancho Mirage
APWA PROJECT OF THE YEAR
OVID
0 0
GARY VASQUEZ RESUME
RECENT PROJECT EXPERIENCE
Maryland Avenue Park, City of Glendale
CPRS AWARD OF EXCELLENCE, March 2015
Balboa Boulevard Enhancements,
City of Newport Beach
APWA COMMUNITY IMPROVEMENT PROJECT OF THE
YEAR, February 2015
El Cariso Regional Park, County of Los Angeles
South Gate Park, City of South Gate
Washington Street Mini Park, City of Diamond Bar
CPRS AWARD OF EXCELLENCE
Hopper Park, City of Lawndale
CPRS PARK OPERATIONS TOUR
Admiral Kidd Park, City of Long Beach
CPRS AWARD OF EXCELLENCE
Veteran's Park, City of Stanton
APWA PROJECT OF THE YEAR
Harry M. Dotson Park, City of Stanton
CPRS AWARD OF EXCELLENCE
Los Rios Park, City of San Juan Capistrano
CPRS AWARD OF EXCELLENCE
APWA PLANNING EXCELLENCE AWARD
APA AWARD OF EXCELLENCE
Pioneer Road Park, City of Tustin
OC PLAYGROUND OF THE YEAR 2012
NRPA PARK DESIGN AWARD
APWA PROJECT AWARD
Cerritos School Park, Glendale
CPRS AWARD OF EXCELLENCE
APWA PROJECT OF THE YEAR
Heritage Island Park Rehabilitation Project,
City of Cerritos
CPRS AWARD OF MERIT
Laguna Hills Community Center, City of Laguna Hills
CPRS AWARD OF EXCELLENCE
Rancho Mirage City Hall, City of Rancho Mirage
APWA PROJECT OF THE YEAR
Designing landscapes that create community..
SENIOR PROJECT MANAGER /
DIRECTOR OF DESIGN
.................... ................... ...............................
GARY VASQUEZ, Senior Project Manager, provides
senior design leadership as a result of 20 years
of experience designing multi- faceted projects
throughout California. His design abilities have
proven to be not only innovative and unique, but
award - winning. He will work under the direction of
David Volz providing creative design solutions to the
challenges and opportunities that arise. Mr. Vasquez
has provided high quality project management
on many of our firms' most successful and highly
acclaimed park projects.
Mr. Vasquez is a key figure in our community outreach
program. He successfully integrates the ideas
generated through the public input process to create
the master plan. This dedication to ensuring the
community's input has led to extremely successful
projects. Mr. Vasquez has extensive experience in
the development process from inception through
master plan development, construction document
preparation, contract administration, and on -site
inspection. He ensures adherence to established
project budgets, schedules and cost agreements.
His recent projects include project management,
design, construction drawings and construction
oversight for George Washington Park in Anaheim,
Ford Park in Bell Gardens, Bryant Ranch Park in
Yorba Linda, Dateland Park and Bagdouma Park in
Coachella, and landscape plans for several projects
including the APWA/CPRS award winning Bell
Gardens Sports Park. In addition, the Los Rios Park
he designed in San Juan Capistrano won the CPRS
Award of Excellence along with the 2010 APWA
Planning Excellence Award.
EDUCATION
MLA, Landscape Architecture, 1989
California State Polytechnic University,
Pomona
BS, Ornamental Horticulture, 1986
California State Polytechnic University,
San Luis Obispo
REGISTRATION
Landscape Architect, California
#3883,1992
own
.......... - _ _ ............
PAUL CASSAR RESUME
PROJECT MANAGER
PAUL CASSAR, Project Manager, has more than 13
years of experience in landscape architecture working
on projects for public agencies. His design expertise
ranges from recreational parks to streetscapes,
school sites, as well as city design guidelines.
A benefit to Mr. Cassar's design ability is his attention
to detail and his knowledge of playground design,
the latest construction practices and materials, ADA
accessibility concerns, and his experience in the
installation of hardscape, softscape, and irrigation
systems. He brings field investigation, research, and
communication experience to each of our projects.
Mr. Cassar has been a key figure at OVD in
coordinating design development plans and
carrying them through construction drawings. He is
known for his ability to collaborate with a variety of
clients, architects, engineers and designers and to
successfully manage projects from beginning to end.
He ensures adherence to established project
schedules and cost agreements, and monitors
production for delivery of the highest quality products
to clients. He cooperates well with staff, clients, and
agencies to create successful products and works
closely with contractors during construction. He is
typically responsible for plan checking to ensure the
successful completion and delivery of projects.
He utilized his expertise in a wide variety of projects
including the Los Rios Park in San Juan Capistrano,
Balboa Boulevard in Newport Beach and El Cariso
Regional Park in the County of Los Angeles. In
addition, the Maryland Avenue Park he collaborated
on in Glendale won the APWA 2014 Project of the
Year Award for Recreation and Athletic Facilities.
EDUCATION
BS, Landscape Architecture, 2005
California State Polytechnic University,
Pomona
............................. ...............................
Designing landscapes that create community ...
RECENT PROJECT EXPERIENCE
Maryland Avenue Park, City of Glendale
CPRS AWARD OF EXCELLENCE, March 2015
Balboa Boulevard Enhancements,
City of Newport Beach
APWA COMMUNITY IMPROVEMENT PROJECT OF THE
YEAR, February 2015
Hogan Park, City of Lawndale
State Street Park, City of South Gate
El Cariso Regional Park, County of Los Angeles
South Gate Park, City of South Gate
Washington Street Mini Park, City of Diamond Bar
CPRS AWARD OF EXCELLENCE
Hawaiian Gardens Memorial,
City of Hawaiian Gardens
Hopper Park, City of Lawndale
CPRS PARK OPERATIONS TOUR
Smallwood Park Renovations (CDBG funded),
City of Costa Mesa
Admiral Kidd Park, City of Long Beach
CPRS AWARD OF EXCELLENCE
Veteran's Park, City of Stanton
APWA PROJECT OF THE YEAR
Los Rios Park, City of San Juan Capistrano
CPRS AWARD OF EXCELLENCE
APWA PLANNING EXCELLENCE AWARD
APA AWARD OF EXCELLENCE
Seal Beach Memorial, City of Seal Beach
All American Park, City of Paramount
Hurless Barton Park, City of Yorba Linda
11\T11
0 0
ANGELA LEE RESUME
RECENT PROJECT EXPERIENCE
Maryland Avenue Park, City of Glendale
CPRS AWARD OF EXCELLENCE, March 2015
Balboa Boulevard Enhancements,
City of Newport Beach
CPRS AWARD OF EXCELLENCE
APWA COMMUNITY IMPROVEMENT PROJECT OF
THE YEAR, February 2015
El Cariso Regional Park, County of Los Angeles
Pacific Park Artificial Turf Fields, City of Glendale
South Gate Park, City of South Gate
Hogan Park, City of Lawndale
State Street Park, City of South Gate
Seal Beach Memorial, City of Seal Beach
"Landscape architecture is so important, the
environment around us affects the way we behave
and how we feel. I really appreciate the goal of this
office to make parks and public spaces that people
can enjoy and feel proud of their communities."
PROJECT DESIGNER
....................................... ............................... I ................
ANGELA LEE, Project Designer, has worked as part
of the David Volz Design team since 2013. She has
experience in many aspects of the public landscapes
design process including conceptual planning,
planting design, irrigation design, and community
presentation techniques.
Ms. Lee is extremely knowledgeable in drafting
construction documents and understands exactly
what information contractors will need. Her abilities
include computer graphic skills, writing and
composition, and an aptitude for tackling challenging
tasks with timely completion of duties. She is typically
responsible for plan checking to ensure consistent
update of plan details from client requests.
Not only does she understand and work on the
design and construction process but she is excellent
at analyzing data from our community input charrette
process to help form a common goal of what the
community desires. Noteworthy projects include El
Cariso Regional Park of Los Angeles, Harbor Avenue
in Costa Mesa, and many more projects approaching
construction.
EDUCATION
BA, Cinematic Arts, 2003
University of Southern California
MLA, Landscape Architecture, 2010
- Angela Lee School of Natural Resources
University of Michigan
U ®D
.................................................................... ...............................
D esigning landscapes that create community ..
APPROACH OF WORK
UNDERSTANDING & APPROACH
Eisenhower Park is well used and well loved. There are some
identified improvements that will make this park and the beach
parking lots more accessible, specifically 8th Street and 10th
Street pedestrian access routes. Updating and upgrading the
popular playground is also being contemplated.
The DVD team would like to reach out to the community for
ideas and to confirm the improvement strategies identified.
These elements and improvements are to be considered:
1. Playground Refurbishment
The existing play apparatus needs to be replaced
with new play pieces. Due to the confines of the tile
wall surrounding the space, compact pieces with a
constrained fall zone will be proposed. An on -site
community outreach workshop will all the DVD team
to listen to the public and gain inspirations for possible
new play apparatus. If the swing component is to be
replaced, a new small play structure will be proposed.
