HomeMy WebLinkAboutPC Res 16-13 - 2016-06-20RESOLUTION NO. 16 -13
A RESOLUTION OF THE SEAL BEACH PLANNING
COMMISSION APPROVING CONDITIONAL USE PERMIT
15 -7 AND ASSOCIATED INITIAL STUDY /MITIGATED
NEGATIVE DECLARATION WITH MITIGATION
MONITORING AND REPORTING PROGRAM TO
CONSTRUCT A 37,000 SQ. FT. HEALTH CLUB (FITNESS
CENTER) AT 12411 SEAL BEACH BOULEVARD WITHIN
THE SHOPS AT ROSSMOOR IN THE GENERAL
COMMERCIAL (GC) ZONING AREA
THE PLANNING COMMISSION OF THE CITY OF SEAL BEACH DOES HEREBY
RESOLVE:
Section 1. Martin Potts of MPA ( "the applicant ") on behalf of the
property owner CPT Shops at Rossmoor, LLC John Miller, submitted an application to
the City of Seal Beach Department of Community Development for Conditional Use
Permit (CUP) 15 -7. The proposed project includes constructing and operating a 37,000
square foot health club at an existing shopping center, the Shops at Rossmoor, within
the Commercial General (CG) zoning area.
Section 2. The proposed development of a fitness center constitutes a
project that is subject to review under the California Environmental Quality Act (CEQA)
1970 (Public Resources Code, Section 21000 et seq.) and the State CEQA Guidelines
(California Code of Regulations, Section 15000 et seq.). Based on the findings of an
Initial Study, a Mitigated Negative Declaration was prepared pursuant to Section
21080(c) of the Public Resources Code and Section 15070 of the State CEQA
Guidelines. Notice of preparation of the Initial Study /Mitigated Negative Declaration
was posted for the period of April 28, 2016 to May 18, 2016. The City received
comments on the proposed Initial Study /Mitigated Negative Declaration.
Section 3. On May 18, 2016, a duly noticed public meeting was
conducted by the Seal Beach Environmental Quality Control Board (EQCB) during the
public comment period on the proposed Initial Study /Mitigated Negative Declaration.
The EQCB received public comments on the project, and forwarded those public
comments and the EQCB comments to the Planning Commission for consideration as
part of the Planning Commission's consideration of the project, in accordance with Seal
Beach Municipal Code Section 3.10.005(F).
Section 4. A duly noticed public hearing was held before the Planning
Commission on June 20, 2016 to consider Conditional Use Permit 15 -7 and the
associated Initial Study /Mitigated Negative Declaration with Mitigation Monitoring and
Reporting Program. At the public hearing, the Planning Commission received into the
record the comments forwarded from the EQCB and all other evidence and testimony
provided on this matter. The record of the hearing indicates the following:
Page 1 of 6
Resolution 16 -13
12411 Seal Beach Boulevard
A. On October 5, 2015, the applicant submitted an application to the
Community Development Department for Conditional Use Permit 15 -7 for a proposed
project at 12411 Seal Beach Boulevard, Seal Beach, California.
B. The subject property is a puzzle piece shaped parcel with a lot area
of approximately 1,544,202 sq. ft. or (35.45 acres). The property is approximately 1427
feet wide by 1007 feet deep. The site is surrounded on the north, south and west by
residential uses and to the east by commercial uses.
C. The subject property is currently developed as a commercial
shopping center with approximately 309,535 square feet of gross building area.
D. The applicant is requesting to construct and operate a large scale
commercial recreational use that is approximately 37,000 square feet in gross floor
area.
E. The health club is proposed to operate seven days a week. Hours
of operation would be 5:00 a.m. to 11:00 p.m. Monday through Thursday, 5:00 a.m, to
10:00 p.m. on Fridays, and 8:00 a.m. to 8:00 p.m. on Saturdays and Sundays.
Section 4. Based upon the facts contained in the record, including
those stated in the preceding Section of this resolution and pursuant to Chapter 11.5.20
of the Seal Beach Municipal Code, the Planning Commission makes the following
findings:
A. The proposed improvements are consistent with the General Plan
which encourages architectural diversity in the commercial area (Planning Area 4) while
stimulating growth and prosperity of the city and encouraging compatibility between
residential and commercial uses. The construction and operation of a health club will
provide a use that is customarily associated with commercial centers and near
residential uses to encourage and promote recreational facilities.
B. The proposed use is allowed within the applicable zoning district
with Conditional Use Permit approval and will comply with all other applicable provisions
of the Municipal Code. The subject site is located within the General Commercial (GC)
zone, an area where the Seal Beach Municipal Code (Section 11.2.10.010) allows
health club facilities with approval of a Conditional Use Permit.
C. The proposed use, as conditioned below, will be located on a site
that is physically adequate for the type, density, and intensity of use being proposed,
including provision of services, and the absence of physical constraints. The subject site
is currently developed as a commercial retail shopping center. The construction of the
health club will be located in an area of the center that is currently utilized as a parking
lot behind the Sprouts market. This application will allow the site to continue to conform
to the Seal Beach Municipal Code (Section 11.2.10.015) which provides Development
Standards for the General Commercial (GC) zoned area. The proposed building is
consistent with development standards applicable to height, setbacks and parking.
