HomeMy WebLinkAboutItem Q Seal Beach PMP final report (4) FINAL REPORT UPDATE OF CITYWIDE PAVEMENT MANAGEMENT PROGRAM (Citywide) 2016-2023 City of Seal Beach, CA June, 2016 00-21 June 8, 2016 Mr. David Spitz, P.E. Associate Engineer CITY OF SEAL BEACH 211 Eighth Street Seal Beach, CA 90740 Subject: Final Report - Update of the Pavement Management Program Dear David: As part of the 2016 Update of the Pavement Management Program for the City of Seal Beach, Bucknam Infrastructure Group, Inc. (Bucknam) is pleased to submit the Final Report for the City’s pavement network. The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories:  Executive Summary (Section I)  Quality Control/Quality Assurance Plan (Section II)  Pavement Management Program Development and Reporting (Section II)  Pavement Conditions For Each Segment in the Network (PCI Report – Section III) The Pavement Condition Index report shows the present condition of each street in the pavement network. In addition, the report shows the basic geometry of each street segment.  Recommended Maintenance and Repair Strategies The recommended maintenance and repair strategies were used to generate the Forecasted Maintenance Report and were based on our 2016 inspections and pavement deterioration analysis. Additionally, we have assessed and incorporated unit cost and maintenance application practices/types with our strategies.  Projected Projects based on those Strategies (Forecasted Maintenance Report – Section IV) The Forecasted Maintenance Report projects the street maintenance activities required for the next seven years, broken down to show maintenance recommendations for streets. The report included in this section (based on City’s Actual budget) is broken down by fiscal year.  OCTA Renewed Measure M Compliance Reporting (Section V) We have included the necessary OCTA Renewed Measure M compliance reporting, mapping and budget forecasting that is required for Seal Beach’s 2016 Pavement Management Program All comments received from the City have been incorporated in the reports that fo llow. All of the City’s issues and needs that were brought to our attention are included in the report. It has been a pleasure working with you and the City on updating your Pavement Management Program. We look forward to the continued success of this project and future teamwork with City staff. Sincerely, Bucknam Infrastructure Group, Inc. Peter J. Bucknam Project Manager Infrastructure Management – GIS Services City of Seal Beach Page i 2016 Citywide Pavement Management Program Final Report – June 8, 2016 TABLE OF CONTENTS Citywide MPAH and Local Report I. Executive Summary II. Pavement Management Program-Capital Improvement Program  Quality Assurance/Quality Control Plan  7-Year Actual Budget Scenario  7-Year Recommended Budget Scenario  7-Year Maintain Budget Scenario  Condition Distribution Report III. Pavement Condition Index (PCI) Reports - All Streets  PCI Map  Rank - A to Z Order  Rank - PCI Order (0-100) IV. Forecast Maintenance Reports  MPAH and Local (2016-2023) – Recommended Budget V. OCTA Renewed Measure M Compliance Reporting  For OCTA Submittal Section V can be copied / removed and sent to OCTA for compliance City of Seal Beach Page ii 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Table and Figure Reference Page # Figure 1 – Pavement Area by Functional Classification Sec 1-4 Figure 2 – PCI Distribution for All Seal Beach Streets Sec 1-7 Figure 3 – Sample Pavement Life Cycle Sec 2-1 Figure 4 – Resulting Conditions based on Unconstrained Budget Projection Sec 2-10 Figure 5 – Resulting Conditions based on Maintain Budget Projection Sec 2-14 Figure 6 – Resulting Conditions based on Existing Budget Projection Sec 2-18 Figure 7 – Resulting Conditions based on Do Nothing Budget Projection Sec 2-20 Figure 8 – PCI Calculation Worksheet Sec 2-24 Figure 9 – MPAH Condition Distribution Sec 2-25 Figure 10 – Local Condition Distribution Sec 2-25 Figure 11 – Seal Beach Pavement Condition Index (PCI) Map – 2016 Sec 3-4 Table 1 – Condition Distribution Totals by Section Mileage Sec 1-6 Table 2 – Historical PCI Conditions for Seal Beach (FY 2006 through 2016) Sec 1-6 Table 3 – Projected Work Program for All Streets (Unconstrained Budget) Sec 1-10 Table 4 – Projected Work Program for All Streets (Maintain Budget) Sec 1-10 Table 5 – Projected Work Program for All Streets (Existing Budget) Sec 1-11 Table 6 – Projected Work Program for All Streets (Do Nothing Budget) Sec 1-11 Table 7 – PCI Range Sec 2-2 Table 8 – Strategy Assignment Table Sec 2-6 Table 9 – Projected Work Program for All Streets (Unconstrained Budget) Sec 2-10 Table 10 – Projected Work Program for All Streets (Maintain Budget) Sec 2-13 Table 11 – Historical PCI Results (FY 2010 to 2016) Sec 2-13 Table 12 – Projected Work Program for All Streets (Existing Budget) Sec 2-17 Table 13 – Projected Work Program for All Streets (Do Nothing Budget) Sec 2-20 Acronym Listing Asphalt Concrete (AC) American Public Works Association (APWA) Capital Improvement Program (CIP) Countywide Pavement Management Plan Guidelines (Guidelines) Geographic Information System (GIS) Government Accounting Standards Board Statement 34 (GASB 34) Maintenance and Repair (M&R) Master Plan of Arterial Highway (MPAH) Orange County Transportation Authority (OCTA) Pavement Condition Index (PCI) Pavement Management Program (PMP) Portland Cement Concrete (PCC) City of Seal Beach Page 1 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I SECTION I EXECUTIVE SUMMARY 2015-16 UPDATE OF PAVEMENT MANAGEMENT SYSTEM As the City of Seal Beach continues to show growth with its population, demographics, infrastructure and maintenance needs, the street network has been running parallel as the system matures and capital street projects widen and lengthen streets. The City developed its Pavement Management Program (PMP) through StreetSaver in early 2004 and eventually converted the PMP in 2010. Over the past four years the City has used MicroPAVER as its PMP software; with the Orange County Transportation Authority (OCTA) decision to allow MicroPAVER or StreetSaver as an acceptable PMP software’s the City continues to remain in compliance with OCTA guidelines This system is essential to the City in that it assists Public Works staff in capturing competitive funding for its arterial highway system as well as cost-effectively managing the local network through proactive maintenance and scheduling. On a biennial basis, the Seal Beach PMP is updated to provide current data on the City’s street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources. Over the past several months Bucknam Infrastructure Group (Bucknam) surveyed all 18.6 miles of arterial and collector (Master Plan of Arterial Highways-MPAH) sections, 22.8 miles of Local sections to assist the City in complying with the most recent OCTA-Renewed Measure M requirements (January 2016). These requirements are clearly shown within the new “Countywide Pavement Management Program, Guidelines Manual” for MicroPAVER use. Bucknam reviewed the City’s previous maintenance 2013-15 efforts and the current 2016-17 proposed street improvements for pertinent historical and scheduled maintenance in order to generate a CIP report that identifies recommendations for improvement in the current operating and maintenance efforts put forth by the City. The result of this work effort is shown throughout this report. In the upcoming years as the City continues to build upon this study through future inspections and maintenance efforts, Seal Beach PMP data will continue to provide reliable solutions to enhance the program through detailed funding analysis, City specific budgetary reporting and level of service reporting. As the City annually matures the PMP, key questions will be answered by reviewing the pavement information readily available within our report as well as through the MicroPAVER database. Specifically, our findings and recommendations provide Public Works administrators, managers and field personnel with:  the present condition status of the pavement network (arterial and collector streets), as a whole and of any grouping or individual component within the City;  a ranked list of all streets, or segments of streets, by pavement condition within the network; City of Seal Beach Page 2 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I  rehabilitation/maintenance needs of each street segment by year;  an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding;  optimum annual pavement expenditure levels for pavement maintenance for the next seven (7) years;  prediction of the life-cycle performance of the City’s pavement network and each individual street section;  updated PMP data to assist the City with GASB 34 compliance; and  pavement condition data and analysis presented in GIS through ESRI ArcMap Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. This report reflects the current state of the City’s pavement network and recommended maintenance strategies for the next seven (7) years. FINDINGS AND RECOMMENDATIONS Through our assessment of historical maintenance performed across the City and through our discussions with City staff the conditional data found on the network clearly shows that the City has applied strong, preventative maintenance strategies over the past decade. Pavement management involves frequent preventative maintenance; as pavement deteriorates through heavy traffic impacts, weathering and time, preventative maintenances (such as slurry seal, stop gap, etc.) have limited benefits. More aggressive maintenance applications have to be used. Our study has shown that key overlay projects will still need to be funded over the next seven years to maintain the network’s high level of condition. Through our analysis of the Seal Beach PMP we have found and recommend the following items which should be considered for a proactive approach to the PMP and future management of the program: Arterials / Collectors (MPAH) The actual workload requirements identified indicate that the Arterial street network is currently in “Good” condition. At a minimum, to maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified in Table 4 to maintain a “Good” network weighted average PCI value. Our MPAH findings for conditional data and recommendations for revenue expenditures are shown below:  The Arterial/Collector network has a weighted PCI of 82.1;  The MPAH network consists of 18.6 miles equaling 5,271,658 square feet of pavement City of Seal Beach Page 3 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I  Currently, 24% of the arterial/collector network (3.1 miles) qualifies for rehabilitation/reconstruction maintenance;  MPAH maintenance projects should focus on increasing the current PCI above a weighted average of 84 within the next 7 years;  Develop a proactive fiscal and planned approach to identify arterial overlay projects based on the deterioration modeling within MicroPAVER  Current allocated MPAH funding results in the MPAH weighted PCI to decrease from its current PCI of 82.1 to 74.9 after seven years (Funded at $200,000/yr)  At a minimum, maintain the MPAH expenditures at an average of $791,000/yr level over the next seven years to generate the PCI results identified within Table 5 (Section I, page 9) of this report  Perform pavement inspections on the MPAH network every two years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA requirements for Measure M2 Locals The actual workload requirements identified indicate that the Local street network is currently in “Good” condition. At a minimum, to maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified in Table 4 to maintain a “Good” network weighted average PCI value. Our Local findings for conditional data and recommendations for revenue expenditures are shown below:  The Local network has a weighted PCI of 86.1;  The Local network consists of 22.8 miles equaling 4,062,883 square feet of pavement;  Currently, 8% of the Local network (2.2 miles) qualifies for rehabilitation/reconstruction; while 30% of the network (8.7 miles) qualifies for slurry seal maintenance  Local maintenance projects should focus on the maintaining the current PCI above a weighted average of 84 over the next 7 years;  Develop a proactive fiscal and planned approach to identify Local overlay projects based on the deterioration modeling within MicroPAVER  Current allocated Local funding through FY 2016/17 generates a decrease in Local conditions after seven years (PCI of 86.1 drops to 80.7); Funded at $375,000/yr) City of Seal Beach Page 4 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I  Maintain the Local expenditures at an average of $659,500/yr over the next seven years to generate the projects identified within the Section IV reporting  Perform pavement inspections on the Local network every two years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA requirements for Renewed Measure M2 The funding requirements presented are generated in the form of individual projects, as outlined in the Forecasted Maintenance Reports (Section IV). While the project listings outlined in the Forecasted Maintenance Reports are the recommendations generated through our analysis and the PMP, final project recommendations should be weighed against the actual approach the City wishes to utilize in scheduling the workloads for contracting purposes. Pavement conditions, utility schedules and/or City policy decisions may indicate that a particular pavement section needs attention earlier than the rest of the roads in its area. CITY’S PAVEMENT NETWORK Within the Seal Beach pavement management network there are approximately 41.5 section miles of streets. The Arterial and Collector (MPAH) network consists of 5,327,374 SF of pavement that includes 47 pavement sections totaling in 12.9 section miles. The Local network consists of 4,064,667 SF of pavement that includes 202 pavement sections totaling in 28.6 section miles. The City’s pavement network is broken down into manageable groups that have similar characteristics, such as pavement rank, surface type and maintenance zone. Pavement segments are identified by their branch and section unique ID numbers. Pavement “branches” that have a common usage, such as Seal Beach Blvd, defines a “branch” within MicroPAVER. Pavement “sections” are pavement segments within the defined branch that have consistent pavement conditions, rankings, construction/maintenance histories and use. Representative inspection samples are then selected and visually surveyed to locate distress data. This data is used to calculate the pavement sections Pavement Condition Index (PCI) which includes distress type, extent of the distress and its severity. All inspections follow the industry ASTM D6433 standard for pavement assessment. The PCI is a condition rating that ranges from 100 (a new pavement section or recently overlaid or reconstructed) to 0 for a section that has structurally failed and deteriorated dramatically. Weighted Figure 1 City of Seal Beach Page 5 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I average PCI = pavement section PCI * its area / by the total square footage of the network. The weighted average PCI for the City’s Arterial and Collector (MPAH) network is 82.1 The weighted average PCI for the City’s Local network is 86.1 Table 1 on the following page summarizes the conditions found within the Seal Beach network. Additionally, the City’s network is distinctly separated into seven (7) communities; these include: Old Town includes the area south of Pacific Coast Highway (PCH) and Marina Drive (between 1st Street and Seal Beach Boulevard). Bridgeport includes the area west of PCH, north of Marina Drive and SW of the San Gabriel River. Marina Hill (N/S) includes the area north of PCH and west of Seal Beach Boulevard; additionally, it is divided into Marina Hill North and Marina Hill South by Bolsa Avenue. Surfside located within Anaheim Bay along the south side. Leisure World includes the area in between Westminster Boulevard and San Diego freeway, west of Seal Beach Boulevard. College Park East includes the area in between the San Diego freeway and Lampson Avenue. College Park West includes the area within the northwest portion of the City and borders the City of Long Beach. City of Seal Beach Page 6 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I CURRENT CONDITIONS The overall weighted condition level for the City’s pavement network is “Good” with a weighted average PCI of 84.4 based on the surface area of each segment. The distribution of the City’s overall pavement network and individual sections are shown in Section III of this report (Pavement Condition Index Report). Table 1 – Condition Distribution Totals by Section Mileage As shown above, the majority of segments are distributed through Very Good to Good condition categories. This is a clear sign that the maintenance efforts performed by the City from 2006 to 2015 have greatly benefited the City’s pavement conditions. Table 2 – Historical PCI Conditions for Seal Beach (FY 2006 through 2016) Based on the weighted PCI value associated with the Arterial and Collector (MPAH) routes (82.1) it is a good indication that the City is performing proper and timely maintenance for those specific street classifications. This is clear by looking at the total mileage that falls within the MPAH Very Good to Good condition categories (9.2 out of 12.9, which accounts to 71% of the MPAH network). The Arterial rehabilitation projects that are scheduled through the City’s Seven-Year CIP are needed and will continue to sustain the MPAH network at or above today’s conditions over the next several years. Congruently, the Local street network continues to show high PCI values due to the proactive slurry seal and overlay program that was put in place. Local section mileage between Very Good and Good (25.3 miles) accounts for 88% of the network. With the current strategic and scheduled slurry seal program our budget analysis models are showing that the City will see a leveling out of Local weighted PCI; this is a natural occurrence and is expected when overall conditions are at high levels (i.e. citywide weighted PCI’s in the mid 80’s). However, it is important to point out that 15% of the MPAH and Local pavement sections are within the Fair to Poor condition ranges; these sections should be prioritized and scheduled for immediate consideration for stop gap/slurry maintenance or overlay rehabilitation. With the maintenance zone/tract schedule that is in place combined with the standard rate of asphalt deterioration, overlay City of Seal Beach Page 7 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I maintenance will be needed on both pavement functional classifications within the City. As large overlay and rehabilitation projects are considered for funding, the City should also consider using sub-grade R-Values, distress severities and extents as parameters for determining whether a pavement section that lies within the Fair to Poor condition range should be slurry sealed or overlaid. Bucknam developed a seven-year Capital Improvement Program for the City based on the City’s current 7-yr CIP / Street Maintenance/Rehabilitation Program, pavement deterioration, available funding and the most recent 2016 inspections. These recommendations and results are shown in Section II of this report where we have demonstrated how the City’s current “actual” citywide budget performs against the conditions found within the pavement network. Figure 2 – PCI Condition Distribution for All Seal Beach Streets City of Seal Beach Page 8 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I MAINTENANCE STRATEGY DEVELOPMENT Based on the results of the condition survey and input from the City, pavement maintenance/rehabilitation strategies were developed. At the outset, City and Bucknam staff identified a distribution of City maintenance funds that would be applied to the network over the next ten years. This was based upon the desire to prevent the decrease in street conditions and not allow an increase in the maintenance backlog funds over the ten-year program. With this approach, Bucknam has recommended a “minimal level of service” which creates a major dividing line in determining pavement maintenance. Based on the City’s weighted average PCI, condition distribution, and maintenance practices, our team has identified a PCI of “75” as the minimum level of service. This means that any pavement section with a PCI less than 75 will be recommended for major maintenance. As shown in Figure 2, over 83% of the City’s streets are in Very Good to Good condition. These sections will be targeted for “preventive” maintenance within our Capital Improvement Program (CIP) recommendations. The reasoning in doing this is to extend the life cycles of those “good” pavement sections which accrues capital saving to aggressively rehabilitate those pavement sections that are below the “minimal level of service”. In order to achieve the most effective and optimum program for the City, certain strategies have been selected and/or analyzed. Below is a listing of the maintenance activities utilized in strategy development. Each activity is representative of the types of work that have been programmed as part of the long-term maintenance requirements of the City’s street network. For additional detail on the following activities see Section II. General Repairs – Stop Gap – M&R (PCI Range 20 to 100)* For this maintenance type, small localized surface treatments are utilized as “holding action” solutions (stop gaps) to delay the need for pavement structural strengthening. They typically include activities such as crack sealing, deep patching, skin patching, grinding and leveling. Slurry Seals (PCI Range 60 to 85) Surface treatments applied to pavements with minimal surface distress to provide new wearing surfaces and extend pavement life. Generally thickness ranges from 1/8” to 3/8” and consists of a mixture of conventional or latex-modified emulsified asphalt, well-graded fine aggregate, mineral filler and water a creates a new wearing surface. The City is currently utilizing on all Local streets. Overlays (PCI Range 20 to 60) AC Overlay– Placement of a layer of hot-mixed asphalt concrete over the existing pavement surface (may include pavement fabric). Grinding (milling) is performed prior to the overlay to reduce the total height of asphalt and assure alignment with existing gutter lines. This also includes “dig-outs” and crack sealing prior to the application of an overlay. This treatment provides a new wearing surface and increased structural strength to the pavement section. A conventional overlay should be designed for a ten-year life. The City is currently utilizing this application on Local streets. City of Seal Beach Page 9 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I Asphalt Rubber Hot-Mix Overlay - The ASTM definition is: Asphalt-Rubber is a blend of asphalt cement, reclaimed tire rubber and certain additives in which the rubber component is at least 20% by weight of the total blend and has reacted in the hot asphalt cement sufficiently to cause swelling of the rubber particles. The City is currently utilizing this application on Arterial (MPAH) routes. Specifically, using crumb rubber modified binders in pavement