Our well experienced park design team will be ready to
explore a myriad of options from standard play pieces
to custom constructions. This site's close proximity to
the sea will require careful consideration due to rust and
corrosion on metal parts. DVD has designed several first
exposure play spaces and we can help refine options
and cost analysis.
The creative team at DVD will share our experiences with
catalogue and custom concrete play pieces, manufacture
rock structures for play, rope oriented climbers and artist
built configurations. Any of these possibilities could be
appropriate for this important play space.
2. The New Pedestrian Access Way at 8th Street
The current vehicular way from Ocean Avenue to the
southerly pier parking lot has a workable slope for an
adjacent pedestrian walkway. Our designers will consider
a walkway at the edge of the drive if there is sufficient
width or a walkway on the park site of the retaining wall
with an access point at the bottom of the ramp. This
second option could require a new wall configuration.
3. The New Pedestrian Access Way at 10th Street
This pedestrian access way could include a switch back
walk along the retaining wall and slope at the driveway
corner opposite the new memorial construction. The
........................... ...............................
Designing landscape that create community ..
Los Rios Park, City of San Juan Capisasno
EI Camn, Regional Park County of Los Angeles
Mmsal nod Pad, City of Long Beach
U ®U
10
0
APPROACH OF WORK
Downtown Parking Lot. City of La Qmnta
Viva Sports Park City of Vista
El Canso Regional Park,
County of Los Angeles
Maryland Ave Park City, of Glendale
........................... ...............................
Designing landscape that create community ...
ramps could be just behind the parking lot wall or further
into the park down slope. Cost and aesthetics will be
considered in the proposed solutions DVD puts forward.
Engineering for walls and grading will be prepared under
the guidance of our surrey and civil engineering partner,
DMS Engineers.
4. Lights and Undergrounding
The two beach parking lots, the kids' playground and the
new accessible walkways will all need to be lighted for
night use. DVD will work closely with our colleagues at
Design West Engineering to select appropriate energy -
wise fixtures, and maintainable fixture poles. Our design
layouts will be analyzed for light and glare control. Our
team will also prepare plans for undergrounding all
the wires and for constructing new switch gear for the
project.
The community outreach we are proposing for the Eisenhower
Park refurbishment project will provide us with insights related
to this park's current uses and the needs of the community.
The DVD team will take the ideas and inspirations received from
the community and refine the ideas into initial concept plans.
These conceptual layouts will be presented to city staff in an
idea consolidation meeting. The best ideas and solutions will
then be refined into conceptual plans for further consideration.
A commission workshop is proposed as the best forum to
review the concept plans. Plans will be presented and the ideas
reviewed. The DVD team will look for agreement on the elements
which will become a part of the final construction plans.
The final concept plans, which will be the focus of our planning
efforts, will be the culmination of the community's ideas being
honed into final graphic representation of the best development
strategy forth is park site. A preliminary construction budgetwill be
prepared and the finalized concept plans will then be packaged
and presented to the Parks and Recreation Commission.
SCOPE OF SERVICES
David Volz Design proposes to provide the following services
to the City of Seal Beach for the Eisenhower Park improvement
project. Ourteam is well versed in the development of community
inspired improvement plans for important park design projects.
The following services are proposed for this project:
PHASE I - PRELIMINARY DESIGN
Task 1- Initialize Project
1.01 Background Research
a. Collect available data and maps Or„
........... .......... ... ............. I'll --- ..__ ......
u
APPROACH OF WORK
b. Meet with city project personnel
c. Review Preliminary project program
d. Review plans and documents of the site
1.02 Prepare base map for planning purposes
1.03 Meeting with city staff to review work to
date
1.04 Community workshop at the park site
a. Conduct site walk
b.
Discuss opportunities and objectives
c.
Review limitations and challenges
d.
Review program opportunities
e.
Facilitate design charrette with
d.
participants
f.
Gather ideas and direction
1.05 Document input received at workshop
a.
Prepare summary of input
b.
Annotate maps with insights gained
Meeting and Deliverables
Community workshop on site
Initial program identification
Summary of comments and input
Review meeting with staff
Project planning map
Task 2 - Preliminary Concept Plans
2.01 Prepare preliminary concept plans
a.
Develop designs for park improvements
b.
Develop concepts and alternatives
c.
Refine and consolidate ideas
d.
Prepare initial concept plan map
e.
Prepare order of magnitude construction
cost estimate
f.
Prepare preliminary concept packet for
P &R Commission review
Meeting and Deliverables
Meeting with city staff
Concept plan workshop
Initial concept plans (3 anticipated)
Order of magnitude cost estimate
Summary of comments and inputs
Task 3 - Commission Study Session
3.01 Present concepts plans to P & R Commission
a. Review background and challenges
b. Present initial concept and alternatives
c. Gather input from Commission
d. Seek consensus on collective vision
3.02 Document input
a. Document input and comments
b. Consolidate comments into summary
Designing landscape that create co,
ommunity ...
letter report
c. Review work to date with city staff
Meeting and Deliverables
Commission Study Session
Summary letter report
PHASE II - DESIGN SURVEY
Task 1- Base Map Preparation
1.01
Perform topographic survey
1.02
Utilities research
1.03
Utilities preliminary notice
1.04
Prepare base map for work areas
Meeting and Deliverables
Topographic Survey
Utilities Notifications
PHASE III - FINAL DESIGN
Task 1- Plans and Specifications
1.01 Develop base maps and standard details
1.02 Coordinate with affected utility companies
1.03 Prepare construction plan sets, specifications
and construction cost budget estimates
1.04 Submit plans for initial review by city
1.05 Revise plans as required
1.06 Submit plans for final review
Meeting and Deliverables
PS &E initial and final submittals
PHASE IV - BIDDING AND CONSTRUCTION
Task 1- Bidding and Assistance
1.01 Respond to request for information
Meeting and Deliverables
RFI response
Task 2 - Construction Period Services
2.01 Attend pre bid conference
2.02 Respond to request for information
2.03 Provide construction consultations
2.04 Attend two construction progress meetings
Meeting = I Deliverables
Meetings as indicated
RFI response
Ova
0 0
SUSTAINABILITY
David Volz Design is committed to delivering public landscapes
that are sustainable and beautiful. We embrace the principles of
design that encourage stewardship of our resources, respect for
the environment and creative sustainable practices. Through
our affiliation with LEED's, we identify and quantify the sus-
tainability of our designs. From our parks, all accessible play-
grounds, streetscapes and sport fields to our historic gardens,
DVD delivers outstanding, sustainable, award winning projects.
A beautiful and sustainable landscape starts with a clear under-
standing of the client's requirements, the site and environs and
a creative approach to the design process. Water efficiencies,
energy use reductions, waste reduction, recycled content and
localized material's sourcing can all be quantified and are an
integral part of our design.
David Volz Design is dedicated to the opportunity and challenge
of creating unique spaces and special places that draw inspira-
tion from the environs and the community. Our team is detail
oriented and our focus is on delivering outstanding public land-
scapes that meet and exceed the expectations of our clients.
David Volz Design believes the very definition of sustainability
speaks of environments that are well used and enjoyed, and
maintainable over time. We at DVD believe that the ultimate
measure of sustainability of any public space has to be high use
and enjoyment over the long term.
Resource conservation through the use and specification of re-
cycled and reused materials and identification of locally sourced
goods are important sustainability issues. Adaptive reuse of on-
site materials, carefully balanced grading operations and protec-
tion of on -site resources are always considered in our designs.
Water resources are conserved through our thoughtful low wa-
ter use planting schemes, precise irrigation layout and control
systems, as well as, stormwater capture, cleaning and reuse. For
pollution prevention, best practices stormwater recycling plans
are embraced and integral to our designs. On site water deten-
tion, bio filtration, permeable pavement, and many other mea-
sures are creatively incorporated into the landscapes we design.
Our award - winning design of Rancho Mirage City Hall has been
recently highlighted by the Sustainable Sites Initiative. David
Volz Design is proud to have been chosen for this honor. The
Sustainable Sites Initiative is an interdisciplinary effort by the
American Society of Landscape Architects, the Lady Bird John-
son Wildflower Center and the United States Botanic Garden to
create voluntary national guidelines and performance bench-
marks for sustainable land design, construction and mainte-
nance practices.
_............ ds _ _hatc ........... ......lity.....................
Designing landscape that create community ...
La Paz spans Complex. City of Laguna Niguel
Storm Water Retention & Cleaning
Los Rios Park, City of San Juan Capistrano - Pevneaoi= Pav,ng
Rancho Mirage City Hall.