D. The location, size, design, and operating characteristics of the
proposed use, as conditioned below, will be compatible with and will not adversely
affect uses and properties in the surrounding neighborhood. The subject site is located
within the General Commercial zone, which consists of properties developed as
Page 2 of 6
Resolution 16 -13
12411 Seal Beach Boulevard
commercial retail and office buildings. The proposed building and use with the added
conditions as proposed will compliment the surrounding area and operate in a manner
conducive with the Municipal Code requirements of noise, screening, glare, and other
code requirements. The City has included 3 mitigation measures, one to reduce
construction noise between specified times, two to require mufflers on construction
equipment and three the project proponent shall extend the queuing length of the left -
turn pocket lane from northbound Seal Beach Boulevard onto westbound Rossmoor
Center Way, as recommended in the revised queuing analysis dated April 2016.
E. The establishment, maintenance, and operation of the proposed
use will not be detrimental to the health, safety, or welfare of persons residing or
working in the vicinity. The construction and operation of the health club will increase
the landscape area which will soften visual impacts to the residences adjacent to the
site by adding landscaping. The subject site will continue to operate as a commercial
property, which is consistent with the uses in the surrounding neighborhood.
Section 5. Based on the foregoing, the Planning Commission hereby
finds that In compliance with CEQA and the State CEQA Guidelines, an Initial
Study /Mitigated Negative Declaration has been prepared for Conditional Use Permit 15-
7 for the construction and operation of a 37,000 square foot health club. The Mitigated
Negative Declaration finds that the proposed conditional use permit would not have a
significant effect on the environment if subject to the mitigation measures described in
the Mitigation Monitoring and Reporting Program (MMRP). The Planning Commission,
in its independent judgment, hereby finds the Initial Study /Mitigated Negative
Declaration and MMRP comply with CEQA and hereby adopts them. A copy of the
approved Mitigated Negative Declaration and Mitigation Monitoring and Reporting
Program is attached as Exhibit A to this Resolution
Section 6. Based on the foregoing, the Planning Commission further
approves Conditional Use Permit 15 -7 for the construction and operation of a 37,000
square foot health club, subject to the following conditions:
1. Conditional Use Permit 15 -7, subject to the adopted Initial Study /Mitigated
Negative Declaration with Mitigation Monitoring and Reporting Program, is
approved for the construction and operation of a 37,000 square foot health club
located at 12411 Seal Beach Boulevard.
2. All plan check and future construction shall be in substantial compliance with the
plans approved through Conditional Use Permit 15 -7. All new construction shall
comply with all applicable state and local codes.
3. The site shall be developed and maintained in accordance with the approved
plans which include Site Plans, architectural elevations, exterior materials and
colors, landscaping, sign program, and grading on file in the Planning
Department, the conditions contained herein, the Development Code regulations.
4. The Planning Commission reserves the right to revoke or modify this CUP if any
violation of the approved conditions occurs, or any violation of the Code of the
City of Seal Beach occurs.
Page 3 of 6
Resolution 16 -13
12411 Seal Beach Boulevard
5. The health club will operate seven days a week. Hours of operation shall be
limited to 5:00 a.m. to 11:00 p.m. Monday through Thursday, 5:00 a.m. to 10:00
p.m. on Fridays, and 8:00 a.m. to 8:00 p.m. on Saturdays and Sundays.
6. Prior to any use of the project site or business activity being commenced
thereon, all Conditions of Approval shall be completed to the satisfaction of the
Community Development Department.
7. Approval of this request shall not waive compliance with all sections of the
Municipal Code, all other applicable City Ordinances, and applicable Specific
Plans in effect at the time of Building Permit issuance.
8. All ground- mounted utility appurtenances such as transformers, AC condensers,
etc., shall be located out of public view and adequately screened through the use
of a combination of concrete or masonry walls, berming, and /or landscaping to
the satisfaction of the Community Development Department.
9. All roof mounted equipment such as AC condensers shall be screened from
view.
10. A detailed on -site lighting plan, including a photometric diagram, shall be
reviewed and approved by the Planning Department prior to the issuance of
Building Permits. Such plan shall indicate style, illumination, location, height, and
method of shielding so as not to adversely affect adjacent properties.
11. The developer shall submit a construction access plan and schedule for the
development for the Planning and Engineering Department approval; including,
but not limited to, public notice requirements, special street posting, phone listing
for community concerns, hours of construction activity, dust control measures,
and security fencing.
12. Any modification or any intensification of the use beyond what is specifically
approved by Conditional Use Permit 15 -7 shall require review and approval by
the Planning Department prior to intensification or modification.
13. No exterior changes to the design of the project, including exterior
materials, shall be permitted without prior City review and approval.
14. The applicant is required to obtain all Building and Safety permits prior to
construction or demolition.