application benefit local agencies in that cities find:  Pavement resists cracking by being more flexible;  Cost savings come from a longer life cycle (from Bucknam’s experience typically 20% longer), decreased maintenance and the use of less material  Improvement in skid resistance;  Decreased noise; and  It provides long-lasting color contrast for marking and striping Reconstruction (PCI Range 0 to 20) Removal of the existing pavement section to a prescribed depth followed by the placement of a conventional flexible pavement section using a structural AC Hot Mix or AR Hot Mix or a full depth asphalt. Each classification of road has a typical design cross-section upon anticipation traffic loading. *PCI values shown with each maintenance/rehabilitation type are “typical” ranges for a given type of work. These ranges are not set in stone and may vary based upon City practices and policies. City of Seal Beach Page 10 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I ANNUAL BUDGET PROJECTIONS The budgeting process was approached with the following in mind, generate a four unique budget scenarios for the next seven (7) years based upon actual road pavement conditions in order to: 1. Review and model the City’s MPAH funded projects and schedules from 2016 to 2023 2. Review and model the City’s Local funded projects and schedules from 2016 to 2023 Based on current and future pavement maintenance needs, four annual work programs have been prepared and summarized below:  Scenario 1 – Unconstrained Budget; Table 3 demonstrates how the City’s current conditions respond to an unlimited annual funding source; Table 3 – Projected Work Program for All Streets (Unconstrained Budget)  Scenario 2 – Maintain PCI at 84; Table 4 demonstrates the recommended annual funding necessary to maintain the overall weighted PCI at 84 after seven years; Table 4 – Projected Work Program for All Streets (Maintain Budget) City of Seal Beach Page 11 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I  Scenario 3 – Existing Budget; Table 5 demonstrates the City’s “Actual” scheduled seven-year CIP work program and the resulting PCI after seven years; Table 5 – Projected Work Program for All Streets (Existing Budget)  Scenario 4 – Do Nothing; Table 6 demonstrates a constrained annual budget of $0 and its PCI results after seven years. Table 6 – Projected Work Program for All Streets (Do Nothing Budget) Additional detail and breakdown of budget projections are demonstrated in Section II of this report. All work program budgets generated are presented in terms of current 2016 dollars. The most recent ENR construction index was reference for budget programs as well as City input. All repair activities were based on distresses observed at the time of the field survey. These are recommendations and are to be used as “the best case scenario” for improving the Seal Beach street network. QUALITY CONTROL EFFORTS This project included the conversion of all MicroPAVER data to MicroPAVER; Bucknam methodically assessed and converted essential inventory segmentation, work histories, inspections, pavement applications, unit costs and other key attributes utilizing MicroPAVER conversion tools. Through this conversion we found that all segmentation, work history and key attributes converted seamlessly; however, 8% of all previous inspections needed further analysis due to the fact that they demonstrated a +/- 10 variance in PCI. Our staff performed the necessary field inspections and internal analysis to correct these issues. City of Seal Beach Page 12 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section I As indicated in our scope of work, we performed numerous quality control checks in the field during survey efforts as well as specific site investigations requested by the City. Field check efforts were performed at the end of each week of survey. During survey, no major field quality control issues were noted. RECOMMENDATIONS The actual workload requirements identified indicate that the City’s arterial network is currently in “Good” condition. To maintain this condition, it is critical that preventive/stop gap maintenance and overlay activities are funded at the levels identified in Table 4 and the reports in Section IV to maintain a “Good” network weighted average PCI value (PCI range of 71 to 85). Special considerations should be made toward focusing overlay maintenance in strategic areas each fiscal year. It is recommended that special attention be made to those Local sections that are close to qualifying for overlay maintenance and/or those sections that have a high amount of “load” bearing distresses within their limits (Local sections within Fair to Poor PCI ranges; 3.0 miles). As the City moves towards the “second” pass of slurry seal maintenance to the Locals, it is key to point out that a moderate amount of pavement sections still require overlay rehabilitation in the latter part of the Local program schedule (e.g. FY 2016 and beyond). Due to the City’s “high” weighted PCI for Locals we recommend that the City continues to follow the Preventative Program within its seven (7) zone communities. In order to meet these requirements, certain projects have been recommended within the context of this report. The funding recommendations presented are generated in the form of individual projects, as listed in the Forecasted Maintenance Reports (Section IV). While the project listings outlined in the Forecasted Maintenance Reports are the recommendations generated by the PMP, final project recommendations should be weighed against the actual approach the City wishes to utilize in scheduling the workloads for contracting purposes. Pavement condition may indicate that a particular pavement section needs attention earlier than the rest of the roads in its given zone or Tract area. City of Seal Beach Page 1 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II SECTION II PAVEMENT MANAGEMENT PROGRAM / CAPITAL IMPROVEMENT PROGRAMS Bucknam performed the following services in accordance with the scope of services that was contracted with the City of Seal Beach. As a quick overview, the following tasks were performed to complete the work over the past year: 2016 Pavement Management Work Efforts: Task 1: Project Kickoff-Data Management Task 2: Development of the City’s PMP/GIS Link Task 3: Update of Maintenance Activities Task 4: Pavement Condition Survey (approx. 47.8 section miles) Task 5: Budgetary Analysis and Capital Improvement Reports Task 6: Executive Summary and Final CIP Reports Task 7: Mapping of the Pavement Network Numerous studies from the United States Army Corps of Engineers and APWA have shown that it is much more cost effective to maintain a pavement segment in good condition over its useful life in comparison to letting it deteriorate to the point that it requires a major overlay or reconstruction, which is shown in sample deterioration curve (Figure 3) below. Figure 3 – Sample Pavement Life Cycle Each $1.00 spent on maintenance within the “Good” range will cost $6.50 to $8.00 for reconstruction if maintenance is deferred. City of Seal Beach Page 2 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Pavement Management Update 2015-16 As a part of the 2016 update of the pavement management program, a major element of work was to complete a comprehensive assessment of the existing street network within the City. This included assessing the City’s existing MicroPAVER dataset, GIS centerline file, street naming conventions and work history information. From there, Bucknam worked with the City to confirm any changes within public / private street listing as well as all true area adjustments which set the foundation for accurate CIP reporting. Work history information was provided by the City in the form of completed bid documents, institutional knowledge and the previous MicroPAVER dataset. This information was entered into the proper pavement segments that match the limits of those projects. From there, CIP pavement recommendations were performed where the pavement maintenance information the City provided (PMS material practices, unit costs, slurry seal maintenance zones, and capital budgets) were used to generate recommendations through the MicroPAVER system. Table 7 demonstrates PCI ranges established by the City’s request. Once a pavement inspection is complete, a PCI is calculated for each pavement section. Each PCI calculated now falls within a defined PCI range category, furthermore, a weighted PCI was calculated for the all streets within the network (weighted average PCI = pavement section PCI * its area / by the total square footage of the network). This information can also be represented through MicroPAVER to show how much square footage or percentage of area falls within PCI range category. PCI RANGE CONDITION 86-100 Very Good 75-85 Good (Seal Beach Network 2016 = 84.4) 60-74 Fair 41-59 Poor 0-40 Very Poor Table 7 - PCI Range The summary of all roads condition data and their representative PCI's can been seen in the Pavement Condition Report in Section III. City of Seal Beach Page 3 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Quality Assurance / Quality Control Plan As required by the Orange County Transportation Authority (OCTA), the City of Seal Beach must prepare and implement a quality assurance / quality control (QA/QC) plan regarding pavement management inspection as they pertain to MicroPAVER. For the purposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project. Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and ensures that it complies with the OCTA guidelines defined within the “Countywide Pavement Management Plan Guidelines (Guidelines)”. As shown within the OCTA Guidelines, our staff followed and delivered on the requirements stated on Section 2.4, page 8 which require specific QA/QC data (Items A through G). Additionally, Chapter 3 requires numerous data/deliverables from local agencies for Measure M2 eligibility. All general PCI budgetary report submittals will follow the Chapter 3 guidelines. In conjunction with the outlined items within the OCTA Guidelines Section 2.4 we have summarized our QA/QC procedures below: a. Descriptions of condition survey - Our staff follows the required Condition Survey Protocols (Guidelines, Section 2.1); our staff assesses each pavement section for the minimum distresses outlined within Section 2.1. Additionally, based on the pavement conditions found, we collect all MicroPAVER distresses (ASTM Standard D6433), if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information. b. How data was collected - Our surveys follow the OCTA accepted walking/windshield requirements. All sections that our staff surveys are performed through the walking/windshield method. Our staff physically measures the width of every section as well as measures for any square footage adjustment that need to be added or taken away from a sections “true area” (i.e. cul-de-sac, bus pads, street width variances, etc.). c. Accuracy required for data collection - We use a statistical sampling approach for measuring the quality of our field technician’s work. In this manner, 10 percent of the o riginal surveys are re-surveyed by a different survey crew than the original, supervised by a field supervisor, and the results are compared to the original surveys. Our QC process involves checking the field crews’ work in a “blind study” fashion. Quality control checks are performed at the end of each survey week. This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments.  When QA/QC issues are found, our staff documents the issues within MicroPAVER user interface and/or our GIS work environment. If distress types, severities and/or extents found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 15% of the original survey d. Data check for accuracy by agency – As described above our staff re-inspects, as a minimum, 10% of the original survey (OCTA only requires 5%). Per the agencies requests, our staff will submit PCI reports to the agency as project status reports for their review. City of Seal Beach Page 4 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Agencies will typically review specific pavement sections for PCI accuracy based on recent overlay or slurry seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts). Additionally, our staff performs “ride-a-long” surveys with local agency staff to build consensus on how our MicroPAVER /ASTM D6433 surveys are performed, recorded and reported on. e. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI’s calculated through the most recent inspections will be compared to previous PCI’s. If the variance in PCI is greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or re- inspection (OCTA Guidelines are followed). f. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist the agency in submitting the following:  Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years  1/3 of Local streets will be surveyed and reported on every two years; all streets will be surveyed within the six year requirement  Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted every two years g. Experience of Inspectors – Bucknam staff have been trained on the use of MicroPAVER and is certified with the required MicroPAVER segment calibration and inspection practices. All Bucknam field technicians are trained using the ASTM D6433 survey methodologies and have passed OCTA’s prequalification testing (Bucknam is certified by OCTA through June, 2017). h. Field data collection safety procedures – Bucknam field survey techniques utilize the following procedures:  All vehicles are properly marked or flagged with appropriate sign markings indicating that a “PAVEMENT SURVEY IS IN PROGRESS”  All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line-of-site warning  Large MPAH routes are surveyed using two field technicians to increase traffic control warning and safety  While parking or stopping along the survey route, vehicles legally park within the right- of-way or use a parking lot  All field technicians wear fluorescent vests to warn traffic and pedestrians City of Seal Beach Page 5 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II On a case-by-case basis, if our staff was responsible for converting a previous PMP database to MicroPAVER this will be properly notated within our reporting. Our staff will provide examples of how the previous inspections were performed compared to the most recent MicroPAVER based surveys. Bucknam will provide the local agency a copy of our QA/QC plan prior to any pavement inspection work. With approval, our staff will begin the MicroPAVER ASTM D6433 based inspections. City of Seal Beach Page 6 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II STRATEGY ASSIGNMENT TABLE Once the appropriate activities from the above listings were selected by the City, a Strategy Assignment Table was defined within the system that allocated the appropriate actions to the specific repair needs of the street. In defining the maintenance strategy list, emphasis was placed on defining pavement condition thresholds, using the PCI, for the specific maintenance activities within these categories. Strategy Assignment Table Table 8 - Strategy Assignment Table – Minimal level of service The strategies shown in Table 8 were developed to identify the most critical segments in each of the work programs (Arterial/Collector and Locals). Segment priorities were established by determining the range of PCI's requiring first attention based on the relative value of each segment’s PCI, thus maximizing the annual maintenance budget. Also, distress quantity, extent, type (load vs. climate) and severity were critical elements in the decision process for recommending maintenance. The assignment table is used as a guide within MicroPAVER to recommend maintenance, however, further assessment by City staff and/or outside parties can override maintenance recommendations. This can be done by reviewing and assessing distress extents and their weighted percentages. Once the strategy assignments were set within the system, budgets and work assignments were generated for each work program on an annual basis. Using pavement deterioration curves for each type of pavement surface and functional classification, both current and future work requirements for each pavement segment were determined. In forecasting the maintenance requirements in future years, the current PCI value is reduced annually for each pavement segment based on the MicroPAVER deterioration curves within the City’s database. Likewise, maintenance activities performed in a given year increase the PCI value as they are applied to City of Seal Beach Page 7 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II the segment. The overall program is dynamic in that each strategy consists of a cyclic series of actions that simulates the pavement anticipated life cycle. Strategy Assignment Notes 1. Unit costs from the City’s most recent construction bids were used; 2. 15% contingency costs were applied to pavement material costs; these included construction management and inspection, design, contract administration, material testing/inspection 3. Additional soft costs that were not included were: a. Right-of-way improvements b. Curb & gutter improvements c. ADA ramp improvement d. Utility improvement e. Tree removals 4. Bucknam applied a 3% inflation rate on the annual budget within forecasted maintenance projections (Section IV) City of Seal Beach Page 8 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II SEVEN-YEAR ANNUAL WORK PROGRAM PROJECTIONS The goal of these projections is to assist City policy makers in utilizing the recommendations of the MicroPAVER system. By using the City of Seal Beach’s current budgets and maintenance practices the system will develop “section unique” improvements and strategies. Each segment will be tied to a specific fiscal year. As shown in the following pages, we have assessed the budgets that have been projected to meet the maintenance and rehabilitations needed to maximize the City’s return on investment. The budget forecasting goal for the Arterial and Collector network focused on:  Establishing a proactive 7-year Maintenance & Rehabilitation Program;  Developing a preventive maintenance program; and  Selecting the most cost effective repairs based on City strategies SCENARIO 1 - UNCONSTRAINED BUDGET – Demonstrates a highly proactive budget that loads heavy funding early on within the seven (7) cycle. SCENARIO 2 - MAINTAIN PCI at 84 – The “maintain” budget was generated for the City to demonstrate the necessary annual funding required to maintain the City’s current weighted PCI of 84.4 through a seven year model. SCENARIO 3 – EXISTING BUDGET – The existing budget models the City’s current annual $575,000 budget against today’s PCI conditions. This audit demonstrates how the City’s PCI and deferred maintenance reacts to available funding. SCENARIO 4 – DO NOTHING BUDGET – The “do nothing” budget demonstrates how aggressively the City’s weighted PCI decreases and how the deferred maintenance increase through a seven-year model. Note 1: The City’s Preventative Program seven-yr cycle was utilized within all budget scenarios shown above. City of Seal Beach Page 9 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II SCENARIO 1 - UNCONSTRAINED BUDGET City of Seal Beach Page 10 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II UNCONSTRAINED BUDGET – In order to create distinctive budgetary benchmarks for comparison the City requested that an initial, unconstrained budget be modeled to demonstrate highly proactive slurry, overlay and reconstruction projects. In doing so, the obvious result of high, network-wide PCI’s occurs but this model also clearly demonstrates the amount of deferred maintenance that resides on the network as of January 2016. We have summarized our findings below: UNCONSTRAINED PROGRAM Unconstrained Program incorporates all functional classes, Principal (A), Arterial (B), Collector (C) and Local (E). Table 9 - Projected Work Program for All Streets (Unconstrained Budget) By allowing the PMP to be funded at unlimited annual funding it is clear to see that the citywide weighted PCI reaches a level of 93.5 within the first year after applying $9.03 million. A high level of condition is maintained throughout the seven year program and results in a weighted PCI of 87.7 by FY 2022-23. (See Figure 4 below). Figure 4 – Resulting Conditions based on Unconstrained Budget City of Seal Beach Page 11 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Also, the annual deferred maintenance total decreases from $8.6 million to $0 at the end of the seven- years if the City applies a $14.7 million budget for slurry, overlay, and reconstruction maintenance. Even though the deferred maintenance shows a null value, small minor stop gap maintenance remains on the network; if we were to extend the 7-yr CIP out to 10 years the deferred maintenance would begin to rise again to a level of $1.2 million by FY 2025. Again, this budget model allows PMP managers to see how much reconstruction, rehabilitation and preventive maintenance resides on the network today and set a high benchmark to compare to the following three scenarios below. City of Seal Beach Page 12 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II SCENARIO 2 – MAINTAIN PCI at 84 BUDGET (Current Level) City of Seal Beach Page 13 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II MAINTAIN PCI at 84 BUDGET – With the City striving to show proactive maintenance across all City pavements, a budget program was generated to show the greatest return on investment through the application of slurry seal, mill & cap, and alternative overlay maintenance. Our goal under this model is to maintain the current 2016 weighted PCI of 84.4 through a seven-year program. This model will demonstrate the necessary funding to achieve this goal. Again, we used the “Unconstrained” 7-yr PMP model (shown above) as a cornerstone for our modeling within the “maintain” program. Combining the previous reporting model with a realistic and achievable annual budget, we found positive results. MAINTAIN PROGRAM Maintain Program incorporates all functional classes, Principal (A), Arterial (B), Collector (C) and Local (E). Table 10 – Projected Work Program for All Streets (Maintain Budget) Referring to Table 10, it is noted that the weighted PCI remains at today’s conditions through the seven- year projection (84.4 to 84.3). Additionally, the annual deferred maintenance total decreases from $8.6 million to $6.9 million at the end of the seven-years if the City utilizes an annual budget average of $1,450,400/yr for slurry, overlay, and reconstruction maintenance. We found that annual average square footage breakdowns of maintenance areas were consistent and well balanced. We recommend that a balanced maintenance/funding approach be applied to both the MPAH and Local networks; both networks have roughly the same weighted PCI with the only variance being that the MPAH network is slightly larger in total square footage. As shown in Table 11 below, the City’s weighted PCI continues to show high weighted PCI values, furthermore, with the results shown in Table 10 above and the reduced amount of deferred maintenance, a strategic long-term plan to sustain this asset will need to be implemented. Table 11 – Historical PCI Conditions for Seal Beach (FY 2006 through 2016) City of Seal Beach Page 14 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Figure 5 – Resulting Conditions based on Maintain Budget Projection The City’s Local slurry/overlay maintenance “community” strategy should continue through the next seven years for several reasons. With the City applying a maintenance area/tract methodology to the Local network, four beneficial impacts occur: 1) Planned / Maintenance areas are addressed every seven years which creates a dedicated project schedule for City staff and constituent inquiries; 2) Deferred overlay maintenance can be addressed in a more effective manner due to accrued revenues 3) A preventative maintenance strategy is more cost-effective in a long-term PMP rather than implementing a maintenance approach that addresses only the “worst-first” streets. 