City of Reach Mirage
Maintenance Reduction
City of Long Beach
Stone Water Retention & Cleaning
Tustin Branch Trails. City of Tustin - Recycled & ReNsed Materials
Rapper Park, City of Lavmdee
...... ...............................
1�VN
u
QUALITY CONTROL PROGRAM
DVD has an established quality control and assurance program that we undertake for all our design services,
and for this project. The primary elements include:
• Verification that required deliverables and documents noted in the Scope of Work are provided.
• A Peer Review will be conducted by our senior professional staff to solicit critical comments and verify
correctness.
• Retention of documents with highlighted markings and red -line comments, and verification that
required revisions are incorporated into the updated documents.
• Continual assessment and tracking of project schedule and budget against baseline data.
• A complete construction review for constructability and biddability of the complete PS &E package will
be assigned to experienced professionals on staff prior to final submittal to our client.
The Principal -in- Charge will be responsible for implementation of these Quality Control measures.
1. Project Initiation
Quality Assurance Review
• Goals and objectives defined
• Scope of work defined
• Budget identified
• Schedule established
Notice to • Problem areas identified
Proceed • Checklist prepared
Project I I IConcel Design
tanning) 1, Design gn J I Development
2. Work Plan
Quality Assurance Review
• Goals and objectives reviewed
• Work plan reviewed
• Alternative and
preliminary solutions evaluated
• Recommended
solutions defined
............................. ...............................
Designing landscapes that create community...
3. Design Confirmation
Quality Assurance Review
• Program and materials finalized
• Recommended solutions refined
• Final design defined
• Budget review
• Checklist reviewed
Final Final
Design Correctk
4. Constructability
Quality Assurance Review
• Quality assurance check for
completeness and format
• Verification check for completeness
• Biddability and constructability review
Deliver
to Clien
10 V ID
10 0
ABILITY TO STAY WITHIN BUDGET
Delivering projects within our client's expectations, budgets and time frame is our top priority. We aim to
keep our clients happy and remain in mutually beneficial relationship for the long -term. We are an extension
of your staff and are willing to support you in any task needing assistance. In Anaheim, where we have had
a 15 year on -call agreement, DVD is often called to help on fast track, high visibility projects. For instance, the
George Washington Park site in downtown required a quick study and design to secure funding and to be a
showcase park as its location is across the street from City Hall. DVD was able to meet the City's deadlines
and the park has won accolades and design awards for its sensitivity to the neighborhood's needs, the his-
toric relevance of the parks structures and the beauty of its overall design. Our client was very pleased that
the neighborhood has an outstanding park and the funding targets and deadlines were met in the planning
and design of this great facility.
David Volz Design strives to stay on top of the ever changing world of the construction industry and its pric-
ing. We regularly analyze what is happening with projects during estimating and bidding process to ensure
that we are as close as possible to our clients' budget. We have been very successful in tracking costs. The
following are recent project estimates and the contract amount of the construction bid.
BALBOA BOULEVARD IMPROVEMENTS
City of Newport Beach
Entry monuments • New bus stops • Pedestrian oriented
thoroughfare • Colorful plantings • Green walls • Storm
water retention • APWA Project of the Year • ASCE
Community Enhancement Project of the Year
Estimate: $ 2 million
Construction Cost: $ 2 million
WASHINGTON STREET PARK
City of Diamond Bar
Community neighborhood park • Universally accessible
Play structure Stormwater detention: bio - swales &
riparian corridor Native and climate sensitive plantings
Low water usage irrigation • Shaded picnic area • Chess
tables • Public art • Gardens • CPRS Award of Excellence
Estimate: $ 600,000
Construction Cost: $ 600,000
ADMIRAL KIDD PARK
City of Long Beach
11.5 acres • 2 themed play structures • ADA accessible
exercise stations • Navy theme • Chess tables • Stormwater
detention: bio - swales & riparian corridor • Climate sensitive
plantings • Basketball court with volleyball overlay • New and
updated soccer fields • CPRS Award of Excellence • APWA
Project of the Year Two play structures
Estimate: $ 2.7 million
Construction Cost $ 2.6 million
BELL GARDENS SPORTS PARK
City of Bell Gardens
18 acre sports park • synthetic and natural turf • shaded
spectator areas • lighting • irrigation • security systems
CPRS Award of Excellence • APWA Project of the Year
Estimate: $ 6.9 million
Construction Cost: $ 6.94 million
............................. ...............................
Designing landscapes that create community...
MARYLAND AVENUE MINI PARK
City of Glendale
Play structure • Historic Tropico District theme • Shaded
picnic area • Chess tables • Public art • Community garden
• Drought - tolerant plantings • Stormwater run -off basin
CPRS Award of Excellence • APWA Project of the Year
Estimate: $1.6 million
Construction Cost: $1.5 million
EL CARISO PARK
County of Los Angeles
Universally accessible playground • 4 shaded play areas
• Concession building • Synthetic turf fields • Sensory
garden maze • Shaded picnic areas • Restrooms
Parking
Estimate: $10 million
Construction Cost: $10 million
LOS RIOS PARK
City of San Juan Capistrano
Historical depiction wall • sustainable plantings & irrigation
• equestrian trial & tie -up facilities • themed play structure
picnic area • DG parking lot • CPRS Award of Excellence
APWA Project of the Year • APWA Planning Excellence
APA Award of Excellence
Estimate: $ 2.25 million
Construction Cost: $ 2 million
DATELAND PARK
City of Coachella
3.3 acre neighborhood and skate park • splash pad
shaded play areas • restroom and community center
amphitheater • sustainable plantings
Estimate: $ 2.8 million
Construction Cost: $ 2.4 million
111111VIIIII
0
0
PROJECT SCHEDULE
David Volz Design proposes the following schedule for this important project. The initial design work, preliminary design will require
about four weeks of studio time and an estimated 2 weeks for the public outreach meeting coordination and 2 weeks for community
meeting coordination. The final design schedule includes a week for plan review by the city prior to a formal turnover of the documents.
Phas e II - Design Survey
1. Base Map Preparation
Phase III - Final Design
1. Plans & Specifications
Phase IV - Bidding and Construction
1. Bidding and Assistance I I I I I As- needed
2. Construction Period Services As- needea
.
Work effort
Milestone
nra
....... ning ................................................................................................................. ............................... .�.r
Designing landscape that create community ...
MONTH 1
wkl I wk2 w0 wk4
MONTH 2
wk5 wkfi wkl wk8
MONTH 3
wk9 w1,10 wkll wk 12
MONTH 4
wk 13 wk 14 wk is wk lfi
1 MONTH 5
wk 17 wk 18 wk19 wkM
Phase I - PffConcept sign
1. Initializ
2. PrelimiPlans
3. Commiession
Phas e II - Design Survey
1. Base Map Preparation
Phase III - Final Design
1. Plans & Specifications
Phase IV - Bidding and Construction
1. Bidding and Assistance I I I I I As- needed
2. Construction Period Services As- needea
.
Work effort
Milestone
nra
....... ning ................................................................................................................. ............................... .�.r
Designing landscape that create community ...
0
0
SUBCONSULTANTS FIRM PROFILE
DIMS CONSULTANTS, INC. (CIVIL) is a full service Civil Engineering
DM firm providing awide range of engineering servicesto Municipalities,
institutions and developers throughout Southern California.
LTANTS,I
C I V IL E N G I N E E k s Our firm was established in 1994 by Mr. Surender Dewan, P.E. The
firm is Caltrans certified MBE /SBE and provides engineering and
12371 Lewis Street, Suite 203 related services to municipalities, government entities, and private
Garden Grove, CA industries. With our staff of registered civil engineers, designers,
Tel: (714) 740 -8840
www.dmsconsultantsinc.com construction observers, contract administrators, surveyors, and
specialists in transportation, building and safety, and computer -
sided design, DMS Consultants, Inc. is uniquely qualified to respond
to the diverse needs of our clientele.
We are dedicated to technical excellence and providing high quality
service. A team approach is taken to every project undertaken, with
a project manager or engineer directing, managing and acting as
the central design figure in our work. We strive to maintain a high
level of communication with our clients and jurisdictional agencies.
We are acutely aware of the value and importance of providing
close individual attention to each project and to working within
constraints of time and budget We also know the success of our
firm rests clearly on the management, competence, and expertise
of our professional staff and team.
DESIGN WEST ENGINEERS, INC (Electrical) is a full - service
Mechanical, Electrical, Plumbing and Energy Consulting Firm.
We are founded on the philosophies of second -to -none service,
environmental sensibility, and commitment to forward- thinking
innovation. Established in 2000 and centered on these ideas, we
have quickly grown to become one of Southern California's most
DESIGN WEST ENGINEERING prominent and the Inland Empire's largest MEP firms. Our office
currently maintains 30 employees.
