Loading...
HomeMy WebLinkAboutItem 5TO: FROM: MEETING DATE: SUBJECT: LOCATION: APPLICANT: PLANNING COMMISSION STAFF REPORT Planning Commission ITEM NUMBER Director of Community Development OCTOBER 17. 2016 PUBLIC HEARING 5 REQUEST FOR A CONDITIONAL USE PERMIT 16 -6 AND MINOR USE PERMIT TO ALLOW A SHARED PARKING AGREEMENT FOR A SMALL COMMERCIAL RECREATIONAL FACILITY (MARTIAL ART STUDIO) IN A COMMERCIAL PLAZA LOCATED IN THE MAIN STREET SPECIFIC PLAN (MSSP) AREA AT 348 AND 350 MAIN STREET. 348 AND 350 MAIN STREET ERIC LENORE RECOMMENDATION: After conducting the public hearing and receiving public testimony, staff recommends that the Planning Commission adopt the attached Resolution No. 16 -22 to APPROVE Conditional Use Permit (CUP -6) and Minor Use Permit (MUP 16 -6) with conditions. GENERAL PLAN DESIGNATION ZONE: SITE DESCRIPTION: Assessor's Parcel Number: CUP /MUP 16 -6 350 Main Street COMMERCIAL — GENERAL MSSP (MAIN STREET SPECIFIC PLAN) 043 - 113 -48 Subject Site Area: 17,537 sq. ft. (0.40 acres) Building Area (Both Buildings): 15,000 sq. ft. Building Area (Dojo Studio) Surrounding Properties: ENVIRONMENTAL ASSESSMENT: 1,600 sq. ft. North: Commercial across Pacific Coast Hwy South: Commercial East: Commercial and Residential West: Commercial across Main St. This project is determined to be a Class 3 (Conversion of Small Structures) Categorical Exemption pursuant to Section 15303 of the Guidelines for the California Environmental Quality Act (Public Resources Code Section 21000 et seq.) for the permitting of a shared parking agreement for a commercial center and the operation of a dojo where only minor modifications are required for the conversion of use. LEGAL NOTIFICATION: The legal notice of this hearing was published in the Seal Beach Sun Newspaper on October 6, 2016 and mailed to property owners and occupants within a 500' radius of the subject property on October 6, 2016, with affidavits of publishing and mailing on file. VICINITY MAP: C f t y 1. C S r a l B r a c h I� �L ACOIAI enno. Page 2 of 6 CUP /MUP 16 -6 350 Main Street ANALYSIS: The applicant Eric Lenore filed an application on behalf of Main & PCH, LLC (the Applicants) to permit a shared parking agreement fora 15,000 sq. ft. two -story retail plaza in the Main Street Specific Plan (MSSP) zoning area. The subject site consists of two adjacent parcels with a reciprocal parking agreement. Each parcel is currently under construction with a two story commercial building. The northern building, 350 Main Street referred to as "Building A," will be 9,550 sq. ft. The southern building, 348 Main Street referred to as "Building B," will be 5,450 sq. ft. The Plaza is located on the southeast corner of Main Street and Pacific Coast Highway. The site is primarily surrounded by commercial uses but some residential uses are located across an alley to the east. The subject site is located in the Main Street Specific Plan area which permits retail and similar pedestrian oriented uses on the first floor facing Main Street while office and fitness type uses are permitted on the second floor. The Main Street Specific Plan established parking ratios for various uses within the specific plan area. Retail uses are required to provide 1 parking space per 500 sq. ft. of gross floor area, offices that do not generate customer visits require 1 space per 500 sq. ft. and offices with customers require 1 space per 300 sq. ft. The subject site was originally approved as a commercial plaza with retail uses on the ground floor and offices with no customers on the second floor. A total of 30 parking spaces were required to meet the Seal Beach Municipal Code ( §11.4.20.015) parking requirements for the plaza. Each building is independent of the other; however, a reciprocal parking agreement was recorded on the properties to require that the parking areas are accessible and usable to each building. The reciprocal parking agreement between the properties requires that both commercial buildings be analyzed together to ensure that one building does not monopolize an excess of the 30 parking spaces provided to serve both buildings. Linscott, Law & Greenspan (LLG), a traffic and engineering firm, originally prepared a Traffic Impact Analysis (TIA), dated April 30, 2013, to evaluate traffic and parking requirements to determine if the applied code requirements would adequately meet the needs of the mixed use commercial plaza. The TIA identified that the 30 parking spaces proposed for the subject site would meet the needs of the plaza; however, specific land uses were utilized to determine the required parking. The specific analysis of parking requirements in the TIA limited the plaza to only allow the uses that were reviewed in the analysis. The plaza is currently under construction and will have 11,107 sq. ft. of leasable space between both buildings. The remaining 3,893 sq. ft. within the 15,000 sq. ft. center consists of common area, such as restrooms and hallways, which will not be allocated to any of the tenants. The applicant is in the process of leasing space to a pie shop, a tailor, and a martial arts studio that will occupy units on the first and second floors of Building A. The applicant is seeking tenants to occupy the remaining tenant spaces in each building and would like to have some ability to lease to a wider range of uses in order to provide a variety of services to the public. This request is consistent with the Main Street Specific Plan which encourages a variety of service and retail businesses in the Main Street area. In order to support the applicant's request to allow a broader range of uses in the plaza, an Addendum to the TIA was required. The TIA Addendum, prepared by LLG and dated September 26, 2016, provided a shared parking analysis to forecast the peak parking Page 3 of 6 CUP/ MUP 16 -6 350 Main Street requirements for full- occupancy of the plaza based on the parking demand patterns of each use at the site. Shared parking calculations recognize that different uses often experience individual peak parking demands at different times of day, or days of the week. A shared parking analysis will utilize industry standard parking profiles to determine the total number of parking spaces required to meet the needs of the entire center instead of the needs of each use. City parking code requirements are typically based on peak demands for each land use to ensure that a parking lot serving a single business, such as a restaurant, is able to meet the needs of that use when it is in highest demand. A shared parking analysis, however, acknowledges that different business types reach their peak demand at different times of the day so one business can have a peak while another business has a lower demand. Application of a shared parking methodology can result in an overall parking need that is less than the sum of individual peak requirements for each land use. The Seal Beach Municipal Code ( §11.4.20.020) permits the use of shared parking facilities to serve multiple uses or properties provided the available parking is adequate to serve the needs of all uses. An applicant can seek approval of a Conditional Use Permit if the shared parking facility will provide less than the total number of parking spaces required by the Municipal Code provided that the following findings can be made: 1. The peak hours of parking demand from all uses do not coincide so that peak demand will not be greater than the parking provided; and 2. The adequacy of the quantity and efficiency of parking provided will equal or exceed the level that can be expected if parking for each use were provided separately. The TIA Addendum analyzed three different scenarios to evaluate different land uses and square footage allocations within the plaza. The Addendum analyzed the forecasted parking needs for each scenario during weekday and weekend conditions to determine if the available on -site parking would be able to adequately meet the real life parking needs of each mix of uses. The highest peak demand for Scenarios 1 and 2 occurred during the weekday at 3:00 p.m., while Scenario 3 had two weekday peak times at 1:00 p.m. and 3:00 p.m. The tenant mixes for each scenario are provided in the following table, as identified on page 3 of the TIA Addendum, along with the peak parking demand identified for each scenario on Tables 6 -11 of the TIA Addendum. The TIA Addendum provided an hourly analysis of each use to show that peak hours of each use do not coincide to cause a parking need greater than the 30 parking spaces provided on the subject site. Similarly, the analysis shows that each use will have its own peak demand at different times of the day and the allocation so the subject site will be able to meet the peak demand of each individual use within the plaza. Table on Next Page Page 4 of 6 CUP/ MUP 16 -6 350 Main Street TABLE 1 Parking Scenarios Weekda SCENARIO 1 SCENARIO 2 SCENARIO 3 Gross Parking Gross Parkin g Gross Parking Use Floor Area required Floor Area required Floor Area required s, ft. (sq ft (sq. ft Dessert Shop 999 2 999 2 999 2 Retail 2,915 6 2916 ' 6 5,479 11 Office (No 5,593 11 3983 '' 8 - - Customer Office - - 1609 5 3,029 10 Martial Arts 1,600 5 1,600 5 1,600 5 Studio Common Area 3,893 8 1 3,893 @ 8 3,893 8 Shared Parking 27 29 30 Demand SOURCE: LLG TIA Addendum, dated September 26, 2016 The TIA Addendum shows that the 30 parking spaces provided on the subject site can accommodate all three scenarios identified in the addendum and summarized in the table above so long as the allocated square footages are not exceeded for higher intensified uses. The TIA Addendum examined parking allocation based upon the existing leases, the proposed dojo, and three specific mixes of uses. The applicant has stated that they are seeking approval of Scenario 2 so that the plaza can provide the most flexible amount of services and uses. Conditions have been included in the attached resolution to limit all future uses to the specific square footage and floor areas identified in the TIA Addendum so that the parking demand will not exceed a peak demand of 29 spaces. Any future change to the combination of retail and office uses in the plaza will require review by the Planning Commission. The proposed martial arts dojo will occupy a 1,600 sq. ft. second floor space and operate as a Brazilian Jiu Jitsu martial arts studio. The classes will primarily be provided for children between the ages of 4 to 17 years of age and the parents of the enrolled children only. The maximum size of a class will be approximately 20 students with 3 instructors and 3 staff members. The dojo will operate Monday through Friday from 7am to 7pm, with private lessons by appointment on weekends. Classes are proposed every hour with an average class size of 15 students and a maximum of 30 students on site in the evening hours. Students who are not on the mats will be at the student learning lab inside the studio that contains 15 iPads for the students to use. The studio will also provide a shuttle to the site from McGaugh Elementary School and require that during the hours of 3pm to 5pm, the students adhere to a drop off only policy. Each class between 3 pm and 7pm will last 50 minutes. Page 5 of 6 CUP /MUP 16 -6 350 Main Street The shared parking analysis will allow the center to provide a mix of uses and services which is consistent with the vision for the Main Street Specific Plan area. The TIA Addendum identified that the center will be able to operate with the martial arts dojo and provide a mix of commercial uses while providing adequate onsite parking to meet the needs of its land uses. The conditions incorporated into the attached Resolution will ensure that the plaza maintains the specific mix of uses identified in Scenario 2 so that it can continue to provide adequate parking. CONCLUSION: After conducting the public hearing and receiving public testimony, staff recommends that the Planning Commission adopt the attached Resolution No. 16 -22 to APPROVE Conditional Use Permit (CUP 16 -6) and (MUP 16 -6) to permit a shared parking agreement for a 15,000 sq. ft. two -story retail plaza consisting of two buildings with a martial arts dojo in the Main Street Specific Plan (MSSP) located at 350 Main Street. Prepared by: Steve Fowler Assistant Planner Attachments 4: Director of Community Development 1. Resolution No. 16-22— A Resolution of the Seal Beach Planning Commission APPROVING a Conditional Use Permit (CUP 16 -6) and (MUP 16 -6) to permit a shared parking agreement for a 15,000 sq. ft. two -story retail plaza consisting of two buildings with a martial arts dojo in the Main Street Specific Plan (MSSP) located at 350 Main Street. a. Addendum to Traffic Impact Analysis, dated September 26, 2016 2. Site plan and floor Plan 3. Martial Arts Dojo Business Plan 4. Traffic Impact Analysis, Revised September 14, 2016, Original Date April 30, 2016 Page 6 of 6 ATTACHMENT 1 RESOLUTION NO. 16 -22 A RESOLUTION OF THE SEAL BEACH PLANNING COMMISSION APPROVING CONDITIONAL USE PERMIT 16 -6 AND MINOR USE PERMIT TO ALLOW A SHARED PARKING AGREEMENT FOR A SMALL COMMERCIAL RECREATIONAL FACILITY (MARTIAL ART STUDIO) IN A COMMERCIAL CENTER LOCATED IN THE MAIN STREET SPECIFIC PLAN (MSSP) AREA AT 348 AND 350 MAIN STREET INCLUDES: EXHIBIT A ADDENDUM TO TRAFFIC IMPACT ANALYSIS, DATED SEPTEMBER 26, 2016 RESOLUTION NO. 16 -22 A RESOLUTION OF THE SEAL BEACH PLANNING COMMISSION APPROVING CONDITIONAL USE PERMIT 16 -6 AND MINOR USE PERMIT TO ALLOW A SHARED PARKING AGREEMENT FOR A SMALL COMMERCIAL RECREATIONAL FACILITY (MARTIAL ART STUDIO) IN A COMMERCIAL CENTER LOCATED IN THE MAIN STREET SPECIFIC PLAN (MSSP) AREA AT 348 AND 350 MAIN STREET THE PLANNING COMMISSION OF THE CITY OF SEAL BEACH DOES HEREBY FIND AND RESOLVE AS FOLLOWS: Section 1. Eric Lenore, on behalf of Main and PCH, LLC submitted an application to the City of Seal Beach Department of Community Development for Conditional Use Permit (CUP) 16 -6 and Minor Use Permit (MUP) 16 -6 to permit a shared parking agreement for a commercial center with a martial arts studio at 348 and 350 Main Street (the "subject property "), which is located in the Main Street Specific Plan (MSSP) Zone. Section 2. Pursuant to the State of California Public Resources Code and State Guidelines for the California Environmental Quality Act (CEQA), the Community Development Department has determined that the proposed project is categorically exempt from environmental review per Section 15303 (Conversion of small structures) of the State CEQA Guidelines the permitting of a shared parking agreement for a commercial center and the operation of a dojo where only minor modifications are required for the conversion of use. Section 3. A duly noticed public hearing was held before the Planning Commission on October 17, 2016 to consider the application for CUP 16 -6 and MUP 16 -6. At the public hearing, the Planning Commission received and considered all evidence presented, both written and oral, regarding the subject application. The record of the public hearing indicates the following: A. The subject site is located on the south east corner of the Main Street and Pacific Coast Highway intersection. The subject site consists of two parcels totaling 17,537 square -feet (0.40 acre). Each parcel is currently under development with a two -story building. The total square footage of both buildings will be 15,000 square feet and a second story unit of 1,600 square feet will be occupied by a martial arts dojo. B. The subject site is surrounded by commercial uses to the north, south and west while there are both commercial and residential uses to the east across an alley. The subject property is located in the Main Street Specific Plan (MSSP) area. C. The applicant proposes to permit a shared parking agreement for a 15,000 sq. ft. commercial plaza which includes a martial arts studio. Page 1 of 6 Resolution No. 16 -22 350 Main Street D. The proposed martial arts studio will require tenant improvements to establish the branding d6cor. E. Seal Beach Municipal Code Section 11.4.20.020 permits the approval of a Conditional Use Permit for a shared parking facility if appropriate findings can be made. F. An addendum to a Traffic Impact Analysis dated April 30, 2013 was prepared by Linscott, Law & Greenspan. The addendum dated September 26, 2016 provides a shared parking analysis and has been attached to this resolution as Exhibit A Section 4. Based upon the facts contained in the record, including those stated in the preceding Section of this Resolution and pursuant to Chapter 11.5.20 of the Code of the City of Seal Beach, the Planning Commission makes the following findings: A. The proposed use is consistent with the General Plan because the shared parking analysis will allow for a mix of services and retail uses, including a martial arts studio, which encourages growth in the commercial area of Planning Area 1. The General Plan Land Use Element encourages revitalization and reuse within the project area in a logical, systematic manner, compatible with existing commercial uses. A shared parking analysis was prepared to evaluate the real life parking demand that would be generated by various mixes of uses on the subject site. The shared parking analysis provides a logical and systematic approach to allowing various land uses while ensuring that the Planning Area 1 is not further congested. The proposed addition of a martial arts studio and mix of commercial uses with allocated square footages specified in the parking analysis shows the plaza will grow in a logical manner that will be compatible with the existing area. As conditioned, the proposed shared parking agreement will allow for expanded services of the facility, which is proposed to be compatible with the surrounding uses. B. The proposed use is allowed within the Main Street Specific Plan (MSSP) zoning area subject to approval of a Conditional Use Permit and complies with all other applicable provisions the Municipal Code. The General Plan Land Use Map designates the subject property as Commercial - General and the Zoning Map designates the area as Main Street Specific Plan (MSSP). Pursuant to the Seal Beach Municipal Code a shared parking agreement is permitted in the MSSP zone with approval of a Conditional Use Permit. The shared parking analysis will ensure that the proposed uses within the subject site are able to operate with adequate parking so that there is no impact to the limited parking availability on Main Street. C. The site is physically adequate for the type, density, and intensity of the use being proposed. A shared parking analysis, prepared by Linscott, Law & Greenspan evaluated the proposed mix of uses on the subject site and concluded that the project site can accommodate the anticipated parking demand for the proposed uses. The proposed share parking agreement with the conditions listed below will allow the accommodation of a mix of uses on the subject site without impacting the Main Page 2 of 6 Resolution No. 16 -22 350 Main Street Street parking areas. The shared parking analysis identified that the peak demand of the center would require 29 parking spaces and the subject site provides 30 onsite parking spaces to serve the plaza. The subject site is developed with two multi- tenant commercial buildings. No major alterations are required on the site. D. The location, size, design, and operating characteristics of the proposed restaurant with the alcohol license upgrade would be compatible with the surrounding uses and will not adversely affect those uses or properties in the surrounding areas. The shared parking analysis evaluated three separate mixes of land uses with varying square footage allocations. Scenario 2 of the TIA Addendum, which consists of 999 sq. ft. for a dessert shop, 2,916 sq. ft. for retail, 3,983 sq. ft. for offices with no customers, 1,609 sq. ft. for offices with customers, 1,600 sq. ft. for a martial arts studio, and 3,893 sq. ft. of common areas. The parking analysis shows that peak parking demand occurs at around 3:00 p.m. on weekdays requiring 29 parking spaces. The subject site provides 30 parking spaces on site which accommodates the peak demand of the plaza. A condition has been incorporated to limit the size and types of uses allowed to those identified above, and reflected on page 3 of the TIA Addendum (Exhibit A), so that no adverse effects will result from the plaza. E. The establishment, maintenance, and operation of the proposed use at the subject site will not be detrimental to the health, safety, or welfare of persons residing or working in the vicinity of the proposed use. The shared parking agreement and conditions included in this resolution will require the plaza to maintain the land use square footages allocated in the TIA Addendum prepared by Linscott, Law, & Greenspan. The operation of uses detailed in the addendum will ensure an adequate amount of parking remains available for all the users on site so that the surrounding Main Street Parking areas are not impacted by the business on the subject site. F. The peak parking demand hours for all uses do not coincide so that peak demand will not be greater than the parking provided. The shared parking analysis in the TIA Addendum prepared by Linscott, Law, & Greenspan, dated September 26, 2016, illustrates that the peak parking demand for Scenario 2, occurs daily at 3:00 p.m. At peak demand the subject site requires 29 parking spaces to meet the needs of all uses on the subject site. The plaza will provide a total of 30 parking spaces on the subject site, which results in a surplus of one parking space for the plaza. G. The adequacy of the quantity and efficiency of parking provided will equal or exceed the level that can be expected if parking for each use were provided separately. The TIA Addendum prepared by Llnscott, Law & Greenspan analyzed each use separately to determine the parking demand need to serve each use throughout the day. The finding of the TIA Addendum specified that the 30 parking spaces on site will adequately serve all uses within the center because the peak times vary for most uses. The TIA Addendum showed that at no time will the peak demand for any use exceed the number of parking spaces provided on the subject site. Section 5. Based upon the foregoing, the Planning Commission hereby approves Conditional Use Permit (CUP) 16 -6 and Minor Use Permit 16 -6 to permit a Page 3 of 6 Resolution No. 16 -22 350 Main Stmet shared parking agreement for a commercial plaza with a martial arts studio at 348 and 350 Main Street subject to the following conditions. 1. Approval of Conditional Use Permit (CUP) 16 -6 and Minor Use Permit (16 -6) to permit a shared parking agreement for a commercial center with a martial arts studio at 348 and 350 Main Street within the Main Street Specific Plan. 2. The Main & PCH Plaza shall not exceed the land use square footage thresholds as further described in Scenario 2 of the TIA Addendum, dated September 26, 2016 (Exhibit A) and provided below: a. Dessert Shop: 999 sq. ft. b. Retail: 2,916 sq. ft. c. Office (no customer): 3,983 sq. ft. d. Office (with customers): 1,609 sq. ft. e. Martial Arts Studio: 1,600 sq. ft. f. Common Area: 3,893 sq. ft. 3. The approval of this Conditional Use Permit is not effective until execution and recordation of the shared parking agreement in a form satisfactory to the City. 4. Deliveries to the premises are prohibited between 10:00 P.M. and 7:00 A.M. 5. There shall be no dumping of trash outside and /or glass bottles outside the establishment between the hours of 10:00 P.M. and 7:00 A.M. 6. The establishment must comply with Chapter 7.15 "Noise" of the City of Seal Beach Municipal Code. Should complaints be received regarding noise generated by the establishment, the Planning Commission reserves the right to schedule this permit for reconsideration and may require the applicant/business operator to mitigate the noise level to comply with the provisions of Chapter 7.15. 7. Any proposed alterations or upgrades to the martial arts studio or parking agreement will require review and approval from the City of Seal Beach Planning Division. 8. A modification of this approval must be applied for when: a. The establishment proposes to modify any of its current Conditions of Approval. b. There is a substantial change in the mode or character of operations of the establishment. 9. The Planning Commission reserves the right to revoke or modify this approval if any violation of the approved conditions occurs, any violation of the Code of the City of Seal Beach occurs. 10. The premises of the martial arts studio must be in substantial compliance with the plan submitted with the application and maintained on file with the Community Development Department date stamped June 2, 2016. Page 4 of 6 Resolution No. 16 -22 350 Main Street 11. The hours of operation for the martial arts studio shall be 7:00 AM to 7:00 PM Monday through Friday and 9:00 AM to 11:00 AM on Saturday. 12. In the event staff determines that security problems exist on the site, the conditions of this permit may be amended, under the procedures of the Seal Beach Municipal Code to require the provision of additional security measures. 13. The Planning Commission reserves the right to revoke or modify this approval if harm or operational problems such as criminal or anti - social behavior occur. Examples of harmful or operation behaviors include, but not limited to, violence, vandalism, solicitation and /or litter. 14. The applicant will prominently display these Conditions of Approval in a location within the businesses' customer area that is acceptable to the Community Development Director. 15. Failure to comply with any of these conditions or a substantial change in the mode or character of the Martial arts studio shall be grounds for revoking or modifying this MUP approval. 16. This APPROVAL shall not become effective for any purpose unless /until a City "Acceptance of Conditions" form has been signed and notarized by the applicant before being returned to the Planning Department; and until the ten (10) calendar day appeal period has elapsed. 17. The applicant is required to obtain all required Building and Safety permits prior to tenant improvements, construction or demolition. 18. Approval of this request shall not waive compliance with all sections of the Municipal Code, or all other applicable City Ordinances in effect at the time of building permit issuance. 19. This approval shall become null and void unless exercised within one year of the date of final approval, or such extension of time as may be granted by the Planning Commission pursuant to a written request for extension submitted to the Community Development Department at least ninety days prior to such expiration date. 20. The applicant must indemnify, defend, and hold harmless City, its officers, agents, and employees (collectively "the City" hereinafter in this paragraph) from any and all claims and losses whatsoever occurring or resulting to any and all persons, firms, or corporations furnishing or supplying work, services, materials, or supplies in connection with the performance of the use permitted hereby or the exercise of the rights granted herein, and any and all claims, lawsuits or actions arising from the granting of or the exercise of the rights permitted by this approval, and from any and all claims and losses occurring or resulting to any person, firm, corporation or property for damage, injury or death arising out of or connected with the performance of the use permitted hereby. Applicant's obligation to indemnify, defend, and hold harmless the City as stated herein shall include, but not be limited to, paying all fees and costs incurred by legal counsel of the City's choice in representing the City in connection with any such claims, Page 5 of 6 Resolution No. 16 -22 350 Main Street losses, lawsuits or actions, expert witness fees, and any award of damages, judgments, verdicts, court costs or attorneys' fees in any such lawsuit or action. PASSED, APPROVED, AND ADOPTED by the Seal Beach Planning Commission at a meeting thereof held on October 17, 2016, by the following vote: AYES: Commissioners NOES: Commissioners ABSENT: Commissioners ABSTAIN: Commissioners ATTEST: Jim Basham Planning Commission Secretary Page 6 of 6 Esther Cummings Chairperson EXHIBIT A Addendum to traffic Impact Analysis, dated September 26, 2016 September 26, 2016 Engineers & Planners Tragic Transportation Parking Mr. Eric Lenore tinscott Law & Main & PCH, LLC Greenspan, Engineers 328 Main Street 2 Executive Circle Seal Beach, CA 90740 Suite 250 Wine, CA 92614 LLG Reference No. 2.16.3747.1 949.625.6175 T 949.8.6173 r vvwmIlgengineers.cont Subject: Revised Addendum to the Traffic Impact Analysis Report for the Pasadena Main & PCH Mixed -Use Center Project (dated April 30, 2013) Wine Seal Beach, California San Diego Woodland Hills Dear Mr. Lenore: As requested, Linscott, Law, & Greenspan, Engineers (LLG) is pleased to submit this Addendum to the Traffic Impact Analysis Report we previously completed on April 30, 2013 for the Main & PCH Mixed -Use Center Project. This letter report updates prior versions of the Addendum dated September 13, 2016 and September 20, 2016, to address City staff comments. This Addendum evaluates an updated project description, which includes the addition of a jiu jitsu studio for kids on the second floor of the development, called Dojo by Leo Vieira (referred to herein as "Dojo'). The total size of the project, 15,000 square feet (SF) of Gross Leasable Area (GLA), remains the same, and will also include a dessert shop, retail, and office uses. This letter evaluates the trip generation potential for the proposed Dojo and corresponding revised mix of uses in the Center, and compares those project - generated traffic volumes against the prior use that occupied the site (i.e., Chevron gasoline service station), and against what was previously analyzed in the April 2013 traffic impact study. Philip M. Gnscom PEu9 ml In addition, this Addendum estimates parking needs for the Dojo based on its Jack M. Greenspan, PE iR ii Mum A Law, PE,Rw anticipated operations, enrollment, staffing, and actual physical setting. This parking Paul W. Wilkinson, PE estimation approach is consistent with the City Code requirement for small -scale John P. Keating, PE recreation facilities (20,000 SF or less), which indicates that for specific uses other David S. Shender, PE than gyms and fitness studios, a parking demand analysis may be required. JahnA Braman, PE Clare M. Loek- Jaeger, PE Richard E. Barrens, PE Kcil D. Mxberry, PE An IGM'6Co'roary $vw0ea1 Mr. Eric Lenore September 26, 2016 Page 2 Parking demand for the overall Center, including the Dojo, was determined based on the application of the Urban Land Institute's (ULI) Shared Parking methodology, consistent with the industry-based approach of estimating realistic parking needs for a mixed -use development, and pursuant to Section 11.4.20.020 of the City's Municipal Code that allows the application of the Shared Parking concept to shared parking facilities serving more than one use. As part of this Addendum, the parking requirements for the updated project description were further calculated based on the application of the parking ratios that have been established as part of the City of Seal Beach Municipal Code Chapter 11.4.20.015.A.2 Required Parking — Main Street Specific Plan District for the dessert shop, retail, and office uses, and Chapter 11.4.20.015.A.1 Required Parking for the Dojo. Our method of analysis, findings, and conclusions are detailed in the following sections of this Addendum. Briefly, we find the following: • The trip generation potential for the refined project description, including the proposed Dojo, is generally consistent with the project - generated trips evaluated in the April 2013 traffic impact study. The prior study, which provided two trip generation scenarios, estimated that the Center could generate up to 762 daily trips, 44 AM peak hour trips, and 48 PM peak hour trips. In comparison, the refined project description analyzed in this Addendum is expected to generate 584 daily trips, 30 AM peak hour trips, and 60 PM peak hour trips. This corresponds to a reduction of 178 daily trips and 11 AM peak hour trips, and an increase of 12 PM peak hour trips, when compared against the prior analysis. The additional 12 PM peak hour trips is nominal, and will not result in changes to intersection peak hour levels of service. The April 2013 study concluded that, based on the City's traffic impact methodology, all key intersections would operate at acceptable levels of service (i.e., LOS D or better) without and with the project, and that the project would not cause significant traffic impacts under any of the traffic scenarios analyzed. The revised project description, which includes the proposed Dojo, will not result in any changes to those conclusions. • Pursuant to Section 11.4.20.020 of the Citys Municipal Code, which allows the application of the Shared Parking concept to shared parking facilities serving more than one use, the Shared Parking methodology was used in estimating realistic parking needs for the Center, and using anticipated operations, enrollment, staffing, and the physical setting as basis for the Dojo's parking demand, under three tenant -mix scenarios for Suites 350 D, 350 E, 348 B. and 348 C. The results are as follows: N 137Wi2163749 -350 ,Main Street Update, Seel BeacM1U]6] TIA Addendum Letter 9 -26 -I6 dac Mr. Eric Lenore September 26, 2016 Page 3 Scenario 1: Suites 350 D, 350 E, 348 B, and 348 C as "Office, no customer service" (5,593 SF total) Weekday Peak Demand = 27 spaces at 3:00 PM (3 surplus spaces) Weekend Peak Demand = 16 spaces at 2:00 PM (14 surplus spaces) Scenario 2: Suites 350 D, 350 E, and 348 B, as "Office, no customer service" (3,983 SF total), and Suite 348 C as "Business Office" (1,609 SF) Weekday Peak Demand = 29 spaces at 3:00 PM (l surplus space) Weekend Peak Demand = 16 spaces at 2:00 PM (14 surplus spaces) Scenario 3: Suites 350 E and 348 C as 'Business Office" (3,029 SF total), and Suites 350 D and 348 B as "Retail' (2,564 SF total) Weekday Peak Demand = 30 spaces at 1:00 PM and 3:00 PM (0 surplus spaces) Weekend Peak Demand = 21 spaces at 2:00 PM (9 surplus spaces) Based on the above findings, we conclude that the on -site supply of 30 spaces for the project will be adequate in meeting the parking needs under any of the three tenant -mix scenarios evaluated in this Addendum. • It is recommended that I to 2 parking spaces located nearest the proposed Dojo be designated as "15- minute short-term parking" to facilitate parents dropping off and picking up students on weekday afternoons. • The application of City Code parking ratios to the updated project description for the entire Center results in a Code -based requirement of 32 spaces. When compared against the project's parking supply of 30 on -site spaces, the 32 spaces required by City Code results in a Code -based deficiency of 2 spaces. This changes the conclusion in the April 2013 study that previously indicated the project having adequate parking supply to meet its City Code parking requirement. It should be noted, however, that 7 on- street, angled parking spaces along Main Street on the project site's frontage will be provided. and these spaces will serve as contingent parking for nearby uses, including the project. N:U700Q 163945- 350 Main Street Update, Seal BeiahO747 TL\ Addendum Leiin 9.26.16 doc Mr. Eric Lenore September 26, 2016 Page 4 PROJECT LOCATION AND DESCRIPTION The project site is a 0.40± acre rectangular shaped parcel of land located at 350 Main Street, on the southeast corner of Main Street and Pacific Coast Highway in the City of Seal Beach, California. The project site is currently vacant, however the subject property was previously developed with a Chevron service station that had 8 vehicle fueling positions and 4 service bays. The proposed project includes the development of a two -story, 15,000 -SF building. A total of 30 spaces in a parking garage will be provided, in addition to 7 on- street, angled parking spaces along Main Street on the project site's frontage which will serve as contingent parking for nearby uses, including the project. Table I presents the development tabulation for the project, which reflects refinements to the prior mix of uses in the project description used as basis for the April 2013 study. The proposed Dojo will provide jiu jitsu classes to children primarily residing in the immediate local Seal Beach community. The daily schedule for kids classes on Monday through Friday is as follows: 2:50 PM — 3:40 PM: one class up to 20 students; 5 to 7 years old 4:00 PM —4:50 PM: one class up to 20 students; 8 to 10 years old 5:10 PM — 6:00 PM: one class up to 20 students; I I to 13 years old 6:20 PM — 7:10 PM: one class up to 20 students; 14 to 17 years old On Saturdays, the schedule for kids classes is as follows: 9:00 AM — 9:50 AM: one class up to 20 students; 5 to 10 years old 10:00 AM — 10:50 AM: one class up to 20 students; I I to 17 years old In addition to kids classes, parents of enrolled children will be offered private classes to be held between 8:00 AM and 1:00 PM, on Monday through Friday. Five employees will be present for kids classes, of which two will be adult employees, and three will be teen students at the Dojo. One adult employee will be on staff during private classes for parents. All adult employees will be driving their own vehicle, and therefore accounted for in a separate category in the trip generation and parking demand assessment. The teen student employees will not be driving, and presumed to be part of the same student pool categories, who are dropped off /picked up by private vehicle, or by the complimentary shuttle service, or by non- motorized means (walking, bike, skateboard). The anticipated operations for the Dojo includes the provision of the following key amenities: S:b90prd16➢d9 -350 Plain street Update, Seel BeachU0411 IA Addendum Lener 9R6 -16 due Mr. Eric Lenore September 26, 2016 Page 5 • A complimentary drop -off and pick -up service by shuttle (Mercedes Benz Sprinter passenger van that could accommodate up to 12 passengers) will be provided. Students ages 5 to 10 years old will be picked -up after school at McGaugh Elementary and transported to the Dojo for the 2:50 PM and 4:00 PM classes. After the 4:00 PM class, all students will be transported directly to their homes. Students who are II years and older (those attending the 5:10 PM and 6:20 PM classes) will also be able to use the complimentary shuttle; however, the demand for this may be very small, if at all, because these older students are likely, and will be encouraged (an incentive program is described below), to ride their bikes, walk, and /or skateboard to and from their classes at the Dojo. • In addition, a state -of -the -art student Learning Lab will be equipped with 12 iPads for students to complete Los Alamitos School District - assigned homework. This will encourage more students to use the shuttle, or ride bikes /walk/skateboard with friends, right after school, then do homework while waiting for their specific class to begin. • As a way to encourage parents who must transport their children to class to only drop off or pick up their children, class registration materials will require parent signatures to acknowledge their understanding of the following: • Information about the complimentary shuttle service and student Learning Lab, as described above. • There will not be a parent waiting area inside the Dojo. • Parents' presence during class may distract students and prevent them from learning at their fullest ability, so parents are discouraged from waiting for the class to end while parked on site. • Parents need to be as efficient as possible when dropping off students or picking them up by private vehicle, so that vehicle drop- offs /pick -ups along the driveway do not impede other vehicles circulating on site, and so that parking duration in designated short-term spaces are kept to a minimum. • A Dojo staff member will assist during the drop -off and pick -up periods to ensure that traffic flows and short-term parking spaces operate as efficiently as possible, so parents may be directed accordingly. • As an incentive for students to walk, ride bikes, and /or skateboard to and from class, a rewards program will be established that gives rewards points to students, which can then be used for purchasing items from the Dojo's store, such as Dojo shirts, backpacks, rash guards, and even cash - back rewards. H:b000r2163747 350 Main Street Update, Seal BeacM0949 T I A Addendum Lmer 9 -26 16 doc Mr. Eric Lenore September 26, 2016 Page 6 PROJECT TRIP GENERATION As presented in the April 2013 study, traffic generation is expressed in vehicle trip ends, defined as one -way vehicular movements, either entering or exiting the generating land use. Generation factors and equations found in the 9th Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE) [Washington, D.C., 2012] are typically applied in trip forecasting procedures. Since ITE trip rates do not specifically account for the unique tripmaking characteristics of the proposed Dojo, Dojo - generated traffic was estimated by deriving vehicular trips from the person trips and operational parameters anticipated, as described above. Table 2 presents the Dojo's vehicle arrival and departures, tripmaking assumptions, and resulting Dojo - generated trips during the weekday, AM peak commute hour, and PM peak commute hour (highlighted in yellow). The Dojo is expected to generate 146 weekday daily trips (73 inbound, 73 outbound), 5 AM peak hour trips (3 inbound, 2 outbound), and 30 PM peak hour trips (15 inbound, 15 outbound). Table 3 presents the ITE trip rates applied to estimate the trip generation for the prior use (Chevron gas station), and the other components of the project (i.e., dessert shop, retail, office). It should be noted that applying the ITE rates for High- Turnover (Sit - Down) Restaurants to the dessert shop is a conservative measure. The dessert shop will only have 10 indoor seats (no outdoor dining), compared to a much larger sit - down casual restaurant, so it will likely generate fewer trips than projected. Table 4 summarizes the trip generation potential for the prior Chevron gas station and the project, as now proposed and including the Dojo. The trip generation potential of a gasoline service station with 8 vehicle fueling positions totals 782 daily trips, with 41 trips (21 inbound, 20 outbound) during the AM peak hour and 64 trips (32 inbound, 32 outbound) during the PM peak hour. The proposed project is forecast to generate 584 daily trips, with 30 trips (20 inbound, 10 outbound) during the AM peak hour, and 60 trips (27 inbound, 33 outbound) during the PM peak hour. Comparison of the trips generated by the proposed project to the trips generated by the prior use (Chevron gas station) shows that the project would generate less traffic than the prior gas station use, with 198 fewer daily trips, I I fewer AM peak hour trips, and 4 fewer PM peak hour trips. The trip generation potential for the refined project description, including the proposed Dojo, is generally consistent with the project - generated trips evaluated in the April 2013 traffic impact study. The prior study, which provided two trip \ Q700@ I63]a] -350 Plain street Upi seal OenehO0a0l IA Addendum Lener 9 -26-16 doe Mr. Eric Lenore September 26, 2016 Page 7 generation scenarios, estimated that the Center could generate up to 762 daily trips, 44 AM peak hour trips, and 48 PM peak hour trips. In comparison, the refined project description analyzed in this Addendum is expected to generate 584 daily trips, 30 AM peak hour trips, and 60 PM peak hour trips. This corresponds to a reduction of 178 daily trips and I I AM peak hour trips, and an increase of 12 PM peak hour trips, when compared against the prior analysis. The additional 12 PM peak hour trips is nominal, and will not result in changes to intersection peak hour levels of service. The April 2013 study concluded that, based on the City's traffic impact methodology, all key intersections would operate at acceptable levels of service (i.e., LOS D or better) without and with the project, and that the project would not cause significant traffic impacts under any of the traffic scenarios analyzed. The revised project description, which includes the proposed Dojo, will not result in any changes to those conclusions. PARKING SUPPLY - DEMAND ANALYSIS This parking analysis involves determining the expected future site parking needs, based on the size and type of tenancy components, versus the 30 -space parking supply on site. Typically, there are two methods that can be used to estimate a site's peak parking needs. These methods have been used in this analysis and include: • Application of City Code requirements (which typically treats each tenancy type as a "stand alone" use at maximum demand). • Application of shared parking usage patterns by time -of -day (which recognizes that the parking demand for each tenancy type varies by time of day and day of week). The shared parking analysis starts with a code calculation for each tenancy type. The shared parking methodology is concluded to be applicable to the project because the individual tenancy /land use types (i.e., restaurant, retail, office) experience peak demands at different times of the day. Similar to estimating trip generation for the Dojo, the unique parking needs of the Dojo were derived from the anticipated operational parameters. Table 5 presents the parking demand estimates for a typical weekday. The resulting peak parking demand for the Dojo is 4 spaces during weekday afternoon classes. N WW121619a9 -3$D Plain Svee, Upd m. Seal Spa W747 TIA Add ,-dum Ue ,, 9 -2G 16 d.c Mr. Eric Lenore September 26, 2016 Page 8 SHARED PARKING ANALYSIS Section 11.4.20.020 of the City's Municipal Code allows the application of the Shared Parking concept to shared parking facilities serving more than one use, as follows: "A. Shared Parking. 1. Permit Requirement. A conditional use permit may be approved for shared parking facilities serving more than one use on a site or serving more than one property. The use permit may allow for a reduction of the total number of spacer required by this chapter if the following findings are made, in addition to the required findings pursuant to Chapter 11.5.20: Development Permits, Section 11.5.20.020: Required Findings: a. The peak hours of parking demand from all uses do not coincide so that peak demand will not be greater than the parking provided; and b. The adequacy of the quantity and efficiency of parking provided will equal or exceed the level that can be expected if parking for each use were provided separately. 2. Shared Parking Agreement. A written agreement between the landowner(s) and the city shall be filed, in a form satisfactory to the city attorney, and including: a. A guarantee that there will be no substantial alteration in the uses that will create a greater demand for parking without application for an approval of use permit; b. A guarantee among the landowner(s) for access to and use of the shared parking facilities; and c. Evidence that the agreement has been recorded in the county recorder's office. " Based on the above the Shared Parking methodology was used in estimating realistic parking needs for the Center, and using anticipated operations, enrollment, staffing, and the physical setting as basis for the Dojo's parking demand, under three tenant - mix scenarios for Suites 350 D, 350 E, 348 B, and 348 C. Shared Parking Methodology Accumulated experience in parking demand characteristics indicates that a mixing of land uses results in an overall parking need that is less than the sum of the individual peak requirements for each land use. The objective of this shared parking analysis is to forecast the peak parking requirements for full- occupancy tenancy based on the combined demand patterns of different tenancy types at the site. v- U]00r2161]a7. 350 Main Sven Gpde2, Seal 6eechU949 Tld Addendum Lever 9 -26 16 doe Mr. Eric Lenore September 26, 2016 Page 9 Shared parking calculations recognize that different uses often experience individual peak parking demands at different times of day, or days of the week. When uses share common parking footprints, the total number of spaces needed to support the collective whole is determined by adding parking profiles (by time of day for weekdays versus weekend days), rather than individual peak ratios as represented in City Code. In that way, the shared parking approach starts from the City's own code ratios and results in the "design level" parking supply needs of a site. It should be noted that the "demand" results of the shared parking calculation are intended to be used directly for comparison to site supply. No further adjustments or contingency additions are needed because such contingencies are already built into the peak parking ratios and time of day profiles used in the calculation. There is an important common element between the traditional "code" and the shared parking calculation methodologies; the peak parking ratios or "highpoint" for each land use's parking profile typically equals the "code" parking ratio for that use. The analytical procedures for shared parking analyses are well documented in the Shared Parking, 2n' Edition publication by the Urban Land Institute (ULI). Shared parking calculations utilize hourly parking accumulations developed from field studies of single developments in free- standing settings, where travel by private auto is maximized. These characteristics permit the means for calculating peak parking needs when land use types are combined. Further, the shared parking approach illustrates how, at other than peak parking demand times, an increasing surplus of spaces will serve the overall needs of the site. Shared Parking Ratios and Profiles The hourly parking demand profiles (expressed in percent of peak demand) utilized in this analysis are based on profiles developed by the Urban Land Institute (ULI) and published in Shared Parking, 2nd Edition. The ULI publication presents hourly parking demand profiles for several general land use categories. The ULI profiles of parking demand have been used directly, by land use type, in the analysis of this site (with the exception of the Dojo). Application of Shared Parking Methodology The Shared Parking methodology was applied in estimating more realistic parking needs for the Center, and using anticipated operations as basis for the Dojo's parking demand, under three tenant -mix scenarios for Suites 350 D, 350 E, 348 B. and 348 C. N 37W2163949- 350 Main SVeel Up1a14 Seal Beach \3147 I JA Addendum Laner9 -26.16 doc Mr. Eric Lenore September 26, 2016 Page 10 Tables 6, 8, and 10 present the weekday parking demand profiles for the overall Center based on the shared parking methodology, assuming full occupancy and the proposed Dojo. Tables 7, 9, and 11 present the weekend (Saturday) parking demand analysis. Scenario I Consistent with was assumed in the City Code calculations (per Table 6), Scenario 1 presumes Suites 350 D, 350 E, 348 B, and 348 C as "Office, no customer service" (5,593 SF total). Table 6 indicates that the future full occupancy weekday peak parking demand will occur at 3:00 PM, with a peak "design level" demand of 27 spaces. Based on the parking supply of 30 spaces on site, the peak demand hours on a weekday will balance with supply and provide a surplus of 3 spaces. Table 7 indicates that parking needs on a Saturday will be less than the shared peak demand of 27 spaces on a weekday. Scenario 2 Scenario 2 presumes Suites 350 D, 350 E, and 348 B, as "Office, no customer service" (3,983 SF total), and Suite 348 C as `Business Office" (1,609 SF). Table 8 indicates that the future full occupancy weekday peak parking demand will occur at 3:00 PM, with a peak "design level' demand of 29 spaces. Based on the parking supply of 30 spaces on site, the peak demand hours on a weekday will balance with supply and provide a surplus of 1 space. Table 9 indicates that parking needs on a Saturday will be less than the shared peak demand of 29 spaces on a weekday. Scenario 3 Scenario 3 presumes Suites 350 E and 348 C as 'Business Office" (3,029 SF total), and Suites 350 D and 348 B as `Retail" (2,564 SF total). Table 10 indicates that the future full occupancy weekday peak parking demand will occur at 1:00 and 3:00 PM, with a peak "design level' demand of 30 spaces. Based on the parking supply of 30 spaces on site, the peak demand on a weekday will exactly match supply. Table 11 indicates that parking needs on a Saturday will be less than the shared peak demand of 30 spaces on a weekday. N 1370012 1637J7 -350 Mato Sven U,d ,q sem oeachn747 I IA Adder n, U.n , 9-26. 