HomeMy WebLinkAboutItem X Final 2017-21 5 Year CIPYear Year CCapital apital IImprovement mprovement PProgram rogram FY 2016/17FY 2016/17 ——FY 2020/21FY 2020/21 City of Seal Beach City of Seal Beach City of Seal Beach TABLE OF CONTENTS City Council and Executive Team ………………………………… 2 Message from the Director ………………………………… 3 – 4 CIP Accomplishments ………………………………… 5 – 6 CIP Process ………………………………… 7 – 8 CIP Summary Schedule By Fund Type ………………………………… 9 – 13 By Project Type ………………………………… 14 – 15 SECTION I - BEACH AND PIER Summary Sheet ………………………………… 16 Individual Project Detail Sheets ………………………………… 17 – 18 SECTION II - BUILDING AND FACILITIES Summary Sheet ………………………………… 19 Individual Project Detail Sheets ………………………………… 20 – 24 SECTION III - PARKS Summary Sheet ………………………………… 25 Individual Project Detail Sheets ………………………………… 26 – 27 SECTION IV - SEWER Summary Sheet ………………………………… 28 Individual Project Detail Sheets ………………………………… 29 – 32 SECTION V – STORM DRAIN Summary Sheet ………………………………… 33 Individual Project Detail Sheets ………………………………… 34 – 35 SECTION VI - STREETS AND TRANSPORTATION Summary Sheet ………………………………… 36 – 38 Individual Project Detail Sheets ………………………………… 39 – 56 SECTION VII - WATER Summary Sheet ………………………………… 57 – 58 Individual Project Detail Sheets ………………………………… 59 – 69 SECTION VIII – UNFUNDED PROJECTS/NEEDS Summary Sheet ………………………………… 70 City of Seal Beach City of Seal Beach Principal Officers City Council Sandra Massa-Lavitt Mayor Mike Varipapa Mayor Pro-Tem Ellery Deaton Council Member Gary Miller Council Member David Sloan Council Member City Executive Team Jill R. Ingram City Manager Joe Bailey Marine Safety Chief Jim Basham Interim Director of Public Works Director of Community Development Victoria L. Beatley Finance Director/City Treasurer Patrick Gallegos Assistant City Manager Michael Ho Deputy Director of Public Works/ City Engineer Robin Roberts City Clerk Craig A. Steele City Attorney Joe Stilinovich Chief of Police 2 City of Seal Beach City of Seal Beach June 1, 2016 Message from the Deputy Director of Public Works/City Engineer: Honorable Mayor, Members of the City Council and Citizens of the City of Seal Beach: The Department of Public Works is pleased to submit the fiscal year 2016/17 through 2020/21 5-year Capital Improvement Program (CIP) for the City of Seal Beach. The CIP is a vital planning document that outlines priorities for the City’s infrastructure. The first year of the CIP is identical to the Capital Improvements section of the City’s FY 2016-17 budget document. Whereas the budget is the plan for the next 12 months of the City, the CIP strategically plans and prioritizes projects to maximize the efficient use of funds. The financial resources of the City vary with the economy, but the needs of the infrastructure and community are consistent. The CIP generally presents a balanced approach to invest in the City’s infrastructure by proactively managing the assets and planning the most effective method of expenditure. The Staff is looking for innovative ways to deliver on needs for the City, in an efficient delivery method that does not impact City residents quality of life nor business and visitors ability to enjoy the City as well. The Capital Improvement Program allows for planning of large expenditures and aggressive pursuit of grant funding to augment City funds. Projects within the CIP are divided into seven (7) operational areas; Beach & Pier, Building & Facilities, Parks, Sewer System, Storm Drain System, Street & Transportation and Water. The proposed CIP includes over 35 projects to be delivered during the next 5 years totaling over $32 million in value. The funding sources start with local funds including the City’s General Fund, grants, enterprise accounts, and fees. Those funds are aggressively augmented with grants. Numerous unfunded needs are currently identified and listed in the unfunded needs section totaling more than $155 million. Unfunded projects are crucial to identifying and planning future needs for the City. Those needs should be and are reviewed annually to locate funding sources. Responsible planning of the Capital Improvement Program will always include unfunded needs, and further highlight the importance of efficiency with expenditure of the City’s fiscal resources. The ultimate goal for the Capital Improvements Program is to effectively manage the City’s physical assets by delivering capital projects that meet schedule, stay within budget, and minimize the impact to the public. Not every alternate funding source is utilized as they sometimes add in duration and can attach conditions in exchange for the funding. Grant opportunities are individually assessed for viability. 3 4 City of Seal Beach City of Seal Beach CIP Accomplishments In Fiscal Year 2015/16 the City completed seven Capital Improvement Projects totaling over $1,000,000 in value. A list of those projects is below: Project No. Description Budget Expenditures BP1501 5-Year Pier Structural Assessment Report $100,000 $94,000 PR1502 Eisenhower Park Improvement Project $145,100 $144,000 PR1601 Court Rehabilitation ST1502 Local Street Resurfacing Program $475,000 $331,000 ST1607 Annual Street Tree Planting Program $20,000 $20,000 ST1603 Westminster Avenue Bike Path and Drainage Study $70,000 $38,000 EM1601 El Nino Storm Prep $452,000 $452,000 SS1602 Sewer System Smart Manhole Covers $20,000 $20,000 TOTAL $1,312,100 $1,120,000 The City also has sixteen (16) capital projects currently in final design, bidding, or construction phase and are as follows: Project No. Description Phase BG1401 & BG1402 Council Chambers and Seal Beach TV 3 Remodel Projects Construction PR1602 Eisenhower Tot Lot Rehabilitation Project Construction SD1601 Construction SS1301 Sewer Master Plan Update Design SS1401 Sewer Rate Update Design ST1408 Traffic Management Center Update Construction ST1601 Annual Slurry Seal Project Bidding ST1604 Annual Concrete Repair Project Bidding WT1501 Water Rate Update Design WT1607 7th Street Alley Water/Sewer Line Replacement Project Bidding WT0904 Beverly Manor Booster Station Improvements Project ( Design EM1602 Pier Demolition (Construction) Construction BP1002 Pier Remodel (Design) Design ST1509 Westminster Ave. Median Improvements (Design) Design ST1510 PCH and Anderson Landscape Improvements (Construction) Construction ST1610 Westminster Ave. Rehabilitation (Design) Design $94,000 $144,000 $21,000 $331,000 $20,000 $38,000 $452,000 $20,000 Council Chambers and Seal Beach TV 3 Remodel Projects Eisenhower Tot Lot Rehabilitation Project West End Pump Station Improvement Project Sewer Master Plan Update Sewer Rate Update Traffic Management Center Update Annual Slurry Seal Project Annual Concrete Repair Project Water Rate Update 7th Street Alley Water/Sewer Line Replacement Project Beverly Manor Booster Station Improvements Project Pier Demolition Pier Remodel Westminster Ave. Median Improvements PCH and Anderson Landscape Improvements Westminster Ave. Rehabilitation $100,000 $145,100 $30,000 $475,000 $20,000 $70,000 $452,000 $20,000 5 City of Seal Beach City of Seal Beach The City’s CIP consists of the following seven major areas: 1. Beach & Pier 2. Building & Facilities 3. Parks 4. Sewer 5. Storm Drain 6. Streets & Transportation 7. Water Beach & Pier. The City’s Beach and Pier are landmark tourist attractions that draw approximately 2 million visitors per year. The Pier is made up of a wooden deck with lighting, utility infrastructure, and a restaurant. The beach includes 3 parking lots, approximately 2 miles of dry sand beach, 2 sets of public restrooms, 2 parks, and landscaping. Building & Facilities. The City’s Building and Facilities house employees, visitors, tenants and business owners citywide in 22 structures. Structures include City Hall, Police Station, 2 Fire Stations, city maintenance facilities, and recreation and community centers. A facility master plan was adopted in FY 2011/12. Projects within this CIP were identified within that Facility Master Plan. Others are included in the unfunded needs. Parks. The City’s Park infrastructure provides landscaping and the City’s Urban Forest. Seal Beach has 70 park and landscape sites citywide. The forestry has over 150 species to maintain and nourish. Three projects are included within this year’s CIP. Sewer. The City provides sewer collection for the residents of Seal Beach and passes the raw sewage to the Orange County Sanitation District for treatment. The City’s Sewer System has more than 160,000 feet of pipe, 700 manholes, and 7 pump stations. Storm Drain. The City’s Storm Drain System collects surface runoff in 11 drainage areas throughout the City with one Storm Drain pump station. Streets & Transportation. The City’s Streets and Transportation System is responsible for more than 101 lane miles, continuous traffic flow, landscaped medians, traffic signals and utility work within the streets. Water. The Water Division conveys potable water to all residents, business owners, tenants and the Naval Base. The infrastructure includes two booster stations, two reservoirs, four wells, telemetry, valves, pressure regulation stations, fire hydrants, meters and control center. 