275 Hospitality Lane, Suite 100
San Bernardino, Ca 92408 We offer a diversified range of practical experience in municipal,
Tel: 909-890-3700 educational, green - building, transportation, medical, commercial,
www.designwesteng.com and residential building sectors. Our highly qualified and innovative
SBE #47289 engineers work in a multi - disciplined environment, each familiar
with overall project requirements in addition to their specific area
of expertise. We offer you the most up -to -date expertise in the latest
technologies to maximize your project's potential.
Together, we approach your project and its difficult challenges using
well- designed, efficient, cost effective solutions that are tailored to
your environment concerns, longevity, and constructability.
_......'g "la.'s'c'a es't.._............_ ................. .......... ............_........._................._.._ ................_..._......_...
D ®A
Designing landscapes [hat create community ...
DMS CONSULTANTS, INC. RESUME
SURENDER M. DEWAN, P.E.
PROJECT MANAGER/PRESIDENT
EDUCATION:
Bachelor of Science, Civil Engineering. Delhi University, 1970
Master of Science, Civil Engineering. Washington University, 1978
ACIIVE REGISTRATION:
Civil Engineer, California - RCE 34559
PROFESSIONAL BACKGROUND:
Mr. Dewan, President of DMS Consultants, Inc., has more than 30 years of
professional experience in the design of Public Works projects. Mr. Dewan is
responsible for performing and /or coordinating engineering design and other
related technical services including project management; preparation of plans,
specifications, estimates, design; and evaluation of major storm drain projects
and street improvement projects
CURRENT OR RECENTLY COMPLETED PRO.jECTS:
> Placentia Avenue Reconstruction - Fullerton
• W Covina Boulevard and Cataract Avenue Street Improvements - San Dimas
• Fire Station 48 Off -Site Improvements on Beverly Manor Road - Seal Beach
• Eastbluff Drive Street Rehabilitation Project - Newport Beach
• Seal Beach Boulevard and Lampson Avenue Median Improvement Project - Seal Beach
Y Drainage Improvements Gladstone Street. Cataract Avenue, Bonita Avenue - San Dimas
• Washington Street Cul- de-Sac Improvements - Diamond Bar
• Ocean Avenue Street Improvement Project - Seal Beach
• Sidewalk Improvement Project, Ellis Avenue, OT-961 - Fountain Valley
• Norwalk Boulevard Median Divider Improvements - Cerritos
• Marquardt Avenue 183'° to Artesia Boulevard Median Improvements - Cerritos
• Jamboree Road Rehabilitation, Ford to San Joaquin & Bristol to University - Newport Beach
• Grand Avenue Betterment/Improvement Project, Phase I. II & III - Diamond Bar
• 1W Street Improvements, Pioneer Boulevard to Bloomfield Avenue - Cerritos
• Jamboree Road Street Rehabilitation, Ford Road to Bison Ave. - Newport Beach
• Jamboree Road Street Rehabilitation, Bison Ave. to University Or - Newport Beach
• 30" Street West, Accelerated Road Construction Program - County of Los Angeles
• Holmes Avenue Et Al., Accelerated Road Construction Program - County of Los Angeles
• Arrow Highway Street Resurfacing and Restoration Project - San Dimas
• San Dimas Canyon Road, Landscaped Median and Street Restoration Project - San Dimas
• Gladstone Street, Landscaped Median and Street Restoration Project - San Dimas
Katella Avenue, State College Blvd. to 57 Freeway Improvements - Anaheim
> State College Boulevard, Orangewood Ave. to Katella Ave. Improvements - Anaheim
> 32nd Street/Newport Boulevard Rehabilitation - Newport Beach
> Ambushers and Meadowglen Street Improvements - Diamond Bar
> Brea Canyon Road and Brea Canyon Cut -Off Street Improvements - Diamond Bar
DMS
Designing landscapes that create community..
1111111VIIIII,
0
DESIGN WEST ENGINEERING, INC. RESUME
DESIGN WEST ENGINEERING
Resumes for Key Personnel
Education
BS Electrical Engineering
Cal Poly Pomona
Active Registrations
P.E. License NE19480
IESNA Board Member
Leo Maya Senior Electrical Engineer
With over a decade of electrical design and project management experience prior to joining Design
West in 2005, Leo Maya has worked on a wide array of projects including large commercial and
industrial buildings, health care and institutional facilities, sports field lighting street and area
lighting, golf course electrical systems, custom residences, and various dry utility designs. In
2009, Mr. Maya took over the responsibility of running the electrical production. Apart from
standard electrical and lighting design, he oversees the electrical BIM design team; solar
photovoltaic design; specialized analyses including arc flash, coordination studies and load flow
evaluation; all low voltage applications including fire alarm, security, data and signal, and A/V
systems. His continuing education in the field of the electrical engineering and lighting design,
along with his membership and board position for the IESNA (Illuminating Engineers Society of
North America) keep him up to date with the latest lighting and energy efficient technologies.
Beyond his technical prowess, it is Mr. Maya's dedication to maintaining long -term client
relationships and his diverse background that have made him such a valuable asset to the Design
West team. This dedication to customer service is evident in the work ethic and the character
displayed by his whole team.
Roy Morales Project Manager & Senlor Electrical Designer
Roy as both project manager and senior electrical designer is in charge in developing the
preliminary one line diagram for utilities submittal, review the 100% DD for compliance with NEC
and local code. Roy joined the Design West team after working several years with Dream
Engineering when the company was bought out in 2009. Roy brought with him expertise and
relationships with many of the local Parks and Recreation agencies after providing years of
reliable design and service to this clientele. His experience includes design for buildings, sports
field lighting, street and median lighting, electrical distribution, communications distribution
(copper & fiber optic), commercial buildings, industrial buildings, large residential units and energy
conservation projects.
Small Business Certification
Design West Engineering is a certified Small Business Enterprise (SBE) with the state Department of General Services,
reference number 47289.
A
kit,/.
Designing landscapes that create community _.
Cl
Aroma Park, City of West Covine
REFERENCES
Mr. Shahan Begoumian
Park Development Manager
City of Glendale
613 East Broadway, Suite 120
Glendale, CA 91206
(818) 548 -3796
Sbegoumian@ci.glendale.ca.us
Mr. Michael Estes
Director of Community Services
City of Lawndale
14717 Burin Avenue
Lawndale, CA 90260
(310) 973 -3272
MEstes@lawndalecity.org
Mr. Sean Crumby
City Engineer
City of Long Beach
333 W. Ocean Blvd
Long Beach, CA 90802
(562) 570 -6383
Sean.Crumby @longbeach.gov
Ms. Pamela Galera
Senior Project Planner
City of Anaheim
200 S. Anaheim Blvd
Anaheim, CA 92805
(714)765 -5066
pgalera @anaheim.net
Mr. Khoon Tan
Project Engineer
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
(949) 443 -6353
KTan@sanjuancapistrano.org
•
Bruce Harry
Director of Public Works
City of Rancho Mirage
69 -825 Highway 111
Rancho Mirage, CA 92270
(760) 770 -3224
bruceh@ci.rancho-mirage.ca.us
Mr. Bob Rose
Parks and Recreation Director
City of Diamond Bar
21825 Copley Or
Diamond Bar, CA 91765
(760) 346 -0611
brose @diamondbarca.gov
Mr. Bart Mejia
Public Works Sr. Engineer
77 Fair Drive
P.O. Box 1200
Costa Mesa, CA 92628 -1200
(714) 754 -5291
Baltazar.Mejia@costamesaca.gov
Mr. Paul Adams
Director of Parks and Recreation
City of South Gate
4900 Southern Avenue
South Gate, CA 90280
(323) 563 -5478
padams @sogate.org
Mr. Kirk Streets
Senior Project Manager
City of Irvine
6467 Oak Canyon
Irvine, CA 92618
(714) 724 -7554
KStreets@ci.irvine.ca.us
D®E1111
besi.ning .............. that ..eate......... nit.....................................__........._.................. ............................... - �r.�.•
Designing landscape that create community ..
0 •
DAVID VOLZ DESIGN HOURLY RATE SCHEDULE
Effective Date 2015
Cae ays Perk, City oI Newport Beach
PRINCIPAL IN CHARGE $220 /hour
DIRECTOR OF DESIGN $193 /hour
LICENSED PROFESSIONALS $155 /hour
PROJECT MANAGERS $135 /hour
PROJECT DESIGNERS $121 /hour
ADMINISTRATORS $110 /hour
David Volz Design hourly rates are inclusive
of direct costs such as vehicle usage and
mileage, equipment usage (including
computers). Printing, copying, and sub -
consultant expenses will be billed at cost
plus fifteen percent. Printing prepared in-
house will be provided at market rates plus
mark -up.
.. ............................... _.. _
Novi)
Designing landscape that create com ... munity . .. .......
C�
CONFLICT OF INTEREST
Admiral Kidd Park, city of Long Beach
........................................ ...............................