4) All maintenance alternatives are available due to the increased funding and focused maintenance within one zone per year. On the negative side, if low weighted PCI values occur within a given zone, all streets within that zone may not be able to be addressed with maintenance when that zone is scheduled for maintenance. The deferred maintenance will have to be scheduled for maintenance in future years or simply will have to wait until the zone cycle repeats. The Local maintenance model that has been developed under the Maintain budget can be used as a benchmark to monitor the City’s annual budget allocations as the network continues to mature and age; the proper amount of funding for slurry seal and overlay maintenance needs to be the City’s highest priority. City of Seal Beach Page 15 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Additionally, it is recommended that the City continue to monitor the usefulness and applicability of Cape Seal as an asphalt alternative for the specific local sections. Specific sections are now qualifying for maintenance that warrants a stronger application rather than a typical slurry seal. With a seven year cycle in motion, it is essential to address local sections that have PCI’s less than 75 with the proper maintenance since crews will not be back within that area for five to six years. City of Seal Beach Page 16 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II SCENARIO 3 – EXISTING BUDGET ($575,000/yr) Includes the following funding breakdown:  Local Slurry Seal Funding - $100,000/yr  Local Overlay / Recon Funding - $275,000/yr  Arterial Overlay / Recon Funding - $200,000/yr City of Seal Beach Page 17 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II EXISTING BUDGET – The overriding goal for the citywide network was to maintain or increase the City’s weighted PCI through the seven-year CIP. The Existing budget was generated for the City to demonstrate how the current Local Revenues/General Fund, Gas Tax and Measure M2 Turnback/Competitive funding are attributing to how the network PCI reacts to the budget on a yearly basis. EXISTING PROGRAM (BASED ON CURRENT SEAL BEACH BUDGET) Existing Program incorporates all functional classes, Principal (A), Arterial (B), Collector (C) and Local (E). Table 12 - Projected Work Program for All Streets (Existing Budget) After applying the scheduled CIP projects and following the City’s maintenance zone cycle within the available funding the resulting weighted PCI decreases from where it stands today, 84.4, to a PCI level of 77.8 over the seven year CIP. (See Figure 6 on the following page). It is important to point out that even though a large amount of arterial and local pavement segments are in good “PCI” standing the annual budget ($575,000) simply is not enough to sustain and/or improve upon today’s conditions. Also, the resulting maintenance backlog shows a strong increase in workloads by FY 2019 which demonstrates the “natural deterioration of pavement and associated future costs of maintenance”. When a PMP network reaches high PCI values (i.e. mid-80’s) the network naturally will need to allow its pavements sections to deteriorate to allow for proper maintenance. These results indicate that the City’s historical CIP / Street Maintenance Program budgets have been well managed; proper amounts of PMP revenue were focused on the right MPAH routes and to the right Local tracts and neighborhoods. Based upon the Existing Budget the annual deferred maintenance total increases from $8.6 million to $14.5 million at the end of the seven-years if the City utilizes an annual budget average of $575,000/yr for slurry, overlay, and reconstruction maintenance. This is a clear-cut sign, in that with an increase in backlog and a decreasing PCI value over the seven-year program, a significant increase in capital funding is needed to sustain today’s conditions through FY 2022. DEFINITIION OF DEFERRED MAINTENANCE Delaying repairs on streets where pavement condition indicates a need creates deferred maintenance. Deferred maintenance includes pavement maintenance / rehabilitation that is needed across the entire network, but cannot be performed due to the lack of available funding and is pushed to the next budget cycle. The actual repairs that are being deferred are City of Seal Beach Page 18 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II often referred to as a “backlog”. As maintenance is deferred, the opportunity to apply life extending preventive pavement applications is lost and the ultimate cost of rehabilitation multiples. At a minimum, it is recommended that the City maintain the allocated funding shown in the 7-year CIP and strive to allocate the proper amount of funding to increase the PCI and balance the deferred maintenance. Additionally, with OCTA now implementing the Local Match Reduction program, it will be essential for Seal Beach to produce and demonstrate “measurable PCI improvement” and/or a weighted average PCI greater than 75. OCTA has produced the “Countywide Pavement Management Program, Guidelines Manual” for PMP use (January 2016). Seal Beach will need to demonstrate the following in order to obtain a local match reduction of 10%:  Show measurable improvement of paved road conditions during the previous reporting period defined (every two years for Arterials and every six years for Locals) as an overall weighted (by area) average system improvement of one PCI point  No reduction in the overall weighted PCI in the Master Plan of Arterial Highway (MPAH) and Local street categories (compliant)  This report is efficient to meet OCTA requirements Within Section V of this report, Bucknam has included the compliant OCTA Seal Beach submittal for City use and delivery to OCTA. Figure 6 – Resulting Conditions based on Existing Budget Projection City of Seal Beach Page 19 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II SCENARIO 4 – DO NOTHING BUDGET City of Seal Beach Page 20 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II DO NOTHING BUDGET – In order to show a large negative impact to the City’s weighted PCI and deferred maintenance backlog the City requested that a “Do Nothing” budget be modeled. This scenario injects $0 dollars into the MPAH (Arterial) and Local networks to demonstrate the following results: DO NOTHING PROGRAM Do Nothing Program incorporates all functional classes, Principal (A), Arterial (B), Collector (C) and Local (E). Table 13 - Projected Work Program for All Streets (Do Nothing Budget) By allowing the PMP to be funded at a constrained $0 annual funding it is clear to see that the citywide weighted PCI drops to a level of 69.6 after the seven years. This represents a 14.8 PCI value drop; these results can be compared to the Existing and Maintain budget scenarios to identify the most common - sense solution to sustaining the City’s pavement asset. Figure 7 – Resulting Conditions based on Do Nothing Budget Projection City of Seal Beach Page 21 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Also, the annual deferred maintenance total decreases from $8.6 million to $23.7 at the end of the seven years. If this model was in effect, the decrease in PCI below 75 would disqualify the City for OCTA funding benefits (Local Match Reduction program). Additionally, with OCTA now implementing the Local Match Reduction program, it will be essential for Seal Beach to produce and demonstrate “measurable PCI improvement” and/or a weighted average PCI greater than 75. OCTA has produced the “Countywide Pavement Management Program, Guidelines Manual” for PMP use (January 2016). Seal Beach will need to demonstrate the following in order to obtain a local match reduction of 10%:  Show measurable improvement of paved road conditions during the previous reporting period defined (every two years for Arterials and every six years for Locals) as an overall weighted (by area) average system improvement of one PCI point  No reduction in the overall weighted PCI in the Master Plan of Arterial Highway (MPAH) and Local street categories (compliant)  This report is efficient to meet OCTA requirements PAVEMENT MANAGEMENT SYSTEM REPORTS In addition to the annual budget scenario, this report contains a comprehensive and complementary assemblage of pavement management reports ranging from summary reports to annual maintenance and rehabilitation schedules (Forecasted Maintenance Report, Section IV). Collectively as well as individually, the reports represent reasonable projections of pavement maintenance needs and performance based on visual condition assessments, unit cost estimates, and pavement deterioration models. It is important to note that pavement segment dimensions and surface area (recorded during 2004- 2016 inspections, along with the action and repair costs, as presented within reports are accurate within tolerable limits. This is noteworthy due to the "implied" accuracy of reporting length and width to the nearest foot, surface area to the nearest square foot, and action and repair unit costs and project estimates to the nearest penny and dollar, respectively. NEXT STEPS As with any infrastructure management software program, time investments need to be made by key Public Works staff to maintain the integrity of the data as well as the accuracy. Bucknam will be performing training sessions in the use of the MicroPAVER system and how to generate standard maintenance reports to assist City staff in developing condition reports, yearly budgets, project level analysis, and CIP projections. This will be key to future staff management of the pavement program and reporting. City personnel need to maintain their commitment to the preventive maintenance system, while working toward reducing the City's present backlog of rehabilitation projects. City of Seal Beach Page 22 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II In order to ensure that report outputs are accurate and credible, it is essential that the integrity of all data files be maintained. This will require performing all necessary updates when changes are made to scheduling scenarios, unit cost information, historical data, etc. In addition, the entire pavement network will have to be re-inventoried at regular intervals. This will not only allow work to be scheduled based on the most current condition data available, but will provide City personnel with a means to monitor actual rates of pavement deterioration so appropriate modifications can be made to the system curves. To be compliant with the OCTA Measure M2 requirements, the City must generate a biennial Arterial and Collector (MPAH) network pavement management report indicating condition ratings and associated budgets. Locals are required to be reported on every six years. We recommended that Local inspections be performed every two years in order to monitor section deterioration (33% of the network every two years). Bucknam will be supporting the City with staff level support to assist in the continuous updates with the MicroPAVER system. This will include work history updates, generating reports from the system, unit cost updates, and future inspections. The Seal Beach MicroPAVER database has been provided to the City and installed on the necessary workstations/server. City of Seal Beach Page 23 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II CONDITION DISTRIBUTION REPORT This report depicts the distribution of the pavement condition throughout the street network and its functional classes by section mileage. The PCI rating scale ranges from “Very Good” to “Very Poor”, with a “Very Good” condition corresponding to a pavement at the beginning of its life cycle, and a “Very Poor” condition representing a badly deteriorated pavement with virtually no remaining life. The table below shows the general description for each pavement condition: Condition Description – PCI Range - Description Very Good (86-100) - Minor to low distress, no significant distress. Little distress, with the exception of utility patches in good condition, or slight hairline cracks; may be slightly weathered Good (75-85) - Slight to moderately weathered, slight distress, possibly patching (City of Seal Beach citywide weighted average PCI is 84.4). Fair (60-74) - Severely weathered or slight to moderate levels of distress, generally limited to patches and non-load-related cracking. Poor (41-59) - Moderate to severe distresses including load-related types, such as alligator cracking. Very Poor (0-40) - Severely distressed, large quantities of distortion or alligator cracking. Failure of the pavement, distress has surpassed tolerable rehabilitation limits. City of Seal Beach Page 24 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II CALCULATION OF PCI In order to calculate a Pavement Condition Index (PCI) value within MicroPAVER, specific street section data needs to be inputted into MicroPAVER to define the survey limits, asphalt types, pavement age and metrics. Pavement “sections” are pavement segments within the defined branch that have consistent pavement rankings, construction/maintenance histories and use. Representative inspection samples are then selected and visually surveyed to locate distress data. This data is used to calculate the pavement sections Pavement Condition Index (PCI) which includes distress type, extent of the distress and its severity. The PCI is a condition rating that ranges from 100 (pavement section that is in perfect condition) to 0 for a section that has structurally failed and deteriorated dramatically. The PCI is calculated from three major data entries from our inspectors: 1. Distress Type (one of 20 AC or 19 PCC types shown on the MicroPAVER inspection forms) 2. Distress Quantity (the square footage, length or count of a specific distress) 3. Distress Severity (the level of severity determined for each distress found; low, medium or high) Figure 8 – PCI Calculation Worksheet City of Seal Beach Page 25 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section II Figure 9 – MPAH Condition Distribution Figure 10 – Local Condition Distribution City of Seal Beach Page 1 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section III SECTION III PAVEMENT CONDITION INDEX REPORT A. PCI Map B. Rank – Name A to Z C. Rank - PCI Order City of Seal Beach Page 2 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section III PAVEMENT CONDITION INDEX REPORT Listed alphabetically by street name or PCI, this report provides the City with a listing of pertinent inventory and pavement condition data for each inventory unit within the City's pavement network. The Pavement Condition Index (PCI) Report notes the names, limits, classification, dimension, surface type, and lane configuration of each inventory unit. Detailed descriptions of the information appearing on this report are presented below: BRANCH NAME - The name of each inventory unit appears in this column. Generally, the inventory unit name is taken directly from a street sign; however, where no street signs are posted, the name appearing on the network map is noted instead. A sample set of street name suffix abbreviation definitions is presented below: AV - Avenue CT - Court CIR - Circle BLVD - Boulevard DR - Drive LN - Lane RD - Road HWY - Highway ST - Street WAY - Way EB - East Bound F – Frontage Road NB - North Bound SB - South Bound WB - West Bound TER – Terrace PL - Place FROM - A description of the beginning limit of each inventory unit appears in this column. If the beginning limit exists between intersections, then the beginning limit description may be an address, post mile marker, or a distance from a known point of reference (e.g., "500' N/MAIN ST"). TO - A description of the ending limit of each inventory unit appears in this column. Like BEGIN limit, the END limit description may consist of a street name, an address, or a distance from a known point of reference. In the case of cul-de-sacs, or dead-ends, the END limit consists of and address, or a directional reference, such as "NORTH END," when no address is available. RANK - The codes for the five functional classifications as the inventory unit appears in this column are represented below. Basically, units are classified according to traffic volume. CODE DESCRIPTION A Principal Arterial C Collector E Local SURFACE - A code was assigned to each inventory unit to describe surface type. CODE DESCRIPTION AC Asphalt Concrete AAC Asphalt Concrete with AC Overlay Work History PCC Concrete City of Seal Beach Page 3 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section III LENGTH - The length of the section within each branch. UNITS - The unit of measurement for the section length, typically linear feet (LF). AREA - The area of each section within a branch. UNITS - The unit of measurement for the section area, typically square feet (SF). ZONE – Unique geographical area associated with street location (typically defined by maintenance zones, Council Districts, Slurry Seal zone, etc.). PCI - Pavement Condition Indices were calculated for inventory units based on severity and extent of distress manifestations observed within the inventory unit. Ranging between 0 and 100, a PCI of "100" corresponds to a pavement at the beginning of its life cycle, while a PCI of "0" corresponds to a badly deteriorated pavement which is at or near the end of its life cycle. PCI CLIMATE, LOAD AND OTHER – reflects “Section Extrapolated Distress”; these values are shown within the Sample Distresses tab within the PCI window. Distresses are aggregated based on the type and severity level. For random samples, distress quantities are adjusted to reflect the extrapolated value based on the sections total area. Extrapolated distress deducts are classified as resulting from Climate, Load and Other distresses. The Distress Classification portion of the tab shows the “percent” of extrapolated distress deduct belonging to Climate, Load and Other (these %’s are shown within the PCI reports herein). These values are beneficial in that they support the decision whether recommend slurry seal, overlay or reconstruction project for street sections. INSPECTION DATE – Represents the most recent inspection date performed on a given sections. PCI shown is historical in value and may not indicate what “today’s” PCI is due to variance in time. Pavement deterioration calculations can be performed on a section(s) to demonstrate a deteriorated PCI based upon a new current date. City of Seal Beach Page 4 2016 Citywide Pavement Management Program Final Report – March 22, 2016 Section III Figure 11 – Seal Beach Pavement Condition Index (PCI) Map - 2016 PCH SEA L B E A C H B L 1ST ST CATALINA AV 5TH S T HUS S E Y R D BOLSA AV CENT R A L A V AL N/ O C E A N MARINA DR SEAL W Y 6TH S T EL E C T R I C A V S B 8TH S T 7TH S T 4TH S T CRESTVIEW AV 17T H S T 10T H S T 16T H S T BA L B O A D R 11T H S T MAR L I N A V 15T H S T COASTLINE DR 14T H S T EL E C T R I C A V N B AL E / 6 T H MAIN S T FORR E S T A L L N AL E / 4 T H 13T H S T LAND I N G A V AL E / 7 T H BA Y S I D E D R TA P E R D R OCEA N A V MARVISTA AV 12T H S T 2ND S T 3RD S T AL E / 1 4 T H AL E / 5 T H DRIFTWOOD AV SE A B R E E Z E D R G A L L E O N W Y AL E / 1 1 T H CORSA I R W Y FATHOM AV DOL P H I N A V CLIPPER WY AL E / 8 T H AL N / E L E C T R I C AL E / 1 7 T H PELORUS AVE AL E / 1 2 T H SA N D P I P E R D R AL E / 1 0 T H SU R F P L IS L A N D V I E W D R AL E / 1 3 T H RIVI E R A D R AL E / 2 N D SO U T H S H O R E D R HARBOR WY BE A C H C O M B E R D R AL E / M A I N BAY O U W Y AL E / 3 R D AL E/1S T EL E C T R I C A V CARME L A V AVA L O N D R ADOLFO L O P E Z D R FLAGSTAFF CT AL E/G A L L E O N CA R A V E L W Y DORY W Y AL E / 3 R D BER Y L C O V E W Y CRYS T A L C O V E W Y MAS T H E A D C T N E P T U N E A V EME R A L D P L 14T H S T AL N / E L E C T R I C AL E / 1 S T 1ST S T 10T H S T 1ST ST 1ST ST OCE A N A V AL E / 1 0 T H 13T H S T MAIN S T OCEA N A V AL E / 5 T H 8TH S T 7TH S T 12T H S T AL E / 7 T H AL E / 8 T H City of Seal Beach, CaPCI MAP : SOUTHWEST SECTOR Legend PCI centerline RANGE 86 - 100 75 - 85 65 - 74 41 - 55 0 - 40 µ Pavement Management Program 2016 Bucknam Infrastructure Group, Inc.June 2016 Source: City of Seal Beach centerlineCreated using: ArcMap v. 10.3.1 Pa g e 5 LAMPSON AV ELDER AV ALMOND AV FIR AV BIRCHWOOD AV IRONW O O D A V ASTE R S T GUAVA AV DOGWOOD AV RO S E S T OL E A N D E R S T HE A T H E R S T CANDLEBERRY AV HAZELNUT AV WIS T E R I A S T BLUE B E L L S T FU C H S I A S T VI O L E T S T BANY A N A V DA I S Y S T CA M E L I A S T RO S E C I R PA N S Y C R SU N F L O W E R S T IR I S S T MA R I G O L D S T GO L D E N R O D S T BAS S W O O D S T DA I S Y C R TE A B E R R Y C R PR I M R O S E C R IR I S C R SU N F L O W E R C R P A N S Y S T FE R N C R TU L I P S T PR I M R O S E S T JA S M I N C R DA H L I A D R CA R N A T I O N C R HE A T H E R C R F I R C R GO L D E N R O D C R CL O V E R C R DA I S Y S T IRONWOOD AV CANDLEBERRY AV IRONWOOD AV WIS T E R I A S T FIR AV ELDER AV GUAVA AV FIR AVCA N D L E B E R R Y A V DOGWOOD A V DOGWOOD AV ALMOND AV FIR AV HAZELNUT AV VIO L E T S T City of Seal Beach, CaPCI MAP : NORTHEAST SECTOR Legend PCI centerline RANGE 86 - 100 75 - 85 65 - 74 41 - 55 0 - 40 µ Pavement Management Program 2016 Bucknam Infrastructure Group, Inc.June 2016 Source: City of Seal Beach centerlineCreated using: ArcMap v. 10.3.1 Pa g e 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date MPAH 09 019 1ST ST OCEAN AV MARINA DR 887 40 35,480 A MPAH AC 2 1 96 100 0 0 1/20/16 09 021 1ST ST PCH 597' NE/PCH 597 24 14,328 A MPAH AC 2 1 56 55 35 10 1/21/16 09 0258 1ST ST MARINA DR PCH 2,172 23 49,956 A MPAH AC 2 1 48 47 50 3 1/21/16 09 0259 1ST ST PCH MARINA DR 2,172 22 47,784 A MPAH AC 2 1 59 48 40 12 1/21/16 031 051 BOLSA AV SEAL BEACH BL BALBOA DR 1,985 37 73,445 C MPAH AC 2 2 95 100 0 0 1/14/16 031 052 BOLSA AV BALBOA DR PCH 993 37 36,741 C MPAH AC 2 2 53 40 51 9 1/14/16 062 098 ELECTRIC AV 5TH ST CORSAIR WY 510 37 18,870 C MPAH AC 2 1 100 0 0 0 1/20/16 062 099 ELECTRIC AV CORSAIR WY CDS 380 33 13,640 C MPAH AC 2 1 86 91 0 9 1/20/16 062 0100 ELECTRIC AV SEAL BEACH BL END 190 34 6,460 C MPAH AC 2 1 94 40 15 45 1/20/16 063 0101 ELECTRIC AV NB MAIN ST 6TH ST 960 27 25,920 C MPAH AC 1 1 43 12 77 11 1/20/16 063 0102 ELECTRIC AV NB SEAL BEACH BL 14TH ST 820 27 22,140 C MPAH AAC 1 1 93 41 0 59 1/20/16 063 0103 ELECTRIC AV NB 14TH ST MAIN ST 1,590 27 42,930 C MPAH AC 1 