6 City of Seal Beach City of Seal Beach CIP PROCESS The Capital Improvement Program is comprised of construction projects and equipment purchases (excluding vehicles) which cost $10,000 or more. The CIP also includes activities that can be planned for or occur on an irregular or one time basis. Minor capital outlays of less than $10,000 and reoccurring maintenance activities will be included with the operation and maintenance budget. The Capital Improvement Program is a plan that identifies the capital projects to be funded during a five year planning horizon. The CIP is updated annually, and the first year of the plan serves as the current year capital budget. The CIP is a planning document to help City Council systematically schedule and finance capital projects to ensure cost-effectiveness as well as conformance with established policies. The CIP is organized into the same functional groups used for the operating programs. The CIP reflects a balance between capital replacement projects that repair, replace, or enhance existing facilities, equipment or infrastructure, and capital facility projects that significantly expand or add to the City’s existing fixed assets. The CIP will emphasize project planning with projects typically progressing through the following phases: 1. Identification of Project. Improvements within the Capital Improvement Plan are generated or identified as follows: Advanced planning: Most of the improvements are identified within a Planning document or Master Plan. Many master plans are required by funding agencies. All master plans are adopted by the City Council. Currently the City has master plans adopted as follows:  2005 Sewer Master Plan (Currently being updated)  2008 Master Plan of Drainage  2010 Water Rate Study  2011 Water Master Plan  2011 Street Tree Master Plan  2011 Facility Master Plan  2012 Fleet Management Plan  2013 Concrete Rehabilitation Master Plan  2013 Park and Community Services Master Plan  2014 Pavement Management Plan  2015 Pier Condition Assessment  2016 Urban Water Management Plan 2. Reaction to need or opportunity: Projects may originate through a need or opportunity. An example of a project that was delivered as a result of a need and opportunity is the El Nino Storm Prep that occurred this year. 3. Desire from the community: Projects may originate through a desire from the community. One example in the proposed CIP is PCH and Anderson Landscaping Improvements project. 7 City of Seal Beach City of Seal Beach Finally, before a project can be identified for inclusion into the CIP, funding for the project must be secured, or it will remain on the unfunded list of the CIP. A. Permitting and Environmental Analysis. Environmental Analysis is performed on every CIP project to comply with the California Environmental Quality Act (CEQA) and in some cases with the National Environmental Quality Act (NEPA). Permitting is required from a variety of agencies and is assessed for every project. Permits may be necessary from agencies such as the California Coastal Commission, Caltrans, Department of Fish and Wildlife, Army Corps of Engineers, State Lands Commission, County of Orange, etc. B. Design. Projects are designed in-house with public works staff wherever possible. The City’s engineering staff in many cases does not have the available time or resources to perform the design, or the expertise to perform the design. In these cases, the City will locate and secure the service of an appropriately qualified consultant. Construction documents including plans and specifications are prepared and approved by the City Council prior to beginning construction. C. Construction. Improvements will be constructed in a manner that will minimize impacts to the residents. The City employs a construction manager (with materials testing) to ensure that all construction projects are carried out safely, and constructed to meet the construction documents. D. Incorporate into maintenance activities. All CIP projects are incorporated into the maintenance activities of the City. The maintenance staff will incorporate any new facilities into all routine inspections and ongoing maintenance programs. Staff will include new facilities into future maintenance budgets. E. Equipment Acquisitions. Equipment acquisitions such as vehicles, heavy machinery, computers, office furnishings, and other equipment items are included in the Capital Improvement Program and are acquired and installed independently from construction contracts. 8 CIP SUMMARY SCHEDULE BY FUNDING TYPE FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach General Fund 23.2% City Traffic Impact Fees 0.4% State Gas Tax 3.0% Measure M2 4.2% Tidelands 10.8% Sewer Captial 5.3% Water Capital 47.8% SBTV Funds 0.9% Grants 3.9% Community Facilities District 0.5% 2016/17 CIP BY FUNDING SOURCE 9 CIP SUMMARY SCHEDULE BY FUNDING TYPE FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach General Fund 19.6% City Traffic Impact Fees 0.3% State Gas Tax 4.4% Measure M2 8.8% Tidelands 8.4% Sewer Captial 5.0% Water Capital 49.5% SBTV3 Funds 0.7% Grants 2.9% Community Facilities District 0.4% 5 YEAR CAPITAL IMPROVEMENT PROGRAM TOTAL BY FUNDING SOURCE 10 CIP SUMMARY SCHEDULE BY FUNDING TYPE Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Total Previously Approved Carryover General Fund BG0904 New Swimming Pool 4,836,900$ 4,836,900$ Yes BG1401 City Council Chamber Remodel 243,000$ 243,000$ Yes BG1504 Citywide Financial Information System 190,000$ 500,000$ 100,000$ 790,000$ Yes BG1603 Countywide 800mhz Agreement 58,000$ 58,000$ Yes PR1602 Eisenhower Park Tot Lot Rehabilitation 240,000$ 240,000$ Yes PR1701 Annual Citywide Court Rehabilitation 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ Yes SD1601 West End Pump Station Electrical Improvements 125,000$ 125,000$ Yes ST1302 Utility Undergrounding Project 10,000$ 10,000$ Yes ST1707 Annual Street Tree Planting Program 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ Yes 5,752,900$ 550,000$ 150,000$ 50,000$ 50,000$ 6,552,900$ State Gas Tax ST1408 Traffic Management Center Update 75,000$ 75,000$ Yes ST1601 Annual Slurry Seal Program 70,000$ 70,000$ Yes ST1604 Annual Concrete Repair Program 25,000$ 25,000$ Yes ST1605 Annual Striping Program 25,000$ 25,000$ Yes ST1606 Annual Signage Replacement Program 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Yes ST1508 Old Town Parking and Signage Improvements 100,000$ 100,000$ Yes ST1610 Westminster Avenue Rehabilitation (WCL to Seal Beach Blvd)200,000$ 200,000$ Yes ST1701 Annual Slurry Seal Program 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ ST1704 Annual Concrete Repair Program 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ ST1705 Annual Striping Program 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ ST1708 Westminster/17th St. Corridor Traffic Signal Synchronization 50,000$ 50,000$ 730,000$ 185,000$ 185,000$ 185,000$ 185,000$ 1,470,000$ Measure M2 Funds ST1602 Local Street Resurfacing Program 275,000$ 275,000$ Yes ST1610 Westminster Avenue Rehabilitation (WCL to Seal Beach Blvd)300,000$ 300,000$ Yes ST1702 Local Street Resurfacing Program 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ ST1703 Arterial Street Resurfacing Program 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ 1,050,000$ 475,000$ 475,000$ 475,000$ 475,000$ 2,950,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 11 CIP SUMMARY SCHEDULE BY FUNDING TYPE Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Total Previously Approved Carryover FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach Sewer Capital Fund BP1002 Pier Remodel Project 665,000$ 665,000$ Yes BP1102 Local Coastal Plan 80,000$ 80,000$ Yes SS1301 Sewer System Master Plan Update 250,000$ 250,000$ Yes SS1401 Sewer System Rate Study 80,000$ 80,000$ Yes SS1601 Annual Sewer Manhole Rehabilitation Program 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Yes WT1607 7th Street Alley(PCH to N. Electric Ave.)235,000$ 235,000$ Yes SS1702 Annual Sewer Lining Program 100,000$ 100,000$ 100,000$ 300,000$ 1,320,000$ 10,000$ 110,000$ 110,000$ 110,000$ 1,660,000$ Water Capital Fund BP1002 Pier Remodel Project 620,000$ 620,000$ Yes BP1102 Local Coastal Plan 80,000$ 80,000$ Yes WT0904 Booster Station Rehab. - Beverly Manor 5,200,000$ 5,200,000$ Yes WT1301 Main Line Replacement Hellman Ranch 500,000$ 2,500,000$ 3,000,000$ WT1501 Water System Rate Update 80,000$ 80,000$ Yes WT1602 Leisure World