Loading...
HomeMy WebLinkAboutItem O AGENDA STAFF REPORT Z DATE: June 27, 2016 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Jim Basham, Interim Director of Public Works SUBJECT: AUTHORIZE THE CITY MANAGER TO EXECUTE A CONSTRUCTION CONTRACT WITH DOUG MARTIN CONTRACTING CO., INC. FOR THE 2016 ANNUAL SLURRY SEAL PROJECT CIP NO. ST1601 SUMMARY OF REQUEST: That the City Council adopt Resolution No. 6659: 1. Awarding a construction contract to Doug Martin Contracting Co., Inc. in the amount of $104,807.20; 2. Authorizing the City Manager to approve contract changes not to exceed $5,000; and 3. Authorizing the City Manager to approve payments for inspection not to exceed $5,000. BACKGROUND AND ANALYSIS: The 2016 Annual Slurry Seal Project CIP No. ST1601 (Project) consists of applying a slurry seal to selected streets throughout the City as identified in the City's adopted 2014 Pavement Management Program report. Application of slurry seal is typically done every 5-7 years and extends the effective life of asphalt concrete pavement. At the May 9, 2016 City Council meeting, the City Council approved the plans and specifications for this Project and authorized the solicitation for bids. On June 2, 2016, the City Clerk's office received four bids with the following results: Agenda Item 0 Rank Contractor Amount 1 Doug Martin Contracting Co., Inc. $ 104,807.20 2 All American Asphalt $ 115,571.50 3 Roy Allan Slurry Seal $ 122,934.00 4 Mission Paving and Sealing Inc. $ 148,895.55 Based upon the references, qualifications, work experience and cost, staff recommends selecting Doug Martin Contracting Co., Inc. as the lowest responsive bidder at $104,807.20. ENVIRONMENTAL IMPACT: This Project complies with all requirements of the California Environmental Quality Act (CEQA) and is categorically exempt under section 15301 class 1 subsection (c). LEGAL ANALYSIS: No legal analysis is required for this item. FINANCIAL IMPACT: In the approved FY 2015/16 Budget, $140,000 of State Gas Tax Funds have been identified for the Project. Design plans were prepared in-house. The construction contract is $104,807.20 with Doug Martin Contracting Co., Inc. The table below presents the estimated breakdown of the Project cost: Description Amount Construction $104,807.20 Contingency $ 5,000.00 Inspection $ 5,000.00 Total $114,807.20 The remaining State Gas Tax Funds of $25,000 will be utilized for the 2016 Annual Concrete Repair Program Project CIP No. ST1604. RECOMMENDATION: That the City Council adopt Resolution No. 6659: 1. Awarding a construction contract to Doug Martin Contracting Co., Inc. in the amount of $104,807.20; 2. Authorizing the City Manager to approve contract changes not to exceed $5,000; and Page 2 3. Authorizing the City Manager to approve payments for inspection not to xceed $5,000. S BMI ED B NOTED AND APPROVED: "":asham J II Ingram, City Mt ger Int. im Director of Public Works Prepared by: Cesar Rangel, Associate Engineer Attachments: A. Resolution No. 6659 B. Contract Agreement C. Slurry Seal Map Page 3 Attachment "A" RESOLUTION NUMBER 6659 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE A CONSTRUCTION CONTRACT WITH DOUG MARTIN CONTRACTING CO., INC. FOR 2016 ANNUAL SLURRY SEAL PROJECT CIP NO. ST1601 THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE: SECTION 1. The City Council hereby awards a contract to Doug Martin Contracting Co, Inc. for the 2016 Annual Slurry Seal Project CIP No. ST1601 (the "Project") in the amount of $104,807.20. SECTION 2. The City Council hereby authorizes and directs the City Manager to execute the contract on behalf of the City. SECTION 3. The City Council hereby authorizes the City Manager to approve payments for additional work requests in connection with the Project in the cumulative amount up to $5,000. SECTION 4. The City Council hereby authorizes the City Manager to approve payments for inspection in connection with the Project in the cumulative amount up to $5,000. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 27th day of June , 2016 by the following vote: AYES: Council Members: NOES: Council Members: ABSENT: Council Members: ABSTAIN: Council Members: ATTEST: Mayor City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } Resolution Number 6659 I, Robin Roberts, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6659 on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council at a regular meeting held on the 27th day of June , 2016. City Clerk Attachment "B" PUBLIC WORKS AGREEMENT FOR 2016 ANNUAL SLURRY SEAL PROJECT CIP NO. ST1601 between HEE 'i�G►F A2 ,9`y\COQ: City of Seal Beach 211 - 8th Street Seal Beach, CA 90740 Doug Martin Contracting Co., Inc. 220 Foundation Avenue La Habra, CA 90631 (714) 441-0513 (714) 441-0541 - FAX THIS AGREEMENT is made as of June 27, 2016 by and between the City of Seal Beach, a California charter city ("City"), and Doug Martin Contracting Co., Inc., a General Contractor ("Contractor"). 