Loading...
HomeMy WebLinkAboutStudy Session PowerPoint 2017-21 5 Year CIP Revised6/13/2016 TOPIChS ■List of Accomplishments ■Projects in the Works ■Funding Sources 07 Divisions CIP's ■Unfunded List 6/13/2016 2015 -1.6 LIST OF . 5-Year Pier Structural Report $100,000 $94,000 Eisenhower Park Improvement Project $145,100 $144,000 Local* Street Resurfacing $475,000 $331,000 Annual Street Tree Planting Program $20,000 $20,000 Westminster Avenue Bike Path and Drainage Study $7.0,000 $38,000 El Nino Storm Preparation $452,000 $452,000 Smart Sewer Manhole Covers $20,000 $19,600 Court Rehabilitation $30,000 $21,000 Total $1,312,100 $1,120,000 T "St Alley Water /Sewer line Replacement Project Savings $192,100 PROJECTS IN TN WOR BG1402 & BG1407 Council Chambers and SBTV3 Remodel Projects Construction PR1602 Eisenhower Tot Lot Rehabilitation Project Construction SD1601 West End Pump Station Improvement Project Construction ST1408 Traffic Management Center Update - Construction EM1602. Pier Demolition Construction ST1510 PCH and Anderson Landscape Improvements Construction ST1601 Annual Slurry Seal Project Bidding ST3604 Annual Concrete Repair Project Bidding WT1607 T "St Alley Water /Sewer line Replacement Project Bidding 551301 .Sewer Master Plan Update Design WT1501 & 551401 Water /Sewer Rate Update Design - BP1002 Pier Remodel Design WT0904 Beverly Manor. Booster Station Improvements Project - 'Design ST1509 Westminster Ave. Median Improvements Design ST1610 Westminster Ave. Rehabilitation Design 6/13/2016 FUNDING SOUR'G �S ■Sources • Gas Tax -Sewer Capital: • Water Capital •Community Facility Districts • OCTA Measure M2` , -Traffic Impact Fees *General Fund -Seal Beach Cable Foundation -Tidelands • Grants 6/13/2016 6/13/2016 STRE4 -TS 2,C, 7 Seal Beach Comprehensive Parkin Plan $ 140,000 U tility Under grounding Project $ 10,000 Traffic Management Center Upgrade - $ 318,000 Old Town Parking and Si na a Improvements $ 100,000 Westminster Avenue Median Improvements $ 130,600 %nnual Slurry Seal Project (FY15 /16) $ 70,000 Local Street Resurfacing Program (FY15/16 ) $ 275,000 nnual Concrete Repair Program (FY15 /16 ) $ 25,000 %nnual Striping Program FY15/16) $ 25,000 %nnual Si na a Replacement Program $ 10,000 %nnual Street Tree Planting Program FY16 17 $ 20,000 Westminster Avenue Rehabilitation (WCL to SBB ) $ 1,000,000 estminster /17w St. Corridor Traffic Signal Synchronization $ 281,000 6/13/2016 11 WATER 2016- 7 = Beach and Pier Water Station Rehab. - Beverly Manor $ 5,200,000 Water System Rate Update $ 80,000 Navy Reservoir Chlorination System Upgrades $ 100,000 7th Street Alley Utility Rehabilitation $ 470,000 Water System Infrastructure Repairs $ 675,000 Westminster Ave. Water Main Replacement $ 2,800,000 05 Widening Water Line Reconfiguration $ 750,000 Lampson Avenue Water Main Replacement $ 1,300,000 Water Total $ 11,375,00 016 -1 CIP PROJECTS = Beach and Pier $ 47125,000 Buildings and Facilities $ 5,546,900 Parks $ 190,000 Storm Drain $ 125,000 Sewer System $ 340,000 Streets and Transportation $ 31054,600 Water System $ 11,375,000 2016 -17 TOTA $ 24,756,50 6/13/2016 6/13/2016 Beach