Well Improvements 700,000$ 700,000$ Yes WT1603 Water Well Rehab. - Bolsa Chica Well 1,000,000$ 1,000,000$ Yes WT1605 Navy Reservoir Chlorination System Upgrades 100,000$ 100,000$ WT1607 7th Street Alley(PCH to N. Electric Ave.)235,000$ 235,000$ Yes WT1701 West Orange County Connector Waterline Extension 675,000$ 675,000$ WT1702 Westminster Ave. Water Main Replacement 2,800,000$ 2,800,000$ WT1703 405 Widening Water Line Reconfiguration 750,000$ 750,000$ WT1704 Lampson Ave. Water Main Replacement 1,300,000$ 1,300,000$ 11,840,000$ 500,000$ 3,500,000$ 700,000$ 16,540,000$ Traffic Impact Fees (Fund 049) ST1207 Seal Beach Comprehensive Parking Management Plan 90,000$ 90,000$ Yes 90,000$ 90,000$ Seal Beach Cable Foundation Fees (Fund 50) BG1402 SBTV3 Control Room Upgrades 219,000$ 219,000$ Yes 219,000$ 219,000$ Grants (Fund 080) ST1408 Traffic Management Center Upgrades 243,000$ 243,000$ Yes ST1610 Westminster Avenue Rehabilitation (WCL to Seal Beach Blvd)500,000$ 500,000$ Yes ST1708 Westminster/17th St. Corridor Traffic Signal Synchronization 231,000$ 231,000$ 974,000$ 974,000$ CFD Landscape (Fund 209) ST1509 Westminster Avenue Median Improvements 130,600$ 130,600$ Yes 130,600$ 130,600$ Tidelands (Fund 034) BP1002 Pier Remodel Project 2,600,000$ 2,600,000$ Yes BP1102 Local Coastal Plan 80,000$ 80,000$ Yes SD1602 10th Street Parking Lot Sump Pump 130,000$ 130,000$ 2,680,000$ 130,000$ -$ -$ -$ 2,810,000$ TOTAL 24,786,500$ 1,850,000$ 4,420,000$ 1,520,000$ 820,000$ 33,396,500$ 12 Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget 5-year total General Fund 5,752,900$ 550,000$ 150,000$ 50,000$ 50,000$ 6,552,900$ City Traffic Impact Fees 90,000$ -$ -$ -$ -$ 90,000$ State Gas Tax 730,000$ 185,000$ 185,000$ 185,000$ 185,000$ 1,470,000$ Measure M2 1,050,000$ 475,000$ 475,000$ 475,000$ 475,000$ 2,950,000$ Sewer Capital 1,320,000$ 10,000$ 110,000$ 110,000$ 110,000$ 1,660,000$ Water Capital 11,840,000$ 500,000$ 3,500,000$ 700,000$ -$ 16,540,000$ Seal Beach Cable Foundation 219,000$ -$ -$ -$ -$ 219,000$ Grants 974,000$ -$ -$ -$ -$ 974,000$ Community Facilities District 130,600$ -$ -$ -$ -$ 130,600$ Tidelands 2,680,000$ 130,000$ -$ -$ -$ 2,810,000$ TOTAL 24,786,500$ 1,850,000$ 4,420,000$ 1,520,000$ 820,000$ 33,396,500$ CIP SUMMARY SCHEDULE BY FUNDING TYPE FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 13 CIP SUMMARY SCHEDULE BY PROJECT TYPE Project Number & Name Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Total Previously Approved Carryover Beach and Pier BP1002 Pier Remodel Project 3,885,000$ 3,885,000$ Yes BP1102 Local Coastal Plan Preparation and Processing 240,000$ 240,000$ Yes 4,125,000$ 4,125,000$ Buildings and Facilities BG0904 New Swimming Pool 4,836,900$ 4,836,900$ Yes BG1401 City Council Chamber Remodel 243,000$ 243,000$ Yes BG1402 SBTV3 Control Room Upgrades 219,000$ 219,000$ Yes BG1504 Citywide Financial Information System 190,000$ 500,000$ 100,000$ 790,000$ Yes BG1603 Countywide 800mhz Agreement 58,000$ 58,000$ Yes 5,546,900$ 500,000$ 100,000$ 6,146,900$ Parks PR1602 Eisenhower Park Tot Lot Rehabilitation 240,000$ 240,000$ Yes PR1701 Annual Citywide Court Rehabilitation (Tennis and Basketball)30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ Yes 270,000$ 30,000$ 30,000$ 30,000$ 30,000$ 390,000$ Sewer System SS1301 Sewer System Master Plan Update 250,000$ 250,000$ Yes SS1401 Sewer System Rate Study 80,000$ 80,000$ Yes SS1601 Annual Sewer Manhole Rehabilitation Program 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Yes SS1702 Annual Sewer Lining Program 100,000$ 100,000$ 100,000$ 300,000$ 340,000$ 10,000$ 110,000$ 110,000$ 110,000$ 680,000$ Storm Drain SD1601 West End Pump Station Electrical Improvements 125,000$ 125,000$ Yes SD1602 10th Street Parking Lot Sump Pump 130,000$ 130,000$ 125,000$ 130,000$ -$ -$ -$ 255,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 14 CIP SUMMARY SCHEDULE BY PROJECT TYPE Project Number & Name Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Total Previously Approved Carryover FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach Streets and Transportation ST1207 Seal Beach Comprehensive Parking Plan 90,000$ 90,000$ Yes ST1302 Utility Undergrounding Project 10,000$ 10,000$ Yes ST1408 Traffic Management Center Upgrade 318,000$ 318,000$ Yes ST1508 Old Town Parking and Signage Improvements 100,000$ 100,000$ Yes ST1509 Westminster Avenue Median Improvements 130,600$ 130,600$ Yes ST1601 Annual Slurry Seal Project 70,000$ 70,000$ Yes ST1602 Local Street Resurfacing Program 275,000$ 275,000$ Yes ST1604 Annual Concrete Repair Program 25,000$ 25,000$ Yes ST1605 Annual Striping Program 25,000$ 25,000$ Yes ST1606 Annual Signage Replacement Program 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Yes ST1610 Westminster Avenue Rehabilitation (WCL to SBB)1,000,000$ 1,000,000$ Yes ST1701 Annual Slurry Seal Project 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ ST1702 Local Street Resurfacing Program 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ ST1703 Arterial Street Resurfacing Program 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ ST1704 Annual Concrete Repair Program 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ ST1705 Annual Striping Program 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ ST1707 Annual Street Tree Planting Program 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ Yes ST1708 Westminster/17th St. Corridor Traffic Signal Synchronization 281,000$ 281,000$ 3,004,600$ 680,000$ 680,000$ 680,000$ 680,000$ 5,724,600$ Water System WT0904 Booster Station Rehab. - Beverly Manor 5,200,000$ 5,200,000$ Yes WT1301 Main line Replacement Hellman Ranch 500,000$ 2,500,000$ 3,000,000$ WT1501 Water System Rate Update 80,000$ 80,000$ Yes WT1602 Leisure World Well Improvements 700,000$ 700,000$ Yes WT1603 Water Well Rehab. - Bolsa Chica Well 1,000,000$ 1,000,000$ Yes WT1605 Navy Reservoir Chlorination System Upgrades 100,000$ 100,000$ WT1607 7th Street Alley(PCH to N. Electric Ave.)470,000$ 470,000$ Yes WT1701 Water System Infrastructure Repairs 675,000$ 675,000$ WT1702 Westminster Ave. Water Main Replacement 2,800,000$ 2,800,000$ WT1703 405 Widening Water Line Reconfiguration 750,000$ 750,000$ WT1704 Lampson Avenue Water Main Replacement 1,300,000$ 1,300,000$ 11,375,000$ 500,000$ 3,500,000$ 700,000$ -$ 16,075,000$ TOTAL 24,786,500$ 1,850,000$ 4,420,000$ 1,520,000$ 820,000$ 33,396,500$ 15 SECTION I - BEACH AND PIER SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Beach and Pier (BP) BP1002 Pier Remodel Project Water Capital Fund 620,000$ 620,000$ Sewer Capital Fund 665,000$ 665,000$ Fund 034 - Tidelands 2,600,000$ 2,600,000$ Total 3,885,000$ 3,885,000$ BP1102 Local Coastal Plan Preparation and Processing Water Capital Fund 80,000$ 80,000$ Sewer Capital Fund 80,000$ 80,000$ Fund 034 - Tidelands 80,000$ 80,000$ Total 240,000$ 240,000$ 5 YEAR TOTAL 4,125,000$ 4,125,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 16 PROJECT CATEGORY Beach & Pier PROJECT No.BP1002 PROJECT NAME Pier Remodel Project TOTAL PROJECT COST $3,885,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION City Pier PROJECT STATUS Not Started PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:This project will reduce the need for on-going maintenance by staff. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Capital 620,000$ 620,000$ Sewer Capital 665,000$ 665,000$ Fund 034 - Tidelands 2,600,000$ 2,600,000$ TOTAL 3,885,000$ 3,885,000$ Expenditures Design 466,200$ 466,200$ Construction 3,418,800$ 3,418,800$ TOTAL 3,885,000$ 3,885,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 MAP PICTURE This project will upgrade the end of the pier with new decking and utility lines including all new sewer and sewer pump stations, new fire and domestic water lines, and new power lines and communication lines. These will serve the pier for a new restaurant and public restrooms. The utility lines have deteriorated over the years and constant repairs have costs increasing annually. Repairs are needed to maintain pier safety. Both fire inspection and pier inspection have identified the replacement of the fire line as urgent. New decking has been identified as needed and this will complete Phase 4 of the pier redecking. JUSTIFICATIONDESCRIPTION City of Seal Beach 17 PROJECT CATEGORY Beach & Pier PROJECT No.BP1102 PROJECT NAME Local Coastal Plan Preparation and Processing TOTAL PROJECT COST $240,000 PROJECT MANAGER Jim Basham, Director of CD WORKED PERFORMED BY Contract LOCATION Seal Beach Coastal Zone PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:This project will reduce annual permitting cost for the City and its residents. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Capital 80,000$ 80,000$ Sewer Capital 80,000$ 80,000$ Fund 034 -Tidelands 80,000$ 80,000$ TOTAL 240,000$ 240,000$ Expenditures Consultant 240,000$ 240,000$ TOTAL 240,000$ 240,000$ The City staff and consultant team will be working with the California Coastal Commission to process a Local Coastal Plan for the City of Seal Beach. By having a Local Coastal Program the City is authorized to issue Coastal Development Permits (CDP). Issuing of permits will save the City and private property owners time and money by not having to apply for the CDP directly with the California Coastal Commission. MAP PICTURE PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 18 SECTION II - BUILDING AND FACILITIES SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Buildings and Facilities (BG) BG0904 New Swimming Pool Fund 001 - General Fund 4,836,900$ 4,836,900$ Total 4,836,900$ 4,836,900$ BG1401 City Council Chamber Remodel Fund 001 - General Fund 243,000$ 243,000$ Total 243,000$ 243,000$ BG1402 SBTV3 Control Room Upgrades SBTV3 Funds 219,000$ 219,000$ Total 219,000$ 219,000$ BG1504 Citywide Financial Information System Fund 001 - General Fund 190,000$ 500,000$ 100,000$ 790,000$ Total 190,000$ 500,000$ 100,000$ 790,000$ BG1603 Countywide 800mhz Agreement Fund 001 - General Fund 58,000$ 58,000$ Total 58,000$ 58,000$ 5 YEAR TOTAL 5,546,900$ 500,000$ 100,000$ 6,146,900$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 19 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG0904 PROJECT NAME New City Swimming Pool TOTAL PROJECT COST $4,836,900 PROJECT MANAGER Jim Basham, Director of CD and Michael Ho, City Engineer WORKED PERFORMED BY Contract LOCATION To Be Determined PROJECT STATUS Conceptual PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 4,836,900$ 4,836,900$ TOTAL 4,836,900$ 4,836,900$ Expenditures Design 400,000$ 400,000$ Construction 4,436,900$ 4,436,900$ TOTAL 4,836,900$ 4,836,900$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 MAP PICTURE This project will construct a new swimming pool at a location that has yet to be determined. The existing pool has ongoing maintenance with rising annual costs. The City has invested into repairs of the pool to provide a temporary repair. Construction of a new facility will better suit the needs of the community. JUSTIFICATION Undetermined. Capital outlays will be reduced for maintenance. Additional facilities may increase ongoing routine maintenance. DESCRIPTION City of Seal Beach 20 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1401 PROJECT NAME Council Chambers Remodel TOTAL PROJECT COST $243,000 PROJECT MANAGER Michael Ho, City Engineer WORKED PERFORMED BY Contract LOCATION City Hall PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 243,000$ 243,000$ TOTAL 243,000$ 243,000$ Expenditures Design 44,181$ 44,181$ Construction 198,819$ 198,819$ TOTAL 243,000$ 243,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION To upgrade the audio, video and communication infrastructure throughout the Council Chambers. Also to add a conference room, restroom, make the chambers ADA compliant, and increase security for the Council Chambers. The Council Chambers has no conference room, restroom, secondary exit and outdated audio video equipment. This project will provide a more secure area and entrance/exit for the Mayor and City Council. The new audio and video equipment will provide networking capabilities monitors and the ability to hook up additional computer at multiple locations. <pic of Council Chambers inside> MAP PICTURE City of Seal Beach 21 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1402 PROJECT NAME SBTV3 Control Room Upgrade TOTAL PROJECT COST $219,000 PROJECT MANAGER Michael Ho, City Engineer WORKED PERFORMED BY Contract LOCATION City Hall PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Cable Foundation Fund 219,000$ 219,000$ TOTAL 219,000$ 219,000$ Expenditures Design 20,000$ 20,000$ Construction 199,000$ 199,000$ TOTAL 219,000$ 219,000$ To relocate the SBTV3 in the control room above the cascade between City Hall and Council Chambers to the storage room over Council Chambers. This includes all A/V equipment data, networking and computers. The current SBTV3 has been in its location for over 10 years. The equipment has outgrown in size and making the room inaccessible. Technology has changed over the years leaving behind the control room equipment outdated and past its useful life. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 22 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1504 PROJECT NAME Citywide Financial Information System TOTAL PROJECT COST $790,000 PROJECT MANAGER Victoria Beatley, Director of Finance WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 190,000$ 500,000$ 100,000$ 790,000$ TOTAL 190,000$ 500,000$ 100,000$ 790,000$ Expenditures Study 190,000$ 190,000$ Migration/Acquisition 500,000$ 500,000$ Implementation 100,000$ 100,000$ TOTAL 190,000$ 500,000$ 100,000$ 790,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project is the first step in the process of replacing the financial management system. A consultant will assist with analysis of city needs and vendor selection. The City's financial management system is more than 14 years old, and does not provide effective reporting tools to comply with current citywide needs. <pic of inside Finance Dept> MAP PICTURE City of Seal Beach 23 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1603 PROJECT NAME Countywide 800mhz TOTAL PROJECT COST $58,000 PROJECT MANAGER Joe Stilanovich, Police Chief WORKED PERFORMED BY Contract LOCATION Police Station PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 58,000$ 58,000$ TOTAL 58,000$ 58,000$ Expenditures Implementation 58,000$ 58,000$ TOTAL 58,000$ 58,000$ The city has 800 mhz radios that are used for emergency communication that are compatible with agencies througout the region. As a region all of the agencies are upgrading together to allow for seamless transition to new technology. The existing system has been used for more than 10 years and outlived it's usefull life. Upgrade with the region is necessary to allow emergency communication to continue. <pic of inside Finance Dept> MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 24 SECTION III - PARKS SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Parks (PR) PR1602 Eisenhower Park Tot Lot Rehabilitation Fund 001 - General Fund 240,000$ 240,000$ Total 240,000$ 240,000$ PR1701 Annual Citywide Court Rehabilitation (Tennis and Basketball) Fund 001 - General Fund 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ Total 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ 5 YEAR TOTAL 270,000$ 30,000$ 30,000$ 30,000$ 30,000$ 390,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 25 PROJECT CATEGORY Parks PROJECT No.PR1602 PROJECT NAME Eisenhower Park Tot Lot Rehabilitation TOTAL PROJECT COST $240,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION 10th St. Beach Lot Playground PROJECT STATUS Construction PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 240,000$ 240,000$ TOTAL 240,000$ 240,000$ Expenditures Construction 240,000$ 240,000$ TOTAL 240,000$ 240,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION Renovate tot lot equipment and the proposed improvements within the playground area will be ADA compliant. The tot lot equipment is past useful life. MAP PICTURE City of Seal Beach 26 PROJECT CATEGORY Parks PROJECT No.PR1701 PROJECT NAME Citywide Court Rehabilitation (Tennis/Basketball)TOTAL PROJECT COST $150,000 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual PICTURE Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ TOTAL 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ Expenditures Design In House -$ Construction 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ TOTAL 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ To resurface tennis courts at the Tennis Center and basketball courts at various locations citywide. This will also include crack filling, final coating and painting. MAP Tennis and basketball courts need maintenance to the surface. Natural wear and tear from weather, use and time affect the surface. Depending on location and usage, the average life of a court resurface varies from 3 to 6 years. City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 27 SECTION IV - SEWER SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Sewer System (SS) SS1301 Sewer System Master Plan Update Sewer Capital Fund 250,000$ 250,000$ Total 250,000$ 250,000$ SS1401 Sewer System Rate Study Sewer Capital Fund 80,000$ 80,000$ Total 80,000$ 80,000$ SS1601 Annual Sewer Manhole Rehabilitation Project Sewer Capital Fund 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Total 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ SS1702 Annual Sewer Lining Program Sewer Capital Fund 100,000$ 100,000$ 100,000$ 300,000$ Total 100,000$ 100,000$ 100,000$ 300,000$ 5 YEAR TOTAL 340,000$ 10,000$ 110,000$ 110,000$ 110,000$ 