1 of 9 1.4 In the event of any material discrepancy between the express provisions of this Agreement and the provisions of the other Contract Documents, the provisions of this Agreement shall prevail. 2. Effective Date. This Agreement is effective as of June 27, 2016 (the "Effective Date"), and shall remain in full force and effect until Contractor has rendered the services required by this Agreement. 3. Payment. For performing and completing the Work in accordance with the Contract Documents, City shall pay Contractor, in full compensation therefor, the amount of $104,807.20, subject to any additions and deletions pursuant to the terms of the Contract Documents. Said sum shall constitute payment in full for all work performed hereunder, including, without limitation, all labor, materials, equipment, tools and services used or incorporated in the Work, supervision, administration, overhead, expenses and any and all other things required, furnished or incurred for completion of the Work as specified in the Contract Documents. City shall make payments to Contractor on account of the contract sum at the time, in the manner, and upon the conditions specified in the Contract Documents. The City Manger may authorize extra work to fund unforeseen conditions up to the amount approved at the time of award by the City Council. Payment for additional work in excess of this amount requires prior City Council authorization. 4. Contractor's Personnel. 4.1 All Work shall be performed by Contractor or under Contractor's direct supervision, and all personnel shall possess the qualifications, permits, and licenses required by state and local law and by the Notice Inviting Bids/Instructions to Bidders to perform such Services, including, without limitation, a City of Seal Beach business license as required by the Seal Beach Municipal Code. 4.2 Contractor shall be responsible for payment of all employees' wages and benefits, and shall comply with all requirements pertaining to employer's liability, workers' compensation, unemployment insurance, and Social Security. Contractor shall fully comply with the workers' compensation law regarding Contractor and Contractor's employees. 4.3 Contractor shall indemnify and hold harmless City and its elected officials, officers, employees, servants, designated volunteers, and agents serving as independent contractors in the role of city officials, from any and all liabilities, damages, claims, costs and expenses of any nature to the extent arising from Contractor's alleged violations of personnel practices. 4.4 Contractor is, and shall at all times remain as to City, a wholly independent contractor. Contractor shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Contractor or any of Contractor's employees, except as set forth in this Agreement. Contractor shall not, at any time, or 3 of 9 the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. 5.5 Waiver of Right of Subrogation. Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses, and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor. 5.6 Survival. The provisions of this Section 5 shall survive the termination of the Agreement and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an lndemnitee's right to recover under this indemnity provision, and an entry of judgment against a Contractor shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provision. 6. Insurance. 6.1 Liability Insurance. Contractor shall procure and maintain in full force and effect for the duration of this Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the services hereunder by Contractor, and its agents, representatives, employees and subcontractors. The policy limits set forth below do not act as a limitation upon the amount of indemnification to be provided by Contractor. Contractor shall complete and execute the following documents attached as Exhibits hereto and incorporated herein by this reference: 6.1.1 Exhibit D-1: Additional Insured Endorsement - Commercial General Liability. 6.1.2 Exhibit D-2: Additional Insured Endorsement - Automobile Liability. 6.1.3 Exhibit D-3: Additional Insured Endorsement. 6.2 Minimum Scope of Insurance. Unless otherwise approved by City, coverage shall be at least as broad as: 6.2.1 Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001). 6.2.2 Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). 