11 d., Mr. Eric Lenore September 26, 2016 Page 1 I Based on the above, we conclude that the peak parking needs of the project, as now proposed, will be adequately met by the 30 -space supply on site. Given the surpluses expected during the peak parking conditions on a weekday, it is recommended that I to 2 parking spaces located nearest the proposed Dojo be designated as "15- minute short-term parking" to facilitate parents dropping off and picking up students on weekday afternoons. CODE PARKING REQUIREMENTS Table 12 presents the parking requirements for the overall Center based on the application of City Code (specifically, the parking ratios that have been established as part of the City of Seal Beach Municipal Code Chapter 11.4.20.015.A.2 Required Parking — Main Street Specific Plan District) to the dessert shop, retail, office, and common areas (presumed to be parked at the same rate as retail /commercial uses). For the Dojo, the parking ratio for "small -scale (20,000 SF or less) gyms and fitness studios" from Chapter 11.4.20.015.A.I Required Parking was applied. The application of City Code parking ratios to the updated project description for the entire Center results in a Code -based requirement of 32 spaces. When compared against the project's parking supply of 30 on -site spaces, the 32 spaces required by City Code results in a Code -based deficiency of 2 spaces. This changes the conclusion in the April 2013 study that previously indicated the project having adequate parking supply to meet its City Code parking requirement. It should be noted, however, that 7 on- street, angled parking spaces along Main Street on the project site's frontage will be provided, and these spaces will serve as contingent parking for nearby uses, including the project. We appreciate the opportunity to prepare this Addendum. Should you have any questions or need additional assistance, please do not hesitate to call us at (949) 825- 6175. Very truly yours, Linscott, Law & Greenspan, Engineers �J . Akl_� Trissa (de Jesus) Allen, P.E. Senior Transportation Engineer N.O7WZ16)747 -350 Main Sum Upmue, Seal B— h \3547TIA Addendum Leuer9 -16 -16 doc TABLE 1 DEVELOPMENT TABULATION Square Feet (SF) Gross Leasable Description Area (GLA) First Floor 350 A Doc's Pies dessert shop 999 350 B Kim's Alterations retail /seamstress 700 350C Open retail 1,106 348 A Open retail /clothing 1,109 3,914 First Floor Total: Second Floor 350 D Offices at Main & PCH office 1,275 350 E Offices at Main & PCH office 1,420 350 F Dojo by Leo Vieira jujitsu studio 1,600 348 B Open office 1,289 348 C Offices at Main & PCH office 1,609 7,193 Second Floor Total: Common Areas 3,893 TOTAL PROJECT: 15,000 Breakdown bv Land Use Dessert Shop 999 Retail 2,915 Doj o 1,600 Office 5,593 Common Areas 3,893 15,000 TOTAL PROJECT: �$ § C3 \! ! . c \ } §2!2 )k) » }\ {/ () \{i {r {\ - /j* )» - u��( {) $» ! 7 �`\\ �! ]) af«\\ \ \ a \ )} @«fa4 \ \ a \ TABLE 3 PROJECT TRIP GENERATION RATES ITE Land Use Category Daily 2 -Way Alf Peak Hour PM Peak Hour Enter % Exit % Total Enter % Exit % Total I'fE 944: Gasoline /Service Station 168.56 51% 49% 12.16 50% 50% 13.87 (trips per vehicle fueling position) ITE 932: High-Tumover (Sit-Down) Restaurant 127.15 55% 45% 10.81 60% 40% 9.85 (trips per 1,000 SF) I "IT 820: Shopping Center 42.70 62% 38% 0.96 48% 52% 3.71 (trips per 1,000 SF) ITE 710: General Office 11.03 88% 12% 156 17% 83% 1.49 (trips per 1.000 SF) Source: Trip Generation Manua(, 91h Edition, Institute of Transportation Engineers (ITE), Washington. D.C. (2012). TABLE 4 PROJECT TRIP GENERATION ESTIMATES Notes: [a] Assumes Daily and PM peak hour pass -by reductions are 42 %, and AM peak hour is 58 %. [b] Vehicle trips estimated based on the application of ITE rates per Table 3. [c] Assumes Daily and AM peak hour pass -by reductions are 10 %, and PM peak hour is 43 %. [d] Assumes Daily and AM peak hour pass -by reductions are 10 %, and PM peak hour is 34 %. [e] Vehicle trips estimated based on anticipated operational patterns for the proposed Dojo per Table 2. Daily AM Peak Flour PM Peak Hour Enter Exit Total Enter Exit Total Project Description 2 -Way Existing Development Chevron Gas - Station (8 fueling positions) 1.348 49 48 97 56 55 HI I Pass -By Reduction [a] (566) (28) (28) (56) (24) (23) (47) 782 21 20 41 32 31 64 Existing Net Trips Proposed Project Dessert Shop (999 SF) [b] 127 6 5 11 6 4 10 Pass -By Reduction [c] (13) (1) 0 (1) (3) (1) (4) 114 5 5 10 3 3 6 Dessert/Small Restaurant Net Trips Retail (2,915 SF) + Common Areas (3,893 SF) [b] 291 4 3 7 12 13 25 Pass -By Reduction [d] (29) 0 (1) (1) (4) (5) (9) 262 4 2 6 8 8 16 Retail Net Trips General Office (5,593 SF) [b] 62 8 1 9 1 7 8 Dojo (1,600 SF) [el 146 3 2 5 15 15 30 Proposed Project Net Trips 584 20 10 1 30 1 27 1 33 1 60 Proposed Project Minus Existing Trips (198) (1) (10) (11) (5) 1 (4) Notes: [a] Assumes Daily and PM peak hour pass -by reductions are 42 %, and AM peak hour is 58 %. [b] Vehicle trips estimated based on the application of ITE rates per Table 3. [c] Assumes Daily and AM peak hour pass -by reductions are 10 %, and PM peak hour is 43 %. [d] Assumes Daily and AM peak hour pass -by reductions are 10 %, and PM peak hour is 34 %. [e] Vehicle trips estimated based on anticipated operational patterns for the proposed Dojo per Table 2. En LU §m ca CL � ( \ \;\ ƒ)\ \ J &)3)\ - ��)\\\�� TABLE 6 SCENARIO 1: SUITES 350 D, 350 E, 348 B, 348 C AS OFFICE, NO CUSTOMER SERVICE WEEKDAY SHARED PARKING DEMAND ANALYSIS [a] Land Use Retail + Common Areas Office Dessert Shop Data Shared Parking Demand Comparison w/ Parking Supply 30 Spaces Sin Pkg Rate 6.808 KSF 2.00 /KSF 5.593 KSF 2.00 /KSF 0.999 KSF 2.00 /KSF 1.600 KSF 2.50 /KSF Ibl Gross Spaces 14 Spc 11 Spc. 2 Ste. 4 Ste. Time of Day Number of Spaces Number of Spaces Number of Spaces Number of Spaces Surplus (Deficiency) 600 AM 0 0 0 0 0 30 7:00 AM 1 3 0 0 4 26 8:00 AM 3 8 0 3 14 16 9:00 AM 6 11 0 3 20 10 10 00 AM 8 11 0 3 22 8 11 00 AM 11 10 1 3 25 5 12:00 PM 12 9 1 3 25 5 1:00 PM 1 13 9 1 3 26 4 2:00 PM 12 11 1 1 25 5 3:00 PNf 12 10 1 4 27 3 4:00 PM 12 9 1 4 26 4 5:00 PM 12 5 1 4 22 8 6:00 PM 12 3 2 4 21 9 7:00 PM 12 1 2 4 19 11 8:00 PM 10 1 2 0 13 17 9:00 PM 7 0 2 0 9 21 10:00 PM 4 0 2 0 6 24 1 1:00 PM 1 0 1 0 2 28 12:00 AM 0 0 0 0 0 30 Notes: [a] Puking rates for all land uses based on UIJ procedure normalized to express percentage in terms ofabsolute peak demand ratios. [b] Effective ratio is reported for the proposed Dojo. See Table 5 for the detailed peak parking demand estimation for the Dojo. TABLE 7 SCENARIO 1: SUITES 350 D, 350 E, 348 B, 348 C AS OFFICE, NO CUSTOMER SERVICE WEEKEND SHARED PARKING DEMAND ANALYSIS [a] Land Use Retail + Common Areas Office Dessert Shop Dojo Shared Parking Demand Comparison w/ Parking Supply 30 Spaces Sin Plug Rate 6.808 KSF 2.00 /KSF 5.593 KSF 2.00 /KSF 0.999 KSF 2.00 /KSF 1.600 KSF 2.50 /KSF IbI Gross Spaces 14 Spec 11 Spe. 2 Spe. 4 Spe. Time of Day Number of Spaces Number of Spaces Number of Spaces Number of Spaces Surplus (Deficiency) 600 AM 0 0 0 U 0 30 700 AM 1 0 0 U 1 29 8:00 AM 2 1 0 2 5 25 9:00 AM 5 1 0 4 10 20 10:00 AM 9 1 0 4 14 16 11 00 AM 10 1 0 2 13 17 12:00 PM 12 1 1 0 14 16 1.00 PM 1 13 1 1 0 15 15 2:00 PM 14 1 1 0 16 14 3:00 PM 14 0 1 0 15 15 4 00 PM 13 0 1 0 14 16 5:00 PM 13 0 1 0 14 f6 6:00 PM 12 0 2 0 14 16 7:00 PM 10 0 2 0 12 18 8:00 PM 9 0 2 0 11 19 9:00 PM 8 0 2 0 10 20 10 00 PM —L-5 U 2 0 7 23 11.00 PM 2 0 2 0 4 26 12:00 AM 0 U 1 0 I 1 29 Nolen: [a] Parking rates fur all land uses based on ULI procedure normalized to express percentage in terms of absolute peak demand ratios. [b] Effective ratio is reported for the proposed Dojo. Sec Table 5 for the detailed peak parking demand estimation for ,he Dojo. TABLE 8 0 SCENARIO 2: SUITES 350 D, 350 E, 348 B AS OFFICE, NO CUSTOMER SERVICE; SUITE 348 C AS BUSINESS OFFICE WEEKDAY SHARED PARKING DEMAND ANALYSIS [a] Land Use Retail + Common Areas Office Dessert Shop Dojo Shared Parking Demand Comparison w/ Parking Supply 30 Spaces Size Pkg Rate 6.808 KSF 2.00 /KSF 5.593 KSF 2.32 /KSF Ibl 0.999 KSF 2.081 /KSF 1.600 KSF 2.50 /KSF lei Gross Spaces 14 Spc, 13 Spe. 2 Spc. 4 Slur. Time of Day Number of Spaces Nom ber of Spaces Number of Spaces Number of Spaces Surplus (Deficiency) 600 AM 0 0 0 0 0 30 700 AM 1 4 0 0 5 25 8:00 AM 3 9 0 3 15 15 9:00 AM 6 12 0 3 21 9 10:00 AM 8 13 0 3 24 6 1 1:00 AM 11 12 1 3 27 3 12:00 PM 12 11 1 3 27 3 1 00 PM 1 13 11 1 3 28 2 2:00 PM 12 13 1 1 27 3 3:00 PNI 12 12 1 4 29 1 4:00 PM 12 11 1 4 28 2 5-00 PM 12 6 1 4 23 7 6:00 PM 12 3 2 4 21 9 7:00 PM 12 1 2 4 19 11 8:00 PM 10 1 2 0 13 17 9:00 PM 7 0 2 0 9 21 10:00 PM 4 0 Z 0 6 24 I 100 PM 1 0 1 0 2 28 12:00 AM 0 0 0 0 0 30 Notes [a] Parking rates for all land uses based on ULI procedure normalized to express percentage in terms ofabsolute peak demand ratios. [b] Effective ratio is reported for offices without customer services, and business offices, See Table 12 for City Code ratios by once type applied. [c] Effective ratio is reported for the proposed Dojo. See Table 5 for the detailed peak parking demand estimation for the Dojo. TABLE 9 SCENARIO 2: SUITES 350 D, 350 E, 348 B AS OFFICE, NO CUSTOMER SERVICE; SUITE 348 C AS BUSINESS OFFICE WEEKEND SHARED PARKING DEMAND ANALYSIS [a] Land Use Retail +Common Areas Office Dessert Shop Dojo Shared Parking Demand Comparison w/ Parking Supply 30 Spaces Size Pkg Rate 6.808 KSF 2.00 /KSF 5.593 KSF 2.32 /KSF Ibl 0.999 KSF 2.00 /KSF 1.600 KSF 2.50 /KSF [eI Gross Spaces 14 Spe 13 Spa 2 Spe. 4 Spe. Timeof Day Number of Spaces Number of Spaces Number of Spaces Number of Spaces Surplus (Deficiency) 6:00 AM 0 0 0 0 0 30 7:00 AM 1 0 0 0 1 29 8:00 AM 2 1 0 2 5 25 9:00 AM 5 1 0 4 10 20 10:00 AM 9 1 0 4 14 16 1100AM 10 1 0 2 13 17 12:00 PM 12 1 1 0 14 16 1:00 PM 13 1 1 0 15 15 2:00 PM 14 1 1 II 16 14 3:00 PM 14 0 1 0 15 15 4:00 PM 13 0 1 0 14 16 5:00 PM 13 0 1 0 14 16 6.. -00 PM 12 0 2 0 14 16 7:00 PM 10 0 2 0 12 18 8:00 PM 9 0 2 0 11 19 9:00 PM 8 0 2 0 10 20 10:00 PM 5 0 2 0 7 23 1 1:00 PM 2 0 2 0 4 26 12:00 AM 0 0 1 0 1 29 Notes [a] Parking rates for all land uses based on ULI procedure normalized to express percentage in terms of absolute peak demand ratios. [b] Effective ratio is reported for offices without customer services, and business off-ices . See Table 12 for City Code ratios by office type applied. [cl Effective ratio is reported for the proposed Dojo. See Table 5 for the detailed peak parking demand estimation for the Dojo. TABLE 10 SCENARIO 3: SUITES 350 E, 348 C AS BUSINESS OFFICE; SUITE 350 D, 348 B AS RETAIL WEEKDAY SHARED PARKING DEMAND ANALYSIS [a[ Land Use Retail +Common Areas Office Dessert Shop Dojo Shared Parking Demand Comparison w/ Parking Supply 30 Spaces Si. Pkg Rate 9.372 KSF 2.00 /KSF 3.029 KSF 3.33 /KSF 0.999 KSF 2.00 /KSF 1.600 KSF 2.50 /KSF Ibl Gross Spaces 19 Spin 10 Spe. 2 Spc. 4 Spe. Time of Day Number of Spaces Number of Spaces Number of Spaces Number of Spaces Surplus (Deficiency) 6,00 AM 0 0 0 0 0 30 700 AM 2 3 0 0 5 25 8:00 AM 7 0 3 13 17 9:00 AM 8 10 0 3 21 9 10:00 AM 12 10 0 3 25 5 11:00 AM 15 9 1 3 28 2 12:00 PM 17 8 1 3 29 1 1:00 PM 18 8 1 3 30 0 2:00 PM 17 10 1 1 29 1 3:00 Pb1 16 9 1 4 30 0 4:00 PM 16 8 1 4 29 1 5:00 PM 16 5 1 4 26 4 6:00 PM 16 2 2 4 24 6 7:00 PM 16 1 2 4 23 7 8:00 PM 14 1 2 0 17 13 9:00 PM 10 0 2 0 12 18 10:00 PM 5 0 2 0 7 23 1100 P.M 2 0 1 0 3 27 12:00 AM 0 0 0 0 0 30 Notes' [a] Parking rates for all land uses based on ULI procedure normalized to express percentage in terms ofabsolute peak demand ratios. Ibl Effective ratio is reported for the proposed Dojo. See Table 5 for the detailed peak parking demand estimation for the Dojo. TABLE 11 SCENARIO 3: SUITES 350 E, 348 C AS BUSINESS OFFICE; SUITE 350 D, 348 B AS RETAIL WEEKEND SHARED PARKING DEMAND ANALYSIS [a] Land Use Retail + Common Areas office Dessert Shop Dojo Shared Parking Demand Comparison w/ Parking Supply 30 Spaces Size Pkg Rate 9.372 KSF 2.00 /KSF 3.029 KSF 3.33 /KSF 0.999 KSF 2.00 /KSF 1.600 KSF 2.50 /KSF Ibl Gross Spaces 19 Spe. 10 Spe. 2 Spe. 4 Spe. Timeof Da_v Number of Spaces Number of Spaces Number of Spaces Number of Spaces Surplus (Deficiency) 6:00 AM 0 0 0 0 0 30 7:00 AM 2 0 0 0 2 28 8:00AM 4 1 0 2 7 23 900 AM 8 1 0 4 13 17 1000 AM it 1 0 4 16 14 I1:00AM 14 1 0 2 17 13 12:00 PM 16 1 1 0 IS 12 1:00 PM 18 1 1 0 20 10 2:00 PM 19 1 1 0 21 9 3.00 PM 19 0 1 0 20 10 4:00 PM 18 0 1 0 19 11 5:00 PM 18 0 1 0 19 11 6:00 PM 15 0 2 0 17 13 7:00 PM 14 0 2 0 16 14 8:00PM 13 0 2 0 IS 15 900 PM 11 0 2 fl 13 17 1000 PM 1 0 2 0 9 21 1 1:00 PM 3 0 2 0 5 25 12:00 AM 0 0 1 0 1 29 Notes: [al Parking rates for all land uses based on ULI procedure normalized to express percentage in terms of absolute peak demand ratios. [b] Effective ratio is reported for the proposed Dojo. See Table 5 for the detailed peak parking demand estimation for the Dojo. TABLE 12 CITY CODE PARKING REQUIREMENTS Notes: [a] Source: City of Seal Beach Municipal Code Chapter 11.4.20.015.A.2 Required Parking — Main Street Specific Plan District. [b] Source: City of Seal Beach Municipal Code Chapter 11.4.20.015.A.1 Required Parking for "small -scale (20,000 SF or less) gyms and fitness studios ". [c] Common areas are presumed to be parked at the same rate as retaiVcommercial uses. City of Seal Beach Spaces Project Component Size Code Ratio Required Dessert Shop 999 SF 1 space per 500 SF [a] 2 Retail 2,915 SF I space per 500 SF [a] 6 Office, no customer services 5,593 SF 1 space per 500 SF [a] 1 I Dojo 1,600 SF I space per 300 SF [b] 5 Common Areas 3,893 SF 1 space per 500 SF [c] 8 TOTAL: 15,000 SF 32 Total Off - Street Parking Supply 30 Code -Based Parking Surplus or (Deficiency) (2) On- Street Parking along Project Frontage 7 (i.e., parking contingency to support nearby uses, including the project) Notes: [a] Source: City of Seal Beach Municipal Code Chapter 11.4.20.015.A.2 Required Parking — Main Street Specific Plan District. [b] Source: City of Seal Beach Municipal Code Chapter 11.4.20.015.A.1 Required Parking for "small -scale (20,000 SF or less) gyms and fitness studios ". [c] Common areas are presumed to be parked at the same rate as retaiVcommercial uses. ATTACHMENT 2 Site Plan and Floor Plan �'d n 3§ b.e�. ifs 8 ea I a'S y. i �• I m I a�V. yz I I I I I I III I I I j II I I I I I — 1 II� �I III I I E I ! I S I I I I I .4 •E 51� IItA 6 Z � E °� _ � 3� � a w w� ly�dE4'I T o z °5 a�qY °,�i? a -. 3 4 P¢Qd g AA Z U P'�a1Y54 @f %Q u Z3 an3 ¢ 0 3 i IY..- 99 i3 a.`is i ApSI5 4S Riffs d4 E d5p dE 31£515 * w ¢ a I ! g ¢ ( E 5E ! a ! ° #Y5 y e6 ieg3.; d3 z5Siy 9E 5 19 S39 Id I d: E 52£3 2 UQ¢ 2a ir°nmg am <� °9 S 9S ial ip�11 P[b k -M d15 ry ¢dav�P 5p3 35 '§ Id 3a13P11sf a �E ppp liei 1§ �f 3 � O I Ii 3 2 OJ 0� `r d 9g O 035 11 6 ¢j a d. �ii::?c9K 96 Ee63pv � M pr 9A2 a$$ iii .�- ssa �, E -I6i,z i L N azy e# es $F, a� l ,Il R 3 p [zl I _ Q c�:, N\, G Cam'' o U J m m T c6 J � ¢ h 0 m o m 0 > N< V1 d� a V p N d O d �? N < m U ILI L a J m N U) O L O N m N d u y W 0O< Cl)O VO II Cl t6N O o O- n0 a N�Om Um n nL L N N o 3¢ < T m LL <O o < a o w 00 ¢ n« U O U) ow 0 M W J ti < N ATTACHMENT 3 Martial Arts Dojo Business Plan d t® m o R o a KIDS JIU -JITSU I SEAL BEACH, CA 350 Main Street, Suite D, Seal Beach, CA 90740 Tel: (562) 761 -6876 1 Email: dojoleovieira @gmail.com To the Entire Seal Beach Community and Residents, Dojo By Leo Vieira, LLC wants to introduce the great martial art of jiu jitsu to the children of Old Town Seal Beach. It will be a huge benefit to the children of Old Town by promoting physical fitness, self esteem, self defense and a healthy lifestyle. There is no other type of business in Old Town that provides this type of positive impact. Our class schedule avoids generating traffic during peak hours. Classes will be scheduled from 2:00 p.m. - 3:00 p.m., 3:00 p.m. — 4:00 p.m., and 4:00 p.m. — 5:00 p.m. for younger children, and 7:00 p.m. — 8:00 p.m. for teens. In addition, parents of students will be encouraged to have their children walk or ride bicycles to class, with financial incentives and discounts for doing so, in order to enhance healthy lifestyles, and minimize negative environmental and traffic impacts. Those children who are unable to walk or ride bicycles to class will also have the option of transport to and from class in a van owned by Dojo By Leo Vieira, LLC that can carry up to fifteen students, which is the maximum number that can be enrolled in any of the j iu j itsu classes. Dojo By Leo Vieira, LLC will become part of and promote and preserve the fabric, culture, and small town charm and appeal of Old Town and Main Street. After all, it is precisely because of these qualities that its owners themselves live in and cherish this community. With Gratitude, Ar iris Teorgoults Frank Phung Leo Vieira ATTACHMENT 4 Traffic Impact Analysis, Revised September 14, 2016, Original Date April 30, 2016 TRAFFIC IMPACT ANALYSIS REPORT MAIN & PCH MIXED -USE CENTER PROJECT Seal Beach, California Revised September 14, 2016 (Original Date: April 30, 2013) Prepared for. MAIN & PCH, LLC C/O BAY CITY PARTNERS 627 BAYSIDE DRIVE NEWPORT BEACH, CA 92660 AND CITY OF SEAL BEACH 2118TH STREET SEAL BEACH, CALIFORNIA 90740 S. LLG Ref. 2.13.3368.1 14 Z�Z m No. 78943 z Exp3/31/18 7F CIVIL OF CAL Prepared by. Under the Supervision of Shane S. Green, P.E. Richard E. Barretto, P.E. Transportation Engineer III Principal i r No. 2006 O tLrscatr, Law & Greenspan, Engineers 2 Eaecuave Circle suite 250 Irvine, CA 92614 949.825:6175 e 4196b.617J r wo- Ilg engineers. cam TABLE OF CONTENTS SECTION PAGE Executive Summary vi 1.O Introduction .................................................................................................. ............................... 1 1.1 Study Area ................................................................................................. ............................... 2 2.0 Project Description 2.1 Site Access....... M 3 3.0 Existing Conditions ...................................................................................... ............................... 4 3.1 Existing Street System ............................................................................... ............................... 4 3.2 Existing Traffic Volumes ........................................................................... ............................... 5 3.3 Existing Intersection Conditions ................................................................ ............................... 5 3.3.1 Intersection Capacity Utilization (ICU) Method of Analysis ............ ............................... 5 3.3.2 Highway Capacity Manual (HCM) Method ofAnalysis (Unsignalized Intersections) .... 7 3.4 Existing Level of Service Results .............................................................. ............................... 7 4.0 Traffic Forecasting Methodology ............................................................. ............................... 10 5.0 Project Traffic Characteristics ................................................................. ............................... 11 5.1 Project Traffic Generation ....................................................................... ............................... 11 5.2 Project Traffic Distribution and Assignment ........................................... ............................... 15 5.3 Existing Plus Project Traffic Conditions ................................................. ............................... 15 6.0 Future Traffic Conditions ......................................................................... ............................... 16 6.1 Ambient Traffic Growth .......................................................................... ............................... 16 6.2 Cumulative Projects Description and Location ....................................... ............................... 16 6.3 Cumulative Projects Trip Generation and Assignment ........................... ............................... 16 6.4 Year 2016 Cumulative Traffic Volumes .................................................. ............................... 16 7.0 Traffic Impact Analysis Methodology ..................................................... ............................... 19 7.1 Impact Criteria and thresholds ................................................................. ............................... 19 7.2 Traffic Impact Analysis Scenarios ........................................................... ............................... 19 8.0 Peak Hour Intersection Capacity Analysis .............................................. ............................... 21 8.1 Existing Plus Project Analysis ................................................................. ............................... 21 8.1.1 Existing Plus Project Traffic Conditions ......................................... ............................... 21 8.2 Year 2016 Traffic Conditions .................................................................. ............................... 23 8.2.1 Year 2016 Cumulative Traffic Condit ions ....................................... ............................... 23 8.2.2 Year 2016 Cumulative Plus Project Traffic Condit ions .................. ............................... 23 LINSCou, LAw & GREENSPAN, engineers j LLG Ret 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N 03000133368- Mein &PCHMixed -Use Cancer, Seal OearLTea nU368 Man &Kit Mixed- Use Center TIA9- Ii16.doc TABLE OF CONTENTS SECTION PAGE 9.0 State of California (Caltrans) Methodology 25 9.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections) .............. 25 9.2 Existing Plus Project Traffic Conditions ................................................. ............................... 27 9.2.1 Existing Traffic Conditions .............................................................. ............................... 27 9.2.2 Existing Plus Project Traffic Condit ions ......................................... ............................... 27 9.3 Year 2016 Traffic Conditions .................................................................. ............................... 29 9.3.1 Year 2016 Cumulative Traffic Conditions ....................................... ............................... 29 9.3.2 Year 2016 Cumulative Plus Project Traffic Conditions .................. ............................... 29 10.0 Site Access and Internal Circulation Evaluation .................................... ............................... 31 10.1 Site Access Evaluation ......................................................................... ............................... 31 10.2 Internal Circulation Evaluation ............................................................ ............................... 31 11.0 City Code Parking Analysis ...................................................................... ............................... 32 11.1 Main Street Angled Parking Spaces .................................................... ............................... 32 12.0 Project Specific Improvements ................................................................... .............................35 13.0 Congestion Management Program (CMP) Compliance Assessment .... ............................... 36 LINSCOU, LAw 8 GREENSPAN, engineers N LLG Ret: 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N 1330012133368. M.. & PCH Mixeu -0se Co, ,Seal Be cbRepartW&8 Mvn & PCH.Mixe -Use Ccnmr r1A 9- 1i -16.d c APPENDICES APPENDIX A. Traffic Study Scope of Work B. Existing Traffic Count Data C. Intersection Level of Service Calculation D. Caltrans Intersection Level of Service Calculation Worksheets LINseoTT, Lnw & GREENSPAN, engineers III LLG Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Scal Reach N %3300v 133]08- Man&PCH Mixed- Use Cent, Seel 6eaehR_Wp 0368Mein &PCHMixed -HSe Ci,d,T1A e- I+16.doe LINSCOTT, LAw & GREENSPAN, engineers iv LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach A:'3300 @133368 - M.. & PCH Mlmd -Use Center, Seal Beach4tmon0368 Hain & PCH .Mixc -Gee Center TIA 214 -16. doc LIST OF FIGURES SECTION— FIGURE # FOLLOWING PAGE 1 -1 Vicinity Map .......................................................................................... ..............................2 2 -1 Existing Aerial Site Photograph ........................................................... ..............................3 2 -2 Proposed Site Plan — I I Floor Layout .................................................. ..............................3 2 -3 Proposed Site Plan -2nd Floor Layout ................................................. ..............................3 3 -1 Existing Roadway Conditions and Intersection Controls ................. ..............................5 3 -2 Existing AM Peak Hour Traffic Volumes ......................................... ..............................5 3 -3 Existing PM Peak Hour Traffic Volumes .......................................... ..............................5 5 -1 Prior Gas Station Distribution Pattern ............................................ ............................... 15 5 -2 Project Distribution Pattern ............................................................. ............................... 15 5 -3 AM Peak Hour Project Traffic Volumes ........................................ ............................... 15 5-4 PM Peak Hour Project Traffic Volumes ........................................ ............................... 15 5 -5 Existing Plus Project AM Peak Hour Traffic Volumes ................. ............................... 15 5-6 Existing Plus Project PM Peak Hour Traffic Volumes .................. ............................... 15 6-1 Location of Cumulative Projects ..................................................... ............................... 17 6-2 AM Peak Hour Cumulative Projects Traffic Volumes .................... ............................... 18 6-3 PM Peak Hour Cumulative Projects Traffic Volumes .................... ............................... 18 6-4 Year 2016 Cumulative AM Peak Hour Traffic Volumes ............. ............................... 18 6-5 Year 2016 Cumulative PM Peak Hour Traffic Volumes .............. ............................... 18 6-6 Year 2016 Cumulative Plus Project AM Peak Hour Traffic Volumes ...................... 18 6-7 Year 2016 Cumulative Plus Project PM Peak Hour Traffic Volumes ....................... 18 10 -1 Passenger Vehicle U -Tum Assessment.. ......................................................................... 31 10 -2 Passenger Vehicle Circulation Assessment ..................................... ............................... 31 11-1 Conceptual On- Street Parking Layout ............................................. ............................... 34 LINSCOTT, LAw & GREENSPAN, engineers iv LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach A:'3300 @133368 - M.. & PCH Mlmd -Use Center, Seal Beach4tmon0368 Hain & PCH .Mixc -Gee Center TIA 214 -16. doc LIST OF TABLES SECTION —TABLE # PAGE 3 -1 Level of Service Criteria for Signalized Intersections (ICU Methodology ) .....................6 3 -2 Level of Service Criteria for Unsignalized Intersections (HCM Methodology) ..............8 3 -3 Existing Peak Hour Levels of Service .................................................. ..............................9 5 -1 Project Traffic Generation Rates ...................................................... ............................... 12 5 -2 Project Traffic Generation Forecast ................................................. ............................... 13 5 -3 Project Alternative Traffic Generation Forecast .............................. ............................... 14 6-1 Location and Description of Related Projects .................................. ............................... 17 6-2 Related Projects Tragic Generation Forecast .................................. ............................... 18 7 -1 City of Seal Beach Intersection Impact Threshold Criteria ............. ............................... 20 8-1 Existing Plus Project Peak Hour Intersection Capacity Analysis ... ............................... 22 8-2 Year 2016 Cumulative Plus Project Peak Hour Intersection Capacity Analysis .......... 24 9-1 Level of Service Criteria for Signalized Intersections (HCM Methodology) ............... 26 9-2 Existing Plus Project Peak Hour Intersection Capacity Analysis — Caltrans ................ 28 9-3 Year 2016 Peak Hour Intersection Capacity Analysis — Caltnans ... ............................... 30 11 -1 City Code Parking Requirement (Retail Only) ................................ ............................... 33 11 -2 City Code Parking Requirement (Retail Plus Office) ...................... ............................... 34 LINSCO7, LAW & GREENSPAN, engineers v LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Reach Sa33004I W68 M..& PCH M.1ed- Use Center. Seal BeachU eponOW Main & PCH Mixesi Use CelltarTIA 9 -14-16 Joc EXECUTIVE SUMMARY MAIN & PCH MIXED -USE CENTER PROJECT Seal Beach, California Revised September 14, 2016 (Original Date: April 30, 2013) Study Background — The original traffic impact analysis report was previously completed on April 30, 2013. This report updates that study to address City comments. An Addendum (a separate letter report), dated September 13, 2016, has also been prepared to evaluate the trip generation and parking implications of a refined project description, which includes the addition ofjiujitsu studio (i.e., Dojo) to the Project. • Project Description and Location — The project site is a 0.40± acre rectangular shaped parcel of land located at 350 Main Street, on the southeast corner of Main Street and Pacific Coast Highway in the City of Seal Beach, California. The project site is currently vacant, however the subject property was previously developed with a Chevron service station that had eight (8) vehicle fueling positions and four (4) service bays. The proposed Project includes the development of a two story 15,000 square -foot (SF) building. Based on information provided by the project applicant, Main & PCH, LLC, the Project's mix of uses will include a 556 SF of coffee shop, 11,882 SF of retail use and 2,562 SF of office use or 14,444 SF of retail- oriented uses to include artist, photographer and sculptor studios. Parking for the Project will be provided via a 30 -space parking structure. The proposed Project is expected to be completed by Year 2016. Study Scope — The following six (6) key study intersections have been identified for evaluation under Existing Traffic Conditions, Existing Plus Project Traffic Conditions, Year 2016 Without and With Project Traffic Conditions: Key Study Intersections I . Pacific Coast Highway at I` Street 2. Main St/Bolsa Ave at Pacific Coast Highway 3. 12' Street/Balboa Drive at Pacific Coast Highway 4. Seal Beach Boulevard at Pacific Coast Highway 5. Main Street /Bolsa Avenue at Electric Avenue 6. Seal Beach Boulevard at Bolsa Avenue Existing Traffic Conditions — All six (6) key study intersections currently operate at LOS D or better during the AM and PM peak hours. Lwscorr, LAw & GREENSPAN, engineers vi LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N %3IDO¢G]i68 - Mwe &["I Mixed Else Center, Seal Beuh&ep9v0368 Mvn A, PCH Nixed -U­ Came, TIA 944 -16 ri • Project Trip Generation — On a typical weekday, the proposed Project is expected to generate 762 daily trips, with 43 trips (23 inbound, 20 outbound) produced in the AM peak hour and 48 trips (23 inbound, 25 outbound) produced in the PM peak hour. • Related Projects Trip Generation — Two (2) related projects were considered in the cumulative traffic setting. On a typical weekday, the two (2) related projects are expected to generate 823 daily trips, with 58 trips (21 inbound and 37 outbound) forecast during the AM peak hour and 75 trips (41 inbound and 34 outbound) forecast during the PM peak hour. Existing Plus Project Traffic Conditions — The results of the "Existing Plus Project' analysis indicates that the proposed Project will not significantly impact any of the six (6) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The six (6) key study intersections are forecast to operate at LOS D or better with the addition of Project generated traffic to existing traffic. Year 2016 Cumulative Plus Project Traffic Conditions — The results of the "Year 2016 Cumulative Plus Project' analysis indicates that the proposed Project will not significantly impact any of the six (6) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The six (6) key study intersections are forecast to continue to operate at LOS D or better with the addition of project generated traffic in the Year 2016. State of California (Caltrans) Methodology — The results of the "Existing Plus Project', "Year 2016 Cumulative Plus Project' traffic analyses using the State of California (Caltrans) Methodology indicates that traffic associated with the proposed Project will not significantly impact any of the six (6) key study intersections. Site Access and Internal Circulation Evaluation — Access to the site is provided via an existing alley way which has right -turn in /out only access along Pacific Coast Highway and also connects to another alley way which is a one -way (eastbound only) alley that has access to Main Street and 10`h Street. The on -site circulation layout of the proposed Project is expected to be adequate on an overall basis. It should be noted that U -turns are currently restricted along Pacific Coast Highway. However, if U -turns were permitted this would allow for a more direct route to the site. Project Specific Improvements — The following improvements are recommended in conjunction with development of the proposed Project to enhance site access /circulation and provide additional parking along Main Street for the general public, inclusive of customers of the proposed mixed -use building. ❑ Main Street /Bolsa Avenue at Pacific Coast Highway: Subject to the review and approval of Caltrans and /or the City of Seal Beach, modify existing traffic signal accordingly to allow U -turn movements from the westbound left-turn lane on Pacific LINscoT , LAW $ GREENSPAN, engineers VII LLG Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach Vila Wi3133368 - Main & PCH Mixed Use C-d erSeel PeachUtepone3368 Main & PCH Mixed Use CenterTiA 9 -ir-16 doe Coast Highway. The removal of the current U -turn restriction will require the replacement of a mast arm mount sign and installation of a minimum of 25 feet of red curb on Pacific Coast Highway. Additionally, restripe northbound Main Street and provide additional angled on- street parking spaces via the removal of the existing northbound right -turn lane on Main Street at Pacific Coast Highway. Up to 12 additional angled spaces on- street can be provided by this recommended enhancement, of which 7 are located along Project frontage and 5 are located along the Bay Theatre frontage. City Code Parking Analysis — Direct application of the City's code to the proposed Project results in a total parking requirement of 30 spaces. When compared against the proposed off - street parking supply of 30 spaces, the Project satisfies the City's parking requirements. CMP Assessment — The proposed Project does not meet the criteria required for a CMP traffic analysis. Therefore, it is concluded that the proposed Project will not have any significant traffic impacts on the Congestion Management Program Highway System of Orange County. UNxoTr, LAw & GREENSPAN, engineers VIII LLG Ref 2 -13 -3368 Main & PCI I Mixed -Use Center Project, Seal Beach 5- 133 00421333 68 - Mein & PCH Mixed- Ore Center. Seal eeadtateporr 968 Muir & K14 MixW Use Center TLA 9 -I+ -16 doc TRAFFIC IMPACT ANALYSIS REPORT MAIN & PCH MIXED -USE CENTER PROJECT Seal Beach, California Revised September 14, 2016 (Original Date: April 30, 2013) 1.0 INTRODUCTION The original traffic impact analysis report was previously completed on April 30, 2013. This report updates that study to address City comments. An Addendum (a separate letter report), dated September 13, 2016, has also been prepared to evaluate the trip generation and parking implications of a refined project description, which includes the addition of jiu jitsu studio (i.e., Dojo) to the Project. This traffic impact analysis addresses the potential traffic impacts and circulation needs associated with the proposed Main & PCH Mixed -Use Center Project (hereinafter referred to as Project) in the City of Seal Beach, California. The proposed Project includes the development of a new mixed -use center consisting of a two- story 15,000 square -foot (SF) building with a 30 -space parking garage on a 0.40+ acre rectangular shaped parcel of land that was formerly occupied by a gasoline service station. This report documents the findings and recommendations of a traffic impact analysis conducted by Linscott, Law & Greenspan, Engineers (LLG) to determine the potential impacts associated with the proposed Project. The traffic analysis evaluates the existing operating conditions at six (6) key study intersections within the project vicinity, estimates the trip generation potential of the Project, and forecasts future operating conditions without and with the proposed Project. Where necessary, intersection improvements /mitigation measures are identified. This traffic report satisfies the City of Seal Beach Traffic Impact Study Guidelines, dated March 2010 and is consistent with the requirements and procedures outlined in the most current Congestion Management Program (CMP) for Orange County. The Scope of Work for this traffic study, which is included in Appendix A, was developed in conjunction with City of Seal Beach Public Works Department staff. The project site has been visited and an inventory of adjacent area roadways and intersections was performed. Existing peak hour traffic information has been collected at six (6) key study intersections for use in the preparation of level of service calculations. Information concerning cumulative projects (planned and /or approved) in the vicinity of the project has been researched at the City of Seal Beach and City of Long Beach. Based on our research, there are two (2) related projects located in the City of Seal Beach and no related project located in the City of Long Beach within close proximity to the site. The two (2) related projects were considered in the cumulative traffic analysis for this project. LlNscoTr, Lnw & GREENSPAN, engineers 1 LLG Ref. 2 -13 -3368 Main & PCI I Mixed -Use Center Project, Seal Beach .[:\3300\2133366 - Man & PCH Mixed Use Cemer, Seal OeachUtepor W69 Man & ICH Mixed Use Cement\ 9 -H -16. dos This traffic report analyzes existing and future weekday daily, AM peak hour and PM peak hour traffic conditions for a near -term (Year 2016) traffic setting upon completion of the proposed Project. Peak hour traffic forecasts for the near -term horizon years have been projected by increasing existing traffic volumes by an annual growth rate of one percent (1.0 %) per year and adding traffic volumes generated by two related projects. 1.1 Study Area The six (6) key study intersections selected for evaluation in this report provide both regional and local access to the study area. They consist of the following: Key Study Intersections I. Pacific Coast Highway at I" Street 2. Main St/Bolsa Ave at Pacific Coast Highway 3. 12`h Street/Balboa Drive at Pacific Coast Highway 4. Seal Beach Boulevard at Pacific Coast Highway 5. Main Street / Bolsa Avenue at Electric Avenue 6. Seal Beach Boulevard at Bolsa Avenue Figure 1 -1 presents a Vicinity Map, which illustrates the general location of the Project and depicts the study locations and surrounding street system. The Volume- Capacity (V /C) and Level of Service (LOS) investigations at these key locations were used to evaluate the potential traffic- related impacts associated with area growth, cumulative projects and the proposed Project. When necessary, this report recommends intersection improvements that may be required to accommodate future traffic volumes and restore /maintain an acceptable Level of Service, and/or mitigates the impact of the project. Included in this Traffic Impact Analysis are: • Existing traffic counts, Estimated project traffic generation /distribution /assignment, Estimated cumulative project traffic generation /distribution /assignment, AM and PM peak hour capacity analyses for existing conditions, AM and PM peak hour capacity analyses for existing plus project conditions, AM and PM peak hour capacity analyses for future near -term (Year 2016) traffic conditions without and with the proposed Project, Caltrans Evaluation, • Recommended Improvements, Site Access Evaluation, and Parking Evaluation. LINscou, Lnw & GREENSPAN, engineers 2 LLG Ref. 2 -13 -3368 Main & PCFI Mixed -Use Center Project, Seal Beach .N \33 W 13U336B -,Main & PCH..Mixed -Use Conte, Seal BeachIR,onV369 Main & PCH Nixed -Um Cemee TIA 9.Io -16 doc ® - STUDY INTERSECTION FIGURE 1-1 ° PROJECT SITE NO SCALE VICINITY MAP MAIN & PCH MIXED-USE CENTER, SEAL BEACH 2.0 PROJECT DESCRIPTION The project site is located at 350 Main Street which is on the southeast corner of Main Street and Pacific Coast Highway in the City of Seal Beach, California. The project site is currently vacant, however the subject property was previously developed with a Chevron service station that had eight (8) vehicle fueling positions and four (4) service bays. Figure 2 -1 presents an aerial depiction of the existing Project site as developed with the former gas station. Figures 2 -2 and 2 -3 present the proposed first floor and second floor layouts /site plan for the proposed Project, respectively, as conceptually approved by the City of Seal Beach in December 2012. Review of the proposed site plan indicates the proposed Project includes the development of two, two -story buildings with a total floor area of 15,000 square -feet (SF). Based on information provided by the project applicant, Main & PCH, LLC, the Project's potential mix of uses will include a 556 SF of coffee shop and 14,444 SF of retail /commercial uses consisting of 11,882 SF of retail use and /or 2,562 SF of office uses to include artist, photographer and sculptor studios. Parking for the Project will be provided via a 30 -space parking structure. The proposed Project is expected to be constructed and occupied in a couple of phases by the Year 2016. 2.1 Site Access Access to the subject property was previously provided by two sets of driveways located on Main Street and Pacific Coast Highway. As a part of the site development, the existing driveways will be closed and replaced with continuous sidewalk along the site frontage to enhance pedestrian connectivity. Vehicular access to the Project's parking garage will be provided via an existing north - south alley way on Pacific Coast Highway that borders the property on the east and another alley way which is a one -way (eastbound only) alley that connects to Main Street and I Otl' Street. UNscor , lAw & GREENSPAN, engineers 3 LLG Rcf. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach S\3 Wc133368 -Man & PCH Mixed Use Center, Seal 9eaxhlRcpo W68 Majil & ICH Ml,e Use Center 11A 9 -14-16 doe SOURCE: BING _ KEY FIGURE 2 -1 'T E: ] = PROJECT SITE 1, NO SCALE EXISTING AERIAL SITE PHOTOGRAPH MAIN & PCH MIXED -USE CENTER, SEAL BEACH Alley 19 7 7.7 & vi Main Street SOURCE MAIN AND PCH _LC Q). SCALE FIGURE 2-2 PROPOSED SITE PLAN- 1ST FLOOR LAYOUT MAIN & PCH MIXED—USE CENTER, SEAL BEACH Alley Ot -r-T 7—fal -'T ZZ. fff Main 51reet SOURCE MAIN AND PCH _LC Q). SCALE FIGURE 2-3 PROPOSED SITE PLAN- 2ND FLOOR LAYOUT MAIN & PCH MIXED—USE CENTER, SEAL BEACH 3.0 EXISTING CONDITIONS 3.1 Existing Street System The principal local network of streets serving the proposed Project includes Pacific Coast Highway, I't Street, Main Street, and Seal Beach Boulevard. The following discussion provides a brief synopsis of these key area streets. The descriptions are based on an inventory of existing roadway conditions. Pacific Coast Highway is a four -lane, divided roadway generally oriented in the east -west direction. Pacific Coast Highway borders the project site to the North. Pacific Coast Highway will provide access to the site via one right -turn in /right -turn out only at the alley way. On- street parking is not permitted along this roadway in the vicinity of the project, except along the south side of the street east of Main Street/Bolsa Avenue. The posted speed limit on Pacific Coast Highway is 40 miles per hour (mph). Traffic signals control the study intersections of Pacific Coast Highway at I" Street, Main Street/Bolsa Avenue, 12th Street/Balboa Drive, and Seal Beach Boulevard. Pacific Coast Highway is classified as a Primary Arterial (100 -foot right -of -way) in the City of Seal Beach Circulation Element. Is` Street is a four -lane, divided roadway oriented in the north -south direction. On- street parking is permitted on Ist Street in the vicinity of the project. The posted speed limit on Ist Street is 40 mph. I" Street is classified as a Primary Arterial (100 -foot right -of -way) north of Marina Drive and a Secondary Arterial (80 -foot right -of -way) south of Marina Drive in the City of Seal Beach Circulation Element. Main StreetBolsa Avenue is generally a two -lane roadway that borders the project site to the west. Bolsa Avenue is to the north of Pacific Coast Highway while Main Street is to the south of Pacific Coast Highway. On- street parking is permitted on Main Street south of Pacific Coast Highway. However, on- street parking is not permitted on Bolsa Avenue north of Pacific Coast Highway. The posted speed limit on Main Street is 25 mph south of Pacific Coast Highway while Bolsa Avenue has a posted speed limit of 30 mph north of Pacific Coast Highway. A traffic signal controls the study intersections of Bolsa Avenue at Seal Beach Boulevard, while an all -way stop controls the study intersection of Main Street at Electric Avenue. Main Street/Bolsa Avenue is classified as a Secondary Arterial (80 -foot right -of -way) in the City of Seal Beach Circulation Element. Seal Beach Boulevard is a two -lane roadway south of Pacific Coast Highway and a four -lane roadway north of Pacific Coast Highway. On- street parking is permitted on Seal Beach Boulevard south of Pacific Coast Highway. However, on- street parking is not permitted on Seal Beach Boulevard north of Pacific Coast Highway. The posted speed limit on Seal Beach Boulevard is 35 mph south of Pacific Coast Highway while Seal Beach Boulevard has a posted speed limit of 50 mph north of Pacific Coast Highway. Seal Beach Boulevard is classified as a Major (120 -foot right - of -way) north of Pacific Coast Highway and a Primary Arterial (100 -foot right -of -way) south of Pacific Coast Highway in the City of Seal Beach Circulation Element. LINS=, LAw $ GREENSPAN, ongineers 4 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach 503 3000 133 368 Main & PCH Miz d -Ilse Cent , Seal oeachlRepon0368 Man & PCH Mlcea -Use Centu I'IA o -In -16 doc Figure 3 -1 presents an inventory of the existing roadway conditions for the arterials and intersections evaluated in this report. This figure identifies the number of travel lanes for key arterials, as well as intersection configurations and controls for the key area study intersections 3.2 Existing Traffic Volumes Six (6) key study intersections have been identified as the locations at which to evaluate existing and future traffic operating conditions. Some portion of potential project- related traffic will pass through each of these intersections, and their analysis will reveal the expected relative impacts of the project. These key locations were selected for evaluation based on discussions with City of Seal Beach staff and in consideration of the City's traffic study guidelines. Existing AM peak hour and PM peak hour traffic volumes for the six (6) key study intersections were obtained from traffic counts conducted by Transportation Studies Inc. in March and April of 2013. Figures 3 -2 and 3 -3 illustrate the existing AM and PM peak hour traffic volumes at the six (6) key study intersections evaluated in this report, respectively. Appendix B contains the peak period count sheets for the locations evaluated in this report. 3.3 Existing Intersection Conditions Existing AM and PM peak hour operating conditions for the six (6) key study intersections were evaluated using the Intersection Capacity Utilization (ICU) methodology for signalized intersections and the methodology outlined in Chapter 17 of the Highway Capacity Manual 2000 (HCM2000) for unsignalized intersections. 3.3.1 Intersection Capacity Utilization (ICU) Method of Analysis In conformance with City of Seal Beach requirements, existing AM and PM peak hour operating conditions for the key signalized study intersections were evaluated using the Intersection Capacity Utilization (ICU) method. The ICU technique is intended for signalized intersection analysis and estimates the volume to capacity (V /C) relationship for an intersection based on the individual V/C ratios for key conflicting traffic movements. The ICU numerical value represents the percent signal (green) time, and thus capacity, required by existing and /or future traffic. It should be noted that the ICU methodology assumes uniform traffic distribution per intersection approach lane and optimal signal timing. Per City of Seal Beach requirements, the ICU calculations use a lane capacity of 1,600 vehicles per hour (vph) for left -turn lanes and shared lanes, and a through lane and right -turn lane capacity of 1,700 vph. Per City of Seal Beach requirements, a clearance adjustment factor of 0.10 was added to each Level of Service calculation. The ICU value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. The ICU value is the sum of the critical volume to capacity ratios at an intersection; it is not intended to be indicative of the LOS of each of the individual turning movements. The six qualitative categories of Level of Service have been defined along with the corresponding ICU value range and are shown in Table 3 -1. LINscou, LAw & GREENSPAN, engineers rj LI.G Net 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N 13 30O 133368- Mein &PCHMixed -Uce Center, Srz BexehlReport0368 Mein &PCHNixed -U,e Center i IA a- 1a -16doe = APPROACH LANE ASSIGNMENT • = TRAFFIC SIGNAL.