680,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 28 PROJECT CATEGORY Sewer System PROJECT No.SS1301 PROJECT NAME Sewer System Master Plan Update TOTAL PROJECT COST $250,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Sewer Fund 250,000$ 250,000$ TOTAL 250,000$ 250,000$ Expenditures Consultant 250,000$ 250,000$ TOTAL 250,000$ 250,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION MAP PICTURE The City strategically plans for improvements to the sanitary sewer system. The sewer system master plan ensures that the CIty complies with all codes and requirements, upgrades structurally deficient and inadeguately sized sanitary sewers. Preparation of a master plan is a requirement of the CItys' Waste Discharge Requirements permit and is typically performed every 5-7 years. The most recent sanitary sewer plan was prepared in 2005. The study will update the City's Sanitary Sewer Master Plan. City of Seal Beach 29 PROJECT CATEGORY Sewer System PROJECT No.SS1401 PROJECT NAME Sewer System Rate Study TOTAL PROJECT COST $80,000 PROJECT MANAGER Jim Basham, Director of CD WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Sewer Fund 80,000$ 80,000$ TOTAL 80,000$ 80,000$ Expenditures Consultant 80,000$ 80,000$ TOTAL 80,000$ 80,000$ The study will update the City's Sanitary Sewer Rate Structure so that the appropriate fees are charged to ratepayers for the services recieved. A rate study is necessary to insure that the appropriate fees are charged for the service of the sewer system. A key component to a rate study is outreach to the rate payers regarding input towards future fees. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 30 PROJECT CATEGORY Sewer System PROJECT No.SS1601 PROJECT NAME Annual Sewer Manhole Rehabilitation Project TOTAL PROJECT COST $50,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Sewer Fund 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ TOTAL 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Expenditures Design In House Construction 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ TOTAL 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ MAP PICTURE To repair, reline, and/or rehabilitate aged sewer manholes city wide.The majority of Sanitary Sewer Manholes were constructed throughout the city 20-40 years ago. Many are below the water table. This programs seeks to locate and rehabilitate a few of the worst manholes every year. By proactively rehabilitating the worst manholes the City will prevent failures and sewer spills. City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 31 PROJECT CATEGORY Sewer System PROJECT No.SS1702 PROJECT NAME Annual Sewer Lining Program TOTAL PROJECT COST $300,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Sewer Fund 100,000$ 100,000$ 100,000$ 300,000$ TOTAL 100,000$ 100,000$ 100,000$ 300,000$ Expenditures Design 10,000$ 10,000$ 10,000$ 30,000$ Construction 90,000$ 90,000$ 90,000$ 270,000$ TOTAL 100,000$ 100,000$ 100,000$ 300,000$ To repair sewer lines without having to open cut into a street by relining the interior of the pipe with a new structural pipe. The majority of Sanitary Sewer lines were constructed throughout the city more than 40 years ago. Many are below the water table. This annual program seeks to rehabilitate sewer lines without having to dig trenchs into a street. The City completed a large lining project in 2012 and will begin a small annual program in FY 2018/19. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 32 SECTION V - STORM DRAIN SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Storm Drain (SD) SD1601 West End Pump Station Electrical Improvements Fund 001 - General Fund 125,000$ 125,000$ Total 125,000$ 125,000$ SD1602 10th Street Parking Lot Sump Pump Fund 034 -Tidelands 130,000$ 130,000$ Total 130,000$ 130,000$ 5 YEAR TOTAL 125,000$ 130,000$ 255,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 33 PROJECT CATEGORY Storm Drain System PROJECT No.SD1601 PROJECT NAME West End Pump Station Electrical Improvements TOTAL PROJECT COST $125,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 125,000$ 125,000$ TOTAL 125,000$ 125,000$ Expenditures Design 15,000$ 15,000$ Construction 110,000$ 110,000$ TOTAL 125,000$ 125,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION The West End Pump Station is a critical Storm Drain facility that provides drainage for portions of Old Town, the Hill, and Bridgeport. The electrical system needs replacement of a variable frequency drive. Additionally the pump that drains the nuisance water needs to be replaced. Portions of Old Town and Bridgeport are constructed below the elevation of the banks of the San Gabriel River. In order to prevent flooding the water needs to be pumped over the banks of the river. MAP PICTURE City of Seal Beach 34 PROJECT CATEGORY Storm Drain System PROJECT No.SD1602 PROJECT NAME 10th Street Parking Lot Sump Pump TOTAL PROJECT COST $130,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION 10th Street Beach Parking Lot PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Tidelands 130,000$ 130,000$ TOTAL 130,000$ 130,000$ Expenditures Design 30,000$ 30,000$ Construction 100,000$ 100,000$ TOTAL 130,000$ 130,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION In the event of Rain or Storm activity water can pool along the Boardwalk and in the 10th Street Parking lot. This situation predominantly occurs during winter months. This project seeks to install a pump that will move the water over the berm and into the Ocean. Water occassionally overtops the Winter Sand Berm. Additionally winter rains have no path for water to drain. A sump pump will allow for water to be pumped out of the area. MAP PICTURE City of Seal Beach 35 SECTION VI - STREETS AND TRANSPORTATION SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Streets and Transportation (ST) ST1207 Seal Beach Comprehensive Parking Management Plan Fund 049 - Traffic Impact Fee 90,000$ 90,000$ Total 90,000$ 90,000$ ST1302 Utility Undergrounding Project Fund 001 - General Fund 10,000$ 10,000$ Total 10,000$ 10,000$ ST1408 Traffic Management Center Update 080-361 Grant Funds 243,000$ 243,000$ Fund 040 - Gas Tax 75,000$ 75,000$ Total 318,000$ 318,000$ ST1508 Old Town Parking and Signage Improvements Fund 040 - Gas Tax 100,000$ 100,000$ Total 100,000$ 100,000$ ST1509 Westminster Avenue Median Improvements Fund 209 - Community Facilities District 130,600$ 130,600$ Total 130,600$ 130,600$ ST1601 Annual Slurry Seal Project Fund 040 - Gas Tax 70,000$ 70,000$ Total 70,000$ 70,000$ ST1602 Local Street Resurfacing Program Measure M2 Turnback 275,000$ 275,000$ Total 275,000$ 275,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 36 SECTION VI - STREETS AND TRANSPORTATION SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach ST1604 Annual Concrete Repair Program Fund 040 - Gas Tax 25,000$ 25,000$ Total 25,000$ 25,000$ ST1605 Annual Striping Program Fund 040 - Gas Tax 25,000$ 25,000$ Total 25,000$ 25,000$ ST1606 Annual Signage Replacement Program Fund 040 - Gas Tax 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Total 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ ST1610 Westminster Avenue Rehabilitation (WCL to SBB) 080-361 Grant Funds 500,000$ 500,000$ Measure M2 Turnback 300,000$ 300,000$ Fund 040 - Gas Tax 200,000$ 200,000$ Total 1,000,000$ 1,000,000$ ST1701 Annual Slurry Seal Project Fund 040 - Gas Tax 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ Total 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ ST1702 Local Street Resurfacing Program Measure M2 Turnback 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ Total 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ ST1703 Arterial Street Resurfacing Program Measure M2 Turnback 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ Total 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ ST1704 Annual Concrete Repair Program Fund 040 - Gas Tax 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ Total 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ 37 SECTION VI - STREETS AND TRANSPORTATION SUMMARY SHEET Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach ST1705 Annual Striping Program Fund 040 - Gas Tax 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ Total 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ ST1707 Annual Street Tree Planting Program Fund 001 - General Fund 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ Total 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ ST1708 Westminster/17th St. Corridor Traffic Signal Synchronization 080-361 Grant Funds 231,000$ 231,000$ Fund 040 - Gas Tax 50,000$ 50,000$ Total 281,000$ 281,000$ 5 YEAR TOTAL 3,004,600$ 680,000$ 680,000$ 680,000$ 680,000$ 5,724,600$ 38 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1207 PROJECT NAME Comprehensive Parking Manag. Plan TOTAL PROJECT