1 96 86 0 14 1/20/16 064 0104 ELECTRIC AV SB 6TH ST MAIN ST 910 25 22,750 C MPAH AC 1 1 66 29 56 15 1/20/16 064 0105 ELECTRIC AV SB SEAL BEACH BL 14TH ST 755 25 18,875 C MPAH AAC 1 1 94 50 0 50 1/20/16 064 0106 ELECTRIC AV SB 14TH ST MAIN ST 1,605 25 40,125 C MPAH AAC 1 1 43 16 66 18 1/20/16 086 316 LAMPSON AV HEATHER ST CANDLEBERRY AV 2,630 60 157,800 A MPAH AC 4 6 81 42 18 40 1/26/16 086 317 LAMPSON AV CANDLEBERY AV BASSWOOD ST 1,269 56 11,200 A MPAH AAC 5 6 87 32 0 68 3/29/16 086 318 LAMPSON AV BASSWOOD ST 735' E/O BASSWOOD ST 735 56 11,200 A MPAH AAC 5 6 82 66 17 17 1/5/16 086 319 LAMPSON AV 735' E/O BASSWOOD ST OLD RANCH PLAZA 1,903 56 11,200 A MPAH AAC 5 6 85 64 0 36 1/5/16 086 320 LAMPSON AV OLD RANCH PLAZA SEAL BEACH BLVD 746 56 11,200 A MPAH AAC 5 6 71 43 25 32 1/5/16 086 321 LAMPSON AV CITY LIMIT ROSE ST 1,781 60 96,300 A MPAH AC 4 6 91 86 0 14 1/26/16 086 335 LAMPSON AV ROSE ST HEATHER ST 1,582 60 87,306 A MPAH AC 4 6 95 78 0 22 1/26/16 090 0150 MARINA DR PCH 6TH ST 629 61 38,369 C MPAH AC 3 1 13 20 80 0 1/20/16 090 0151 MARINA DR 6TH ST 1ST ST 1,650 50 82,500 C MPAH AC 2 1 67 40 49 11 1/26/16 090 0304 MARINA DR 1ST ST CITY LIMIT 965 50 45,520 C MPAH AC 2 1 82 32 40 28 1/26/16 0100 0165 OLD RANCH PARKWAY SEAL BEACH BL 200' W/ SEAL BEACH BL 520 48 24,960 A MPAH AC 3 3 39 34 52 14 1/5/16 0100 0166 OLD RANCH PARKWAY 200' W/ SEAL BEACH 720' W/ SEAL BEACH 200 64 12,800 A MPAH AC 4 3 34 32 68 0 1/5/16 0100 0167 OLD RANCH PARKWAY 720' W/ SEAL BEACH 22 FWY 1,030 34 37,520 A MPAH AC 2 3 25 24 52 24 1/5/16 0115 0184 SEAL BEACH BL ELECTRIC AV PCH 1,510 40 60,400 A MPAH AC 2 1 82 33 15 52 1/20/16 0115 0186 SEAL BEACH BL PCH BOLSA AV 1,640 97 159,080 A MPAH AAC 6 6 94 40 0 60 1/20/16 0115 0190 SEAL BEACH BL OLD RANCH PKY LAMPSON AV 833 89 74,137 A MPAH AC 6 6 92 65 0 35 1/5/16 0115 0191 SEAL BEACH BL LAMPSON AV ST. CLOUD DR 915 77 70,455 A MPAH AC 6 6 90 50 0 50 1/5/16 0115 0192 SEAL BEACH BL ST. CLOUD DR PLYMOUTH DR 1,491 77 114,807 A MPAH AC 6 6 91 41 0 59 1/5/16 0115 0193 SEAL BEACH BL PLYMOUTH DR CITY LIMIT 1,040 97 100,880 A MPAH AC 6 6 91 45 0 55 1/5/16 0115 322 SEAL BEACH BL BOLSA AV HERON POINTE 2,062 99 204,138 A MPAH AC 2 6 97 100 0 0 1/26/16 0115 323 SEAL BEACH BL HERON POINTE ADOLFO LOPEZ DR 1,248 99 123,552 A MPAH AC 2 6 97 93 0 7 1/26/16 0115 324 SEAL BEACH BL ADOLFO LOPEZ DR APOLLO DR 579 98 56,742 A MPAH AC 6 6 86 54 0 46 1/20/16 0115 325 SEAL BEACH BL APOLLO DR ROAD C 1,788 98 175,224 A MPAH AC 6 6 78 27 0 73 1/26/16 0115 326 SEAL BEACH BL ROAD C WESTMINSTER BL 1,551 98 151,998 A MPAH AC 6 6 77 51 12 37 1/26/16 0115 327 SEAL BEACH BL WESTMINSTER BL ST ANDREWS DR 1,010 95 95,950 A MPAH AC 6 6 71 61 9 30 1/26/16 0115 328 SEAL BEACH BL ST ANDREWS DR (N) GOLDEN RAIN RD 1,964 95 186,580 A MPAH AC 6 6 81 59 0 41 1/26/16 0115 329 SEAL BEACH BL (N) GOLDEN RAIN RD FWY 405 SOUTH 1,527 95 145,065 A MPAH AC 6 6 89 45 36 19 3/29/16 0115 330 SEAL BEACH BL FWY 405 SOUTH OLD RANCH PARKWAY 1,858 95 176,510 A MPAH AC 6 6 93 23 0 77 1/26/16 0127 0208 WESTMINSTER BL CITY LIMIT APOLLO DR 1,451 79 102,419 A MPAH AC 4 6 49 52 16 32 1/26/16 0127 0209 WESTMINSTER BL BOLSA CHICA RD SEAL BEACH BL 10,610 72 763,920 A MPAH AC 4 6 95 24 0 76 1/8/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 1 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0127 314 WESTMINSTER BL APOLLO DR 1467' E/O APOLLO DR 1,451 79 103,002 A MPAH AC 4 6 48 50 33 17 1/26/16 0127 315 WESTMINSTER BL 1467' E/O APOLLO DR SEAL BEACH BLVD 1,429 79 102,489 A MPAH AC 4 6 51 51 17 32 1/26/16 4,064,667 LOCALS 01 01 10TH ST ELECTRIC AV PCH 660 40 26,400 E LOCAL AC 2 1 94 76 0 24 1/20/16 01 02 10TH ST OCEAN AV ELECTRIC AV 950 40 38,000 E LOCAL AC 2 1 83 100 0 0 1/20/16 01 03 10TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 64 12 64 24 1/20/16 02 04 11TH ST ELECTRIC AV LANDING AV 210 37 7,770 E LOCAL AC 2 1 100 0 0 0 1/20/16 02 05 11TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 84 60 0 40 1/20/16 02 06 11TH ST OCEAN AV ELECTRIC AV 965 40 38,600 E LOCAL AC 2 1 94 100 0 0 1/26/16 03 07 12TH ST ELECTRIC AV PCH 860 37 31,820 C LOCAL AAC 2 1 95 90 0 10 1/20/16 03 08 12TH ST OCEAN AV ELECTRIC AV 810 40 32,400 E LOCAL PCC 2 1 98 100 0 0 1/6/16 03 09 12TH ST SEAL WY OCEAN AV 210 24 5,040 E LOCAL AC 2 1 78 29 54 17 1/20/16 04 010 13TH ST ELECTRIC AV PCH 1,013 21 21,273 E LOCAL AC 1 1 100 0 0 0 2/8/16 04 011 13TH ST OCEAN AV ELECTRIC AV 710 40 28,400 E LOCAL AC 2 1 92 100 0 0 1/20/16 04 012 13TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 76 28 59 13 1/20/16 05 013 14TH ST ELECTRIC AV PCH 1,010 21 21,210 E LOCAL AC 2 1 100 0 0 0 1/20/16 05 014 14TH ST OCEAN AV ELECTRIC AV 660 40 26,400 E LOCAL AC 2 1 88 22 0 78 1/20/16 05 015 14TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 57 6 69 25 1/20/16 06 016 15TH ST ELECTRIC AV PCH 1,110 21 23,310 E LOCAL AC 1 1 100 0 0 0 1/20/16 07 017 16TH ST ELECTRIC AV PCH 1,160 21 24,360 E LOCAL AC 2 1 51 71 29 0 1/20/16 08 018 17TH ST ELECTRIC AV PCH 1,260 21 26,460 E LOCAL AC 1 1 58 71 29 0 1/20/16 09 0332 1ST ST END OCEAN AVE 403 40 16,120 A LOCAL AC 2 1 99 100 0 0 1/26/16 010 022 2ND ST OCEAN AV CENTRAL AV 860 40 34,400 E LOCAL AC 2 1 91 70 30 0 1/20/16 010 334 2ND ST CENTRAL AV MARINA DR 105 40 4,200 E LOCAL AC 2 1 96 100 0 0 1/26/16 011 023 3RD ST OCEAN AV CENTRAL AV 760 40 30,400 E LOCAL AC 2 1 89 28 0 72 1/20/16 012 024 4TH ST OCEAN AV MARINA DR 1,200 40 48,000 E LOCAL AC 2 1 87 30 0 70 1/20/16 013 025 5TH ST MARINA DR PCH 660 60 39,600 C LOCAL AC 4 1 80 24 0 76 1/20/16 013 026 5TH ST OCEAN AV MARINA DR 1,400 40 56,000 E LOCAL AC 2 1 79 74 0 26 1/20/16 014 027 6TH ST OCEAN AV ELECTRIC AV 1,300 40 52,000 E LOCAL AAC 2 1 97 11 0 89 3/29/16 014 333 6TH ST (S) ELECTRIC AV MARINA DR 195 40 7,800 E LOCAL AAC 2 1 86 21 40 39 1/26/16 015 028 7TH ST ELECTRIC AV MARINA DR 210 40 8,400 E LOCAL AAC 2 1 96 100 0 0 1/20/16 015 029 7TH ST OCEAN AV ELECTRIC AV 1,280 40 51,200 E LOCAL AAC 2 1 96 100 0 0 1/20/16 016 030 8TH ST ELECTRIC AV PCH 460 40 18,400 E LOCAL AAC 2 1 97 100 0 0 1/20/16 016 031 8TH ST OCEAN AV ELECTRIC AV 1,150 40 46,000 E LOCAL AAC 2 1 97 100 0 0 1/20/16 017 032 ADOLFO LOPEZ DR END 425 E/SEAL BEACH BL 800 60 48,000 E LOCAL AAC 2 6 83 31 0 69 1/20/16 017 033 ADOLFO LOPEZ DR SEAL BEACH BL 425 W/SEAL BEACH BL 425 60 25,500 E LOCAL AAC 2 6 62 65 0 35 1/20/16 018 034 AGUA PL MARLIN AV CDS 220 27 7,040 E LOCAL AAC 2 5 91 100 0 0 1/14/16 019 035 ALMOND AV DAISY ST ASTER ST 1,950 36 70,200 C LOCAL AC 2 3 100 0 0 0 2/8/16 019 036 ALMOND AV VIOLET ST ROSE CR 765 37 28,305 C LOCAL AC 2 3 98 100 0 0 1/7/16 019 037 ALMOND AV ROSE CR OLEANDER ST 705 37 26,085 C LOCAL AC 2 3 91 100 0 0 1/7/16 019 0311 ALMOND AV IRIS CR DAISY ST 975 36 35,100 C LOCAL AC 2 3 89 16 0 84 1/7/16 019 0312 ALMOND AV OLEANDER ST IRIS CR 1,120 36 40,320 C LOCAL AC 2 3 90 70 0 30 1/7/16 020 038 ASTER ST ALMOND AV BIRCHWOOD AV 1,239 37 45,843 E LOCAL AAC 2 3 90 54 0 46 1/6/16 020 039 ASTER ST BIRCHWOOD AV CANDLEBERRY AV 206 37 7,622 E LOCAL AAC 2 3 93 38 0 62 1/6/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 2 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 021 040 AVALON DR CATALINA AV END 430 33 14,190 E LOCAL AC 2 2 91 100 0 0 1/14/16 022 041 BALBOA DR BOLSA AV CATALINA AV 1,060 37 39,220 C LOCAL AC 2 2 100 0 0 0 1/14/16 022 042 BALBOA DR PCH BOLSA AV 660 37 24,420 E LOCAL AC 2 2 90 100 0 0 1/14/16 023 043 BANYAN AV CAMELIA ST COLUMBINE ST 600 33 19,800 E LOCAL AC 2 3 71 22 61 17 1/8/16 024 044 BASSWOOD ST ASTER ST LAMPSON AV 410 36 14,760 C LOCAL AC 2 3 98 100 0 0 1/5/16 026 046 BAYOU WY BAYSIDE DR HARBOR WY 630 33 20,790 E LOCAL AAC 2 2 91 100 0 0 1/14/16 025 045 BAYSIDE DR BOLSA AV CRESTVIEW AV 1,410 33 46,530 E LOCAL AC 2 2 89 100 0 0 1/14/16 027 047 BEACHCOMBER DR BOLSA AV SEA BREEZE DR 1,160 33 38,280 E LOCAL AAC 2 2 94 100 0 0 1/14/16 028 048 BERYL COVE WY EMERALD COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 029 049 BIRCHWOOD AV DAISY ST ASTER ST 1,650 33 54,450 E LOCAL AAC 2 3 90 68 25 7 1/7/16 029 0313 BIRCHWOOD AV OLEANDER ST DAISY ST 1,950 33 64,350 E LOCAL AAC 2 3 88 69 29 2 1/7/16 030 050 BLUEBELL ST ALMOND AV BIRCHWOOD AV 710 33 23,430 E LOCAL AC 2 3 72 19 66 15 1/7/16 032 053 CAMELIA ST ALMOND AV BANYAN AV 590 33 19,470 E LOCAL AC 2 3 77 46 51 3 1/8/16 033 054 CANDLEBERRY AV FUCHSIA ST ASTER AV 1,730 36 62,280 E LOCAL AAC 2 3 91 63 0 37 1/6/16 033 055 CANDLEBERRY AV MARIGOLD ST FUCHSIA ST 1,560 37 57,720 E LOCAL AAC 2 3 95 100 0 0 1/8/16 033 056 CANDLEBERRY AV WISTERIA ST OLEANDER ST 1,660 33 54,780 E LOCAL AC 2 3 86 33 66 1 3/29/16 033 0303 CANDLEBERRY AV ASTER ST LAMPSON AV 365 36 13,140 E LOCAL AAC 2 3 94 40 0 60 1/6/16 036 059 CARAVEL WY MARINA DR CORSAIR WY 360 37 13,320 E LOCAL AC 2 1 96 91 0 9 1/20/16 034 057 CARMEL AV SURF PL COASTLINE DR 360 37 13,320 E LOCAL AAC 2 2 90 91 0 9 1/14/16 035 058 CARNATION CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 83 28 56 16 1/8/16 037 060 CATALINA AV BALBOA DR COASTLINE DR 1,910 37 70,670 E LOCAL AC 2 2 90 100 0 0 1/14/16 037 061 CATALINA AV SEA BREEZE DR BALBOA DR 1,160 37 42,920 E LOCAL AC 2 2 88 100 0 0 1/26/16 037 0308 CATALINA AV SEA BREEZE DR CDS 1,330 37 49,760 E LOCAL AC 2 2 91 100 0 0 1/26/16 038 062 CENTRAL AV MAIN ST 12TH ST 860 40 34,400 C LOCAL AAC 2 1 97 100 0 0 1/20/16 038 063 CENTRAL AV 1ST ST 2ND ST 260 20 5,200 C LOCAL AAC 1 1 93 56 0 44 1/20/16 038 064 CENTRAL AV 2ND ST 6TH ST 1,265 40 50,600 C LOCAL AAC 2 1 95 100 0 0 1/26/16 038 0252 CENTRAL AV 6TH ST MAIN ST 950 40 38,000 C LOCAL AAC 2 1 97 100 0 0 1/26/16 039 065 CENTRAL WY 2ND ST 1ST ST 260 40 10,400 E LOCAL AC 2 1 94 95 0 5 1/20/16 039 066 CENTRAL WY 4TH ST 2ND ST 560 38 21,280 E LOCAL AC 2 1 91 69 0 31 1/20/16 039 067 CENTRAL WY 5TH ST 4TH ST 260 38 9,880 E LOCAL AC 2 1 95 100 0 0 1/20/16 040 068 CLIPPER WY CARAVEL WY ELECTRIC AV 910 33 30,030 E LOCAL AC 2 1 96 100 0 0 1/20/16 041 069 CLOVER CR ALMOND AV CDS 130 33 5,540 E LOCAL AC 2 3 93 98 2 0 1/8/16 042 070 COASTLINE DR CARMEL AV CDS 480 27 14,110 E LOCAL AC 2 2 90 100 0 0 1/14/16 042 071 COASTLINE DR MARVISTA DR CARMEL DR 455 33 15,015 E LOCAL AC 2 2 90 100 0 0 1/26/16 042 0305 COASTLINE DR BALBOA DR MARVISTA DR 1,850 33 61,050 E LOCAL AC 2 2 91 100 0 0 1/26/16 044 073 COLLEGE PARK DR (N) YALE LN (S) HARVARD LN 1,741 37 64,417 C LOCAL AC 2 4 92 65 0 35 1/8/16 044 074 COLLEGE PARK DR (S) HARVARD LN CITY LIMIT 940 44 27,810 C LOCAL AC 2 4 84 36 57 7 1/8/16 044 337 COLLEGE PARK DR (N) HARVARD LN (N) YALE LN 940 37 34,780 C LOCAL AC 2 4 92 100 0 0 1/8/16 043 072 COLUMBINE ST ALMOND AV BANYAN AV 210 33 6,930 E LOCAL AC 2 3 78 25 71 4 1/8/16 045 075 CORAL PL CDS BAYSIDE DR 230 27 7,310 E LOCAL AC 2 2 89 96 0 4 1/14/16 046 076 CORSAIR WY CARAVEL WY SCHOONER WY 1,020 33 33,660 E LOCAL AC 2 1 94 95 0 5 1/20/16 047 077 CREST DR CATALINA AV CRESTVIEW AV 210 33 6,930 E LOCAL AAC 2 2 89 66 0 34 1/14/16 048 078 CRESTVIEW AV CATALINA AV BAYSIDE DR 1,130 33 37,290 E LOCAL AAC 2 2 90 100 0 0 1/26/16 048 0309 CRESTVIEW AV BAYSIDE DR CREST DR 1,130 33 37,290 E LOCAL AAC 2 2 90 95 0 5 1/26/16 048 0310 CRESTVIEW AV CREST DR AVALON DR 925 33 30,525 E LOCAL AAC 2 2 91 100 0 0 1/26/16 049 079 CRYSTAL COVE WY MARBLE COVE WY OPAL COVE WY 520 33 17,160 E LOCAL AAC 2 5 91 100 0 0 1/14/16 050 080 CRYSTAL PL CRYSTAL COVE WY CDS 240 27 7,530 E LOCAL AC 2 5 93 100 0 0 1/14/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 3 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 051 081 DAFFODIL CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 77 25 75 0 1/8/16 052 082 DAHLIA DR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 75 30 68 2 1/8/16 053 083 DAISY CR FIR AV CDS 230 33 8,840 E LOCAL AC 2 3 57 42 57 1 1/6/16 054 084 DAISY ST ALMOND AV BIRCHWOOD AV 410 33 13,530 E LOCAL AC 2 3 54 12 74 14 1/8/16 054 085 DAISY ST CANDLEBERRY AV DOGWOOD AV 210 33 6,930 E LOCAL AC 2 3 67 14 52 34 1/6/16 055 086 DARTMOUTH CR HARVARD LN CDS 180 34 8,120 E LOCAL AC 2 4 78 10 63 27 3/29/16 056 087 DOGWOOD AV DAISY ST IRONWOOD AV 1,470 33 48,510 E LOCAL AC 2 3 80 40 34 26 3/29/16 056 088 DOGWOOD AV MARIGOLD ST FUCHSIA ST 1,520 33 50,160 E LOCAL AC 2 3 73 32 57 11 1/8/16 056 089 DOGWOOD AV WISTERIA ST OLEANDER ST 1,710 33 56,430 E LOCAL AC 2 3 58 30 63 7 1/7/16 057 090 DOLPHIN AV SEAL WY OCEAN AV 226 24 5,424 E LOCAL AC 2 1 63 28 67 5 1/20/16 057 091 DOLPHIN AV OCEAN AV ELECTRIC AV 582 24 13,968 E LOCAL AC 1 1 90 96 0 4 1/20/16 058 092 DORY WY GALLEON WY SCHOONER WY 360 28 10,080 E LOCAL AC 2 2 93 100 0 0 1/20/16 059 093 DRIFTWOOD AV BALBOA DR COASTLINE DR 1,460 33 48,180 E LOCAL AAC 2 2 89 86 14 0 1/14/16 060 094 EBBTIDE PL COASTLINE PL CDS 230 27 7,410 E LOCAL AC 2 2 87 100 0 0 1/14/16 061 20 ELDER AV FUCHSIA ST IRONWOOD AV 1,500 36 54,000 E LOCAL AC 2 3 94 100 0 0 1/6/16 061 095 ELDER AV HEATHER ST FUCHSIA ST 520 36 18,720 E LOCAL AC 2 3 89 97 0 3 1/6/16 061 096 ELDER AV OLEANDER ST HEATHER ST 1,130 36 40,680 E LOCAL AC 2 3 79 87 0 13 1/6/16 061 097 ELDER AV VIOLET ST PRIMROSE ST 1,380 33 45,540 E LOCAL AC 2 3 80 78 0 22 1/7/16 065 0107 EMERALD COVE WY BERYL COVE WY JADE COVE WY 580 33 19,140 E LOCAL AC 2 5 90 100 0 0 1/14/16 066 0108 EMERALD PL EMERALD COVE WY CDS 230 27 7,460 E LOCAL AC 2 5 86 43 0 57 1/26/16 067 0109 FATHOM AV SILVER SHOALS AV BALBOA DR 810 33 26,730 E LOCAL AC 2 2 91 100 0 0 1/14/16 068 0110 FERN CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 81 17 66 17 1/8/16 069 0111 FIR AV GOLDENROD ST IRONWOOD AV 1,460 33 48,180 E LOCAL AAC 2 3 94 78 0 22 3/29/16 069 0112 FIR AV ROSE ST HEATHER ST 1,260 33 41,580 E LOCAL AC 2 3 73 37 43 20 1/7/16 069 0113 FIR AV SUNFLOWER ST ROSE ST 330 33 10,890 E LOCAL AAC 2 3 97 100 0 0 1/7/16 069 0114 FIR AV WISTERIA ST SUNFLOWER ST 1,220 33 40,260 E LOCAL AAC 2 3 97 100 0 0 1/7/16 070 0115 FIR CR FIR AV CDS 130 60 8,900 E LOCAL AC 2 3 91 95 2 3 1/7/16 072 0117 FUCHSIA CR FIR AV CDS 330 33 12,140 E LOCAL AAC 2 3 93 95 0 5 1/6/16 071 0116 FUCHSIA ST BIRCHWOOD AV ELDER AV 640 33 21,120 E LOCAL AAC 2 3 92 60 40 0 3/29/16 073 0118 GALLEON WY ELECTRIC AV DORY WY 970 33 32,010 E LOCAL AC 2 1 75 18 0 82 1/20/16 097 0160 GATE RD SEAL BEACH BL 1857' W/O SEAL BEACH BL 1,857 42 77,994 E LOCAL AAC 2 6 89 29 0 71 1/26/16 097 0161 GATE RD 1857' W/O SEAL BEACH BL CDS 1,857 25 47,175 E LOCAL AAC 2 6 94 41 0 59 1/26/16 074 0119 GOLDENROD CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 88 41 36 23 1/8/16 0139 0120 GOLDENROD ST ELDER AV CDS 610 33 21,380 E LOCAL AAC 2 3 86 77 0 23 1/6/16 075 0121 GUAVA AV IRONWOOD AV CDS 530 33 18,740 E LOCAL AC 2 3 96 68 0 32 3/29/16 075 0122 GUAVA AV PANSY ST HEATHER ST 1,360 33 44,880 E LOCAL AC 2 3 78 56 0 44 1/7/16 077 0124 HARBOR WY BAYSIDE DR BAYOU WY 760 33 25,080 E LOCAL AC 2 2 100 0 0 0 1/14/16 076 0123 HARVARD LN COLLEGE PARK DR OCCIDENTAL LN 1,063 37 39,331 E LOCAL AC 2 4 88 91 0 9 1/26/16 076 331 HARVARD LN OCCIDENTAL LN (N) COLLEGE PARK DR 1,289 37 47,693 E LOCAL AC 2 4 87 47 0 53 1/26/16 076 336 HARVARD LN (N) COLLEGE PARK DR CDS 992 37 37,804 E LOCAL AC 2 4 94 100 0 0 1/8/16 078 0125 HAZELNUT AV GUAVA AV HEATHER ST 1,210 33 39,930 E LOCAL AAC 2 3 90 65 0 35 1/6/16 078 0126 HAZELNUT AV HEATHER ST ROSE ST 1,610 33 53,130 E LOCAL AC 2 3 82 65 0 35 1/6/16 078 0127 HAZELNUT AV WISTERIA ST SUNFLOWER ST 1,310 33 43,230 E LOCAL AC 2 3 34 15 85 0 1/7/16 079 0128 HEATHER CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 94 63 37 0 1/8/16 0135 0129 HEATHER ST HAZELNUT AV LAMPSON AV 490 37 18,130 E LOCAL AAC 2 3 77 46 34 20 1/6/16 0135 0130 HEATHER ST ELDER AV HAZELNUT AV 790 37 29,230 E LOCAL AC 2 3 90 100 0 0 1/6/16 080 0131 IRIS CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 78 21 77 2 1/8/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 4 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0136 0132 IRIS ST HAZELNUT AV IRONWOOD AV 226 32 7,232 E LOCAL AC 2 3 49 12 68 20 1/6/16 081 0133 IRONWOOD AV CANDLEBERRY AV ELDER AV 524 33 17,292 C LOCAL AC 2 3 98 100 0 0 1/6/16 081 0134 IRONWOOD AV ELDER AV HEATHER ST 1,967 33 64,911 C LOCAL AC 2 3 97 99 0 1 1/6/16 081 0135 IRONWOOD AV ROSE ST IRIS ST 1,420 33 46,860 C LOCAL AC 2 3 50 9 80 11 1/6/16 081 0136 IRONWOOD AV WISTERIA ST TULIP ST 322 37 11,914 C LOCAL AC 2 3 96 100 0 0 1/7/16 081 0137 IRONWOOD AV TULIP ST SUNFLOWER ST 1,020 37 37,740 C LOCAL AC 2 3 64 47 53 0 1/7/16 082 0138 ISLAND VIEW DR BOLSA AV SEA BREEZE DR 1,110 33 36,630 E LOCAL AAC 2 2 94 100 0 0 1/14/16 083 0139 JADE COVE WY EMERALD COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 084 0140 JASMIN CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 94 53 0 47 1/8/16 085 0141 LAGUNA PL MARLIN AV CDS 380 27 11,460 E LOCAL AC 2 5 91 100 0 0 1/14/16 087 0145 LANDING AV 12TH ST 11TH ST 260 42 10,920 E LOCAL AC 2 1 39 61 39 0 1/20/16 087 0146 LANDING AV SEAL BEACH BL 12TH ST 1,210 21 25,410 E LOCAL AC 2 1 95 0 0 100 1/20/16 088 0147 LOYOLA PLAZA COLLEGE PARK DR CDS 330 25 9,250 E LOCAL AC 2 4 80 74 26 0 1/8/16 089 0148 MAIN ST ELECTRIC AV PCH 690 55 37,950 C LOCAL AC 2 1 49 59 41 0 1/21/16 089 0149 MAIN ST OCEAN AV ELECTRIC AVE 1,190 57 67,830 C LOCAL AC 2 1 91 88 0 12 1/20/16 091 0152 MARBLE COVE WY CRYSTAL COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 092 0153 MARIGOLD ST BIRCHWOOD AV CANDLEBERRY AV 160 33 5,280 E LOCAL AC 2 3 51 12 85 3 1/8/16 092 0154 MARIGOLD ST CANDLEBERRY AV DOGWOOD AV 160 33 5,280 E LOCAL AC 2 3 74 29 66 5 1/8/16 093 0155 MARINE AV ELECTRIC AV DOLPHIN AV 320 24 7,680 E LOCAL AC 1 1 89 93 0 7 1/20/16 094 0156 MARLIN AV SEAL BEACH BL BALBOA DR 1,610 37 59,570 E LOCAL AC 2 5 90 79 21 0 1/14/16 095 0157 MARVISTA AV CATALINA AV COASTLINE DR 1,610 33 53,130 E LOCAL AC 2 2 93 100 0 0 3/29/16 095 0158 MARVISTA AV COASTLINE DR PCH 123 36 4,428 E LOCAL AC 2 2 94 100 0 0 1/20/16 096 0159 NEPTUNE AV SEAL WY OCEAN AV 210 24 5,040 E LOCAL AC 2 1 90 42 58 0 1/20/16 098 0162 OCCIDENTAL DR STANFORD LN HARVARD LN 160 33 5,280 E LOCAL AC 2 4 77 16 64 20 1/8/16 099 0163 OCEAN AV 13TH ST MAIN ST 1,265 51 64,515 C LOCAL AC 2 1 80 88 12 0 1/26/16 099 0164 OCEAN AV MAIN ST 5TH ST 1,245 52 64,740 C LOCAL AC 2 1 79 80 20 0 1/26/16 099 0306 OCEAN AV ELECTRIC AV 13TH ST 1,300 51 66,300 C LOCAL AC 2 1 82 96 0 4 1/26/16 099 0307 OCEAN AV 5TH ST 1ST ST 1,240 52 64,480 C LOCAL AC 2 1 77 68 32 0 1/26/16 0101 0168 OLEANDER ST ALMOND AV FIR AV 1,320 36 47,520 E LOCAL AC 2 3 45 23 65 12 1/7/16 0102 0169 OPAL COVE WY CRYSTAL COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 0113 0170 PANSY CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 6 91 53 11 36 1/7/16 0103 0171 PANSY ST FIR AV GUAVA AV 160 33 5,280 E LOCAL AC 2 6 89 74 0 26 1/7/16 0106 0174 PRIMROSE CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 3 91 74 0 26 1/7/16 0104 0172 PRIMROSE ST DOGWOOD AV ELDER AV 210 33 6,930 E LOCAL AC 2 3 92 50 14 36 1/7/16 0105 0173 PRINCETON CR HARVARD LN CDS 230 30 8,900 E LOCAL AC 2 4 70 34 66 0 1/8/16 0107 0175 PURDUE CR COLLEGE PARK DR CDS 68 27 3,836 E LOCAL AC 2 4 58 9 75 16 1/8/16 0108 0176 RIVIERA DR MARLIN AV BOLSA AV 560 31 17,360 E LOCAL AC 2 5 89 100 0 0 1/14/16 0137 0177 ROSE CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 3 93 100 0 0 1/7/16 0109 0178 ROSE ST FIR AV HAZELNUT AV 390 37 14,430 C LOCAL AC 2 3 91 71 0 29 3/29/16 0109 0179 ROSE ST HAZELNUT AV LAMPSON AV 440 37 16,280 C LOCAL AC 2 3 96 83 0 17 3/29/16 0110 0180 ROSSMOOR CENTER WY SEAL BEACH BL WEST RD 864 30 25,920 C LOCAL AC 2 3 88 56 0 44 1/5/16 0110 0181 ROSSMOOR CENTER WY WEST RD MONTECITO RD 364 28 10,192 C LOCAL AC 2 3 88 57 0 43 1/5/16 0111 0182 SANDPIPER DR BOLSA AV TAPER DR 1,110 33 36,630 E LOCAL AC 2 1 97 100 0 0 1/14/16 0112 0183 SCHOONER WY GALLEON WY DORY WY 660 33 21,780 E LOCAL AC 2 1 87 100 0 0 1/20/16 0114 0185 SEA BREEZE DR BOLSA AV CATALINA AV 1,160 33 38,280 E LOCAL AC 2 2 94 100 0 0 1/14/16 0117 0194 SEAL WY 10TH ST 11TH ST 290 15 4,350 E LOCAL PCC 1 1 90 16 78 6 1/20/16 0117 0195 SEAL WY DOLPHIN AV 14TH ST 270 13 3,510 E LOCAL PCC 1 1 88 16 84 0 1/26/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 5 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0117 0196 SEAL WY 12TH ST 11TH ST 300 12 3,600 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0247 SEAL WY 13TH ST 12TH ST 295 12 3,540 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0248 SEAL WY 14TH ST 13TH ST 295 12 3,540 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0249 SEAL WY NEPTUNE AV DOLPHIN AV 385 13 5,005 E LOCAL PCC 1 1 83 9 89 2 1/26/16 0117 0250 SEAL WY ELECTRIC AV NEPTUNE AV 505 13 6,565 E LOCAL PCC 1 1 82 9 91 0 1/26/16 0118 0197 SILVER SHOALS AV BOLSA AV FATHOM AV 300 33 9,900 E LOCAL AC 2 2 100 0 0 0 1/14/16 0119 0198 SOUTH SHORE DR BOLSA AV TAPER DR 1,060 33 34,980 E LOCAL AC 2 2 97 100 0 0 1/14/16 0120 0199 STANFORD LN COLLEGE PARK DR COLLEGE PARK DR 1,860 32 59,520 E LOCAL AC 2 3 82 28 15 57 1/8/16 0138 0200 SUNFLOWER CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 1 98 85 0 15 1/7/16 0121 0201 SUNFLOWER ST FIR AV IRONWOOD AV 560 37 20,720 E LOCAL AC 2 3 42 24 69 7 1/7/16 0122 0202 SURF PL CATALINA AV CDS 480 33 16,940 E LOCAL AC 2 2 91 100 0 0 1/14/16 0123 0203 TAPER DR BOLSA AV CATALINA AV 1,110 33 36,630 E LOCAL AC 2 2 97 100 0 0 1/14/16 0124 0204 TEABERRY CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 2 94 31 0 69 1/7/16 0125 0205 TULIP ST IRONWOOD AV LAMPSON AV 70 36 2,520 E LOCAL AAC 2 3 94 100 0 0 1/7/16 0126 0206 VIOLET ST ALMOND AV CANDLEBERRY AV 660 33 21,780 E LOCAL AC 2 3 85 34 25 41 1/7/16 0126 0207 VIOLET ST ELDER AV FIR AV 160 33 5,280 E LOCAL AC 2 3 43 12 78 10 1/7/16 0128 0210 WISTERIA ST DOGWOOD AV IRONWOOD AV 990 37 36,630 E LOCAL AC 2 3 78 42 46 12 3/29/16 0128 0211 WISTERIA ST DOGWOOD AV CDS 1,040 33 35,570 E LOCAL AC 2 3 80 49 44 7 3/29/16 0129 0212 YALE CR END YALE LN 130 48 6,240 E LOCAL AC 2 4 82 23 77 0 3/29/16 0130 0213 YALE LN (N) COLLEGE PARK DR (S) COLLEGE PARK DR 1,160 33 38,280 E LOCAL AC 2 4 77 55 45 0 1/8/16 5,327,374 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 6 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, PCI (0-100) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date MPAH 090 0150 MARINA DR PCH 6TH ST 629 61 38,369 C MPAH AC 3 1 13 20 80 0 1/20/16 0100 0167 OLD RANCH PARKWAY 720' W/ SEAL BEACH 22 FWY 1,030 34 37,520 A MPAH AC 2 3 25 24 52 24 1/5/16 0100 0166 OLD RANCH PARKWAY 200' W/ SEAL BEACH 720' W/ SEAL BEACH 200 64 12,800 A MPAH AC 4 3 34 32 68 0 1/5/16 0100 0165 OLD RANCH PARKWAY SEAL BEACH BL 200' W/ SEAL BEACH BL 520 48 24,960 A MPAH AC 3 3 39 34 52 14 1/5/16 063 0101 ELECTRIC AV NB MAIN ST 6TH ST 960 27 25,920 C MPAH AC 1 1 43 12 77 11 1/20/16 09 0258 1ST ST MARINA DR PCH 2,172 23 49,956 A MPAH AC 2 1 48 47 50 3 1/21/16 064 0106 ELECTRIC AV SB 14TH ST MAIN ST 1,605 25 40,125 C MPAH AAC 1 1 43 16 66 18 1/20/16 0127 314 WESTMINSTER BL APOLLO DR 1467' E/O APOLLO DR 1,451 79 103,002 A MPAH AC 4 6 48 50 33 17 1/26/16 0127 0208 WESTMINSTER BL CITY LIMIT APOLLO DR 1,451 79 102,419 A MPAH AC 4 6 49 52 16 32 1/26/16 0127 315 WESTMINSTER BL 1467' E/O APOLLO DR SEAL BEACH BLVD 1,429 79 102,489 A MPAH AC 4 6 51 51 17 32 1/26/16 031 052 BOLSA AV BALBOA DR PCH 993 37 36,741 C MPAH AC 2 2 53 40 51 9 1/14/16 09 021 1ST ST PCH 597' NE/PCH 597 24 14,328 A MPAH AC 2 1 56 55 35 10 1/21/16 09 0259 1ST ST PCH MARINA DR 2,172 22 47,784 A MPAH AC 2 1 59 48 40 12 1/21/16 064 0104 ELECTRIC AV SB 6TH ST MAIN ST 910 25 22,750 C MPAH AC 1 1 66 29 56 15 1/20/16 090 0151 MARINA DR 6TH ST 1ST ST 1,650 50 82,500 C MPAH AC 2 1 67 40 49 11 1/26/16 086 320 LAMPSON AV OLD RANCH PLAZA SEAL BEACH BLVD 746 56 11,200 A MPAH AAC 5 6 71 43 25 32 1/5/16 0115 327 SEAL BEACH BL