12. This Conditional Use Permit shall not become effective for any purpose unless
an "Acceptance of Conditions" form has been signed, notarized, and returned to
the Community Development Department; and until the ten (10) day appeal
period has elapsed.
13. The applicant shall indemnify, defend and hold harmless the City, its officers,
agents and employees (collectively "the City" hereinafter) from any and all claims
and losses whatsoever occurring or resulting to any and all persons, firms, or
corporations furnishing or supplying work, services, materials, or supplies in
connection with the performance of the use permitted hereby or the exercise of
the rights granted herein, and any and all claims, lawsuits or actions arising from
the granting of or the exercise of the rights permitted by this Conditional Use
Page 4 of 6
Resolution 16 -13
12411 Seal Beach Boulevard
Permit, and from any and all claims and losses occurring or resulting to any
person, firm, corporation or property for damage, injury or death arising out of or
connected with the performance of the use permitted hereby. Applicant's
obligation to indemnify, defend and hold harmless the City as stated herein shall
include, but not be limited to, paying all fees and costs incurred by legal counsel
of the City's choice in representing the City in connection with any such claims,
losses, lawsuits or actions, expert witness fees, and any award of damages,
judgments, verdicts, court costs or attorneys' fees in any such lawsuit or action.
14. Upon submittal for Building Plan Check, the plans must show that bike racks will
be provided within the project area. The location of the bike racks must be
approved by the Planning Division prior to issuance of Building Permits.
15. Security must be provided in the project area at least thirty minutes prior to the
opening of the health club and remain on site until at least thirty minutes after the
health club's closing.
16. The applicant must reconfigure Rossmoor Center Way between the four way
stop adjacent to Sprouts and Seal Beach Blvd to provide two westbound lanes,
an eastbound lane and a dedicate eastbound right turn pocket. The
reconfiguration of Rossmoor Center Way must be include in the project Plan
Check submittal and approved by City Staff prior to issuance of building permits.
Enaineerina Department
1. Applicant shall modify the City approved traffic signal timing at the intersection of
Seal Beach Boulevard and Rossmoor Center Way to allow for the northbound
extended left turn.
2. Applicant shall implement City approved new traffic signal coordination timing
and plans for Seal Beach Boulevard from North City Limit to the 1 -405 freeway
prepared by a California register traffic engineer.
3. Applicant shall monitor for one (1) year the traffic signal timing and coordination
along Seal Beach Boulevard from North City Limit to the 1 -405 Freeway and
report the City on a monthly basis the conditions prepared by a California register
traffic engineer. Any modifications requested by the City Traffic Engineer shall be
made by the applicant prepared by a California register traffic engineer.
4. Mitigation Measure T -1, below, will require the removal of newly installed median
landscaping on Seal Beach Boulevard. As a result, the applicant is required to
offset the loss of this landscape resource, by reimbursing the City for the cost of
the landscaping, up to $50,000. The amount shall be in addition to all other fees
required for this project. The reimbursement cost will be specified after the City
Engineer has evaluated and identified the project costs incurred for landscaping
within the median.
5. Applicant shall bear 100% of the cost of all above items.
6. Per the current 2016 - 2017 Fee Schedule and a gross leasable space of 37,000
square feet, the following are the fees must be paid prior to the issuance of
building permits:
Page 5 of 6
Resolution 16 -13
12411 Seal Beach Boulevard
1. Transportation Facilities and Programs Development Fee: $3.79/sf X
37,OOOsf = $140,230.00
2. Transportation Facilities and Programs Development Application Fee:
$0.55/sf X 37,OOOsf = $20,350.00
Total combined fee of $160,580.00.
Mitigation Measures:
1. Mitigation Measure NOI -1: The contractor shall limit construction activities to
between the hours of 7:00 A.M. and 7:00 P.M. on weekdays, and 8:00 A.M. and
6:00 P.M. on Saturdays. Construction activities will not be permitted on Sundays
or any federal holidays. The applicant shall ensure compliance with this
condition.
2. Mitigation Measure NOI -2: The contractor, to the satisfaction of the Community
Development Director, shall provide for all construction vehicles to have mufflers
and be maintained in good operating order at all times. No major vehicle repair
shall be conducted on the site. The applicant shall ensure compliance with this
condition.
3. Mitigation Measure T -1: Prior to issuance of occupancy permits, the applicant
shall extend the queuing length of the left -turn pocket lane from northbound Seal
Beach Boulevard onto westbound Rossmoor Center Way, as recommended in
the revised queuing analysis dated April 2016 for the project traffic impact
analysis to the satisfaction of the City Engineer. The City may determine a fair -
share payment for completion of such improvements.
PASSED, APPROVED, AND ADOPTED by the Seal Beach Planning
Commission at a meeting thereof held on June 20, 2016, by the following vote:
AYES: Commissioners Klinger, Cummings, Thomas
NOES: Commissioners Campbell, Machen
ABSENT: Commissioners
ABSTAIN: Commissioners
nning Commission Secretary
Esther Cummings
Chairperson
Page 6 of 6