COST $90,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Traffic Impact Fee 90,000$ 90,000$ TOTAL 90,000$ 90,000$ Expenditures Design 90,000$ 90,000$ TOTAL 90,000$ 90,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION MAP PICTURE This plan provides various policies and programs that result in more efficient use of parking resources. This project will study parking in the city. City of Seal Beach 39 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1302 PROJECT NAME Rule 20A Undergrounding TOTAL PROJECT COST $10,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Seal Beach Blvd.PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 10,000$ 10,000$ TOTAL 10,000$ 10,000$ Expenditures Design 10,000$ 10,000$ TOTAL 10,000$ 10,000$ MAP PICTURE To underground utility lines on Seal Beach Blvd at Golden Ranch Road and South of PCH. This allocation will provide inspection services during construction of underground utilities by SCE. City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 40 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1408 PROJECT NAME Traffic Management Center Upgrade (TMC)TOTAL PROJECT COST $318,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION City Hall PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE Grant On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Gas Tax 75,000$ 75,000$ Grant Funds 243,000$ 243,000$ TOTAL 318,000$ 318,000$ Expenditures Construction 318,000$ 318,000$ TOTAL 318,000$ 318,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION To relocate the existing TMC from the City Yard to City Hall.The existing TMC was constructed over 10 years ago with aging technology and damaged equipment. The City has applied for and successfully was awarded an OCTA grant. MAP PICTURE City of Seal Beach 41 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1508 PROJECT NAME Old Town Parking and Signing Improvements TOTAL PROJECT COST $100,000 PROJECT MANAGER Patrick Gallegos, Assistant City Manager WORKED PERFORMED BY Contract LOCATION Old Town PROJECT STATUS Will Start PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Gas Tax 100,000$ 100,000$ TOTAL 100,000$ 100,000$ Expenditures Construction 100,000$ 100,000$ TOTAL 100,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project seeks to implement recommendations from the Parking Management Plan and includes Wayfarer Signage, replacement of street sweeping signs, and signage replacement as a result of parking changes. The Parking Management Study will provide recommendations to improve parking for residents, businesses, and visitors to the community. MAP PICTURE City of Seal Beach 42 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1509 PROJECT NAME Westminster Ave Median Improvements TOTAL PROJECT COST $130,600 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Ave PROJECT STATUS Design PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total CFD Landscape (209)130,600$ 130,600$ TOTAL 130,600$ 130,600$ Expenditures Design 28,000$ 28,000$ Construction 102,600$ 102,600$ TOTAL 130,600$ 130,600$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will remove the existing asphalt medians and replace with landscaping. The asphalt in the median has cracks, rubble and is beyond deterioration. The new landscape will beautify the area. MAP PICTURE City of Seal Beach 43 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1601 PROJECT NAME Annual Slurry Seal Project TOTAL PROJECT COST $70,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Bidding PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total State Gas Tax 70,000$ 70,000$ TOTAL 70,000$ 70,000$ Expenditures Design In House Construction 70,000$ 70,000$ TOTAL 70,000$ 70,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION MAP PICTURE Slurry Seal is a proven strategy to extend the life of asphalt pavements. The program is well received by residents. This program applies maintenance slurry seals to streets to extend the life of the pavement. The pavement management report data will be used as a guideline to select project streets. City of Seal Beach 44 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1602 PROJECT NAME Local Street Resurfacing Program TOTAL PROJECT COST $275,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Measure M2 275,000$ 275,000$ TOTAL 275,000$ 275,000$ Expenditures Design In House Construction 275,000$ 275,000$ TOTAL 275,000$ 275,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION MAP PICTURE The pavement management report was adopted that analyzed surface conditions and planned a cost efficient pavement maintenance schedule. City streets deteriorate over time and require maintenance. This project will reduce future maintenance costs and add value to neighborhoods. This project will resurface local streets per the pavement management report. City of Seal Beach 45 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1604 PROJECT NAME Annual Concrete Repair Program TOTAL PROJECT COST $25,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Bidding PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Gas Tax 25,000$ 25,000$ TOTAL 25,000$ 25,000$ Expenditures Design In House Construction 25,000$ 25,000$ TOTAL 25,000$ 25,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This program replaces portions of deteriorated concrete sidewalks, curbs and gutters within the City, and brings handicap ramps current to ADA Standards. The program is required to eliminate trip hazards and safety issues. Reduced liability exposure is a benefit of this activity. MAP PICTURE City of Seal Beach 46 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1605 PROJECT NAME Annual Striping Program TOTAL PROJECT COST $25,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total State Gas Tax 25,000$ 25,000$ TOTAL 25,000$ 25,000$ Expenditures Design In House Construction 25,000$ 25,000$ TOTAL 25,000$ 25,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will restripe worn pavement markings, bike lanes and traffic lanes. The program will keep a uniformity of pavement marking and striping citywide. MAP PICTURE City of Seal Beach 47 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1606 PROJECT NAME Annual Signage Replacement TOTAL PROJECT COST $50,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total State Gas Tax 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ TOTAL 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Expenditures Design In House -$ Construction 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ TOTAL 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will replace damaged or missing signs.The program will keep a uniformity of signage throughout the City. <insert picture of a street name sign> MAP PICTURE City of Seal Beach 48 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1610 PROJECT NAME Westminster Ave Rehabilitation (WCL to SBB)TOTAL PROJECT COST $1,000,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE Grant On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Measure M2 Turnback 300,000$ 300,000$ Grant Fund 500,000$ 500,000$ State Gas Tax 200,000$ 200,000$ TOTAL 1,000,000$ 1,000,000$ Expenditures Design 15,000$ 15,000$ Construction 985,000$ 985,000$ TOTAL 1,000,000$ 1,000,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will resurface Westminster Ave. between Seal Beach Blvd. and West City Limits. The City received $500,000 to rehabilitate the pavement. It is funded by a grant from the Orange County Transportation Authority. MAP PICTURE City of Seal Beach 49 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1701 PROJECT NAME Annual Slurry Seal Project TOTAL PROJECT COST $500,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total State Gas Tax 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ TOTAL 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ Expenditures Design In House Construction 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ TOTAL 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This program applies maintenance slurry seals to streets to extend the life of the pavement. The Pavement Management System data will be used as a guideline to select project streets. Slurry Seal is a proven strategy to extend the life of asphalt pavements. The program is well received by residents. MAP PICTURE City of Seal Beach 50 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1702 PROJECT NAME Local Street Resurfacing Program TOTAL PROJECT COST $1,375,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Measure M2 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ TOTAL 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ Expenditures Design In House Construction 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ TOTAL 275,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,375,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will