WESTMINSTER BL ST ANDREWS DR 1,010 95 95,950 A MPAH AC 6 6 71 61 9 30 1/26/16 0115 326 SEAL BEACH BL ROAD C WESTMINSTER BL 1,551 98 151,998 A MPAH AC 6 6 77 51 12 37 1/26/16 0115 325 SEAL BEACH BL APOLLO DR ROAD C 1,788 98 175,224 A MPAH AC 6 6 78 27 0 73 1/26/16 086 316 LAMPSON AV HEATHER ST CANDLEBERRY AV 2,630 60 157,800 A MPAH AC 4 6 81 42 18 40 1/26/16 0115 328 SEAL BEACH BL ST ANDREWS DR (N) GOLDEN RAIN RD 1,964 95 186,580 A MPAH AC 6 6 81 59 0 41 1/26/16 086 318 LAMPSON AV BASSWOOD ST 735' E/O BASSWOOD ST 735 56 11,200 A MPAH AAC 5 6 82 66 17 17 1/5/16 090 0304 MARINA DR 1ST ST CITY LIMIT 965 50 45,520 C MPAH AC 2 1 82 32 40 28 1/26/16 0115 0184 SEAL BEACH BL ELECTRIC AV PCH 1,510 40 60,400 A MPAH AC 2 1 82 33 15 52 1/20/16 086 319 LAMPSON AV 735' E/O BASSWOOD ST OLD RANCH PLAZA 1,903 56 11,200 A MPAH AAC 5 6 85 64 0 36 1/5/16 062 099 ELECTRIC AV CORSAIR WY CDS 380 33 13,640 C MPAH AC 2 1 86 91 0 9 1/20/16 0115 324 SEAL BEACH BL ADOLFO LOPEZ DR APOLLO DR 579 98 56,742 A MPAH AC 6 6 86 54 0 46 1/20/16 086 317 LAMPSON AV CANDLEBERY AV BASSWOOD ST 1,269 56 11,200 A MPAH AAC 5 6 87 32 0 68 3/29/16 0115 329 SEAL BEACH BL (N) GOLDEN RAIN RD FWY 405 SOUTH 1,527 95 145,065 A MPAH AC 6 6 89 45 36 19 3/29/16 0115 0191 SEAL BEACH BL LAMPSON AV ST. CLOUD DR 915 77 70,455 A MPAH AC 6 6 90 50 0 50 1/5/16 086 321 LAMPSON AV CITY LIMIT ROSE ST 1,781 60 96,300 A MPAH AC 4 6 91 86 0 14 1/26/16 0115 0193 SEAL BEACH BL PLYMOUTH DR CITY LIMIT 1,040 97 100,880 A MPAH AC 6 6 91 45 0 55 1/5/16 0115 0192 SEAL BEACH BL ST. CLOUD DR PLYMOUTH DR 1,491 77 114,807 A MPAH AC 6 6 91 41 0 59 1/5/16 0115 0190 SEAL BEACH BL OLD RANCH PKY LAMPSON AV 833 89 74,137 A MPAH AC 6 6 92 65 0 35 1/5/16 063 0102 ELECTRIC AV NB SEAL BEACH BL 14TH ST 820 27 22,140 C MPAH AAC 1 1 93 41 0 59 1/20/16 0115 330 SEAL BEACH BL FWY 405 SOUTH OLD RANCH PARKWAY 1,858 95 176,510 A MPAH AC 6 6 93 23 0 77 1/26/16 062 0100 ELECTRIC AV SEAL BEACH BL END 190 34 6,460 C MPAH AC 2 1 94 40 15 45 1/20/16 064 0105 ELECTRIC AV SB SEAL BEACH BL 14TH ST 755 25 18,875 C MPAH AAC 1 1 94 50 0 50 1/20/16 0115 0186 SEAL BEACH BL PCH BOLSA AV 1,640 97 159,080 A MPAH AAC 6 6 94 40 0 60 1/20/16 031 051 BOLSA AV SEAL BEACH BL BALBOA DR 1,985 37 73,445 C MPAH AC 2 2 95 100 0 0 1/14/16 086 335 LAMPSON AV ROSE ST HEATHER ST 1,582 60 87,306 A MPAH AC 4 6 95 78 0 22 1/26/16 0127 0209 WESTMINSTER BL BOLSA CHICA RD SEAL BEACH BL 10,610 72 763,920 A MPAH AC 4 6 95 24 0 76 1/8/16 09 019 1ST ST OCEAN AV MARINA DR 887 40 35,480 A MPAH AC 2 1 96 100 0 0 1/20/16 063 0103 ELECTRIC AV NB 14TH ST MAIN ST 1,590 27 42,930 C MPAH AC 1 1 96 86 0 14 1/20/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 1 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, PCI (0-100) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0115 323 SEAL BEACH BL HERON POINTE ADOLFO LOPEZ DR 1,248 99 123,552 A MPAH AC 2 6 97 93 0 7 1/26/16 0115 322 SEAL BEACH BL BOLSA AV HERON POINTE 2,062 99 204,138 A MPAH AC 2 6 97 100 0 0 1/26/16 062 098 ELECTRIC AV 5TH ST CORSAIR WY 510 37 18,870 C MPAH AC 2 1 100 0 0 0 1/20/16 4,064,667 LOCALS 078 0127 HAZELNUT AV WISTERIA ST SUNFLOWER ST 1,310 33 43,230 E LOCAL AC 2 3 34 15 85 0 1/7/16 087 0145 LANDING AV 12TH ST 11TH ST 260 42 10,920 E LOCAL AC 2 1 39 61 39 0 1/20/16 0121 0201 SUNFLOWER ST FIR AV IRONWOOD AV 560 37 20,720 E LOCAL AC 2 3 42 24 69 7 1/7/16 0126 0207 VIOLET ST ELDER AV FIR AV 160 33 5,280 E LOCAL AC 2 3 43 12 78 10 1/7/16 0101 0168 OLEANDER ST ALMOND AV FIR AV 1,320 36 47,520 E LOCAL AC 2 3 45 23 65 12 1/7/16 0136 0132 IRIS ST HAZELNUT AV IRONWOOD AV 226 32 7,232 E LOCAL AC 2 3 49 12 68 20 1/6/16 089 0148 MAIN ST ELECTRIC AV PCH 690 55 37,950 C LOCAL AC 2 1 49 59 41 0 1/21/16 081 0135 IRONWOOD AV ROSE ST IRIS ST 1,420 33 46,860 C LOCAL AC 2 3 50 9 80 11 1/6/16 07 017 16TH ST ELECTRIC AV PCH 1,160 21 24,360 E LOCAL AC 2 1 51 71 29 0 1/20/16 092 0153 MARIGOLD ST BIRCHWOOD AV CANDLEBERRY AV 160 33 5,280 E LOCAL AC 2 3 51 12 85 3 1/8/16 054 084 DAISY ST ALMOND AV BIRCHWOOD AV 410 33 13,530 E LOCAL AC 2 3 54 12 74 14 1/8/16 05 015 14TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 57 6 69 25 1/20/16 053 083 DAISY CR FIR AV CDS 230 33 8,840 E LOCAL AC 2 3 57 42 57 1 1/6/16 08 018 17TH ST ELECTRIC AV PCH 1,260 21 26,460 E LOCAL AC 1 1 58 71 29 0 1/20/16 056 089 DOGWOOD AV WISTERIA ST OLEANDER ST 1,710 33 56,430 E LOCAL AC 2 3 58 30 63 7 1/7/16 0107 0175 PURDUE CR COLLEGE PARK DR CDS 68 27 3,836 E LOCAL AC 2 4 58 9 75 16 1/8/16 017 033 ADOLFO LOPEZ DR SEAL BEACH BL 425 W/SEAL BEACH BL 425 60 25,500 E LOCAL AAC 2 6 62 65 0 35 1/20/16 057 090 DOLPHIN AV SEAL WY OCEAN AV 226 24 5,424 E LOCAL AC 2 1 63 28 67 5 1/20/16 01 03 10TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 64 12 64 24 1/20/16 081 0137 IRONWOOD AV TULIP ST SUNFLOWER ST 1,020 37 37,740 C LOCAL AC 2 3 64 47 53 0 1/7/16 054 085 DAISY ST CANDLEBERRY AV DOGWOOD AV 210 33 6,930 E LOCAL AC 2 3 67 14 52 34 1/6/16 0105 0173 PRINCETON CR HARVARD LN CDS 230 30 8,900 E LOCAL AC 2 4 70 34 66 0 1/8/16 023 043 BANYAN AV CAMELIA ST COLUMBINE ST 600 33 19,800 E LOCAL AC 2 3 71 22 61 17 1/8/16 030 050 BLUEBELL ST ALMOND AV BIRCHWOOD AV 710 33 23,430 E LOCAL AC 2 3 72 19 66 15 1/7/16 056 088 DOGWOOD AV MARIGOLD ST FUCHSIA ST 1,520 33 50,160 E LOCAL AC 2 3 73 32 57 11 1/8/16 069 0112 FIR AV ROSE ST HEATHER ST 1,260 33 41,580 E LOCAL AC 2 3 73 37 43 20 1/7/16 092 0154 MARIGOLD ST CANDLEBERRY AV DOGWOOD AV 160 33 5,280 E LOCAL AC 2 3 74 29 66 5 1/8/16 052 082 DAHLIA DR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 75 30 68 2 1/8/16 073 0118 GALLEON WY ELECTRIC AV DORY WY 970 33 32,010 E LOCAL AC 2 1 75 18 0 82 1/20/16 04 012 13TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 76 28 59 13 1/20/16 032 053 CAMELIA ST ALMOND AV BANYAN AV 590 33 19,470 E LOCAL AC 2 3 77 46 51 3 1/8/16 051 081 DAFFODIL CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 77 25 75 0 1/8/16 0135 0129 HEATHER ST HAZELNUT AV LAMPSON AV 490 37 18,130 E LOCAL AAC 2 3 77 46 34 20 1/6/16 098 0162 OCCIDENTAL DR STANFORD LN HARVARD LN 160 33 5,280 E LOCAL AC 2 4 77 16 64 20 1/8/16 099 0307 OCEAN AV 5TH ST 1ST ST 1,240 52 64,480 C LOCAL AC 2 1 77 68 32 0 1/26/16 0130 0213 YALE LN (N) COLLEGE PARK DR (S) COLLEGE PARK DR 1,160 33 38,280 E LOCAL AC 2 4 77 55 45 0 1/8/16 03 09 12TH ST SEAL WY OCEAN AV 210 24 5,040 E LOCAL AC 2 1 78 29 54 17 1/20/16 043 072 COLUMBINE ST ALMOND AV BANYAN AV 210 33 6,930 E LOCAL AC 2 3 78 25 71 4 1/8/16 055 086 DARTMOUTH CR HARVARD LN CDS 180 34 8,120 E LOCAL AC 2 4 78 10 63 27 3/29/16 075 0122 GUAVA AV PANSY ST HEATHER ST 1,360 33 44,880 E LOCAL AC 2 3 78 56 0 44 1/7/16 080 0131 IRIS CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 78 21 77 2 1/8/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 2 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, PCI (0-100) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0128 0210 WISTERIA ST DOGWOOD AV IRONWOOD AV 990 37 36,630 E LOCAL AC 2 3 78 42 46 12 3/29/16 013 026 5TH ST OCEAN AV MARINA DR 1,400 40 56,000 E LOCAL AC 2 1 79 74 0 26 1/20/16 061 096 ELDER AV OLEANDER ST HEATHER ST 1,130 36 40,680 E LOCAL AC 2 3 79 87 0 13 1/6/16 099 0164 OCEAN AV MAIN ST 5TH ST 1,245 52 64,740 C LOCAL AC 2 1 79 80 20 0 1/26/16 013 025 5TH ST MARINA DR PCH 660 60 39,600 C LOCAL AC 4 1 80 24 0 76 1/20/16 056 087 DOGWOOD AV DAISY ST IRONWOOD AV 1,470 33 48,510 E LOCAL AC 2 3 80 40 34 26 3/29/16 061 097 ELDER AV VIOLET ST PRIMROSE ST 1,380 33 45,540 E LOCAL AC 2 3 80 78 0 22 1/7/16 088 0147 LOYOLA PLAZA COLLEGE PARK DR CDS 330 25 9,250 E LOCAL AC 2 4 80 74 26 0 1/8/16 099 0163 OCEAN AV 13TH ST MAIN ST 1,265 51 64,515 C LOCAL AC 2 1 80 88 12 0 1/26/16 0128 0211 WISTERIA ST DOGWOOD AV CDS 1,040 33 35,570 E LOCAL AC 2 3 80 49 44 7 3/29/16 068 0110 FERN CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 81 17 66 17 1/8/16 078 0126 HAZELNUT AV HEATHER ST ROSE ST 1,610 33 53,130 E LOCAL AC 2 3 82 65 0 35 1/6/16 099 0306 OCEAN AV ELECTRIC AV 13TH ST 1,300 51 66,300 C LOCAL AC 2 1 82 96 0 4 1/26/16 0117 0250 SEAL WY ELECTRIC AV NEPTUNE AV 505 13 6,565 E LOCAL PCC 1 1 82 9 91 0 1/26/16 0120 0199 STANFORD LN COLLEGE PARK DR COLLEGE PARK DR 1,860 32 59,520 E LOCAL AC 2 3 82 28 15 57 1/8/16 0129 0212 YALE CR END YALE LN 130 48 6,240 E LOCAL AC 2 4 82 23 77 0 3/29/16 01 02 10TH ST OCEAN AV ELECTRIC AV 950 40 38,000 E LOCAL AC 2 1 83 100 0 0 1/20/16 017 032 ADOLFO LOPEZ DR END 425 E/SEAL BEACH BL 800 60 48,000 E LOCAL AAC 2 6 83 31 0 69 1/20/16 035 058 CARNATION CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 83 28 56 16 1/8/16 0117 0249 SEAL WY NEPTUNE AV DOLPHIN AV 385 13 5,005 E LOCAL PCC 1 1 83 9 89 2 1/26/16 02 05 11TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 84 60 0 40 1/20/16 044 074 COLLEGE PARK DR (S) HARVARD LN CITY LIMIT 940 44 27,810 C LOCAL AC 2 4 84 36 57 7 1/8/16 0126 0206 VIOLET ST ALMOND AV CANDLEBERRY AV 660 33 21,780 E LOCAL AC 2 3 85 34 25 41 1/7/16 014 333 6TH ST (S) ELECTRIC AV MARINA DR 195 40 7,800 E LOCAL AAC 2 1 86 21 40 39 1/26/16 033 056 CANDLEBERRY AV WISTERIA ST OLEANDER ST 1,660 33 54,780 E LOCAL AC 2 3 86 33 66 1 3/29/16 066 0108 EMERALD PL EMERALD COVE WY CDS 230 27 7,460 E LOCAL AC 2 5 86 43 0 57 1/26/16 0139 0120 GOLDENROD ST ELDER AV CDS 610 33 21,380 E LOCAL AAC 2 3 86 77 0 23 1/6/16 012 024 4TH ST OCEAN AV MARINA DR 1,200 40 48,000 E LOCAL AC 2 1 87 30 0 70 1/20/16 060 094 EBBTIDE PL COASTLINE PL CDS 230 27 7,410 E LOCAL AC 2 2 87 100 0 0 1/14/16 076 331 HARVARD LN OCCIDENTAL LN (N) COLLEGE PARK DR 1,289 37 47,693 E LOCAL AC 2 4 87 47 0 53 1/26/16 0112 0183 SCHOONER WY GALLEON WY DORY WY 660 33 21,780 E LOCAL AC 2 1 87 100 0 0 1/20/16 05 014 14TH ST OCEAN AV ELECTRIC AV 660 40 26,400 E LOCAL AC 2 1 88 22 0 78 1/20/16 029 0313 BIRCHWOOD AV OLEANDER ST DAISY ST 1,950 33 64,350 E LOCAL AAC 2 3 88 69 29 2 1/7/16 037 061 CATALINA AV SEA BREEZE DR BALBOA DR 1,160 37 42,920 E LOCAL AC 2 2 88 100 0 0 1/26/16 074 0119 GOLDENROD CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 88 41 36 23 1/8/16 076 0123 HARVARD LN COLLEGE PARK DR OCCIDENTAL LN 1,063 37 39,331 E LOCAL AC 2 4 88 91 0 9 1/26/16 0110 0180 ROSSMOOR CENTER WY SEAL BEACH BL WEST RD 864 30 25,920 C LOCAL AC 2 3 88 56 0 44 1/5/16 0110 0181 ROSSMOOR CENTER WY WEST RD MONTECITO RD 364 28 10,192 C LOCAL AC 2 3 88 57 0 43 1/5/16 0117 0195 SEAL WY DOLPHIN AV 14TH ST 270 13 3,510 E LOCAL PCC 1 1 88 16 84 0 1/26/16 011 023 3RD ST OCEAN AV CENTRAL AV 760 40 30,400 E LOCAL AC 2 1 89 28 0 72 1/20/16 019 0311 ALMOND AV IRIS CR DAISY ST 975 36 35,100 C LOCAL AC 2 3 89 16 0 84 1/7/16 025 045 BAYSIDE DR BOLSA AV CRESTVIEW AV 1,410 33 46,530 E LOCAL AC 2 2 89 100 0 0 1/14/16 045 075 CORAL PL CDS BAYSIDE DR 230 27 7,310 E LOCAL AC 2 2 89 96 0 4 1/14/16 047 077 CREST DR CATALINA AV CRESTVIEW AV 210 33 6,930 E LOCAL AAC 2 2 89 66 0 34 1/14/16 059 093 DRIFTWOOD AV BALBOA DR COASTLINE DR 1,460 33 48,180 E LOCAL AAC 2 2 89 86 14 0 1/14/16 061 095 ELDER AV HEATHER ST FUCHSIA ST 520 36 18,720 E LOCAL AC 2 3 89 97 0 3 1/6/16 097 0160 GATE RD SEAL BEACH BL 1857' W/O SEAL BEACH BL 1,857 42 77,994 E LOCAL AAC 2 6 89 29 0 71 1/26/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 3 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, PCI (0-100) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 093 0155 MARINE AV ELECTRIC AV DOLPHIN AV 320 24 7,680 E LOCAL AC 1 1 89 93 0 7 1/20/16 0103 0171 PANSY ST FIR AV GUAVA AV 160 33 5,280 E LOCAL AC 2 6 89 74 0 26 1/7/16 0108 0176 RIVIERA DR MARLIN AV BOLSA AV 560 31 17,360 E LOCAL AC 2 5 89 100 0 0 1/14/16 019 0312 ALMOND AV OLEANDER ST IRIS CR 1,120 36 40,320 C LOCAL AC 2 3 90 70 0 30 1/7/16 020 038 ASTER ST ALMOND AV BIRCHWOOD AV 1,239 37 45,843 E LOCAL AAC 2 3 90 54 0 46 1/6/16 022 042 BALBOA DR PCH BOLSA AV 660 37 24,420 E LOCAL AC 2 2 90 100 0 0 1/14/16 029 049 BIRCHWOOD AV DAISY ST ASTER ST 1,650 33 54,450 E LOCAL AAC 2 3 90 68 25 7 1/7/16 034 057 CARMEL AV SURF PL COASTLINE DR 360 37 13,320 E LOCAL AAC 2 2 90 91 0 9 1/14/16 037 060 CATALINA AV BALBOA DR COASTLINE DR 1,910 37 70,670 E LOCAL AC 2 2 90 100 0 0 1/14/16 042 071 COASTLINE DR MARVISTA DR CARMEL DR 455 33 15,015 E LOCAL AC 2 2 90 100 0 0 1/26/16 042 070 COASTLINE DR CARMEL AV CDS 480 27 14,110 E LOCAL AC 2 2 90 100 0 0 1/14/16 048 0309 CRESTVIEW AV BAYSIDE DR CREST DR 1,130 33 37,290 E LOCAL AAC 2 2 90 95 0 5 1/26/16 048 078 CRESTVIEW AV CATALINA AV BAYSIDE DR 1,130 33 37,290 E LOCAL AAC 2 2 90 100 0 0 1/26/16 057 091 DOLPHIN AV OCEAN AV ELECTRIC AV 582 24 13,968 E LOCAL AC 1 1 90 96 0 4 1/20/16 065 0107 EMERALD COVE WY BERYL COVE WY JADE COVE WY 580 33 19,140 E LOCAL AC 2 5 90 100 0 0 1/14/16 078 0125 HAZELNUT AV GUAVA AV HEATHER ST 1,210 33 39,930 E LOCAL AAC 2 3 90 65 0 35 1/6/16 0135 0130 HEATHER ST ELDER AV HAZELNUT AV 790 37 29,230 E LOCAL AC 2 3 90 100 0 0 1/6/16 094 0156 MARLIN AV SEAL BEACH BL BALBOA DR 1,610 37 59,570 E LOCAL AC 2 5 90 79 21 0 1/14/16 096 0159 NEPTUNE AV SEAL WY OCEAN AV 210 24 5,040 E LOCAL AC 2 1 90 42 58 0 1/20/16 0117 0194 SEAL WY 10TH ST 11TH ST 290 15 4,350 E LOCAL PCC 1 1 90 16 78 6 1/20/16 010 022 2ND ST OCEAN AV CENTRAL AV 860 40 34,400 E LOCAL AC 2 1 91 70 30 0 1/20/16 018 034 AGUA PL MARLIN AV CDS 220 27 7,040 E LOCAL AAC 2 5 91 100 0 0 1/14/16 019 037 ALMOND AV ROSE CR OLEANDER ST 705 37 26,085 C LOCAL AC 2 3 91 100 0 0 1/7/16 021 040 AVALON DR CATALINA AV END 430 33 14,190 E LOCAL AC 2 2 91 100 0 0 1/14/16 026 046 BAYOU WY BAYSIDE DR HARBOR WY 630 33 20,790 E LOCAL AAC 2 2 91 100 0 0 1/14/16 028 048 BERYL COVE WY EMERALD COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 033 054 CANDLEBERRY AV FUCHSIA ST ASTER AV 1,730 36 62,280 E LOCAL AAC 2 3 91 63 0 37 1/6/16 037 0308 CATALINA AV SEA BREEZE DR CDS 1,330 37 49,760 E LOCAL AC 2 2 91 100 0 0 1/26/16 039 066 CENTRAL WY 4TH ST 2ND ST 560 38 21,280 E LOCAL AC 2 1 91 69 0 31 1/20/16 042 0305 COASTLINE DR BALBOA DR MARVISTA DR 1,850 33 61,050 E LOCAL AC 2 2 91 100 0 0 1/26/16 048 0310 CRESTVIEW AV CREST DR AVALON DR 925 33 30,525 E LOCAL AAC 2 2 91 100 0 0 1/26/16 049 079 CRYSTAL COVE WY MARBLE COVE WY OPAL COVE WY 520 33 17,160 E LOCAL AAC 2 5 91 100 0 0 1/14/16 067 0109 FATHOM AV SILVER SHOALS AV BALBOA DR 810 33 26,730 E LOCAL AC 2 2 91 100 0 0 1/14/16 070 0115 FIR CR FIR AV CDS 130 60 8,900 E LOCAL AC 2 3 91 95 2 3 1/7/16 083 0139 JADE COVE WY EMERALD COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 085 0141 LAGUNA PL MARLIN AV CDS 380 27 11,460 E LOCAL AC 2 5 91 100 0 0 1/14/16 089 0149 MAIN ST OCEAN AV ELECTRIC AVE 1,190 57 67,830 C LOCAL AC 2 1 91 88 0 12 1/20/16 091 0152 MARBLE COVE WY CRYSTAL COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 0102 0169 OPAL COVE WY CRYSTAL COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 0113 0170 PANSY CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 6 91 53 11 36 1/7/16 0106 0174 PRIMROSE CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 3 91 74 0 26 1/7/16 0109 0178 ROSE ST FIR AV HAZELNUT AV 390 37 14,430 C LOCAL AC 2 3 91 71 0 29 3/29/16 0122 0202 SURF PL CATALINA AV CDS 480 33 16,940 E LOCAL AC 2 2 91 100 0 0 1/14/16 04 011 13TH ST OCEAN AV ELECTRIC AV 710 40 28,400 E LOCAL AC 2 1 92 100 0 0 1/20/16 044 073 COLLEGE PARK DR (N) YALE LN (S) HARVARD LN 1,741 37 64,417 C LOCAL AC 2 4 92 65 0 35 1/8/16 044 337 COLLEGE PARK DR (N) HARVARD LN (N) YALE LN 940 37 34,780 C LOCAL AC 2 4 92 100 0 0 1/8/16 071 0116 FUCHSIA ST BIRCHWOOD AV ELDER AV 640 33 21,120 E LOCAL AAC 2 3 92 60 40 0 3/29/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 4 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, PCI (0-100) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0104 0172 PRIMROSE ST DOGWOOD AV ELDER AV 210 33 6,930 E LOCAL AC 2 3 92 50 14 36 1/7/16 020 039 ASTER ST BIRCHWOOD AV CANDLEBERRY AV 206 37 7,622 E LOCAL AAC 2 3 93 38 0 62 1/6/16 038 063 CENTRAL AV 1ST ST 2ND ST 260 20 5,200 C LOCAL AAC 1 1 93 56 0 44 1/20/16 041 069 CLOVER CR ALMOND AV CDS 130 33 5,540 E LOCAL AC 2 3 93 98 2 0 1/8/16 050 080 CRYSTAL PL CRYSTAL COVE WY CDS 240 27 7,530 E LOCAL AC 2 5 93 100 0 0 1/14/16 058 092 DORY WY GALLEON WY SCHOONER WY 360 28 10,080 E LOCAL AC 2 2 93 100 0 0 1/20/16 072 0117 FUCHSIA CR FIR AV CDS 330 33 12,140 E LOCAL AAC 2 3 93 95 0 5 1/6/16 095 0157 MARVISTA AV CATALINA AV COASTLINE DR 1,610 33 53,130 E LOCAL AC 2 2 93 100 0 0 3/29/16 0137 0177 ROSE CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 3 93 100 0 0 1/7/16 01 01 10TH ST ELECTRIC AV PCH 660 40 26,400 E LOCAL AC 2 1 94 76 0 24 1/20/16 02 06 11TH ST OCEAN AV ELECTRIC AV 965 40 38,600 E LOCAL AC 2 1 94 100 0 0 1/26/16 027 047 BEACHCOMBER DR BOLSA AV SEA BREEZE DR 1,160 33 38,280 E LOCAL AAC 2 2 94 100 0 0 1/14/16 033 0303 CANDLEBERRY AV ASTER ST LAMPSON AV 365 36 13,140 E LOCAL AAC 2 3 94 40 0 60 1/6/16 039 065 CENTRAL WY 2ND ST 1ST ST 260 40 10,400 E LOCAL AC 2 1 94 95 0 5 1/20/16 046 076 CORSAIR WY CARAVEL WY SCHOONER WY 1,020 33 33,660 E LOCAL AC 2 1 94 95 0 5 1/20/16 061 20 ELDER AV FUCHSIA ST IRONWOOD AV 1,500 36 54,000 E LOCAL AC 2 3 94 100 0 0 1/6/16 069 0111 FIR AV GOLDENROD ST IRONWOOD AV 1,460 33 48,180 E LOCAL AAC 2 3 94 78 0 22 3/29/16 097 0161 GATE RD 1857' W/O SEAL BEACH BL CDS 1,857 25 47,175 E LOCAL AAC 2 6 94 41 0 59 1/26/16 076 336 HARVARD LN (N) COLLEGE PARK DR CDS 992 37 37,804 E LOCAL AC 2 4 94 100 0 0 1/8/16 079 0128 HEATHER CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 94 63 37 0 1/8/16 082 0138 ISLAND VIEW DR BOLSA AV SEA BREEZE DR 1,110 33 36,630 E LOCAL AAC 2 2 94 100 0 0 1/14/16 084 0140 JASMIN CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 94 53 0 47 1/8/16 095 0158 MARVISTA AV COASTLINE DR PCH 123 36 4,428 E LOCAL AC 2 2 94 100 0 0 1/20/16 0114 0185 SEA BREEZE DR BOLSA AV CATALINA AV 1,160 33 38,280 E LOCAL AC 2 2 94 100 0 0 1/14/16 0124 0204 TEABERRY CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 2 94 31 0 69 1/7/16 0125 0205 TULIP ST IRONWOOD AV LAMPSON AV 70 36 2,520 E LOCAL AAC 2 3 94 100 0 0 1/7/16 03 07 12TH ST ELECTRIC AV PCH 860 37 31,820 C LOCAL AAC 2 1 95 90 0 10 1/20/16 033 055 CANDLEBERRY AV MARIGOLD ST FUCHSIA ST 1,560 37 57,720 E LOCAL AAC 2 3 95 100 0 0 1/8/16 038 064 CENTRAL AV 2ND ST 6TH ST 1,265 40 50,600 C LOCAL AAC 2 1 95 100 0 0 1/26/16 039 067 CENTRAL WY 5TH ST 4TH ST 260 38 9,880 E LOCAL AC 2 1 95 100 0 0 1/20/16 087 0146 LANDING AV SEAL BEACH BL 12TH ST 1,210 21 25,410 E LOCAL AC 2 1 95 0 0 100 1/20/16 010 334 2ND ST CENTRAL AV MARINA DR 105 40 4,200 E LOCAL AC 2 1 96 100 0 0 1/26/16 015 029 7TH ST OCEAN AV ELECTRIC AV 1,280 40 51,200 E LOCAL AAC 2 1 96 100 0 0 1/20/16 015 028 7TH ST ELECTRIC AV MARINA DR 210 40 8,400 E LOCAL AAC 2 1 96 100 0 0 1/20/16 036 059 CARAVEL WY MARINA DR CORSAIR WY 360 37 13,320 E LOCAL AC 2 1 96 91 0 9 1/20/16 040 068 CLIPPER WY CARAVEL WY ELECTRIC AV 910 33 30,030 E LOCAL AC 2 1 96 100 0 0 1/20/16 075 0121 GUAVA AV IRONWOOD AV CDS 530 33 18,740 E LOCAL AC 2 3 96 68 0 32 3/29/16 081 0136 IRONWOOD AV WISTERIA ST TULIP ST 322 37 11,914 C LOCAL AC 2 3 96 100 0 0 1/7/16 0109 0179 ROSE ST HAZELNUT AV LAMPSON AV 440 37 16,280 C LOCAL AC 2 3 96 83 0 17 3/29/16 014 027 6TH ST OCEAN AV ELECTRIC AV 1,300 40 52,000 E LOCAL AAC 2 1 97 11 0 89 3/29/16 016 030 8TH ST ELECTRIC AV PCH 460 40 18,400 E LOCAL AAC 2 1 97 100 0 0 1/20/16 016 031 8TH ST OCEAN AV ELECTRIC AV 1,150 40 46,000 E LOCAL AAC 2 1 97 100 0 0 1/20/16 038 0252 CENTRAL AV 6TH ST MAIN ST 950 40 38,000 C LOCAL AAC 2 1 97 100 0 0 1/26/16 038 062 CENTRAL AV MAIN ST 12TH ST 860 40 34,400 C LOCAL AAC 2 1 97 100 0 0 1/20/16 069 0114 FIR AV WISTERIA ST SUNFLOWER ST 1,220 33 40,260 E LOCAL AAC 2 3 97 100 0 0 1/7/16 069 0113 FIR AV SUNFLOWER ST ROSE ST 330 33 10,890 E LOCAL AAC 2 3 97 100 0 0 1/7/16 081 0134 IRONWOOD AV ELDER AV HEATHER ST 1,967 33 64,911 C LOCAL AC 2 3 97 99 0 1 1/6/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 5 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, PCI (0-100) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0111 0182 SANDPIPER DR BOLSA AV TAPER DR 1,110 33 36,630 E LOCAL AC 2 1 97 100 0 0 1/14/16 0119 0198 SOUTH SHORE DR BOLSA AV TAPER DR 1,060 33 34,980 E LOCAL AC 2 2 97 100 0 0 1/14/16 0123 0203 TAPER DR BOLSA AV CATALINA AV 1,110 33 36,630 E LOCAL AC 2 2 97 100 0 0 1/14/16 03 08 12TH ST OCEAN AV ELECTRIC AV 810 40 32,400 E LOCAL PCC 2 1 98 100 0 0 1/6/16 019 036 ALMOND AV VIOLET ST ROSE CR 765 37 28,305 C LOCAL AC 2 3 98 100 0 0 1/7/16 024 044 BASSWOOD ST ASTER ST LAMPSON AV 410 36 14,760 C LOCAL AC 2 3 98 100 0 0 1/5/16 081 0133 IRONWOOD AV CANDLEBERRY AV ELDER AV 524 33 17,292 C LOCAL AC 2 3 98 100 0 0 1/6/16 0138 0200 SUNFLOWER CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 1 98 85 0 15 1/7/16 09 0332 1ST ST END OCEAN AVE 403 40 16,120 A LOCAL AC 2 1 99 100 0 0 1/26/16 02 04 11TH ST ELECTRIC AV LANDING AV 210 37 7,770 E LOCAL AC 2 1 100 0 0 0 1/20/16 04 010 13TH ST ELECTRIC AV PCH 1,013 21 21,273 E LOCAL AC 1 1 100 0 0 0 2/8/16 05 013 14TH ST ELECTRIC AV PCH 1,010 21 21,210 E LOCAL AC 2 1 100 0 0 0 1/20/16 06 016 15TH ST ELECTRIC AV PCH 1,110 21 23,310 E LOCAL AC 1 1 100 0 0 0 1/20/16 019 035 ALMOND AV DAISY ST ASTER ST 1,950 36 70,200 C LOCAL AC 2 3 100 0 0 0 2/8/16 022 041 BALBOA DR BOLSA AV CATALINA AV 1,060 37 39,220 C LOCAL AC 2 2 100 0 0 0 1/14/16 077 0124 HARBOR WY BAYSIDE DR BAYOU WY 760 33 25,080 E LOCAL AC 2 2 100 0 0 0 1/14/16 0117 0247 SEAL WY 13TH ST 12TH ST 295 12 3,540 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0248 SEAL WY 14TH ST 13TH ST 295 12 3,540 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0196 SEAL WY 12TH ST 11TH ST 300 12 3,600 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0118 0197 SILVER SHOALS AV BOLSA AV FATHOM AV 300 33 9,900 E LOCAL AC 2 2 100 0 0 0 1/14/16 5,327,374 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 6 of 6 City of Seal Beach Page 1 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section IV SECTION IV FORECASTED MAINTENANCE REPORT A. Recommended Budget 2016-2023 City of Seal Beach Page 1 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section IV FORECASTED MAINTENANCE REPORT Listed in chronological order by plan year then alphabetically by functional class, street name. This report presents the year and action corresponding to the next scheduled work activity for selected street segments within the pavement network. Note 1: The City’s Preventative Program seven-yr cycle was utilized within all budget scenarios shown above. RECOMMENDED BUDGET – The “recommended” budget was generated for the City to demonstrate what level of annual funding is necessary to increase the overall weighted PCI by one (1) point after seven years. DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2016-17 1ST ST PCH MARINA DR 2,172 22 47,784 Arterial MPAH 59 ARHM $210,250 2016-17 1ST ST PCH 597' NE/PCH 597 24 14,328 Arterial MPAH 56 ARHM $63,043 $273,293 2016-17 5TH ST MARINA DR PCH 660 60 39,600 Collector CPW/Bridge 80 Slurry Seal $15,840 2016-17 COLLEGE PARK DR (S) HARVARD LN CITY LIMIT 940 44 27,810 Collector CPW/Bridge 84 Slurry Seal $11,124 2016-17 DARTMOUTH CR HARVARD LN CDS 180 34 8,120 Local CPW/Bridge 78 Slurry Seal $3,248 2016-17 GALLEON WY ELECTRIC AV DORY WY 970 33 32,010 Local CPW/Bridge 75 Slurry Seal $12,804 2016-17 HARVARD LN COLLEGE PARK DR OCCIDENTAL LN 1,063 37 39,331 Local CPW/Bridge 88 Slurry Seal $15,732 2016-17 HARVARD LN OCCIDENTAL LN (N) COLLEGE PARK DR 1,289 37 47,693 Local CPW/Bridge 87 Slurry Seal $19,077 2016-17 LOYOLA PLAZA COLLEGE PARK DR CDS 330 25 9,250 Local CPW/Bridge 80 Slurry Seal $3,700 2016-17 OCCIDENTAL DR STANFORD LN HARVARD LN 160 33 5,280 Local CPW/Bridge 77 