+ = STOP SIGN P = PARKING. NP = NO PARKING N NO SCALE U = UNDIVIDED. D = DIMDED 2 = NUMBER OF TRAVEL LANES (XX)- POSTED SPEED LIMIT (MPH) [:_�] = PROJECT SITE FIGURE 3 -1 EXISTING ROADWAY CONDITIONS AND INTERSECTION CONTROLS MAIN & RICH MIXED -USE CENTER, SEAL BEACH } S �Ir - \ z110 I \ °h /,7 I o��^Sz I BOLSA AVE / 9 e e Ll ~ C Y �P lJ�9�( ryJTJ x Ps R KEY N FIGURE 3 -2 N O SCALE PROJECT SITE EXISTING AM PEAK HOUR TRAFFIC VOLUMES lz m MAIN & PCH MIXED -USE CENTER, SEAL BEACH S � " � S m % ( I l \ sti% 1 � J L 23 BOLSA / AVE 146 2 291 „' a �y L C e O 2 ! zs 1P JS�9J\ �J )51� X h P r KEY FIGURE 3 -3 L:= N NO SCALE PROJECT SITE EXISTING PM PEAK HOUR TRAFFIC VOLUMES MAIN & PCH MIXED —USE CENTER, SEAL BEACH TABLE 3.1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS (ICU METHODOLOGY) Level of Service (LOS) Intersection Capacity Utilization Value (V /C) Level of Service Description EXCELLENT. No vehicle waits longer A 0.00-0.60 than one red light, and no approach phase is fully used. VERY GOOD. An occasional approach B 0.61 —0.70 phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. GOOD. Occasionally drivers may have to C 0.71 —0.80 wait through more than one red light; backups may develop behind turning vehicles. FAIR. Delays may be substantial during portions of the rush hours, but enough D 0.81-0.90 lower volume periods occur to permit clearing of developing lines, preventing excessive backups. POOR. Represents the most vehicles E 0.91 —1.00 intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. FAILURE. Backups from nearby locations or on cross streets may restrict or prevent F > 101 movement of vehicles out of the intersection approaches. Potentially very long delays with continuously increasing queue lengths. LINSCOTr, LAw & GREENSPAN, engineers 6 LLG Re(. 2 -I3 -3368 Main & PCH Mixed -Use Center Project, Seal Beach 9'.G3 Wt2133368 - Mvn & Kit Mi.ed Use Center. Seal neadOHexrsoi 68 Man & ICII Mixon Use Center I [A 9 -14 16 dac 3.3.2 Highway Capacity Manual (HCM) Method of Analysis ( Unsignalized Intersections) The 2000 HCM unsignalized methodology for stop - controlled intersections was utilized for the analysis of the unsignalized intersections. This methodology estimates the average control delay for each of the subject movements and determines the level of service for each movement. For all -way stop controlled intersections, the overall average control delay is measured in seconds per vehicle, and level of service is then calculated for the entire intersection. For one -way and two -way stop - controlled (minor street stop - controlled) intersections, this methodology estimates the worst side street delay, measured in seconds per vehicle and determines the level of service for that approach. The HCM control delay value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. The six qualitative categories of Level of Service have been defined along with the corresponding HCM control delay value range, as shown in Table 3 -1. 3.4 Existing Level of Service Results Table 3 -3 summarizes the existing peak hour service level calculations for the six (6) key study intersections based on existing traffic volumes and current street geometry. Review of Table 3 -3 indicates that all six (6) key study intersections currently operate at LOS D or better during the AM and PM peak hours. Appendix C contains the ICU /LOS and FICM /LOS calculation worksheets for the six (6) key study intersections for the AM peak hour and PM peak hour. LINS=, Low 8 GREENSPAN, engineers 7 LLG Ref. 2 -13 -3368 Main 8 PCH Mixed -Use Center Project, Seal Beach N.U300L 1333Ge - Man g VCII Nixvd ISe Cemcq Sevl eeach�Ne0onB36H Mwn & 1'CI{ Niced USe Ccnmr TlA 0 -1a -16 doc TABLE 3 -2 LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS (HCM METHODOLOGY)[ Level of Service (LOS) Highway Capacity Manual Delay Value (see/veh) Level of Service Description A < 10.0 Little or no delay B > 10.0 and < 15.0 Short traffic delays C > 15.0 and <25.0 Average traffic delays D > 25.0 and < 35.0 Long traffic delays E > 35.0 and <_ 50.0 Very long traffic delays F > 50.0 Severe congestion I Source: Higimav Capacity Manual 2000, Chapter 17 (Unsignahzed Intersections). LINSCOTT, Low & GREENSPAN, engineers 8 LLG Ret: 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach S.U300HI+J36tl -Mwn &PCH Mixed -Use Cere, Seal Ik h�Re,,MU368 Nlvn &PCH Mired- Use('enter I 1 4.1�16d TABLE 3 -3 EXISTING PEAK HOUR LEVELS OF SERVICE L1NScoT r LAw & GREENSPAN, engineers 9 LLG Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach st 1330P? 133368. Mvn & PCH Mixed Use Center Seal Bvch1Repon0368 .Main & PCH Mixed -Use Center TIA 9.1446 doe (1) Existing Time Control Traffic Conditions ICU /HCM I LOS Key Intersection Jurisdiction Period Type Pacific Coast Highway at I. City of Seal Beach/ AM 60 Traffic 0.668 B 1st Street Caltrans PM Signal 0.807 D Main SUBolsa Ave at City of Seal Beach/ AM 50 Traffic 0.663 B 2. Pacific Coast Highway Caltrans PM Signal 0.782 C 12th St/Balboa Dr at City of Seal Beach/ AM 50 Traffic 0.703 C 3. Pacific Coast Highway Caltrans PM Signal 0.799 C Seal Beach Boulevard at City or Seal Beach/ AM 60 Traffic 0.765 C 4. Pacific Coast Highway Caltrans PM Signal 0.824 D Main Street at City of AM All -Way 8.1 s/v A 5. Electric Avenue Seal Beach PM Stop 8.8 s/v A Seal Beach Boulevard at City of AM 60'fralfe 0.434 A 6. Bolsa Avenue Seal Beach PM Signal 0.427 A L1NScoT r LAw & GREENSPAN, engineers 9 LLG Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach st 1330P? 133368. Mvn & PCH Mixed Use Center Seal Bvch1Repon0368 .Main & PCH Mixed -Use Center TIA 9.1446 doe 4.0 TRAFFIC FORECASTING METHODOLOGY In order to estimate the traffic impact characteristics of the Project, a multi -step process has been utilized. The first step is trip generation, which estimates the total arriving and departing traffic on a peak hour and daily basis. The traffic generation potential is forecast by applying the appropriate vehicle trip generation equations or rates to the project development tabulation. The second step of the forecasting process is trip distribution, which identifies the origins and destinations of inbound and outbound project traffic. These origins and destinations are typically based on demographics and existing/anticipated travel pattems in the study area. The third step is traffic assignment, which involves the allocation of project traffic to study area streets and intersections. Traffic assignment is typically based on minimization of travel time, which may or may not involve the shortest route, depending on prevailing operating conditions and travel speeds. Traffic distribution patterns are indicated by general percentage orientation, while traffic assignment allocates specific volume forecasts to individual roadway links and intersection turning movements throughout the study area. With the forecasting process complete and project traffic assignments developed, the impact of the proposed project is isolated by comparing operational (LOS) conditions at selected key intersections using expected future traffic volumes with and without forecast project traffic. The need for site - specific and /or cumulative local area traffic improvements can then be evaluated and the significance of the project's impacts identified. LINScou. Lnw 8 GREENSPAN, engineers 10 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach 5i33W2133368 - Mien & PCH Axed Use Center. Seal 9eacM1Ne,on0368 Maw & PCH Mixed -Use Center 'OA 9 -1x.16 do, 5.0 PROJECT TRAFFIC CHARACTERISTICS 5.1 Project Traffic Generation The trip generation potential of the proposed Project has been estimated using trip rates /equations for ITE Land Use: 710 General Office, ITE Land Use 820: Shopping Center and /or ITE Land Use: 936 Coffee Shop without Drive - Through as contained in the 9" Edition of the Trip Generation, published by the Institute of Transportation Engineers (ITE), [Washington, D.C., 2012]. Given the prior use recently closed, a comparison to the previous land use's trip generation potential has been estimated using the average trips rates for ITE 944: Gasoline /Service Station. Table 5 -1 presents the ITE rates used in forecasting the vehicular trips. Table 5 -2 summarizes the trip generation potential for the Previous Land Use and the proposed Project. As shown in the upper half of Table 5 -2, the trip generation potential of a gasoline service station with 8 vehicle fueling positions totals 782 daily trips, with 41 trips (21 inbound, 20 outbound) during the AM peak hour and 64 trips (32 inbound, 32 outbound) during the PM peak hour. A review of lower portion of Table 5 -2 shows the trip generation forecast for the Project. As shown, the proposed Project, assuming a mix of retail /coffee house uses (no office), is forecast to generate 762 daily trips, with 43 trips (23 inbound, 20 outbound) produced in the AM peak hour and 48 trips (23 inbound, 25 outbound) produced in the PM peak hour. Comparison of the trips generated by the proposed Project to the trips generated by the Previous Land Use shows that the proposed Project overall generates less traffic than the prior gas station use, with 20 fewer daily trips, 2 more AM peak hour trips and 17 fewer PM peak hour trips. As described in Section 2.0, the Project's mix of uses may include a 556 SF of coffee shop and 14,444 SF of retail /commercial uses consisting of 11,882 SF of retail use and 2,562 SF of office use. It should be noted that this alternative option, as presented in Table 5 -3, which replaces a portion of the retail use with office use would be expected to generate I more AM trip and 3 fewer PM peak hour trips than the retail /coffee house tenant mix. Therefore, for the purpose of this analysis both options are considered as interchangeable and would yield similar results. LINscou, LAW 8 GREENSPAN, en9lneeB 1.1.40 Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N 13301 - Slain R PCH Mixed Use Cenwr. Seal eeaehlRepoT3368 Wain & ICH Mixed Use Cener [ IA a -14.16 doe TABLE 5 -1 PROJECT TRAFFIC GENERATION RATES' ITE Land Use Code Daily 2 -Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total • ITE 710: General Office 11.03 1.37 0.19 1.56 0.25 1.24 1.49 (TE /1,000 SF) • ITE 820: Shopping Center 42.70 0.60 0.36 0.96 1.78 1.93 3.71 (TE /1,000 SF) • ITE 936: Coffee Shop without Drive - Through 745.653 55.27 53.11 108.38 20.37 20.38 40.75 (TE/1,000 SF) • ITE 944: Gasoline /Service Station 168.56 6.20 5.96 12.16 6.94 6.93 13.87 (TE /Fueling Position) Notes: TE 11,000 SF = Trip ends per 1,000 square feet of development ' Source: Trip Generation Manual.0 Edition. Institute of °fmnsportation Engineers (ITE). Washington. D.C. (2012). 3 No data is provided for Daily rates. "therefore. the Daily rate was assumed to be equal to the average between the AM and PM peak hour multiplied by a factor of 10. LINSCOTT, LAw 8 GREENSPAN, engineers 12 LLG Ref 2 -13 -3368 Plain & PCI I Mixed -Use Center Project, Seal Beach S:U3WQ 133368 - Man & PCH Mixed Use Cenien Seal BesehlNeponU368 Man & PCH Mixed Use Center TIA 1t.14 16 doc TABLE 5.2 PROJECT TRAFFIC GENERATION FORECAST Pass -by trips are trips made as intermediate stops on the way from an origin to a primary trip destination. Pass -by trips are attracted from traffic passing the site on adjacent streets (i.e. Pacific Coast Highway and Main Street). The Trip Generation Manual. 0 Edition. Institute of Transportation Engineers (ITE), Washington. D.C. (2012), Volume /: User's Guide and Handbook recommends a pass -by reduction factor of 58:6 for the AM peak hour and 42% for the PM peak hour. The Daily pass - by percentage was estimated to be 42 %. Per ITE Handbook, the Daily pass -by reduction for a Coffee /Espresso Stand with drive - through window service is 89 %. To provide a conservative estimate, a pass -by reduction factor of 50% was used for the Project on a Daily and AM and 1'M peak hour basis. Per ITE Handbook the PM peak hour pass -by reduction factor of 34% was used. The Daily and AM peak hour pass -by percentage was estimated to be 10 %. LINSCon, LAW 8 GREENSPAN, engineers 13 LLG Ref. 2 -13 -3368 Main & PCI I Mixed -Use Center Project, Seal Beach N: \33001 133368 - M.n & PCH .Mined -Cse Ce.a. Seal Beach \Repo 0369 Alin te PC'H Mixed Use Ce Ier'I'IA 9 -I+ -16 doe Daily AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Project Description 2 -Way Previous (Existing) Land Use Development 1,348 49 48 97 56 55 111 • Chevron Gas - Station (8 fueling positions) Pass -By Reduction -566 -28 -28 -56 -24 -23 -47 Previous Land Use " Net " Trip Generation 782 21 20 41 32 32 64 Proposed Project • Coffee Shop (556 SF) 415 31 29 60 12 11 23 Pass -By Reductions -208 -16 -14 -30 -6 -5 -II Subtotal 207 15 15 30 6 6 12 • Retail (14,444 SF) 617 9 5 14 26 28 54 Pass -By Reduction -62 -1 0 -1 -9 -9 -18 Subtotal 555 8 5 13 17 19 36 Proposed Project "Net" Trip Generation 762 23 20 43 23 15 48 Ne[ Difference Trip Generation Forecast -20 2 0 2 -9 Proposed Project vs. Previous Land Use Pass -by trips are trips made as intermediate stops on the way from an origin to a primary trip destination. Pass -by trips are attracted from traffic passing the site on adjacent streets (i.e. Pacific Coast Highway and Main Street). The Trip Generation Manual. 0 Edition. Institute of Transportation Engineers (ITE), Washington. D.C. (2012), Volume /: User's Guide and Handbook recommends a pass -by reduction factor of 58:6 for the AM peak hour and 42% for the PM peak hour. The Daily pass - by percentage was estimated to be 42 %. Per ITE Handbook, the Daily pass -by reduction for a Coffee /Espresso Stand with drive - through window service is 89 %. To provide a conservative estimate, a pass -by reduction factor of 50% was used for the Project on a Daily and AM and 1'M peak hour basis. Per ITE Handbook the PM peak hour pass -by reduction factor of 34% was used. The Daily and AM peak hour pass -by percentage was estimated to be 10 %. LINSCon, LAW 8 GREENSPAN, engineers 13 LLG Ref. 2 -13 -3368 Main & PCI I Mixed -Use Center Project, Seal Beach N: \33001 133368 - M.n & PCH .Mined -Cse Ce.a. Seal Beach \Repo 0369 Alin te PC'H Mixed Use Ce Ier'I'IA 9 -I+ -16 doe TABLE 5 -3 PROJECT ALTERNATIVE TRAFFIC GENERATION FORECAST Pass -by trips are trips made as intermediate stops on the way from an origin to a primary trip destination. Pass -by trips are attracted from traffic passing the site on adjacent streets (i.e. Pacific Coast Ilighway and Main Street). The Trip Generation Manual. 9ih Edition. Institute of Transportation Engineers (ITE). Washington. D.C. (2012). Volume 1: User's Guide ana Handbook recommends a pass -by reduction factor of 58% for the AM peak hour and 42% for the PM peak hour. The Daily pass. by percentage was estimated to be 42 %. Per ITE Handbook. the Daily pass -by reduction for a Coffee /Espresso Stand with drive - through window service is 89 %. to provide a conservative estimate, a pass -by, reduction factor of 50% was used for the Project on a Daily and AM and PM peak hour basis. Per ITE Handbook the PM peak hour pass -by reduction factor of 34% was used. the Daily and AM peak hour pass -by percentage was estimated to be 10 %. LINSCOTr, LAW 8 GREENSPAN, engineers 14 LLCM Ref, 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N U3 WQ 133368 - Mvn & KH Minh Um Cemer. Seal aeadRteponOu g %1vn & IKH.Mixe -Use Center "I IA 9 -14.16 aoc Daily AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Project Description 2 -Way Previous (F_xistinr) Land Use Development 1,348 49 48 97 56 55 111 • Chevron Gas- Station (8 fueling positions) Pass -By Reduction' -566 -28 -28 -56 -24 -23 -47 Previous Land Use "Net " Trip Generation 782 21 20 41 32 32 64 Proposed Project • Coffee Shop (556 SF) 415 31 29 60 12 11 23 Pass -By Reduction' -208 -16 -14 -30 -6 -5 -11 Subtotal 207 15 15 30 6 6 12 • Retail (11,882 SF) 507 7 4 11 21 23 44 Pass -By Reduction -51 -1 0 -1 -7 -8 -15 Subtotal 456 6 4 10 14 15 29 • Office (2,562 SF) 28 4 0 4 1 3 4 Proposed Project "A'ei " Trip Generation 691 j 25 j 19 j dd j 21 j 24 45 Net Difference Trip Generation Forecast -91 4 -1 3 -Il -9 -20 Proposed Project vs. Previous Land Use Pass -by trips are trips made as intermediate stops on the way from an origin to a primary trip destination. Pass -by trips are attracted from traffic passing the site on adjacent streets (i.e. Pacific Coast Ilighway and Main Street). The Trip Generation Manual. 9ih Edition. Institute of Transportation Engineers (ITE). Washington. D.C. (2012). Volume 1: User's Guide ana Handbook recommends a pass -by reduction factor of 58% for the AM peak hour and 42% for the PM peak hour. The Daily pass. by percentage was estimated to be 42 %. Per ITE Handbook. the Daily pass -by reduction for a Coffee /Espresso Stand with drive - through window service is 89 %. to provide a conservative estimate, a pass -by, reduction factor of 50% was used for the Project on a Daily and AM and PM peak hour basis. Per ITE Handbook the PM peak hour pass -by reduction factor of 34% was used. the Daily and AM peak hour pass -by percentage was estimated to be 10 %. LINSCOTr, LAW 8 GREENSPAN, engineers 14 LLCM Ref, 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N U3 WQ 133368 - Mvn & KH Minh Um Cemer. Seal aeadRteponOu g %1vn & IKH.Mixe -Use Center "I IA 9 -14.16 aoc 5.2 Project Traffic Distribution and Assignment Figure 5 -1 and 5 -2 presents the traffic distribution patterns for the prior gas station and proposed Project, respectively. Project traffic volumes both entering and exiting the site have been distributed and assigned to the adjacent street system based on the following considerations: the site's proximity to major traffic carriers (i.e. Pacific Coast Highway, Main Street, etc.), expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals, • existing intersection traffic volumes, and • ingress /egress availability at the site and location of parking garage access. The anticipated AM and PM peak hour traffic volumes associated with the proposed Project are presented in Figures 5 -3 and 5 -4, respectively. The traffic volume assignments presented in Figures 5 -3 and 5 -4 reflect the traffic distribution characteristics shown in Figure 5 -2 and the traffic generation forecast presented in Table 5 -2. 5.3 Existing Plus Project Traffic Conditions The existing plus project traffic conditions have been generated based upon existing conditions and the estimated project traffic. These forecast traffic conditions have been prepared pursuant to the City's traffic study guidelines and are consistent with the California Environmental Quality Act (CEQA) guidelines, which require that the potential impacts of a Project be evaluated upon the circulation system as it currently exists. This traffic volume scenario and the related capacity analyses will identify the roadway improvements necessary to mitigate the direct traffic impacts of the Project, if any. Figures 5 -5 and 5 -6 present projected weekday AM and PM peak hour traffic volumes at the six (6) key study intersections with the addition of the trips generated by the proposed Project to existing peak hour traffic volumes. LINSCOTT, LAw 8 GREENSPAN, engineers 15 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal [leach U300U; 3368 -\lain K KHNixea Use Center, Sell Beuh�Re x0368 Kiln k PCH Mina -L'se Cenlel TIA 1.14.16a oKo S b K o / 10R 1 BOLSA AVE m a � a P' °x x )O9 = INBOUND PERCENTAGE FIGURE 5 -1 OUTBOUND PERCENTAGE N - PROJECT SITE NO SCALE PRIOR GAS STATION DISTRIBUTION PATTERN MAIN & PCH MIXED -USE CENTER, SEAL BEACH KEY INBOUND PERCENTAGE FIGURE 5-2 OUTBOUND PERCENTAGE -- DIRECTION OF TRAVEL IN ALLEY -WAY N NO SCALE PROJECT SI E PROJECT DISTRIBUTION PATTERN MAIN & PCH MIXED-USE CENTER, SEAL BEACH o ti " p S 1 1 ( 6 I Or 0 r I , °�( 0 BOLSA AVE ! (� D ~ C O o �• 9ST ° 0 E ° X P (XX) = PASS- BY/DIVERTED TRIPS FIGURE 5 -3 N ED = PROJECT SITE NO SCALE AM PEAK HOUR PROJECT TRAFFIC VOLUMES MAIN & RICH MIXED -USE CENTER, SEAL BEACH p � " p S p s I 0 / I 0 BCLSA AVE XF�� C, o a C�4Sl o 0 0 2 J// ° e \d P 8 (NO SCALE KEY (XX) = PASS- BY/)IVERTED TRIPS E':]= PROJECT SITE FIGURE 5 -4 PM PEAK HOUR PROJECT TRAFFIC VOLUMES MAIN & PCH MIXED -USE CENTER, SEAL BEACH KEY FIGURE 5 -5 [(] = N NO SCALE PROJECT SITE EXISTING PLUS PROJECT AM PEAK HOUR TRAFFIC VOLUMES MAIN & PCH MIXED -USE CENTER, SEAL BEACH S � " � Z i 2 JV 1f r B' n a / I �4...(•�sg \I I BOLSA o ! AVE �! (r 68 146 0 a P KEY FIGURE 5 -6 C -= PROJECT SITE (t NC SCALE EXISTING PLUS PROJECT PM PEAK HOUR TRAFFIC VOLUMES li MAIN & PCH MIXED —USE CENTER, SEAL BEACH 6.0 FUTURE TRAFFIC CONDITIONS 6.1 Ambient Traffic Growth Horizon year, background traffic growth estimates have been calculated using an ambient traffic growth factor. The ambient traffic growth factor is intended to include unknown and future related projects in the study area, as well as account for regular growth in traffic volumes due to the development of projects outside the study area. The future growth in traffic volumes has been calculated at one percent (1.0 %) per year. Applied to the Year 2013 existing tratlic volumes, this results in a 3.0% growth in existing volumes to near -term horizon year 2016. 6.2 Cumulative Projects Description and Location In order to make a realistic estimate of future on- street conditions prior to implementation of the proposed Project, the status of other known development projects (cumulative projects) in the vicinity of the proposed Project has been researched at the City of Seal Beach and City of Long Beach. With this information, the potential impact of the proposed Project can be evaluated within the context of the cumulative impact of all ongoing development. Based on our research, there are two (2) cumulative projects in the City of Seal Beach within the vicinity of the subject site that have either been built, but not yet fully occupied, or are being processed for approval. These two (2) cumulative projects have been included as part of the cumulative background setting. Table 6 -1 provides the location and a brief description for each of the two (2) cumulative projects. Figure 6 -1 graphically illustrates the location of the cumulative projects. These cumulative projects are expected to generate vehicular traffic, which may affect the operating conditions of the key study intersections. 6.3 Cumulative Projects Trip Generation and Assignment Table 6 -2 summarizes the trip generation potential for all two (2) cumulative projects. As shown, the cumulative projects are forecast to generate a total of 823 daily trips, with 58 trips (21 inbound and 37 outbound) forecast during the AM peak hour and 75 trips (41 inbound and 34 outbound) forecast during the PM peak hour. The AM and PM peak hour traffic volumes associated with the two (2) cumulative projects in Year 2016 are presented in Figures 6 -2 and 6 -3, respectively. 6.4 Year 2016 Cumulative Traffic Volumes Figures 6 -4 and 6 -5 present the Year 2016 AM and PM peak hour cumulative traffic volumes at the six (6) key study intersections, respectively. Please note that the cumulative traffic volumes represent the accumulation of existing traffic, ambient growth traffic and cumulative projects traffic. Figures 6 -6 and 6 -7 illustrate the Year 2016 forecast AM and PM peak hour traffic volumes with the inclusion of the trips generated by the proposed Project, respectively. LINSWII, LAW & GREENSPAN, engineers 16 LLG Ref. 2 -13 -3368 Main & PCI I Mixed -Use Center Project, Seal Beach i'.II300? 133368 Mvn & PCH M &ed -U,, C,m,,, Seel Ue haZepon33368 Nl n & PCH Nixed Use CeFlttf 1A 9 -1a -I6 doc TABLE 6 -1 LOCATION AND DESCRIPTION OF RELATED PROJECTS1' No. Cumulative Project Location /Address Description City of Seal Beach Development South of Marina Drive, east of the San Gabriel River Channel, west of I" Street 48 single family DU and 6.4 acres of neighborhood park I. Ocean Place Residential Project 2. 81" Street Medical 81" Street and Pacific Coast Highway Demolition of 2,800 SF of retail and construction of 4,470 SF of medical office In Source: City of Seal Beach Planning Department. LlNseon, Law 8 GREENSPAN, engineers 17 I.LG Ref: 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach \:13iWU33368 M.. &PCH Mi.M -U,O Cam,, Seal Be— aeponb369 Man& PCH.Mi�N U=e Cenvv TIA 9 44 doc KEY �t' FIGURE 6 -1 E)3= PROJECT SIM 0 SCALE 0 LOCATION OF CUMULATIVE PROJECTS MAIN & PCH MIXED -USE CENTER, SEAL BEACH TABLE 6 -2 RELATED PROJECTS TRAFFIC GENERATION FORECASTtt Cumulative Project Description Daily Two Way AM Peak Hour PM Peak Hour In Out Total In Out Total City of Seal Beach Development 561 13 34 47 36 21 57 I. Ocean Place Residential Project 12 2. 8" Street Medical 162 8 3 I I 5 13 18 Total Cumulative Projects Trip Generation Potential 823 21 37 58 41 34 75 I I Source: Trip Generation, 91h Edition, Institute of Transportation Engineers, (FIE) (Washington, D.C. (2012)1. 12 Source: ,Vain & PCH N xed -Use Censer Project TIA prepared by LLG, dated October 27. 2011. LINSCOTT, LAw & GREENSPAN, engineers 18 LLG Ref. 2 -13 -3369 Main & PCH Mixed -Use Center Project, Seal Beach N U 30012133368.,Maln d PCH Mixed - U%eCCnmc Seel HeaehlRepon036tl Mvn an PCH Mixed -Use Center TIA 9 -H -16 don o � " o s � o i 1 I i °� E 0v ° _ 1 � 0 X�_1�01\11` BOLSA AVE o O o ti 9y.T � moo a J/( \ 0 P v 4 x 6 \d,° � °l oo Hwr E h P S KEY FIGURE 6 -2 }3= N No SCALE PROJECT SITE AM PEAK HOUR CUMULATIVE PROJECT TRAFFIC VOLUMES MAIN & PCH MIXED —USE CENTER, SEAL BEACH o � " 0 5 0 i 0 0 152 Or- 9 / J// \ 0\ r T 00 BOLSA AVE -� ! (� 0 _ 0 a L C o O o h 4ST ,�o 0 2 J/ 0 0 Ol oo tip, Q KEY N N FIGURE 6 -3 = TE O SCALE PROJECT SI PM PEAK HOUR CUMULATIVE PROJECT TRAFFIC VOLUMES MAIN & PCH MIXED -USE CENTER, SEAL BEACH 3 , �o s ' 48 8 s 80LSA AVE 4110 AFC, ,: p� 92 C ^� 1 � CO h lit /B e s KEY FIGURE 6 -4 = PROJECT SITE N NO SCALE YEAR 2016 CUMULATIVE AM PEAK HOUR TRAFFIC VOLUMES MAIN & PCH MIXED -USE CENTER, SEAL BEACH S � " � S 1 t i s46& (^ 9SSI 107 \�1/ 24 BOLSA / AVE J / 6 _ 754 .( m/ F I5 o � 4ST ti�wo S 160 \jj79OJ X P 8 KEY FIGURE 6 -5 ['] = (t NO SCALE PROJECT SITE YEAR 2016 CUMULATIVE PM PEAK HOUR TRAFFIC VOLUMES MAIN & PCH MIXED —USE CENTER, SEAL BEACH �o s 1196- �91 BOLSA° / AVE / r 18 _ 249 1 C P KEY PROO St JECT IE FIGURE 6 -6 C�= 15,0 SCALE YEAR 2016 CUMULATIVE PLUS PROJECT AM PEAK HOUR TRAFFIC VOLUMES MAIN & PCH MIXED -USE CENTER, SEAL BEACH KEY FIGURE 6 -7 PROJECT SITE N w SCALE YEAR 2016 CUMULATIVE PLUS PROJECT PM PEAK HOUR TRAFFIC VOLUMES MAIN & PCH MIXED -USE CENTER, SEAL BEACH 7.0 TRAFFIC IMPACT ANALYSIS METHODOLOGY The relative impact of the proposed Project during the AM peak hour and PM peak hour was evaluated based on analysis of future operating conditions at the six (6) key study intersections, without, then with, the proposed Project. The previously discussed capacity analysis procedures were utilized to investigate the future volume -to- capacity relationships and service level characteristics at each study intersection. The significance of the potential impacts of the Project at each key intersection was then evaluated using the following traffic impact criteria. 7.1 Impact Criteria and thresholds Per City of Seal Beach and Orange County CMP criteria, impacts to local and regional transportation systems are considered significant if: An unacceptable peak hour Level of Service (LOS) (i.e. LOS E or F) at any of the key intersections is projected. The City of Seal Beach considers LOS D (ICU = 0.801 - 0.900) to be the minimum desirable LOS for all intersections; and A significant transportation impact is determined based on the sliding scale criteria presented in Table 7 -1. As indicated in Table 7 -1, the project - related increase in ICU value that defines a significant impact varies with LOS. At LOS A or B, the threshold of significance is an increase of 0.06 or greater. At LOS C or LOS D, the threshold of significance is an increase of 0.04 or greater or 0.02 or greater, respectively, in the ICU value. This is reduced to 0.01 or greater under LOS E and F. At unsignalized intersections, this report identifies a significant traffic impact when the addition of Project traffic results in a decrease in LOS by one level or more for those locations operating at LOS D or E. 7.2 Traffic Impact Analysis Scenarios The following scenarios are those for which volume /capacity calculations have been performed at the six (6) key intersections for near -term (Year 2016) traffic conditions: (1) Existing Traffic Conditions; (2) Existing Plus Project Traffic Conditions; (3) Scenario (2) with Improvements, if necessary; (4) Year 2016 Cumulative Traffic Conditions; (5) Year 2016 Cumulative plus Project Traffic Conditions; (6) Scenario (5) with Improvements, if necessary; LINscoT , LAw & GREENSPAN, engineers 19 LLG Ref 2 -13 -3368 Main & PCH Mixed -Ilse Center Project. Seal Beach N:Uioi Main & PCH Mixed -tsc Cemcr, Seal BeadiaepueU36b Mein & PCH MNed -L4e Center NA 9 -11 -16 doe TABLE 7.1 CITY OF SEAL BEACH INTERSECTION IMPACT THRESHOLD CRITERIA Level of Service Final ICU Project - Related Increase in ICU A, B 0.00-0.69 0.06 or more C 0.70-0.79 0.04 or more D 0.80-0.89 0.02 or more E, F 0.90 or more 0.01 or more LiNSCOrr, LAw & GREENSPAN, engineers 20 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach YG3W� 133369 M. & PCH Mhed -Cee Cent, Seel Beacht eron036H My & NCH Mieed -Use Center TIA 9.11.16 doc 8.0 PEAK HOUR INTERSECTION CAPACITY ANALYSIS 8.1 Existing Plus Project Analysis Table 8 -1 summarizes the peak hour level of service results at the six (6) key study intersections for "Existing Plus Project" traffic conditions. The first column (1) of ICU /LOS values or HCM /LOS values in Table 8 -1 presents a summary of existing AM and PM peak hour traffic conditions (which were also presented in Table 3 -3). For comparison purposes, the second column (2) lists existing plus "prior gas station' traffic conditions, while the third column (3) lists existing plus project traffic conditions. The fourth column (4) shows the increase in ICU value or Delay value due to the added peak hour Project trips when compared to column I and indicates whether the traffic associated with the Project will have a significant impact based on the significant impact criteria defined in this report. The fifth column (5) of Table 8 -1 indicates the anticipated operating conditions with implementation of improvements planned and /or recommended to mitigate Project traffic and /or achieve an acceptable Level of Service. 8.1.1 Existing Plus Project Traffic Conditions Review of Columns 3 and 4 of Table 8 -1 indicates that traffic associated with the proposed Project will not significantly impact any of the six (6) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The six (6) key study intersections are forecast to continue operate at LOS D or better with the addition of Project generated traffic to existing traffic. Further review of Table 8 -1 shows the impact of the proposed Project is comparable to the prior gas station land use with the projected services levels identical to one another at each study intersection (See Column 2 and Column 3). LINSCOT , LAW & GREENSPAN engineers 21 LLG Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N N3300�133368 -Man & PCH Mi,ed-Use Cemep Seal Bemh)Rsp n 3368 Man & PCH Nixed Use CenterUA 9 -N -16. doe TABLE 8.1 E%ISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS Represents forecast service level with the potential removal of the northbound right -mm lane on Main Street to provide additional angled on- street public parking spaces along Main Street The removal ofthe northbound right -rum lane will result in up to 12 new on- street angled parking spaces. E LINSC0II, IAW d Gari , enginean 22 LLG Ref 2 -13-1 aci Main & PCH MixM -Use Center Project, Seal Beach .I � Iu]I . vo,"31'll 1,1l ss'wia. 1n1li- 11."r -.;r" Wing 111 1„1 1'C I-u, 11 }11-16J- (2) (3) (4) (5) (1) Existing Existing Significant Existing Plus Gas Station Plus Project Impact With Time Traffic Conditions Traffic Conditions Traffic Conditions (Column 3- Column 1) Improvements Key Intersection Period ICU /HCM LOS ICU /HCM LOS ICU /HCM LOS Increase ( Y.Ps. ICU /HCM LOS Pacific Coast Highway at AM 0668 B 0668 B 0670 B - 1stStreet PM 0.807 D 0.808 D 0.809 D 0.002 So — -- Main Street at AM 0.663 B 0G69 B 0.664 0.670° B 2. Pacific Coast Highway PM 0.782 C 0.790 C 0785 0.785 C 12th Street at AM 0703 C 0,704 C 0714 C 0.011 No — — 3. Pacific Coast Highway PM 0.799 C 0.800 D 0.802 D 0.003 No -- -- Seal Beach Boulevard at AM o 765 C 0]66 C 0768 C 0.003 No -- — 4. Pacific Coast Highway PM 0824 D 0.825 D 0.826 D 0.002 No -- -- Main Street at 5. AM 8.1 s/v A 8 2 s/v A 8.1 s/v A 00 s/v No -- — Electric Avenue PM d.8 yv A 9.o s/v - --1111 I A 8.9 s/v d 0.1 Vv No — -- Seal Beach Boulevard at AM 0 434 A 0,434 A 0,441 A 0.009 No — -- 6. Bolsa Avenue PM 0427 A 0427 A 0.000 N. — — Represents forecast service level with the potential removal of the northbound right -mm lane on Main Street to provide additional angled on- street public parking spaces along Main Street The removal ofthe northbound right -rum lane will result in up to 12 new on- street angled parking spaces. E LINSC0II, IAW d Gari , enginean 22 LLG Ref 2 -13-1 aci Main & PCH MixM -Use Center Project, Seal Beach .I � Iu]I . vo,"31'll 1,1l ss'wia. 1n1li- 11."r -.;r" Wing 111 1„1 1'C I-u, 11 }11-16J- 8.2 Year 2016 Traffic Conditions Table 8 -2 summarizes the peak hour level of service results at the six (6) key study intersections for the 2016 horizon year. The first column (1) of ICU /LOS values or HCM /LOS values in Table 8 -2 presents a summary of cumulative weekday AM and PM peak hour traffic conditions (existing plus ambient plus cumulative projects traffic) based on existing intersection geometry, but without any traffic generated from the proposed Project. The second column (2) presents the Year 2016 cumulative plus prior gas station traffic conditions. The third column (3) presents forecast Year 2016 cumulative conditions with the addition of Project traffic. The fourth column (4) shows the increase in ICU value or Delay value due to the added peak hour Project trips and indicates whether the traffic associated with the Project will have a significant impact based on the significant impact criteria defined in this report. The fifth column (5) indicates the anticipated level of service with planned and /or recommended improvements. 8.2.1 Year 2016 Cumulative Traffic Conditions An analysis of future (Year 20 16) cumulative traffic conditions indicates that the addition of ambient traffic growth and cumulative projects traffic will not adversely impact any of the six (6) key study intersections. The six (6) key study intersections are forecast to continue operate at LOS D or better during the AM and PM peak hours with the addition of ambient traffic growth and related projects traffic. 8.2.2 Year 1016 Cumulative Plus Project Traffic Conditions Review of Columns 3 and 4 of Table 8 -2 indicates that traffic associated with the proposed Project will not significantly impact any of the six (6) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The six (6) key study intersections are forecast to continue to operate at LOS D or better with the addition of project generated traffic in the Year 2016. Further review of Table 8 -2 shows the impact of the proposed Project in Year 2016 Cumulative Traffic Conditions is comparable to the prior gas station land use with the projected services levels identical to one another at each study intersection (See Column 2 and Column 3). LINSC01T, LAW 8 GREENSPAN, engineers 23 LLG Ref. 2 -13 -3368 Main & PCn Mixed -Use Center Project, Seal Beach Sa \33004133368 - Men & PCH Mixed Use Cessei, Sel Beuh\ReperU368 Main & PCH W xed -0ee Cente'I1A 1) -I4 -16 doe TABLE 8.2 YEAR 2016 CUMULATIVE PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS 1° Represents forecast service level with doe potential removal ofthe northbound right -mm lane on Main Street to provide additional angled on- street public parking spaces alone Main Street. The removal cfthc northbound fight -rum lane will result in up to 12 new on -sheet angled parking spaces. LINSCOTT, Las &GaEENSPnN, engineers 24 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project. Seal Fi ach ..%a"Ja,an- Nam1ICn m,W -uzI —, SUI 1—.1 Noon 3?6N.W 1 I1II11- 111.1,0, ne III I IM1ew (I) (2) (3) (4) (5) Year 2016 Cumulative Ve.r20l6Cumulativc Significant Year 2016 Cumulative Plus Gas Station Plus Project Impact Year 2016 With Time Traffic Conditions Traffic Conditions Traffic Conditions (Column 3- Column 1) Improvements Key Intersection Period ICU /HCM i LOs ICU/HCM LOS ICU /IICM LOS Increase Yn/No ICU/HCM LOS Pacific Coast Highway at AM 0.691 B 0.692 B 0.693 B 0.002 No — — IslSlreet PM 0. W13 U 0.844 D 0.846 D 0.003 No -- -- Main Street at AM 0 684 B 0.690 B 0685 B 0,001 No 0.6911) B 2. Pacific Coast Highway PM 0.808 D 0818 D 0.810 D 0.002 No 0 81 D 12th Street all AM 0.722 C 0.723 C 0.733 C 0.011 No -- -- 3. Pacific Coast Highway PM 0,822 D 0.824 D 0825 D 0.003 No -- — Seal Beach Boulevard at AM 0 788 C 0 789 ^— C 0.791 C 0003 4 No -- — 4. Pacific Coast Highway PM 0.848 D 0.849 D 0.850 D 0.002 No — — Main Street at _ AM 82 s/v ,1 8.2 s/v A 8 2 s/v A f1.0 s/v No -- — 5. Electric Avenue PM 9.0 s/v A 9.1 s/v A 9.0 s/v A 00,/, No -- -- 9Ca1 Reach Boulevard at AM 0.454 A 0.45.1 A 0.455 A 0.001 No -- — 6. Balsa Avenue PM 0.440 A 0440 A 0 44 1 A 0.001 No -- -- 1° Represents forecast service level with doe potential removal ofthe northbound right -mm lane on Main Street to provide additional angled on- street public parking spaces alone Main Street. The removal cfthc northbound fight -rum lane will result in up to 12 new on -sheet angled parking spaces. LINSCOTT, Las &GaEENSPnN, engineers 24 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project. Seal Fi ach ..%a"Ja,an- Nam1ICn m,W -uzI —, SUI 1—.1 Noon 3?6N.W 1 I1II11- 111.1,0, ne III I IM1ew 9.0 STATE OF CALIFORNIA (CALTRANS) METHODOLOGY In conformance with the current Caltrans Guide for the Preparation of Traffic Impact Studies, existing and projected peak hour operating conditions at the four signalized state - controlled study intersections within the study area have been evaluated using the Highway Capacity Manual 2000 (HCM 2000 for signalized intersections) operations method of analysis. These signalized state - controlled locations include the following four of the six study intersections: 1. Pacific Coast Highway at Is' Street 2. Main Street/Bolsa Avenue at Pacific Coast Highway 3. 12th Street/Balboa Drive at Pacific Coast Highway 4. Seal Beach Boulevard at Pacific Coast Highway Caltrans "endeavors to maintain a target LOS at the transition between LOS "C" and LOS "D" on State highway facilities "; it does not require that LOS "D" (shall) be maintained. However, Caltrans acknowledges that this may not always be feasible and recommends that the lead agency consult with Caltrans to determine the appropriate target LOS. For this analysis, LOS D is the target level of service standard and will be utilized to assess the potential Project impacts at the state- controlled study intersections. 9.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections) Based on the HCM operations method of analysis, level of service for signalized intersections is defined in terms of control delay, which is a measure of driver discomfort, frustration, fuel consumption, and lost travel time. The delay experienced by a motorist is made up of a number of factors that relate to control, geometries, traffic, and incidents. Total delay is the difference between the travel time actually experienced and the reference travel time that would result during ideal conditions: in the absence of traffic control, in the absence of geometric delay, in the absence of any incidents, and when there are no other vehicles on the road. In Chapter 16 of the HCM, only the portion of total delay attributed to the control facility is quantified. This delay is called control delay. Control delay includes initial deceleration delay, queue move -up time, stopped delay, and final acceleration delay. In contrast, in previous versions of the HCM (1994 and earlier), delay included only stopped delay. Specifically, LOS criteria for traffic signals are stated in terms of the average control delay per vehicle. The six qualitative categories of Level of Service that have been defined along with the corresponding HCM control delay value range for signalized intersections are shown in Table 9 -1. LiNscoii, Lnw 8 GREENSPAN, engineers 25 LLG Ref. 2 -I3 -3368 Plain & PCH Mixed -Use Center Project, Seal Beach N% 33WH13336N- Nan &PCHMi,ed. Use Cenrec Seel Beach \ReponWog My &PCHMixed- lie(mterF1 A 9-".16 doe TABLE 9 -1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS (HCM METHODOLOGY)'s Level of Service (LOS) Control Delay Per Vehicle (seconds /vehicle) Level of Service Description This level of service occurs when progression is extremely favorable and most vehicles arrive A < 10.0 during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. This level generally occurs with good B > 10.0 and < 20.0 progression, short cycle lengths, or both. More vehicles stop than with LOS A, causing higher levels of average delay. Average traffic delays. These higher delays may result from fair progression, longer cycle lengths, or both. Individual cycle failures may C > 20.0 and < 35.0 begin to appear at this level. The number of vehicles stopping is significant at this level, though many still pass through the intersection without stopping. Long traffic delays. At level D, the influence of congestion becomes more noticeable. Longer delays may result from some D > 35.0 and < 55.0 combination of unfavorable progression, long — cycle lengths, or high v/c ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. Very long traffic delays. This level is considered by many agencies (i.e. SANBAG) to be the limit of acceptable delay. These high E > 55.0 and < 80.0 delay values generally indicate poor progression, long cycle lengths, and high v/c ratios. Individual cycle failures are frequent occurrences. Severe congestion. This level, considered to be unacceptable to most drivers, often occurs with over saturation, that is, when arrival flow rates F >_ 80.0 exceed the capacity of the intersection. It may also occur at high v/c ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be major contributing factors to such delay levels. I' Source: Highwgv, Capacin' Manual 2000, Chapter 16 (Signalized Intersections). LINSCort, LAw & GREENSPAN, engineers 26 LLG Ref 2.13 -3368 Main & PCI I Mixed -Use Center Project, Seal Beach N U3WU33368 Mvn& I' CH MkW Ux Ceme,, Seal& -ac Re r,0368 ]fun& PCH .Miaai Uu Cam,TIA 9- 11 16d 9.2 Existing Plus Project Traffic Conditions Table 9 -2 summarizes the peak hour Highway Capacity Manual 2000 level of service results at the four signalized state - controlled study intersections within the study area for "Existing Plus Project' traffic conditions. The first column (1) of HCM /LOS values in Table 9 -2 presents a summary of existing AM and PM peak hour traffic conditions. The second column (2) lists existing plus prior gas station traffic conditions. The third column (3) lists existing plus project traffic conditions. The fourth column (4) indicates whether Project traffic will have a significant impact based on the significant impact criteria defined in this report. The fifth column (5) of Table 9 -2 indicates the anticipated operating conditions with implementation of improvements planned and /or recommended to mitigate Project traffic and /or achieve an acceptable Level of Service. 9.2.1 Existing Traffic Conditions Three of the four signalized state - controlled study intersections currently operate at LOS D or better during the AM and PM peak hours. Pacific Coast Highway at I" Street currently operates at LOS E during the PM peak hour when assessed using the HCM /LOS methodology. 9.2.2 Existing Plus Project Traffic Conditions Review of Columns 1, 2 and 3 of Table 9 -2 indicates that traffic associated with the proposed Project when will not adversely impact any of the four signalized state - controlled study intersections, when compared to the LOS standards and significant impact criteria specified in this report. Although the intersection of Pacific Coast Highway at I" Street is forecast to continue operate at unacceptable LOS E during the PM peak hour with the addition of the project traffic, the increase in delay due to added Project traffic is nominal and results in a 0.7 sec /veh change in delay during the afternoon commute hour (compare Column 3 and Column I of Table 9 -2). As assessment of the current intersection layout and signal operations for Pacific Coast Highway at I" Street indicates that the removal of crosswalk across the north leg of Pacific Coast Highway at I't Street will improve the service level to LOS C (See Column 5 of Table 9 -2). The removal of this crosswalk will also minimize pedestrian and vehicular conflicts between motorists making an eastbound left-turn from 1st Street to continue northbound on Pacific Coast Highway. LINSCOTT, LAW 8 GREENSPAN, engineers 27 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach 1.13300EI+3368 - Mvn & PCH Sliced -U4e C­ ,e, Seel Be chUtepon6369 M1 n A, PCH MixmI Use Cc icr TIA 9.13.16 doc TABLE 9.2 EXISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS • CALTRANS 16 Represents forecast service level with removal of the existing crosswalk across the north leg of Pacific Coast Highway, nonh of I Avenue; the crosswalk across the south leg is maintained and split phase operation on W Street is maintained This improvement is similar to the recent changes as the Seal Beach Boulevardnsionfic Coast Highway intersection where a crosswalk is only provided across one leg of Pacific Coast Highway and the signal operates with 'split phasing", p Represents forecast service level with the potential removal of the northbound fight -turn lane on Hain Street to provide additional angled onatreet public parking spaces alone Main Street. The removal offs, northbound riaht -fain lane will result in up to 12 new on- street angled oarkine spaces. LIii LAW & GREENSPAN, en,isnas 28 LLG aer. 2.13 -3368 Main & IT11 Nixed -Use Center Vroiea, Seal (leach J .In ";'Is Nmna 1.111- 111�,ro 311s tan.A IN w" 11 11 111- (2) (3) (I) Existing Existing (4) (5) Existing Plus Gas Station Plus Project Significant With Time Traffic Conditions Traffic Conditions Traffic Conditions Impact Improvements RCM I LOS FILM LOS NCM LOS Ves/No NCM ( LOS Key Intersection Period Pacific Coast Highway at AM 304 C 305 C 307 C No 200 C Ist Street PM 64.9 E 65.1 E 65.6 E No 28.21r' C Main Street at AM Met B 19.1 B 19.1 B No 19.119 B 2. Pacific Coast Highway PM 26.4 C 27.0 C 27.0 C No 27.1 C 12th Street at AM T5 B 17.5 I B 17.8 B No -- — 3. Pacific Coast Highway PM 20.2 C 20.2 I C 20.6 C No — — Seal Beach Boulevard at AM 34.2 C 34.2 .1� C 14.5 C No — 4. Pacific Coast Highway PM 40.1 O 401 D 404 D No — -- 16 Represents forecast service level with removal of the existing crosswalk across the north leg of Pacific Coast Highway, nonh of I Avenue; the crosswalk across the south leg is maintained and split phase operation on W Street is maintained This improvement is similar to the recent changes as the Seal Beach Boulevardnsionfic Coast Highway intersection where a crosswalk is only provided across one leg of Pacific Coast Highway and the signal operates with 'split phasing", p Represents forecast service level with the potential removal of the northbound fight -turn lane on Hain Street to provide additional angled onatreet public parking spaces alone Main Street. The removal offs, northbound riaht -fain lane will result in up to 12 new on- street angled oarkine spaces. LIii LAW & GREENSPAN, en,isnas 28 LLG aer. 2.13 -3368 Main & IT11 Nixed -Use Center Vroiea, Seal (leach J .In ";'Is Nmna 1.111- 111�,ro 311s tan.A IN w" 11 11 111- 9.3 Year 2016 Traffic Conditions Table 9 -3 summarizes the peak hour Highway Capacity Manual 2000 level of service results at the four signalized state - controlled study intersections for the 2016 horizon year. The first column (1) of HCM /LOS values in Tablc 9 -3 presents a summary of cumulative weekday AM and PM peak hour traffic conditions (existing plus ambient plus cumulative projects traffic) based on existing intersection geometry, but without any traffic generated from the proposed Project. The second column (2) presents the Year 2016 cumulative plus prior gas station tragic conditions. The third column (3) presents forecast Year 2016 cumulative conditions with the addition of Project traffic. The fourth column (4) indicates whether Project traffic will have a significant impact based on the significant impact criteria defined in this report. The fifth column (5) indicates the anticipated level of service with planned and /or recommended improvements. 9.3.1 Year 2016 Cumulative Traffic Conditions Three of the four signalized state - controlled study intersections are forecast to continue to operate at LOS D or better during the AM and PM peak hours, while Pacific Coast Highway at I" Street is forecast to continue to operate at LOS E during the PM peak hour in the Year 2016. 9.3.2 Year 2016 Cumulative Plus Project Traffic Conditions Review of Tablc 9 -3 indicates that traffic associated with the proposed Project will not adversely impact any of the four signalized state - controlled study intersections, when compared to the LOS standards and significant impact criteria specified in this report. Although the intersection of Pacific Coast Highway at I" Street is forecast to continue operate at unacceptable LOS E during the PM peak hour with the addition of the project traffic, the increase in delay due to added Project traffic is nominal and results in a 0.9 sec /veh change in delay during the afternoon commute hour (compare Column 3 and Column I of Table 9 -3). As noted earlier, the removal of crosswalk across the north leg of Pacific Coast Highway at I't Street will improve the service level of this key intersection to LOS C (See Column 5 of Table 9 -3). Appendix D presents the HCM /LOS calculations for the four signalized state - controlled study intersections. LiNS=, Lnw & GREENSPAN, engineers 29 LLG Re(. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N 133W7113169 71]3968 -.Main & PCH MLed -Use Cenle� Scat eeachWeport J368 Main & ICH Nixed Use Center YIA 9 -14-16 doc TABLE 9-3 CUMULATNE PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS - CALTRANS Represents forecast service level with removal ofthe existing crosswalk across the north leg of Pacific Coast Highway, north of Ia Avenue, the crosswalk across the south leg is maintained and split phase operation on 1"Strica is maimacial This improvement is similar to the recent changes as the Seal Beach Boulevard/Pacilre Coast Highway intersection where a crosswalk is only provided across one leg of Pacific Coast Highway mid the signal operates with 'split- phasing ". " Represents forecast service level with the potential removal of the northbound right -mm lane on Main Street to provide additional angled on- street public parking spaces along Blain Street. The removal ofthe northbound right -turn lane will result in up to 12 new on- street angled parking spaces. LINKOFT, IAW &(3RMN PAN, angineera 30 UG Rd 2 -13 -3368 Main & PCH MzN -Use Center Prnject, Seal Beach I. lao `l lill, -Mmii ¢ IiII N�vdlr..[min. eel IICwM1 Vcl'^n3r6x bLin d ICIINiw31:.