resurface local streets per the pavement management system. A pavement management report was adopted that analyzed surface conditions and planned a cost efficient pavement maintenance schedule. City streets deteriorate over time and require maintenance. This project will reduce future maintenance costs and add value to neighborhoods. MAP PICTURE City of Seal Beach 51 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1703 PROJECT NAME Arterial Street Resurfacing Program TOTAL PROJECT COST $1,000,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Measure M2 Turnback 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ TOTAL 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ Expenditures Design In House -$ Construction 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ TOTAL 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will resurface arterial streets per the pavement management system. MAP PICTURE A pavement management report was adopted that analyzed surface conditions and planned a cost efficient pavement maintenance schedule. City streets deteriorate over time and require maintenance. City of Seal Beach 52 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1704 PROJECT NAME Annual Concrete Repair Program TOTAL PROJECT COST $250,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Gas Tax 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ TOTAL 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ Expenditures Design In House Construction 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ TOTAL 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This program replaces portions of deteriorated concrete sidewalks, curbs and gutters within the City, and brings handicap ramps current to ADA Standards. The program is required to eliminate trip hazards and safety issues. Reduced liability exposure is a benefit of this activity. MAP PICTURE City of Seal Beach 53 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1705 PROJECT NAME Annual Striping Program TOTAL PROJECT COST $125,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total State Gas Tax 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ TOTAL 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ Expenditures Design In House Construction 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ TOTAL 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will restripe worn pavement markings, bike lanes and traffic lanes. The program will keep a uniformity of pavement marking and striping citywide. MAP PICTURE City of Seal Beach 54 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1707 PROJECT NAME Street Tree Planting Program TOTAL PROJECT COST $100,000 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total General Fund 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ TOTAL 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ Expenditures Construction 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ TOTAL 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This program provides funding for the installation of new trees throughout the City. Locations are identified continually. This program helps improve the local environment for residents and visitors. MAP PICTURE City of Seal Beach 55 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1708 PROJECT NAME Westminster/17th St. Corridor Traffic Signal Synchronization TOTAL PROJECT COST $281,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Avenue PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE Grant On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Grant Fund 231,000$ 231,000$ State Gas Tax 50,000$ 50,000$ TOTAL 281,000$ 281,000$ Expenditures Design In House Construction 281,000$ 281,000$ TOTAL 281,000$ 281,000$ This project will synchronize the traffic signals on Westminster Ave. from the West to the East Seal Beach city limits. The effects of this project will help traffic flow tremendously along Westminster Ave. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 56 Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total Water System WT0904 Booster Station Rehab. - Beverly Manor Water Capital Fund 5,200,000$ 5,200,000$ Total 5,200,000$ 5,200,000$ WT1301 Main line Replacement Hellman Ranch Water Capital Fund 500,000$ 2,500,000$ 3,000,000$ Total 500,000$ 2,500,000$ 3,000,000$ WT1501 Water System Rate Update Water Capital Fund 80,000$ 80,000$ Total 80,000$ 80,000$ WT1602 Leisure World Well Improvements Water Capital Fund 700,000$ 700,000$ Total 700,000$ 700,000$ WT1603 Water Well Rehabilitation - Bolsa Chica Well Water Capital Fund 1,000,000$ 1,000,000$ Total 1,000,000$ 1,000,000$ WT1605 Navy Reservoir Chlorination System Upgrades Water Capital Fund 100,000$ 100,000$ Total 100,000$ 100,000$ WT1607 7th Street Alley(PCH to N. Electric Ave.) Sewer Capital Fund 235,000$ 235,000$ Water Capital Fund 235,000$ 235,000$ Total 470,000$ 470,000$ WT1701 Water System Infrastructure Repairs Water Capital Fund 675,000$ 675,000$ Total 675,000$ 675,000$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 57 Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019- 2020 Budget Proposed 2020- 2021 Budget Proposed 5-year total FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach WT1702 Westminster Ave. Water Main Replacement Water Capital Fund 2,800,000$ 2,800,000$ Total 2,800,000$ 2,800,000$ WT1703 405 Widening Water Line Reconfiguration Water Capital Fund 750,000$ 750,000$ Total 750,000$ 750,000$ WT1704 Lampson Avenue Water Main Replacement Water Capital Fund 1,300,000$ 1,300,000$ Total 1,300,000$ 1,300,000$ 5 YEAR TOTAL 11,375,000$ 500,000$ 3,500,000$ 700,000$ 16,075,000$ 58 PROJECT CATEGORY Water System PROJECT No.WT0904 PROJECT NAME Booster Sta. Rehab. - Beverly Manor TOTAL PROJECT COST $5,200,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION North Gate Road PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:It will eliminate the existing monthly maintenance cost. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 5,200,000$ 5,200,000$ TOTAL 5,200,000$ 5,200,000$ Expenditures Design 231,000$ 231,000$ Construction 4,969,000$ 4,969,000$ TOTAL 5,200,000$ 5,200,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION MAP PICTURE This project will construct upgrades and improvements to the Beverly Manor Water Well, Booster Station and Reservoir as identified in the 2011 Water System Master Plan. The water system requires continual capital maintenance to maintain reliability and to meet water quality standards. City of Seal Beach 59 PROJECT CATEGORY Water System PROJECT No.WT1301 PROJECT NAME Main Line Repl. Hellman TOTAL PROJECT COST $3,000,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Hellman Ranch Properties PROJECT STATUS Pre-planning PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will minimize the water main breaks in this area. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 500,000$ 2,500,000$ 3,000,000$ TOTAL 500,000$ 2,500,000$ 3,000,000$ Expenditures Design 500,000$ 500,000$ Construction 2,500,000$ 2,500,000$ TOTAL 500,000$ 2,500,000$ 3,000,000$ MAP PICTURE This project will replace or relocate an 18" transmission line on Hellman Ranch to feed Marina and Old Town. This is a replacement of an existing line. It provides redundancy for the part of the system serving Old Town. It will maintain system reliability. The existing pipeline is in poor condition. City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 60 PROJECT CATEGORY Water System PROJECT No.WT1501 PROJECT NAME Water Rate Study TOTAL PROJECT COST $80,000 PROJECT MANAGER Michael Ho, City Engineer WORKED PERFORMED BY Consultant LOCATION City Wide PROJECT STATUS Planned PRIORITY High ALTERNATE FUNDING SOURCE N/A On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 80,000$ 80,000$ TOTAL 80,000$ 80,000$ Expenditures Design 80,000$ 80,000$ TOTAL 80,000$ 80,000$ The study will update the rate structure for the City's Potable Water System. The operation of the City's Water System is funded through a water enterprise fee that is charged to the residents bimonthly. The rate structure is typically studied and set approximately every 5 years. This will insure that the fee charged is appropriate for the services that are rendered. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 61 PROJECT CATEGORY Water System PROJECT No.WT1602 PROJECT NAME Leisure World Well Improvements TOTAL PROJECT COST $700,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Leisure World PROJECT STATUS Planned PRIORITY Medium ALTERNATE FUNDING SOURCE N/A On-going Operating & Maintenance Impact:- Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 700,000$ 700,000$ TOTAL 700,000$ 700,000$ Expenditures Design 70,000$ 70,000$ Construction 630,000$ 630,000$ TOTAL 700,000$ 700,000$ To upgrade the SCADA communications equipment at the Leisure World Well Site. The existing Supervisory Control And Data Acquisition (SCADA) system at the Leisure World Well site is analog. To match the city wide system this must convert to a digital system. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 62 PROJECT CATEGORY Water System PROJECT No.WT1603 PROJECT NAME Bolsa Chica Well Improvement Project TOTAL PROJECT COST $1,000,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Bolsa Chica Road PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Project will eliminate the maintenance of the electrical pump & equipment Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 1,000,000$ 1,000,000$ TOTAL 1,000,000$ 1,000,000$ Expenditures Design 100,000$ 100,000$ Construction 900,000$ 900,000$ TOTAL 1,000,000$ 1,000,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will rehabilitate the well site pumps, generators, motors and water treatment equipment. This project will rehabilitate the Bolsa Chica Water Well as identified in the 2003 Water System Master Plan. MAP PICTURE City of Seal Beach 63 PROJECT CATEGORY Water System PROJECT No.WT1605 PROJECT NAME Navy Reservoir Chlorination System Upgrades TOTAL PROJECT COST $100,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Navy Reservoir PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:The maintenance of the system will remain unchanged with this project. Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 100,000$ 100,000$ TOTAL 100,000$ 100,000$ Expenditures Construction 100,000$ 100,000$ TOTAL 100,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION The Navy Reservoir is one of two reservoirs in the City. Water is stored within the reservoir and then added into the pressurized system as needed. A chlorination system is located at the reservoir and technology improvements are recommended. The water system requires continual upkeep to keep it reliable. The system provides drinking water to residents and businesses as well as for fire protection. This project will insure that the drinking water in Seal Beach continues to meet requirements for distribution. MAP PICTURE City of Seal Beach 64 PROJECT CATEGORY Water System PROJECT No.WT1607 PROJECT NAME 7th Street Alley (PCH to N. Electric)TOTAL PROJECT COST $470,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Construction PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Sewer Fund 235,000$ 235,000$ Water Fund 235,000$ 235,000$ TOTAL 470,000$ 470,000$ Expenditures Construction 470,000$ 470,000$ TOTAL 470,000$ 470,000$ MAP PICTURE This project rehabilitates water and sewer facilities within the 7th Street Alley between Electric Avenue and Pacific Coast Highway. This project will update deteriorated water and sewer facilities within the 7th Street Alley between Electric Avenue and Pacific Coast Highway. The pavement in the alley will be removed in order to rehabilite the utilities and be replaced with concrete at the conclusion of construction. City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 65 PROJECT CATEGORY Water System PROJECT No.WT1701 PROJECT NAME West OC Connector Waterline Extension TOTAL PROJECT COST $675,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Emergency repairs will be reduced Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 675,000$ 675,000$ TOTAL 675,000$ 675,000$ Expenditures Design 67,500$ 67,500$ Construction 607,500$ 607,500$ TOTAL 675,000$ 675,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION This project will relocate a 33-inch transmission line on Westminster Ave. that crosses the 405 freeway. Relocation is needed with the 405 expansion project. Due to the 405 widening project, many utilities that cross have to be relocated and rebuilt. This water line serves as a connection point of imported water to the northwestern cities of Orange County. Six water districts will participate in the cost for relocation of this line. MAP PICTURE City of Seal Beach 66 PROJECT CATEGORY Water System PROJECT No.WT1702 PROJECT NAME Westminster Ave. Water Main Replacement TOTAL PROJECT COST $2,800,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Ave. PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 2,800,000$ 2,800,000$ TOTAL 2,800,000$ 2,800,000$ Expenditures Design 280,000$ 280,000$ Construction 2,520,000$ 2,520,000$ TOTAL 2,800,000$ 2,800,000$ This project will replace the existing water main line on Westminster Ave.This project will update the deteriorated water line located on Westminster Ave. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 67 PROJECT CATEGORY Water System PROJECT No.WT1703 PROJECT NAME 405 Widening Water Line Reconfiguration TOTAL PROJECT COST $750,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION 405 Freeway PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 750,000$ 750,000$ TOTAL 750,000$ 750,000$ Expenditures Design 70,000$ 70,000$ Construction 680,000$ 680,000$ TOTAL 750,000$ 750,000$ This project will extend water line connections due to the 405 widening project. Two water lines that cross the 405 and feed parts of the city North and South of the 405 need to be rebuilt per Caltrans regulations in line with the 405 widening project. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION City of Seal Beach 68 PROJECT CATEGORY Water System PROJECT No.WT1704 PROJECT NAME Lampson Ave Water Main Replacement TOTAL PROJECT COST $1,300,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Lampson Avenue PROJECT STATUS Planned PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:- Funding Source Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 5-year total Water Fund 1,300,000$ 1,300,000$ TOTAL 1,300,000$ 1,300,000$ Expenditures Design 130,000$ 130,000$ Construction 1,170,000$ 1,170,000$ TOTAL 1,300,000$ 1,300,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2016/17 - 2020/21 DESCRIPTION JUSTIFICATION To remove and replace the existing 12" ACP waterline on Lampson Ave from Seal Beach Blvd. to Basswood St. The existing Lampson waterline has historically failed and caused numerous main line breaks. It has outlasted its useful life. <insert pic of any waterline> MAP PICTURE City of Seal Beach 69 SECTION VIII - UNFUNDED PROJECTS/NEEDS SUMMARY SHEET UNFUNDED NEEDS/PROJECTS Project Name Cost Beach and Pier 8th and 10th Street City Parking Lot Rehabilitation 300,000$ 8th and 10th Street Utility Undergrounding and Lighting Improvements 200,000$ 500,000$ Buildings and Facilities Pier Entrance Improvements 100,000$ Main Street - Streetscape Improvements (Street Furniture)150,000$ McGaugh Pool Facility 3,280,860$ McGaugh Pool Deck Rehabilitation 200,000$ ADA Upgrades to all City Buildings 500,000$ Community Center Improvements 1,500,000$ Mary Wilson Library Roof Replacement 100,000$ Beach Facility-Maintenance Building 601,370$ Beach Facility-Storage Building 63,470$ Library/Senior Center Improvements 3,739,670$ North Seal Beach Community Center 1,096,150$ Old City Hall Remodel 1,649,450$ 12,980,970$ Parks New Pedestrian lighting on Electric Ave Greenbelt 300,000$ Citywide Park and Turf Renovation 1,000,000$ Zoeter Field Rehabilitation (including stands)100,000$ Zoeter Bleachers 526,020$ Zoeter Building(Daycare)382,250$ Arbor Park Field Restoration 50,000$ Heather Park Restrooms 250,000$ City Entry Monument Signs 100,000$ Seal Way Boardwalk Improvements (Wall and sidewalk)200,000$ PR1601 Annual Citywide Court Rehabilitation 90,000$ Tennis Center Club House 820,050$ Tennis Center Gate/Site 302,500$ Tennis Center Locker/Shower/Restrooms 1,510,630$ Tennis Center Workout Room 566,170$ Marina Community Center/Park 1,615,130$ 7,812,750$ Storm Drain Storm Drain Master Plan Projects 90,000,000$ 90,000,000$ Streets and Transportation Seal Beach Boulevard and Rossmoor Center Way Intersection Improvements 200,000$ Westminster Avenue Storm Drain Undergrounding 3,000,000$ Traffic Signal Upgrades 1,000,000$ Traffic Signals - Battery Backup Replacement 25,000$ Lampson Avenue Bicycle Lane Improvements 1,000,000$ Gold Coast Stub Ends Improvements 300,000$ Citywide Concrete Rehabilitation 1,000,000$ Citywide Street Paving Rehabilitation 18,000,000$ Alley Pavement Rehabilitation 5,000,000$ ST1603 Westminster Ave. Bicycle Path and Drainage Improvements 200,000$ ST1508 Old Town Parking and Signage Improvements 100,000$ 29,825,000$ Sewer System SS1601 Annual Manhole Rehabilitation Program 30,000$ SS1602 Sewer System Smart Manhole Covers 20,000$ 50,000$ Water System WT1103 Lampson Water Well Connection Improvements 1,200,000$ WT1502 Anaheim Bay Water System Improvements 2,000,000$ WT1503 College Park West Water Rehabilitation 1,000,000$ WT1504 Citywide Water Meter Replacement Study 50,000$ WT1606 Water Valve Replacement Program 150,000$ WT1701 Water System Infrastructure Repairs 1,200,000$ 5,600,000$ TOTAL 146,768,720$ FY 2016/17 -2020/21 5 year CIP Budget City of Seal Beach 70