Slurry Seal $2,112 2016-17 PRINCETON CR HARVARD LN CDS 230 30 8,900 Local CPW/Bridge 70 Slurry Seal $3,560 2016-17 SCHOONER WY GALLEON WY DORY WY 660 33 21,780 Local CPW/Bridge 87 Slurry Seal $8,712 2016-17 STANFORD LN COLLEGE PARK DR COLLEGE PARK DR 1,860 32 59,520 Local CPW/Bridge 82 Slurry Seal $23,808 2016-17 YALE CR END YALE LN 130 48 6,240 Local CPW/Bridge 82 Slurry Seal $2,496 2016-17 YALE LN (N) COLLEGE PARK DR (S) COLLEGE PARK DR 1,160 33 38,280 Local CPW/Bridge 77 Slurry Seal $15,312 $137,526 2016-17 PURDUE CR COLLEGE PARK DR CDS 68 27 3,836 Local CPW/Bridge 58 ARHM $16,878 $16,878 2016-17 Total $427,697 2017-18 1ST ST MARINA DR PCH 2,172 23 49,956 Arterial MPAH 48 ARHM $219,806 2017-18 OLD RANCH PARKWAY SEAL BEACH BL 200' W/ SEAL BEACH BL 520 48 24,960 Arterial MPAH 39 ARHM $113,069 2017-18 OLD RANCH PARKWAY 200' W/ SEAL BEACH 720' W/ SEAL BEACH 200 64 12,800 Arterial MPAH 34 ARHM $57,984 $390,859 2017-18 ADOLFO LOPEZ DR END 425 E/SEAL BEACH BL 800 60 48,000 Local Hill/Cove 83 Slurry Seal $19,680 2017-18 BALBOA DR PCH BOLSA AV 660 37 24,420 Local Hill/Cove 90 Slurry Seal $10,012 2017-18 BAYSIDE DR BOLSA AV CRESTVIEW AV 1,410 33 46,530 Local Hill/Cove 89 Slurry Seal $19,077 2017-18 CARMEL AV SURF PL COASTLINE DR 360 37 13,320 Local Hill/Cove 90 Slurry Seal $5,461 2017-18 CATALINA AV BALBOA DR COASTLINE DR 1,910 37 70,670 Local Hill/Cove 90 Slurry Seal $28,975 2017-18 CATALINA AV SEA BREEZE DR BALBOA DR 1,160 37 42,920 Local Hill/Cove 88 Slurry Seal $17,597 2017-18 COASTLINE DR CARMEL AV CDS 480 27 14,110 Local Hill/Cove 90 Slurry Seal $5,785 2017-18 COASTLINE DR MARVISTA DR CARMEL DR 455 33 15,015 Local Hill/Cove 90 Slurry Seal $6,156 2017-18 CORAL PL CDS BAYSIDE DR 230 27 7,310 Local Hill/Cove 89 Slurry Seal $2,997 2017-18 CREST DR CATALINA AV CRESTVIEW AV 210 33 6,930 Local Hill/Cove 89 Slurry Seal $2,841 2017-18 CRESTVIEW AV CATALINA AV BAYSIDE DR 1,130 33 37,290 Local Hill/Cove 90 Slurry Seal $15,289 2017-18 CRESTVIEW AV BAYSIDE DR CREST DR 1,130 33 37,290 Local Hill/Cove 90 Slurry Seal $15,289 2017-18 DRIFTWOOD AV BALBOA DR COASTLINE DR 1,460 33 48,180 Local Hill/Cove 89 Slurry Seal $19,754 2017-18 EBBTIDE PL COASTLINE PL CDS 230 27 7,410 Local Hill/Cove 87 Slurry Seal $3,038 2017-18 EMERALD COVE WY BERYL COVE WY JADE COVE WY 580 33 19,140 Local Hill/Cove 90 Slurry Seal $7,847 Arterial Total Local Paving Total Arterial Total Slurry Seal Total Page 1 of 4 DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2017-18 EMERALD PL EMERALD COVE WY CDS 230 27 7,460 Local Hill/Cove 86 Slurry Seal $3,059 2017-18 MARLIN AV SEAL BEACH BL BALBOA DR 1,610 37 59,570 Local Hill/Cove 90 Slurry Seal $24,424 2017-18 RIVIERA DR MARLIN AV BOLSA AV 560 31 17,360 Local Hill/Cove 89 Slurry Seal $7,118 $214,399 2017-18 ADOLFO LOPEZ DR SEAL BEACH BL 425 W/SEAL BEACH BL 425 60 25,500 Local Hill/Cove 62 AC Overlay $54,825 $54,825 2017-18 Total $660,083 2018-19 OLD RANCH PARKWAY 720' W/ SEAL BEACH 22 FWY 1,030 34 37,520 Arterial MPAH 25 AC Recon $368,071 $368,071 2018-19 10TH ST OCEAN AV ELECTRIC AV 950 40 38,000 Local Old Town 83 Slurry Seal $15,960 2018-19 11TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 84 Slurry Seal $2,205 2018-19 12TH ST SEAL WY OCEAN AV 210 24 5,040 Local Old Town 78 Slurry Seal $2,117 2018-19 13TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 76 Slurry Seal $2,205 2018-19 14TH ST OCEAN AV ELECTRIC AV 660 40 26,400 Local Old Town 88 Slurry Seal $11,088 2018-19 4TH ST OCEAN AV MARINA DR 1,200 40 48,000 Local Old Town 87 Slurry Seal $20,160 2018-19 5TH ST OCEAN AV MARINA DR 1,400 40 56,000 Local Old Town 79 Slurry Seal $23,520 2018-19 6TH ST (S) ELECTRIC AV MARINA DR 195 40 7,800 Local Old Town 86 Slurry Seal $3,276 2018-19 OCEAN AV 13TH ST MAIN ST 1,265 51 64,515 Collector Old Town 80 Slurry Seal $27,096 2018-19 OCEAN AV MAIN ST 5TH ST 1,245 52 64,740 Collector Old Town 79 Slurry Seal $27,191 2018-19 OCEAN AV ELECTRIC AV 13TH ST 1,300 51 66,300 Collector Old Town 82 Slurry Seal $27,846 2018-19 OCEAN AV 5TH ST 1ST ST 1,240 52 64,480 Collector Old Town 77 Slurry Seal $27,082 $189,746 2018-19 10TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 64 AC Overlay $11,970 2018-19 14TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 57 AC Overlay $11,970 2018-19 16TH ST ELECTRIC AV PCH 1,160 21 24,360 Local Old Town 51 AC Overlay $55,541 2018-19 17TH ST ELECTRIC AV PCH 1,260 21 26,460 Local Old Town 58 AC Overlay $60,329 2018-19 DOLPHIN AV SEAL WY OCEAN AV 226 24 5,424 Local Old Town 63 AC Overlay $12,367 2018-19 LANDING AV 12TH ST 11TH ST 260 42 10,920 Local Old Town 39 AC Overlay $24,898 2018-19 MAIN ST ELECTRIC AV PCH 690 55 37,950 Collector Old Town 49 AC Overlay $86,526 $263,600 2018-19 Total $821,417 2019-20 MARINA DR PCH 6TH ST 629 61 38,369 Collector MPAH 13 AC Recon $387,911 $387,911 2019-20 BANYAN AV CAMELIA ST COLUMBINE ST 600 33 19,800 Local CPE Phase 1 71 Slurry Seal $8,712 2019-20 BIRCHWOOD AV OLEANDER ST DAISY ST 1,950 33 64,350 Local CPE Phase 1 88 Slurry Seal $28,314 2019-20 BLUEBELL ST ALMOND AV BIRCHWOOD AV 710 33 23,430 Local CPE Phase 1 72 Slurry Seal $10,309 2019-20 CAMELIA ST ALMOND AV BANYAN AV 590 33 19,470 Local CPE Phase 1 77 Slurry Seal $8,567 2019-20 CARNATION CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 83 Slurry Seal $3,890 Arterial Total Slurry Seal Total Local Paving Total Arterial Total Local Paving Total Slurry Seal Total Page 2 of 4 DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2019-20 COLUMBINE ST ALMOND AV BANYAN AV 210 33 6,930 Local CPE Phase 1 78 Slurry Seal $3,049 2019-20 DAFFODIL CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 77 Slurry Seal $3,890 2019-20 DAHLIA DR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 75 Slurry Seal $3,890 2019-20 FERN CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 81 Slurry Seal $3,890 2019-20 GOLDENROD CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 88 Slurry Seal $3,890 2019-20 IRIS CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 78 Slurry Seal $3,890 2019-20 ROSSMOOR CENTER WY SEAL BEACH BL WEST RD 864 30 25,920 Collector CPE Phase 1 88 Slurry Seal $11,405 2019-20 ROSSMOOR CENTER WY WEST RD MONTECITO RD 364 28 10,192 Collector CPE Phase 1 88 Slurry Seal $4,484 $98,178 2019-20 DAISY ST ALMOND AV BIRCHWOOD AV 410 33 13,530 Local CPE Phase 1 54 AC Overlay $31,796 $31,796 2019-20 Total $517,884 2020-21 BOLSA AV BALBOA DR PCH 993 37 36,741 Collector MPAH 53 ARHM $181,868 $181,868 2020-21 DAISY ST CANDLEBERRY AV DOGWOOD AV 210 33 6,930 Local CPE Phase 2 67 Slurry Seal $3,119 2020-21 DOGWOOD AV DAISY ST IRONWOOD AV 1,470 33 48,510 Local CPE Phase 2 80 Slurry Seal $21,830 2020-21 DOGWOOD AV MARIGOLD ST FUCHSIA ST 1,520 33 50,160 Local CPE Phase 2 73 Slurry Seal $22,572 2020-21 ELDER AV OLEANDER ST HEATHER ST 1,130 36 40,680 Local CPE Phase 2 79 Slurry Seal $18,306 2020-21 GOLDENROD ST ELDER AV CDS 610 33 21,380 Local CPE Phase 2 86 Slurry Seal $9,621 2020-21 HEATHER ST HAZELNUT AV LAMPSON AV 490 37 18,130 Local CPE Phase 2 77 Slurry Seal $8,159 2020-21 MARIGOLD ST CANDLEBERRY AV DOGWOOD AV 160 33 5,280 Local CPE Phase 2 74 Slurry Seal $2,376 $85,982 2020-21 DAISY CR FIR AV CDS 230 33 8,840 Local CPE Phase 2 57 AC Overlay $21,393 2020-21 DOGWOOD AV WISTERIA ST OLEANDER ST 1,710 33 56,430 Local CPE Phase 2 58 AC Overlay $136,561 2020-21 MARIGOLD ST BIRCHWOOD AV CANDLEBERRY AV 160 33 5,280 Local CPE Phase 2 51 AC Overlay $12,778 $170,731 2020-21 Total $438,580 2021-22 ELECTRIC AV NB MAIN ST 6TH ST 960 27 25,920 Collector MPAH 43 ARHM $132,192 2021-22 ELECTRIC AV SB 6TH ST MAIN ST 910 25 22,750 Collector MPAH 66 ARHM $116,025 $248,217 2021-22 FIR AV ROSE ST HEATHER ST 1,260 33 41,580 Local CPE Phase 3 73 Slurry Seal $19,127 2021-22 GUAVA AV PANSY ST HEATHER ST 1,360 33 44,880 Local CPE Phase 3 78 Slurry Seal $20,645 2021-22 HAZELNUT AV HEATHER ST ROSE ST 1,610 33 53,130 Local CPE Phase 3 82 Slurry Seal $24,440 2021-22 IRONWOOD AV TULIP ST SUNFLOWER ST 1,020 37 37,740 Collector CPE Phase 3 64 Slurry Seal $17,360 2021-22 WISTERIA ST DOGWOOD AV IRONWOOD AV 990 37 36,630 Local CPE Phase 3 78 Slurry Seal $16,850 $98,422 2021-22 IRIS ST HAZELNUT AV IRONWOOD AV 226 32 7,232 Local CPE Phase 3 49 AC Overlay $18,008 2021-22 IRONWOOD AV ROSE ST IRIS ST 1,420 33 46,860 Collector CPE Phase 3 50 AC Overlay $116,681 Local Paving Total Slurry Seal Total Arterial Total Slurry Seal Total Arterial Total Slurry Seal Total Local Paving Total Page 3 of 4 DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2021-22 SUNFLOWER ST FIR AV IRONWOOD AV 560 37 20,720 Local CPE Phase 3 42 AC Overlay $51,593 2021-22 HAZELNUT AV WISTERIA ST SUNFLOWER ST 1,310 33 43,230 Local CPE Phase 3 34 AC Recon $463,426 $649,707 2021-22 Total $996,346 2022-23 ELECTRIC AV SB 14TH ST MAIN ST 1,605 25 40,125 Collector MPAH 43 ARHM $210,656 $210,656 2022-23 CANDLEBERRY AV WISTERIA ST OLEANDER ST 1,660 33 54,780 Local CPE Phase 4 86 Slurry Seal $26,294 2022-23 ELDER AV VIOLET ST PRIMROSE ST 1,380 33 45,540 Local CPE Phase 4 80 Slurry Seal $21,859 2022-23 VIOLET ST ALMOND AV CANDLEBERRY AV 660 33 21,780 Local CPE Phase 4 85 Slurry Seal $10,454 2022-23 WISTERIA ST DOGWOOD AV CDS 1,040 33 35,570 Local CPE Phase 4 80 Slurry Seal $17,074 $75,682 2022-23 OLEANDER ST ALMOND AV FIR AV 1,320 36 47,520 Local CPE Phase 4 45 AC Overlay $122,126 2022-23 VIOLET ST ELDER AV FIR AV 160 33 5,280 Local CPE Phase 4 43 AC Overlay $13,570 $135,696 2022-23 Total $422,034 Arterial 2016 to 2023 Grand Total $2,060,875 Slurry Seal 2016 to 2023 Grand Total $899,933 Local Paving 2016 to 2023 Grand Total $1,323,233 Total $4,284,041 Local Paving Total Slurry Seal Total Arterial Total Local Paving Total Page 4 of 4 City of Seal Beach 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section V SECTION V OCTA RENEWED MEASURE M COMPLIANCE REPORTING City of Seal Beach 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section V March 22, 2016 Mr. David Spitz, P.E. Associate Engineer CITY OF SEAL BEACH 211 Eighth Street Seal Beach, CA 90740 Subject: City of Seal Beach – OCTA Pavement Management Compliance Report 2016 Dear David: As part of the 2016 Update of the Pavement Management Program (PMP) for the City of Seal Beach, Bucknam is pleased to submit the PMP reporting required by the Orange County Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City’s required biennial PMP prior to June 2016. The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories:  Pavement Management Program Certification  Quality Assurance / Quality Control (QA/QC) Plan  MicroPAVER Data Files (included within the Seal Beach .e70 MicroPAVER file)  Pavement Management Plan that includes the following:  Average Pavement Conditions For Each Segment in the Network (PCI Report) The Pavement Condition Index report shows the present condition of each street in the pavement network (MPAH and Locals). In addition, the report shows the basic geometry of each street segment. City of Seal Beach 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Section V  Seven-year Projected PCI Under Existing Funding Levels This report identifies the projected PCI’s based on the local agencies current funding programs. This report details the PCI projects for the entire network, MPAH roadways and Local streets.  Seven-year Plan for Road Maintenance and Rehabilitation (Forecasted Maintenance Report) The Forecasted Maintenance Report projects the street maintenance activities required for the next seven years, broken down to show maintenance levels for all streets. This includes all scheduled projects provided by the City for fiscal years 2016-17 through 2022-23.  Alternative Funding Levels OCTA has requested two reports indicating the necessary funding to maintain the City’s current weighted average PCI as well as the necessary funding to improve the weighted average PCI by one PCI point over the next seven years.  Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction)  Centerline mileage for MPAH, Local streets and total network  Percentage of total network in each of the five condition categories based on centerline mileage All comments received from the City have been incorporated in the reports that follow. All of the City’s issues and needs that were brought to our attention are included in the report. It has been a pleasure working with you and the City on updating your Pavement Management Program. We look forward to the continued success of this project and future teamwork with City staff. Sincerely, Bucknam Infrastructure Group, Inc. Peter J. Bucknam Project Manager Infrastructure Management – GIS Services City of Seal Beach, CA Page i 2016 Citywide Pavement Management Program Final Report – June 8, 2016 TABLE OF CONTENTS OCTA Chapter 3 Reports, “Countywide PMP Guidelines Manual - Citywide Report Executive Summary I. Pavement Management Program Certification II. QC/QA Plan III. Pavement Data Files (see Seal Beach .e70 MicroPAVER file) IV. Pavement Management Plan  Weighted Average Pavement Condition Index (PCI) Reports o MPAH Map o PCI Map o PCI Report - A to Z Order  Entire Network  MPAH roadways  Local streets  Projected PCI Under Existing Funding Levels (next seven-years)  Entire Network  MPAH roadways  Local streets  Road Maintenance and Rehabilitation Projections (Seven-Yr Projection) o Includes all line items within Chapter 3 requirements  Alternative Funding Levels required to: o Maintain Existing Average Network PCI o To Improve Average Network PCI  Backlog by Fiscal Year (re: restoration, rehabilitation and reconstruction)  Centerline mileage for MPAH, Local streets and total network  Percentage of total network in each of the five condition categories based on centerline mileage City of Seal Beach, CA Page ii 2016 Citywide Pavement Management Program Final Report – June 8, 2016 V. Local Match Reduction Reporting  In order to be eligible for Local Match Reduction of 10%, the following must be submitted: o Measureable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point. o No reduction in the overall weighted (by area) average PCI in the MPAH or local street categories - or – o Have road pavement conditions during the previous reporting period within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher City of Seal Beach, CA Page 1 2016 Citywide Pavement Management Program Final Report – June 8, 2016 CITYWIDE CHAPTER 3 OCTA SUBMITTAL - part of - COUNTYWIDE PAVEMENT MANAGEMENT PROGRAM GUIDELINES MANUAL City of Seal Beach, CA Page 2 2016 Citywide Pavement Management Program Final Report – June 8, 2016 EXECUTIVE SUMMARY 2015-16 UPDATE OF PAVEMENT MANAGEMENT PROGRAM (PMP) As the City of Seal Beach continues to show growth with its population, demographics, infrastructure and maintenance needs, the street network has been running parallel as the system matures and capital street projects widen and lengthen streets. The City developed its Pavement M anagement Program (PMP) in early 2002 with the use of an automated database program. Over the past fourteen years the City has used MicroPAVER as its PMP software; with the Orange County Transportation Authority (OCTA) decision to allow MicroPAVER or StreetSaver as an acceptable PMP software’s the City continues to remain in compliance with OCTA guidelines This system is essential to the City in that it assists Public Works staff in capturing competitive funding for its arterial highway system as well as cost-effectively managing the local network through proactive maintenance and scheduling. On an biennial basis, the Seal Beach PMP is updated to provide current data on the City’s street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources. Over the past several months Bucknam Infrastructure Group (Bucknam) surveyed all 18.6 miles of arterial and collector (Master Plan of Arterial Highways-MPAH) sections, 22.8 miles Local sections to assist the City in complying with the most recent OCTA-Renewed Measure M requirements (January 2016). These requirements are clearly shown within the new “Countywide Pavement Management Program, Guidelines Manual” for MicroPAVER use. Bucknam reviewed the City’s previous maintenance 2013-15 efforts and the current 2016-17 proposed street improvements for pertinent historical and scheduled maintenance in order to generate a CIP report that identifies recommendations for improvement in the current operating and maintenance efforts put forth by the City. The result of this work effort is shown throughout this report. In the upcoming years as the City continues to build upon this study through future inspections and maintenance efforts, Seal Beach PMP data will continue to provide reliable solutions to enhance the program through detailed funding analysis, City specific budgetary reporting and level of service reporting. As the City annually matures the PMP, key questions will be answered by reviewing the pavement information readily available within our report as well as through the MicroPAVER database. Specifically, our findings and recommendations provide Public Works administrators, managers and field personnel with: * the present condition status of the pavement network (arterial and collector streets), as a whole and of any grouping or individual component within the City; * a ranked list of all streets, or segments of streets, by condition within the network; * rehabilitation/maintenance needs of each street segment by year; City of Seal Beach, CA Page 3 2016 Citywide Pavement Management Program Final Report – June 8, 2016 * an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding; * optimum annual pavement expenditure levels for pavement maintenance for the next seven (7) years; * prediction of the life-cycle performance of the City’s pavement network and each individual street section; * updated PMP data to assist the City with GASB 34 compliance; and * pavement condition data and analysis presented in GIS through ESRI ArcMap Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. This report reflects the current state of the City’s pavement network and recommended maintenance strategies for the next seven (7) years. FINDINGS AND RECOMMENDATIONS Through our assessment of historical maintenance performed within the City and through our discussions with City staff the conditional data found across the network clearly shows that the City has applied strong, preventative maintenance strategies over the past decade. Pavement management involves frequent preventative maintenance; as pavement deteriorates through heavy traffic impacts, weathering and time, preventative maintenances (such as slurry seal, stop gap, etc.) have limited benefits. More aggressive maintenance applications have to be used. Our study has shown that key overlay projects will be needed over the next seven years to maintain the network’s high level of condition. Through our analysis of the Seal Beach PMP we have found and recommend the following items which should be considered for a proactive approach to the PMP and future management of the program: Arterials / Collectors (MPAH) The actual workload requirements identified indicate that the Arterial street network is currently in “Good” condition. At a minimum, to maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 15 to maintain a “Good” network weighted average PCI value. Our MPAH findings for conditional data and recommendations for revenue expenditures are shown below:  The Arterial/Collector network has a weighted PCI of 82.1;  The MPAH network consists of 18.6 miles equaling 5,271,658 square feet of pavement City of Seal Beach, CA Page 4 2016 Citywide Pavement Management Program Final Report – June 8, 2016  Currently, 24% of the arterial/collector network (3.1 miles) qualifies for rehabilitation/reconstruction maintenance;  MPAH maintenance projects should focus on the increasing the current PCI above a weighted average of 84 within the next 7 years;  Develop a proactive fiscal and planned approach to identify arterial overlay projects based on the deterioration modeling within MicroPAVER  Current allocated MPAH funding results in the MPAH weighted PCI to decrease from its current PCI of 82.1 to 74.9 after seven years (Funded at $200,000/yr)  At a minimum, maintain the MPAH revenues at an average of $791,000/yr level over the next seven years to generate the PCI results identified within Table 5 (Section I, page 9) of this report  Perform pavement inspections on the MPAH network every two years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA requirements for Measure M2 Locals The actual workload requirements identified indicate that the Local street network is currently in “Good” condition. At a minimum, to maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 15 to maintain a “Good” network weighted average PCI value. Our Local findings for conditional data and recommendations for revenue expenditures are shown below:  The Local network has a weighted PCI of 86.1;  The Local network consists of 22.8 miles equaling 4,062,883 square feet of pavement;  Currently, 8% of the Local network (2.2 miles) qualifies for rehabilitation/reconstruction; while 30% of the network (8.7 miles) qualifies for slurry seal maintenance  Local maintenance projects should focus on the maintaining the current PCI above a weighted average of 84 over the next 7 years;  Develop a proactive fiscal and planned approach to identify Local overlay projects based on the deterioration modeling within MicroPAVER  Current allocated Local funding through FY 2016/17 generates a decrease in Local conditions after seven years (PCI of 86.1 drops to 80.7); Funded at $375,000/yr)  Maintain the Local revenues at an average of $659,500/yr over the next seven City of Seal Beach, CA Page 5 2016 Citywide Pavement Management Program Final Report – June 8, 2016 years to generate the projects identified within the Section IV reporting  Perform pavement inspections on the Local network every six years (33% every two years) to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA requirements for Renewed Measure M The funding requirements presented are generated in the form of individual projects, as outlined in the Forecasted Maintenance Reports (Section IV). While the project listings outlined in the Forecasted Maintenance Reports are the recommendations generated through our analysis and the PMS, final project recommendations should be weighed against the actual approach the City wishes to utilize in scheduling the workloads for contracting purposes. Pavement condition may indicate that a particular pavement section needs attention earlier than the rest of the roads in its area. City of Seal Beach, CA Page 6 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Pavement Management Plan Certification Appendix F: Pavement Management Plan Certification The City of Seal Beach, CA certifies that is has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M (M2). The plan was developed by Bucknam Infrastructure Group, Inc. using MicroPAVER, a pavement management system conforming to American Society for Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements:  Inventory of MPAH and Local routes reviewed and updated biennially. The last update of the inventory was completed on January, 2016 for the Arterial (MPAH) and September 2014 for the Local streets  Assessment of the pavement condition for all routes in the system, updated biennially. The last field review of the pavement condition was completed in January, 2016.  