� l�niv'r M v�lv.l6 Jrc I) (2) (3) Year 2016 Cumulative Year 2016 Cumulative (4) (5) Year 2016 Cumulative Plus Gas Station Plus Project Significant Year 2016 With Time Traffic Conditions Trallic Conditions Traffic Conditions Impact Improvements HCM LOS IICM ' LOS IICM LOS YWNo HCM LOS Key Intersection Period Pacific Coast Highway at AM 32.4 C 32.5 C 32.9 C No 20.8 C I. Ist Street PM 76A E 76.8 E 793 E No 34,0a C Main Street at AM 19.5 B 19.6 B 19.6 B No 199" B 2. Pacific Coast Highway PM 27.9 C 28.3 C 283 C No 28,4 C 12th Street at AM 179 B IT9 B 182 B No -- -- 3. Pacific Coast Highway PM 21.1 C 21,1 C 21.6 C No -- — Seal Beach Boulevard at AM 15S U 35,8 U 36.1 U No -- — 4. Pacific Coast Highway PM 429 D 429 D 431 D No -- — Represents forecast service level with removal ofthe existing crosswalk across the north leg of Pacific Coast Highway, north of Ia Avenue, the crosswalk across the south leg is maintained and split phase operation on 1"Strica is maimacial This improvement is similar to the recent changes as the Seal Beach Boulevard/Pacilre Coast Highway intersection where a crosswalk is only provided across one leg of Pacific Coast Highway mid the signal operates with 'split- phasing ". " Represents forecast service level with the potential removal of the northbound right -mm lane on Main Street to provide additional angled on- street public parking spaces along Blain Street. The removal ofthe northbound right -turn lane will result in up to 12 new on- street angled parking spaces. LINKOFT, IAW &(3RMN PAN, angineera 30 UG Rd 2 -13 -3368 Main & PCH MzN -Use Center Prnject, Seal Beach I. lao `l lill, -Mmii ¢ IiII N�vdlr..[min. eel IICwM1 Vcl'^n3r6x bLin d ICIINiw31:.� l�niv'r M v�lv.l6 Jrc 10.0 SITE ACCESS AND INTERNAL CIRCULATION EVALUATION 10.1 Site Access Evaluation As shown in Figure 2 -2, access to the site is provided via an existing alley way which has right -turn in /out only access along Pacific Coast Highway and also connects to another alley way which is a one -way (eastbound only) alley that has access to Main Street and 10th Street. However, to improve direct project access from Pacific Coast Highway, an assessment of U -turn movements for westbound left -turn traffic on Pacific Coast Highway at Main Street/Bolsa Avenue has been prepared. Currently, U -turn movements from the westbound left -turn lane on Pacific Coast Highway is restricted. However, if U -turns were permitted this would allow for a more direct route to the Project's parking garage for westbound traffic. Figure 10 -1 presents the results of a Passenger Vehicle U -turn Assessment. A review of this figure indicates that passenger cars are able to make a U -turn from the westbound left -turn lane on Pacific Coast Highway, provided curbside parking is restricted. The removal of the current U -turn restriction will require the replacement of a mast arm mount sign and installation of a minimum of 25 feet of red curb on Pacific Coast Highway, along Project frontage. 10.2 Internal Circulation Evaluation The on -site circulation layout of the conceptual Project site plan as illustrated Figure 2 -2 on an overall basis is adequate. Passenger vehicles are able to access the Project's parking garage from the existing alley and circulate throughout the parking lot. Figure 10 -2 illustrate the turning movements required of a passenger car as it enters the parking garage from the existing alley to circulate throughout the site. LlNscom Law & GREENSPAN, engineers 31 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach S- b3CW2133369 -Main & PCH .Mixed -Use Come, Seal 6eachlRepon0368 Main & ICH Nixed USe Cmter TL\ 9 -W -16 doc \ \ n \ \^ M11 REMOVE R73 -3(CA) FROM \ \� MAST ARM AND REPLACE W flR R73 -2(CA) R73 -3(CA) R73 -2(CA) �/ rvoUTURry n \ INSTALL 25 OF RED C RED CURB 19.00 &4 ` p 3.00 11.00 � 7�, � - �.^' V�d'i� � Passenger teat �'�• _ _ lb ' A WEN : zoo 10 Lockkto Lock Time :6.00 Steering Angle : 31.6 (� a r ° EX. RAW \ E J ®SCA E., —5D FIGURE 10 -1 PASSENGER VEHICLE U —TURN ASSESSMENT MAIN & PCH MIXED—USE CENTER, SEAL BEACH Alley IT r 2 , 19,00 4 3eO 11.00 Passenger f..t Wdth 7*00 P Lock to Lock rme 6.0 stcenng Angle 31.6 Main Street SOURCE MAIN AND PCH LLC Q)". SCALE FIGURE 10-2 PASSENGER VEHICE CIRCULATION ASSESSMENT MAIN & PCH MIXED—USE CENTER, SEAL BEACH 11.0 CITY CODE PARKING ANALYSIS To determine the number of parking spaces required for the proposed Project, the parking demand was calculated using the parking codes per Chapter 11.4.20.015.A.2 Required Parking — Main Street Specific Plan District in the City of Seal Beach Municipal Code. The following parking ratios were utilized: Coffee Shop = LO spaces per 500 SF gross /loor area Retail= 1.0 spaces per 500 SFgross floor area Office = 1.0 spaces per 300 SF gross floor area As mentioned previously, the Project's mix of uses will include a 556 SF of coffee shop and 14,444 SF of retail /commercial uses consisting of 11,882 SF of retail use and /or 2,562 SF of office use or 14,444 SF of retail - oriented uses. Although section 5.0 indicated that both options are considered as interchangeable for the purposes of this parking assessment each has been looked at individually. Table 11 -1 presents the direct application of the City's code to the Project (Retail Only). Review of the lower portion of Table 11 -1 identifies that the Project will result in a total code parking requirement of 30 spaces. When compared against the proposed off - street parking supply of 30 spaces the site is expected to operate at a balanced condition. Table 11 -2 presents the direct application of the City's code to the Project (Retail Plus Office). Review of the lower portion of Table 11 -2 identifies that the Project will result in a total code parking requirement of 34 spaces. When compared against the proposed off - street parking supply of 30 spaces the site is expected to have a parking deficiency of 4 spaces. 11.1 Main Street Angled Parking Spaces To address the potential parking deficiency associated with a "Retail Plus Office" tenant mix of the proposed Project, the provision of on- street angled parking on Main Street along Project frontage, as well as along the frontage of the Bay Theatre was investigated. As discussed with City staff, the extension of angled on- street will require restriping of Main Street and the removal of the existing northbound right -turn lane on Main Street at Pacific Coast Highway. Figure 11 -1 presents the conceptual on- street parking layout for Main Street. A review of Figure 11 -1 shows that up to 12 additional angled spaces on- street, of which 7 are located along Project frontage and 5 are located along the Bay Theatre frontage. The addition of 7 spaces on Main Street could offset 4 space parking deficiency of the Retail Plus Office" tenant mix of the proposed Project. The implementation of this potential "parking enhancement" will be subject to the review and approval of the City of Seal Beach. It should be noted that the removal of the northbound right -turn lane will have minimal impact of the operating condition of Main Street/Bolsa Avenue at Pacific Coast Highway as this intersection is forecast to operate at LOS D or better during the AM peak hour and PM peak hour (See Tables 8 -1, 8-2, 9 -2 and 9 -3). LiNSCM, Lnw & GREENSPAN, engineers 32 LLG Ref. 2 -13 -3368 Main &. PCH Mixed -Use Center Project, Seal Beach N 13300@133368 -Main & PCH >1iRab Use Cuimq S W 9eechUteponU]6tl Main & PCfI Mired -0se CenterTLA 21a.16 doc TABLE 11 -1 CITY CODE PARKING REQUIREMENT (RETAIL ONLY) Land Use Size City of Carson Code Parkin Ratio20 Spaces Required Coffee Shop Retail TOTAL: 556 SF 14,444 SF 15,000 SF I spaces per 500 SF of GFA I spaces per 500 sf of GFA TOTAL: I 29 30 A. TOTAL PARKING CODE REQUIREMENT 30 B. TOTAL OFF - STREET PARKING PROVIDED 30 C. PARKING SURPLUS /DEFICIENCY ( + / -) (B —A) 0 20 Source: City of Seal Beach Municipal Code Chapter 11.4.20.015..4.2 Required Parking —,lain Street Specific Plan District. LINScoTT, LAw & GREENSPAN, engineers 33 LLG Ref. 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N133M1 133368 Man & I H Nixed -L'se C'enlec Sed Hexhl epon13368 Mvin & PCH Mixed -Ihe Curter TIA 9 14-16 doe TABLE 11 -2 CITY CODE PARKING REQUIREMENT (RETAIL PLUS OFFICE) Land Use Size City of Carson Code Parkin Ratio' Spaces Required Coffee Shop Retail Office TOTAL: 556 SF 11,882 SF 2,562 SF 15,000 SF 1 spaces per 500 sf of GFA I spaces per 500 sf of GFA I spaces per 300 sf of GFA TOTAL: 1 24 9 34 A. TOTAL PARKING CODE REQUIREMENT 34 B. TOTAL OFF - STREET PARKING PROVIDED 30 C. PARKING SURPLUS /DEFICIENCY ( + / -) (B —A) -4 D. ON- STREET PARKING ALONG PROJECT FRONTAGE 7 E. PARKING SURPLUS/DEFICIENCY ( + / -) (D —C) 3 xl Source: City of Seal Beach Municipal Code Chapter 11.4.20.015.A.2 Required Parking —Main Street Specific Plan District. r LMSCOTT, LAW & GREENSPAN, engineers 34 LLG Ref 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach 133M2133369 -.Main & PCH Nixed -Use Center, Seal aeachUtepon0368 Main & PCn Mixed. Use Center TI A 9 -W -16 doc SCALE: 1 " -50' FIGURE 11 -1 CONCEPTUAL ON- STREET PARKING LAYOUT MAIN & PCH MIXED -USE CENTER, SEAL BEACH 12.0 PROJECT SPECIFIC IMPROVEMENTS The following improvements are recommended in conjunction with development of the proposed Project to enhance site access /circulation and provide additional parking along Main Street for the general public, inclusive of customers of the proposed mixed -use building. ❑ No. 2 — Main Street /Bolsa Avenue at Pacific Coast Highway: Subject to the review and approval of Caltrans and /or the City of Seal Beach, modify existing traffic signal accordingly to allow U -tum movements from the westbound left -turn lane on Pacific Coast Highway. As shown in Figure 10 -1, the removal of the current U -turn restriction will require the replacement of a mast arm mount sign and installation of a minimum of 25 feet of red curb on Pacific Coast Highway. Additionally, restripe northbound Main Street and provide additional angled on- street parking spaces via the removal of the existing northbound right -turn lane on Main Street at Pacific Coast Highway. As shown in Figure 11 -1, up to 12 additional angled spaces on- street are provided by the enhancement, of which 7 are located along Project frontage and 5 are located along the Bay Theatre frontage. The removal of the northbound right -turn lane will have minimal impact of the operating condition of Main Street/Bolsa Avenue at Pacific Coast Highway as this intersection is forecast to continue operate at LOS D or better during the AM peak hour and PM peak hour. LMscotr, Lnw& GREEnspaw, engineers 35 LLG Ref: 2 -13 -3368 Main & PCH Mixed -Use Center Projccl, Seal Beach V_U100a] 33368 - Main & PCH Mixed -USC Comer, Sed BeaehlRepon0368 Mdn & PCH Mixed Use Cerdcr 1 JA 9.14.16 doc 13.0 CONGESTION MANAGEMENT PROGRAM (CMP) COMPLIANCE ASSESSMENT This analysis is consistent with the requirements and procedures outlined in the current Orange County Congestion Management Program (CMP). The CMP requires that a traffic impact analysis be conducted for any project generating 2,400 or more daily trips, or 1,600 or more daily trips for projects that directly access the CMP Highway System (HS). Per the CMP guidelines, this number is based on the desire to analyze any impacts that will be 3.0% or more of the existing CMP highway system facilities' capacity. However, as noted in this traffic study, the proposed Project is expected to generate no more than 762 daily trips, and thus does not meet the criteria required for a CMP traffic analysis. Therefore, it is concluded that the proposed Project will not have any significant traffic impacts on the Congestion Management Program Highway System of Orange County. LlNscoT , LAw & GREENSPAN, engineers 36 LLG lief 2 -13 -3368 Main & PCH Mixed -Use Center Project, Seal Beach N.WWC13336N- Win &PCH\4 re Use Rmeq SW BrachUk, prtUd68Vom & PCHMI.d.U'se CIIIl TIA 414.1s&, APPENDIX A TRAFFIC STUDY SCOPE OF WORK LINScou, LAw 8 GREENSPAN, engineers LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach MEMORANDUM To: Mr. Michael Ho, P.E., City Engineer Date: April 5, 2013 City of Seal Beach From: Richard E. Barretto, P.E., Princi al // LLG e 2. Linscott, Law & Greenspan, Eng � 'S,56� Subject TIA Scope of Work— Main & PCH Mixed -Use Center Project Seal Beach, California As a follow -up to our telephone discussions on Tuesday, March 26, 2013, which included Jim Basham, Law & Greenspan, Engineers (LLG) is pleased to submit the following Traffic Study Scope of Work for the proposed Main & PCH Mixed -Use Center Project for your review and approval. Traffic Studv Scone of Work Engineers 8 Planners Tta4tie Transportation Parking Utiscott Law 8 Greenspan. Engineers 2 Executive Circle Suite 250 Irvine, CA 92814 949.825,6175 5 94984AI73 r ronvr.Ilgengineers com The Traffic Impact Analysis Report for the proposed Main & PCH Mixed -Use Center Pasadena Irv6ce Project will be prepared according to City of Seal Beach Traffic Impact Study San Diego Guidelines dated March 2010 and in consideration of the traffic requirements of the woodland Hips most current Congestion Management Program (CMP) for Orange County. A. Project Location: The project site is located at 350 Main Street which is on the southeast corner of Main Street and Pacific Coast Highway in the City of Seal Beach, California. See the attached Figure 1 -1, a Vicinity Map that illustrates the general location of the Project and surrounding street system. Figure 2 -1 is an existing aerial photograph of the Project site. B. Project Description: The Project site is now currently vacant; however the subject property was previously developed with a Chevron service station that had eight (8) vehicle fueling positions and four (4) service bays. The proposed Main & PCH Mixed -Use Center Project will consist of a two story 15,000 square - foot (SF) building. Based on information provided by the project applicant, Main & PCH, LLC, the Project's mix of uses will include a 556 SF of coffee shop and 14,444 SF of retail /commercial uses consisting of 11,882 SF of retail use and /or 2,562 SF of office use or 14,444 SF of retail- oriented uses to include artist, photographer and sculptor studios as permitted in the Main Street Specife Plan, City of Seal Beach, dated July 1996; no restaurant / food uses, other than the coffee shop, are proposed at this time. Parking for the Project will be provided via a 30 -space parking structure. Access to the site is provided via an alley way which has right -turn in /out only access along Pacific Coast Highway and also connects to another alley way which has V_93W2133368- Main & PCH Missal Use Center, Seal BeroldLaners0368- Main & PCH 611xed -Ls Ccno,r CA Scope of Work 4-5 13.dea Mr. Michael He April 5, 2013 Page 2 direct access to Main Street and 1 Oth Street. Figures 2 -2 illustrates the preliminary site plan for the proposed Project. C. Project Study Area: The following five (5) key study intersections have been selected for evaluation. Key Study intersections I. Pacific Coast Highway at I" Street 4. Main St at Electric Ave L Pacific Coast Highway at Main SUBolsa Ave 5. Seal Beach Blvd at Balsa Ave 3. Pacific Coast Highway at Seal Beach Blvd D. Traffic Counts: As discussed, traffic counts have been conducted on Thursday, March 28, 2013 during the morning peak period (7:00 AM — 9:00 AM) and evening peak period (4:00 PM — 6:00 PM) at the aforementioned five (5) key study intersections. E. Project Traffic Generation: The trip generation potential of the proposed Project will be estimated using the average rates for ITE Land Use 710: General Office Building, ITE Land Use 820: Shopping Center and ITE Land Use: 936 Coffee Shop without Drive - Through published in the Trip Generation, 9th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012). Given the prior use recently closed, a comparison to the previous land use's trip generation potential has been estimated using the average trips rates for ITE 944: Gasoline /Service Station. Table I presents the ITE rates used in forecasting the vehicular trips. In combination with Table 1, the upper half of Table 2 summarizes the trip generation potential for the Previous Land Use. The trip generation potential, totals 782 daily trips, with 41 trips (21 inbound, 20 outbound) during the AM peak hour and 64 trips (32 inbound, 32 outbound) during the PM peak hour. A review of lower portion of Table 2 shows the trip generation forecast for the Project. As shown, the proposed Project, assuming a mix of retail /office /coffee hour, is forecast to generation 691 daily trips, with 44 trips (25 inbound, 19 outbound) produced in the AM peak hour and 45 trips (21 inbound, 24 outbound) produced in the PM peak hour. Comparison of the trips generated by the proposed Project to the trips generated by the Previous Land Use shows that the proposed Project overall generates less traffic Mr. Michael Ho April 5, 2013 Page 3 than the prior gas station use, with 91 fewer daily trips, 3 more AM peak hour trips and 20 fewer PM peak hour trips. For the purposes of this study the entitled "trip credit" was not applied in our analysis since the site is currently vacant. Therefore, the forecast Project trips (i.e., 44 AM trips and 45 PM trips) were used to evaluate the Project's potential traffic impacts. However, the impact of the prior gas station, assuming full operations, will be assessed and compared to that of the proposed Project. F. Project Trip Distribution Pattern: Project traffic volumes both entering and exiting the site have been distributed and assigned to the adjacent street system based on the following considerations: • location of site access points in relation to the surrounding street system, • the site's proximity to major traffic carriers and regional access routes, • physical characteristics of the circulation system such as lane channelization and presence of traffic signals that affect travel patterns, • presence of traffic congestion in the surrounding vicinity, • turn restrictions at adjacent intersections; and • input from City staff. See attached Figure 3. G. Project Completion Year Background Traffic: • Ambient Growth Rate: 1.0% per year to Year 2015/2016 subject to confirmation of the project applicant. • Cumulative Projects — Cumulative projects have been researched at the City of Seal Beach and Long Beach. Tables 3 and 4 presents the two cumulative projects located in the City of Seal Beach that will be included as part of cumulative condition; there are no related projects within the City of Long Beach. H. Analysis Scenarios: Exislin2 Year (a) Existing traffic; (b) Existing plus Project traffic; (c) Traffic in (b), with mitigation if necessary; For comparison purposes, Existing Plus Gas Station traffic will be calculated as well. Mr. Michael Ho April 5, 2013 Page 4 Project Completion Year (d) Opening Year Cumulative Traffic Conditions (Existing plus Ambient Growth plus Related Projects); (e) Traffic in (d) plus proposed project traffic; (f) Traffic in (e), with mitigation if necessary; The LOS calculations will be based on the Intersection Capacity Utilization (ICU) methodology for signalized intersections and the Highway Capacity Manual (HCM) methodology for unsignalized intersections. The Project's potential impacts will be based on City of Seal Beach significant impact criteria and Orange County CMP requirements. It should be noted that the three intersections located along Pacific Coast Highway will also be evaluated using the HCM signalized methodology per Caltrans requirements. I. Other Issues: • Evaluate Site Access and Internal Circulation, inclusive circulation within the proposed parking structure. • Assess potential construction of angled on- street parking along the project frontage on Main Street in place of the existing right -turn lane. • Project Parking Requirements using current parking requirements as documented in the Main Street Specific Plan, City of Seal Beach, dated July 1996. Mr. Michael Flo April 5, 2013 Page 5 We appreciate the opportunity to provide this scope of work. Should you have any questions, please call us at (949) 825 -6175. Thank you. Recommended by: Ing 7 % 1; Consultant's Representative Approved by: City of Seal Beach Jim Basham, Director of Community Development Shane Green, P.E., Transportation Engineer 111, LLG File 4/5/2013 Date Date Mr. Michael Ho April 5, 2013 Page 6 TABLE 1 PROJECT TRAFFIC GENERATION RATES' ITE Land Use Code Daily 2 -Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total • ITE 710: General Office (TE /1,000 SF) 11.03 88% 12% 1.56 17% 83% 1.49 • ITE 820: Shopping Center (TE /1,000 SF) 42.7 62% 38% 0.96 48% 52% 3.71 • ITE 936: Coffee Shop without Drive - Through 745.652 51% 49% 108.38 50% 50% 40.75 (TE /1,000 SF) • ITE 944: Gasoline /Service Station 168.56 51% 49% 12.16 50% 50% 13.87 (TE /Fueling Position) Notes TF11,000 SF =Trip ends per 1,000 square feet of development Source: Trip Generation Manual, 9ih Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012). No data is provided for Daily rates. Therefore, the Daily rate was assumed to be equal to the average between the AM and PM peak hour multiplied by a factor of 10. Mr. Michael Ho April 5, 2013 Page 7 TABLE 2 PROJECT TRAFFIC GENERATION FORECAST Pass -by trips are trips made as intermediate stops on the way from an origin to a primary trip destination. Pass -by trips are attracted from traffic passing the site on adjacent streets (i.e. Pacific Coast Highway and Main Street). The Trip Generation Manual, 9" Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012), Volume 1: User's Guide and Handbook recommends a pass -by reduction factor of 58% for the AM peak hour and 42% for the PM peak hour. The Daily pass -by percentage was estimated to be 42 %. Per ITE Handbook, the Daily pass -by reduction for a Coffee /Espresso Stand with drive - through window service is 89 %. To provide a conservative estimate, a pass -by reduction factor of 50% was used for the Project on a Daily and AM and PM peak hour basis. Per ITE Handbook the PM peak hour pass -by reduction factor of 34% was used. The Daily and AM peak hour pass -by percentage was estimated to be 10 %. Daily AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Project Description 2 -Way Previous (Existine) Land Use Development 1,348 49 48 97 56 55 111 • Chevron Gas- Station (8 fueling positions) Pass -By Reduction -566 -28 -28 -56 -24 -23 -47 Previous Land Use "Net" Trip Generation 782 21 20 41 32 32 64 Proposed Project • Coffee Shop (556 SF) 415 31 29 60 12 11 23 Pass -By Reduction" -208 -16 -14 -30 -6 -5 -11 Subtotal 207 15 15 30 6 6 12 • Retail (11,882 SF) 507 7 4 11 21 23 44 Pass -By Reductions -51 -1 0 -1 -7 -8 -15 Subtotal 456 6 4 10 14 15 29 • Office (2,562 SF) 28 4 0 4 1 3 4 Proposed Project `Net" Trip Generation 691 25 19 44 21 24 45 Net Difference Trip Generation Forecast -91 4 -1 3 -I1 -9 -20 Proposed Project vs. Previous Land Use Pass -by trips are trips made as intermediate stops on the way from an origin to a primary trip destination. Pass -by trips are attracted from traffic passing the site on adjacent streets (i.e. Pacific Coast Highway and Main Street). The Trip Generation Manual, 9" Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012), Volume 1: User's Guide and Handbook recommends a pass -by reduction factor of 58% for the AM peak hour and 42% for the PM peak hour. The Daily pass -by percentage was estimated to be 42 %. Per ITE Handbook, the Daily pass -by reduction for a Coffee /Espresso Stand with drive - through window service is 89 %. To provide a conservative estimate, a pass -by reduction factor of 50% was used for the Project on a Daily and AM and PM peak hour basis. Per ITE Handbook the PM peak hour pass -by reduction factor of 34% was used. The Daily and AM peak hour pass -by percentage was estimated to be 10 %. Mr. Michael Ho April 5, 2013 Page 8 TABLE 3 LOCATION AND DESCRIPTION OF RELATED PROJECTS6 No. Cumulative Project Location /Address Description City of Seat Beach Development South of Marina Drive, east of the San 48 single family DU and 6.4 acres of Ocean Place Residential I. Gabriel River Channel, west of I Project Street neighborhood park Demolition of 2,800 SF of retail and construction 2. 8'" Street Medical 8`h Street and Pacific Coast Highway of 4,470 SF of medical office 6 Source'. City otSeal Beach Planning Department. Mr. Michael Ho April 5, 2013 Page 9 TABLE 4 RELATED PROJECTS TRAFFIC GENERATION FORECAST' Source: Trip Generation, 91h Edition, Institute of Transportation Engineers, (I FE) [Washington. D C. (2012)] . 8 Source: Ocean Place Residential Project Tld prepared by LI.G, dated October 27, 2011_ AM Peak Hour PM Peak Hour Daily Cumulative Project Description Two Way In Out Total In Out Total City of Seat Beach Development 561 13 34 47 36 21 57 1. Ocean Place Residential Projects 2. 8" Street Medical 162 8 3 11 5 13 18 Total Cumulative Projects 823 21 37 58 41 34 75 Trip Generation Potential Source: Trip Generation, 91h Edition, Institute of Transportation Engineers, (I FE) [Washington. D C. (2012)] . 8 Source: Ocean Place Residential Project Tld prepared by LI.G, dated October 27, 2011_ ®- STUDY INI RSECTION FIGURE 1 -1 N E :I = PROJECT SITE NO SCALE VICINITY MAP MAIN & PCH MIXED -USE CENTER, SEAL BEACH SOURCE: BING KEY FIGURE 2 -1 [] = PROJECT SITE N NO SCALE EXISTING AERIAL SITE PHOTOGRAPH MAIN & PCH MIXED -USE CENTER, SEAL BEACH O Alley 'II -J: 7F Main Street SOURCE MAIN AND PCH LLC Q). SCALE FIGURE 2-2 PROPOSED SITE PLAN MAIN & PCH MIXED-USE CENTER, SEAL BEACH s� n SZ v y 0 59 BCLSA AVE O F n OqS v 2 o, Ss hkr � E \' Og �P 8 h S KEY FIGURE 3 ®= SNDY INTERSECION (TAO SCALE PROJECT SITE PROJECT DISTRIBUTION PATTERN MAIN & PCH MIXED -USE CENTER, SEAL BEACH APPENDIX B EXISTING TRAFFIC COUNT DATA LiNscou, LAw 8 GREENSPAN, engineers LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach City: SEAL BEACH N -S Direction: 1ST STREET E -W Direction: PACIFIC COAST HIGHWAY Transportation Studies, Inc. 2640 Walnut Avenue, Suite B Tustin. CA, 92780 File Name : h1303039 Site Code : 00000562 Start Date : 3/28/2013 Page No : 1 — BREAK "' 04:00 PM 0 1ST STREET 0 PACIFIC COAST 353 1ST STREET 8 PACIFIC COAST 30 25 416 0 Southbound 04:15 PM 1 HIGHWAY 1 Northbound 344 4 HIGHWAY 1 29 22 390 0 795 04:30 PM Westbound 0 0 0 Eastbound 5 10 Start Time Ri hIT ru Left Ri ht Thru Left Right] Thru I Left Right I Thru I Left I Int Total 07:00 AM 5 0 0 0 0 325 3 2 0 51 11 296 1 689 07:15 AM 181 1 0 0 2 392 2 S 0 55 9 362 1 832 07:30 AM 393 2 0 1 1 409 1 8 0 48 14 362 1 847 07:45 AM 0 0 0 __ 0 2 415 3 17 0 38 11 376 2 864 Total 1 3 0 1 5 1541 9 35 0 192 45 1396 5 3232 08:00 AM 971 0 0 0 1 393 1 17 0 451 13 362 01 836 08:15 AM 444 1 0 D 4 408 1 1 9 0 39 1 17 334 0 813 08:30 AM 1421 1 0 0 0 362 4 10 0 40 15 287 1 720 08:45 AM 2 0 0 0 341 6 8 0 591 11 315 0 733 Total 0.2 4 0 01 5 1504 161 44 0 174 1 56 1298 1 1 3102 — BREAK "' 04:00 PM 0 0 0 0 353 5 8 0 30 25 416 0 837 04:15 PM 1 0 1 0 344 4 3 1 29 22 390 0 795 04:30 PM 0 0 0 0 372 5 10 0 31 22 465 1 906 04:45 PM 0 0 0 0 339 4 5 2 13 35 484 1 883 Total 1 0 1 0 1408 181 26 3 103 104 1755 21 3421 05.00 PM 1 1 2 1 393 7 13 0 24 30 513 1 986 05:15 PM 1 0 0 1 389 8 8 0 39 20 485 0 951 0530 PM 1 0 0 0 397 8 11 0 37 42 475 0 971 05:45 PM 0 0 0_ 1 368 81 9 0 42 38 444 0 910 Total 3 1 2 3 1547 311 41 0 1421 130 1917 1 3818 Grand Total 11 1 4 13 6000 74 146 3 611 335 6366 9 13573 Apprch % 68.8 6.2 25 0.2 98.6 1.2 19.2 0.4 80.4 5 94.9 0.1 Total % 0.1 0 0 0.1 44.2 0.5 1.1 0 4.5 2.5 46.9 0.1 Aff Transportation Studies, Luc. 2640 Walnut Avenue, Suite Tustin, CA, 92780 City: SEAL BEACH N -S Direction: 1ST STREET E -W Direction: PACIFIC COAST HIGHWAY File Name : h1303039 Site Code : 00000562 Start Date : 312812013 Page No : 2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 P-1, Hm it fns Rmine of r17 1S A. InL To al 07:15 AM 1ST STREET Southbound PACIFIC COAST HIGHWAY Westbound 1ST STREET Northbound PACIFIC COAST HIGHWAY Eastbound Start Time I Right l Thru I Left I App Tmai I Right I Thru I Left I Apo Total I Right Thru Left Aao Tow I Right I Thru I Left I App Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 P-1, Hm it fns Rmine of r17 1S A. InL To al 07:15 AM 1 0 0 1 2 392 2 396 8 0 55 63 9 362 1 372 832 07:30 AM 2 0 1 3 1 409 1 411 8 0 48 56 14 362 1 377 847 07:45 AM 0 0 0 0 2 415 3 420 17 0 38 55 11 376 2 389 864 08:00 AM 0 0 0 0 1 393 5 399 17 0 45 62 13 362 0 375 836 Total Volume 3 0 1 4 6 1609 11 1626 50 0 186 236 47 1462 4 1513 3379 App. Total 75 0 25 04 99 0.7 212 0 78.8 31 96.6 0.3 PHF .375 .000 .250 .333 .750 .969 .550 .968 .735 .000 .845 .9371 .839 .972 .500 .912 1 .978 B -2 1 ST STREET Out In Total 1V, 6 1 14 3 0 1 :R hl Thre Left fT L� Peak Hour Data Peak Hour Begins at 0]_'15 A1vm H -2 3y O n TUmino Movements 4l r Lefl Thru Ri ht 186 0 50 58 236 294 Out In Total TRPFT B -2 Transportation Studics, Inc 2640 Walnut Avenue- Suite If Tustin, C.A. 92780 City: SEAL BEACH N -S Direction: 1ST STREET E -W Direction: PACIFIC COAST HIGHWAY 1ST STREET PACIFIC COAST HIGHWAY 1ST STREET Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hnur fnr Fntire Intersecfinn Renins at n5'no PM File Name : h1303039 Site Code : 00000562 Start Date : 3/2812013 Page No :3 PACIFIC COAST 05:00 PM 1 1 2 4 1 393 7 401 13 0 24 37 30 513 1 544 986 05:15 PM 1 0 0 1 1 389 8 398 8 0 39 47 20 485 0 505 951 05:30 PM 1 0 0 1 0 397 8 405 11 0 37 48 42 475 0 517 971 05:45 PM 0 0 0 01 1 368 8 377 9 0 42 51 38 444 0 482 910 Total Volume 3 1 2 6 I 3 1547 31 1581 41 0 142 183 130 1917 1 2048 3818 Y. App. 50 16.7 33.3 02 97.8 2 224 0 77.6 6.3 93.6 0 PHF .750 .250 .250 .3751 750 .974 .969 .976 .788 .000 .845 897 .774 .934 .250 .941 .968 1 ST STREET Out In Total [_� 6 l0 3 21 Right Thru Left 41 4 Peak Hour Data �0 - ~ � j J North i O ml `k Peak Hour begins at 05:00 P 1 �^ — F U �m t U uming Movemmis r awn ~ F* Left Th Q R d4 672 183 345 Out In Total B -3 City: SEAL BEACH N -S Direction: MAIN STREET E -W Direction: PACIFIC COAST HIGHWAY Transportation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA_ 92780 Grnnnc Printod- Turninn M —&—nla File Name : h1303040 Site Code :00003872 Start Date : 3/28/2013 Page No : 1 '" BREAK "' 04:00 PM 37 13 PACIFIC COAST 1 5 266 21 PACIFIC COAST 14 16 34 MAIN STREET 359 57 844 04:15 PM MAIN STREET 42 13 2 1 349 24 27 15 HIGHWAY 16 348 68 942 04:30 PM HIGHWAY 40 20 3 Southbound 4 287 10 21 Northbound 33 27 374 51 885 04:45 PM 23 10 4 Westbound 317 18 17 28 Eastbound 31 391 Start Time Ri ht Thru Left Right Thru Left Ri ht Thru Lek Ri ht Thru Left Int. Total 07:00 AM 17 5 0 0 273 3 14 3 7 13 277 9 621 07:15 AM 24 12 1 1 356 8 8 6 10 11 386 15 838 07:30 AM 14 10 3 3 374 6 18 8 4 9 321 24 794 07:45 AM 25 15 0 1 374 7 19 19 12 14 349 37 872 Total 80 42 41 5 1377 24 59 36 33 47 1333 85 3125 08:00 AM 38 13 1 1 326 6 5 8 181 14 303 16 749 08:15 AM 35 20 2 2 371 12 17 16 14 12 315 11 827 08:30 AM 20 8 6 1 320 12 7 18 17 12 289 14 724 0845 AM 23 14 3. 4 356 8 7 8 17 24 332 30 826 Total 1 116 55 121 8 1373 381 36 50 661 62 1239 71 3126 '" BREAK "' 04:00 PM 37 13 6 1 5 266 21 14 16 34 16 359 57 844 04:15 PM 42 13 2 1 349 24 27 15 37 16 348 68 942 04:30 PM 40 20 3 4 287 10 21 15 33 27 374 51 885 04:45 PM 23 10 4 3 317 18 17 28 31 31 391 52 925 Total 1 142 56 151 13 1219 731 79 74 1351 90 1472 228 3596 29 13 13 2 28 5D4 67 1121 05:45 M —152 20 16 12 1385 1001 64 69 100 98 1345 222 4027 Grand Total 496 226 47 40 5356 2351 238 221 334 297 5779 606 13875 Approh % 64.5 29.4 6.1 0.7 95.1 4.2 30 27.9 42.1 4.4 86.5 9.1 Total % 3.6 1.6 0.3 0.3 38.6 1.7 1.7 1.6 2 4 2.1 41.7 4.4 t- Transportation Studies, Inc. 2640 Walnut Avenue, Suite Ii Tustin, CA. 92780 City: SEAL BEACH N -S Direction: MAIN STREET E -W Direction: PACIFIC COAST HIGHWAY File Name : h1303040 Site Code : 00003872 Start Date : 3/28/2013 Page No : 2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Pnak Hnur fnr Pnfim Inf --firm fe—inc ar rt] 15 AAA Inl Total 07:15 AM MAIN STREET Southbound PACIFIC COAST HIGHWAY I Westbound MAIN STREET j I Northbound PACIFIC COAST HIGHWAY Eastbound Start Time Right Thru I Left I naa. rotqi Right Thru Left A .TOUT Ri ht Thru Lefl TOIaI Right Thru Left APU. tool. Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Pnak Hnur fnr Pnfim Inf --firm fe—inc ar rt] 15 AAA Inl Total 07:15 AM 24 12 1 37 1 356 8 365 8 6 10 24 11 386 15 412 838 07:30 AM 14 10 3 27 3 374 6 383 18 8 4 30 9 321 24 354 794 07:45 AM 25 15 0 40 1 374 7 382 19 19 12 50 14 349 37 400 872 08:00 AM 38 13 1 52 1 326 6 333 5 8 18 31 14 303 16 333 749 Total Volume 101 50 5 1561 6 1430 27 1463 50 41 44 135 48 1359 92 1499 3253 % . Total 64.7 32.1 3.2 0.4 977 1.8 37 30.4 32.6 3.2 90.7 6.1 PHF .664 .833 .417 .750 1 .500 .956 .844 .955 1 658 .539 .611 .675 .857 .880 .622 .910 I .933 MAIN STREET Out In Total U9 156 _205 101 50 5 aR T! nu Lefl �I 11 L� Peak Hour Data > 2 Ica 2 �n Oa c —� Peak Hour Begins at 07] S A f -2 0 5= LLr Tum�MOVement m �m a +, r Left Tien Ri nt 44 41 L_ 125 I F 260 Out In Total wl Transponation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92780 City: SEAL BEACH N -S Direction: MAIN STREET E -W Direction: PACIFIC COAST HIGHWAY File Name : h1303040 Site Code : 00003872 Start Date : 3128/2013 Page No :3 _ MAIN STREET Southbound PACIFIC COAST HIGHWAY MAIN STREET Westbound Northbound PACIFIC COAST HIGHWAY I Eastbound I Start Time I Right I Thru I Left I App, Total Right I Thru I Left I App. TcAM Right I Thru I Left I Ago. Total I Right I Thru I Left Aoo Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int Total 05:00 PM 28 18 1 47 2 340 24 1661 14 16 31 61 26 441 54 521 995 05:15 PM 47 17 3 67 3 375 29 407 13 13 22 48 28 504 67 599 1121 05:30 PM 52 18 8 78 7 305 23 335 18 13 19 50 19 446 37 502 965 0545 PM 31 20 4 55 2 367 24 393 19 19 28 66 25 344 64 433 947 Total Volume 158 73 16 247 14 1387 100 1501 64 61 100 225 98 1735 222 2055 4028 Ao .Total 64 29.6 6.5 0,9 92.4 6.7 28.4 27.1 444 4.8 84.4 10.8 1 PHF 1 .760 .913 .500 .792 .500 .925 .862 .922 1 .842 .803 .806 -852 .875 .861 .828 .858 .898 MAIN STREET Out In Total 297 247 158 73 16 Right Thru Left T 1 L' Peak Hour Data 3 i on 0 °J North Lp r p OQ �F Peak H., Begins at 0500 P �y 0 q min Mmem n u�Pj, Wr a F T r LeR Thru Ri ht F 2711 1 225 F 4% Out In Total IM City: SEAL BEACH N -S Direction: BALBOA DR / 12TH ST E -W Direction: PACIFIC COAST HIGHWAY Transportation Studies. Inc. 2640 Walnut Avenue, Suite H Tustin, CA, 92780 File Name : h1304116 Site Code : 00005163 Start Date : 4/10/2013 Page No : 1 08:00 AM 9 17 PACIFIC COAST 3 340 6 PACIFIC COAST 9 20 5 BALBOA DRIVE 5 780 08:15 AM 12TH STREET 9 5 1 366 5 10 6 15 HIGHWAY 326 10 766 08:30 AM HIGHWAY 5 4 1 Southbound 5 8 8 Northbound 7 310 6 724 08:45 AM 6 3 14 Westbound 351 10 9 Eastbound 22 4 Start Time Right Thru I Left Right I ThruT Left Ri ht I Thru Left Ri hl Thru Left Int. Total 07:00 AM 1 4 8 1 365 2 6 7 19 3 315 0 731 07:15 AM 8 4 7 0 404 6 4 8 14 9 403 3 870 07:30 AM 6 5 8 3 397 5 7 33 17 6 351 21 859 07:45 AM 11 13 10 0 323 10 8 9 16 5 353 6 764 Total 26 26 33 4 1489 23 25 57 66 23 1422 30 3224 08:00 AM 9 17 11 3 340 6 13 9 20 5 342 5 780 08:15 AM 6 9 5 1 366 5 10 6 15 7 326 10 766 08:30 AM 3 5 4 1 348 5 8 8 19 7 310 6 724 08:45 AM 6 3 14 4 351 10 9 12 22 4 241 4 680 Total 1 24 34 34 9 1405 26 40 35 76 23 1219 25 2950 BREAK — 04:00 PM 0 11 12 3 308 2 14 14 16 11 330 19 740 04:15 PM 7 19 8 8 315 3 13 8 16 9 384 10 800 04:30 PM 10 7 10 3 315 7 9 13 23 8 390 15 810 04:45 PM 8 15 17 4 340 7 7 8 19 7 439 13 884 Total 25 52 47 18 1278 191 43 43 74 35 1543 57 3234 05:00 PM 2 16 18 5 345 10 7 18 11 11 396 19 858 05:15 PM 6 19 13 5 365 4 13 11 17 14 481 12 960 05:30 PM 10 14 16 5 374 8 10 7 21 22 486 22 995 05:45 PM 5 15 11 2 389 16 8 14 17 15 481 13 986 Total 23 64 58 17 1473 381 38 50 661 62 1844 661 3799 Grand Total 98, 176 172 48 5645 106 146 185 282 143 6028 178 13207 Apprch% 22 39.5 38.6 0.8 97.3 1.8 218 30.2 46 2.3 94.9 2.8 Total % 0.7 1.3 1.3 0.4 42.7 0.8 11 1.4 2.1 1.1 45.6 1.3 13-7 Trmaponution Studies, Inc. 2640 W91nut Avenue, Suite H Tustin, CA. 92780 City: SEAL BEACH N -S Direction: BALBOA DR / 127H ST E -W Direction: PACIFIC COAST HIGHWAY File Name : h1304116 Site Code :00005163 Start Date : 4/10/2013 Page No :2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 0715 AM Inl. Total 07:15 AM BALBOA DRIVE Southbound PACIFIC COAST HIGHWAY I Westbound 12TH STREET Northbound PACIFIC COAST HIGHWAY Eastbound Start Time I Right I Thru I Left I APO. Taal I Right I Thru I Left I APP. Toia I Right I Thru I Left APP Tolal R "ght Thru Left APP Tm� Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 0715 AM Inl. Total 07:15 AM 8 4 1 19 0 404 6 410 4 8 14 26 9 403 3 415 870 07:30 AM 6 5 8 19 3 397 5 405 7 33 17 57 6 351 21 378 859 07:45 AM 11 13 10 34 0 323 10 333 8 9 16 33 5 353 6 364 764 08:00 AM 9 17 11 37 3 340 6 349 13 9 20 42 5 342 5 352 780 Total Volume 34 39 36 109 6 1464 27 1497 32 59 67 158 25 1449 35 1509 3273 App, Total 31.2 35.8 33 0.4 97.8 1.8 20.3 37.3 42.4 1.7 96 2.3 PHF 1 .773 .574 .818 .736 1 .500 .906 .675 .913 .615 .447 .838 .693 .694 _899 .417 .909 1 .941 BALBOA DRIVE Out In — Total 100 109 t 2091 34 39 36 R In Tht, Lleft :fl N Peak Hour Data <oo �_ on A 0 v� North v F —i Peak Hour B:ginn :107:15 A 4 3 y O 41 T r Left Thru RI ht 67 59 32 911 158 249 Out In Total MU Transportation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92780 City: SEAL BEACH N -S Direction: BALBOA DR / 12TH ST E -W Direction: PACIFIC COAST HIGHWAY Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM File Name : h1304116 Site Code :00005163 Start Date :4/10/2013 Page No :3 COAST HIGHWAY 05:00 PM 2 16 18 36 5 345 10 360 7 18 11 36 11 396 19 426 858 05:15 PM 6 19 13 38 5 365 4 374 13 11 17 41 14 481 12 507 960 05:30 PM 10 14 16 40 5 374 8 387 10 7 21 38 22 486 22 530 995 05:45 PM 5 15 11 31 2 389 16 407 8 14 17 39 15 481 13 509 986 Total Volume 23 64 58 145 17 1473 38 1528 1 38 50 66 154 62 1844 66 1972 3799 APP. Total 15.9 44.1 40 1.1 96.4 2.5 247 32.5 42.9 3.1 93.5 13 PHF .575 .842 .806 .906 1 .850 .947 .594 .939 1 .731 .694 .786 .939 .705 .949 .750 .930 .955 Out In Total 1331 F 145 F 2781 23 64 58 Pig ut Thm Letl Peak Hour Data un North Peak Hour Begins'105:00 P T min M 4, T r Left Thru Ri ht L@ 64 154 316 Out In Total M City: SEAL BEACH N -S Direction: SEAL BEACH BOULEVARD E -W Direction: PACIFIC COAST HIGHWAY 'I ransportation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92780 rrmrna Printed- T1jrninn M —manta File Name : H1303041 Site Code : 00003873 Start Date : 3/28/2013 Page No : 1 08 00A SEAL BEACH 32 PACIFIC COAST 87 SEAL BEACH 3 PACIFIC COAST 34 3 5 BOULEVARD 29 HIGHWAY 08.15 AM BOULEVARD 25 87 HIGHWAY 315 9 26 Southbound 7 Westbound 263 Northbound 947 0830 AM Eastbound 21 55 Start Time Right Th 13 Th_ Left 23 R ht i Ri hi Thru Left Int. Total 07:00 AM 39 15 68 79 238 6 24 32 1 7 233 34 776 07:15 AM 34 9 82 93 351 1 18 36 3 3 313 29 972 07:30 AM 42 18 93 99 368 3 16 31 2 2 350 31 1055 07:45 AM 49 36 97 115 335 4 24 45 3 4 353 35 1100 Total 164 78 340 386 1292 14 82 144 9 16 1249 129 3903 08 00A 57 32 91 87 319 3 21 34 3 5 332 29 1013 08.15 AM 26 25 87 116 315 9 26 40 7 4 263 29 947 0830 AM 44 21 55 107 330 13 21 23 3 5 291 29 942 08:45 AM 47 23 66 80 292 8 16 36 7 7 230 26 838 Totals 174 101 299 390 1256 331 84 133 20 1 21 1116 1131 3740 "' BREAK — 04:00 PM 48 48 104 62 210 14 13 38 5 8 285 57 892 04:15 PM 58 35 76 85 315 17 27 22 5 4 321 54 1019 04:30 PM 39 44 97 74 257 11 20 32 6 7 322 50 959 04:45 PM 59 37 86 67 321 18 13 24 5 3 375 42 1050 Total 1 204 164 3631 26B 1103 601 73 116 21 22 1303 2031 3920 05:00 PM 59 43 111 69 278 18 22 40 5 7 388 39 1079 05:15 PM 61 36 107 77 352 22 16 32 0 9 412 45 1169 05:30 PM 60 52 95 54 276 17 26 30 5 9 357 61 1042 05:45 PM 68 28 85 65 341 18 24 30 1 12 416 48 1136 Total 248 159 398 1 265 1247 751 88 132 11 37 1573 193 4426 Grand Total 790 502 1400 1 1329 4898 1821 327 525 61 96 5241 638 15989 Apprch % 29.3 18.6 52 20.7 76.4 2.8 35.8 57.5 6.7 1.6 87.7 10.7 Total % 4.9 3.1 8.8 8.3 30.6 1.1 2 33 0.4 0.6 32.8 4 B -10 Transportation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92790 City: SEAL BEACH N -S Direction: SEAL BEACH BOULEVARD E -W Direction: PACIFIC COAST HIGHWAY Peak Hour Analysis From 07:00 AM to 08.45 AM - Pe P—k Hni v fnr Pntiro Inf[ fcArtinn Rcninc nt (1718 Ake File Name : H1303041 Site Code : 00003873 Start Date : 3/28/2013 Page No : 2 BOULEVARD I PACIFIC COAST HIGHWAY 07:15 AM 34 9 82 125 93 351 1 445 18 36 3 57 3 313 29 345 972 07:30 AM 42 18 93 153 99 368 3 470 16 31 2 49 2 350 31 383 1055 0745 AM 49 36 97 182 115 335 4 454 24 45 3 72 4 353 35 392 1100 08:00 AM 57 32 91 180 87 319 3 409 21 34 3 58 5 332 29 366 1013 Total Volume 1 182 95 363 640 394 1373 11 1778 79 146 11 236 1 14 1348 124 1486 4140 --2j-App . Total 28.4 14.8 56.7 22.2 77.2 0.6 33.5 61.9 47 0.9 907 8.3 PHF .798 .660 .936 .879 .857 .933 .688 .946 .823 .811 .917 .8191 .700 .955 .886 .948 .941 SEAL BEACH BOULEVARD Out In Total 664 E 640 1304 1B2 95 3fi3 RR lht Tftm Left 1' I L. Peak Hour Data 0 a- ry _ 1 .° �~ vJ Nom S r c _ Q r= —� Peak Hour Begins a1 W.15 A 4 -2 O ur Tumin Movements rr� e' ♦ m O n- a —< r Left Tom Ri hl 11 146 79 120 236 1 356 Out In Toou ME Transpnnation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92780 City: SEAL BEACH N -S Direction: SEAL BEACH BOULEVARD E -W Direction: PACIFIC COAST HIGHWAY File Name : H1303041 Site Code : 00003873 Start Date : 3/28/2013 Page No : 3 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int Total 05:00 PM SEAL BEACH BOULEVARD Southbound I PACIFIC COAST HIGHWAY I SEAL BEACH BOULEVARD Westbound Northbound PACIFIC COAST HIGHWAY Eastbound Start Time Right Thru Left .Total Ri ht Thru Left MP. Tola Right Thru Left APP. Total Right _ _ Thru I Left I An,_ Total _ Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int Total 05:00 PM 59 43 111 213 69 278 18 365 22 40 5 67 1 7 388 39 434 1079 05:15 PM 61 36 107 204 77 352 22 451 16 32 0 481 9 412 45 466 1169 05:30 PM 60 52 95 207 54 276 17 347 26 30 5 61 9 357 61 427 1042 05:45 PM 68 28 85 181 65 341 18 424 24 30 1 55 12 416 48 476 1136 Total Volume 248 159 398 805 265 1247 75 1587 88 132 11 231 37 1573 193 1803 4426 °h Ao . Tolal 30.8 19.8 49 4 16.7 78.6 4.7 38.1 57.1 4.8 2.1 871 10.7 PHF 1 .912 764 .896 .945 .860 .886 .852 .880 1 846 .825 .550 .862 .771 .945 .791 9471 947 SEAL BEACH BOULEVARD Out In Total 590 805 1395 248 159 398 in Thnn Left J f. I Peak Hour Data tt North - � � n tiN F —O TPueak i a _y J I90 y 2 � < VA a m< Len_ Thru_ Rght, �11 2711 231 F 502 O t In Total M City: SEAL BEACH N -S Direction: MAIN STREET E -W Direction: ELECTRIC AVENUE Transportation Studies, Inc. 2640 Walnut A, mw, Suite H Tustin, CA. 92780 rr .un�arl.ded- T—in., u....o,.,o.,+� File Name : h1303042 Site Code : 00005423 Start Date : 3/28/2013 Page No : 1 08:00 AM MAIN STREET 23 ELECTRIC AVENUE 6 MAIN STREET 8 ELECTRIC AVENUE 23 4 2 Southbound 7 Westbound 108 Northbound 5 Eastbound 1 7 Start Time Ri ht Thru Left Right Thru Left Right Thru Left Ri ht l Thru Lefl Int Total 07:00 AM 2 11 3 5 14 7 2 14 0 0 4 7 69 07:15 AM 4 16 1 3 8 7 1 17 3 3 7 5 75 07:30 AM 2 17 6 3 12 2 2 13 3 0 4 8 72 07:45 AM 6 15 6 7 11 6 2 16 5 3 9 9 95 Total 14 59 16 18 45 22 7 60 11 6 24 291 311 08:00 AM 3 23 8 6 12 8 3 23 4 2 9 7 108 08:15 AM 5 27 1 7 18 7 4 26 3 1 5 8 112 08:30 AM 7 17 3 12 8 7 4 26 2 4 8 11 109 08:45 AM 3 20 3 9 14 7 3 19 2 2 8 9 99 Total 18 87 151 34 52 291 14 94 11 9 30 351 428 BREAK "' 04:00 PM 8 33 7 13 13 10 1 33 1 2 8 8 137 04:15 PM 4 40 6 9 3 11 8 39 1 1 13 20 155 04.30 PM 6 34 4 6 19 9 2 32 1 2 16 10 141 04:45 PM 6 29 10 10 11 8 3 24 3 3 17 12 136 Total 24 136 271 38 46 381 14 128 61 8 54 501 569 05 30 PM 6 3 8 25 0 16 _ 05:4 PM 10 45 6 11 13 25 5 2 13 150 Total 27 173 171 36 68 281 15 110 81 14 51 331 580 Grand Total 83 455 75 126 211 1171 50 392 361 37 159 147 1888 Apprch % 13.5 74.2 12.2 27.8 46.5 25.8 10.5 82 7.5 10.8 46.4 42.9 Total °/ 4.4 24.1 4 6.7 11.2 6.2 2.6 20.8 1.9 2 8.4 7.8 ME Transportation Studics, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92780 City: SEAL BEACH N -S Direction: MAIN STREET E -W Direction: ELECTRIC AVENUE File Name : h1303042 Site Code : 00005423 Start Date : 3/28/2013 Page No 2 MAIN STREET Southbound ELECTRIC AVENUE I Westbound MAIN STREET Northbound ELECTRIC AVENU� I Eastbound Start Time Right Thru Left j Asp Total I Right I Thou I Left I Ago. Total Rightl Thru Left Aw. To�el Right Thru Leh npP. To1L Peak Hour Analysis From 07:00 AM to 08:45 AM -Peak 1 of 1 0-1, 14— fnr PmGo Inmre —u— Q—;. » nu -nn nun Int. Total 08:00 AM 3 23 8 34 6 12 8 26 3 23 4 30 2 9 7 18 108 08:15 AM 5 27 1 33 7 18 7 32 4 26 3 33 1 5 8 14 112 08:30 AM 7 17 3 27 12 8 7 27 4 26 2 32 4 8 11 23 109 08:45 AM 3 20 3 26 9 14 7 30 3 19 2 24 2 8 9 19 99 Total Volume 18 87 15 120 34 52 29 115F 14 94 11 119 9 30 35 74 428 k App. Total 15 72.5 12.5 29.6 45.2 25.2 11 8 79 9.2 122 40.5 47.3 PHF 1 .643 .806 469 882 .722 .906 .898 .875 .904 .688 .902 .563 833 .795 .804 _..955 MAIN STREET Out In Total 63 20 283 181 8] 15 7 nl Thin Let I 4 Peak Hour Data n J� zF� ��JJ Won Lp I or U i� —k Peak Hcku Beginsat0&00 L c~i l— e'– Turnip Movem nls o ur 0 J �d 41 r Left Th ru Ri h1 tt 94 14 25 119 244 Out In Total B -14 Transportation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA. 92780 City: SEAL BEACH N -S Direction: MAIN STREET E -W Direction: ELECTRIC AVENUE File Name : h1303042 Site Code : 00005423 Start Date : 3/28/2013 Page No :3 MAIN STREET f Southbound ELECTRIC AVENUE Westbound MAIN STREET Northbound ELECTRIC AVENUE I Eastbound Start Time Right I Thru I Left I p Total I Right I Thou I Left ACG. TOWI Right I Thr I Left I AM Tole! I Right Thru I Left I A, T. I.1 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak i of 1 Peak Hour for Entire Intersection Begins at 05:00 PM ' Int. Total 05:00 PM 6 47 4 57 7 9 9 25 5 30 3 38 2 15 4 21 141 05:15 PM 5 43 3 51 5 25 7 37 1 24 4 29 5 14 6 25 142 05:30 PM 6 38 4 48 13 21 8 42 4 25 0 29 2 16 10 28 147 05:45 PM 10 45 6 61 11 13 4 28 5 31 1 37 5 6 13 24 150 Total Volume 27 173 17 217 36 68 28 132 15 110 8 133 14 51 33 98 580 % App. Total 12.4 79.7 7.8 273 51.5 21.2 11.3 82.7 14.3 52 33.7 PHF .675 920 .708 .889 1 .692 .680 .778 .786 .750 .887 .500 .875 .700 797 .635 .8751 .967 MAIN STREET Out In Tatal 79 F-2-1-71 FSO 27 173 17 'iyht Th ru LL, JJ Peak Hour Data In �~ yJ I p �OIn Z Nunn w J On v W `� Peak Hour 13 ins at 05'00 PMT 4 —� - n �^ t Tumina Mayg�e0 s�� 2 = m w Z �= u, o �dm T r Lett Thru Ri M 215 1 Out In Total MAIN B -15 City: SEAL BEACH N -S Direction: SEAL BEACH BOULEVARD E -W Direction: BOLSA AVENUE Transponation Studies, Inc. 2640 Walnut Avenue, Suite H 'Tustin, CA. 92760 Grouns Printed - Turning Movements File Name : h1303043 Site Code : 00001944 Start Date : 3/28/2013 Page No 1 — BREAK "' 04:00 PM 04:15 PM 04:30 PM 04:45 PM SEAL BEACH 170 162 177 182 9 13 5 9 0 5 a 3 3 1 3 2 SEAL BEACH 6 5 2 6 136 155 150 115 3 7 3 4 11 8 4 8 3 3 0 5 54 33 25 36 459 446 436 434 Total BOLSA AVENUE 691 36 16 BOLSA AVENUE 19 556 171 BOULEVARD 11 1481 1775 05:00 PM BOULEVARD 179 13 7 2 1 2 126 4 Westbound 3 33 433 05:15 PM Eastbound 218 9 4 3 Southbound 6 154 5 6 Northbound 36 505 05:30 PM 55 169 Stag Time Right Thru I Left Ri ht Thru Lek Right I Thru Left Right Thru Left Int. Total 07:00 AM 30 88 3 11 4 5 2 135 2 7 4 32 323 07:15 AM 32 113 2 14 0 2 0 169 5 7 0 41 385 07:30 AM 41 151 1 7 3 7 0 169 1 27 0 50 457 07:45 AM 94 153 2 11 5 6 3 157 5 33 5 77 551 Total 197 505 8 43 12 20 5 630 13 74 9 200 1716 08:00 AM 36 124 6 15 0 2 3 186 0 22 0 71 465 08:15 AM 33 116 3 13 0 6 3 168 1 6 1 33 383 08:30 AM 25 132 4 9 2 4 1 147 4 8 1 35 372 0.8:45 AM 46 138 3 5 1 2 2 137 3 6 0 29 372 Total 1 140 510 161 42 3 141 9 638 81 2 1681 1592 — BREAK "' 04:00 PM 04:15 PM 04:30 PM 04:45 PM 61 52 55 60 170 162 177 182 9 13 5 9 0 5 a 3 3 1 3 2 3 2 4 4 6 5 2 6 136 155 150 115 3 7 3 4 11 8 4 8 3 3 0 5 54 33 25 36 459 446 436 434 Total 228 691 36 16 9 131 19 556 171 31 11 1481 1775 05:00 PM 58 179 13 7 2 1 2 126 4 5 3 33 433 05:15 PM 59 218 9 4 3 0 6 154 5 6 5 36 505 05:30 PM 55 169 8 6 2 3 2 123 2 5 2 36 413 0545 PM 53 188 6 6 1 2 2 149 3 13 5 41 469 Total 1 225 754 361 23 8 61 12 552 141 29 15 1461 1820 Grand Total 1 790 2460 96 124 32 531 45 2376 52 176 37 6621 6903 Apprch % 23.6 73.5 2.9 59.3 153 25.4 1.8 96.1 21 20.1 4,2 75.7 Total ° / 11.4 35.6 IA 1.8 0.5 0.8 0.7 34.4 0.8 2.5 0.5 9.6 City: SEAL BEACH N -S Direction: SEAL BEACH BOULEVARD E -W Direction: BOLSA AVENUE Transportation Studies, Inc. 2640 Walnut Avenue, Suite II Tustin, CA_ 92780 AVENUE I SEAL BEACH BOULEVARD BOLSA File Name : h1303043 Site Code :00001944 Start Date : 3/2812013 Page No : 2 07:15 AM 32 113 2 147 14 0 2 16 0 169 5 1741 7 0 41 481 385 07:30 AM 41 151 1 193 7 3 7 17 0 169 1 170 27 0 50 77 457 07:45 AM 94 153 2 249 11 5 6 22 3 157 5 165 33 5 77 115 551 08_00 AM 36 124 6 166 15 0 2 17 3 186 0 189 ` 22 0 71 93 465 Total Volume 203 541 11 755 47 8 17 72 6 681 11 698 89 5 239 3331 1858 App. Total 26.9 71.7 1.5 65.3 11.1 23.6 0.9 97.6 1.6 26.7 1.5 71.8 PHF .540 .884 .458 .758 1 .783 .400 .607 .818 1 .500 .915 -550 .923 .674 .250 .776 .7241 .843 SEAL BEACH BOULEVARD Out In Total F-!966!7755 E 1722 203 541 Right Tlim Left 4J ` L. Peak Hour Data �en o m_A ? 9 z NoM a a z J - r- > J^ > < Peak Hour Begins at 0:15 A 0 —� m �S Z Tumin Movements m 74' o m �a 4, r Left Thru Ri M 1 681 6 64] F 6-9-81 305 SFAI REACH Oul In n T%t RIWA Transportation Studies, Inc. 2640 Walnut Avenue, Suite H Tustin, CA_ 92780 City: SEAL BEACH File Name : h1303043 N -S Direction: SEAL BEACH BOULEVARD Site Code : 00001944 E -W Direction: BOLSA AVENUE Start Date : 3/28/2013 Page No :3 SEAL BEACH BOULEVARD Southbound BOLSA AVENUE I Westbound SEAL BEACH BOULEVARD I Nort hbound BOLSA AVENUE Eastbound Start Time L Right I Thru I Left I App. Totai I Right I ThruI Left I _App. mu, I RlqhtL Thru I Left I App Tow, Right I Thru I Leff I App. Tout Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire intersection Beans at 05:00 PM lot Total 05:00 PM 58 179 13 250 7 2 1 10 2 126 4 132 5 3 33 41 433 05:15 PM 59 218 9 286 4 3 0 7 6 154 5 165 6 5 36 41 505 05:30 PM 55 169 8 232 6 2 3 11 2 123 2 127 5 2 36 43 413 05:45 PM 53 188 6 247 6 1 2 9 2 149 3 154 13 5 41 59 469 Total Volume 225 754 36 1015 23 8 6 37 12 552 14 578 29 15 146 190 1820 A. Total 22.2 74.3 3.5 62.2 21.6 16.2 2.1 95.5 2.4 15.3 7.9 76.8 PHF .953 .865 .692 .887 .821 .667 .500 .841 .500 .896 .700 .876 -558 .750 .890 .805 .901 SEAL BEACH BOULEVARD Out In Total Lz] 1015 1736 225 750 36 Right Thni Left 1�f 4 Peak Hour Data u a 'r —� Peak Hour Begins a105:00 P �2 to O. r� °`cam Tumine Movements m MIL`°J•I� �ic i �9 T r Left Thru R, or 12 789 578 1367 Out In Total Rot �FAI BEACH RNK APPENDIX C INTERSECTION LEVEL OF SERVICE CALCULATION WORKSHEETS Lwscm, Lnw & GREENSPAN, engineers LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach PCH N "'1.1. .'',," D =dera, ,, LINscou, LAw 8 GREENSPAN, engineers APPENDIX C -1 EXISTING TRAFFIC CONDITIONS LLG Ref 2 -13- 3368 -1 Main & PCH Mixed -Use Cenwr, Sea] Beach et r%ll, b41, Cwl' Y. ,!nW.uopnr ' + =nR; plrtm +in 1. AM Existing Wed Apr 17, 2013 11:56:04 Page 4 -1 AM Existing Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach --- ----- --------- - - - - -- ---------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.668 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 46 Level Of Service: B Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R -_---------- I --------------- II --------------- II -------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ---- -------- I --- -- ------ - - - -II -------- II------ ---------- II---------- - - - - - I Volume Module: Base Vol: 11 1609 6 4 1462 47 186 0 50 1 0 3 Growth Adj: 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1_00 1.00 Initial Bse: 11 1609 6 4 1462 47 186 0 50 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVal: 0 0 0 0 0 D 0 0 0 0 0 0 Initial Fut: 11 1609 6 4 1462 47 186 0 50 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 1609 6 4 1462 47 186 0 50 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 1609 6 4 1462 47 186 0 50 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 1609 6 4 1462 47 186 0 50 _ 0 3 ------------ --------------- II--------------- II--------------- II--------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1600 3288 12 1600 3200 100 3200 0 1600 400 0 1200 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.49 0.50 0.00 0.46 0.47 0.06 0.00 0.03 0.00 0.00 0.00 Crit Moves: + # ** *Y #* * * ** * * ** Traffix 8.0.0715 (c) 2006 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -1 AM Existing Wed Apr 17, 2013 11:56:04 Page 5 -1 AM Existing Ccndi-icns 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach ---------------------------------------------------------------- Level Of Service Computation Report ICU 1(LOSS as Cycle Length o) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol./Cap-(X): 0.663 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx OPtimal Cycle: 46 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II--------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 - 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II------ --------- II----- ----- - - - - - I Volume Module: Base Vol: 44 41 50 5 50 101 92 1.359 48 27 1430 6 Growth Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bee: 44 41 50 5 50 101 92 1359 48 27 1430 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVal: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 44 41 5C 5 50 1011 92 1359 48 27 1430 6 User Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 PHF Volume: 44 41 50 5 50 101 92 1359 48 27 1430 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced 'Vol: 44 41 50 5 50 101 92 1359 48 27 1430 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 44 41 50 5 50 101 92 1359 48 27 1430 6 OvlAdjVol: 3 ---- --------------- II--------------- II--------------- II-- -------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 "_600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.0E 1.06 1.00 1.06 1.06 1.00 1.G6 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.00 0.03 0.06 0.06 0.40 0.03 0.02 0.44 0.45 Ov1Adj V /S: 0.00 Crit Moves: ** *+ * * ** * *** *k ** Traffix 8.0.0715 (c) 2008 Dowlina Assoc. Licensed zo LLG Costa Mesa, CA C -2 AM Existing Wed Apr 17, 2013 11:56:04 Page 6 -1 AM Existing Conditions 2.13.3368.1. Main & PCH Mixed -Use Center, Seal Beach _ -___ ___ _____ __ ____ ___ _ - -_ _- ___________- Level Of Service Computation Report ICU 1(LOSS as Cycle Length %) Method (Future Volume Alternative) Tntersection #3 12th Street at Pacific Coast Highway Cycle (sec): 100 Critical Voi. /Cap.