6.2.3 Insurance Services Office form number CG 20 10 11 85 (Ed. 11/85) covering Additional Insured—Owners, Lessees or Contactors (Form B). 5 of 9 6.5.4 Each insurance policy required by this Section 6 shall be endorsed to state that coverage shall not be canceled or materially modified except after 30 days prior written notice by first class mail has been given to City. 6.5.5 Each insurance policy, except for any professional liability policy, required by this Section 6 shall expressly waive the insurer's right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city or agency officials. 6.6 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VIII unless waived in writing by City's Risk Manager. 6.7 Verification of Coverage. All insurance coverages shall be confirmed by execution of endorsements on forms approved by the City. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before services commence. As an alternative to City forms, Contractor's insurer may provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications. 7. Liquidated Damages. Should the Contractor fail to complete the project, or any part thereof, in the time agreed upon in the Contract, the Contractor shall reimburse the City for the additional expense and damage for each calendar day that the Contract remains uncompleted after the Contract completion date. It is agreed that the amount of such additional expense and damage incurred by reason of failure to complete the Contract is the per diem rate of $750.00 per calendar day. Such amount is hereby agreed upon as liquidated damages for the loss to the City resulting from the failure of the Contractor to complete the project within the allotted time and to the value of the operation of the works dependent thereon. It is expressly understood and agreed that this amount is a reasonable amount and is established in lieu of damages that are incapable of calculation at the inception hereof; and this amount is not to be considered in the nature of a penalty. The City shall have the right to deduct such damages from any amount due, or that may become due to the Contractor, or the amount of such damages shall be due and collectible from the Contractor or the Contractor's Surety. Progress payments made after the scheduled completion date shall not constitute a waiver of liquidated damages. 8. Suspension. City may, in writing, order Contractor to suspend all or any part of the Contractor's Services for the convenience of City or for work stoppages beyond the control of City or Contractor. A suspension of the Services does not void this Agreement. 9. Notices. Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Contractor's and City's 7 of 9 14. Construction. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 15. Entire Agreement. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between Contractor and City. This Agreement supersedes all prior oral or written negotiations, representations, or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement. 16. Severability. The invalidity in whole or in part of any provisions of this Agreement shall not void or affect the validity of the other provisions of this Agreement. IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above. CITY OF SEAL BEACH CONTRACTO:: D. Martin Contracting Company, Inc. By: By: i r"' �% ,. rd Jill R. Ingram, City Manager Name: Doug Martin Attest: Title: President By: Robin Roberts, City Clerk Name: ULLAJL,Makra4D Approved as to Form: Title: Dixie Martin, Secretary By: Craig A. Steele, City Attorney 9 of 9 Attachment "C" a It jaw i Ards EMI,■ 31S H �� =„a 1, 1S Val M= , 1,, ,�=. ... ,�,,��''� w i c�0 I ���1111 � a a ; �� 1 -- NI- ..5 .111111ui a 1 . . 1 s: rr, .. .. �"' //11111 Q �,No New 1 o--< ANON ii low cn 15. Paz 4 - i i� i� C��1�1� cc a N csg 61.1.11.4 0 y - 0/11111'_� liii i LI S J . >u ce 41\IS I3MOlJNns =C 1111001111011 a: :`�11O u,'• Z cn l l l Qom .. ���i.,+' ��IIIII�► `I�,�"�' IS 3soI s •"111 - .a.: 1111111." :, I •.ININd , 2 N .1111;16 ���OS I� /HIS o a - -' PAN V ST vilil: a �� - 1�i 1�11i�� -> ow=� � - -o i-- -- - -M -- ,� I _z W-- -- --i 11211111!■. -- -- - IL I. IR"op \ - a ■ u'II II a N � -- -- -EE N— -- -- = HME 11 , 10:1111 amt.w- NI -a: as:.--3-%a9 O III 1111.11:41��11- —M ILUiiii!iiII -- -vp ip3H1V3H o -Q �4IIn li ii IU -= � - IEIIWH! -- N a ism '-- I' -- 11111111 :• 1 - -- Iifl11 -- -'iU -- 1 11 III: 111611411 MI mg Mr Mil 11111 g i WI imi 11111 IOW illir sae 1114111 �,���M..-_- - -- imam - A 11111 011110 OIL I ft4"141 11/ atv% AWE 'ASIIII Niawmoa v ail A ,.." :-*A '0' I. i Allw lit 44 ' s..041_,Li_L A&- _______Th , z . , „. 40,,,„. 4# , , , i ! 'N,0]- J j��'ei ; • J ( ,