Designing landscape that create community..,
David Volz Design Landscape Architects, Inc.
does not have any conflict of interests with the
City of Seal Beach or with any of its officers or
employees. DVD is focused on providing public
agency consultanting services, we do not provide
services to developers If you have any concerns,
please feel free to contact David Volz to discuss
any issues with him directly.
�-N
C�
CERTIFICATIONS
C
A� tie CERTIFICATE OF LIABILITY INSURANCE
DATE(MMMOI»VY)
3/11/2015
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: H the certificate hostler is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate do" not confer rights to the
certificate hostler in lieu of such ondomement(s).
PRODUCER
Cornerstone Specialty Insurance Services, Inc.
14252 Culver Drive, A299
Irvine CA 92604
MaCT Aimee La Russ
PXO . (714) 731 -7700 FAX (730)] 31 -7]50
�DDDD E6 a;aimee @cornerstomspecialty.com
INSURIERPU APPOROrq COVERME
NAICS
INSURERA:RLI Insurance Company
13056
INSURED
DAVID VOLE DESIGN LANDSCAPE ARCHITECTURE, INC.
151 Ealalns Drive, Ste. N -B
Costa Name CA 92626
I"URERBLib0rtY Insurance UnderMritere
19917
INSURER C:
COYMFACMLOENERALW1B
INSURER O:
INSURER E:
1 INSURER F:
EACH OCCURRENCE
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAMS.
INR
TYPE OF INSURANCE
TO VERIFY COVERAGE IN FORCE
POLICY NUMBER
FOmY EFF
POLICY EXP
LIMTa
E
COYMFACMLOENERALW1B
EACH OCCURRENCE
$ 1,000,000
A
CLryIMSMADE ® OCCUR
PREMISES . inssomossol
E 1,000,000
X
Men EXP(MY en Psi
S 10,000
ADDT'L INSURED /PRIa91RY
PSB0001408
3/14/2015
3/14/2016
BZZHCZ INVR OF suim
PERSONALa AOVINJURY
a INCLUDED
X
P6R POEM IPPB3040610
GENERAL AGGREGATE
a 2,000,000
GENTAGGREGATEUMMAPPLE:SPER:
AS RCDUIRED BY WRITTEN
POLICV� �T FLOC
CONTRACT
PRODUCTS - COMPAOP AGG
a 2,000,000
a
OTHER'.
CONTPACTOAI. LIAR INCLD
AUTOMOBILE
LIABILnY
COBINED mmi SINGLE
TA
i 1,000,000
BODILY INJURY For session)
a
A
ANY AUTO
ALL OMED SCHEDULED
AUTOS AUTOS
PS1110001408
3/14/2015
3/14/2016
BODILY IWURY(Per Riskiest)
a
PROPERTY DAMAGE
ra M
a
X
NOR-0aNED
HRED AUTOB X AUTOS
a
UMBRELLA UAB
OCCUR
EACH OCCURRENCE
a
AGGREGATE
6
EXCESSLIAB
LIAIMBWDE
DEG
I RETENTION
a
WORKERS COMPER IVATION
AND EMPLOYERS' LIABILITY YIN
ANY PRDPRIETORPARTNEWEXECUOVE
X NTE R
EI. EACH ACCIDENT
a 1,000 000
•
OFFICERAIEMBER EXCLUDED?
(Manfeory,n NH)
MIA
PM0001346
3/14/2015
3/14/2016
EL DISEASE- EA EMPL0
a 1,000,000
n es aesceteinfer
DESCRIPTION OF OPERATIONS tabs
EL. DNEASE - POLICY LAIR
a 11000,000
•
PROFESSIONAL LIABILITY
ABA100668 -0003 3/14/2015 3/14/2016 EACH CMM $2,000,000
Claims Made
I ANNUAL AGGREGATE $2,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD tai, A66Rbne1 Roomms SCM6YIe. may M artachb I mom space Is nqunef)
Evidence of coverage in force. Contractual insurance requirements Mill be addressed at the time the
contract is awarded.
CERTIFICATE HOLDER CANCELLATION
01988- 2014ACORD CORPORATION. All rights reserved.
ACORD 25 (2014101) The ACORD name and logo are registered marks of ACORD
INS025 ,,mw,,
1P\T1P
Designing landscapes that create community . - ������.............. .......
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
FOR PROPOSAL PURPOSES ONLY
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
PLEASE CONTACT CORNERSTONE SPECIALTY
ACCORDANCE WITH THE POLICY PROVISIONS.
TO VERIFY COVERAGE IN FORCE
AUTHORIZED REPRESENTATNE
Aimee La Rue /AIMEEL
01988- 2014ACORD CORPORATION. All rights reserved.
ACORD 25 (2014101) The ACORD name and logo are registered marks of ACORD
INS025 ,,mw,,
1P\T1P
Designing landscapes that create community . - ������.............. .......
0 0
DAVID VOLZ DESIGN SBE CERTIFICATION
California Certification Report - p. i - Generated on Mar 9, 2015
California Certification
J'J J
JJJ
J J
'JJJ
GBCI
GREEN BUILDING CERTIFICATION INSTITUTE
-i ERERY CF?.TIFIFi THAT
David Volz
HAS .VCHIEI -D THE_,.a. I A-....iI 1)j
LEED® ACCREDITED PROFESSIONAL
yY DEMONSTRATIIG THE dNOWLEDGL OF G4Gtp BUILDING PRACTICE
REQUIRED FOR S'UCCESSrIIL IMPLEMENTATION OF THE LEADERSHIP IN ENERGY
AND ENVIROSMENTAL DESIGA ILEED'1 GREEN RU�IL /DIN /f) RATINC SYSTEMn+
Harch 28, 2008
U�^ ^+^ }+i[lu�e,l i Rulu�l n +:nau 4Mnk +r nl �ii
............. s-cap ...'hat 're'at......... ..................................................................... ............................... -„r�-
Designing landscapes that create community'.. .
Legal Business Name DAVID VOLZ DESIGN LANDSCAPE ARCHITECTS INC
Doing Business As DAVID VOLZ DESIGN LANDSCAPE ARCHITECTS INC
Address 151 KALMUS DR M-8 Phone (714) 641 -1300
COSTA MESA, CA 92626 FAX (714) 641 -1323
Email dvolz @dvotzdesign.com
Web Page http: //www.dvolzdesign.com
Active Certifications SB (micro) Feb 24, 2015 - Feb 28, 2017
Business Types Service;
classifications [701317] Land and soil management
1771016] Environmental planning
[811015) Civil engineering
Keywords PARK DESIGN NEIGHBORHOOD COMMUNITY PARK SPORT SCHOOL FIELDS CAMPUS PLANNING
TRAIL NATURE FACILITY MASTER PLANS FEASIBILITY STUDIES URBAN OPEN SPACE STREETSCAPE
DEVELOPMENT MITIGATION RESTORATION SUSTAINABLE LANDSCAPE ARCHITECT PLANTING
DESIGN
DAVID VOLZ DESIGN LEED CERTIFICATION
J'J J
JJJ
J J
'JJJ
GBCI
GREEN BUILDING CERTIFICATION INSTITUTE
-i ERERY CF?.TIFIFi THAT
David Volz
HAS .VCHIEI -D THE_,.a. I A-....iI 1)j
LEED® ACCREDITED PROFESSIONAL
yY DEMONSTRATIIG THE dNOWLEDGL OF G4Gtp BUILDING PRACTICE
REQUIRED FOR S'UCCESSrIIL IMPLEMENTATION OF THE LEADERSHIP IN ENERGY
AND ENVIROSMENTAL DESIGA ILEED'1 GREEN RU�IL /DIN /f) RATINC SYSTEMn+
Harch 28, 2008
U�^ ^+^ }+i[lu�e,l i Rulu�l n +:nau 4Mnk +r nl �ii
............. s-cap ...'hat 're'at......... ..................................................................... ............................... -„r�-
Designing landscapes that create community'.. .
0 0
DAVID VOLZ DESIGN QSD/P CERTIFICATION
E
Q U
cn� v E
`- o
Z / Z v
= W N v
W
W > N e d o
~
°
=
Q G p > ti
v Z r
W C. < to c
� o
F C. ctQ z O a s CA
Vo
v o
LL
2
0
W ` w Q
V v ft LU
J LL
_.... at'c ....................................._..... .............................., ..........................
Designing landscapes that create community...
0
u
LETTERS OF RECOMMENDATION
.W,aMfaunv hat. C1raN1 wrier V wesedlleaui
Decemb.,6,2010
To whom It May Comm.
The 01, of Bell larder mmml,emocd David Volr Desq. to provide seMCes for our award
sting "I G.H.Sports Center. Thieflrro provided Bell Gardens with manse as well as
professional tleslpr aervi[ei en thl5lmpmtant [ivk propR (pv Spor6 Center Fas re[eivetl
chimps.. (36) awards from venous pmfoono d societies and has become a &am success within
our community.