(X): 0.703 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 50 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Protected Protected Rights: Include include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 L 1 0 ------------ I--------------- II--------------- 11--------------- II---------- - - - - -I Volume Module: Base Vol: 67 59 32 36 39 34 35 1449 25 2 "/ 1464 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1-00 initial Bse: 67 59 32 36 39 34 35 1449 25 27 1464 6 Added Vol: 0 0 0 0 0 0 0 0 0 C 0 0 PasserByVoi: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 67 59 32 36 39 34 35 1449 25 27 1464 6 User Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 67 59 32 36 39 34 35 1449 25 27 1464 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 67 59 32 36 39 34 35 1449 25 27 1464 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 67 59 32 36 39 34 35 1449 25 27 1464 6 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation. Flow Module: Sat /Lane: 1600 1600 1600 1600 160C 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 678 597 324 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.02 0.02 0.02 0.02 0.43 0.01 0.02 0.45 0.46 Crit Moves: * * ** * * ** * * ** * * ** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -3 AM Existing Wed Apr 17, 2013 11:56:04 Page 7 -1 AN, Existing Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.765 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 60 Level. Of Service: C Sr_reet Name: Seal Reach Blvd PCII Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II --------------- i Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Grecn: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 _ 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II - - -- ----- - - - - -I Volume Module: Base Vol: 11 140' 79 363 95 182 124 1348 14 11 1373 394 Growth: Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: it 146 79 363 95 182 124 1348 14 11 1373 394 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 146 79 363 95 182 124 1348 14 11 1373 394 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PEE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF.F Volume: 11 146 79 363 95 182 124 1348 14 it 1373 394 Reduct Vol: 0 0 C 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 146 79 363 95 182 124 1348 14 11 1373 394 PCE Adj: 1.000 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 146 79 363 95 182 124 1348 14 11 1373 394 Ov1AdjVol: 201 -I - -- ---- II--------------- II------- -------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 160C 1-600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2176 1124 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I --------------- II--------------- II--- ------------ II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.11 0.06 0.11 0.08 0.40 0.01 0.01 0.40 0.23 0v1AdjV /S: 0.12 Crit Moves: * * ** * * ** * * +* *�°+ Tra°tix 8.0.0.715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -4 AM Existing Wed Apr 17, 2013 11:56:04 Page 8 -1 AM Existing Conditions 2.13.3368.1 Main 5 PCH Mixed -use Center, Seal Beach - - - - --- -------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.152 Less Time (sec): 0 Average Delay (sec /veh): 8.1 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II--------------- I Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 11 0 0 0 0 11 0 0 0 0 1! 0 0 ------------ --------------- II--------------- II------- -------- II---------- - -- - - I Volume Module: Base Vol: 11 94 14 15 87 18 35 30 9 29 52 34 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 94 14 15 87 18 35 30 9 29 52 34 Added Vol: 0 0 0 C 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 94 14 15 87 18 35 30 9 29 52 34 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1._00 1.00 PHF Volume: 11 94 1-1-4 15 67 18 35 30 9 29 52 34 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 94 14 15 87 18 35 30 9 29 52 34 PCE Adj: 1..00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 11 94 14 15 87 18 35 30 9 29 52 34 -- --- - - - - -- {--------------- Il - ----- 11--------- ------ 11 - -- - -- -I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.09 0.79 C.12 0.12 0.73 0.15 0.47 0.41 0.12 0.25 0 -45 0.30 Final Sat.: 73 621 92 99 571. 1.18 354 303 91. 197 354 232 ------------ I --------------- II---------------!--------------- II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.15 0.15 0.15 0.15 0.15 0.15 0.10 0.10 0.10 0.15 0.15 0.15 Crit Moves: **** # # #* * *++ +YY* Delay /Ven: 8.1 8.1 8.1 8.1 8.1 8.1 8.0 8.0 8.0 8.1 8.1. 8.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.1 8.1 8.1 3.1 8.1 8.i 8.0 8.0 8.0 6.1 3.1 8.1. LOS by Move: A A A A A A A A A A A A ApproachDel: 8.1 8.1 8.0 8.1 Delay Adj: 1..00 1.00 1.00 1.00 ApprAdj Del: 8.1 8.1 8.0 8.1 LOS by A.ppr: A A A A AliWayAvgQ: 0.2 0.2 0 -2 0.2 0.2 0.2 0.1. 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -5 AM Existing Wed Apr 17, 2013 11:56:04 Page 9 AM Existing Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ---- --- --- - -- -- -- ------------------------------- Level. Of Service Computation Report ICU 1(lioss as Cycle Length $) Method (Future Volume Alternative) Intersection H6 Seal Beach Blvd at Bolsa Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.434 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Spilt Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 681 6 11 591 203 239 5 89 17 8 47 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 681 6 11 541 203 239 5 89 17 8 47 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 681 6 11 541 203 239 5 89 17 8 47 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PP.F Volume: 11 681 6 11 541 203 239 5 89 17 8 47 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 1.1 681 6 11 541 203 239 5 89 17 8 47 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 681 6 11 541 203 239 5 89 17 8 47 ------------ --------------- II--------------- II--------------- II---------- - - -- - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.06 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.97 0.03 1.00 2.18 0.82 0.98 0.02 1.00 1.00 1.00 1.00 Final Sat.: 1600 4958 42 1600 3690 1310 1567 33 1700 1600 1700 1700 ------------ I --------------- II--------------- II --------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 C.14 0.14 0.01 0.15 0.15 0.15 0.15 0.05 0.01 0.00 0.03 Crit Moves: Traffix 8.0.071-5 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -6 PM Existing Wed Apr 17, 2013 11:56:39 Page 4 -1 PM Existing Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 41 PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.807 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 68 Level Of Service: D Street Name: PCH lst Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: i 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 --- I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 31 1547 3 1 1917 i30 142 0 41 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 31 1547 3 1 1917 130 142 0 41 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 31 1547 3 1 1917 130 142 0 41 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 PHF Volume: 31 1547 3 1 1917 130 142 0 41 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 31 1547 3 1 1917 130 142 0 41 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 ELF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 31 1547 3 1 1917 130 142 0 41 2 1 3 ------------ --------------- II--------------- II-------------- -II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 i.99 0.01 1.00 1.87 0.13 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1600 3294 6 1600 3097 203 3200 0 1600 533 267 800 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.47 0.48 0.00 0.62 0.64 0.04 0.00 0.03 0.00 0.00 0.00 Crit Moves Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -7 PM Existing Wed Apr 17, 2C13 11:56 :39 Page 5 -1 --- - - - - -- - -- - PM Existing Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach Level. Of Service Computation Report ICO 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.782 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 63 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound vilest Bound Movement: L - T - R 1, - T - R L - T - R L - T - R ------------ --------------- 11--------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 C 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 100 61 64 16 73 158 222 1735 98 100 1387 14 Growth Adi: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 100 61 64 16 73 158 222 1735 98 100 1387 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserSyVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 100 61 64 16 73 158 222 1735 98 100 1367 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 100 6i 64 16 73 158 222 1735 98 100 1387 14 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 100 61 64 16 73 158 222 1735 98 100 1387 14 PCE Adj: 1_00 7..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 FinalVolu_-ne: 100 61 64 16 73 158 222 1735 98 100 1387 14 OvlAdj VOl: 0 ------------ --------------- II --------------- II --------------- II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3268 32 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol. /Sat: 0.06 0.04 0.04 0.01 0.04 0.09 0.14 0.51 0.066 0.06 0.42 0.44 Ov1Adj V /S: 0.00 Crit Moves: * * ** * * ** # * ** * * ** Tra££ix 8.0.0715 (c) 2008 Dowlinc Assoc. Licensed to LLG Costa -Mesa, CA C -8 PM Existing Wed Apr 17, 2013 11:56:39 Page 6 -1 PM Existing Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 100 Critical Vo].. /Cap.(X): 0.799 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 66 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 I! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 66 50 38 58 64 23 66 1844 62 38 1473 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 66 50 38 58 64 23 66 1644 62 38 1473 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 66 SO 38 58 64 23 66 1844 62 38 1473 17 User Adi: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 66 50 38 58 64 23 66 1844 62 38 1473 17 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 66 50 38 58 64 23 66 1844 62 38 1473 17 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 FinalVolume: 66 50 38 58 64 23 66 1.844 62 38 1473 17 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.32 0.25 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 686 519 395 1600 1700 1700 1600 3400 1700 1600 3263 37 ------------ I --------------- li--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.04 0.04 0.01 0.04 0.54 0.04 0.02 0.45 0.47 Crit Moves: Trzffix E.0.0715 (c) 2008 Dowling Assoc. Licensed to IILG Costa Mesa, CA G9 PM Existing Wed Apr 17, 2013 11:56:39 Pace 7 -1 PM Existing Conditions 2.13.3366.1 Main 6 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU, 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 44 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol-/Cap-(X): 0.824 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 73 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II --------------- I Control: Split Phase Split Phase Protected Protected Rights: include Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 --------------------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 11 132 88 398 159 248 193 1573 37 75 124 7 265 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 132 88 398 159 248 193 1573 37 75 1247 265 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 132 88 398 1.59 248 193 1573 37 75 1247 265 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 132 88 398 159 248 193 1573 37 75 1247 265 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 132 88 398 159 248 193 1573 37 75 1247 265 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolum.e: 11 132 88 398 159 248 193 1573 37 75 1247 265 Ov1Adj VoL 17 --------------II---------------II---------------II------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1_600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2020 1280 3200 1700 1700 1600 3400 1700 1600 3400 1700 --------------- II---------------!--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.15 0.12 0.46 0.02 0.05 0.37 0.16 Ov1AdjV /S: 0.01 Crit Moves: * * ** ** ** * * #k * * ** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -10 PM Existing Wed Apr 17, 2013 11:56:39 Page 8 -1 PM Existing Conditions 2- 13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection N5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.285 Loss Time (sec): 0 Average Delay (sec /veh): 8.8 optimal Cycle: 0 Level Of Service: A *+** k****+*****#*******+*** k}*****+*********}**** * * * * * * * * * * * * * * *k * * * * # * =k * }k* }kk Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound west Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II-!----- -------- II --------------- I Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 i! 0 0 0 0 1! 0 0 ------------ I --------------- II--------------- II------- -- - - -- - II- - - - -- Volume Module: Base Vol: 8 110 15 17 173 27 33 51 14 28 68 36 Growth Adj: 1..00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 8 110 15 17 173 27 33 51 14 28 68 36 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 8 1.10 15 17 173 27 33 51 14 28 68 36 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 8 110 15 17 173 27 33 51 14 28 68 36 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 8 110 15 17 173 27 33 51 14 28 68 36 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 F.inalVolume: 8 110 15 17 173 27 33 51 14 28 68 36 --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 I.00 1.00 1.00 Lanes: 0.06 0.83 0.11 0.08 0.80 0.12 0.34 0.52 0.14 0.21 0.52 0.27 Final Sat.: 44 610 83 60 607 95 234 362 99 152 370 196 --------------- II--------------- II--------------- II- --------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.18 0.18 0.18 0.28 0.28 0.28 0.14 0.14 0.14 0.19 0.18 0.18 Crit Moves: * * ** *+ ** * + *# } * ** Delay /Veh: 8.6 8.6 8.6 9.2 9.2 9.2 8.6 8.6 8.6 8.7 8.7 8.7 Delay Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.0 8.6 6.6 9.2 9.2 9.2 8.6 8.6 8.6 8.7 8.7 8.7 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.6 9.2 8.6 8.7 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 8.6 9.2 B.6 8.7 LOS by Anpr: A A A A AllwayAVgQ: 0.2 0.2 0.2 0.4 0.4 0.4 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Ccsta Mesa, CA C -II PM Existing Wed Apr 17, 2013 11:56:39 Page 9 -1 PM Existing Conditions 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Lcss as Cycle Length s) Method (Future Volume Alternative) Intersection k6 Seal Beach Blvd at Bolas Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.427 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II ------ -- -- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 ------------ I --------------- II--------------- II-------------- -II------ -- -- - - -- - I Volume Module: Base Vol: 14 552 12 36 754 225 146 15 29 6 8 23 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 552 12 36 754 225 146 15 29 6 8 23 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 552 12 36 754 225 146 15 29 6 8 23 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1-00 PF.F Volume: 14 552 12 36 754 225 146 15 29 6 8 23 Reduct Vol: 0 0 0 0 0 G G 0 0 0 0 0 Reduced Vol: 14 552 12 36 754 225 146 15 29 6 8 23 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 14 552 12 36 754 225 146 15 29 6 8 23 ------------ --------------- II--------------- II-- ------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 Adjustment: 1..00 1..04 1.00 1.00 1.05 1.00 1..00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.94 0.06 1.00 2.31 0.69 0.91 0.09 1.00 1.00 1.00 1.00 Final Sat.: 1600 4898 102 1600 3897 1103 1451 149 1700 1600 1700 1700 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.11 0.12 0.02 0.19 0.20 0.10 0.10 0.02 0.00 0.00 0.01 Crit Moves: * * ** * * ** * * +* * * ** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Cosa Mesa, CA C -12 LINscon, LAW$GREENSPAN, B gin28B APPENDIX C -11 EXISTING PLUS GAS STATION TRAFFIC CONDITIONS LLG Ref. 243- 3368 -1 Man & PCH Mixed -Use Center, Seal Bcach �.N J". 11, W, c.'mxb R.",, ,x.,ao RM Existing Plus Gas StatioMon Apr 29, 2013 15:05:36 Page 4 -1 AM Existing Plus Gas Station Conditions 2.1-3.3368.1 Main & PCH Mixed -Use Center, Seal Beach --------- ---- ------- --- ------ ✓- -- -- ---- --------- - -------- --- - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH at lst Street *#**** w***#*****+****}**** 4**#**** k+* w*** w*+#}}** * * # * * * *# * * +w * # * * * Cycle (sec): 100 Critical Vol./Cap-(X): 0.668 Loss Time (sec): io Average Delay (sec /veh): xxxxxx Optimal Cycle: 46 Level Of Service: 8 Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II-------------- II ------- -------- II ------ ---- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 u^ ------------ I --------------- II---------------'---- --- ----- --- II---------- - - - - - I Volume Module: Base Vol: 11 1611 6 4 1464 47 186 0 50 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 l.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 1611 6 4 1464 47 186 0 50 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 1611 6 4 1464 47 186 0 50 1 0 3 User Adi: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 i.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 1611 6 4 1464 47 186 0 50 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 1611 6 4 1464 47 186 0 So 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 1611 6 4 1464 47 186 0 50 1 0 3 ------------ --------------- II--------------- tl--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1600 3288 12 1600 3200 1.00 3200 0 1600 400 0 1200 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.49 0.51 0.00 0.46 0.47 0.06 0.00 0.03 0.00 0.00 0.00 Crlt Moves: Traff_x 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -18 AM Existing Plus Gas StatioMon Apr 29, 2013 15:05:36 Pace 5 -1 AM Existing Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -- --- -- - -- - -- --- ---------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Lencth %) Method (Future Volume Alternative) Intersection #2 Main Street at PCH ++++** FF+ F***}*++ FF} F#+++ Fk+ FF+ F++*++*+*+ F* x+++ F+ ++ # }+# *FF *FF }k } # # + +F * # } # # + + } + }* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.669 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 46 Level Of Service: B S'-reet Name: Main Street PCH Approach: Nor7h Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II ---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include Include Min. Green: 0 0 0 0 0 C 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ---------------- II--------------- II--- --------- --- il---------- - - - - - I Volume Module: Base Vol: 58 44 50 8 50 101 92 1345 68 39 1422 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial. Bse: 58 44 50 8 50 101 92 1345 68 39 1422 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 58 44 50 8 50 101 92 1345 68 39 1422 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 HE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 i.00 1.00 1.00 PHF Volume: 56 44 50 8 50 101 92 1345 68 39 1422 6 Reduct Vol: 0 0 C 0 0 0 0 0 C 0 0 0 Reduced Vol: 58 44 50 8 50 101 92 1345 6B 39 1422 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 58 44 50 8 50 101 92 1345 68 39 1422 6 OvlAdj VOl: 3 ------------ ---------------!--------------- II----------- - - --II Saturation Flow Module: Sat /Lane: 16600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.066 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3287 13 --- I --------------- Ii--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.03 0.03 0.01 0.03 0.066 0.06 0.40 0.04 0.02 0.43 0.45 Ov1AdjV /S: 0.00 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C- 14 AM Existing Plus Gas StatioMon Apr 29, 2013 15:05:36 Page 6 -1 AM Existing Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Sea! Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 43 12Lh Street at Pacific Coast Highway **}***** k************ ii****}**+*#**k Yr**}**** k+# Y* ** * * *k * + * * + * * * * * ** *+ * #k+ # * *Y + *# Cycle (sec): 100 Critical Vol.. /Cap.(X): 0.704 Loss Time (sec): 10 Average Delay (s =_c /veh): xxxxxx Optimal Cycle: 50 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1. 0 1 1 0 2 0 1 1. 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 67 59 32 36 39 34 35 1453 25 27 1468 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 7..00 1..00 1.00 i.00 1.00 1.00 1.00 Initial Bse: 67 59 32 36 39 34 35 1453 25 27 1468 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 67 59 32 36 39 34- 35 1453 25 27 1468 6 User Adj: 1.00 1.00 1.00 1.00 1.0C 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 67 59 32 30' 39 34 35 1453 25 27 1468 6 Reduct Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 67 59 32 36 39 34 35 1453 25 27 1468 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 67 59 32 36 39 34 35 1453 25 27 1468 6 --------------- II --------------- II--------------- II---------- - - - - - I Saturation_ Flow Module: Sat /Lane: 1.600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.0C 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0,37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 678 597 324 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- II--------------- II--------------- II--------- - - - --- I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.02 0.02 0.02 0.02 0.43 0.01 0.02 0.45 0.46 Crit Moves: * * ** * *** + *+* ** ** +***#+++*******+*}}+********** k*++*+** k**+ YV**#++* ** * #} * # * **** * * *}* *- k **k**++ * +++ Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LTG Costa Mesa, CA C -15 SAM Existing Plus Gas StatioMon Apr 29, 2013 15:05:36 Page 7 -1 AM Existing Plus Gas Station Conditions 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach - -_ __ - - - -_ - ------- --- ------ - - - --- Level Of Service Computation Report ICU ].(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.766 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 60 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bouna East Bound West Bound Movement: L - T - R L - T - R L - T - R L - _ - R ------------ I --------------- II--------------- II --------------- II--------------- I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 1.1 146 79 363 95 182 124 1350 14 11 1375 394 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 146 79 363 95 182 124 1350 14 11 1375 394 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 146 79 363 95 182 124 1350 14 17, 1375 394 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7..00 1.00 1.00 PHF Volume: 11 146 79 363 95 182 124 1350 14 11 1375 394 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 146 79 363 95 132 124 1.350 14 11 1375 394 PCE Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1 -00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 146 79 363 95 182 124 1350 14 11 1375 394 Ov1Adj VOl: 201 ------------ --------------- II--------------- II--------------- il---------- - - - - - I Saturation Flow Module: Sat /Lane: 1606 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1 -00 1.00 2.00 1.00 Final Sat.: 1.600 2176 1124 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I --------------- II--------------- II--------------- II---------- - - - - - i Capacity Analysis Module: Vol /Sat: C.01. 0.07 0.07 0.11 0.06 0.11 0.08 0.40 0.01. 0.01 0.40 0.23 Ov1Adj V /S: 0.12 Crit Moves: *+ ** **#+ . + +k +.+* Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -l6 AM Existing Plus Gas StatioMon Apr 29, 2013 15:05:36 Page 8 -1 AM Existing Plus Gas Station Conditions 2.13.3368.1 Main k PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical. Vol.. /Cac.(X): 0.162 Loss Time (sec): 0 Average Delay (sec /veh): 8.2 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II---------------! I--------------- II ---------- - - - - - i Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Main. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 11 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 it 0 0 ------------ I --------------- II--------------- II------------- -- II---------- - - - - - I Volume Module: Base Vol: i1 97 14 17 90 20 37 30 9 29 52 36 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 97 14 17 90 20 37 30 9 29 52 36 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: it 97 14 17 90 20 37 30 9 29 52 36 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: it 97 14 17 90 20 37 30 9 29 52 36 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 97 14 17 90 20 37 30 9 29 52 36 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 M,LF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 97 14 17 90 20 37 30 9 29 52 36 --------------------------- II--------------- II--------------- 11---------- - - - - -I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.09 0.80 0.11 0.13 0.71 0.16 0.49 0.39 0.1.2 0.25 0.44 0.31 Final Sat.: 71 622 90 105 557 124 361 293 88 193 346 240 ------------ I --------------- II --------------- II --------------- II ---------- - - - - - ' Capacity Analysis Module: Vol /Sat: 0.16 0.16 0.16 0.16 0.16 0.16 0.10 0.10 0.10 0.15 0.15 0.15 Crit Moves: * # *# ** ** ++ *+ + + #+ Delay /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1, 8.1 8.1 8.1 8.1 8.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 i_00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 8.1 8.1 8.1 8.1 8.1 LOS by Move: A A A A A A A A A A A A AnproachDel: 8.2 6.2 8.1 6.1 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 8.2 8.2 8.1 8.1 LOS by Appr: A A A A Al1WayAvcQ: 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LTG Costa Mesa, CA C -17 AM Existing Plus Gas StatioMon Apr 29, 2013 15:05:36 Page 9 -1 AM Existing Plus Gas Station Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length o) Method (Future Volume Alternative) Intersection #6 Seal Beach Blvd at Balsa Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.434 Loss Time (sec): 10 Averace Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Balsa Ave Approach: North Bound South Bound East Sound West Bound Movement: L - T - R L - T - R L - T - R L - _ !-- - R ------------ I Control: --------------- II--------------- Pro -ected Protected II --------------- Split Phase II------- Solit - -- - -I Phase Rights: Include Include Include Include Min. Green! 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: ------------ 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 I Volume Module: --------------- II--------------- II----------- -- -- II-- -------- - - - - - I Base Vol: 11 681 6 li 541 203 239 5 89 17 8 47 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1..00 1.00 1.00 Initial Bse: 11 681. 6 II 541. 203 239 5 89 17 8 47 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 6681 6 ii 541 203 239 5 89 17 8 47 User Adj: 1.00 1.00 1.00 100 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 PHI Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 681 6 11 541 203 239 5 89 17 8 47 Reduct Vol: C 0 0 0 C 0 0 0 0 0 0 0 Reduced Vol: 11 681 6 11 541 203 239 5 89 11 8 47 PCE Adj: 1.O0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 FinalVolume: Ii 681 6 11 541 203 239 5 89 17 8 47 Saturation Flow --------------- II--------------- Module: II--------------- II---------- - - - -- I Sat /Lane: 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 Adjustment: 1.00 1.04 1..00 1-00 1.06 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.97 0.03 1.00 2.18 0.82 0.98 0.02 1.00 1.00 1.00 1.O0 Final Sat.: 1600 --------------- 4958 42 1600 3690 1310 1567 33 1700 1.600 1700 1700 Capacity Analysis II--------------- Module: II--------------- II---------- - - - - - I Vol /Sat: 0.01 0.14 0.14 0.01 0.15 0.15 0.15 0.15 0.05 0.C1 0.00 0.03 Crit Moves: * * ** * * ** * + ** * * ** Traffix 8.0.0713 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -18 PM Existing Plus Gas StatioMon Apr 29, 2013 15:05:52 Page 4 -1 PM Existing Plus Gas Station Conditions 2.13.3366.1 Main d PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------- - - - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #{1 PCH at 1st Street Cycle (sec): 100 Critical Vol-/Cap-(X): 0.808 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 69 Level Of Service: D Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11 --------------- II--------------- II--------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ I --------------- II--------------- II--- ---- -------- II--------- - - - - - - I Volume Module: Base Vol: 31 1550 3 1 1920 130 142 0 41 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 Initial Bse: 31 1550 3 1 1920 130 1.42 0 41 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 C 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 31 1550 3 1 1920 130 1.42 0 41 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 31 1550 3 1 192C 130 142 0 41 2 1 3 Reduct Vol: 0 C 0 0 0 0 0 0 0 0 0 C Reduced Vol: 31 1550 3 1 1920 130 142 0 41 2 1 3 PCE Adj: 1.00 1.00 1.00 i_00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 FinalVolume: 31 1550 3 1 1920 130 142 0 41 2 1 3 ------------ ---------------II---------------II---------------II------ Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 16CO 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1..00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.87 0.13 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1600 3294 6 1600 3097 203 3200 0 1600 533 267 800 ------------ I --------------- II - - -- ---------------II---- Capacity Analysis Module: Vol /Sat: C.02 0.47 0.49 0.00 0.62 0.64 0.04 0.00 0.03 0.00 0.00 0.00 Crit Moves: * * ** * * *+ ** +* * *** **** *F-,. * * * * * * ** * *� * }+* *t *k 1Y 4 * **ir * * ** * *F *ii } *+ +k * *y *Y +-t ai }* * *ki +Y, + * *z *1 * ** *i Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -19 PM Existing Plus Gas StatioMon Apr 29, 2013 15:05:52 Page 5 -1 PM Existing Plus Gas Station Conditions 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cvcle Length %) Method (Future Volume Alternative) Intersection 42 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.790 Loss Time (sec): 10 Average Delay (sec /veh): Xxxxxx Optimal Cycle: 65 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II------ --------- II- --------- - - - - - I Volume Module: Base Vol: 117 66 64 21 73 158 222 172E 115 113 1380 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 117 66 64 21 73 158 222 1.72E 1.15 113 1380 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 117 66 64 21 73 158 222 1728 115 113 --380 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Ad!: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PHF Volume: 117 66 64 21 73 158 222 1728 115 113 1380 14 Redact Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 117 66 64 21 73 158 222 1728 115 113 =380 14 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 117 66 64 21 73 15B 222 1728 115 113 1380 14 OvlAdjVoi: 0 ------------ --------------- II--------------- II---------- ----- II--- ------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: .1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3268 32 ------------ I --------------- II--------------- II------------- -- II--------- - -- - - I Capac_ty Analysis Module: Vol /Sat: 0.07 0.04 0.04 0.01 0.04 0.09 0.14 0.51 0.07 0.07 0.42 0.44 Ov1AdjV /S: 0.00 Crlt Moves: Traftix 8.0.0715 (c) 2008 Dowling Assoc. Licensed. to LLG Costa Mesa, CA C -20 PM Existing Plus Gas StatioMon Apr 29, 2013 15:05:52 Page 6 -1 PM Existina Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Sea! Beach -------------------------------------------------------------------------------- Leve1 Of Service Computation Report ICU 1(LO5S as Cycle Length o-) Method (Future Volume Alternative; +**+*+++********+**+**+****+**+****+************* * ** * * +* + * ** * * * * + * + + + + * + * + * * * + ++ Intersection 43 12th Street at Pacific; Coast Highway *#+*+*****+** k* i.****++* z#* k*+++++******* k#******** * * * * ** *Y+ { * *k ** *k:4 *- T * * * * * * *+* Cycle (sec): 100 Critical Vel. /Cap.(X): 0.800 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 67 Level Of Service: D Street Name: 12th Street Patric Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- --------------- --------------- Control: Permitted Permitted Protected Protected Rights: include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4 -0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 C 1 1 0 1 1 0 ------------ I ----------- ---- II------------- - -II --------------- --------------- Volume Module: Base Vol: 66 50 38 58 64 23 66 1850 62 -38 1479 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1..00 Tnitial Has: 66 50 38 58 64 23 66 1850 62 38 1479 P Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVoi: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 66 50 38 58 64 23 66 1.850 62 38 1479 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 66 5C 38 58 64 23 66 1850 62 38 1479 li Reduct Vol.: 0 C 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 66 50 38 58 64 23 66 1850 62 38 1479 17 PCE Adj: 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fir.alVOlume: 66 50 38 58 64 23 66 1850 62 38 1479 17 ------------ -------------- II--------------- fl--------------- lf---- ------ - - - - - I Saturation Flow Module: Sat;Lane: 1.600 1.600 1.600 1600 160C 1600 1600 1600 1600 1.600 1600 1600 Adjustment: 1.00 1.00 1.0C 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.32 0.25 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 686 519 395 1600 1700 1700 1600 3400 1700 1600 3264 36 ------------ I --------------- II--------------- II-- ----------- -- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.04 0.04 0.01 0.04 0.54 0.04 0.02 0.45 0.47 Crit Moves: *_ ** _+** Tra[fix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -21 PM Existing Plus Gas StatioMon Apr 29, 2013 15:05:52 Page 7 -1 PM Existing Plus Gas Station Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach ------ - -- - -- -- ------------ -- - - - - -- - - ---- - - - - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Tntersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.825 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 73 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II ------_-------- II_-------------- II ----- ----- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include - Ovl Min. Green: 0 0 0 0 U 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 - 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1. 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- fi----- ----- - - - -- I Volume Module: Base Vol: 11 132 88 398 159 248 193 157,6 37 75 1250 265 Growth Adj: 1.00 1.00 1.O0 1.00 1.00 1.00 1."00 100 1.00 1.00 1.00 1.00 Initial Bse: 11 132 88 398 159 248 193 _576 37 75 1250 265 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 132 88 398 159 248 193 1576 37 75 1250 265 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 132 Be 398 159 248 193 1576 37 75 1250 265 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 132 88 398 159 248 193 "_576 37 75 1250 265 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1 "00 1.00 1.00 1.00 1.00 1.00 FinalVolum.e: 11 132 88 398 159 248 193 1576 37 75 1250 265 Ov1Adj Vol: 17 ------------ --------------- II-------------- II--------------- II-------- -- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1 "00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2020 1280 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.15 0.12 0.46 0.02 0.05 0.37 0.16 Ov1Adj V /S: 0.01 Cri.t Moves- Trafiix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -22 PM Existing Plus Gas StatioMon Apr 29, 2013 15:05:52 Page 8 -1 PM Existing Plus Gas Station Ccndit_ons 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.301 Loss Time (sec): 0 Average Delay (sec /veh): 9.0 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Apprcach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- f!--------------- 11--------------- 11 --------------- Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: lncl.ude Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 11 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 8 115 15 20 178 30 36 51 14 28 68 39 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 Initial Bse: 8 115 15 20 178 30 36 51 14 28 68 39 Added Vol: 0 0 C 0 0 0 0 0 0 0 0 0 PasserBy"Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 8 1i5 15 20 178 30 36 5 14 28 66 39 User Adj: 1.00 1.00 1.00 1.00 1.00 11.00 1.00 1.00 7.00 1.00 1.00 1.00 PHF Adj: 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 8 115 15 20 178 30 36 51 14 28 68 39 Reduc- Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced "Vol: 8 115 15 20 178 30 36 5i 14 28 68 39 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 8 115 15 20 178 30 36 51 14 28 63 39 ------------ ------------- - -II -- --- II-- ------------- II---------- - - - - -I Saturation Flow Mod -ale: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 Lanes: 0.06 0.83 0.11 0.09 0.78 0.13 0.36 0.50 0.14 0.21 0.50 0.29 Final Bar.- 42 609 79 66 591 100 244 346 95 148 359 206 - ----------- I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.19 C.19 0.19 0.30 0.30 0.30 0.15 0.15 0.15 0.19 0.19 0.19 Crit Moves: * * ** #,: #* #*** Y *Y# Delay /Veh: 8.7 8.7 8.7 9.4 9.4 9.4 8.7 8.7 8.7 8.7 8.7 B.7 Delay Adj: i.00 i.00 1.00 1.00 1.00 3..00 1.00 1.00 1.00 i.00 1.00 1.00 Adj Del /Veh: 8.7 8.7 8.7 9.4 9.4 9.4 8.7 8.7 8.7 8.7 8.1 8. 7 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.7 9.4 8.7 8.7 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 8.7 9.4 8.7 8.7 LOS by Appr: A A A A A- !lWayAvgQ: 0.2 0.2 0.2 0.4 0.4 0.4 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per .lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -23 PM Existing Plus Gas StatioMOn Apr 29, 2013 15:05:53 Page 9 -1 PM Existing Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal. Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length. %) Method (Future Volume Alternative) Intersection #6 Seal Beach Blvd at Bolsa Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.427 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound 'west Bound Movement: L - T - F. L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II--------------- I Control: Protected Protected Split: Phase, Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 6 1 0 2 t 0 0 1 0 0 1 1 0 1 0 1 ----------- - I - - -- ---- II--------------- 11--------------- II---------- - - - - -I Volume Module: Base Vol: 14 552 12 36 754 225 146 15 29 6 8 23 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 Initial Bse: 14 552 12 36 754 225 146 15 29 6 8 23 Added Vol: 0 0 0 0 0 0 0 G 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 552 12 36 754 225 146 15 29 6 8 23 User Adj: 1.00 i.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 552 12 36 754 225 146 15 29 6 8 23 Redact Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 14 552 12 36 754 225 146 15 29 6 8 23 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Volume: 14 552 12 36 754 225 146 15 29 6 8 23 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.05 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.94 0.06 1.00 2.31 0.69 0.91 0.09 1.00 1.00 1.00 1.00 Final Sat.: 1600 489E 1.02 1600 3397 1103 1451 149 1700 1600 1700 1700 ----- I-------------- II--------------- II------ ---- ----- 11---------- - - - - -I Capacity Analysis Module: Vol. /Sat: 0.01 0.11 0.12 0.02 0.19 0.20 0.10 0.10 0.02 0.00 0.00 0.01 Crit Moves: .raffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -24 LINSCOTT, Law & GREENSPM, engineers APPENDIX C -lll EXISTING PLUS PROJECT TRAFFIC CONDITIONS LLG Ref. 2- 13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach N'F :O.Ni 1. 1 v, S.;i P_, . R.-r—',, ,Sq�s Liu Ca _'.n FM Existing Plus Project Fri Apr 19, 2013 10:28:07 Page 4 -1 AM Existing Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH at 1st Street *****W W**+***++**#**+****#+***** k+ k********}***#* * } }+++ + }i + + + + * * } *# ++ +++ }+i + * +i* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.670 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 47 Level Of Service: B Street Name: PCH 1st Street Approach: North Bound South Bound East Bound Wes? Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II--------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ I --------------- II--------------- II--------------- II-------- -- - - - - - I Volume Module: Base Vol: 11 1616 6 4 1471 47 186 0 50 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 161.6 6 4 1471 47 186 0 50 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserB_yVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial _ut: 11 1616 6 4 1471 47 186 0 50 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 1616 6 4 1471 47 186 0 50 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 161.6 6 4 1471 47 186 0 50 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 NILE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVo'ume: 11 1616 6 4 1471 47 186 0 50 1 0 3 ------------ --------------- II--------------- II--------------- II-- -------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1600 3288 12 1600 3201 99 3200 0 1600 40C 0 1200 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.49 0.51 0.00 0.46 0.47 0.06 0.00 0.03 0.00 0.00 C.00 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -25 AM Existing Plus Project Fri Apr 19, 2013 10:28:07 Page 5 -1 AM Existing Plus Project Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach ------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length s) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.664 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 46 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound "West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl. Tncl.ude Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4 -0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 i 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I--------------- 11--------------- II-------------- -11---------- - - - - -I Volume Module: Base Vol: 42 41 48 9 50 101 92 1369 48 40 1438 6 Growth Adj: 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 42 41 48 9 50 101 92 1369 48 40 1438 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 42 41. 48 9 50 101 92 1369 48 40 1438 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHP Adj: 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 42 41 48 9 50 101 92 1369 48 40 1438 6 Redact Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 42 41 42 9 50 101 92 1369 48 40 1438 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 42 41 48 9 50 101 92 1369 48 40 1438 6 OvlAdj Vol: 3 ------------------ --------- 11----------- - -- -11 -- -11--------------- I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1 -00 1.99 0.01 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.01 0.03 0.06 0.06 0.40 0.03 0.03 0.44 0.45 OviAdjV /S: 0.00 Crit Moves: # * ## * } +* * + }} + + ## Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed. to LLG Costa Mesa, CA C -26 AM Existing Plus Project Fri Apr 19, 2013 10:28:07 Page 6 -1 AM Existing Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach `--- ----------- - - - -- -- --------------- Level O� Service Computation Report ICU 1(Loss as Cycle Length �) Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 100 Critical Vol. /Cap.(X): 0.714 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 52 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II------------- II---------- - - - - - I Volume Module: Base Vol: 67 59 32 36 39 34 50 1457 29 27 1470 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 11.00 1.00 1.00 Initial Bse: 67 59 32 36 39 34 50 1457 29 27 1470 6 Added Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOL: 0 0 0 0 0 0- 0 0 0 0 0 0 Initial Put: 67 59 32 36 39 34 50 1457 29 27 1470 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 67 59 32 36 39 34 50 1457 29 27 1470 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 67 59 32 36 39 34 50 1457 29 27 1470 6 PCF. Adj: 1.00 1.00 1.00 1.00 "_.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 67 59 32 36 39 34 50 1457 29 27 1470 6 ------------ I--------------- II --------------- II --- ------- -- --- II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1..00 1..06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 678 597 324 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I--------------- II--------------- 11--------------- II---------- - - - - -I Capacity Analysis Module: Vol. /Sat: 0.04 0.10 0.10 0.02 0.02 0.02 0.03 0.43 0.02 0.02 0.45 0.46 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowding Assoc. Licensed to LLG Costa Mesa, CA C -27 AM Existing Plus Project Fri Apr 19, 2013 10:28:07 Page 7 -1 AM Existing Plus Project Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach - - - - -- - - -- ---- -- - --- - - ----------------- - - - - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.768 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 60 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - 'P - R L - T - R L - T - R -- --------------- II--------------- II --------------- II ---------- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1. 0 1 1 0 2 0 1 0 - 1. 0 2 0 1. 1 0 2 0 1 ------------ - ----------- --- II---- -- - - - - -- -II--------------- Volume Module: Base Vol: 11 Growth Adj: 1.00 Initial Bse: li Added Vol: 0 PasserByVol: 0 Initial Put: it User Adj: 1.00 PHF Adj: 1.00 PAP Volume: 11 Reduct Vol: 0 Reduced Vol: 11 PCE Adj: 1.00 MLF Adj: 1.00 Final-Volume: 11 Ov1Adj Vol: 146 79 1.00 1.00 146 79 0 C 0 C 146 79 1.00 1.00 1.00 1.00 146 79 0 0 140' 79 1.00 1.00 1.00 1.00 140' 79 ----- I --- - - - - -- Saturation Flow Module 363 95 1.00 1.00 363 95 0 0 0. 0 363 95 1.00 1.00 1.00 1.00 363 95 C 0 363 95 1.00 1.00 1.00 1.00 363 95 182 1.00 182 0 0 182 1.00 1.00 182 0 182 1.00 1.00 182 127 1352 1.00 1.00 127 1352 0 0 0 0 127 1352 1.00 1.00 1.00 1.00 127 1352 0 0 127 1352 1.00 1.00 1.00 1.00 127 1352 14 11 1.00 1.00 14 11 0 0 0 0 14 11 1.00 1.00 1.00 1.00 14 it 0 0 14 11 1.00 1.00 i.00 1.00 1.4 11 1378 394 1.00 1.00 1378 394 0 C o C 1378 394 1.00 1.00 1.00 1.00 1378 394 0 C 1378 394 1.00 1.00 1.00 1.00 1378 394 201 Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 Adjustment: 1.00 1.05 1.00 1..00 1.06 i.06 1.00 1.06 1.06 1.00 1.06 1..06 Lanes: 1..00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: ----- 1600 2176 1.124 33200 1700 1700 1600 3400 1700 1600 3400 1700 I--------------- Capacity Analysis Module: II--------------- II--------------- 11---------- - - - - -I Vol /Sat: 0.01 0.07 0.07 0.11 0.06 0.11 0.08 0.40 0.01 0.01 0.41 0.23 OvlAdjV /S: 0.12 Crit Moves: * * ** * + *+ # # ** + + +} Traffi.x 8.0.071.5 (c) 2008 Dowl_ng Assoc. Licensed to LLG Costa Mesa, CA C -28 AM Existing Plus Project Fri Apr 19, 2013 10:28:07 Page 8 -1 AM Existing Pius Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.156 Loss Time (sec): 0 Average Delay (sec /veh): 8.1 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II --------------- I Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 11 0 0 0 0 11 0 0 0 0 11 0 0 0 0 11 0 0 --------------------------- II--------------- 11-- ------------- II---------- - - - - -I Volume Module: Base Vol: 11 97 14 15 87 18 36 30 9 30 53 35 Growth Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 91 14 15 87 18 36 30 9 30 53 35 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 97 14 15 87 18 36 30 9 30 53 35 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PEE Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 97 14 15 87 18 36 30 9 30 53 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 97 14 15 87 18 36 30 9 30 53 35 PCE Adj: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1..00 1..00 1.00 1.00 1.00 MLF Ad 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 97 14 15 87 i8 36 30 9 30 53 35 Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1._00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.09 0.80 0.11. 0.12 0.73 0.15 0.48 0.40 0.12 0.25 0.45 0.30 Final Sat.: 71. 623 90 98 570 ]i8 358 298 89 1.99 351 232 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.16 0.16 0.16 0.15 0.15 0.15 0.10 0.10 0.10 0.15 0.15 0.15 Crit Moves: ++YY #k ## YY ++ *# +* Delay /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 8.1 8.1 8.1 8.1 8.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 i.00 1.00 1.00 Adj Del /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 8.1 8.1 8.1 B.l 8.1 LOS by Move: A A A A A A A A A A A ApproachDel: 8.2 8.2 8.1 8.1 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 8.2 8.2 8.1 8.1 LOS by Appr: A A A A AllWayAVgQ: 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -29 AM Existing Plus Project Fri Apr -1-9, 2013 10:28:08 Page 9 -1 AM Existing Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -- ---- - - ---- ---- ------ ------------- -- --- ------ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 Seal Beach Blvd at Bolsa Ave *+*+**+*##*+***********#******}+**##**##*++*#+*** # + # + * * * + * * * + * * * * * * * + } * * }„ * * * } #* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.443 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A ********+***** s*}*+*#********+**#********#** t**** * ** * *k * *** } * * ** # ** *i+* } * * ** * * *z Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound West Bound Movement : L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 _ 0 0 1, 0 0 1 1 0 1 0 1 ------------ --------------- II--------------- II--------- ------ I!