and Pier � FACILIT'E�S) th and 10th Street City Parking Lot Rehabilitation $ 300,000 8th and 10th Street Utility Undergrounding and Lighting Improvements $ 200,000 Beach Parkin Lot $1,191,410 Total $1,691,410 U.N U�ID D LFST (BLDG � FACILIT'E�S) Buildings and Faciti0es Pier Entrance Improvements $ 100.000 Main Street - Streetsca a Improvements Street Furniture $ 150,000 McGau h Pool Facility $ 3,280,860 McGau h Pool Deck Rehabilitation $ 200,000 DA Upgrades to all City Buildings - $ 500,000 ommunity Center Improvements $ 1,500,000 Mary Wilson Library Roof Replacement $ 100,000 Beath Facility-Maintenance Building $ 601,370 Beach Facility-Restaurant Building $ 251,460 Beach Facilit -Story a Building $ 63,470 Ana Senior Center Im rovements - $ 3,739,670 North Seal Beach Community Center $ 1,096,150 Id City Hall Remodel $ 1,649,450 Total $ 13,232,430 UNFUNDED I�ST (PARKS) Parks $ 90,000,000 Total New Pedestrian lighting on Electric Ave Greenbelt $ 300,000 'itywide Park and Turf Renovation $ 1,000.000 peter Field Rehabilitation (including stands $ 100.000 peter Bleacher $ 526.020 peter Building(Daycare) $ 382.250 %rbor Park Field Restoration $ 50.000 Heather Park Restrooms $ 250,000 ity Entry .Monument Signs $ 100,000 eat Way Boardwalk Improvements Wall and sidewalk $ 200.000 PR1601 Annual Citywide Court Rehabilitation $ 90.000 Tennis Center Club House $ 820.050 Tennis Center Gate Site $ 302,500 Tennis Center Locker Shower Restrooms $ 1.510,630 Tennis Center Workout Room - $ 566,170 Marina Community Center Park $ 1,615,130 Total $ 7,812,750' UNFUNDED LIST (S70RM DRAIN) Storm Drain Storm Drain Master Plan Projects $ 90,000,000 Total $ 90,000,000 6/13/2016 F] U FUNDED LIST (STF2EyETS) Streets and Transportation Seal Beach Boulevard and Rossmoor Center Way Intersection Improvements $ 200,000 Westminster Avenue Storm Dmin Under grounding $ 31000,000 Traffic Signal Upgmdes $ 1,000,000 Traffic Si nis - Battery Backup Replacement $ 25,000 lam on Avenue Bicycle Lane Improvements - $ 11000,000 Gold Coast Stub Ends Improvements $ 300,000 CitrNide Concrete Rehabilitation $ 1,000,000 Citywide Street Paving Rehabilitation $ 18.000,000 Alley Pavement Rehabilitation $ 5,000,000 T16O3 Westminster Ave. Bicycle Path and Drainage Improvements $ 200.000 T15O8 Old Town Parking and Si na a Improvements $ 100,000 Total 1 $ 29,825,000 Sewer System S1601 Annual Manhole Rehabilitation Program $ 30,000 S1602 Sewer System Smart Manhole Covers $ 20,000 Total $ 50,000 6/13/2016 10 UNFUNDED LIST (W�4TER) Water System T1103 Lampson Water Well Connection Improvements $1,200,000 T1502 Anaheim Bay Water System Improvements $2,000,000 T1503 College Park West Water Rehabilitation $1,000,000 T1504 Citywide Water Meter Replacement Stud $ 50,000 T1606 Water Valve Replacement Program $ 150,000 T1701 Water System Infrastructure Repairs $1,200,000 Total 1$5,600,000 29,825,000 Sewer UNFUNDED LIST TO Beach and Pier $ 1,691,410 Buildings and Facilities $ 13,232,430 Parks $ 7,812,750 Storm Drain $ 90,000,000 Streets and Transportation $ 29,825,000 Sewer $ 50,000 Water $ 5,600,000 TOTAL $ 148,211,59 6/13/2016 11 QUESTION Y 6/13/2016 12