I would highly recommend David Volt Design to any nemy that is in need of part planning or
public landscape lmprovemem. for Podher assidaaearmfmmatlon .yleamrentanmeat
156216015-]6W Monday through Friday, 8:00om- 500pm.
Sid sly,
/[�(L�flt[C tiiZJC
PamNa L wassemmn
Director of geconlem & Community Services
CC. John Oropen, Public Works Diva.,
"Our Sports Center has received 36 awards from
various professional societies and has become
a great success within our community. I would
highly recommend DVD to any agency that is
in need of park planning or public landscape
improvement."
- Pamela Wasserman, Director of Recreation &
Community Services, City of Bell Gardens
"These [DVD's] services
have included community
based design processes,
public outreach meetings,
presentations to
commissions and council
and creative solutions that
have addressed many
community needs.... I
sincerely recommend DVD to
any agency .. "
-Mike Estes, Community
Services Manager
City of Lawndale
........................... ...............................
Designing landscape that create community ...
"DVD has ... led design
workshops and solicited input
from local youth and community
groups and presented the
conceptual design to our ...
officials. Their creative design
work and interactive approach to
� the design process has received
A deaCity high praise from the community."
-Greg Johnson, Community Services
Director, City of Westminster
To Prospective partners for architectural design services,
David Vdz Design has provided park design, community outreach and construction documents
b this Cdy of Westminster for th,e City s new spray park at Sgkr Park, one of the oldest
municipal parks in orange County. CA. The landscape arcisilecturef services included the
design concept plans and final comVUCtion. David Vdz Desgn has. through tlIe course of Uns
work. led design workshops and sdicited input from local youth and community groups and
presented the conceptual designs to our appointed and shocked! officials. Their cas a0ve design
work and interactive approach W dm design process has received high praise born the
community. The firm always conducts themselves in a professional manner and grey are
extremely attentive and easy to work Wait .
I would highly recommend David Volt Design to any Ghent m agency for park and landscape
design. I can be reached m my ofice m provide specific tlerails of th r services w the cmy mW
to confirm my recommendation in suppon of Davit Vat Desgn
Grog 14—
thr nrtY. +'ervicer Diremor
8. Westminster Blvd.
weelniese r. Ch 92583
('+14)895-2860 Eat. 3673
0 um w.tr K +6 . QMw nrgaM.asse 0 dook
vv �.i
November 18, 2010
gig: Roromty for AonfoSUpponofkeral omi Desi®r'sProposalmLOa
angehf County far As- Needed Profealoeal5nrvlas
To whom It may concern,
The City of hawmdals has commissioned David Volt Dedlin to provide seMms on
several pork dosign projects. These services have mduded community based daegn
proem. public outreach meetings. p.esentatl ms m commleekms and c ... of antl
.,fee solutions that Rave addressed many community needs. Our recently
completed Hopper park Is an outstanding DVD designed park The pack has
I eceived accolades from the community and design awards from CM. In addition.
DVD Is currontly working on the Citys Hagan Park expansion /rmmvation project. as
well we the design of. spray pad water feature and Is. Atldams park. I have always
Mown DVD be W professional in then debts enoraod p[edm utdolitrwmk
Should additional information be requii ed. please do not neslhn to contact me at
(310) 973 -3272, or via email at ORS1CSPla ndzle� ry v. I dnmrely recommend
Datld Vol. Design to any agency looking her .tivenanit professional landscape
arddcectanl services.
Raspeofdlymbmifted.
Mice Fetm
Community Service hLmger
City of l.ewnddo
(310)9733272
Bored noeaogialanswi etyvm
1111rID
LETTERS OF RECOMMENDATION
QCITY OF LONG BEACH
DEPM1MENi Of PARnS, PECREAiION G MARINE
'fJMN. pup0a4, Wqd, Lqp ga. CA 599151 W]
(36Q) 5N310O - FAX hall SM31M
eamakemens ad
Novemrer P. 2010
To WMm II W, Concern,
RE: RecomresnMllm in SMPl ali W Darld Volta Dead,
Davitl Vole Desgn Into Minded high quality design and mnaultdg servlw 0 the City of Long
Beam for owr reelw years under an 'as needed/on call' seta" May have govde d perk
dwembpedpounstruclbn document¢ and provrdM mnellruuclmn lad ,roes onadromem of
large end ..a perk Wopda.
Two mMrle propde aneolly undemay inclWa a hgh lava of design and a eem d sub
cons ftem' under Davit Volz Designs' antad. Mminel Kind Park 'M a large rewnalruclbn
and multi sue park eaparubn prop 1. Thp park c mate mmylale and wiA be a ywl ddtllWn
to Me clay's perk hmmbry. Daka/Chewz Pal aia be a 50 -acre liner front a^r^ody park.
Devil Volz Do.gn AM Ill team of proles .l sub mnaullenh haw overseen a pslk
ou ni pewsahr ft qt's masbrplan defies ormnl.
T1,* firm has aMys hovdeC Ere Cly of long aeash iiAn hgh quany professorial sane- for
Iheee Missile, and marry others. The itmi s prbosed. pdvrd Vole, es alleys a ha b arty staff
W an arms donations and attend me etkngs. Ha and his slaii are wry respmeyre and .is
diligently b neat wry fight sstddime wlan necessary
I highly mmnrnwd Davd Volz Design to your main, for hndsmpa architectural sarvaas. d
you Mw any tasters regarding Ihh Mlle,, Plwae do not Wisdom b anted cue al
(562) 57431M
sbcerely.
AnnelAa,dfpla
Park Dmabpmm Offiker
Planning and Da.MINn1a1E Bmaau
"DVD has provided high quality design and
consulting services to the City of Long Beach
for over twelve years ... they have provided park
planning, leadership at public outreach meetings,
creative park design, developed construction
documents and provided construction period
services on dozens of large and small park
projects."
-Anna Mendiola, Park Development Officer
City of Long Beach
"Our experience with the
firm was a fine example of
their creative and innovative
talents.... their professional
and collaborative approach
to the process made their
team a joy to work with.
-Rudy Acosta, Redevelopment
Director
City of Desert Hot Springs
C�
DecemM, 2. 2010
City of Anaheim
COMMUNITY SERVICES DEPARTMENT
Pals Diviaon
Nnannla tik Wi11
RE: RaeoemwCaY,a I. Sapper. of Owned VoR pinta
D. dl' Vole 6aar tars arendM high uaa1M deacon and urinal zrvima maw Cie, of
mI ®mre,I r ry nrouderad es. i,nmMreo"a .ark Nunun n arol do ..e. akMalUnaht,as
ers meedgV p and, e - doo.n¢ idee Wwa
m
derear a nit P ark pex. i nclwnp aw Clol"I warmanS
Geo,a % .se" rans .
One W. 4uMnn pojencumnJY b hti ®uNe rmoaed- edhe Olurn S,a6ue
Field. Tlue oorao ugn ofa mnnebdvfooLLWl mtiw field ophdn a high Inel ofdnto
and a ripe o:.,rnpmn laden Devil Voh Douala' resume. EMV Umplared, oV, veo
efuld.peyss nmiwuc earl' fkW aia he. boon "mum m her Cal parkimrMOry.
Thrum aaahwp poaided We Ciry ofendein aim kcal gu.iuy prat Anna: rervue I
IhigNY ma' Jaa+en'ioe+ef0.vid VOiz pes®rm YOra aSeaeY.l roe he rochelnme
(]IQ ]65d Ida, ahprW wy tuMCa b.pkpormd "(seem he aagmmd m wyyon m.
memmmlpoe-
I
Simard
I //
„raw°„ ` � •ASL"
"David Volz Design
' Cowerd> 5trhm Depnsnem l Ciy, araeWe® has provided high
[endaap•Nehien a3pe9
R93SwMMWeim BwMV"d 1 SuiaglJ
quality design and
Nwh<im, CA 92gM
Oflda(ll",T63I541
consulting services
I E.rusil "
... innovative park
E mss
a
planning and design,
m
leadership at public
outreach meetings..."
- Pamela Galera, LEED
AP, ASLA
City of Anaheim
City of Desert Hot Springs
65 -950 Pierson 61W - Deseri Hw Syringe • CA • 91210
(760)719."11
xmsv.ciNOfd/u.osg
RE: RECOMMENDATION IN SUPPORT OF DAVID VOU DESIGN
To Whorl II May CwKem:
Th6 yea, and City M Dfead Hot Seaga mmmosonred the landscape Magri fmm of Date VO4 Deem
W pmNae sarvkae for our heauldul Ooaar p. Rauta o Lion Pmpd. TM lam pronded me City wan
design Mae spread. mnevwlm Mmmen1 pepaaMn and constnrchou admivaraagn serw06 for the
P,njal. QY ..Perrone .rile 1. lam w a fine a are. on than OEaave and Innovat labnN.