------- --- - - - - - I Volume Module: Base Vol: 11 684 6 11 541 207 239 5 E9 17 8 47 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 684 6 11 541 207 239 5 89 17 8 47 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVO L 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fet: 11 684 6 11 541 207 239 5 89 17 8 47 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PHF Adj: 1.G0 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1.00 1.00 PEP Volume: 11 684 6 11 541 207 239 5 89 17 8 47 Reduct Vol: 0 0 0 0 0 0 0 C 0 0 0 0 Reduced Vol: 11 684 6 11 541 207 239 5 69 17 8 47 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1..00 i.00 1.00 1.00 1_00 1.00 1.0c 1.00 1.00 1.00 1.00 1.00 FinalVoiume: 11 684 6 11 541 207 239 5 89 17 8 47 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation, Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.06 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1..00 2.97 0.03 1.00 2.17 0.83 0.98 0.02 1.00 1.00 1.00 1.00 Final Sat.: 1600 495E 42 1600 3672 1328 1567 33 1700 1600 1700 1700 ------------ I --------------- II---------------!-- ------------- II---------- - - -- - I Capacity Analysis Module: Vol /Sat: 0.01 0.14 0.14 0.01 0.15 0.16 0.15 0.15 0.05 0.01 0.00 0.03 Crit Moves: * * ** ***} * + ** * * ** Tratfix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -30 PM Existing Plus Project Fri Apr 19, 2013 !6:28:26 Page 4 -1 PM Existing Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach - - -- - - -- - - - - -- --- - - - - - -- - -- -- - - - --- - - - - --- -- - -- - - -- - - - - -- -- -- --- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) intersection 41 PCH at 1st Street **** 4************+ i*+#*+**+*****#* i+*#+*** 4i* k*** * * * * + * ** * * * * *Y * * * *YY+ * *+ * * * * *ik Cycle (sec): 100 Critical Vol. /Cap.(X): 0.809 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 69 Level Of Service: D Street Name: PCH 1st Street Approach: North Bound South Bound East Bound [Vest Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II---- _---------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 C 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ --------------- II--------------- II--------------- ---------- - - - - - I Volume Module: Base Vol: 31 1555 3 1 1924 130 142 0 41 2 1 3 Growth Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 31 1555 3 1 1924 130 142 0 41 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 31 1555 3 1 1924 130 142 0 41 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 31 1555 3 1 1924 130 142 0 41 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Voi: 31 1555 3 1 1924 130 142 0 41 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 31 1555 3 1 1924 130 142 0 41 2 1 3 --- ------- - -I - -- -- II--------------- II--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1.600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1..03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.87 0.13 2.00 0.00 1_00 0.33 0.17 0.50 Final Sat.: 1600 3294 6 1600 3097 203 3200 0 1600 533 267 800 ------------ I --------------- II--------------- II---------- -- - - - H ---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 C.47 0.49 0.00 0.62 0.64 0.04 0.00 0.03 0.00 0.00 0.00 Grit Moves: Traffix 8.0.0715 (c) 2008 Dowlirg Assoc. Licensed to LLG Costa Mesa, CA C-31 PM Existing Plus Project Fri Apr. 19, 2013 10:28:26 Pane 5-1 PM Existing Plus Project Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative; Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Voi. /Cap.(X): 0.785 Loss Time (sec): 10 Average Delav (sec /veh): xxxxxx Optimal Cycle: 63 Level Of Service: C ****** i`#}******* i+}*+#****** k*+#- 4+** A****-++}*## A* * * * * * * # *k *k * * * * # *k * *ix } * * * * *} *Y Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II --------------- II --------------- II --------- - - - - - I Volume Module: Base Vol: 99 61 63 19 '73 158 222 1743 98 110 1398 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 99 61 63 19 73 158 222 1743 98 110 1398 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 99 61 63 19 73 158 222 1743 98 1.10 1398 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 99 61 63 19 73 158 222 1743 98 110 1398 14 Reduce Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 99 61 63 19 73 158 222 1743 98 110 1398 14 PCE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 FinalVolume: 99 61 63 19 73 158 222 1743 98 110 1398 14 Ov1AdjVol: 0 ------------ --------------- II--------------- II--------------- II--------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1..00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1..00 1.9B 0.02 Final Sat.: 1600 1700 1700 1600 1.700 1700 1.600 3400 1700 1600 3268 32 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.04 0.04 0.01 0.04 0.09 0.14 0.51 0.06 0.07 0.43 0.44 OvlAdjv /S: 0.00 Crit Moves: * } }+ * } }* * + ** * * #* Traffix 8.0.0715 (c) 2008 Dowlleg Assoc. Licensed to LLG Costa Mesa, CA C -32 PM Existing Plus Project Fri. Apr 19, 2013 10:28:26 Paue 6 -1 PM Existing Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ---------------------------------------------------- ------ -- --- ---- ------ - - ---- Level Of Service Computation Report ICU 1(Loss as Cycle Length o) Method (Future Volume Alternative) Intersection B3 12t1i Street at Pacific Coast Highway Cycle (sec): 100 Critical Vol. /Cap.(X): 0.802 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 67 Level Of Service: D Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- 11 --------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 it 0 0 1 0 1 0 _ 1 0 2 0 1 1 0 1 1 0 ------------ I -------------- II------------ - - II--------------- II------ --- - - - - - - I Volume Module: Base Vol: 66 50 38 58 64 23 83 1.854 67 38 1478 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 66 50 38 58 64 23 83 1854 67 38 1478 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVcl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 66 50 38 58 64 23 83 1854 67 38 1473 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 i.00 i.o0 1.00 1.00 1..00 1.00 i.00 1.00 1.00 1.00 PHF Volume: 66 50 38 58 64 23 83 1854 67 38 1418 17 Reduct Vol: 0 0 0 C 0 0 0 0 0 0 0 0 Reduced Vol: 66 50 38 58 64 23 83 1854 67 38 1478 17 PCE Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 66 50 38 58 64 23 83 1854 67 38 1478 17 --------------- II--------------- II--------------- II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.32 0.25 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 686 519 395 1600 1700 1700 1600 3400 1700 1600 3264 36 ------------ I --------------- II --------------- II--------------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.04 0.04 0.01 0.05 0.55 0.04 0.02 0.45 0.47 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -33 PM Existing Plus Project Fri Apr 19, 2013 10:28:26 Pace 7 -1 PM Existing Pius Project Conditions 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Lenath %) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.826 Less Time (sec): 1.0 Average Delay (sec /veh): xxxxxx Optimal Cycle: 73 Level O_ Service: D ***+ k* i*******++*# iti********** F* tk* F**+**** k***** * *+ * + #* * * *** *k* *i *k * +*4 *kk * **kk Street Name: Seal Beach Blvd PCH. Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --- I --------------- II -----------_-_- II --------------- II ---------- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 _ 0 2 0 ------------ I -- II--------------- II------------ - - -II- ------- - - - - -! Volume Module: Base Vol: 11. 132 88 398 159 248 1.97 1578 37 75 1251 265 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 132 88 398 159 248 197 1578 37 75 1251 265 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 D 0 0 0 Initial Fut: 11 132 88 398 159 248 197 1578 37 75 1251 265 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 132 88 398 159 248 197 1578 31 75 1251 265 Reducz Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 132 88 398 159 248 197 1578 37 75 1251 265 PCE Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adi: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 132 88 398 159 248 197 1578 37 75 1251. 265 Ov1AdjVol: 17 ------------ --------------- II--------------- II --------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 160C 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2020 1280 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01. 0.07 0.07 0.12 0.09 0.15 0.12 0.46 0.02 0.05 0.37 0.16 Ov1AdjV /S: 0.01 Crit Moves: * * ** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -34 PM Existing Plus Project Fri Apr i9, 2013 10:28:26 Page 871 PM Existing Plus Project Conditions 2.13.3368.1. Main & PCH Mixed -Use Center, Seal Beach - ---- --- -- --- - - --- -` Level Of Service Computation Report - 2000 HCM 4 -Way Stop Method (Future Volume Alternative) - Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical. Vol./Can-(X): 0.286 Loss Time (sec): 0 Average Delay (sec /veh): 8.9 Optimal Cycle: 0 Level Of Service: A * k***++*********+***#***** k*+++*+#**#*#*#******** * * * * * *k+ # + #++ * * * + *+ * * * * * * * * * * ** Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ---------_-- I --------------- II--------------- II--------------- II---------- - - - - - I Control: Stop Sign Stop Sian Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 C 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 11 0 0 0 0 11 0 0 0 0 1! 0 0 ------------ I --------------- II-------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 8 112 15 17 173 21 34 51 14 29 69 37 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 initial -Bse: 8 112 IS 17 173 27 34 51 14 29 69 37 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVo1: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 8 112 15 17 173 27 34 51 14 29 69 37 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 PHF Volume: 8 112 .15 17 173 27 34 51 14 29 69 37 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 8 112 15 17 173 27 34 51 14 29 69 37 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fina!Vclume: 8 112 15 17 173 27 34 51 14 29 69 37 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1..00 1..00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 Lanes: 0.06 0.83 0.11 0.06 0.80 0.12 0.34 0.52 0.i4 0.21 0.52 0.27 Final Sat.: 44 610 82 59 604 94 238 357 98 154 367 197 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.18 0.18 C.18 0.29 0.29 0.29 0.14 0.14 0.14 0.19 0.19 0.19 Crit Moves: + # #* * *#* *k *# + # *+ Delay /Veh: 8.6 8.6 8.6 9.3 9.3 9.3 B.6 8.6 8.6 8.7 8.7 6.7 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 8.6 8.6 8.6 9.3 9.3 9.3 3.6 8.6 8.6 8.7 8.7 8.7 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.6 9.3 8.6 8.7 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 8.6 9.3 8.6 8.7 LOS by Appr: A A A A AllWayAvgQ: 0.2 0.2 0.2 0.4 0.4 0.4 0.1 0.1 0.1 0.2 0.2 0.2 Nate: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. licensed to LLG Costa Mesa, CA C -35 PM Existing Plus Project Fri Apr 19, 2013 10:28:26 Pace 9 -1 PM Existing Plus Project Conditions 2.13.3368.1 Main & PCH Nlixed -Use Center, Seal Beach -- - - - --- - --- ----------- - - - - -- ------- ----P -- ----- - - - -- - - -- Level Of Service Computation Report ICU 1(Loss as Cycle Lenath %) Method (Future Volume Alternative) Intersection #6 Seal Beach Blvd at Balsa Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.427 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------------- I Control: Protected Protected Split Phase Split Phase R.ia hts: Include Include Include Include Min. Greer.: 0 C C 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 ---- --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 14 556 12 36 754 228 1.45 1.5 29 6 8 23 Growth Adj: 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 556 12 36 754 228 146 1.5 29 6 8 23 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 556 12 36 754 228 146 15 29 6 6 23 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.0c 1.00 1.00 1..00 1.00 1.00 1..00 1.00 1.00 1 -00 PRE Volume: 14 556 12 36 754 228 146 15 29 6 8 23 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 14 556 12 36 754 228 146 15 29 6 8 23 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 14 556 12 36 754 226 146 15 29 6 8 23 ------------ --------------- II--------------- II--------- ----- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.05 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.94 0.06 1.00 2.30 0.70 0.91 0.09 1.00 1.00 1.00 1.00 Final Sat.: 1600 4899 101 1600 3886 1114 1451 149 1700 1600 1700 1700 --- I - - - - -- --------------- II-------------- -II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.11 0.12 0.02 0.19 0.20 0.10 0.10 0.02 0.00 0.00 0.01 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -36 APPENDIX C -1 V EXISTING PLUS PROJECT PLUS MITIGATION TRAFFIC CONDITIONS LNSCOTT. LAW 8 GREENSPAN, engineers LLG Ref. 2- 13- 3368 -1 Main & PCI I Mixed -Use Center, Seal Beach .•• ar. �bm. :t �.v ,,l i,,,, c,.n.=tiun". v. h All r ... 44 n,.' e...,. AM Existing Plus Project (MWed Apr 24, 2013 08:58:14 Page 5 -1 AM Existing Plus Project Conditions (Mitigation) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach _ __________________________ ___________ __ __ ___ _____ ___ Level Of Service Computation Report ICU 1(Lose as Cycle Length 8) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.670 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 47 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11--------------- II--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 42 41 48 9 50 101 92 1369 48 40 1438 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 42 41 48 9 50 101 92 1369 48 40 1438 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 42 41 48 9 50 101 92 1369 48 40 1438 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 42 41 48 9 50 101 92 1369 48 40 1438 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 42 41 48 9 50 101 92 1369 48 40 1438 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 42 41 48 9 50 101 92 1369 48 40 1438 6 OvlAdjVOl: 3 -------------- II--------------- II--------------- II------ --- - - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 0.46 0.54 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 737 863 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- II--------------- II--------------- II--------- - - - - -- I Capacity Analysis Module: Vol /Sat: 0.03 0.06 0.06 0.01 0.03 0.06 0.06 0.40 0.03 0.03 0.44 C.45 Ov1AdjV /S: 0.00 Crit Moves: * * ** * * ** * * ** * * ** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -37 PM Existing Plus Project Wed Apr 24, 2013 08:58:44 Page 5 -1 PM Existing Plus Project Conditions (Mitigation) 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach --------- ---- -- --------------- - ---- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.785 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 63 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II ---- Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min_ Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.D 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II-------- -- ----- II---------- - - - - - I Volume Module: Base Vol: 99 61 63 i9 73 158 222 1743 98 110 1398 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 99 61 63 19 73 158 222 1743 98 110 1398 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 99 61 63 19 73 158 222 1743 98 110 1398 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 99 61 63 19 73 158 222 1743 98 1.10 1398 14 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 99 61 663 19 73 158 222 1743 98 110 1398 14 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 99 61 63 19 '73 158 222 1743 98 110 1398 14 Ov1AdjVol: 0 ------------ --------------- II--------------- II--------------- II--------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 0.49 0.51 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1600 787 813 1600 1700 1700 1600 3400 1700 1'600 3268 32 ------------ I --------------- II--------------- II-------------- II--- ------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.08 0.08 0.01 0.04 0.09 0.14 0.51 0.06 0.07 0.43 0.44 OvlAdjV /S: 0.00 Crit Moves: * + ** * + ** * * ** * * ** TraffiX 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -38 LiNscou, LAW & GREENSPAN, engineers APPENDIX C -V CUMULATIVE TRAFFIC CONDITIONS LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach AM Cum Thu Apr 18, 2013 11:57:55 Page 4 -1 AM Cumulative Conditions 2.13.3368.1. Main S PCH Mixed -use Center, Seal Beach. _ ______ ___ ___ _____ ________ - ____-- _______ -- _____________ -_ -__ Level Of Service Computation Report ICU 1.;Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.691 Loss Time (sec): 10 Averace Delay (sec /veh): xxxxxx Optimal Cycle: 49 Level Of Sery -ice: B **+*#}** k** kkkkkk** k#*#***#** F# k#** k*** FF+ F***+#+ * * # *k # * *k *Fk + *k + * * # # * # # } * # }kFi2 Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--- ------------ II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 -- - -- --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 1.4 16658 6 4 1508 55 211 0 52 1 0 3 Growth Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 1658 6 4 1508 55 211 0 52 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 1658 6 4 1508 55 211 0 52 1 0 3 User Adj: 7..00 7..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 16658 6 4 1508 55 211 0 52 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 14 1658 6 4 1508 55 211 0 52 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1:00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 14 1658 6 4 1508 55 211 0 52 1 0 3 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sa- /Lane: 1600 16600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1600 3288 12 1600 3187 113 3200 0 1600 400 0 1200 ------------ I --------------- II--------------- II--------------- II---------- - -- - - I Capacity Analysis Module: Vol /Sat: 0.01 0.50 0.52 0.00 0.47 0.49 0.07 0.00 0.03 0.00 0.00 0.00 Crit Moves: *kk* * # *} # * *+ k # ++ #**** F***+`##***#*#}.:**#************* k * * * * * } + # + ** * * # * * * *: * *F ** * * * ** +.iii } * = * * * * * * #* Traffix 8.0.0 "715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -39 AM Cum Thu Apr 18, 2013 11:57:55 Page 5 -1 AM Cumulative Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach --- - - - - -- ------------------------------------- hevel Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection B2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.684 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 48 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R ., - T - R ------------ I --------------- II --------------- 11 --------------- 11 Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 C ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 45 42 52 5 52 101 98 1410 49 28 1478 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 45 42 52 5 52 107 98 1410 49 28 1478 66 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 45 42 52 5 52 107 98 1410 49 2.8 1473 6 User Adj: 1..00 1.00 1..00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PEP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 45 42 52 5 52 107 98 1410 49 28 1473 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 45 42 52 5 52 107 98 1410 49 28 1478 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1:00 1.00 1.00 1.00 1.00 FinalVoiume: 45 42 52 5 52 107 98 1.410 49 28 1478 6 OvlAdj Vcl: 3 ------------ --------------- II--------------- II--- ------------ II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I--------------- II--------------- fl--------------- II---- ------ - -- - - I Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.00 0.03 0.06 0.06 0.41 0.03 0.02 0.45 0.46 OvlAdjV /S: 0.00 Crit Moves * * ** * * ** * * ** * * ** * * +** * +a +* +i4 ** + *i +diww Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LEG Costa Mesa, CA C -40 AM Cum Thu Apr 18, 2013 11:57:55 Page 6 -1 AM Cumulative Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 93 12th Street at Pacific Coast Highway ++++++++++++++++«.+++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + Cycle (sec): 100 Critical Vol. /Cap.(X): 0.722 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 53 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Sound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------- ------- - - - - -- --------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 C Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 11 0 0 1 0 1, 0 1. 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Ease Vol: E9 61 33 37 4C 35 36 1502 26 28 1513 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 69 61 33 37 40 35 36 1502 26 28 1513 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 C 0 0 0 0 0 0 0 0 0 0 Initial Fut: 69 61 33 37 40 35 36 1502 26 28 1513 6 User Adj: 1.00 1.0C 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PHF Volume: 69 61 33 37 40 35 36 1502 26 28 1513 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 69 61 33 37 40 35 36 1502 26 28 1513 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 69 61 33 37 40 35 36 1502 26 28 1513 6 ------------ I--------------- I1--------------- 1l--------------- II---------- - - - --I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1-600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 677 599 324 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I ---------------!--------------- II ------- -------- II ---------- - - - - - i Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.02 0.02 0.02 0.02 0.44 0.02 0.02 0.46 0.47 Crit Moves: + + ++ + + ++ + ++ + + ++ Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C-41 AM Cum Thu Apr 18, 2013 11:57:55 Page 7 -1 AM Cumulative Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.788 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 64 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--- _----------- II---------- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include .Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: � 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I-- -` - - -- ------ ?I--------------- II --------------- --------------- Volume Module: Base Vol: 11 150 81 374 98 188 131 1394 14 11 1418 406 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 150 81 374 98 188 131. 1394 14 1.1 1418 406 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByvol: 0 0 C 0 0 0 0 0 0 0 0 0 Initial Fur: 11 150 81 3.74 98 188 131 1394 14 11 1413 406 User Adj: 1.00 1.00 i.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 ?IF Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 150 8i 374 98 188 131 1394 14 it 1418 406 Reduce Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 i50 81 374 98 188 131 1394 14 11 1418 406 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.0e 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 1i 150 81 374 98 188 131 1394 14 11 1418 406 OvI Adj Vol: 207 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1.600 1.600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 i.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.30 0.10 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2178 1122 3200 1700 1700 16600 3400 1700 1600 3400 1700 ------------ I --------------- II--------------- II----- -- -------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.06 0.11 0.08 0.41 0.01 0.01 0.42 0.24 OvlAdjV /S: 0.12 Crit Moves: + # +, #* ** _ # *# #+ ## Traffix 8.0.0715 (c) 2008 Dowiine Assoc. Licensed to LLG Costa Mesa, CA C -42 AM Cum Thu Aar 18, 2013 11:57:55 Page 8 -1 AM Cumulative Conditions 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4 -Way Stoo Method (Future Volume Alternative) Intersection N5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.158 Loss Time (sec): 0 Average Delay (sec /veh): 8.2 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound Scuth Bound East Bound West Bound Movement: L - T - P L - T - R L - T - R L - T - R ------------ 1--------------- 11 --------------- II--------------- 11 --------------- Control: Stop Sign Stop Sign Stop Sign Stop Siyn Rights: Include Include Include include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 11 0 0 0 0 it 0 0 0 0 1.1 0 0 0 0 1.1 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 97 14 15 90 19 36 31 9 30 54 35 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 97 14 15 90 19 36 31 9 30 54 35 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 97 14 15 90 19 36 31 9 30 54 35 User Adj: 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 97 14 15 90 19 36 31 9 30 54 35 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 97 14 15 90 19 36 31 9 30 54 35 PCE Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 YinalVolume: 11 97 14 15 90 19 36 31 9 30 54 35 ------------ I--------------- il--------------- II--------------- II------- --- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.09 0.80 0.11 0.12 0.73 0.15 0.47 0.41 0.12 0.25 0.46 0.29 Final Sat.: 71 622 90 95 570 120 352 303 88 196 353 229 ------------ I --------------- II--------------- II--------------- II----- ----- - - - - - I Capacity Analysis Module: Vol /Sat: 0.16 0.16 0.16 0.16 0.16 0.16 0.10 0.10 0.10 0.15 0 -15 0.15 Crit Moves: k # *# * * ** * *kw ++ #f Delay /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 8.1 8.1 8.2 8.2 8.2 Delay Adj: 1.00 i.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 8.1 8.1 8.2 8.2 8.2 LOS by Move: A A A A A A A A A A A A Approach Del: 3.2 8.2 8.1 8.2 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 3.2 8.2 8.1 8.2 LOS by Appr: A A A A Al1WayA-vgQ: 0.2 0.2 0.2 0.2 0.2 0.2 0.i 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C43 AM Cum Thu Apr 18, 2013 11:57:55 Page 9 -1 AM Cumulative Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------- --- --- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 46 Seal Beach Blvd at Bolsa Ave Cycle (sec): 100 Critical Vol. /Cao.(X): 0.454 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 31 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ ------------- - - II - -- ---- II--------------- II---------- - - - - -I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4 -0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 7. 0 0 1 0 0 1 1 0 1 0 1 ------------ I --------------- II --------------- II----- ----------- II---------- - - - - - I Volume Module: Base Vol: Growth Adj: Initial Bse: Added Vol: PasserByVol: Initial Fut: User Adj: PHI Adj: PHF Volume: Reduct Vol: Reduced Vol.: PCE Adj: MLF Adj: FinaiVOlume: 11 1.00 ]1 0 0 11 i.00 1.00 11 0 11 1.00 1.00 11 704 6 11 i.00 1.00 1.00 704 6 11 0 0 C 0 0 C 704 6 11 1.00 1.00 1.00 1.00 1.00 1.00 704 6 11 0 0 C 704 6 11 1.00 1 -00 1.00 1.00 1.00 1.00 704 6 11 Saturation Flow Module 558 1.00 558 0 0 556 1.00 1.00 558 0 558 1.00 1.00 558 212 1.00 212 0 0 212 1.00 1.00 212 0 212 1.00 1.00 212 249 5 92 1.00 1.00 1.00 249 5 92 0 0 0 C 0 0 249 5 92 1.00 1.00 1.00 1.00 1.00 1.00 249 5 92 0 0 0 249 5 92 1.00 1.00 1.00 1.00 1.00 1.00 249 5 92 18 8 48 1.00 1.00 1.00 18 8 48 0 0 C 0 0 G 18 8 48 1_.00 1.00 1.00 1.00 1.00 1.00 18 8 48 0 0 C 18 8 48 1.00 1.00 1.00 1.00 1.00 1.00 18 a 48 Sat /Lace: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.06 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.97 0.03 1.00 2.7.7 0.83 0.98 0.02 1.00 1.00 1.00 1.00 Final Sat.: 1600 4959 41 1600 --------------- 3678 1322 II 1569 --------- 31 1700 ----- II 1600 ---------- 1700 1700 -- - - - I ------------ I --------------- Capacity Analysis Module: II Vol /Sat: 0.01 0.14 0.15 0.01 0.15 0.16 0.16 0.16 0.05 0.01 0.00 0.03 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to T;LG Costa Mesa, CA C -44 PM Cum Thu Apr 18, 2013 11:58:11 Pace 4 -1 PM Cumulative Conditions 2.13.3368.1 Mains PCH Mixed -Use Center, Seal Beach - - - - --- ------- - - - - -' - -- - Level Or Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection kl PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.843 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 78 Level Of Service: D Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - 'P - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II--------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1, 1 0 1 0 1. 1 0 2 0 0 1 0 0 C 11 0 0 ---------------- II--------------- 11--------- ------ II---------- - - - - -I Volume Module: Base Vol: 39 1597 3 1 1977 154 158 0 42 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 nitial Bse: 39 1597 3 1 1977 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 39 1597 3 1 1977 154 158 0 42 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 100 1.00 PHE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHE Volume: 39 1597 3 1 1977 154 158 0 42 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1597 3 1 1977 154 158 0 42 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.GO 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 E'inalVolume: 39 1597 3 1 1977 154 1S8 0 42 2 1 3 ------------I---------------II---------------II---------------II- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1..03 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.86 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1600 3294 6 1600 3069 231 3200 0 1600 533 267 B00 ------------ I --------------- 11 --------------- II--------------- II --------------- I Capacity Analysis Module: Vol /Sat: 0.02 0.48 0.50 0.00 0.64 0.67 0.05 0.00 0.03 0.00 0.00 0.00 Crit Moves. Traffix 8.G.0715 (c) 2008 Dowling Assoc. Licensed to LLG Cesta Mesa, CA C -45 PM Cum Thu Apr 18, 2013 11:58:11 Page 5 -1 PM Cumulative Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU !(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.808 Loss Time (sec): 10 Average Delay (secfveh): xxxxxx Optimal Cycle: 68 Level Of Service: D Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 i 1 0 ------- - - - - -I II --------------- 1 --------------- 11 --------------- Volume Module: Base Vol: 103 63 Growth Adj: 1.00 1.00 Initial Bse: 103 63 Added Vol: 0 0 PasserByVol: 0 0 Initial Fut: 103 63 User Adj: 1.00 1.00 PHF Adj: 1.00 1.00 PHF Volume: 103 63 Reduct Vol: 0 0 Reduced Vol: 1,03 63 PCE Adj: 1.00 1.00 MLF Adj: 1.00 1.00 Finalvoiume: 103 63 Ov1AdjVol: --- -- - - - - -- - - - - -- Saturation Flow Module 66 1.00 66 0 0 66 1.00 1.00 66 0 66 1.00 00 66 16 1.00 16 0 0 16 1.00 1.00 16 0 16 1.00 1.00 16 75 168 1.00 1.00 75 168 0 0 0 0 75 168 1.00 1.00 1.00 1.00 75 168 0 0 75 168 1.00 1.00 1.00 1.00 75 168 0 233 1.00 233 0 0 233 1.00 1.00 233 C 233 1.00 1.00 233 1795 1.00 1795 0 0 1795 1.00 1.00 1795 0 1795 1.00 1.00 1795 102 103 1437 14 1.00 1.00 1.00 1.0C 102 103 14 37 1.4 0 0 0 C 0 0 0 C 102 1.03 1437 14 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 102 103 1437 14 0 0 C C 102 103 1437 14 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1.00 102 103 1437 14 Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 .1.600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 100 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3269 31 ------------ I -------------- Capacity Analysis Module: II --------------- II --------------- II ---------- - - - - - I V31/Sat: 0.06 0.04 0.04 0.01 0.04 0.10 0.15 0.53 0.06 0.06 0.44 0.45 Ov1AdjV /S: 0.00 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -46 PM Cum Thu Apr 18, 2013 11:58:11 Page 6 -1 PM Cumulative Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Leve1 Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 12th Street ac Pacific Coast Highway Cycle (sec): 100 Critical Vol. /Cap.(X): 0.822 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 72 Level Of Service: D Street Name: 12th Street Pacific Coast Highway Approach: North 5ourd South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------- _-- _-- II----------- ----II - - ------ - - - - -I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 11 0 0 1, 0 1. 0 .1 1 0 2 0 1 1 0 1 1. 0 ------------ ---------------.--------------- II--------------- II------ ---- - -- - - I Volume Module: Base Vol: 68 52 39 60 66 24 68 1907 64 39 1525 18 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 Initial Bse: 68 52 39 60 66 24 68 1907 64 39 1525 18 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 68 52 39 60 66 24 68 1907 64 39 1525 18 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 68 52 39 60 66 24 68 1907 64 39 1525 18 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 68 52 39 60 66 24 68 1907 64 39 1525 18 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1..00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 68 52 39 60 66 24 68 1907 64 39 1525 18 ------------ ---- - - - - -- ---- II--------------- II--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.33 0.24 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 684 523 392 1600 1700 1700 1600 3400 1700 1600 3263 37 ------------ I --------------- II--------------- II--------------- II-- -------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.04 0.04 0.01 0.04 0.56 0.04 0.02 6.47 0.48 Crit Moves: ++ +* Traffx 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C=}7 PM Cum Thu Apr 18, 2013 11:58:1.1 Page 7 -1 PM Cumulative Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach - - -- -- - -- ----------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vcl. /Cap.(X): 0.848 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 80 Level Of Service: D Street Name: Seal Beach Rlvd PCH Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - T - 3 L - T - R L - T - R ------------ --------------- II_-------------- II--------------- II--------- - - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ov1 Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 136 91 410 164 257 201 1626 38 77 1290 273 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 136 91 410 164 257 201 1626 38 77 1290 273 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 136 91 410 164 257 201 16266 38 77 1290 273 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 136 91 410 164 257 201 1626 38 77 1290 273 Reduct Vol: 0 0 0 C 0 0 0 0 0 0 0 0 Reduced Vol: 11 136 91 410 164 257 201 1626 38 77 1290 273 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.O0 1.00 1.00 1.00 1.00 MLF Adj: 1..00 1.00 1.00 1.00 11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 136 91 410 164 257 201 1626 38 77 1290 273 OviAdj Vol: 16 ------------ --------------- II------------_-- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1..00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.20 C.80 2.00 _.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2017 1283 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I ---------------II---------------II---------------II--------------- Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.13 0.10 0.15 0.13 0.48 0.02 0.05 0.38 0.16 Ov1Adj V /S: 0.01 Crit Moves: ** ** Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C-48 PM Cum Thu Apr 1.8, 2013 11:58:11. Pace 8 -1 PM Cumulative Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach - - - -- -- - -- - --- ------------------------------------ Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.298 Loss Time (sec): 0 Average Delay (sec /veh): 9.0 Optimal Cycle: 0 Level Of Service: A *******************+ k+****** z** i******* ki******** * * **+ * * *f * **±* * * * * ** *�* *** ** * +* Street Name: Mai-n Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - -- ---------- ----- II---- ------- - - -- II -- ------ II-- -------- - - -- -I Control: Stop Sign Stop Sign Stop Sign Stop Sign Righcs: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 It 0 0 0 0 1! 0 0 0 0 1; 0 0 0 0 11 0 0 --------------- II--------------- II--------------- II---- ------ - - - - - I Volume Module: Base Vol: 8 113 15 16 179 28 34 54 14 29 70 37 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 8 113 15 18 1"(° 28 34 54 14 29 70 37 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 8 113 15 15 179 2B 34 54 14 29 70 37 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 "1.00 1.00 1.00 1.00 1.00 PKF Volume: 8 113 15 18 179 28 34 54 14 29 70 37 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: B 113 15 18 179 28 34 54 14 29 70 37 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Volume: 8 113 15 13 179 28 34 54 14 29 70 37 ------------ --------------- II--------------- II--------------- ff---------- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.06 0.83 0.11 0.0E 0.80 0.12 0.33 0.53 0.14 0.21 0.52 0.27 Final Sat.: 43 607 81 60 601 94 230 365 95 152 367 194 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.19 0.19 0.19 0.30 0.30 0.30 0.15 0.15 0.15 0.19 0.19 0.19 Crit Moves: ++ ** *_,.v _ *++ * ++* Delay /Veh: 8.7 8.7 8.7 9.4 9.4 9.4 8.7 8.7 8.7 8.8 8.8 8.8 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.7 8.7 8.7 9.4 9.4 9.4 8.7 8.7 8.7 8.8 8.B 8.8 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.7 9.4 8.7 8.8 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 8.7 9.4 8.7 8.8 LOS by Aopr: I A A A Al1WayAvgQ: 0.2 0.2 0.2 0.4 0.4 0.4 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -49 PM Cum Thu Aar 18, 2013 11:58:11 Page 9 -1 PM Cumulative Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach ---- -- - - - --- -- -- --- ------ ---- - - ---- ----- Level Of Service Computatior Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #66 Seal Beach Bl.vd at Bolsa Ave Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.440 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave ADoroach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R T, - T - R ------------ --------------- II--------------- II----------- - - - -II Control: Protected Protected Split Phase Split Phase Richts: include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 ------------ --------------- II--------------- II--------- ------ II---------- - - - - - I Volume Module: Base Vol: 14 571 12 37 779 237 154 15 30 6 6 24 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initia_ Bse: 14 571 12 37 779 237 154 15 30 6 8 24 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 571 12 37 779 237 154 15 30 6 8 24 User Ad-j: 1.00 1.00 1.00 1.00 1.00 1.D0 1.00 1.00 1.00 1.00 i.00 1.00 PHF Adj: 1.00 i.00 1.0c 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 571 12 37 779 237 154 15 30 6 8 24 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced "Vol: 14 571 12 37 779 237 154 15 30 6 8 24 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 7..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinaiVolume: 14 571 12 37 779 237 154 15 30 6 8 24 ----------- --------------- II--- ------------ II----------- - - - -II I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.05 1.00 1.00 1.00 1.06 1.00 1.06 1.066 Lanes: 1.00 2.94 0.06 1.00 2.30 0.70 0.91 0.09 1.00 1.00 1.00 1.00 Final Sat.: 1600 4901 99 1600 3880 1120 1458 142 1700 1600 1700 1700 ------------ I --------------- II--------------- II------- -------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.12 0.12 0.02 0.20 0.21 0.11 0.11 0.02 0.00 0.00 0.01 Crit Moves: Traffix 6.0.0715 (c) 2008 Dowl_ng Assoc. Licensed to LLG Costa Mesa, CA C -50 UNSCOTT, LAW 8 GREENSPAN, engineers APPENDIX C -VI CUMULATIVE PLUS GAS STATION TRAFFIC CONDITIONS LLG Ref. 2 -13- 3368 -1 Main & PCH aired -Use Center, Seal Beach I . 1 I, 1 1wr v.. b... oa....n n.t e+ V. AM Cum Plus Gas Station Mon Apr 29, 2013 15:05:03 Page 4 -1 AM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center., Seal Beach -- ----------------------------------- Level Of Service Computation Report TCU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH. at 1st Street } } }#}a + * +++} }}} *+}w w *++*+}*#}*}#}}*}*#+#-**+} } }} #** * *+} +*+ +I + +4..4kx1*i*i *k; k}k Cycle (sec): 100 Critical Vol. /Cap.(X): 0.692 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 49 Level Of Service: B Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ____________ Control: Protected Protected Split Phase Split Phase Rights: include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y -1--R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 ----- I --------------- II--------------- II----- -- -------- II---------- - - - - - I Volume Module: Base Vol: 14 1660 6 4 1510 55 211 0 52 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 1-660 6 4 1510 55 211 0 52 1 0 3 Added Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 1660 6 4 1510 55 211 0 52 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 1660 6 4 1510 55 211 0 52 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol.: 1.4 1660 6 4 1510 55 211 0 52 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 14 1660 6 4 151.0 55 211 0 52 1 0 3 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 10600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1..03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1600 3288 12 1600 3188 112 3200 0 1600 400 0 1200 -- I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.50 .0.52 0.00 0.47 0.45 0.07 0.00 0.03 0.00 0.00 0.00 Crit Moves: Traffix 8.0.0715 (c) 2005 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -51 AM Cum Plus Gas Station Mon Apr 29, 2013 15:05:03 Page 5 -1 A.M Cumulative Plus Gas Station Conditions 2.1.3.3368.1 Main & PCH Mixed -Use Center, Seal Beach ---- ----- --- -- ------ - ----- - --- -- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) # *ilk #F *+'.F *i- kF +3k33k +k344 /kkkxltk { * }kkf 314 \FYi+ 444 # {t4 *it #kki *1' {iliLi *<}Y # *3 +Fi1 Intersection N2 Main Street at PCH t *L *k3kY31 *x *4 * *3 3433 F**} 3** 3�4i�*k* 33* 4* k } # # *+33333t33i3k + +Y4 # * #kA *33Y4 +331 #Yi* Cycle (sec): 100 Critical. Vol. /Cap.(X): 0.690 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 49 Level OP Service: B 3 #k34# 1131 *#33 *ik3Y333ini+ } # * #kk *k } *L #* #17131131 + *F * #kk * +i -f +* #kki # *t -k 3343Fk3 kk4* Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovi Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 - 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II------------- ! - II------------ --- II- --------- - - - - - I Volume Module: Base Vol: 59 45 52 8 52 107 98 1396 69 40 1470 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 59 45 52 8 52 107 98 1396 69 40 1470 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 C 0 G 0 0 0 0 0 0 initial Put: 59 45 52 8 52 107 98 1396 69 40 1470 6 User Adj: 1.00 1.00 1..00 1.00 1.00 1.O0 1.00 1.00 1.00 1.00 1.00 I..CO PHF Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 59 45 52 8 52 107 98 1396 69 40 1470 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 59 45 52 8 52 107 98 1396 69 40 1470 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 59 45 52 8 52 107 98 1396 69 40 1470 6 Ov1AdjVol: - ------------ --------------- II--------------, II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1.600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I--------------- 11--------------- II--------------- II---------- - - -- -I Capacity Analysis Module: Vol. /Sat: 0.04 0.03 0.03 0.01 0.03 0.06 0.06 0.41 0.04 0.03 0.45 0.46 Ov1AdjV /S: C.00 Crit Moves * * #3 14 ** 13 ** * *1* 3rt'k3 kkik4Yk43* 4111# il}** 4+ + # }i }t +i *i *43 * *3 *k * *33k- }33 -t.i k3- i3kkk }3i kkax131k3 * # *34k* Traffix 6.0.0715 (c) 2008 Dowling Assoc. Licensed to LEG Costa Mesa, CA C -52 AI-1 Cum Plus Gas Station Mon Apr 29, 2013 15:05:03 Page 6 -1 AM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main 3 PCI1 Mixed -Use Center. Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length 3) Method (Future Volume Alternative) I.I. - I 4 � - I I II, *i .1: II Ii 1411 44 * I I i 4 « i * * I * *i * I* I I k+ M i I. I I ki F .:}i I * * I F}*i-- k*I *III- intersection 43 12th StreeL at Pacific Coast Highway }y };.1.� }k+4�xL + # }i 444it * *i kA A'A *iMFk} *- AA #kA #kkL�Li * } *ki k4�k�}4 / }*A }xikf }il *A' * } #4} Cycle (sec): 100 Critical Vol./Cap-(X): 0.723 Loss Time (sec): 10 Average Delav (sec /veh): xxxxxx Optimal Cycle: 53 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound SouLh Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 t 0 1. 1 0 2 0 1 1 0 1 1 0 -- I --------------- II--------------- II--------------- II----- ---- - - - - - - I Volume Module: Base Vol: 69 61 33 37 40 35 36 1506 26 28 1517 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1..00 1.00 1.00 1.00 1.00 Initial Bse: 69 61 33 37 40 35 36 1506 26 28 151 7 6 Added Vol: 0 0 0 C 0 0 0 0 0 0 0 0 Passer3yVo1: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 69 61 33 37 40 35 36 1506 26 28 1517 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 69 61 33 37 40 35 36 1506 26 28 1517 6 Reduce Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 69 61 33 37 40 35 36 1506 26 28 1517 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 FinalVolume: 69 61 33 37 40 35 36 1506 26 28 1517 6 ------------ --------------- II--------------- II-------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 677 599 324 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- II - - - - -- - II---- ----- ------ II------- --- - - - - -I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.02 0.02 0.02 0.02 0.44 0.02 0.C2 0.46 0.48 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowlzno Assoc. Licensed to LLG Costa Mesa, CA C -53 AM Cum Plus Gas Station Mon Apr 29, 2013 15:05:03 Page 7 -1 AM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main e PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 1.00 Cri L.ical. Vol.. /Cap.(X): 0.789 Loss Time (sec): 10 Average Delay (sec /veh)): xxxxxx Optimal Cycle: 64 Level Of Service: C SLreeL Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound west Bound Movemert: L - T - R L - T - R L - T - R L - T - R --- --------------- II--------------- II--------------- II---- _----- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: include Include Include OV1 Mir.. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 _ 0 2 0 1 0 1 1 0 2 0 1 - 0 2 0 1 --------------------------- II--------------- II------ -------- -11- -------- - - -- -I Volume Module: Base Vol: 11 150 81 374 98 188 131 1396 14 11 1420 406 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 150 81 374 98 188 131 1396 14 11 1420 406 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: Ii 150 81 374 98 188 131 1396 14 11 1420 406 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1..00 PHF Volume: 11 150 81 374 98 188 131 1396 14 11 1420 406 Reduc= Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced "Vol: 11 150 81 374 98 188 131 1396 14 11 1420 406 PCE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 150 81 374 98 188 131 1396 14 11 1420 406 OvlAdj Vol: 207 --------------------------- II--------------- 11--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1.600 1600 1600 1-600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2178 11.22 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I--------------- II--------------- 11--------------- 11------ ---- - -- - -I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.06 0.11 0.08 0.41 0.01 0.01 0.42 0.24 OvlAdj V /S: 0.12 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -54 AM Cum Plus Gas Station Mon Apr 29, 2013 15:05:03 Page 8 -1 AM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main 5 PCB Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap -(X): 0.168 Loss Time (sec): 0 Average Delay (sec /veh): 8.2 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - 'r - R ------------ --------------- II --------------- II--------------- 11 --------------- I Control: Stop Sign Stop Sign Stop Sign S-op Sign Righ�s: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 11 0 0 0 0 1! 0 0 0 0 1! 0 C 0 0 1! 0 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 100 14 17 93 21 38 31 9 30 54 37 Growth Adj: 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 Initial Bse: 11 100 14 17 93 21 38 31 9 30 54 37 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Passer2yVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 100 14 17 93 21 38 31 9 30 54 37 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11, 100 14 17 93 21 38 31 9 30 54 37 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 1.1 100 14 17 93 21 38 31 9 30 54 37 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.O0 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00 FinalVolume: 11 10C 14 17 93 21 38 31 9 30 54 37 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.09 0.80 0.11 0.13 0.71. 0.16 0.49 0.40 0.11 0.25 0.45 0.30 Final Sac.: 68 622 87 101 555 125 359 293 85 192 345 237 ------------ --- -- ------ -- - -I! --------------- --------------- --------------- Capacity Analysis Module: Vol. /Sat: 0.16 0.16 0.16 0.1.7 0.17 0.1.7 0.11. 0.11 0.11 0.16 0.16 0.16 Crit Moves: * *.i +... 1.1, ♦,,- Delay/Veh: 8.2 e -2 8.2 8.3 8.3 3.3 8.1 8 -1 8.1 8.2 8.2 8.2 Delay Adj: 1.00 1.00 1.00 1.00 "_.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.2 8.2 8.2 8.3 8.3 8.3 8.1. 8.1 8.1 8.2 8.2 8.2 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.2 8.3 8 -1 8.2 Delay Adj: 1.00 i..00 1.00 1.00 ApprAdj Del: 8.2 8.3 8 -1 8.2 LOS by Appr: A A A A A11WayAvgQ: 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -55 AM Cum Plus Gas Station Mon Apr 29, 2013 15:05:03 Page 9 -1 AM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -` - Level Of Service Computation Report ICU 1(I.oss as Cycle Length $) Method (Future Volume Alternative) }#*+*+###*+##*#*****+*}***+++#***+++*}#*** + * * * * * * * + + # * * * * * # # } #* + * * + # # * * #L Intersection k6 Seal Beach Blvd at Bol.sa Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.454 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle.: 31 Level Of Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 _ 0 0 1 0 0 1 1 0 1 0 1 ---------- - - I - -- -II---------------II---------------II----- Volume Module: Base Vol: 11 704 6 1i 558 212 249 5 92 18 8 48 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Sse: 11 704 6 11 553 212 249 5 92 18 8 48 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 704 6 11 558 212 249 5 92 18 8 43 User Adj: 1.00 i.00 1.00 1100 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 709 6 it 558 212 249 5 92 18 8 48 Reduct Vol: 0 0 0 0 0 C 0 0 0 0 0 0 Reduced Vol: 11 704 6 li 558 212 249 5 92 18 8 48 PCE Adj: 1.00 1.00 1..00 1.00 1.00 7..00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 11 704 6 11 558 212. 249 5 92 18 8 48 ------------ --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.06 1_00 1.00 1.00 1.06 1.00 1.06 1..06 Lanes: 1.00 2.97 0.03 1.00 2.17 0.83 0.93 0.02 1.00 1.00 1.00 1.00 Final Sat.: 1600 4959 41 1600 3678 1322 1569 31 1700 1600 1700 1700 ------- ----- I ------------- - -li -- ----- II--------------- II---------- -- - - -I Capacity Analysis Module: Vol /Sat: 0.01 0.14 0.15 0.01 0.15 0 -16 0.16 0.16 0.05 0.01 0.00 0.03 Crit Moves: * * ** * * ** # * }* * * ** Traffix B.C.0715 (c) 2008 Dowlicq Assoc. Licensed to LLG Costa Mesa, CA C -56 PM Cum Plus Gas Station Mon Apr 29, 2013 15:05:22 Page 4 -1. -- - -- PM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach ---- --- - - - --- - ---- -- ---- ---- - - - --- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.844 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: -78 Level Of Service: D Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II--------------- II---------- -- - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 G 1 I 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 39 1600 3 i 1980 154 158 0 42 2 _ 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 39 1600 3 1 1980 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 C 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 39 1600 3 1 1980 154 158 0 42 2 1 3 User Ad',: i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 "_.00 -.00 PHF Volume: 39 1600 3 1 1980 154 158 C 42 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1600 3 1 1980 154 158 0 42 2 1 3 PCE Adj: 1.00 1.00 100 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 i.00 ELF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 39 1600 3 1 1980 154 158 0 42 2 1 3 ------------ --------------!