HomeMy WebLinkAboutItem M AGENDA STAFF REPORT DATE: June 27, 2016 TO: Honorable Mayor and City Council THRU: Jill Ingram, City Manager FROM: Jim Basham, Interim Director of Public Works SUBJECT: 2015/16 EL NINO STORM FINAL BUDGET AMENDMENT - EM1601 SUMMARY OF REQUEST: That the City Council adopt Resolution No. 6657 Approving Budget Amendment 16-12-01 to allocate $356,700 for the Project from General Fund Reserves (includes a transfer to Tidelands of $ 174,300). BACKGROUND/ANALYSIS: On December 14, 2015 the City Council authorized the City Manager to enter into construction contracts and professional service agreements in order to help protect the City from potential damage caused by the upcoming El Nino Winter. Some of the pre-emptive steps the City took included: • Larger Winter Sand Berm. The berm was built wider, longer and taller than in typical winters, almost double its original size. • Portable Pumps. The City set up portable pumps in some of the City's sump areas that are the most susceptible to flooding including Seal Beach Boulevard and Electric Avenue, Marina Drive and Corsair Way, 10th Street at the Boardwalk, and Ironwood Avenue and Elder Avenue. These pumps were designed to pump storm water from potential flooded areas into storm drain facilities quicker than gravity flow would normally allow. • Increased Staff Levels. Adequate staff in the event of large rain events and flooding. • Increased Sand Bags. Sand available for residents of Seal Beach. • On-Call Coastal Engineering. In case the City needed additional engineering support services, staff retained the services of Moffatt & Nichol. • Maintenance Activities. City contractors trimmed back palm trees and other street trees that could become dangerous in a large rain event. Agenda Item M Page 2 Additional maintenance gear was provided to maintenance staff, for help during flooding and for clean-up purposes. Every park and facility owned or managed by the City was inspected to make sure that it was in good condition, and maintenance in Gum Grove Park included adding 100 yards of decomposed granite to walking paths and clearing of brush that would obstruct surface drainage in the park. The typical "rainy season" and El Nino Winter season is now over. All of the rented pumps have been returned. The winter sand berm has been taken down. It is now the appropriate time to summarize the costs associated with all El Nino work intended for the protection of the City of Seal Beach and to request a budget amendment to cover all costs not previously budgeted for this work. ENVIRONMENTAL IMPACT: This is not a project within the California Environmental Quality Act. LEGAL ANALYSIS: The City Attorney has reviewed and approved as to form. FINANCIAL IMPACT: All charges related to El Nino winter storm preparation and action will be funded by the City's General Fund and Tidelands Account. Final expenses include: Description Vendor Amount Additional Berm Work Post Earthworks Constructors .......................................................................................................................................................................................................................................................................................................................................................................................... ................................................................ On-Call Coastal Moffatt & Nichol $0.00 Engineering Gum Grove Park Maint. Spectrum Care $33,750.00 ............................ ...... ..................................................................................................................... ........................................ .. ...... .. ....................... .. ...... ............. Tree Maintenance Great Scott Tree Service $4,500.00 .................. .. ............... ........... .. .. .. .. ...... .... .. ............ .. .. .............. .. ........... .. ...... .. ....... Pumps Godwin Pumps $257,035.23 ....... .. ... .. .. .. .. ... .. ... .. .. .. .. .. ..... .. ......... ....... Emergency Supplies Multiple Vendors $21,094.16 Total to date: $451,653.39 Page 3 On April 12, 2016 the City Council approved Budget Amendment 16-10-02 which allocated $45,000 for the Project from the Tidelands Account and $50,000 for the project from General Funds as follows: Description Account Revised/Adopted Proposed Budget (diff) Budget Budget Amendment Transfer Out 001-080-47000 $10,386,000 $10,436,000 $50,000 Transfer In 045-000-31500 $10,574,897 $10,669,897 $95,000 Contract Professional 045-333-44000 $10,574,897 $10,669,897 $95,000 Transfer Out 034-863-47000 $ 810,000 $ 855,000 $45,000 Additional funds are required to cover the final costs of the project. All additional costs will be funded by the City's General Fund and the Tidelands Account. The Budget Amendments required are as follows: Budget Amendment 16-12-01 allocates $356,700 for the Project from General Fund Reserves (includes a transfer to Tidelands of $ 174,300). Description Account Revised/Adopted Proposed Budget (diff) Budget Budget Amendment Transfer Out 001-080-47000 $10,601,800 $10,958,500 $ 356,700 Transfer In 045-000-31500 $10,815,697 $11,172,397 $ 356,700 Contract Professional 045-333-44000 $10,815,697 $11,172,397 $ 356,700 Transfer Out 034-863-47000 $ 855,000 $ 1,029,300 $ 174,300 Transfer In 034-000-31500 $ 1,905,000 $ 2,079,300 $ 174,300 RECOMMENDATION: That the City Council adopt Resolution No. 6657 Approving Budget Amendment 16-12-01 to allocate $356,700 for the Project from General Fund Reserves (incl •-s a transfer to Tidelands of $ 174,300). SU;: ED NOTED AND APPROVED: ■r41 i -. • Ailt . Jim -sham J J . Ingram, City Ma ai!er Interi Director of Public Works Prepared By: David Spitz, P.E. Associate Engineer Attachments: A. Resolution No. 6657 Attachment "A" RESOLUTION NUMBER 6657 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL APPROVING BUDGET AMENDMENT NO. 16-12-01 NOW, THEREFORE, THE SEAL BEACH CITY COUNCIL DOES HEREBY FIND AND RESOLVE: Section 1. The City Council hereby approves Budget Amendment 16-12-01 allocating $174,300 for the Project from the Tidelands Account and $182,400 for the project from General Funds as follows: Description Account Revised/Adopted Proposed Budget (diff) Budget Budget Amendment Transfer Out 001-080-47000 $10,601,800 $10,958,500 $ 356,700 Transfer In 045-000-31500 $10,815,697 $11,172,397 $ 356,700 Contract Professional 045-333-44000 $10,815,697 $11,172,397 $ 356,700 Transfer Out 034-863-47000 $ 855,000 $ 1,029,300 $ 174,300 Transfer In 034-000-31500 $ 1,905,000 $ 2,079,300 $ 174,300 Section 2. The City Clerk shall certify to the passage and adoption of this resolution. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 27th day of June, 2016 by the following vote: AYES: Council Members: NOES: Council Members: ABSENT: Council Members: ABSTAIN: Council Members: ATTEST: Sandra Massa-Lavitt, Mayor Robin L. Roberts, City Clerk Resolution Number 6657 STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Robin Roberts, Acting City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6657 on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council at a regular meeting held on the 27th day of June, 2016. Robin L. Roberts, City Clerk