Percentage of all section of pavement needing: o Preventive Maintenance = 22.2%, Rehabilitation = 5.2%, Reconstruction = 12.1%  Budget needs for preventive maintenance, rehabilitation and/or reconstruction of deficient sections of pavement for: o Current biennial period $2,953,300, Following biennial period $2,953,800  Funds budgeted or available for Preventive Maintenance, Rehabilitation and/or Reconstruction. o Current biennial period $1,150,000 Following biennial period $1,150,000  Backlog by year of unfunded rehabilitation, restoration and reconstruction needs (See page 17)  The Pavement Management Plan is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors. *An electronic copy of the Pavement Management Plan with MicroPAVER or StreetSaver compatible files has been or will be submitted with the certification statement. A copy of this certification is being provided to the Orange County Transportation Authority. Submitted by: __Jim Basham ______City of Seal Beach Name (Print) Jurisdiction _____________________________ ________________________________ Signed Date _ Interim Director of Public Works Title City of Seal Beach, CA Page 7 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Quality Assurance / Quality Control Plan As required by the Orange County Transportation Authority (OCTA), the City of Seal Beach must prepare and implement a quality assurance / quality control (QA/QC) plan regarding pavement management inspection as they pertain to MicroPAVER. For the purposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project. Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and ensures that it complies with the OCTA guidelines defined within the “Countywide Pavement Management Plan Guidelines (Guidelines)”. As shown within the OCTA Guidelines, our staff followed and delivered on the requirements stated on Section 2.4, page 8 which require specific QA/QC data (Items A through G). Additionally, Chapter 3 requires numerous data/deliverables from local agencies for Measure M2 eligibility. All general PCI budgetary report submittals will follow the Chapter 3 guidelines. In conjunction with the outlined items within the OCTA Guidelines Section 2.4 we have summarized our QA/QC procedures below: d. Descriptions of condition survey - Our staff follows the required Condition Survey Protocols (Guidelines, Section 2.1); our staff assesses each pavement section for the minimum distresses outlined within Section 2.1. Additionally, based on the pavement conditions found, we collect all MicroPAVER distresses (ASTM Standard D6433), if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information. e. How data was collected - Our surveys follow the OCTA accepted walking/windshield requirements. All sections that our staff surveys are performed through the walking/windshield method. Our staff physically measures the width of every section as well as measures for any square footage adjustment that need to be added or taken away from a sections “true area” (i.e. cul-de-sac, bus pads, street width variances, etc.). f. Accuracy required for data collection - We use a statistical sampling approach for measuring the quality of our field technician’s work. In this manner, 10 percent of the original surveys are re-surveyed by a different survey crew than the original, supervised by a field supervisor, and the results are compared to the original surveys. Our QC process involves checking the field crews’ work in a “blind study” fashion. Quality control checks are performed at the end of each survey week. This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments.  When QA/QC issues are found, our staff documents the issues within MicroPAVER user interface and/or our GIS work environment. If distress types, severities and/or extents found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 15% of the original survey i. Data check for accuracy by agency – As described above our staff re-inspects, as a minimum, 10% of the original survey (OCTA only requires 5%). Per the agencies requests, City of Seal Beach, CA Page 8 2016 Citywide Pavement Management Program Final Report – June 8, 2016 our staff will submit PCI reports to the agency as project status reports for their review. Agencies will typically review specific pavement sections for PCI accuracy based on recent overlay or slurry seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts). Additionally, our staff performs “ride-a-long” surveys with local agency staff to build consensus on how our MicroPAVER/ASTM D6433 surveys are performed, recorded and reported on. j. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI’s calculated through the most recent inspections will be compared to previous PCI’s. If the variance in PCI is greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or re- inspection (OCTA Guidelines are followed). k. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist the agency in submitting the following:  Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years  1/3 of Local streets will be surveyed and reported on every two years; all streets will be surveyed within the six year requirement  Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted every two years l. Experience of Inspectors – Bucknam staff have been trained on the use of MicroPAVER and is certified with the required MicroPAVER segment calibration and inspection practices. All Bucknam field technicians are trained using the ASTM D6433 survey methodologies and have passed OCTA’s prequalification testing (Bucknam is certified by OCTA through June, 2017). m. Field data collection safety procedures – Bucknam field survey techniques utilize the following procedures:  All vehicles are properly marked or flagged with appropriate sign markings indicating that a “PAVEMENT SURVEY IS IN PROGRESS”  All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line-of-site warning  Large MPAH routes are surveyed using two field technicians to increase traffic control warning and safety  While parking or stopping along the survey route, vehicles legally park within the right- of-way or use a parking lot  All field technicians wear fluorescent vests to warn traffic and pedestrians City of Seal Beach, CA Page 9 2016 Citywide Pavement Management Program Final Report – June 8, 2016 On a case-by-case basis, if our staff was responsible for converting a previous PMP database to MicroPAVER this will be properly notated within our reporting. Our staff will provide examples of how the previous inspections were performed compared to the most recent MicroPAVER based surveys. Bucknam will provide the local agency a copy of our QA/QC plan prior to any pavement inspection work. With approval, our staff will begin the MicroPAVER ASTM D6433 based inspections. City of Seal Beach, CA Page 10 2016 Citywide Pavement Management Program Final Report – June 8, 2016 MicroPAVER Data Files The City of Seal Beach MicroPAVER database is available within the compressed Seal Beach .e70 database file (see provided DVD). Available PMP data and the associated reporting data includes:  Street names and limits for the City’s public streets  Street identifiers (Branch ID, Section ID)  Direction  Begin and end of section  Length, width and true areas  Functional Classification (MPAH, Local)  Number of travel lanes  Pavement Condition Index (PCI) and date of inspection  Type of recommended treatment  Cost of recommended treatment City of Seal Beach, CA Page 11 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Pavement Management Plan Bucknam has enclosed the required PMP reports that assist the City of Seal Beach in compliance with the OCTA requirements outlined in Chapter 3 of the Countywide Pavement Management Program Guidelines Manual.  Weighted Average Pavement Condition Index (PCI) Reports o MPAH Map o PCI Map o PCI Report - A to Z Order  Entire Network  MPAH roadways  Local streets  Projected PCI Under Existing Funding Levels (next seven-years)  Entire Network  MPAH roadways  Local streets  Road Maintenance and Rehabilitation Projections (Seven-Yr Projection) o Includes all line items within Chapter 3 requirements  Alternative Funding Levels required to: o Maintain Existing Average Network PCI o To Improve Average Network PCI  Backlog by Fiscal Year (re: restoration, rehabilitation and reconstruction)  Centerline mileage for MPAH, Local streets and total network  Percentage of total network in each of the five condition categories based on centerline mileage City of Seal Beach, CA Page 12 2016 Citywide Pavement Management Program Final Report – June 8, 2016 PAVEMENT CONDTION INDEX REPORTING Bucknam has included below the average weighted PCI (by area) for: o PCI Report - A to Z Order  Entire Network  MPAH roadways  Local streets Additionally, we have included a PCI map for the City’s use (previous page). For the City of Seal Beach the weighted pavement condition index (PCI) for the entire network is 84.4; for the MPAH designated streets the PCI is 82.1; for the Local streets the PCI is 86.1. Current Pavement Conditions for Entire Network (Section Miles) Pavement Network Totals & Historical PCI Trends We have enclosed a Pavement Condition Index (PCI) report which demonstrates specific PCI values, inspection dates, section measurements, functional classifications, etc. DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date MPAH 09 019 1ST ST OCEAN AV MARINA DR 887 40 35,480 A MPAH AC 2 1 96 100 0 0 1/20/16 09 021 1ST ST PCH 597' NE/PCH 597 24 14,328 A MPAH AC 2 1 56 55 35 10 1/21/16 09 0258 1ST ST MARINA DR PCH 2,172 23 49,956 A MPAH AC 2 1 48 47 50 3 1/21/16 09 0259 1ST ST PCH MARINA DR 2,172 22 47,784 A MPAH AC 2 1 59 48 40 12 1/21/16 031 051 BOLSA AV SEAL BEACH BL BALBOA DR 1,985 37 73,445 C MPAH AC 2 2 95 100 0 0 1/14/16 031 052 BOLSA AV BALBOA DR PCH 993 37 36,741 C MPAH AC 2 2 53 40 51 9 1/14/16 062 098 ELECTRIC AV 5TH ST CORSAIR WY 510 37 18,870 C MPAH AC 2 1 100 0 0 0 1/20/16 062 099 ELECTRIC AV CORSAIR WY CDS 380 33 13,640 C MPAH AC 2 1 86 91 0 9 1/20/16 062 0100 ELECTRIC AV SEAL BEACH BL END 190 34 6,460 C MPAH AC 2 1 94 40 15 45 1/20/16 063 0101 ELECTRIC AV NB MAIN ST 6TH ST 960 27 25,920 C MPAH AC 1 1 43 12 77 11 1/20/16 063 0102 ELECTRIC AV NB SEAL BEACH BL 14TH ST 820 27 22,140 C MPAH AAC 1 1 93 41 0 59 1/20/16 063 0103 ELECTRIC AV NB 14TH ST MAIN ST 1,590 27 42,930 C MPAH AC 1 1 96 86 0 14 1/20/16 064 0104 ELECTRIC AV SB 6TH ST MAIN ST 910 25 22,750 C MPAH AC 1 1 66 29 56 15 1/20/16 064 0105 ELECTRIC AV SB SEAL BEACH BL 14TH ST 755 25 18,875 C MPAH AAC 1 1 94 50 0 50 1/20/16 064 0106 ELECTRIC AV SB 14TH ST MAIN ST 1,605 25 40,125 C MPAH AAC 1 1 43 16 66 18 1/20/16 086 316 LAMPSON AV HEATHER ST CANDLEBERRY AV 2,630 60 157,800 A MPAH AC 4 6 81 42 18 40 1/26/16 086 317 LAMPSON AV CANDLEBERY AV BASSWOOD ST 1,269 56 11,200 A MPAH AAC 5 6 87 32 0 68 3/29/16 086 318 LAMPSON AV BASSWOOD ST 735' E/O BASSWOOD ST 735 56 11,200 A MPAH AAC 5 6 82 66 17 17 1/5/16 086 319 LAMPSON AV 735' E/O BASSWOOD ST OLD RANCH PLAZA 1,903 56 11,200 A MPAH AAC 5 6 85 64 0 36 1/5/16 086 320 LAMPSON AV OLD RANCH PLAZA SEAL BEACH BLVD 746 56 11,200 A MPAH AAC 5 6 71 43 25 32 1/5/16 086 321 LAMPSON AV CITY LIMIT ROSE ST 1,781 60 96,300 A MPAH AC 4 6 91 86 0 14 1/26/16 086 335 LAMPSON AV ROSE ST HEATHER ST 1,582 60 87,306 A MPAH AC 4 6 95 78 0 22 1/26/16 090 0150 MARINA DR PCH 6TH ST 629 61 38,369 C MPAH AC 3 1 13 20 80 0 1/20/16 090 0151 MARINA DR 6TH ST 1ST ST 1,650 50 82,500 C MPAH AC 2 1 67 40 49 11 1/26/16 090 0304 MARINA DR 1ST ST CITY LIMIT 965 50 45,520 C MPAH AC 2 1 82 32 40 28 1/26/16 0100 0165 OLD RANCH PARKWAY SEAL BEACH BL 200' W/ SEAL BEACH BL 520 48 24,960 A MPAH AC 3 3 39 34 52 14 1/5/16 0100 0166 OLD RANCH PARKWAY 200' W/ SEAL BEACH 720' W/ SEAL BEACH 200 64 12,800 A MPAH AC 4 3 34 32 68 0 1/5/16 0100 0167 OLD RANCH PARKWAY 720' W/ SEAL BEACH 22 FWY 1,030 34 37,520 A MPAH AC 2 3 25 24 52 24 1/5/16 0115 0184 SEAL BEACH BL ELECTRIC AV PCH 1,510 40 60,400 A MPAH AC 2 1 82 33 15 52 1/20/16 0115 0186 SEAL BEACH BL PCH BOLSA AV 1,640 97 159,080 A MPAH AAC 6 6 94 40 0 60 1/20/16 0115 0190 SEAL BEACH BL OLD RANCH PKY LAMPSON AV 833 89 74,137 A MPAH AC 6 6 92 65 0 35 1/5/16 0115 0191 SEAL BEACH BL LAMPSON AV ST. CLOUD DR 915 77 70,455 A MPAH AC 6 6 90 50 0 50 1/5/16 0115 0192 SEAL BEACH BL ST. CLOUD DR PLYMOUTH DR 1,491 77 114,807 A MPAH AC 6 6 91 41 0 59 1/5/16 0115 0193 SEAL BEACH BL PLYMOUTH DR CITY LIMIT 1,040 97 100,880 A MPAH AC 6 6 91 45 0 55 1/5/16 0115 322 SEAL BEACH BL BOLSA AV HERON POINTE 2,062 99 204,138 A MPAH AC 2 6 97 100 0 0 1/26/16 0115 323 SEAL BEACH BL HERON POINTE ADOLFO LOPEZ DR 1,248 99 123,552 A MPAH AC 2 6 97 93 0 7 1/26/16 0115 324 SEAL BEACH BL ADOLFO LOPEZ DR APOLLO DR 579 98 56,742 A MPAH AC 6 6 86 54 0 46 1/20/16 0115 325 SEAL BEACH BL APOLLO DR ROAD C 1,788 98 175,224 A MPAH AC 6 6 78 27 0 73 1/26/16 0115 326 SEAL BEACH BL ROAD C WESTMINSTER BL 1,551 98 151,998 A MPAH AC 6 6 77 51 12 37 1/26/16 0115 327 SEAL BEACH BL WESTMINSTER BL ST ANDREWS DR 1,010 95 95,950 A MPAH AC 6 6 71 61 9 30 1/26/16 0115 328 SEAL BEACH BL ST ANDREWS DR (N) GOLDEN RAIN RD 1,964 95 186,580 A MPAH AC 6 6 81 59 0 41 1/26/16 0115 329 SEAL BEACH BL (N) GOLDEN RAIN RD FWY 405 SOUTH 1,527 95 145,065 A MPAH AC 6 6 89 45 36 19 3/29/16 0115 330 SEAL BEACH BL FWY 405 SOUTH OLD RANCH PARKWAY 1,858 95 176,510 A MPAH AC 6 6 93 23 0 77 1/26/16 0127 0208 WESTMINSTER BL CITY LIMIT APOLLO DR 1,451 79 102,419 A MPAH AC 4 6 49 52 16 32 1/26/16 0127 0209 WESTMINSTER BL BOLSA CHICA RD SEAL BEACH BL 10,610 72 763,920 A MPAH AC 4 6 95 24 0 76 1/8/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 1 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0127 314 WESTMINSTER BL APOLLO DR 1467' E/O APOLLO DR 1,451 79 103,002 A MPAH AC 4 6 48 50 33 17 1/26/16 0127 315 WESTMINSTER BL 1467' E/O APOLLO DR SEAL BEACH BLVD 1,429 79 102,489 A MPAH AC 4 6 51 51 17 32 1/26/16 4,064,667 LOCALS 01 01 10TH ST ELECTRIC AV PCH 660 40 26,400 E LOCAL AC 2 1 94 76 0 24 1/20/16 01 02 10TH ST OCEAN AV ELECTRIC AV 950 40 38,000 E LOCAL AC 2 1 83 100 0 0 1/20/16 01 03 10TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 64 12 64 24 1/20/16 02 04 11TH ST ELECTRIC AV LANDING AV 210 37 7,770 E LOCAL AC 2 1 100 0 0 0 1/20/16 02 05 11TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 84 60 0 40 1/20/16 02 06 11TH ST OCEAN AV ELECTRIC AV 965 40 38,600 E LOCAL AC 2 1 94 100 0 0 1/26/16 03 07 12TH ST ELECTRIC AV PCH 860 37 31,820 C LOCAL AAC 2 1 95 90 0 10 1/20/16 03 08 12TH ST OCEAN AV ELECTRIC AV 810 40 32,400 E LOCAL PCC 2 1 98 100 0 0 1/6/16 03 09 12TH ST SEAL WY OCEAN AV 210 24 5,040 E LOCAL AC 2 1 78 29 54 17 1/20/16 04 010 13TH ST ELECTRIC AV PCH 1,013 21 21,273 E LOCAL AC 1 1 100 0 0 0 2/8/16 04 011 13TH ST OCEAN AV ELECTRIC AV 710 40 28,400 E LOCAL AC 2 1 92 100 0 0 1/20/16 04 012 13TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 76 28 59 13 1/20/16 05 013 14TH ST ELECTRIC AV PCH 1,010 21 21,210 E LOCAL AC 2 1 100 0 0 0 1/20/16 05 014 14TH ST OCEAN AV ELECTRIC AV 660 40 26,400 E LOCAL AC 2 1 88 22 0 78 1/20/16 05 015 14TH ST SEAL WY OCEAN AV 210 25 5,250 E LOCAL AC 2 1 57 6 69 25 1/20/16 06 016 15TH ST ELECTRIC AV PCH 1,110 21 23,310 E LOCAL AC 1 1 100 0 0 0 1/20/16 07 017 16TH ST ELECTRIC AV PCH 1,160 21 24,360 E LOCAL AC 2 1 51 71 29 0 1/20/16 08 018 17TH ST ELECTRIC AV PCH 1,260 21 26,460 E LOCAL AC 1 1 58 71 29 0 1/20/16 09 0332 1ST ST END OCEAN AVE 403 40 16,120 A LOCAL AC 2 1 99 100 0 0 1/26/16 010 022 2ND ST OCEAN AV CENTRAL AV 860 40 34,400 E LOCAL AC 2 1 91 70 30 0 1/20/16 010 334 2ND ST CENTRAL AV MARINA DR 105 40 4,200 E LOCAL AC 2 1 96 100 0 0 1/26/16 011 023 3RD ST OCEAN AV CENTRAL AV 760 40 30,400 E LOCAL AC 2 1 89 28 0 72 1/20/16 012 024 4TH ST OCEAN AV MARINA DR 1,200 40 48,000 E LOCAL AC 2 1 87 30 0 70 1/20/16 013 025 5TH ST MARINA DR PCH 660 60 39,600 C LOCAL AC 4 1 80 24 0 76 1/20/16 013 026 5TH ST OCEAN AV MARINA DR 1,400 40 56,000 E LOCAL AC 2 1 79 74 0 26 1/20/16 014 027 6TH ST OCEAN AV ELECTRIC AV 1,300 40 52,000 E LOCAL AAC 2 1 97 11 0 89 3/29/16 014 333 6TH ST (S) ELECTRIC AV MARINA DR 195 40 7,800 E LOCAL AAC 2 1 86 21 40 39 1/26/16 015 028 7TH ST ELECTRIC AV MARINA DR 210 40 8,400 E LOCAL AAC 2 1 96 100 0 0 1/20/16 015 029 7TH ST OCEAN AV ELECTRIC AV 1,280 40 51,200 E LOCAL AAC 2 1 96 100 0 0 1/20/16 016 030 8TH ST ELECTRIC AV PCH 460 40 18,400 E LOCAL AAC 2 1 97 100 0 0 1/20/16 016 031 8TH ST OCEAN AV ELECTRIC AV 1,150 40 46,000 E LOCAL AAC 2 1 97 100 0 0 1/20/16 017 032 ADOLFO LOPEZ DR END 425 E/SEAL BEACH BL 800 60 48,000 E LOCAL AAC 2 6 83 31 0 69 1/20/16 017 033 ADOLFO LOPEZ DR SEAL BEACH BL 425 W/SEAL BEACH BL 425 60 25,500 E LOCAL AAC 2 6 62 65 0 35 1/20/16 018 034 AGUA PL MARLIN AV CDS 220 27 7,040 E LOCAL AAC 2 5 91 100 0 0 1/14/16 019 035 ALMOND AV DAISY ST ASTER ST 1,950 36 70,200 C LOCAL AC 2 3 100 0 0 0 2/8/16 019 036 ALMOND AV VIOLET ST ROSE CR 765 37 28,305 C LOCAL AC 2 3 98 100 0 0 1/7/16 019 037 ALMOND AV ROSE CR OLEANDER ST 705 37 26,085 C LOCAL AC 2 3 91 100 0 0 1/7/16 019 0311 ALMOND AV IRIS CR DAISY ST 975 36 35,100 C LOCAL AC 2 3 89 16 0 84 1/7/16 019 0312 ALMOND AV OLEANDER ST IRIS CR 1,120 36 40,320 C LOCAL AC 2 3 90 70 0 30 1/7/16 020 038 ASTER ST ALMOND AV BIRCHWOOD AV 1,239 37 45,843 E LOCAL AAC 2 3 90 54 0 46 1/6/16 020 039 ASTER ST BIRCHWOOD AV CANDLEBERRY AV 206 37 7,622 E LOCAL AAC 2 3 93 38 0 62 1/6/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 2 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 021 040 AVALON DR CATALINA AV END 430 33 14,190 E LOCAL AC 2 2 91 100 0 0 1/14/16 022 041 BALBOA DR BOLSA AV CATALINA AV 1,060 37 39,220 C LOCAL AC 2 2 100 0 0 0 1/14/16 022 042 BALBOA DR PCH BOLSA AV 660 37 24,420 E LOCAL AC 2 2 90 100 0 0 1/14/16 023 043 BANYAN AV CAMELIA ST COLUMBINE ST 600 33 19,800 E LOCAL AC 2 3 71 22 61 17 1/8/16 024 044 BASSWOOD ST ASTER ST LAMPSON AV 410 36 14,760 C LOCAL AC 2 3 98 100 0 0 1/5/16 026 046 BAYOU WY BAYSIDE DR HARBOR WY 630 33 20,790 E LOCAL AAC 2 2 91 100 0 0 1/14/16 025 045 BAYSIDE DR BOLSA AV CRESTVIEW AV 1,410 33 46,530 E LOCAL AC 2 2 89 100 0 0 1/14/16 027 047 BEACHCOMBER DR BOLSA AV SEA BREEZE DR 1,160 33 38,280 E LOCAL AAC 2 2 94 100 0 0 1/14/16 028 048 BERYL COVE WY EMERALD COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 029 049 BIRCHWOOD AV DAISY ST ASTER ST 1,650 33 54,450 E LOCAL AAC 2 3 90 68 25 7 1/7/16 029 0313 BIRCHWOOD AV OLEANDER ST DAISY ST 1,950 33 64,350 E LOCAL AAC 2 3 88 69 29 2 1/7/16 030 050 BLUEBELL ST ALMOND AV BIRCHWOOD AV 710 33 23,430 E LOCAL AC 2 3 72 19 66 15 1/7/16 032 053 CAMELIA ST ALMOND AV BANYAN AV 590 33 19,470 E LOCAL AC 2 3 77 46 51 3 1/8/16 033 054 CANDLEBERRY AV FUCHSIA ST ASTER AV 1,730 36 62,280 E LOCAL AAC 2 3 91 63 0 37 1/6/16 033 055 CANDLEBERRY AV MARIGOLD ST FUCHSIA ST 1,560 37 57,720 E LOCAL AAC 2 3 95 100 0 0 1/8/16 033 056 CANDLEBERRY AV WISTERIA ST OLEANDER ST 1,660 33 54,780 E LOCAL AC 2 3 86 33 66 1 3/29/16 033 0303 CANDLEBERRY AV ASTER ST LAMPSON AV 365 36 13,140 E LOCAL AAC 2 3 94 40 0 60 1/6/16 036 059 CARAVEL WY MARINA DR CORSAIR WY 360 37 13,320 E LOCAL AC 2 1 96 91 0 9 1/20/16 034 057 CARMEL AV SURF PL COASTLINE DR 360 37 13,320 E LOCAL AAC 2 2 90 91 0 9 1/14/16 035 058 CARNATION CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 83 28 56 16 1/8/16 037 060 CATALINA AV BALBOA DR COASTLINE DR 1,910 37 70,670 E LOCAL AC 2 2 90 100 0 0 1/14/16 037 061 CATALINA AV SEA BREEZE DR BALBOA DR 1,160 37 42,920 E LOCAL AC 2 2 88 100 0 0 1/26/16 037 0308 CATALINA AV SEA BREEZE DR CDS 1,330 37 49,760 E LOCAL AC 2 2 91 100 0 0 1/26/16 038 062 CENTRAL AV MAIN ST 12TH ST 860 40 34,400 C LOCAL AAC 2 1 97 100 0 0 1/20/16 038 063 CENTRAL AV 1ST ST 2ND ST 260 20 5,200 C LOCAL AAC 1 1 93 56 0 44 1/20/16 038 064 CENTRAL AV 2ND ST 6TH ST 1,265 40 50,600 C LOCAL AAC 2 1 95 100 0 0 1/26/16 038 0252 CENTRAL AV 6TH ST MAIN ST 950 40 38,000 C LOCAL AAC 2 1 97 100 0 0 1/26/16 039 065 CENTRAL WY 2ND ST 1ST ST 260 40 10,400 E LOCAL AC 2 1 94 95 0 5 1/20/16 039 066 CENTRAL WY 4TH ST 2ND ST 560 38 21,280 E LOCAL AC 2 1 91 69 0 31 1/20/16 039 067 CENTRAL WY 5TH ST 4TH ST 260 38 9,880 E LOCAL AC 2 1 95 100 0 0 1/20/16 040 068 CLIPPER WY CARAVEL WY ELECTRIC AV 910 33 30,030 E LOCAL AC 2 1 96 100 0 0 1/20/16 041 069 CLOVER CR ALMOND AV CDS 130 33 5,540 E LOCAL AC 2 3 93 98 2 0 1/8/16 042 070 COASTLINE DR CARMEL AV CDS 480 27 14,110 E LOCAL AC 2 2 90 100 0 0 1/14/16 042 071 COASTLINE DR MARVISTA DR CARMEL DR 455 33 15,015 E LOCAL AC 2 2 90 100 0 0 1/26/16 042 0305 COASTLINE DR BALBOA DR MARVISTA DR 1,850 33 61,050 E LOCAL AC 2 2 91 100 0 0 1/26/16 044 073 COLLEGE PARK DR (N) YALE LN (S) HARVARD LN 1,741 37 64,417 C LOCAL AC 2 4 92 65 0 35 1/8/16 044 074 COLLEGE PARK DR (S) HARVARD LN CITY LIMIT 940 44 27,810 C LOCAL AC 2 4 84 36 57 7 1/8/16 044 337 COLLEGE PARK DR (N) HARVARD LN (N) YALE LN 940 37 34,780 C LOCAL AC 2 4 92 100 0 0 1/8/16 043 072 COLUMBINE ST ALMOND AV BANYAN AV 210 33 6,930 E LOCAL AC 2 3 78 25 71 4 1/8/16 045 075 CORAL PL CDS BAYSIDE DR 230 27 7,310 E LOCAL AC 2 2 89 96 0 4 1/14/16 046 076 CORSAIR WY CARAVEL WY SCHOONER WY 1,020 33 33,660 E LOCAL AC 2 1 94 95 0 5 1/20/16 047 077 CREST DR CATALINA AV CRESTVIEW AV 210 33 6,930 E LOCAL AAC 2 2 89 66 0 34 1/14/16 048 078 CRESTVIEW AV CATALINA AV BAYSIDE DR 1,130 33 37,290 E LOCAL AAC 2 2 90 100 0 0 1/26/16 048 0309 CRESTVIEW AV BAYSIDE DR CREST DR 1,130 33 37,290 E LOCAL AAC 2 2 90 95 0 5 1/26/16 048 0310 CRESTVIEW AV CREST DR AVALON DR 925 33 30,525 E LOCAL AAC 2 2 91 100 0 0 1/26/16 049 079 CRYSTAL COVE WY MARBLE COVE WY OPAL COVE WY 520 33 17,160 E LOCAL AAC 2 5 91 100 0 0 1/14/16 050 080 CRYSTAL PL CRYSTAL COVE WY CDS 240 27 7,530 E LOCAL AC 2 5 93 100 0 0 1/14/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 3 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 051 081 DAFFODIL CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 77 25 75 0 1/8/16 052 082 DAHLIA DR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 75 30 68 2 1/8/16 053 083 DAISY CR FIR AV CDS 230 33 8,840 E LOCAL AC 2 3 57 42 57 1 1/6/16 054 084 DAISY ST ALMOND AV BIRCHWOOD AV 410 33 13,530 E LOCAL AC 2 3 54 12 74 14 1/8/16 054 085 DAISY ST CANDLEBERRY AV DOGWOOD AV 210 33 6,930 E LOCAL AC 2 3 67 14 52 34 1/6/16 055 086 DARTMOUTH CR HARVARD LN CDS 180 34 8,120 E LOCAL AC 2 4 78 10 63 27 3/29/16 056 087 DOGWOOD AV DAISY ST IRONWOOD AV 1,470 33 48,510 E LOCAL AC 2 3 80 40 34 26 3/29/16 056 088 DOGWOOD AV MARIGOLD ST FUCHSIA ST 1,520 33 50,160 E LOCAL AC 2 3 73 32 57 11 1/8/16 056 089 DOGWOOD AV WISTERIA ST OLEANDER ST 1,710 33 56,430 E LOCAL AC 2 3 58 30 63 7 1/7/16 057 090 DOLPHIN AV SEAL WY OCEAN AV 226 24 5,424 E LOCAL AC 2 1 63 28 67 5 1/20/16 057 091 DOLPHIN AV OCEAN AV ELECTRIC AV 582 24 13,968 E LOCAL AC 1 1 90 96 0 4 1/20/16 058 092 DORY WY GALLEON WY SCHOONER WY 360 28 10,080 E LOCAL AC 2 2 93 100 0 0 1/20/16 059 093 DRIFTWOOD AV BALBOA DR COASTLINE DR 1,460 33 48,180 E LOCAL AAC 2 2 89 86 14 0 1/14/16 060 094 EBBTIDE PL COASTLINE PL CDS 230 27 7,410 E LOCAL AC 2 2 87 100 0 0 1/14/16 061 20 ELDER AV FUCHSIA ST IRONWOOD AV 1,500 36 54,000 E LOCAL AC 2 3 94 100 0 0 1/6/16 061 095 ELDER AV HEATHER ST FUCHSIA ST 520 36 18,720 E LOCAL AC 2 3 89 97 0 3 1/6/16 061 096 ELDER AV OLEANDER ST HEATHER ST 1,130 36 40,680 E LOCAL AC 2 3 79 87 0 13 1/6/16 061 097 ELDER AV VIOLET ST PRIMROSE ST 1,380 33 45,540 E LOCAL AC 2 3 80 78 0 22 1/7/16 065 0107 EMERALD COVE WY BERYL COVE WY JADE COVE WY 580 33 19,140 E LOCAL AC 2 5 90 100 0 0 1/14/16 066 0108 EMERALD PL EMERALD