--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.86 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1600 3294 6 1600 3069 231 3200 0 1600 533 2667 800 ------ --- --- I ------ -- -- - - - -- it - - - -- --------- II--- ------------ II---------- - - - - -I Capacity Analysis Module: Vol/Sat: 0.02 0.49 0.50 0.00 0.65 0.61 0.05 0.00 0.03 0.00 0.00 0.00 Cri.t moves. Traffix 8.0.07'_5 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -57 PM Cum Pius Gas Station Mon Apr 29, 2013 15:05:22 Page 5 -1 PM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach _ - - -_ -- _ -____ - ________ -_ ____________________ _ _ __ Level. Of Service Computation Report ICU 1(Loss as Cycle Length o) Method (Future Volume Alternative) Intersection t2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.818 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 71 Level Of Service: D +*+k* m# s***+**#** {***#£*+ iv++ k*******+*+**** * #* * * * * ** ** * * * *£ * * *+ *#z * * * * ** ++ Street Name: Main Street PCH Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - 'P - R L - T - R L - T - R ___ __________ _ _II__ _---- 11__ _- _-- _______- II__-- _________ - -I Control: Permitted Permitted Protected Protected Rights: Include Ov.1 Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4 -0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1, 1 0 1 0 1 1 0 2 0 1 l 0 1 1. 0 ------------ ---------------- II--------------- 11--------------- II--------------- I Volume Module: Base Vol: 120 68 66 21 75 168 233 1788 119 116 1430 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7..00 Tnitial Bse: 120 68 66 21 75 168 233 1788 119 116 1430 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Tnitial Fut: 120 68 66 21 75 168 233 1788 119 116 1430 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 120 68 66 21 75 166 233 1788 119 116 1430 14 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 120 68 66 21 75 168 233 1788 119 7.16 1.430 14 PCB Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1..00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 100 1.00 Finalvolume: 120 66 66 21 "15 168 233 1788 119 116 1430 14 Ov!Adj Vol: 0 ------------ --------------- II--------------- II--------------- II--------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.0E 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1600 1700 1700 1600 1700 1700 1600 3400 1700 1600 3269 31 ------------ I---------------{--------------- II--------------- 11------- --- - - - - -I Capacity Analysis Module: Vol /Sat: 0.08 0.04 0.04 0.01 0.04 0.10 0.15 0.53 0.07 0.07 0.44 0.45 OvlAdjV /S: 0.00 Crit Moves. * * ** # # ## + + ** * + #+ Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -58 PM Cum Plus Gas Station Mon Apr 29, 2013 15:05:22 Page 6 -1 PM Cumulative Plus Gas Station Conditions 2.13.3368.1. Main & PCH Mixed -Use Center, Seal Beach ------------------------------------------------------------------ Level Of Service COMOUtaLiOn Report TCU 1(Loss as Cycle Length a) Mezhod (Future Volume Alternative) Intersection H3 12th Street at Pacific Coast Highway ***+*#*****+***}###** k**#**#*#*****+***}* k**+***** k ** * #i:}i ** } + +++ *} * #k + *+ * + * } * }* Cycle (sec): 100 Critical Vol. /Cap.(X): 0.824 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 72 Level Of Service: D ******#**++*****#*****************#**** k********+ * ** *+ +x+ * *k* * ** * *+ * # *kk * *+ * * # ** Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- 1--------------- --------------- i Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 y. +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 11 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ---------- - - I - -- ----- II--------------- II--------------- II---------- - - - - -I Volume Module: Base Vol: 68 52 39 60 66 24 68 1913 64 39 1531 18 Growth Adj: 1..00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 68 52 39 60 66 24 68 1913 64 39 1531 18 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 68 52 39 60 66 24 68 1913 64 39 1531 18 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 68 52 39 60 66 24 68 1913 64 39 1531 18 Reduct Vol: 0 0 0 0 0 0 0 C 0 0 0 0 Reduced Vol: 68 52 39 60 66 24 68 1913 64 39 1531 18 PCE Adj: 1..00 1.00 1.00 1.00 1.00 1.00 ]. -00 1.00 1.00 1.00 1.00 1_00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 FinalVOlume: 68 52 39 60 66 24 68 1513 64 39 1531 18 --- --- - - ---- Saturation Flow Module: Sat /Lane: 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1 -00 1.066 1.06 1.00 1.03 1.00 Lanes: 0.43 C.33 0.24 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 684 523 392 1600 1700 1700 1600 3400 1700 1600 3263 37 ---------- - - I --------------- ------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.04 0.04 0.01 0 -04 0.56 0.04 0.02 0.47 0.48 Crit Moves: Tra`fix 8.0.0715 (c) 2008 Dowlirg Assoc. Licensed to LL-_ Costa Mesa, CA C -59 PM Cum Plus Gas Station blon Apr 29, 2013 15:05:22 Page 7 -1 PM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach --- -- - - -- --- ---- --- --- - - -- -- - - -- Level Of Service Computation Report ICU 1(Loss as Cycle 'Lencth %) Method (Future Volume Alternative) Intersection 44 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.849 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 80 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: No-th Sound South Bound East Bound West Bound Movement: L - T - R 1. - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovi Min. Green: 0 0 0 G 0 0 0 0 0 0 0 0 YfR: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- il--------------- II---------- - - - - - I Volume Module: Base Vol: 11 136 91 410 164 257 201 1629 38 77 1293 273 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 136 91 410 164 257 201 1629 38 77 1293 273 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 136 91 410 164 257 201 1629 38 77 1293 273 Use- Adj: 1.00 1.CO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 136 91 410 164 257 201 1629 38 77 1293 273 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 136 91 410 164 257 201 1629 38 77 1293 273 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 i.00 1.00 FinalVO.l.ume: 11 136 91. 410 1.64 257 207. 1629 38 77 1293 273 OvlAdtVol: 16 ------------ --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2017 1283 3200 1.700 1700 1600 3400 1700 1600 3400 1700 ------------ I ---------------!--------------- II--------------- II---------- - - - - - I Capacity Analysis Mocule: Vol /Sat: 0.0i 0.07 0.07 0.13 0.10 0.15 0.13 0.48 0.02 0.05 0.38 0.16 Ov1AdjV /S: 0.01 Crit Moves: } * #} } * +} * } ** * + +* Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -60 PM Cum Plus Gas Station. Mon Aor 29, 2013 15:05:22 Page 8 -1 PM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach -- - -- Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.314 Loss Time (sec): 0 Averace Delay (sec /veh): 9.1 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II---------- - - - - - I Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 11 0 0 0 0 11 0 0 0 0 1! 0 0 --------------------------- II--------------- 11--------------- II---------- - - - - -I Volume Module: Base Vol: 8 118 15 21 1.84 31. 37 54 14 29 70 40 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 Initial Bse: 8 118 15 21 184 31 37 54 14 29 70 40 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 C 0 0 0 0 0 0 0 0 0 Initial Fut: 8 118 15 21 184 31 37 54 14 29 70 40 User_ Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1_.00 1.00 1.00 1.00 PEP Adj: 1.00 1.00 1.00 100 1.00 1.00 1..00 1.00 i.00 1.00 1.00 1.00 PEE Volume: 8 118 15 21 184 31 37 54 14 29 70 40 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 8 118 15 21 184 37. 37 59 19 29 70 40 ICE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 8 118 15 21 184 31 37 54 14 29 70 40 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.0C 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.06 0.84 0.10 0.09 0.78 0.13 0.35 0.52 0.13 0.21 0.50 0.29 Final Sat.: 41 606 77 67 586 95 239 349 91 147 356 203 ------------ I --------------- II--------------- II--------------- II---------- -- - - - I Capacity Analysis Module: Vol /Sat: 0.19 0.19 0.19 0.31 0.31 0.31 0.15 0.15 0.15 0.20 0.20 0.20 Crit Moves: * # ## + +:# * * #* * *** Delay /Veh: 8.8 8.8 E.E 9.6 9.6 9.6 8.8 8.8 8.8 8.8 8.8 8.8 Delay Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.8 8.8 8.8 9.6 9.6 9.6 8.8 8.8 8.8 8.8 8.6 8.6 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.8 9.6 8.8 8.8 Delay Adj: 1..00 1.00 1.00 1.00 ApprAdj Del: 8.8 9.6 8.8 8.8 LOS by Appr: A A A A A11WayAvgQ: 0.2 0.2 0.2 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LEG Costa Mesa, CA C -6l PM Cum Pius Gas Station Mon Apr 29, 2013 15:05:22 Page 9 -1 PM Cumulative Plus Gas Station Conditions 2.13.3368.1 Main 6 PCE Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length Method (Future Volume Alternative) 1*****='*+*f F#+*+** i*** i*************** z**-**** FY#* * * * * * ** * * * * * * ** * * * * * # ** * * * *k *x* Intersection #6 Seal Beach Blvd at Boisa Ave Cycle (sec): 100 Critical Vol.. /Cap.(X): 0.440 Loss Time (sec): 10 Average Del.ay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A ** t*+* s*+********* i**+ t* * * * * * * ** * *L** * * *4 *** * ** ** * * **:Y t *** ** ** ** * * ***Ii I* * * # * * * -k Street Name: Seal Beach Blvd Bo'_sa Ave Approach: North Bound South Bound East Bound West Bound Movement: L - _ - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: c.0 41.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 --- --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol.: 14 571 12 37 779 237 1.54 15 30 6 8 24 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 100 1.00 1.00 Initial Bse: le 571 12 37 779 237 154 15 30 6 8 24 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 14 571 12 37 779 237 154 15 30 6 8 29 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 571 12 37 779 237 154 15 30 6 8 24 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 14 571 12 37 779 237 154 15 30 6 8 24 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 FinalVOlume: 14 571 12 37 779 237 154 15 30 6 8 24 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lace: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.05 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: i.00 2.94 0.06 1.00 2.30 0.70 0.91. 0.09 1.00 1.00 1.00 1.00 Final Sat.: 1600 4901 99 1600 3880 1120 1458 142 1700 1600 1700 1700 ------------ I --------------- II--------------- II - --- ------ ---- - - - - -I Capacity Analysis Module: Vol /Sat: 0.07. 0.1.2 0.12 0.02 0.20 0.21 0.11. 0.11 0.02 0.00 0.00 0.01 Crit Moves: Tra =fix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LL-_ Costa Mesa, CA C -62 LINscom LAw & GREENSPAN, engineers APPENDIX C -VII CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach 1:: r.a :1'..%A 11lln' "h 1". Nllx'fymv lnllluyi lLyM rar tgFJl.0 y r AM Cum Plus Project Fri Ao= 19, 2013 10:28:42 Page 4 -1 AM Cumulative Plus Project Conditions 2.13.3368.1. Main 5 PCH Mixed -Use Center, Seal Beach -- ------ -- - --- Level Of Service Computation Report ICU !(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.693 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 49 Level Of Service: B Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ ---------------II--------------- Ii --------------- II ---- Control: Protected Protected Split Phase Split Phase Rights: Include Include irclude Include Mi.n. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 --------------------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 14 1665 6 4 1517 55 211 0 52 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 1665 6 4 1517 55 211 0 52 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 1665 6 4 1517 55 211 0 52 1 0 3 User Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 1665 6 4 1517 55 211 0 52 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 14 1665 6 4 1517 55 211 0 52 1 0 3 PCE Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 FinalVolume: 14 1665 6 4 1517 55 211 0 52 1 0 3 ------------ --------------- II--------------- II---------- --- -- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1600 3289 11 1600 3188 112 3200 0 1600 400 0 1200 ------------ I --------------- II--------------- II---- ----------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.51 0.52 0.00 0.48 0.49 0.07 0.00 0.03 0.00 0.00 0.00 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -63 AM Cum Plus Project Fri Apr 19, 2013 10:28:42 Page 5 -1 PM Cumulative Plus Project Conditions 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach - -- ---------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative; intersection a2 Main Street at PCH Cycle (sec): 100 Critical Vol.. /Cap.(X): 0.685 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 48 Level Of Service: 3 Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - 'I - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II ---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Ovi include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 i. 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ ---------------II---------------II---------------II-------- Volume Module: Base Vol: 43 42 50 9 52 107 98 1420 49 41 1486 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 43 42 50 9 52 107 98 1420 49 41 1486 6 Added Vol: 0 0 C 0 0 0 0 0 0 0 0 0 PasserBy Vel: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 43 42 50 9 52 107 98 1420 49 41 1486 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 43 42 50 9 52 107 98 1420 49 41 1486 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 .0 0 Reduced Vol: 43 42 50 9 52 107 98 1420 49 41 1486 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 43 42 50 9 52 107 98 1420 49 41 1486 6 OVlAd -Vol: 3 ------------ --------------- II ---------------II---------------II-- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 1700 170C 1600 1700 1700 1600 3400 1700 1600 3287 13 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.01 0.03 0.06 0.06 0.42 0.03 0.03 0.45 0.47 Ov1AdjV /S: 0.00 Crit Moves: Traffix 8.0.071.5 (c) 2008 Dowling Assoc. Licensed to LEG Costa Mesa, CA C -64 AM Cum Plus Project Fri Apr 19, 2013 10:26:42 Page 6 -1 AM Cumulative Plus Project Conditions 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report ICU ].(Loss as Cycle Lencth 4) Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 100 Critical Vol. /Cap-(X): 0.733 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 55 Level Of Service: C Street Name: 12th Street Pacific Coast Highway ,Approach: North Eound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- 11 --------------- 11 --------------- 11 --------------- Control: Permitted Permitted Protected Protected Rights: Include Include Inc.iude Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 it 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ ---------------!--------------- II----------- ---- II------- --- --- - - I Volume Module: Base Vol: 69 61 33 37 40 35 51 1510 30 28 1519 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 69 61 33 37 40 35 BL 1510 30 28 1519 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 69 61 33 37 40 35 51. 1510 30 28 1519 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PEE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 69 61 33 37 40 35 51 1510 30 28 1519 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 69 61 33 37 40 35 51 1510 30 28 1519 6 PCE Adj: 1.00 1..00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1..00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolame: 69 61 33 37 40 35 51 1510 30 28 1519 6 ------------ --------------- li--------------- II--------------- II------ ---- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1..99 0.01 Final Sat.: 677 599 324 1600 1700 1700 1600 3400 1700 1600 3287 13 --------------- II--------------- II--------------- 1!-------- -- - - - - -I Capacity Analysis Module: Vol /Sat: 0,04 0.10 0.10 0.02 0.02 0.02 0.03 0.44 0.02 0.02 0.46 0.48 Crit Moves: + + ++ + # ++ * * #* * * ** 'Praf£ix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -65 AM Cum Pius Project Fri Apr 19, 2013 10:28:42 Page 7 -1 AM Cumulative Plus Project Conditions 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach ___ - ______ - -_____ - -_ -_ -_ _ _ __ _____ Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) *+++++#**#*+ k+++* Y+*#++++#}#+++***#*}+##++#*#*++ k + * + # # # + + + + + + + * *Y + # # + + + + + * * * # # ++ Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.791 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 65 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - 'P - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- ) Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Yin- Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 G 1 ------------ I --------------- II--------------- II--------------- II---- ------ ---- - I Volume Module: Base Vol: 11 150 81. 374 98 188 134 1398 14 11 1423 406 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 150 81 374 98 182 134 1398 14 11 1423 406 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVo1: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 150 81 374 96 188 134 1398 14 11 1423 406 User Aci: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 1-50 81 374 98 188 134 1398 14 11 1423 406 Reduct Vol: 0 0 0 0 0 0 0 0 G 0 0 0 Reduced Vol.: 11 150 81 374 98 188 1.34 1398 14 11 1423 406 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1-00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 150 81 374 98 188 134 1398 14 11 1423 406 OviA.dj Vol : 207 ------------ --------------- II--------------- II--------- ------ II---------- -- - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1.600 1.600 1 -600 1600 1600 1600 16GG Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 21-73 1122 3200 1700 1700 1600 3400 1700 1600 3400 1700 ------------ I-------------- II------- -------- II--------- - - - - -- 1-l- --------- - - - - -I Capacity Analysis Module: Vol/Sat: 0.01 0.07 0.07 0.12 0.06 0.11 0.08 0.41 0.01 0.01 0.42 0.24 OvlAdjv /S: 0.12 Crit Moves: T_-affix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -66 AM Cum Plus Project Fri Apr 19, 2013 10:28:42 Page 8 -1 AM Cumulative Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach --------- -------- -- ----- ------ - Leve1 Of Service Computation Report 2000 P,CM 4 -way Stop Method (Future Volume Alternative) Intersection #5 Main Street at Electric Ave Cycle (sec): 100 Critical Vol. /Cap.(X): 0.161 Loss Time (sec): 0 Average Delay (sec /veh): 8.2 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II --------------- I Control: Stop Sign Stop Sign Stop Sian Stop Sign Rights: Include Include include Include Min. Greer.: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 11 0 0 0 0 11 0 0 0 0 11 0 0 0 0 11 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 100 14 15 90 19 37 31 9 31 55 36 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 100 14 15 90 19 37 31 9 31 55 36 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 100 14 15 90 19 37 31 9 31 55 36 User Adi: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 i00 14 15 90 19 37 31 9 31 55 36 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 100 14 15 90 19 37 31 9 31 55 36 PCE Adj: 1.00 1.00 1.00 1_00 7..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1..00 1.00 1..00 1.00 1..00 1..00 1.00 1.00 1.00 1..00 1.00 1.00 FinalVolume: 11 100 la 15 90 19 37 31 9 31 55 36 ------------ --------------- II--------------- il-- -- ---- ------- II---------- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.09 0.80 0.11 0.12 0.73 0.15 0.48 0.40 0.12 0.25 0.45 0.30 Final Sat.: 69 623 87 95 567 120 356 298 87 197 350 229 ------ - - - - -- - II - - - - -- Capacity Analysis Module: Vol /Sat: 0.16 0..16 0.1.6 0.16 0.16 0.16 0.10 0.10 0.10 0.16 0.16 0.16 Crit Moves: * * ** °* ** * * ** *£ ** Delay /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 6.1 8.1 8.2 8.2 8.2 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.2 8.2 8.2 8.2 8.2 8.2 8.1 8.1 8.1 8.2 8.2 8.2 LOS by Move: A A A A A A A A. A A A A ApproachDel: 8.2 8.2 8.1 8.2 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 8.2 8.2 8.1 8.2 LOS by Appr: A A A A Al1WayAvgQ: 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -67 AM Cum Plus Project Fri Apr 19, 2013 10:28:42 Page 9 -1 AM Cumulative Plus Project Conditions 2.13.3368.1 Main e PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection 46 Seal Beach Blvd at Bolsa Ave Cycle (sec): 100 Critical Vol.. /Cap.(X): 0.455 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 31 Level OF Service: A Street Name: Seal Beach Blvd Bolsa Ave Approach: North Bound South Bound East Bound west Bound Movement: L - T - R L - T - R - T - R L - T - R ------------ I --------------- II --------------- II -!------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 Volume Module: Base Vol: 11 707 6 Il 558 Growth Adj: 1.00 1.00 1.00 1.00 1.00 initial Rse: 11 707 6 11 558 Added Vol: 0 0 0 0 0 PasserByVoi: 0 0 0 0 0 Initial Put: 11 707 6 11 558 User Adj: 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 707 6 11 558 Reduct Vol: 0 0 C 0 0 Reduced "Vol_ 11 707 6 11 558 PCE Adj: 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 i.00 FinaiVolume: 11 707 6 11 558 ------------I---------------li--------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.O0 1.00 1.06 Lanes: 1.00 2.97 0.03 1.00 2.16 Final Sat.: 1600 4960 40 1600 3660 ------------ I ---------------I!--------- Capacity Analysis Module: Vol /Sat: 0.01 0.14 0.15 0.01 0.15 Crit Moves: * * ** 216 1.00 216 0 0 216 1.00 1.00 216 0 216 1.00 1.00 216 1600 1.00 0.34 1340 0.16 249 5 92 18 8 48 1.00 1.00 1.00 1.00 1.00 1.00 249 5 92 18 8 48 0 0 0 0 0 0 0 0 0 0 0 0 249 5 92 18 8 48 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 249 5 92 18 a 48 0 0 0 0 0 0 249 5 92 18 8 48 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 249 5 92 18 8 48 --------------- II---------- - - - - -I 1600 1600 1600 1600 1600 1600 1.00 1.00 1.06 1.00 1.06 1.06 0.98 0.02 1.00 1.00 1.00 1.00 1569 31 1700 1600 1700 1700 ---------- ----- II---------- - - - - -I 0.16 0.16 0.05 0.01 0.00 0.03 Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -68 PM Cum Plus Project Fri Apr 19, 2013 10:29:22 Pace 4 -1 PM Cumulative Plus Project Conditions 2.13.3368.1 Main 5 PCH Mixed -Use Center, Sea! Beach -------------------------------------------------------------------------------- Leve1 Of Service Computation Report ICU 1(LOSS as Cycle Length 3) Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 100 Critical Vol. /Cap.(X): 0.846 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 79 Level Of Service: D Street Name: PCH 1st Street Approach: North Bound South Bound Gast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II ---------- - - - - - I Control l: Protected Protected Split Phase Split Phase Ri.ghts: Include include .include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ --------------- li--------------- II --------------- II ---------- - - - - - I Voi=e Module: Base Vol: 39 1605 3 1 1984 154 158 0 42 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 39 1605 3 1 1984 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Tnitial Fut: 39 1605 3 1 1984 154 158 0 42 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 39 1605 3 1 1984 154 158 0 42 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 39 1605 3 1 1984 154 158 0 42 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 39 1605 3 1 1984 154 158 0 42 2 1 3 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.03 1.00 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.99 0.01 1.00 1.86 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1600 3294 6 1600 3070 230 3200 0 1600 533 267 800 ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.49 0.50 0.00 0.65 0.67 0.05 0.00 0.03 0.00 0.00 0.00 Crit Moves: Traifix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -69 PM Cum Plus Project Fri Apr 19, 2013 10:29:22 Pace 5 -1 PM Cumulative Plus Project Conditions 2.13.3368.1. Main 5 PCH Mixed -Use Center, Seal Beach ------ --------------- - -- Level Of Service Computation Report ICU 1(Loss as Cycle Length 0) Method (Future Volume Alternative) Intersection 42 Main Street at PCH + +tt «rtra���+ a ttttttattttttt��atr+ ttrtt+ �rta<,:.< >aerrttr +atrr +�rrrrraarrr�rtr ++ Cycle (sec): 100 Critical Vo:L. /Cap.(X): 0.810 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 69 Level Of Service: D Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R I - I - R L - T - R L - T - R --------------------------- 11--------------- II-------- -- ----- 11---------- - - - - -I Control: Permitted Permitted Protected Protected Rights: include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II-------------- -II--------- - - - - - - I Volume Module: Base Vol: 102 63 65 19 73 168 233 1803 102 113 1448 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 102 63 65 19 75 168 233 1803 102 113 1448 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserB_vVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 102 63 65 19 75 168 233 1803 102 1.13 1448 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 102 63 65 i9 75 168 233 1803 102 113 1448 14 Reduce Vol: C 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 102 63 65 19 75 168 233 1803 102 113 1448 14 PCE Adj: 1.O0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 i.00 1.00 Fi.nal.Volume: 1.02 63 65 19 75 168 233 1803 102 113 1448 14 OvlAdjVol: 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1-600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1600 1700 1.700 1600 1700 1700 1600 3400 1700 1600 3269 31 ------------ I ---------------II---------------II---------------II- Capacity Analysis Module: Vol /Sat: 0.06 0.04 0.04 0.01 0.04 0.10 0.15 0.53 0.06 0.07 0.44 0.46 Ov1Ad-j V /S: 0.00 Grit Moves:`' kkkx� trrr �.a.aat�aarttaaatxt +�,e tat era«++.>+ a- +ttra +�ettt t,: tttrararr� +tx + + +�� + +ss�a- k�s +�t +� Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to i,LG Costa Mesa, CA C -70 PM Cum Plus Project Fri Apr 19, 2013 10:29:22 Page 6 -1 PM Cumulative Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach - -_ - - -- --------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Lenath %) Method (Future Volume Alternative) * k***********+#***#**#*** i****** F********#+*#**** ** * #4 # }F } * # * * *k * * * * * * ** * * # * * * ** Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 100 Critical Vol. /Cap.(X): 0.825 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 73 Level Of Service: D Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II---- ----------- II---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II------------- ! - II - - - -- --------------- Volume Module: Base Vol: 68 52 39 60 66 24 85 1917 69 39 1530 18 Growth Adj: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 68 52 39 60 66 24 85 1917 69 39 1530 18 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 C C 0 0 0 0 0 Initial Fut: 68 52 39 60 66 24 85 1917 69 39 1530 18 User Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 i.00 1.00 i.00 1.00 1.00 1.00 i.00 1.00 1.00 PHF Volume: 66 52 39 60 66 24 85 1917 69 39 1530 18 Reduct Vol: 0 0 0 0 0 C 0 0 0 0 0 0 Reduced Vol: 68 52 39 60 66 24 85 1917 69 39 1530 18 PCE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVclume: 68 52 39 60 66 24 85 1917 69 39 1530 18 ------------ --------------- II--------------- II-------------- -II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1.600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.066 1.06 1.00 1.03 1.00 Lanes: 0.43 0.33 0.24 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 684 523 392 1600 1700 1"700 1600 3400 1700 1600 3263 37 ------------ I --------------- II--------------- II---------- ----- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.10 0.10 0.04 0.04 0.01 0.05 0.56 0.04 0.02 0.47 0.48 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -71 PM Cum Plus Project Fri Apr 19, 2013 10:29:22 Pace 7 -1 PM Cumulative Plus Project Conditions 2.1.3.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach -- - - - - -- Level Of Se -vice Computation Report ICU 1(Loss as Cycle Length o) Method (Future Volume Alternative) *****}*******+*+}}k i+*}**#***** Y*#***** k**+#* Y*** * * * * } * * *i * * * +* * * * * * ** * * + * * # * * *# Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.850 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 80 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II---------_----- II_-------------- II---------- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I--------------- II--------------- II--------------- II-------- -- - - - - - I Volume Module: Base Vol: 11 136 91 410 164 257 205 1631 38 77 1294 273 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 InitiaL Bse: 11 136 91 410 164 257 205 1631 38 77 1294 273 Added Vol: 0 0 0 C 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 136 91 410 164 257 205 1631 38 77 1294 273 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 11 136 91 410 164 257 205 1631 38 77 1294 273 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 11 136 91 410 164 257 205 1631 38 77 1294 273 PCE Adj: 1.00 1.00 1.00 i.00 1.00 i.00 1.00 1.00 1.00 1.00 i.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 11 136 91 410 164 257 205 1631 38 77 1294 273 Ov1AdjVol: 16 ------------ --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.05 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.06 1.066 Lanes: 1.00 1.20 0.50 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1600 2017 1283 3200 1700 1700 1600 3400 1700 1600 3400 1700 ---- I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.13 0.10 0.15 0.13 0.48 0.02 0.05 0.38 0.16 Ov1Adj V /S: 0.01 Crit Moves: * * ** * **- Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -72 PM Cum Plus Project Fri Apr 19, 2013 10:29:22 Page 8 -1 PM Cumulative Plus Project Conditions 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM 4 -Way Stop Method (Future Volume Alternative) Intersection 45 Main Street at Electric Ave Cycle (sec): 100 Critical Vol.. /Cap.(X): 0.299 Loss Time (sec): 0 Average Delay (sec /veh): 9.0 Optimal Cycle: 0 Level Of Service: A Street Name: Main Street Electric Ave Approach: North Bound South Bound East Sound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II---_-----_----- II--------------- II ---------- - - - - - I Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Tncl.ude Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 11 0 0 0 0 i! 0 0 0 0 11 0 0 0 0 1! 0 0 ------------ --------------- II--------------- tl--------------- II--- ------- - - - - - I Volume Module: Base Vol: 8 115 15 18 179 28 35 54 14 30 71 38 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 8 115 15 18 179 28 35 54 14 30 71. 38 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 8 115 15 18 179 28 35 54 14 30 71 38 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 8 115 15 18 179 28 35 54 14 30 71 36 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 8 115 15 18 179 28 35 54 14 30 71 38 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 '_.00 1.00 1 -00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 8 115 15 18 179 28 35 54 14 30 71 38 ------------ --------------- II--------------- II----------- ---- II------- --- - - - - - I Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.06 0.83 0.11. 0.08 0.80 0.12 0.34 0.52 0.14 0.22 0.51 0.27 Final Sat.: 42 608 79 60 599 94 233 360 93 154 363 1.94 ------------ I - ------- -- -- - - -II- ----- -II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.19 0.19 0.19 0.30 0.30 0.30 0.15 0.15 0.15 0.20 0.20 0.20 Crit Moves: * * *^ ** ** * *** * * ** Delay /Veh: 8.7 8.7 8.7 9.4 9.4 9.4 8.7 8.7 8.7 8.8 8.8 8.8 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.DO 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 8.7 8.7 8.7 9.4 9.4 9.4 8.7 8.7 8.7 8.8 8.8 8.8 LOS by Move: A A A A A A A A A A A A ApproachDel: 8.7 9.4 8.7 8.8 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdj Del: 8.7 9.4 8.7 8.8 LOS by Appr: A A A A Al1WayAvgQ: 0.2 0.2 0.2 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowlinc Assoc. Licensed to LLG Costa Mesa, CA C -73 PM Cum Plus Project Fri Apr 19, 2013 10:29:22 Pape 9 -1 PM Cumulative Plus Project Conditions 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ----------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 3) Method (Future Volume Alternative) Intersection #6 Seal Beach Blvd at Bolsa Ave Cycle (sec): 1.00 Critical Vol. /Cap.(X): 0.441 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 30 Level Of Service: A Street Name: Seal Beach Blvd Bolas Ave Approach: Nortn Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Tncl.ude Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 0 1 0 1 ------------ I --------------- II--------------- II--------------- II--------- - - - - - I Volume Module: Base Vol: 14 575 12 37 779 240 154 15 30 6 8 24 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 575 12 37 779 240 154 15 30 6 8 24 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVoi: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 14 575 12 37 779 240 154 15 30 6 8 24 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.D0 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 14 575 12 37 779 240 154 15 30 6 8 24 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 14 575 12 37 779 240 154 15 30 6 8 24 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. 1.00 1.00 1.00 FinalVOlume: 14 575 12 37 779 240 154 15 30 6 8 24 ------------ --------------- II--------------- II--------------- II--- ------- - - - - - I Saturation Flow Module: Sat /Lace: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.04 1.00 1.00 1.05 1.00 1.00 1.00 1.06 1.00 1.06 1.06 Lanes: 1.00 2.94 0.06 1.00 2.29 0.71 0.91 0.09 1.00 1.00 1.00 1.00 Final Sat.: 1600 4902 98 1600 3869 1131 1458 142 1700 1600 1700 1700 ------------ I --------------- II ------------- -- II ------------ - - - II - - Capacity Analysis Module: Vo:L /Sat: O.C1 0.12 0.12 0.02 0.20 0.21 0.11 0.11 0.02 0.00 0.00 0.01 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -74 APPENDIX C -011 CUMULATIVE PLUS PROJECT PLUS MITIGATION TRAFFIC CONDITIONS LINSCOTT, LAW & GREENSPAN, en(JlneeS LLG Ref. 2- 13- 3368 -1 Wain & PCH Mixed -Use Center, Seal Reach A w lU I V.i Hm..tt ri AVa. S"l n....4 L" a qua ..t AM Cum Pius Project (Mit) Mon Apr 22, 2013 15:31:22 Page 4 -1 AM Cumulative Plus Project Conditions (Mitigation) 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach -- --- -- - - - - -- ----- -------- ---- Level Of Service Computation Report ICU ].(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 100 Critical Vol. /Cap.(X): 0.691 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 49 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include OVI Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 C 2 0 1 1 0 1 1 0 - - -I - II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 43 42 50 9 52 107 98 1420 49 41 1486 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 43 42 50 9 52 107 98 1420 49 41 1486 6 Added Vol: 0 0 0 0 0 0 0 C 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 43 42 50 9 52 107 98 1420 49 41 1486 6 User Ad!: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 43 42 50 9 52 107 9B 1420 49 41 1486 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol.: 43 42 50 9 52 107 98 1420 49 41 "_486 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 43 42 50 9 52 107 98 1420 49 41 1486 6 Ov1Adj Vol: 3 ------------------ II-------------- II--------------- 11- --------- - - - - -I Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1.600 1600 1600 1600 7.600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 0.46 0.54 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1600 730 870 1600 1700 1700 1600 3400 1700 1600 3287 13 --------------- II - - -- -- il------------ - - -II -- -I Capacity Analysis Module: Vol /Sat: 0.03 0.06 0.06 0.01 0.03 0.06 0.06 0.42 0.03 0.03 0.45 0.47 OvlAdjV /S: 0.00 Crit Moves: Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LL-1 Costa Mesa, CA C -75 PM Cum Plus Project (Mit) Mon Apr 22, 2013 15:31:51 Page 4 -1 PM Cumulative Plus Project Conditions (Mitigation) 2.1-3.3368.1 Main & PCH Mixed -Use Center, Seal Beach - - - - -- ------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length $) Method (Future Volume Alternative) Intersection #2 Main Street at PCH *** s******** k*k** k***++****+*********+** kk*- i*+ 1-k+ * ** * * *i*** *k * *k * * * ** * * * * *k * ** ** Cycle (sec): 100 Critical Vol. /Cap.(X): 0.810 Loss Time (sec): 10 Average Delay (sec /veh): xxxxxx Optimal Cycle: 69 Level Of Service: D Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ---------------------------II--------------- 1-l--- ------------ II - - - -- Volume Module: Base Vol: 102 63 65 19 75 1668 233 1803 102 113 1448 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 102 63 65 19 75 1968 233 1803 102 11.3 1448 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Ent: 102 63 65 19 75 168 233 1803 102 113 1448 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 102 63 65 i9 75 168 233 1803 102 113 1448 14 Reduct Vol: 0 0 0 0 0 0 0 0 0 U 0 0 Reduced Vol: 102 63 65 19 75 168 233 1803 102 113 1448 14 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 11.00 19.00 FinalVolume: 102 63 65 19 75 168 233 1803 102 113 1448 14 Ov1Adj Vol: 0 ------------ ---------------II--------------II---------------II------ Saturation Flow Module: Sat /Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 16600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.06 1.06 1.00 1.06 1.06 1.00 1.03 1.00 Lanes: 1.00 0.49 0.51 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1600 788 813 1600 1700 1700 1600 3400 1700 1600 3269 31 ------------ I ---------------II---------------II---------------II----- Capacity Analysis Module: Vol /Sat: 0.06 0.08 0.08 0.01 0.04 0.10 0.15 0.53 0.06 0.07 0.44 0.46 Ov1AdjV /S: 0.00 Crit Moves: * * * * * ** * * ** * * ** Tra£fix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA C -76 APPENDIX D CALTRANS INTERSECTION LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOrr, LAO & GREENSPAN. engineers LLG Ref 2 -13- 3368 -1 Main do YCI I Mixed -Usc Center, Seal Beach V 6 cl� :13M,, — `.'gin. A PCII \r._.I -Cn. i:u.-.'. c: -B,d kc— ijol niudrn Nm LINSCOTL LAW & GREENSPAN, engineers APPENDIX D -1 EXISTING TRAFFIC CONDITIONS LLG Ref. 2- 13- 3365 -1 Main & PCH Mixed -Use Cenler, Seal Beach AM Existing Thu Apr 18, 2013 16:33:33 Page 4 -1 AM Existing Conditions [Caltrans] 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 41 PCH at 1st Street i kkki l;} }}}}kA* * }}R }# +kA *k #kk4*}i k1Ai*#f« i}**}* i* * ;YF *klk+ *A \k *Mk *2 } } *a } ; # # + * * *# Cycle (sec): 120 Critical Vol. /Cap.(X): 0.614 Loss Time (sec): 16 Average Delay (sec /veh): 30.4 Optimal Cycle: 73 Level Of Service: C Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 7.7 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1., 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 1609 6 4 1462 47 186 0 50 1 0 3 Growth Adz: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 1609 6 4 1462 47 186 0 50 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 1609 6 4 1462 47 186 0 50 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 1694 6 4 1539 49 196 0 53 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 1694 6 4 1539 49 196 0 53 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 FinalVOlume: 12 1694 6 4 1539 49 196 0 53 1 0 3 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3480 112 3502 0 1615 422 0 1266 ------------ I --- -------- ---- II - - -- II--------------- II----- -- --- - -- - -I Capacity Analysis Module: Vol /Sat: 0.01 0.47 0.47 0.00 0.44 0.44 0.06 0.00 0.03 0.00 0.00 0.00 Crit Moves: } + «+ # *a* } *** aaaa Green /Cycle: 0.06 0.53 0.53 0.05 0.52 0.52 0.14 0.00 0.14 0.14 0.00 0.14 Volume /Cap: 0.11 0.88 0.88 0.05 0.64 0.84 0.39 0.00 0.23 0.02 0.00 0.02 Delay /Veh: 53.9 30.0 30.0 54.5 28.0 28.0 47.3 0.0 46.2 44.3 0.0 44.3 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 53.9 30.0 30.0 54.5 28.0 28.0 47.3 0.0 46.2 44.3 0.0 44.3 LOS by Move: D C C D C C D A D D A D HCM2kAvgQ: 0 32 32 0 28 26 4 0 2 0 0 0 Note: Queue retorted is the number of cars per lane Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA EN AM Existing Thu Apr 18, 2013 16:33:33 Page 5 -1 AM Existing Conditions [Caltrans] 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach ----------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cao.(`f.): 0.563 Loss Time (sec): 12 Average Delay (sec /veh): 18.9 Optimal Cycle: 67 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - - R L - T - R ------------ I --------------- II--------------- II------- ! ------- II---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 2B 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II---------- -- - - - I Volume Module: Base Vol: 44 41 50 5 50 101 92 1359 46 27 1430 6 Growth Adi: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 44 41 50 5 50 101 92 1359 48 27 1430 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 44 41 50 5 50 101 92 1359 48 27 1430 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 46 43 53 5 53 106 97 1431 51 28 1505 6 Reducr Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 46 43 53 5 53 106 97 1431 51 28 1505 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 46 43 53 5 53 106 97 1431 51 28 1505 6 ------------ --------------- II----------- --- -II---- ------- - - - -II Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.73 1.00 0.85 0.73 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1378 1900 1615 1393 1900 1615 1805 3610 1615 1805 3591 i5 ------------ I --------------- II--------------- II---------- --- -- II---- ----- - - - - - - I Capacity Analysis Module: Vol /Sat.: 0.03 0.02 0.03 0.00 0.03 0.07 0.05 0.40 0.03 0.02 0.42 0.42 Crit Moves: Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.17 0.11 0.16 0.02 0.14 0.24 0.68 0.64 0.05 0.20 0.68 0.68 Delay /Veh: 40.0 39.4 39.9 38.6 39.7 33.6 65.8 14.9 8.9 52.5 15.7 15.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 40.0 39.4 39.9 38.6 39.7 33.6 65.8 14.9 8.9 52.5 15.7 15.7 LOS by Move: D D D D D C E B A D B B HCM2kAvgQ: 1 1 2 0 2 3 5 17 L L 19 19 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (ci 2008 Dowling Assoc. Licensed to LLG Ccsta Mesa, CA D -2 AM Existing Thu Apr 18, 2013 16:33:33 Page 6 -1 AM Existing Conditions [Caltrans] 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection k3 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.617 Loss Time (sec): 12 Average Delay (sec /veh): 17.5 Optimal Cycle: 63 Level Of Service: B Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound [vest Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 - 0 1 1 0 ------------ I--------------- II--------------- II- --- ----------- 11--------- - - - - -I Volume Module: Base Vol: 67 59 32 36 39 34 35 1449 25 27 14646 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 67 59 32 36 39 34 35 1449 25 27 1464 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVcl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 67 59 32 36 39 34 35 1449 25 27 1464 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 71 62 34 38 41 36 37 1525 26 28 1541 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 62 34 38 41 36 37 1525 26 26 1541 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 62 34 38 41 36 37 1525 26 28 1541 6 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 . 1900 1900 1900 Adjustment: 0.83 0.83 0.83 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 665 585 318 1518 1900 1615 1805 3610 1615 1805 3392 15 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.02 0.02 0.02 0.02. 0.42 0.02 0.02 0.43 0.43 Crit Moves: Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.05 0.63 0.63 0.07 0.65 0.65 Volume /Cap: 0.53 0.53 0.53 0.12 0.11 0.11 0.41 0.68 0.03 0.21 0.66 0.66 Delay /Veh: 44.7 44.7 44.7 39.6 39.4 39.4 58.3 15.4 8.5 53.1 13.6 13.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 44.7 44.7 44.7 39.6 39.4 39.4 58.3 15.4 8.5 53.1 13.6 13.6 LOS by Move: D D D D D D E B A D B B HCM2xAvgQ: 6 6 6 1 1 1 2 19 0 1 19 19 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -3 AM Existing Thu Apr 18, 2013 16:33:33 Page 7 -1 AM Existing Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 44 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol./Cap-(X): 0.751 Loss Time (sec): 16 Average Delay (sec /veh): 34.2 Optimal Cycle: 81 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II ---- _----- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Mi.n. Green: 6 6 6 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 D 2 0 1 1 0 2 0 1 ---------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 146 79 363 95 182 124 1348 14 11 1373 394 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 146 79 363 95 182 124 1348 14 11 1373 394 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 146 79 363 95 182 124 1348 14 11 1373 394 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 154 83 382 100 192 131 1419 15 12 1445 415 Reduce Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 154 83 382 100 192 131 1419 15 12 1445 415 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 154 83 382 100 192 131 1419 15 12 1445 415 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.90 0.90 0.92 1.00 0.65 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2218 1200 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II------ ---- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.11 0.05 0.12 0.07 0.39 0.01 0.01 0.40 0.26 Crit Moves: #4 ** + "' 44 " +*`* Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.08 0.49 0.49 0.06 0.47 0.70 Volume /Cap: 0.08 0.86 0.86 0.47 0.23 0.51 0.86 0.80 0.02 0.10 0.86 0.37 Delay /Veh: 51.2 76.6 76.66 40.0 37.5 41.2 89.2 28.4 15.8 53.5 32.9 7.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 51.2 76.6 76.6 40.0 31.5 41.2 69.2 28.4 15.8 53.5 32.9 7.4 LOS by Move: D E E D D D F C B D C A HCM2kAvgQ: 0 7 7 7 3 7 7 24 0 0 27 6 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA DA PM Existing Thu Apr 18, 2013 16:33:54 Page 4 -1 PM Existing Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -- -- --------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.770 Loss Time (sec): 16 Average Delay (sec /veh): 64.9 Optimal Cycle: 85 Level Of Service: E Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - n ------------ I --------------- II --------------- II --------------- II --------------- ] Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 1.7 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.J 4.0 4.0 Lanes: 1 0 1 1 0 1 0 3. 1 0 2 0 0 1 0 0 0 11 0 0 Volume Module: Base Vol: 31 1547 3 1 1917 Growth Adj: 1.00 1.00 1.00 1.00 1.00 Initial Bse: 31 1547 3 1 1917 Added Vol: 0 0 0 0 0 PasserByvol: 0 0 0 0 0 Initial Fut: 31 1547 3 1 1917 User Adj: 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 PHF Volume: 33 1628 3 1 2018 R.educt Vol: 0 0 0 0 0 Reduced Vol: 33 1628 3 1 2018 PCE Adj: 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 FinalVolume: 33 1628 3 1 2018 ------------I---------------II--------- Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 Lanes: 1.00 1.99 0.01 1.00 1.87 Final Sat.: 1805 3603 7 1805 3347 ------------ I ---------------II--------- Capacity Analysis Module: Vol /Sat: 0.02 0.45 0.45 0.00 0.60 Crit Moves: * * ** * * ** Green /Cycle: 0.05 0.53 0.53 0.06 0.53 Volume /Cap: 0.36 0.86 0.86 0.01 1.13 Delay /Veh: 57.6 28.9 28.9 53.3 94.0 User DelAdj: 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 571 6 28.9 28.9 53.3 94.0 LOS by Move: E C C D F HCM2kAva_Q: 2 30 30 0 60 130 1.00 130 0 0 130 1.00 0.95 137 0 137 1.00 1.00 137 1900 0.94 0.13 227 0.60 0.53 1.1.3 94.0 1.00 94.0 F 60 .kkk4l 142 0 41 2 1 3 1.00 1.00 1.00 1.00 1.00 1.00 142 0 41 2 1 3 0 0 0 0 0 0 0 0 0 7 0 0 142 0 41 2 1 3 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 0.95 0.95 149 0 43 2 1 3 0 0 0 0 0 0 149 0 43 2 1. 3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 149 0 43 2 1 3 --------------- II ----- -- --- - - - - - I 1900 1900 1900 1900 1900 1900 0.92 1.00 0.85 0.92 0.92 0.92 2.00 0.00 1.00 0.33 0.17 0.50 3502 0 1615 581 291. 872 --- -------- ---- II---- - - - - -- - - -I 0.04 0.00 0.03 0.00 0.00 0.00 0.14 0.00 0.14 0.14 0.14 0.14 0.30 0.00 0.19 0.03 0.03 0.03 46.5 0.0 45.8 44.4 44.4 44.4 1.00 1.00 1.00 1.00 1..00 1.00 46.5 0.0 45.8 44.4 44.4 44.4 D A. D D D D 3 0 1 0 0 0 f4k * # * * *+i4k }k #r }k * *;iizA* *iii #1Y+ Note: Queue reported is the numoer of cars per lane Tra£fix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -5 PM Existing Thu Apr 18, 2013 16:33:54 Page 5 -1 PM Existing Conditions [Caltransj 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Le-vel Of Service Comoutation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.715 Loss Time (sec): 12 Average Delay (sec /veh): 26.4 Optimal Cycle: 67 Level Of Service: C *+*# i**+*+++*+*}++*++*+*****+++,+*+****+*****+++*+ : * ** * + * *} + ** *k + + } } + * + + + **+ + * * *+ Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R. L - T - R L - T - R L - T - R -------- I --------------- II--------------- II--------------- 11 --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include Include Min. Green: 24 24 24 2 8 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ---- ----- - -- I -- ------ il----------- - - - -II -------- II--------- - - - - - -I Volume Module: Base Vol: 100 61 64 16 73 158 222 1735 98 100 1387 14 Growth Adj: 1.00 1.00 1.00 l.On 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 100 61 64 16 73 158 222 1735 98 100 1387 1.4 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol.: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 100 61 64 16 73 158 222 1735 98 100 1387 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 105 64 67 17 77 166 234 1826 103 105 1460 15 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 64 67 17 77 166 234 1826 103 1.05 14660 15 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.D0 FinalVolume: 105 64 67 17 77 166 234 1826 103 105 1460 15 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.70 1.00 0.85 0.72 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1326 1900 1615 1360 1900 1615 1805 3610 1615 1805 3570 36 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.08 0.03 0.04 0.01 0.04 0.10 0.13 0.51 0.06 0.06 0.41 0.41 Crit Moves: * * "* * * #* *+ ++ Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.63 0.63 0.07 0.53 0.53 Volume /Cap: 0.40 0.17 0.21 0.06 0.20 0.28 0.77 0.81 0.10 0.81 0.77 0.77 Delay /Veh: 42.7 40.0 40.4 39.0 40.3 26.9 59.0 19.1 8.9 84.3 24.2 24.2 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 Adj Del /Veh: 42.7 40.0 40.4 39.0 40.3 26.9 59.0 19.1 8.9 84.3 24.2 24.2 LOS by Move: D D D D D C E B A F C C HCM2kAvgQ: 4 2 2 1 2 4 10 28 1 6 24 24 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA W. PM Existing Thu Apr 18, 2013 16:33:54 Page 6 -1 PM Existing Conditions (Caltrans] 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Peach -------------------------------------------------------------------------------- Leve1 Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.739 Loss Time (sec): 12 Average Delay (sec /veh): 20.2 Optimal Cycle: 68 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II---------_-_--- II--------------- II ---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 it 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II--------- --- - - - I Voiume Module: Base Vol: 66 50 38 58 64 23 66 1844 62 38 1473 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 66 50 38 58 64 23 66 1844 62 38 1473 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByvoi: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 66 50 38 58 64 23 66 1844 62 38 1473 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PEE Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 69 53 40 61 67 24 69 1941 65 40 1551 18 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 69 53 40 61 67 24 69 1941 65 40 1551 18 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 69 53 40 61 67 24 69 1941 65 40 1551 18 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 i900 1900 1900 1900 1900 1900 1900 1900 [Adjustment: 0.81 0.81 0.81 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.32 0.25 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 657 498 379 1512 1900 1615 1805 3610 1615 1805 3562 41 ------------ I --------------- II--------------- II---- ----------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.04 0.04 0.01 0.04 0.54 0.04 0.02 0.44 0.44 Crit Moves: #k ++ Y * {Y + + +* Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.07 0.65 0.65 0.05 0.63 0.63 Volume /Cap: 0.53 0.53 0.53 0.20 0.18 0.07 0.53 0.83 0.06 0.44 0.69 0.69 Delay /Veh: 44.7 44.7 44.7 40.3 40.0 39.1 58.0 18.5 7.7 58.8 15.7 15.