AddiWMy, their prolessdna and c'ufla xonAse approach 1g the pis them 6euV Wiseni to pap"
dy.t) made men enure team a I, to aOIX with
I awd hol rmummod DA rd Very Design Il any pu the moossope improvemem palm( Trier
tlemmeband pofeaarone am ad ardenWdrnp d the parks iglooere ww greasy app «aIM old
roofed m a ewcaealul and very awai,we andm ape pmpd for Use City d Cannot Hot Springs
It you anions any atlduronar mfn'mamn regarding our exaderea aim Dead vole Deegn, I mry W
consisted at 1750) 329 -BC11, Ex1 =5
sincerely,
Rue, ACme, Rods"Nopmem Gaecry
Gty d Dina Ifm Splgs
BS thaean Boulevard
Desent sat HOl3paga, CA. 92243
bes'i ..................... that re-a-t------mun,..._......._........_._........._.................. .............._---............. _..............
Designing landscape that create community ...
1481 3�e63 ra
un aan nncnp�lavu, nc
Nova 23,2010
I whoa it any wroann
LETTERS OF RECOMMENDATION
I
l
The City of San Juan Capisuwo uianod David Volz Design to design and propose the
conswctim dnwin, and provide conswnion pond services for Los Rios Perk.
Damg the pork's woosu ction. David Volz Design mviewcd. recorded and unwed
RFI's and subndwis in a timely annotator. They own lheaulves available to mown
queniom and asdm in uulving any ,waffi. than may have ants. during cortmuctiw.
David Volz Design's w y ai¢ visits and pancral cmnmutim oversight played an
imporans role to maintain Ins Rios Pad's unique historic cheri nor Milano, impacting
Ne watmcrion schedule or aacnfiwas she aaomled design appeaarce.
David Volz Design has delwated sesstices in a p.[.sa oal it timely malmer msd 1 am
wnfdwt they will perfom "ell in y v upcoming p icn a. Should you have question,
plaax feel fue in woaa me at r%9) 44)4]51
Sioceuly.
Khoo. Tan, PE.
Avaciaa PnW.l Pmiont Manager
CitynrSw lum
/
t Pub K orks Down'
of Son Juan Ca wan so
"This firm has provided Stanton with
creative and professional design
services on several municipal
projects. The Dotson Park Project
and our new Veteran's Memorial
Park are two of the award winning
projects DVD has designed for the
City of Stanton."
-James Box, Assistant City Manager
City of Stanton
Designing landscape that create community ..
"DVD's ... construction oversight played an
important role to maintain Los Rios Park's
unique historic character without impacting
the construction schedule or sacrificing the
intended design appearance."
-Khoon Tan, Project Engineer
City of San Juan Capistrano
November 16, 2010
To Whom It May Concern;
The City of Stanton has a long standing relationship with David Volz Design. This firm
has provided Stanton with creative and professional design services on several
municipal projects. The Dotson Park Project and our new Veteran's Memorial Park are
two of the award winning projects DVD has designed for the City of Stanton
I highly recommend David Volz Design to any agency, (or park planning or any public
landscape improvement projects. For additional Information and comments In support
of this firm please contact my office at 714 -690 -0277.
Respectfully,
- -4�
es A. Box
�
Assistant City Manager
City of Stanton
0
11
LETTERS OF RECOMMENDATION
Wvemter2+, 2010
RE. Reemnse nitkn In Support d Oavid Von Design
Deer u corny
Tie CM of Sea' BasU cWnmdalwed Devi! Vold Dann to gorses arvis for nun
aaam IMnNnp Seal Beall Baas and ertl411cmiam prelim. The fine has Pwkod Sesl
Beat ant, .0 devakpmeM, cannon aNeach all wnaou BOn dwvmenl
aelaarswn sank bveveral Yese IhaveseraaeelywoMdaahae Amenseveml
additional venovative Iandacaa, erk perk emgovemenl patios Dn %d Vela Deign
has a wideel We dingresdea, ars, Asia se nosed Won advaleaes seN milth,
deltrmrables I wowed necpmmad Dared Vale Naito For ark Naaanp a pubbe
landscape improvameat
omis lee, nee to call a you souk Ida to diems has law any further
smaree,. "The firm has provided
Seal Beach with concept
Cooney Pe development, community
Deeds of nabec Waha
may orseal Sion outreach and construction
211 Eenth. CA document preparation
seal txecn, cn eoT +D P P
%24312527 en 1318 services... DVD has
provided creative design/
ideas, and met the agreed
upon schedule with quality
deliverables:'
-Sean Crumby, P.E., Director of
Public Works, City of Seal Beach
CITY OF RANCIJO MIRAGE
Dcucmba6. 2010
To Whonn It May Concen:
RE: Recommendation In Sappois of David Vote Design's
David Vulz Design has been on the city's preselemed wmmlont list for mere Iban ten yeas
They have provided services on dozens of landacepe artldmamal p,cjeeta with de, City of
Rarule Mirage. The landscape erchilecanal services have included the design of new snd
refurbished street radians, ..,I pIt. for Asajor artaid highways and the design of public
la::dscam and pekwitys. One rams major p,,act was a new sustainable landscape for dry
hall Weir oreenve deip work has received aw&Ns farm pholm.nal orgnimio® and high
praise fines the co.it, David Volz Design has, Ilwugh the wuree of their work fnr W,
lad design wirkshopa anal phisanal Nei, designs to comrntinny groups and before ow
appointed ark eland officials. The fun always conducts themselves in a pcfasioai manna
and they are easy to work wiN-
1 would highly recommend David Vole Design many client a agency for Public Park and
landscape design services . 1 ran be reached at the city m povide specific details ofthur aavices
eel m confirm my rewmmeadatrW in support efDevid Volz Design.
Sincerely,
�
and a. Hury
Director of Public Wwla
Ctry of Rancho Mirage
c: David Vote Deign
I o. "on" " "'eara noo Riverside Unified School District
Operations Division — Planning and Development
)nth waMOry. Scott aferriJV'.C+ o25WJNl ya! II laLL'pe• teft n T RIs
Ka Mueller
Umtw. Maaeerw mu flpwo� new
Deconiba 2, 2010
To Whan It May Concern
RE: Remvnmendation in Sopron of David Volz Daiym
The Riverside U.,fied School Distract has a kmg standing relationship nship with David Volz Design.
This hum has ptovidal the District with creative and professional design services on several of
our campuses over the at four gars. Recently David Vote Design provided consnucunn
documents fnr ampus impovemenl pojeces at King. Nonh std Ramona High Schwls. The
we& includes besebdl fields. softball fields. fxithall stadium fields and an all weather ruining
track. Through this work they have presented prtUw designs to staff, sclmol wmminees and
before au elected schwa bond. Thev have always provided high quality professional services m
the District. Their work and that of their sub- wninthante ha met oar cnmrsct requirements for
project schedules and construction budgets.
I would highly recommend David Volz Design in any potential client. for landscape architecture
any public landscape improvement pmjecu. 1 can be reached al the Disoiel for further
comments in suppon orthis fl.
Thank You,
i4 61__�
Ken Mueller
Director, Ment anance & Operaurms.
"DVD has been on the city's
preselected consultant list for
more than ten years.... DVD has,
through the course of their work
for us, lead design workshops
and presented their designs to
community groups and before our
appointed and elected officials....
always conducts themselves in a
profession manner and they are
easy to work with."
-Bruce Harry, Director of Public
Works
City of Rancho Mirage
"The firm has provided the District with
creative and professional design services on
several of our campuses over the past four
years.... They have always provided high
quality professional services to the District.
Their work and that of their sub - consultants
has met our contract requirements for project
schedules and construction budgets."
-Ken Mueller, Director, Riverside
Unified School District
City of Riverside
_ ......... _............ .
DVD
Designin..g . landscape . that create community.
0 0
LETTERS OF RECOMMENDATION
"I Pasadena Unified School District
SL District Service Center
'= Facilities Department
z
Nomealss ,2010
To SVhdehMey'Catm:
RE: lath of Reammadatist be suppon of David Vela Desip
TM Pased.lJm6d School District began a,et mansm, with David V.I. Ded, w Demean of
usammbe DVD 6m hDVDdestined idd the Dasuid wddsat pas, Highssasi® John M�pm
impmvewat pplead DVD late stby Sep September v Peadea High Sn, staid and Saba Mar High
school, with idplmatada msopleW by septsmbe with imp. They have alw pmall by d ®gs
service fore softball me n Pasedme High sdeol, with ®plematjia compielM by Minch
2010 aid other geed cmpm improvement pmjea+s.
