HomeMy WebLinkAboutItem K - PowerPoint Presentation ARCAD I S design&Consultancy
fornaturaland
built assets
ARADIS 0 cealIC-geGCA =,
CITY OF SEAL BEACH
2015 URBAN WATER MANAGEMENT PLAN
Public Hearing
May 23rd, 2016
s .
t
Y . 1
-
� 4
CI -14'SeeigeaCA ARCADIS
Urban Water Management Plan
UWMP Act of 1983 applies to all CA water suppliers with:
3,000 or more service connections
Sells at least 3,000 acre-feet per year (AFY)
Plans must be filed with DWR every 5 years
July 1, 2016 current plan deadline
1
ARCADIS Designr natural aBConsuitancy nd
fo
built assets
,k-
c,fri-OA:SeACReczA FAARCADIS
Major Elements
Demonstrate water supply reliability over 25-year period
— Normal year
— Single-dry year
— Multiple-dry year
Detail shortage contingency planning for up 50%
reduction of service
Describe water demand management measures
Identify planned water supply projects including recycling
and desalination
�.=) C�q c e-P.4A FAARCADIS
DWR • Standardized tables
Standardized • Online Submittal Tool
Tables/Online Manually upload data
Submittal Tool all electronic
Standardized forms and tables
SBx7-7 h' Streamlined process for calculating and
reporting methodologies
erification Form. Metrics include gross water use,indirect
recycled water use
Si •nificant • GIS based tool
g DWR Population • Conjunction with SBx7-7 verification form
UWMP • Two methods:
T001 Manually draw agency's boundary
Changes - Import existing GIS boundary
Demand • Narrative focused,not quantitative
Management • Retail Agencies—simplified to six general
Measures requirements
AWWA Water Audit Software
Water Loss • Tracks water into system,consumption,and
Reporting losses
Evaluate quality and efficiency of operations
2
A RCA D I S 3esign&Consultancy
for natural and
built assets
,►k- Cte cOaigeaCg AARCADIS
SBx7-7 (20% x 2020)
Seal Beach's 20% x 2020 Base/Targets:
Base: 156 GPCD
2015: 149 GPCD (actual 110 GPCD)
2020: 142 GPCD
00 Regional Alliance 20% x 2020 Targets:
2015: 178 GPCD (actual 125 GPCD)
2020: 158 GPCD
`2'` -I o4Seafgec.. ARCADIS
Seal Beach's Demand Projections (AF)
'00%
90% 1,046 1,131 1,131 1132
80%
70%
60%
50%
2.442 2 62' 2,639 2,638 2.842
30%
20%
10%
0%
2020 _025 2030 2033
■Groundwater ■Imported
3
: / 1RCI l S for natural and
built assets
ti)r Cif04 SeaCReccA La ARCADIS
Seal Beach's Imported Water Supply
Municipal Water District of Orange County (MWDOC) Retail
Agency
Supply sufficient to meet demands from 2020 through 2040
under single-dry year and multiple-dry year conditions
Impacts to imported water supply reliability from Delta
pumping restrictions
Integrates Metropolitan's and MWDOC's shortage allocation
plan
Assumes short-term and long-term improvements in Bay-
Delta
,k.
Op-oc SeafgeccA1 ARCADIS
Supply Reliability
Basis of Water Year Data
Base Year Available Supplies if
Year Type (Fiscal Year Year Type Repeats(AF)
Ending) Volume Available %of Average Supply
Average Year 2015 3,774 100%
Single-Dry Year 2014 4,000 106%
Multiple-Dry Years 1st Year 2012 4,000 106%
Multiple-Dry Years 2nd Year 2013 4,000 106%
Multiple-Dry Years 3rd Year 2014 4,000 106%
4
/a RCA D I S 7esign&Consultancy
K for natural and
built assets
Cfri 04 corgerzg OARCADIS � ..
Normal Year Reliability
Demands based on projections for average year factoring
in growth and weather
Normal Year Supply and Demand Comparison (AF)
FYE 2020 2025 2030 2035 2040
Supply 3,488 3,744 3,770 3,769 3,774
Demand 3,488 3,744 3,770 3,769 3,774
C,-,F A A ARCADIS
Single-Dry Year Reliability
Demand Increase of 6% using FY 2013-14 demands as
the single dry year historical
Single Dry Year Supply and Demand Comparison (AF)
FYE 2020 2025 2030 2035 2040
Supply 3,697 3,969 3,995 3,995 4,000
Demand 3,697 3,969 3,995 3,995 4,000
5
P" ARCADIS for natural and ,
bunt assets •
a - Ci a4 ce‘firgeCCA OARCADIS
Multiple-Dry Year Reliability
Demand increase of 6% using FY 2011-12 through FY
2013-14 demands as the multiple dry years historical
Multiple Dry Years Suppl and Demand Com.arison AF
FYE 2020 2025 2030 2035 2040
First year Supply 3,697 3,969 3,996 3,995 4,000
Demand 3,697 3,969 3,996 3,995 4,000
Supply 3,697 3,969 3,996 3,995 4,000
Second year Demand 3,697 3,969 3,996 3,995 4,000
Third year
Supply 3,697 3,969 3,996 3,995 4,000
Demand 3,697 3,969 3,996 3,995 4,000
loc celk-geaCA AARCADIS
Local Supplies
Groundwater
Approximately 2,400 AFY through 4 wells in Orange County
Groundwater Basin
Pumping limitations set by Basin Pumping Percentage (BPP)
Recycled Water
No wastewater or recycled water treatment facilities. All
wastewater sent to Orange County Sanitation District(OCSD)
for treatment and disposal
Seal Beach indirectly benefits from Orange County Water
District (OCWD) Groundwater Replenishment System (GWRS)
provides indirect potable reuse(IPR) credit
6
AR A D I S for natural and
Omit assets
,k- Cfyf Seargeecg OARCaDIS
Local Supplies
Desalination
Desalination projects are identified, but not part of assumed supplies
over 25-year period
- In 2001, MWD developed Seawater Desalination Program (SDP)to
provide incentives for seawater desalination projects
In 2014, MWD modified Local Resources Program (LRP)to include
incentives for locally produced seawater desalination projects
C. -4'SeeLe—ger.cA CAARCADIS
Shortage/Contingency Planning
Incorporates Metropolitan's Water Surplus and Drought
Management Plan (WSDMP) /Water Supply Allocation
Plan (WSAP) and MWDOC's WSAP
Documents Seal Beach's participation in Water
Emergency Response Organization of Orange County
(WEROC)
Seal Beach's Water Conservation Plan — Ordinance no.
1586
7
/. .RCAD I S Designs Consultancy d
for natural an ,,
6uil[assets
S ARCaDIS
Summary
Based on planning assumptions, Seal Beach is projected
to have sufficient supplies under hydrologic scenarios
defined in the UWMP
— Supply shortage contingency planning for 50% reduction and supply
interruption
— Planned water supply projects including recycling
— Current and planned demand management measures
8