COVE WY CDS 230 27 7,460 E LOCAL AC 2 5 86 43 0 57 1/26/16 067 0109 FATHOM AV SILVER SHOALS AV BALBOA DR 810 33 26,730 E LOCAL AC 2 2 91 100 0 0 1/14/16 068 0110 FERN CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 81 17 66 17 1/8/16 069 0111 FIR AV GOLDENROD ST IRONWOOD AV 1,460 33 48,180 E LOCAL AAC 2 3 94 78 0 22 3/29/16 069 0112 FIR AV ROSE ST HEATHER ST 1,260 33 41,580 E LOCAL AC 2 3 73 37 43 20 1/7/16 069 0113 FIR AV SUNFLOWER ST ROSE ST 330 33 10,890 E LOCAL AAC 2 3 97 100 0 0 1/7/16 069 0114 FIR AV WISTERIA ST SUNFLOWER ST 1,220 33 40,260 E LOCAL AAC 2 3 97 100 0 0 1/7/16 070 0115 FIR CR FIR AV CDS 130 60 8,900 E LOCAL AC 2 3 91 95 2 3 1/7/16 072 0117 FUCHSIA CR FIR AV CDS 330 33 12,140 E LOCAL AAC 2 3 93 95 0 5 1/6/16 071 0116 FUCHSIA ST BIRCHWOOD AV ELDER AV 640 33 21,120 E LOCAL AAC 2 3 92 60 40 0 3/29/16 073 0118 GALLEON WY ELECTRIC AV DORY WY 970 33 32,010 E LOCAL AC 2 1 75 18 0 82 1/20/16 097 0160 GATE RD SEAL BEACH BL 1857' W/O SEAL BEACH BL 1,857 42 77,994 E LOCAL AAC 2 6 89 29 0 71 1/26/16 097 0161 GATE RD 1857' W/O SEAL BEACH BL CDS 1,857 25 47,175 E LOCAL AAC 2 6 94 41 0 59 1/26/16 074 0119 GOLDENROD CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 88 41 36 23 1/8/16 0139 0120 GOLDENROD ST ELDER AV CDS 610 33 21,380 E LOCAL AAC 2 3 86 77 0 23 1/6/16 075 0121 GUAVA AV IRONWOOD AV CDS 530 33 18,740 E LOCAL AC 2 3 96 68 0 32 3/29/16 075 0122 GUAVA AV PANSY ST HEATHER ST 1,360 33 44,880 E LOCAL AC 2 3 78 56 0 44 1/7/16 077 0124 HARBOR WY BAYSIDE DR BAYOU WY 760 33 25,080 E LOCAL AC 2 2 100 0 0 0 1/14/16 076 0123 HARVARD LN COLLEGE PARK DR OCCIDENTAL LN 1,063 37 39,331 E LOCAL AC 2 4 88 91 0 9 1/26/16 076 331 HARVARD LN OCCIDENTAL LN (N) COLLEGE PARK DR 1,289 37 47,693 E LOCAL AC 2 4 87 47 0 53 1/26/16 076 336 HARVARD LN (N) COLLEGE PARK DR CDS 992 37 37,804 E LOCAL AC 2 4 94 100 0 0 1/8/16 078 0125 HAZELNUT AV GUAVA AV HEATHER ST 1,210 33 39,930 E LOCAL AAC 2 3 90 65 0 35 1/6/16 078 0126 HAZELNUT AV HEATHER ST ROSE ST 1,610 33 53,130 E LOCAL AC 2 3 82 65 0 35 1/6/16 078 0127 HAZELNUT AV WISTERIA ST SUNFLOWER ST 1,310 33 43,230 E LOCAL AC 2 3 34 15 85 0 1/7/16 079 0128 HEATHER CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 94 63 37 0 1/8/16 0135 0129 HEATHER ST HAZELNUT AV LAMPSON AV 490 37 18,130 E LOCAL AAC 2 3 77 46 34 20 1/6/16 0135 0130 HEATHER ST ELDER AV HAZELNUT AV 790 37 29,230 E LOCAL AC 2 3 90 100 0 0 1/6/16 080 0131 IRIS CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 78 21 77 2 1/8/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 4 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0136 0132 IRIS ST HAZELNUT AV IRONWOOD AV 226 32 7,232 E LOCAL AC 2 3 49 12 68 20 1/6/16 081 0133 IRONWOOD AV CANDLEBERRY AV ELDER AV 524 33 17,292 C LOCAL AC 2 3 98 100 0 0 1/6/16 081 0134 IRONWOOD AV ELDER AV HEATHER ST 1,967 33 64,911 C LOCAL AC 2 3 97 99 0 1 1/6/16 081 0135 IRONWOOD AV ROSE ST IRIS ST 1,420 33 46,860 C LOCAL AC 2 3 50 9 80 11 1/6/16 081 0136 IRONWOOD AV WISTERIA ST TULIP ST 322 37 11,914 C LOCAL AC 2 3 96 100 0 0 1/7/16 081 0137 IRONWOOD AV TULIP ST SUNFLOWER ST 1,020 37 37,740 C LOCAL AC 2 3 64 47 53 0 1/7/16 082 0138 ISLAND VIEW DR BOLSA AV SEA BREEZE DR 1,110 33 36,630 E LOCAL AAC 2 2 94 100 0 0 1/14/16 083 0139 JADE COVE WY EMERALD COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 084 0140 JASMIN CR ALMOND AV CDS 230 33 8,840 E LOCAL AC 2 3 94 53 0 47 1/8/16 085 0141 LAGUNA PL MARLIN AV CDS 380 27 11,460 E LOCAL AC 2 5 91 100 0 0 1/14/16 087 0145 LANDING AV 12TH ST 11TH ST 260 42 10,920 E LOCAL AC 2 1 39 61 39 0 1/20/16 087 0146 LANDING AV SEAL BEACH BL 12TH ST 1,210 21 25,410 E LOCAL AC 2 1 95 0 0 100 1/20/16 088 0147 LOYOLA PLAZA COLLEGE PARK DR CDS 330 25 9,250 E LOCAL AC 2 4 80 74 26 0 1/8/16 089 0148 MAIN ST ELECTRIC AV PCH 690 55 37,950 C LOCAL AC 2 1 49 59 41 0 1/21/16 089 0149 MAIN ST OCEAN AV ELECTRIC AVE 1,190 57 67,830 C LOCAL AC 2 1 91 88 0 12 1/20/16 091 0152 MARBLE COVE WY CRYSTAL COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 092 0153 MARIGOLD ST BIRCHWOOD AV CANDLEBERRY AV 160 33 5,280 E LOCAL AC 2 3 51 12 85 3 1/8/16 092 0154 MARIGOLD ST CANDLEBERRY AV DOGWOOD AV 160 33 5,280 E LOCAL AC 2 3 74 29 66 5 1/8/16 093 0155 MARINE AV ELECTRIC AV DOLPHIN AV 320 24 7,680 E LOCAL AC 1 1 89 93 0 7 1/20/16 094 0156 MARLIN AV SEAL BEACH BL BALBOA DR 1,610 37 59,570 E LOCAL AC 2 5 90 79 21 0 1/14/16 095 0157 MARVISTA AV CATALINA AV COASTLINE DR 1,610 33 53,130 E LOCAL AC 2 2 93 100 0 0 3/29/16 095 0158 MARVISTA AV COASTLINE DR PCH 123 36 4,428 E LOCAL AC 2 2 94 100 0 0 1/20/16 096 0159 NEPTUNE AV SEAL WY OCEAN AV 210 24 5,040 E LOCAL AC 2 1 90 42 58 0 1/20/16 098 0162 OCCIDENTAL DR STANFORD LN HARVARD LN 160 33 5,280 E LOCAL AC 2 4 77 16 64 20 1/8/16 099 0163 OCEAN AV 13TH ST MAIN ST 1,265 51 64,515 C LOCAL AC 2 1 80 88 12 0 1/26/16 099 0164 OCEAN AV MAIN ST 5TH ST 1,245 52 64,740 C LOCAL AC 2 1 79 80 20 0 1/26/16 099 0306 OCEAN AV ELECTRIC AV 13TH ST 1,300 51 66,300 C LOCAL AC 2 1 82 96 0 4 1/26/16 099 0307 OCEAN AV 5TH ST 1ST ST 1,240 52 64,480 C LOCAL AC 2 1 77 68 32 0 1/26/16 0101 0168 OLEANDER ST ALMOND AV FIR AV 1,320 36 47,520 E LOCAL AC 2 3 45 23 65 12 1/7/16 0102 0169 OPAL COVE WY CRYSTAL COVE WY MARLIN AV 360 33 11,880 E LOCAL AC 2 5 91 100 0 0 1/14/16 0113 0170 PANSY CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 6 91 53 11 36 1/7/16 0103 0171 PANSY ST FIR AV GUAVA AV 160 33 5,280 E LOCAL AC 2 6 89 74 0 26 1/7/16 0106 0174 PRIMROSE CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 3 91 74 0 26 1/7/16 0104 0172 PRIMROSE ST DOGWOOD AV ELDER AV 210 33 6,930 E LOCAL AC 2 3 92 50 14 36 1/7/16 0105 0173 PRINCETON CR HARVARD LN CDS 230 30 8,900 E LOCAL AC 2 4 70 34 66 0 1/8/16 0107 0175 PURDUE CR COLLEGE PARK DR CDS 68 27 3,836 E LOCAL AC 2 4 58 9 75 16 1/8/16 0108 0176 RIVIERA DR MARLIN AV BOLSA AV 560 31 17,360 E LOCAL AC 2 5 89 100 0 0 1/14/16 0137 0177 ROSE CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 3 93 100 0 0 1/7/16 0109 0178 ROSE ST FIR AV HAZELNUT AV 390 37 14,430 C LOCAL AC 2 3 91 71 0 29 3/29/16 0109 0179 ROSE ST HAZELNUT AV LAMPSON AV 440 37 16,280 C LOCAL AC 2 3 96 83 0 17 3/29/16 0110 0180 ROSSMOOR CENTER WY SEAL BEACH BL WEST RD 864 30 25,920 C LOCAL AC 2 3 88 56 0 44 1/5/16 0110 0181 ROSSMOOR CENTER WY WEST RD MONTECITO RD 364 28 10,192 C LOCAL AC 2 3 88 57 0 43 1/5/16 0111 0182 SANDPIPER DR BOLSA AV TAPER DR 1,110 33 36,630 E LOCAL AC 2 1 97 100 0 0 1/14/16 0112 0183 SCHOONER WY GALLEON WY DORY WY 660 33 21,780 E LOCAL AC 2 1 87 100 0 0 1/20/16 0114 0185 SEA BREEZE DR BOLSA AV CATALINA AV 1,160 33 38,280 E LOCAL AC 2 2 94 100 0 0 1/14/16 0117 0194 SEAL WY 10TH ST 11TH ST 290 15 4,350 E LOCAL PCC 1 1 90 16 78 6 1/20/16 0117 0195 SEAL WY DOLPHIN AV 14TH ST 270 13 3,510 E LOCAL PCC 1 1 88 16 84 0 1/26/16 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 5 of 6 DRAFT City of Seal Beach, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A to Z) BranchID SectionID Name From To Length Width Area Rank MPAH Type Lanes ZONE PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date 0117 0196 SEAL WY 12TH ST 11TH ST 300 12 3,600 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0247 SEAL WY 13TH ST 12TH ST 295 12 3,540 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0248 SEAL WY 14TH ST 13TH ST 295 12 3,540 E LOCAL PCC 1 1 100 0 0 0 1/26/16 0117 0249 SEAL WY NEPTUNE AV DOLPHIN AV 385 13 5,005 E LOCAL PCC 1 1 83 9 89 2 1/26/16 0117 0250 SEAL WY ELECTRIC AV NEPTUNE AV 505 13 6,565 E LOCAL PCC 1 1 82 9 91 0 1/26/16 0118 0197 SILVER SHOALS AV BOLSA AV FATHOM AV 300 33 9,900 E LOCAL AC 2 2 100 0 0 0 1/14/16 0119 0198 SOUTH SHORE DR BOLSA AV TAPER DR 1,060 33 34,980 E LOCAL AC 2 2 97 100 0 0 1/14/16 0120 0199 STANFORD LN COLLEGE PARK DR COLLEGE PARK DR 1,860 32 59,520 E LOCAL AC 2 3 82 28 15 57 1/8/16 0138 0200 SUNFLOWER CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 1 98 85 0 15 1/7/16 0121 0201 SUNFLOWER ST FIR AV IRONWOOD AV 560 37 20,720 E LOCAL AC 2 3 42 24 69 7 1/7/16 0122 0202 SURF PL CATALINA AV CDS 480 33 16,940 E LOCAL AC 2 2 91 100 0 0 1/14/16 0123 0203 TAPER DR BOLSA AV CATALINA AV 1,110 33 36,630 E LOCAL AC 2 2 97 100 0 0 1/14/16 0124 0204 TEABERRY CR ALMOND AV CDS 430 33 15,440 E LOCAL AC 2 2 94 31 0 69 1/7/16 0125 0205 TULIP ST IRONWOOD AV LAMPSON AV 70 36 2,520 E LOCAL AAC 2 3 94 100 0 0 1/7/16 0126 0206 VIOLET ST ALMOND AV CANDLEBERRY AV 660 33 21,780 E LOCAL AC 2 3 85 34 25 41 1/7/16 0126 0207 VIOLET ST ELDER AV FIR AV 160 33 5,280 E LOCAL AC 2 3 43 12 78 10 1/7/16 0128 0210 WISTERIA ST DOGWOOD AV IRONWOOD AV 990 37 36,630 E LOCAL AC 2 3 78 42 46 12 3/29/16 0128 0211 WISTERIA ST DOGWOOD AV CDS 1,040 33 35,570 E LOCAL AC 2 3 80 49 44 7 3/29/16 0129 0212 YALE CR END YALE LN 130 48 6,240 E LOCAL AC 2 4 82 23 77 0 3/29/16 0130 0213 YALE LN (N) COLLEGE PARK DR (S) COLLEGE PARK DR 1,160 33 38,280 E LOCAL AC 2 4 77 55 45 0 1/8/16 5,327,374 PCI Climate, PCI Load and PCI Other values indicate the % of "distress type" found within section samples Page 6 of 6 City of Seal Beach, CA Page 13 2016 Citywide Pavement Management Program Final Report – June 8, 2016 PROJECTED PCI UNDER EXISTING FUNDING LEVELS (SEVEN-YEAR PROJECTION) Based on the current funding that the City has identified, we have weighted this funding against the conditions found on the network from the most recent survey. We have included summary tables below to demonstrate our PCI findings. Projected PCI Under Current Funding (Seven-Yr Projection) Projected PCI Under Current Funding (Seven-Yr Projection) City of Seal Beach, CA Page 14 2016 Citywide Pavement Management Program Final Report – June 8, 2016 ROAD MAINTENANCE AND REHABILITATION PROJECTIONS (SEVEN-YR) This report is a section-by-section listing of recommended maintenance and rehabilitation projects laid out by fiscal year. This is a seven-year projection which includes the MPAH and Local street programs. DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2016-17 1ST ST PCH MARINA DR 2,172 22 47,784 Arterial MPAH 59 ARHM $210,250 2016-17 1ST ST PCH 597' NE/PCH 597 24 14,328 Arterial MPAH 56 ARHM $63,043 $273,293 2016-17 5TH ST MARINA DR PCH 660 60 39,600 Collector CPW/Bridge 80 Slurry Seal $15,840 2016-17 COLLEGE PARK DR (S) HARVARD LN CITY LIMIT 940 44 27,810 Collector CPW/Bridge 84 Slurry Seal $11,124 2016-17 DARTMOUTH CR HARVARD LN CDS 180 34 8,120 Local CPW/Bridge 78 Slurry Seal $3,248 2016-17 GALLEON WY ELECTRIC AV DORY WY 970 33 32,010 Local CPW/Bridge 75 Slurry Seal $12,804 2016-17 HARVARD LN COLLEGE PARK DR OCCIDENTAL LN 1,063 37 39,331 Local CPW/Bridge 88 Slurry Seal $15,732 2016-17 HARVARD LN OCCIDENTAL LN (N) COLLEGE PARK DR 1,289 37 47,693 Local CPW/Bridge 87 Slurry Seal $19,077 2016-17 LOYOLA PLAZA COLLEGE PARK DR CDS 330 25 9,250 Local CPW/Bridge 80 Slurry Seal $3,700 2016-17 OCCIDENTAL DR STANFORD LN HARVARD LN 160 33 5,280 Local CPW/Bridge 77 Slurry Seal $2,112 2016-17 PRINCETON CR HARVARD LN CDS 230 30 8,900 Local CPW/Bridge 70 Slurry Seal $3,560 2016-17 SCHOONER WY GALLEON WY DORY WY 660 33 21,780 Local CPW/Bridge 87 Slurry Seal $8,712 2016-17 STANFORD LN COLLEGE PARK DR COLLEGE PARK DR 1,860 32 59,520 Local CPW/Bridge 82 Slurry Seal $23,808 2016-17 YALE CR END YALE LN 130 48 6,240 Local CPW/Bridge 82 Slurry Seal $2,496 2016-17 YALE LN (N) COLLEGE PARK DR (S) COLLEGE PARK DR 1,160 33 38,280 Local CPW/Bridge 77 Slurry Seal $15,312 $137,526 2016-17 PURDUE CR COLLEGE PARK DR CDS 68 27 3,836 Local CPW/Bridge 58 ARHM $16,878 $16,878 2016-17 Total $427,697 2017-18 1ST ST MARINA DR PCH 2,172 23 49,956 Arterial MPAH 48 ARHM $219,806 2017-18 OLD RANCH PARKWAY SEAL BEACH BL 200' W/ SEAL BEACH BL 520 48 24,960 Arterial MPAH 39 ARHM $113,069 2017-18 OLD RANCH PARKWAY 200' W/ SEAL BEACH 720' W/ SEAL BEACH 200 64 12,800 Arterial MPAH 34 ARHM $57,984 $390,859 2017-18 ADOLFO LOPEZ DR END 425 E/SEAL BEACH BL 800 60 48,000 Local Hill/Cove 83 Slurry Seal $19,680 2017-18 BALBOA DR PCH BOLSA AV 660 37 24,420 Local Hill/Cove 90 Slurry Seal $10,012 2017-18 BAYSIDE DR BOLSA AV CRESTVIEW AV 1,410 33 46,530 Local Hill/Cove 89 Slurry Seal $19,077 2017-18 CARMEL AV SURF PL COASTLINE DR 360 37 13,320 Local Hill/Cove 90 Slurry Seal $5,461 2017-18 CATALINA AV BALBOA DR COASTLINE DR 1,910 37 70,670 Local Hill/Cove 90 Slurry Seal $28,975 2017-18 CATALINA AV SEA BREEZE DR BALBOA DR 1,160 37 42,920 Local Hill/Cove 88 Slurry Seal $17,597 2017-18 COASTLINE DR CARMEL AV CDS 480 27 14,110 Local Hill/Cove 90 Slurry Seal $5,785 2017-18 COASTLINE DR MARVISTA DR CARMEL DR 455 33 15,015 Local Hill/Cove 90 Slurry Seal $6,156 2017-18 CORAL PL CDS BAYSIDE DR 230 27 7,310 Local Hill/Cove 89 Slurry Seal $2,997 2017-18 CREST DR CATALINA AV CRESTVIEW AV 210 33 6,930 Local Hill/Cove 89 Slurry Seal $2,841 2017-18 CRESTVIEW AV CATALINA AV BAYSIDE DR 1,130 33 37,290 Local Hill/Cove 90 Slurry Seal $15,289 2017-18 CRESTVIEW AV BAYSIDE DR CREST DR 1,130 33 37,290 Local Hill/Cove 90 Slurry Seal $15,289 2017-18 DRIFTWOOD AV BALBOA DR COASTLINE DR 1,460 33 48,180 Local Hill/Cove 89 Slurry Seal $19,754 2017-18 EBBTIDE PL COASTLINE PL CDS 230 27 7,410 Local Hill/Cove 87 Slurry Seal $3,038 2017-18 EMERALD COVE WY BERYL COVE WY JADE COVE WY 580 33 19,140 Local Hill/Cove 90 Slurry Seal $7,847 Arterial Total Local Paving Total Arterial Total Slurry Seal Total Page 1 of 4 DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2017-18 EMERALD PL EMERALD COVE WY CDS 230 27 7,460 Local Hill/Cove 86 Slurry Seal $3,059 2017-18 MARLIN AV SEAL BEACH BL BALBOA DR 1,610 37 59,570 Local Hill/Cove 90 Slurry Seal $24,424 2017-18 RIVIERA DR MARLIN AV BOLSA AV 560 31 17,360 Local Hill/Cove 89 Slurry Seal $7,118 $214,399 2017-18 ADOLFO LOPEZ DR SEAL BEACH BL 425 W/SEAL BEACH BL 425 60 25,500 Local Hill/Cove 62 AC Overlay $54,825 $54,825 2017-18 Total $660,083 2018-19 OLD RANCH PARKWAY 720' W/ SEAL BEACH 22 FWY 1,030 34 37,520 Arterial MPAH 25 AC Recon $368,071 $368,071 2018-19 10TH ST OCEAN AV ELECTRIC AV 950 40 38,000 Local Old Town 83 Slurry Seal $15,960 2018-19 11TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 84 Slurry Seal $2,205 2018-19 12TH ST SEAL WY OCEAN AV 210 24 5,040 Local Old Town 78 Slurry Seal $2,117 2018-19 13TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 76 Slurry Seal $2,205 2018-19 14TH ST OCEAN AV ELECTRIC AV 660 40 26,400 Local Old Town 88 Slurry Seal $11,088 2018-19 4TH ST OCEAN AV MARINA DR 1,200 40 48,000 Local Old Town 87 Slurry Seal $20,160 2018-19 5TH ST OCEAN AV MARINA DR 1,400 40 56,000 Local Old Town 79 Slurry Seal $23,520 2018-19 6TH ST (S) ELECTRIC AV MARINA DR 195 40 7,800 Local Old Town 86 Slurry Seal $3,276 2018-19 OCEAN AV 13TH ST MAIN ST 1,265 51 64,515 Collector Old Town 80 Slurry Seal $27,096 2018-19 OCEAN AV MAIN ST 5TH ST 1,245 52 64,740 Collector Old Town 79 Slurry Seal $27,191 2018-19 OCEAN AV ELECTRIC AV 13TH ST 1,300 51 66,300 Collector Old Town 82 Slurry Seal $27,846 2018-19 OCEAN AV 5TH ST 1ST ST 1,240 52 64,480 Collector Old Town 77 Slurry Seal $27,082 $189,746 2018-19 10TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 64 AC Overlay $11,970 2018-19 14TH ST SEAL WY OCEAN AV 210 25 5,250 Local Old Town 57 AC Overlay $11,970 2018-19 16TH ST ELECTRIC AV PCH 1,160 21 24,360 Local Old Town 51 AC Overlay $55,541 2018-19 17TH ST ELECTRIC AV PCH 1,260 21 26,460 Local Old Town 58 AC Overlay $60,329 2018-19 DOLPHIN AV SEAL WY OCEAN AV 226 24 5,424 Local Old Town 63 AC Overlay $12,367 2018-19 LANDING AV 12TH ST 11TH ST 260 42 10,920 Local Old Town 39 AC Overlay $24,898 2018-19 MAIN ST ELECTRIC AV PCH 690 55 37,950 Collector Old Town 49 AC Overlay $86,526 $263,600 2018-19 Total $821,417 2019-20 MARINA DR PCH 6TH ST 629 61 38,369 Collector MPAH 13 AC Recon $387,911 $387,911 2019-20 BANYAN AV CAMELIA ST COLUMBINE ST 600 33 19,800 Local CPE Phase 1 71 Slurry Seal $8,712 2019-20 BIRCHWOOD AV OLEANDER ST DAISY ST 1,950 33 64,350 Local CPE Phase 1 88 Slurry Seal $28,314 2019-20 BLUEBELL ST ALMOND AV BIRCHWOOD AV 710 33 23,430 Local CPE Phase 1 72 Slurry Seal $10,309 2019-20 CAMELIA ST ALMOND AV BANYAN AV 590 33 19,470 Local CPE Phase 1 77 Slurry Seal $8,567 2019-20 CARNATION CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 83 Slurry Seal $3,890 Arterial Total Slurry Seal Total Local Paving Total Arterial Total Local Paving Total Slurry Seal Total Page 2 of 4 DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2019-20 COLUMBINE ST ALMOND AV BANYAN AV 210 33 6,930 Local CPE Phase 1 78 Slurry Seal $3,049 2019-20 DAFFODIL CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 77 Slurry Seal $3,890 2019-20 DAHLIA DR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 75 Slurry Seal $3,890 2019-20 FERN CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 81 Slurry Seal $3,890 2019-20 GOLDENROD CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 88 Slurry Seal $3,890 2019-20 IRIS CR ALMOND AV CDS 230 33 8,840 Local CPE Phase 1 78 Slurry Seal $3,890 2019-20 ROSSMOOR CENTER WY SEAL BEACH BL WEST RD 864 30 25,920 Collector CPE Phase 1 88 Slurry Seal $11,405 2019-20 ROSSMOOR CENTER WY WEST RD MONTECITO RD 364 28 10,192 Collector CPE Phase 1 88 Slurry Seal $4,484 $98,178 2019-20 DAISY ST ALMOND AV BIRCHWOOD AV 410 33 13,530 Local CPE Phase 1 54 AC Overlay $31,796 $31,796 2019-20 Total $517,884 2020-21 BOLSA AV BALBOA DR PCH 993 37 36,741 Collector MPAH 53 ARHM $181,868 $181,868 2020-21 DAISY ST CANDLEBERRY AV DOGWOOD AV 210 33 6,930 Local CPE Phase 2 67 Slurry Seal $3,119 2020-21 DOGWOOD AV DAISY ST IRONWOOD AV 1,470 33 48,510 Local CPE Phase 2 80 Slurry Seal $21,830 2020-21 DOGWOOD AV MARIGOLD ST FUCHSIA ST 1,520 33 50,160 Local CPE Phase 2 73 Slurry Seal $22,572 2020-21 ELDER AV OLEANDER ST HEATHER ST 1,130 36 40,680 Local CPE Phase 2 79 Slurry Seal $18,306 2020-21 GOLDENROD ST ELDER AV CDS 610 33 21,380 Local CPE Phase 2 86 Slurry Seal $9,621 2020-21 HEATHER ST HAZELNUT AV LAMPSON AV 490 37 18,130 Local CPE Phase 2 77 Slurry Seal $8,159 2020-21 MARIGOLD ST CANDLEBERRY AV DOGWOOD AV 160 33 5,280 Local CPE Phase 2 74 Slurry Seal $2,376 $85,982 2020-21 DAISY CR FIR AV CDS 230 33 8,840 Local CPE Phase 2 57 AC Overlay $21,393 2020-21 DOGWOOD AV WISTERIA ST OLEANDER ST 1,710 33 56,430 Local CPE Phase 2 58 AC Overlay $136,561 2020-21 MARIGOLD ST BIRCHWOOD AV CANDLEBERRY AV 160 33 5,280 Local CPE Phase 2 51 AC Overlay $12,778 $170,731 2020-21 Total $438,580 2021-22 ELECTRIC AV NB MAIN ST 6TH ST 960 27 25,920 Collector MPAH 43 ARHM $132,192 2021-22 ELECTRIC AV SB 6TH ST MAIN ST 910 25 22,750 Collector MPAH 66 ARHM $116,025 $248,217 2021-22 FIR AV ROSE ST HEATHER ST 1,260 33 41,580 Local CPE Phase 3 73 Slurry Seal $19,127 2021-22 GUAVA AV PANSY ST HEATHER ST 1,360 33 44,880 Local CPE Phase 3 78 Slurry Seal $20,645 2021-22 HAZELNUT AV HEATHER ST ROSE ST 1,610 33 53,130 Local CPE Phase 3 82 Slurry Seal $24,440 2021-22 IRONWOOD AV TULIP ST SUNFLOWER ST 1,020 37 37,740 Collector CPE Phase 3 64 Slurry Seal $17,360 2021-22 WISTERIA ST DOGWOOD AV IRONWOOD AV 990 37 36,630 Local CPE Phase 3 78 Slurry Seal $16,850 $98,422 2021-22 IRIS ST HAZELNUT AV IRONWOOD AV 226 32 7,232 Local CPE Phase 3 49 AC Overlay $18,008 2021-22 IRONWOOD AV ROSE ST IRIS ST 1,420 33 46,860 Collector CPE Phase 3 50 AC Overlay $116,681 Local Paving Total Slurry Seal Total Arterial Total Slurry Seal Total Arterial Total Slurry Seal Total Local Paving Total Page 3 of 4 DRAFT City of Seal Beach, CA Forecasted Maintenance Report - FY 2016-2023 Sorted by FY FY Name From To Length Width Area Classification Location PCI Maint. Type Total $ 2021-22 SUNFLOWER ST FIR AV IRONWOOD AV 560 37 20,720 Local CPE Phase 3 42 AC Overlay $51,593 2021-22 HAZELNUT AV WISTERIA ST SUNFLOWER ST 1,310 33 43,230 Local CPE Phase 3 34 AC Recon $463,426 $649,707 2021-22 Total $996,346 2022-23 ELECTRIC AV SB 14TH ST MAIN ST 1,605 25 40,125 Collector MPAH 43 ARHM $210,656 $210,656 2022-23 CANDLEBERRY AV WISTERIA ST OLEANDER ST 1,660 33 54,780 Local CPE Phase 4 86 Slurry Seal $26,294 2022-23 ELDER AV VIOLET ST PRIMROSE ST 1,380 33 45,540 Local CPE Phase 4 80 Slurry Seal $21,859 2022-23 VIOLET ST ALMOND AV CANDLEBERRY AV 660 33 21,780 Local CPE Phase 4 85 Slurry Seal $10,454 2022-23 WISTERIA ST DOGWOOD AV CDS 1,040 33 35,570 Local CPE Phase 4 80 Slurry Seal $17,074 $75,682 2022-23 OLEANDER ST ALMOND AV FIR AV 1,320 36 47,520 Local CPE Phase 4 45 AC Overlay $122,126 2022-23 VIOLET ST ELDER AV FIR AV 160 33 5,280 Local CPE Phase 4 43 AC Overlay $13,570 $135,696 2022-23 Total $422,034 Arterial 2016 to 2023 Grand Total $2,060,875 Slurry Seal 2016 to 2023 Grand Total $899,933 Local Paving 2016 to 2023 Grand Total $1,323,233 Total $4,284,041 Local Paving Total Slurry Seal Total Arterial Total Local Paving Total Page 4 of 4 City of Seal Beach, CA Page 15 2016 Citywide Pavement Management Program Final Report – June 8, 2016 ALTERNATIVE FUNDING LEVELS SEVEN-YEAR ANNUAL WORK PROGRAM PROJECTIONS By using the City of Seal Beach’s current budgets and maintenance practices the system will develop “section unique” improvements and strategies. Each segment will be tied to a specific fiscal year. As shown in the following pages, we have assessed the budgets that have been projected to meet the maintenance and rehabilitations needed to maximize the City’s return on investment. The budget forecasting goal for the Arterial and Local networks focused on:  Establishing a proactive 7-year Maintenance & Rehabilitation Program;  Identify what funding levels are necessary to maintain and/or improve the networks PCI  Selecting the most cost effective repairs based on City strategies ALTERNATIVE FUNDING – MAINTAIN EXISTING AVERAGE NETWORK PCI Citywide Funding Necessary to Maintain Current PCI Citywide Funding Necessary to Maintain Current PCI City of Seal Beach, CA Page 16 2016 Citywide Pavement Management Program Final Report – June 8, 2016 City of Seal Beach, CA Page 17 2016 Citywide Pavement Management Program Final Report – June 8, 2016 ALTERNATIVE FUNDING – TO IMPROVE AVERAGE NETWORK PCI CITYWIDE FUNDING NECESSARY TO INCREASE CURRENT PCI CITYWIDE FUNDING NECESSARY TO INCREASE CURRENT PCI City of Seal Beach, CA Page 18 2016 Citywide Pavement Management Program Final Report – June 8, 2016 BACKLOG BY YEAR OF UNFUNDED PAVEMENT REHABILITATION, RESTORATION AND RECONSTRUCTION NEEDS BACKLOG BY FISCAL YEAR (RE: RESTORATION, REHABILITATION, AND RECONSTRUCTION) BACKLOG BY FISCAL YEAR (RE: RESTORATION, REHABILITATION, AND RECONSTRUCTION) City of Seal Beach, CA Page 19 2016 Citywide Pavement Management Program Final Report – June 8, 2016 Local Match Reduction Reporting Bucknam has enclosed the necessary tables and graphs to demonstrate the City of Seal Beach’s eligibility for Local Match Reduction. In order to be eligible for Local Match Reduction of 10%, the following must be submitted:  Measureable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point.  No reduction in the overall weighed (by area) average PCI in the MPAH or local street categories - or -  Road pavement conditions during the previous reporting period within the highest twenty percent of the scale for road pavement conditions in accordance with OCTA Ordinance No. 3 (i.e. PCI greater or equal to 75). Road conditions found through our 2016-17 PMP management study show that the City is eligible for Local Match Reduction based on the current network weighted PCI of 84.4. Additionally, the City of Seal Beach has demonstrated with the enclosed budget projection (pages 13) that the City’s weighted average PCI (by area) remains above a PCI of 75 and continues to show improvement from previous PMP studies.