I would highly mo m i ad W an,' ageory, for leodscape vcinxhue or any public landampc
unpov ®a4 David Volt Dsvi Z 1 ca be r®chM a 626.396.5850 z 89189 for fPther coamats
in ss,PW of thus firm
SS i d -c . tip," Y , . �Q
gnhyam e "The DVD firm has provided the
Owoe Raimeadedve District with professional design
services on several campus
improvement projects.... I would
highly recommend to any agency,
for landscape architecture or any
public landscape improvement,
DVD:'
- Shirly Barrett, Owner Representative,
Pasadena Unified School District
City of Pasadena
"DVD's work and dedication to the
development and construction teams
was a major factor in the project's
tremendous success. DVD consistently
provided superior knowledge of
design and constructability experience
for these landscape rehabilitation
projects."
-Kirk Streets, Sr. Project Manager
City of Irvine
.................................. ...............................
Designing landscape that create community ...
ate'
I... new
d.ratvwnsa
'M.UI9fOaO1l PSNM
d/ekra
Daenba 21.2010
To Wham It May Contra
Re'. David Vdz Despl
II has been my pbaaae to work with the firm of David Vdz Design. (DVD) for over 6w
yean. During that time We CM of Glendale has cmtra,kedl with DVD for mi adw.es
on several nmyoram park development projects. The recently mmpkled, award waning
Cerritos Park, with a fees City entry monument t an extremely affective addition to he
City. aahedy gateway DVD and their team d consultants have provided leadership for
community whenot. have designed creative and fun play spaces and have Prepared
high gwMy corttmcoon documenti, .
to my poamo, as fie Sr Pmiect Manager with the City of Glendale. Community Services
and Pads Depa"milem I have found David Vdz to Possess advanced knwvbdgs, of all
1M All. lovable m planning antl conabuctjrg perks and p WIk ape. WD and meif
shelf do an exaMm job in represenfig ha denser, mderstanding their made and
delivering the dewed minute They are a very creative firm end present idle design
solution. had won, will for Near client.
I feel David Votz Dwain will provide your agency wih excellent and highly creative design
apices and have no reservations in rxommandirg DVD g working wish ydi Who,
If I an provide any firmer information «details of Dank Vdz Design's qualJaabons,
rase do and heavers, M cum ad ms at (818) 6406a12l or (018) M4512, or
ebaMme®ci Obndak a bus
sincerely.
z�e
G.oge flatters,
Man
Sr . iPlan Manager
Perk Planning 8 Development
R pF set,4
Rovamcer23, 2010
"DVD and their team ...
have provided leadership
for community outreach,
have designed creative
and fun play spaces and
have prepared high quality
construction documents."
- George Balteria, Sr. Project
Manager
City of Glendale
subject David Var Deegn Weec +a Amnl4et. IIC.
To WMm It Me, Co.
It a my Brea peasum to moommend David Volz Design Iantleape A•chdem. Incorpoetd (DVD)
My senator, as Senior Proled Manager for"City oil. PeNe Won,s Department a owel ne ere
peaure 1. won, dowry worn DVD. under dived. of Dad Vat- PnhWM, on he CM.pen 6 Hkka
Canyon Rake Inipatic^ aril Lar a as Rehabilitation lareayelikn Mnpbted), WWII d Wens
IrveWNOmgaM1 Imgwi«i a i landscape Rehadlaaaon rwlapution amderMl. and! Heritage Park g
Rambo San Joegdir. Seri« Cale lineation and Landenapa Raebistrkn (.mmi n final degnl
gmftda over tM last COUpe yeas.
M Amlade,d Recoil .WDDelonwel landeam design management and conshumi sipartM
the pojeds. DvD's r Mad adacaAOn m me dwv oDmml a wnevucnion teams wa o "or
fepor in the Dmiscl'a aenretmirs sucusa. DVD wnsistmpy arovke'1 suanor knoekdW d deegn
and COMVYCt00J1ty .mean noes for these landsaa shamidatlon Pro,i
With DVD's apere. pre City was able to wombed the proem m a We manor wiviin budge, aid
to IM satisfaction d me CM and . resident.
OVID has Men and omen. to es vary prefdent wee aMnMn M aoM, poblen. van, WI
«pamd. exarienmd was her orgenmtlone and management abaiMs, vd exceptionally dear and
candy a+lh verbal and ann m wmmunaatloid
In wnesision I hgNy moomma d Devk Volt Design Landsoisoe aMad.. Ircaaread a you, as
Davk oar and ht aallwosdMa ware aawttarry rime «percy FeNheeto.mea
Igfel Tl4]561lfYa Ns, aHeatitla «seed ademaM Hrarmekon
Iv.
LV 4
same, P bjJW MasB e
per
0 0
............ ..... ................................................... ............................... J)a-lrjm
August 27, 2015 uanAsu+pcArohite aid PanePW--em
www.dvclzdesigr com
Dear Mr. Estevez,
We are looking forward to working with the City of Seal Beach. Our team of professionals has what it takes —
expertise, enthusiasm, and exceptional service —to plan, design, and see to the successful completion of
your project.
Thank you for your consideration in selecting our team as your consultant.
Very truly yours,
10"110 XFOL% DESIGN
A,---
David J. Volz, R.L.A. # 2375
LEED Accredited Professional, QSD /QSI
- i - - ... ... - -- - - -- - -- -- - - .................. Designing landscapes that create community —
Home Office
Luis Estevez
151 Kalmus Drive, Suite. M8
Costa Mesa, CA 92626
City of Seal Beach
phone 714.641.1300
Public Works Department
fax 714.6411323
2118th Street
Coachella valley Office
Seal Beach, CA 90740
78060 Calle Fstado
La Quinta CA 92253
phone. 760 S80 5165
fax: 760.564.0369
RE: PROPOSAL TO PROVIDE PROFESSIONAL LANDSCAPE ARCHITECTURAL DESIGN
SERIVCES
FOR EISENHOWER PARK PLAYGROUND & ADA IMPROVEMENTS PROJECT
Dear Mr. Estevez,
We are looking forward to working with the City of Seal Beach. Our team of professionals has what it takes —
expertise, enthusiasm, and exceptional service —to plan, design, and see to the successful completion of
your project.
Thank you for your consideration in selecting our team as your consultant.
Very truly yours,
10"110 XFOL% DESIGN
A,---
David J. Volz, R.L.A. # 2375
LEED Accredited Professional, QSD /QSI
- i - - ... ... - -- - - -- - -- -- - - .................. Designing landscapes that create community —
0
Phase I - Preliminary Design
1. Initialize Project
2. Preliminary Concept Plans
3. Commission Study Session
Civil Engineering (DMS)
Electrical Engineering (DWE)
Phase II - Design Survey
1. Base Map Preparation
Civil Engineering (DMS)
Electrical Engineering (DWE)
Phase III - Final Design
1. Plans & Specifications
Civil Engineering (DMS)
Electrical Engineering (DWE)
0
FEE PROPOSAL
PR $220 I $1A
193 I $135 I $121 $110 I Total I Fee
4 8 4 8 2 26 $ 4,152
2 4 2 2 10 $ 1,702
8 16 8 12 6 50 $ 8,040
allowance $ 1,840
allowance $ 1,162
2 2 4 8 $ 1,310
2 2 0 4 0 11 8 $ 1,310
allowance $ 5,750
allowance $ 2,323
Phase 11 Totall $ 9,383
8 24 16 24 4 76 $ 11,896
8 24 16 24 4 76 $ 11,896
allowance $ 5,750
allowance $ 6,969
Phase II Totall $ 24,615
Phase IV - Bidding and Construction
1. Bidding and Assistance
1 1 2
1 2 7
$
1,024
2. Construction Period Services
2 4 2
4 2 14
$
2,186
3 5 4
5 4 21
$
3,210
Civil Engineering (DMS)
allowance
$
2,875
Electrical Engineering (DWE)
allowance
$
1,162
Phase IV Totall
$
7,247
Reimbursables
Reimbursable expenses, printing, copying, postage, etc.
Estimate
$
1,000
TOTAL PROPOSED DESIGN FEE $
53,286
ALTERNATE SERVICES
Alternative Service - Custom play space design.
A nice catalogue piece of play
Esitmated
$
5,000
equipment is anticipated in the base fee. If a custom play piece or upgraded play
environment is wanted, an additional fee will be needed for additional design
services.
ASSUMPTIONS:
1. Further definition of the project could require changes to the proposed professional fees. David Volz Design
would be happy to discuss the services and fees proposed to ensure we meet Seal Beach's expectations.
2. Engineering and survey services will be provided if needed. Final scope and fee for engineering and survey to
be determined as project progress.
3. Reimbursables, subconsultant fees, printing, postage, delivery, etc. will be billed at cost plus 15%.
4. Time and materials items will be billed at DVD's current hourly rate schedule.
u-®
6. si........and' .............crea-t----_......................._....... ..... ...._......................._..._.... ..__._...._....................
Designing landscape that create community ..