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 Adj Del /Veh: 44.7 44.7 44.7 40.3 40.0 39.1 58.0 16.5 7.7 58.8 15.7 15.7 LOS by Move: D D D D D D E B A E B 3 HCM2kAvgQ: o` 6 6 2 2 1 3 30 1 2 20 20 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -7 PM Existing Thu Apr 18, 2013 16:33:54 Page 7 -1 PM Existing Conditions (Caltrans] 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach --- -- - -- --- - - - - -- ------ ------ --- - ----- --- - - - - -- - Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cvcle (sec): 120 Critical Vol. /Cap.(X): 0.796 Loss Time (sec): 16 Average Delay (sec /veh): 40.1 Optimal Cycle: 92 Level Of Service: D Street Name: Sea). Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- 11 --------------- 11 --------------- II- Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 2.8 6 21 21 6 21 21 y +R.: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 --------------------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 1.1 132 88 398 159 248 193 1573 37 75 1247 265 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 132 88 398 159 248 193 1573 37 75 1247 265 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 132 88 398 159 246 193 1573 37 75 1247 265 User Adj: 1.00 1.00 i.00 1.00 1.00 1. -00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 139 93 419 167 261 203 1656 39 79 1313 279 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 139 93 419 167 261 203 1656 39 79 1313 279 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 139 93 4i9 167 261 203 1656 39 79 1313 279 ------------ --------------- II--------------- II-- -- --------- -- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.89 0.89 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1 -20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2036 1357 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II----- ---------- II---- ------ - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.16 0.11 0.46 0.02 0.04 0.36 0.17 Crit Moves: ** ** ` * ** * * *` * *#4 Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.13 0.51 0.51 0.05 0.43 0.66 Volume /Cap: 0.08 0.90 0.90 0.51 0.38 0.69 0.85 0.90 0.05 0.87 0.85 0.26 Delay /Veh: 51.9 87.0 87.0 40.6 39.2 47.5 75.6 33.6 14.9 112.5 35.9 8.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 51.9 87.0 87.0 40.6 39.2 47.5 75.6 33.6 14.9 112.5 35.9 8.6 LOS by Move: D F F D D D E C B F D A HCM2kAvgQ: 0 7 7 7 5 10 10 33 1 5 25 4 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowlinq Assoc. Licensed to LLG Costa Mesa, CA D -8 LINSCGTT. LAW 8 GREENSPAN, engineers APPENDIX D -11 EXISTING PLUS GAS STATION TRAFFIC CONDITIONS LLG Ref, 2- 13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach AM Existing Plus Gas StatioMon Apr 29, 2013 15:06:43 Page 4 -1 AM Existing Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach - -_ -- - - -- -- - - -- -- _----------_--_-- - - -_ -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at lst Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.615 Loss Time (sec): 16 Average Delay (sec /veh): 30.5 Optimal Cycle: 73 Level Of Service: C Street Name: PCH 1st Street Approach: North Bound South Bound East Bound 'West Bound Movement: L - T - R L - T - R L - T - R L - T - R ---------------------------11---------------II---------------11---- Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 i 0 1 1 0 2 0 0 1 0 0 0 i! 0 0 ------------ --------------- II--------------- II----------- ---- II--- ------- - - - - - I Volume Module: Base Vol: li 1611 6 4 1464 47 186 0 50 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0.0 1.00 1.00 Initial Bse: 11 1611 6 4 1464 47 186 0 50 1 0 3 Added Vol: 0 C 0 0 0 0 0 0 0 C 0 0 PasserByvol: 0 0 0 0 0 0 0 0 0 0 D U Initial Fut: 11 1611 6 4 1464 47 186 0 50 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 1696 6 4 1541 49 196 0 53 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 1.696 6 4 1541 49 196 0 53 i 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.O0 1.00 1.00 FinalVOlume: 12 1696 6 4 1541 49 196 0 53 1 0 3 ------------ --------------- II--------------- II-- -------- ----- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 i900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 C.95 0.92 1.00 0. 85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3480 112 3502 0 1615 422 0 1266 ------------ I --------------- II--------------- II----------- ---- II-------- -- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.47 0.47 0.00 0.44 0.44 0.06 0.00 0.03 0.00 0.00 0.00 Crit Moves: } *** Green /Cycle: 0.06 0.53 0.53 0.05 0.52 0.52 0.14 0.00 0.14 0.14 0.00 0.14 Volume /Cap: 0.11 0.88 0.88 0.05 0.84 0.84 0.39 0.00 0.23 0.02 0.00 0.02 Delay /Veh: 53.9 30.1 30.1 54.5 28.1 28.1 47.3 0.0 46.2 44.3 0.0 44.3 User DelAdj: 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 53.9 30.1 30.1 54.5 28.1 28.1 47.3 0.0 46.2 44.3 0.0 44.3 LOS by Move: D C C D C C D A D D A D HCM2:+AvgQ: 0 32 32 0 28 28 4 0 2 0 0 0 Note: Queue raported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA AM Existing Plus Gas StatioMon Apr 29, 2013 15:06:43 Page 5 -1 AN Existing Plus Gas Station Conditions (Caltransl 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach ---------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 42 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.572 Loss Time (sec): 12 Average Delay (sec /veh): 19.1 Optimal Cycle: 67 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound west Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 i 1 0 2 0 1. 1. 0 1 1 0 -------------- -- II -- - II------- -------- II---------- - - - - -I Volume Module: Base Vol: 58 44 50 8 50 101 92 1345 68 39 1422 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 58 44 50 6 50 101 92 1345 68 39 1422 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 58 44 50 8 50 101 92 1345 68 39 1422 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PEP Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 61 46 53 8 53 106 97 1416 12 41 1497 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 61. 46 53 8 53 1066 97 1416 72 41 1497 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 61 46 53 8 53 106 97 1416 72 41 1497 6 ------------ --- ---- -------- II--- - - - - -- ----- Il--------- ------ Il---------- - - -- -f Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.73 1.00 0.85 0.73 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 D.01 Final Sat.: 1.378 1900 1615 1387 1900 1615 1605 3610 1615 1805 3591 15 ------------ I -------------- II--------------- II-- ------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.04 0.02 0.03 0.01 0.03 0.07 0.05 0.39 0.04 0.02 0.42 0.42 Crit Moves: *+** + #*} Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.22 0.12 0.16 0.03 0.14 0.24 0.67 0.63 0.07 0.29 0.67 0.67 Delay /Veh: 40.6 39.5 39.9 38.7 39.7 33.6 65.4 14.8 9.1. 53.2 15.7 15.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 40.6 39.5 39.9 38.7 35.7 33.6 65.4 14.8 9.1 53.2 15.7 1.5.7 LOS by Move: D D D D D C E B A D B B HCM2kAvgQ: 2 1 2 0 2 3 5 17 1 2 19 19 Note: Queue reported is the number of cars per lane. Traf,`.ix. 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA n -lo AM Existing Plus Gas StatioMon Apr 29, 2013 15:06:43 Page 6 -1 AM Existing Plus Gas Station Conditions (Caltrans] 2.13.3368.1 Main n PCH Mixed -Use Center, Seal Beach -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) 'k * *tk +k * <£dltf k # #£AI +iM *k * * *i {�.i- I.i* * *L iL��k*# ki-# ! * # *3i*�k *4k *k +k *rt*k *k�kAkA *k♦ Intersection k3 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0 -619 Loss Time (sec): 12 Average Delay (sec /veh): 17.5 Optimal Cycle: 63 Level Of Service: B Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II------------_-- II--- ------------ II --- ------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 11 0 0 1 0 1 D 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 67 59 32 36 39 34 35 1453 25 27 1468 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 Initial Bse: 67 59 32 36 39 34 35 1453 25 27 1468 6 Added Vol: 0 0 G 0 0 0 0 0 0 0 0 0 PasserByvcl: 0 0 0 0 0 0 0 0 c 0 0 0 Initial Fut: 67 59 32 36 39 34 35 1453 25 27 14686 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.55 PHF Volume: 71 62 34 38 41 36 37 1529 26 28 1545 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 62 34 38 41 36 37 1529 26 28 1545 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 71 62 34 38 41 36 37 1529 26 28 1545 6 ---------------- il--------------- II--------------- II--------- - - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1500 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.83 0.83 0.83 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 665 585 318 1518 1900 1615 1805 3610 1615 1805 3592 15 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.02 0.02 0.02 0.02 0.42 0.02 0.02 0.43 0.43 Crit Moves: * * ++ . +_. £ +t+ Greer, /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.05 0.63 0.63 0.07 0.65 0.65 Volume /Cap: 0.53 0.53 0.53 0.12 0.11 0.11 0.41 0.68 0.03 0.21 0.66 0.66 Delay /Veh: 44.7 44.7 44.7 39.6 39.4 39.4 58.3 15.4 8.5 53.1 13.6 13.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 44.7 44.7 44.7 39.6 39.4 39.4 58.3 15.4 8.5 53.1 13.6 13.6 LOS by Move: D D D D D D E B A D B 5 HCM2kAvaQ: 6 6 6 1 1 1 2 19 0 1 19 19 Note: Queue reported is the number of cars per lane. Traffic 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA M AM Existing Plus Gas StatioMon Apr 29, 2013 1.5:06:43 Page 7 -1 .AM Existing Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection N4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.752 Loss Time (sec): 16 Average Delay (sec /veh): 34.2 Optimal Cycle: 82 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - - R - ---------- - - - - -H --------------- II_-- ----- -- ----- II --- ---- ! -- -- - - - I Control: Split Phase Split Phase Protected 2rotected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 2B 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ --------------- II--------------- II-------- ------- II---------- - -- - - I Volume Module: Base Vol: 11 lab 79 363 95 182 124 1350 14 11 1375 394 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 146 79 363 95 182 124 1350 14 11 1375 394 Added "Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 146 79 363 95 182 124 1350 14 11 1375 394 User Adj: 1.00 1.00 1.DD 1.00 1.D0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0 -95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 154 83 382 100 192 131 1421 15 12 1447 415 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 154 83 382 100 192 131 1421 15 12 1447 4i5 PCE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1100 i.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 154 83 382 100 192 131 1.421 15 12 1947 915 ------------ --------------- II--------------- II----- ---------- II- --------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.90 0.90 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final. Sat.: 1805 2218 1200 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I -------------- II--------------- II------------ --- II-- -- ------ - - - - - t Capacity Analysis Module: Voi /Sat: 0.01 0.07 0.07 0.11 0.05 0.12 0.07 0.39 0.01 0.01 0.40 0.26 Crit Moves: * * ** ` + *` 1141 * # ** Green /Cycle: 0.06 0.08 0.08 0.23 0.23 0.23 0.08 0.49 0.49 0.06 0.47 0.70 Volume /Cap: 0.08 0.86 0.86 0.47 0.23 0.51 0.86 0.80 0.02 0.10 0.86 0.37 Delay /Veh: 51.2 76.7 76.7 40.0 37.5 41.2 89.4 28.5 15.7 53.5 32.5 7.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 51.2 76.7 76.7 40.0 37.5 41.2 89.4 28.5 15.7 53.5 32.9 7.4 LOS by Move: D E E D D D F C B D C A HCM2kAvgQ: 0 7 7 7 3 7 7 24 D 0 27 6 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -12 PM Existing Plus Gas StatioMon Apr 29, 2013 15:07:26 Page 4 -1 PM Existing Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at Ist Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.770 Loss Time (sec): 16 Average Delav (sec /veh): 65.1 Optimal Cycle: 85 Level Of Service: E Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------- II --------------- II --------------- II --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y +R: 4.0 10 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ I --------------- II--------------- II--------------- II---------- - -- - - I Volume Module: Base Vol: 31 1550 3 1 1920 130 142 0 41 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 Initial Bse: 31 1550 ]. 1920 . 130 142 0 41 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 U 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 C initial Fut: 31 1550 3 1 1920 130 142 0 41 2 1 3 User Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 33 1632 3 1 2021 137 149 0 43 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 p 0 0 Reduced Vol: 33 1632 3 1 2021 137 149 0 43 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 33 1632 3 1 2021 137 149 0 43 2 1 3 ------------ --------------- II--------------- II------ -- ------- II------- --- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 ?900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 1.87 0.13 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1805 3603 7 1805 3351. 227 3502 0 1615 581 291 872 ------------ I --------------- II--------------- II--------- -- ---- II--------- - - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.45 0.45 0.00 0.60 0.60 0.04 0.00 0.03 0.00 0.00 0.00 Cr it Moves: *' ** x# * -* -: *.* 4 * #* Green /Cycle: 0.05 0.53 0.53 0.06 0.53 0.53 0.14 0.00 0.14 0.14 D.14 0.14 Volume /Cap: 0.36 0.86 0.86 0.01 1.13 1.13 0.30 0.00 0.19 0.03 0.03 0.03 Delay /Veh: 57.6 29.0 29.0 53.3 94.2 94.2 46.5 0 -0 45.8 44.4 44.4 44.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 57.6 29.0 29.0 53.3 94.2 94.2 46.5 0.0 45.8 44.4 44.4 44.4 LOS by Move: E C C D F F D A D D D D HCM2kAvaQ: 2 30 30 0 61 61 3 0 1 0 0 0 Pore: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -13 PM Existing Plus Gas StatioMOn Apr 29, 2013 15:07:26 Page 5 -1 PH Existing Plus Gas Station Conditions [Ca.ltrens) 2.13.3368.1. Main & PCH Mixed -Use Center, Seal Beach ____ ________ ___ _____------_----__----_---------_-----____---- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume .Alternative) Intersection #2 Main Street at PCH kI. ** * * ; ;tIi *I.« * *;«.. * * *4;** *1*+; J I I..* I.I.IAI* * *I A I Y 4k* *4, -«.II, k * « + . I / . h1 N I I } ♦ Cycle (sec): 120 Critical Vol. /Cap.(X): 0.736 Loss Time (sec): 12 Average Delay (sec /veh): 27.0 Optimal Cycle: 68 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound Fast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- 11 --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ ---------------II-! -------------II---------------II-- Volume Module: Base Vol: 117 66 64 21 73 158 222 1728 115 113 1380 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 117 66 64 21 73 158 222 1728 115 113 1380 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 117 66 64 21 73 158 222 1728 115 113 1380 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 PHF Adi: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 123 69 67 22 77 166 234 1819 121 119 1453 15 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 123 69 67 22 77 166 234 1319 121 119 1453 15 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 123 69 67 22 77 166 234 1819 121 119 1453 15 ------------ --------------- II--------------- II--------------- II---------- - - - - - i Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.70 1.00 0.85 0.71 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1326 1900 1615 1.355 1900 1615 1805 3610 1615 1805 3570 36 ------------ I --------------- II--------------- II------ --------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.09 0.04 0.04 0.02 0.04 0.10 0.13 0.50 0.07 0.07 0.41 0.41 Crit Moves: + ;;+ *; ** t +;. Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.62 0.62 0.08 0.53 0.53 Volume /Cap: 0.46 0.18 0.21 0.08 0.20 0.28 0.77 0.81 0.12 0.81 0.77 0.77 Delay /Veh: 43.6 40.1 40.4 39.2 40.3 26.9 58.7 20.0 9.5 82.5 24.2 24.2 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 43.6 40.1 40.4 39.2 40.3 26.9 58.7 20.0 9.5 82.5 24.2 24.2 LOS by Move: D D D D D C E B A F C C HCM2kAvgQ: 4 2 2 1 2 4 10 28 2 6 23 23 ;+ t+*--.*. �.« t+. r+«I«. t+«+* I*+t t+ + ++ *. ;.*�«x + «4« +t+ **. *x*t+ +«+k; Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -14 PM Existing Plus Gas StatioMon Apr 29, 2013 15:07:26 Page 6 -1 PM Existing Plus Gas Station Conditions (CaltransJ 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach ---- ----- - ----- ------------------------------------ Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 43 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.741 Loss Time (sec): 12 Average Delay (sec /veh): 20.2 Optimal Cycle: 69 Level Of Service: C ***?+ I+**** k** t* J*** w**J***+ ks+ Ji.*+ Y**#**++#+**#* * * * * + * * *** * * *H## *+ +*++a# * * *+ *+* Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound [west Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 YIP: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 it 0 0 1 0 1 0 1 1 0 2 0 1 _ 0 1 1 0 ----- I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 66 50 38 58 64 23 66 1850 62 38 1479 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 66 50 38 58 64 23 66 1850 62 38 1479 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fur: 66 50 38 58 64 23 66 1850 62 38 1479 17 User Adj: 1.00 1.00 1..00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 69 53 40 61 67 24 69 1947 65 40 1557 18 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 69 53 40 61 67 24 69 1947 65 40 1557 18 PCE Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 69 53 40 61 67 24 69 1947 65 40 1557 18 ----------- -I--------------- II- - - - - -- ------- II-- ----- -------- II--------- - - - - -I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.81 0.81 0.81 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.32 0.25 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 657 498 379 1512 1900 1615 1805 3610 1615 1805 3562 41 ------------ I --------------- II--------------- II------ --------- II-- -------- - -- - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.04 0.04 0.01 0.04 0.54 0.04 0.02 0.44 0.44 Crit Moves: * *** * * ** * * *? Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.07 0.65 0.65 0.05 0.63 0.63 Volume /Cap: 0.53 0.53 0.53 0.20 0.18 0.07 0.54 0.83 0.06 0.44 0.70 0.70 Delay /Veh: 44.7 44.7 44.7 40.3 40.0 39.1 58.1 13.6 7.7 58.8 15.7 15.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 44.7 44.7 44.7 40.3 40.0 39.1 58.1 18.6 7.7 58.8 15.7 15.7 LOS by Move: D D D D D D E B A E B B HCM2kAvgQ: 6 6 6 2 2 1 3 30 1 2 20 20 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -15 PM Existing Plus Gas StatioMon Apr 29, 2013 15:07:26 Page 7 -1 PM Existing Plus Gas Station Conditions (Caltrans) 2.13.3360.1 Main 5 PCH Mixed -Use Center, Seal Beach _ - -_ __ ------------------------ ------ -- --- ----- ----- -- - - -- Level Of Service Computation Report. 2000 HCM Operations Method (Future Volume Alternative) Intersection 44 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.797 Loss Time (sec): 16 Average Delay (sec /veh): 40.2 Optimal Cycle: 92 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- ! 1 --------------- II --------------- I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 26 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.G 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1. 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II------- --- - - - - - I Volume Module: Base Vol: 11 132 8B 398 1.59 248 193 1576 37 75 1250 265 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 I.DO 1.00 Initial Bse: 11 132 88 39B 159 248 193 1576 37 75 1250 265 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 132 88 393 159 248 193 1576 37 15 1250 265 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 139 93 419 167 261 203 1659 39 79 1316 279 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 139 93 419 161 261 203 1659 39 79 1316 279 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N,LP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 12 139 93 419 167 261 203 1659 39 79 1316 279 ------------ -------- II--------------- II------- ------ -- I!---------- - -- - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.89 0.89 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2036 1357 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II---------- - -- - - I Capacity Analysis [Nodule: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.16 0.11 0.46 0.02 0.04 0.36 0.17 Crit Moves: .++. # * ## +.+# k+ *# Green /Cycle: 0.08 0.08 0.0E 0.23 0.23 0.23 0.13 0.51 0.51 0.05 0.43 0.66 Volume /Cap: 0.09 0.90 0.90 0.51 0.38 0.69 0.86 0.90 0.05 0.87 0.86 0.26 Delay /Veh: 51.9 87.3 67.3 40.6 39.2 47.5 75.8 33.7 14.9 112.5 36.0 8.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1.00 1..00 AdjDel /Veh: 51.9 87.3 87.3 40.6 39.2 47.5 75.8 33.7 14.9 112.5 36.0 8.5 LOS by Move: D F F D D D E C B F D A HCM2kAvgQ: 0 7 7 7 5 10 10 33 1 5 25 4 Note: Queue reported is the number of cars per lane. Tra£fix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -16 LINSCOrf, Lew & GREENSPM, engineers APPENDIX D -Ill EXISTING PLUS PROJECT TRAFFIC CONDITIONS LLG Ref. 2- 13- 3368 -1 Main & PC}I Mixed -Use Center, Seal Beach .. "4' Nil, 11 n 1'Vn. -P- G ". .' • - ♦u' i' .. AM Existing Plus Project Fri Apr 19, 2013 10:29:41 Page 4 -1 AM Existing Plus Project Conditions [Caltrans) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ------ -- --- - - -- -- -- --- - -- -- - Leve1. Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection H1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.616 Loss Time (sec): 16 Average Delay (sec /veh): 30.7 Optimal Cycle: 73 Level Of Service: C Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- 11 - - -I Control: Protected Protected Split Phase Split Phase P.ights: Include include Include Include Min. Green: 6 14 14 6 17 17 1.7 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 _ 0 1 1 0 2 0 0 1 0 0 0 11 0 0 - --- -------- I - ------- -- -- -II --------------- 11 --------------- Volume Module: Base Vol: 11 1616 6 4 1471 47 186 - 0 50 1. 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L.00 Initial Bse: 11 1616 6 4 1471 47 186 0 50 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 1616 6 4 1471 47 186 0 50 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 1701 6 4 1548 49 196 0 53 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 1701 6 4 1548 49 196 0 53 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 i.00 1 -00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinaiVolume: 12 1701 6 4 1548 49 196 0 53 - 0 3 ------------ I --------------- II---- ----- ----- -II - -- ---------- - - - - -I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3481 111 3502 0 1615 422 0 1266 ------------ I --------------- II--------------- II-- ------------- II---------- - -- - - I Capacity Analysis Module: Vol /Sat: 0.01 0.47 0.47 0.00 0.44 0.44 0.06 0.G0 0.03 0.00 0.00 0.00 Crit Moves: + *4* Y * ** * * *+ *4 ** Creen /Cycle: 0.06 0.53 0.53 0.05 0.52 0.52 0.14 0.00 0.14 0.14 0.00 0.14 Volume /Cap: 0.11 0.89 0.89 0.05 0.85 0.85 0.39 0.00 0.23 0.02 0.00 0.02 Delay /Veh: 53.9 30.3 30.3 54.5 28.3 28.3 47.3 0.0 46.2 44.3 0.0 44.3 User De1Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 53.9 30.3 30.3 54.5 28.3 28.3 47.3 0.0 46.2 44.3 0.0 44.3 LOS by Move: D C C D C C D A D D A D HCM2kAvgQ: 0 32 32 0 29 29 4 0 1 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -17 AM Existing Plus Project Fri Apr 19, 2013 10:29:41 Page 5 -1 AM Existing Plus Project Conditions [Caltrans) 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) InterseCz:ion #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.564 Loss Time (sec): 12 Average Delay (sec /veh): 19.1 Optimal Cycle: 67 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R 1., - T - R ------------ --------------- II--------------- II--------------- II --------------- 1 Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II---- r-------- II---------- - - - - - I Volume Module: Base Vol: 42 411 48 9 50 101 92 1369 48 40 1436 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 42 41 48 9 50 101 92 1369 48 40 1438 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 42 41 48 9 50 101 92 1369 48 40 1438 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 44 43 51 9 53 106 97 1441 51 42 1514 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 44 43 51 9 53 106 97 1441 51 42 1514 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 FinalVOlume: 44 43 51 9 53 106 97 1441 51 42 1514 6 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.73 1.00 D.85 0.73 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1378 1900 1.615 1393 1900 1615 1805 3610 1615 1805 3591 15 ------------ I --------------- II--------------- II---- --- -------- II----- ----- - -- - - I Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.01 0.03 0.07 0.05 0.40 0.03 0.02 0.42 0.42 Crit Moves: ' * ** * * ** * *** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.2E 0.06 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.16 0.11 0.16 0.03 0.14 0.24 0.68 0.64 0.05 0.30 0.68 0.68 Delay /Veh: 39.9 39.4 39.9 38.7 39.7 33.7 66.2 14.9 8.9 53.4 15.8 15.6 User DelA.dj: 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 39.9 39.4 39.9 38.7 39.7 33.7 66.2 14.9 8.9 53.4 15.8 15.8 LOS by Move: D D D D D C E E A D B B HCM2,'AvgQ: 1 1 2 0 2 3 5 18 1 2 19 19 Note: Queue reported is the number of cars per lane. Traffix 8.01.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -18 AM Existing Plus Project Fri Apr 19, 2013 10:29:41 Pace 6 -1 AM Existing Plus Project Conditions [Caitrans] 2.13.3366.1 Main 5 ?CH Mixed -Use Center, Seal Beach -------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 43 12th Street at Pacific Coast highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.629 Loss Time (sec): 12 Average Delay (sec /veh): 17.8 Optimal Cycle: 63 Level Of Service: B Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound �dest Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 11 0 0 1 0 1 0 7. 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 67 59 32 36 39 34 50 1457 29 27 1470 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 67 59 32 36 39 34 50 1457 29 27 1470 6 Added Vol: 0 0 0 0 0 0 0 0 0 2 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 67 59 32 36 39 34 50 1457 29 27 14-70 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0.7 1.00 1.00 PHF Adj: D.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 71 62 34 38 41 36 53 1534 31 23 1547 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 71 62 34 38 41. 36 53 1534 31 23 1547 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 71 62 34 38 41 36 53 1534 31 23 1547 6 ------- ----- ------ ---- -- - - -II- ------------- il--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.83 0.83 0.83 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 665 585 318 1518 1900 1615 1805 3610 1615 1805 3592 15 ------ ------ I ------ ------ - -II -- ---- II--------------- II--------- - - - - - -I Capacity analysis Module: Vol /Sat: 0.11 0.11 0.11 0.02 0.02 0.02 0.03 0.42 0.02 0.02 0.43 0.43 Crit Moves: 11-1 * * ** * * ** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.05 0.63 0.63 0.07 0.65 0.65 Volume /Cap: 0.53 0.53 0.53 0.12 0.11 0.11 0.58 0.68 0.03 0.21 0.66 0.66 Delay /Veh: 44.7 44.7 44.7 39.6 39.4 39.4 65.2 15.4 8.6 53.1 13.6 13.6 User De1.Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 44.7 44.7 44.7 39.6 39.4 39.4 65.2 15.4 8.6 53.1 13.6 13.6 LOS by Move: D D D D D D E B A D B B HCM2kAvgQ: 6 6 6 1 1 1 3 20 0 1 19 19 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -19 AM Existing Plus Project Fri Apr 19, 2013 10:29:41 Page 7 -1 AM Existing Plus Project Conditions [Caltrans] 2.13.3366.1 Main 5 PCH Mixed -Use Center, Seal Beach ------------------------------------------ Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.755 Loss Time (sec): 16 Average Delay (sec /veh): 34.5 Optimal Cycle: 82 Level Of Service: C Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include OV1 Min. Green: 6 6 6 28 28 26 G 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------ - - -- -- Volume Module: Base Vol: 11 146 79 363 95 182 127 1352 14 11 1378 394 Growth Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 146 79 363 95 182 127 1352 14 11 1378 394 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 146 79 363 95 182 127 1352 14 11 1378 394 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 154 83 382 100 192 134 1423 15 12 1451 415 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 154 83 382 100 192 134 1423 15 12 1451 415 PCE Adj: 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 12 154 83 382 100 192 134 1423 15 12 1451 415 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1500 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.90 0.90 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.65 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2218 1200 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II--- ------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.11 0.05 0.12 0.07 0.39 0.01 0.01 0.40 0.26 Crit Moves: *k ** ++ +4 +* ** +a *a Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.09 0.49 0.49 0.06 0.47 0.70 Volume /Cap: 0.03 0.86 0.86 0.47 0.23 0.51 0.86 0.80 0.02 0.10 0.86 0.37 Delay /Veh: 51.3 77.5 77.5 40.0 37.5 41.2 89.7 28.5 15.7 53.5 33.3 7.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 51.3 77.5 77.5 40.0 37.5 41.2 59.7 28.5 15.7 53.5 33.3 7.5 LAOS by Move: D E E D D D F C B D C A HCI12kAVgQ: 0 7 7 7 3 7 "1 25 0 0 27 6 *+++ k+* k*a***+ 4*** x#***+*++*#***#*+ k*+***** 4* k+* 4* + *k *4*i. * * #; *i * * * *Yx + +i + + * * * # ** Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -20 PM Existing Plus Project Fri Apr 19, 2013 10:29:54 Page 4 -1 PM Existing Plus Project Conditions [Caltrans[ 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach --- ------ -- ---- - - -- -- ---------------- - -- - -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection N1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.772 Loss Time (sec): 16 Average Delay (sec /veh): 65.6 Optimal Cycle: 86 Level Of Service: E .Street Name: PCH 1st Street Approach: North Hound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 i 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 31 1555 3 1 1924 130 142 0 41 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 31 1555 3 1 1924 130 142 0 41 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 31 1555 3 1 1924 130 142 0 41 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0,95 PHF Volume: 33 1637 3 1 2025 137 149 0 43 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 33 1637 3 1 2025 137 149 0 43 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 33 1637 3 1 2025 137 149 0 43 2 1 3 ----- ------------ --- II---------- - -- - -II --------------- --------------- Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 1.87 0.13 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1305 3603 7 1805 3351 226 3502 0 1615 581 291 872 ------------ I --------------- II----------- ----II - -- - - -II- -- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.45 0.45 0.00 0.60 0.60 0.04 0.00 0.03 0.00 0.00 0.00 Crit Moves: } + #* ** ** # * ** # * #{ Green /Cycle: 0.05 0.53 0.53 0.06 0.53 0.53 0.14 0.00 0.14 0.14 0.14 0.14 Volume /Cap: 0.36 0.86 0.86 0.01 1.13 1.13 0.30 0.00 0.19 0.03 0.03 0.03 Delay_ /Veh: 57.6 25.2 29.2 53.3 95.1 95.1 46.5 0.0 45.3 44.4 44.4 44.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 57.6 29.2 29.2 53.3 95.1 95.1 46.5 0.0 45.8 44.4 44.4 44.4 LOS by Move: E C C D F F D A D D D D HCM2)cAvgQ: 2 30 30 0 61 61 3 0 1 0 0 0 Note: Queue reocrted is the number of cars per lane. Traf£ix 8.0.071.5 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -2l PM Existing Plus Project Fri Apr 19, 2013 10:29:54 Page 5 -1 PM Existing Plus Project Conditions [Caltrans] 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.723 Loss Time (sec): 12 Average Delay (sec /veh): 27.0 Optimal Cycle: 67 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- il--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Ov1 Include include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II---- ---- ------- II-- -------- - - - - - I Volume Module: Base Vol: 99 61 63 19 73 158 222 1743 98 110 1398 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 Initial Bse: 99 61 63 19 73 158 222 1743 98 110 1398 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVo1: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 99 61 63 19 73 158 222 1743 98 110 1398 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volurie: 104 64 66 20 77 166 234 1835 103 116 1472 15 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 104 64 66 20 77 166 234 1335 103 116 1472 15 PCF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 104 64 66 20 77 166 234 1835 103 116 1472 15 ------------ --------------- II--------------- II--------------- II---- ------ - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.70 1.00 0.85 0.72 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2 -00 1.00 1.00 1.98 0.02 Final Sat.: 1326 1900 1615 1360 1900 1615 1805 3610 1615 1805 3571 36 ------------ I --------------- II--------------- II --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.08 0.03 0.04 0.01 0.04 0.10 0.13 0.51 0.06 0.06 0.41 0.41 Crit Moves: * *'* * * ** * * ** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.62 0.62 0 -08 0.53 0.53 Volume /Cap: 0.39 0-17 0.21 0.07 0.20 0.28 0.77 0.82 0.10 0.82 0.77 0.77 Delay /Veh: 42.6 40.0 40.4 39.1 40.3 27.0 59.5 19.9 9.2 84.1 24.3 24.3 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 42.6 40.0 40.4 39.1 40.3 27.0 59.5 19.9 9.2 84.1 24.3 24.3 LOS by Move: D D D D D C E B A F C C HCM2kAvgQ: 4 2 2 1 2 4 10 29 2 6 24 24 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -22 PM Existing Plus Project Fri Apr 19, 2013 10:29:54 Page 6 -1 PM Existing Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach _____ ___ __ _ _ _ _ __ ___ __ _ _ ___ - - - - -_ ___- -__ -__ Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.743 Loss Time (sec): 12 Average Delay (sec /veh): 20.6 Optimal Cycle: 69 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound [hest Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 i 0 1 1 0 ------------ I --------------- II--------------- II-- --- -- -- ------ II-------- -- - - -- - I Volume Module: Base Vol: 66 50 38 58 64 23 83 1854 67 38 1478 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 66 50 38 58 64 23 83 1854 67 38 1478 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 66 50 38 58 64 23 83 1854 67 38 1478 17 User Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 69 53 40 61 67 24 87 1952 71 40 1556 18 Reduct Vol: 0 0 0 0 0 0 0 0 D 0 0 0 Reduced "Vol: 69 53 40 61 67 24 87 1952 71 40 1556 18 PCE Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 69 53 40 61 67 24 87 1952 71 40 1556 18 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.81 0.81 0.81 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.32 0.25 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 657 498 379 1512 1900 1615 1805 3610 1615 1805 3562 41 ------------ I --------------- II---------- ----- II-------- ---- -- -II- - - - - -i Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.04 0.04 0.01 0.05 0.54 0.04 0.02 0.44 0.44 Crit Moves: * *°+ ** +* **#* Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.07 0.65 0.65 0.03 0.63 0.63 Volume /Cap: 0.53 0.53 0.53 0.20 0.18 0.01 0.67 0.83 0.07 0.44 0.70 0.70 Delay /Veh: 44.7 44.7 44.7 40.3 40.0 39.1 67.4 18.7 7.7 58.8 15.7 15.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 44.7 44.7 44.7 40.3 40.0 39.1 67.4 18.7 7.7 58.8 15.7 15.7 LOS by Move: D D D D D D E B A E B B flCM2kAvgQ: 6 6 6 2 2 1 4 30 1 2 20 20 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -23 PM Existing Pius Project Fri Apr 19, 2013 10:29:54 Pace 7 -1 PM Existing Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Leve1 Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.798 Loss Time (sec): 16 Average Delay (sec /veh): 40.4 Optimal Cycle: 92 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - _ - R L - T - R L - T - R L - T - R ------ - - - - -- --------------- II-------------_- II --------------- II---- ----- - - - - - - I Control: Split Phase Split_ Phase Protected Protected Rights: include Include Include Ovl Min. Green: 6 6 6 28 28 28 6 2i 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ --------------- II--------------- II--------------- II---- -- ---- - - - -- I Volume Module: Base Vol: 11 132 88 398 159 248 197 1578 37 75 1251 265 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 132 88 398 159 248 197 1578 37 75 1251 265 Added Vol: D 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 C 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 132 88 392 159 248 197 1578 37 75 1251 265 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 139 93 419. 167 261 207 1661 39 79 1317 279 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 139 93 419 167 261 207 1661 39 79 1317 279 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1100 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1_00 1.00 1.00 1.00 1.00 Finalvolume: 12 139 93 419 167 261 207 1661 39 79 1317 279 --- ----- - - - -I- -----II---------------11---------------II------ Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.89 C.89 0.92 1.DO 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1-OD 2.00 1.00 Final Sat.: 1805 2036 1357 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II---------- -- - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.16 0.11 0.46 0.02 0.04 0.36 0.17 Crit Moves: *' #+ +# *+ * * #* * * ** Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.13 0.51 0.51 0.05 0.42 0.66 Volume /Cap: 0.09 0.91 0.91 0.51 0.38 0.69 0.86 0.91 0.05 0.87 0.86 0.26 Delay /Veh: 51.9 87.6 87.6 40.6 39.2 47.5 76.2 33.8 14.9 112.5 36.5 8.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 51.9 87.6 87.6 40.6 39.2 47.5 76.2 33.8 14.9 112.5 36.5 8.6 LOS by Move: D F F D 0 D E C B F D A HCM2kAvgQ: 0 7 7 7 5 10 101 33 1 5 26 4 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -24 APPENDIX D -IV EXISTING PLUS PROJECT PLUS MITIGATION TRAFFIC CONDITIONS UNSCOTT, Law& GREENSPM, engineers LLG Ref. 2-13- 3368 -1 Main & IICII Mired -Use Center, Seal Beach MITIG8 - AM Existing Plus Pine Apr 30, 2013 16:41:34 Page 1 -1 AM Existing Plus Project Conditions (Caltrans] (Mitigation) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ___ -_ --------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.616 Loss Time (sec): 16 Average Delay (sec /veh): 20.0 Optimal Cycle: 62 Level Of Service: C Street Name: PCH 1st Street Approach: North Bound South Bound cast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------ - - - --- --------------- --------------- --------------- -- --- -- --- - - - - -� Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 6 6 6 Y +R: 4.0 4 -0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4,0 4.0 4.0 Lanes; 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 --------------- --------------- --------------- ---- ---- -- -- - - -� Volume Module: Base Vol: 11 1616 6 4 1471 47 186 0 50 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 1616 6 4 1471 47 186 0 50 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 1616 6 4 1471 47 186 0 50 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 1701 6 4 1548 49 196 0 53 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 1701 6 4 1548 49 196 0 53 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 12 1701 6 a 1548 49 156 0 53 1 0 3 - ----- - - - --- ---- ------- ---- --------------- --------------- - Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.94 0.06 2 -00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3481 111 3502 0 1615 422 0 1266 --------__-- I --------------- --------------- ------- --- - - - - - ---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.01 0.47 0.47 0.00 0.44 0.44 0.06 0.00 0.03 0.00 0.00 0.00 Crit Moves: + +•# *4 #* * # ## + + *# Green /Cycle: 0.07 0.63 0.63 0.05 0.61 0.61 0.14 0.00 0.14 0.05 0.00 0.05 V01ume /Cap: 0.09 0.76 0.76 0.05 0.73 0.73 0.39 0,00 0.23 0.05 0.00 0.05 Delay /Veh: 52.8 17.5 17.5 54.5 18.0 18.0 47.3 0.0 46,2 54.5 0.0 54.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 52.8 17.5 17.5 54.5 18.0 18.0 47.3 0.0 46.2 54.5 0.0 54.5 LOS by Move: D B B D B B D A D D A D HCM2kAvgQ: 0 24 24 0 22 22 4 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -25A AM Existing Plus Project (MWed Apr 24, 2013 14:42:03 Page 5 -1 AM Existing Pius Project Conditions fCaltransl (Mitigation) 2.13.3368.1 Main L PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #2 Main Street at PCH: Cycle (sec): 120 Critical Vo].. /Cap.(X): 0.588 Loss Time (sec): 12 Average Delay (sec /veh): 19.1 Optimal Cycle: 67 Level Of Service: B Street Name: Main Street PCH Approach: North Round South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- 11 --------------- II --------------- i Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 28 6 21 '21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II--------- - - - - - - I Volume Module: Base Vol: 42 41 48 9 50 101 92 1369 48 40 1438 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 42 41 48 9 50 101 92 1369 48 40 1434 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 42 41 48 9 50 101 92 1369 48 40 1438 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 44 43 51 9 53 106 97 1441 51 42 1514 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 44 43 51 9 53 106 97 1441 51 42 1514 6 PCE Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 44 43 51 9 53 106 97 1441 51 42 1514 6 --------------------------- II--------------- II--------------- 11-- -------- - - - - -I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.73 0.92 0.92 0.60' 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 0.46 0.54 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1378 804 942 1248 1900 1615 1805 3610 1615 1805 3591 15 --- - - I - -- ----- II--------------- II----------- ---- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.05 0.05 0.01 0.03 0.07 0.05 0.40 0.03 0.02 0.42 0.42 Crit Moves: * * ** * * ** ** ** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.16 0.27 0.27 0.04 0.14 0.24 0.68 0.64 0.05 0.30 0.68 0.68 Delay /Veh: 39.9 41.0 41.0 38.8 39.7 33.7 66.2 14.9 8.9 53.4 15.8 15.8 User DelAd3: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 39.9 41.0 41.0 38.8 39.7 33.7 66.2 14.9 8.9 53.4 15.8 15.8 LOS by Move: D D D D D C E 3 A D B B HCM2kAvgQ: 1 3 3 0 2 3 5 18 1 2 19 19 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -2513 MITIGB - PM Existing Plus Prue Apr 30, 2013 16:42:16 Page 1 -1 PM Existing Plus Project Conditions [Caltrans] (Mitigation) 2.13.3368.1 Mair_ & PCH Mixed -Use Center, Seal Beach - ____- - - - - -_ ------- ------------ -------- ----- ------ Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at lst Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.772 Loss Time (sec): 16 Average Delay (sec /veh): 28.2 Optimal Cycle: 86 Level Of Service: C Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------- 11 --------------- 11 --------------- 11--------------- Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 6 6 6 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 ------------ ___________ ____ --------------- --------------- --------------- � Volume Module: Base Vol: 31 1555 3 1 1924 130 142 0 41 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 31 1555 3 1 1924 130 142 0 41 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Flt: 31 1555 3 1 1924 130 142 0 41 2 1 3 User Adj: 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 33 1637 3 1 2025 137 149 0 43 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 33 1637 3 1 2025 137 149 0 43 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 1.00 1.00 1.00 MLF Adj: i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Finalvolume: 33 1637 3 1 2025 137 149 0 43 2 1 3 -------------------- ------- --------------- --------------- --------------- Saturation Flow Module. Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 1.87 0.13 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1805 3603 7 1605 3351 226 3502 0 1615 581 291 372 ------------ I--------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.02 0.45 0.45 0.00 0.60 0.60 0.04 0.00 0.03 0.00 0.00 0.00 Crit Moves. * * ** Green /Cycle: 0.05 0.61 0.61 0.07 0.63 0.63 0.14 0.00 0.14 0.05 0.05 0.05 Volume /Cap: 0.36 0.75 0.75 0.01 0.97 0.97 0.30 0.00 0.19 0.07 0.07 0.07 Delay /Veh: 57.6 18.3 18.3 52.3 33.6 33.6 46.5 0.0 45.8 54.7 54.7 54.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 57.6 18.3 18.3 52.3 33.6 33.6 46.5 0.0 45.8 54.7 54.7 54.7 LOS by Move: E B B D C C D A D D D D HCM2kAVgQ: 2 23 23 0 46 46 3 0 1 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -26A PM Existing Plus Project (MWed Apr 24, 2013 14:42:17 Page 5 -1 PM Existing Plus Project Conditions [Caltransl (Mitigation) 2.13.3368.1 Main 6 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection k2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.723 Loss Time (sec): 12 Average Delay (sec /veh): 27.1 Optimal Cycle: 67 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II_-------------- II---------- - - - - -I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 26 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4 -0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- il-------- ----- -- II---------- - - - - - i Volume Module: Base Vol: 99 61 63 19 73 158 222 1743 98 110 1398 14 Growth Adj: 1.CO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.O3 1.00 1.00 Initial Bse: 99 61 63 19 73 158 222 1743 98 110 1393 14 Added Vol: 0 G 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 C 0 0 0 0 0 0 C 0 0 0 Initial Put: 99 61 63 19 73 158 222 1743 98 110 1398 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 104 64 66 20 77 166 234 1835 103 116 1472 15 Reduct Vol: 0 C 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 104 64 66 20 77 166 234 1835 103 116 1472 15 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 104 64 66 20 77 166 234 1835 103 116 1472 15 ------------ I------------- -- II - - - - -- --------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.70 0.92 0.92 0.57 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 0.49 0.51 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1326 864 692 1083 1900 1615 1805 3610 1615 1805 3571 36 ------------ I --------------- II--------------- II--------------- II-- -------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.08 0.07 0.07 0.02 0.04 0.10 0.13 0 -51 0.06 0.06 0.41 0.41 Crit Moves: * * ** * * ** * # #* Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0 -17 0.62 0.62 0.08 0.53 0.53 Volume /Cap: 0.39 0.37 0.37 0.09 0.20 0.28 0.77 0.82 0.10 0.82 0.77 0.77 Delay /Veh: 42.6 42.2 42.2 39.3 40.3 27.0 59 -5 19.9 9.2 84 -1 24.3 24.3 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 -00 1.00 Adj Del /Veh: 42 -6 42.2 42.2 39.3 40.3 27.0 59.5 19.9 9.2 84.1 24.3 24.3 LOS by Move: D D D D D C E B A C C HCM2kAvgQ: 4 4 4 1 2 4 10 29 2 6 24 24 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -26 B LiNscou, LAW 8 GRENSPAN, engi!70 5 APPENDIX D -V CUMULATIVE TRAFFIC CONDITIONS LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach AM Cum Thu Apr 18, 2013 16:35:40 Page 4 -1 AM Cum Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -- ------ - - - - -- -- --------- ------- -------- - ----- --- Level. Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection tl PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cao.(X): 0.639 Loss Time (sec): 16 Average Delay (sec /veh): 32.4 Optimal Cycle: 73 Level Of Service. C Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II---------_----- II_-------------- II---------- -- - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 14 1658 6 4 1508 55 211 0 52 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.O0 1.00 1.00 1.00 1.00 Initial Bse: 14 1658 6 4 1508 55 211 C 52 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 1658 6 4 1508 55 211 0 52 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 15 1745 6 4 1587 58 222 0 55 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 15 1745 6 4 1587 58 222 0 55 1 0 3 PCE Adj: 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 15 1745 6 4 1587 58 222 0 55 1 0 3 ------------ I--------------- II--------------- II -- ----------- -- II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3466 126 3502 0 1615 422 0 1266 ------------ I -- - - - - -- ------ II--------------- 11---- ------- ---- II---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.01 n.49 0.49 0.00 0.46 0.46 0.06 0.00 0.03 0.00 0.00 0.00 Crit Moves: + + ## ** #* * * #* * +#. Green /Cycle: 0.06 0.53 0.53 0.05 0.53 0.53 0.14 0.00 0.14 0.14 0.00 0.14 Volume /Cap: 0.14 0.91 0.91 0.05 0.87 0.87 0.45 0.00 0.24 0.02 0.00 0.02 Delay /Veh: 54.4 32.4 32.4 54.5 29.6 29.6 47.E 0.0 46.3 44.3 0.0 44.3 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .Adj Del /Veh: 54.4 32.4 32.4 54.5 29.6 29.6 47.6 0.0 46.3 44.3 0.0 44.3 LOS by Move: D C C D C C D A D D A D HCM2;<AvgQ: 1 34 34 0 30 30 4 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -27 AM Cum Thu Apr 1B, 2013 16:35:40 Page 5 -1 AM Cum Conditions [Caltransj 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach --- ---- Level. Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection k2 Main Street at PCH ********+##*#* x###*#*## k**+{##* kk#***+** # *k ** }i{ * * * *k * * *# *i+ { * # * * #4f # +k Cycle (sec): 1.20 Critical Vol. /Cap.(Y): 0.583 Loss Time (sec): 12 Average Delay (sec /veh): 19.5 Optimal Cycle: 67 Level Of Service: S Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Sound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include OVI Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 --------------------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: Base Vol: 45 42 52 5 52 107 98 1410 49 28 1478 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 45 42 52 5 52 107 98 1410 49 23 1478 6 Added Vol: 0 0 0 0 0 0 0 0 0 D 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 45 42 52 5 52 107 98 1410 49 28 1478 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.93 0.95 0.95 PHF Volume: 97 44 55 1 55 113 103 1484 52 29 1556 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 47 44 55 5 55 113 103 1484 52 29 1556 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Volume: 47 44 55 5 55 113 103 1484 52 29 1556 6 ------------ --------------- --------------- --------------- H --------------- I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.72 1.00 0.85 0.73 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1374 1900 1615 1391 1900 1615 1805 3610 1615 1805 3592 15 ------------ I--------------- II--------------- II--------------- 11---------- - - - --I Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.00 0.03 0.07 0.06 0.41 0.03 0.02 0.43 0.43 Crit Moves: * * ** * * ** * * *# Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.17 0.12 0.17 0.02 0.14 0.25 0.70 0.66 0.05 0.22 0.70 0.70 Delay /Veh: 40.1 39.5 40.0 38.6 39.7 33.6 67.7 15.1 8.8 52.9 16.4 16.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 40.1 39.5 40.0 38.6 39.7 33.6 67.7 15.1 8.8 52.9 16.4 16.4 LOS by Move: D D D D D C E B A D B B HCM2]_AvcQ: 2 1 2 0 2 3 5 18 1 1 21 21 Note: Queue reported is the number of cars per lane Trartix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -28 AM Cum Thu Apr 18, 2013 16:35:40 Page 6 -1 AM Cum Conditions [Caltrans] 2.13.3368.1 Main 3 PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 43 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.638 Loss Time (sec): 12 Average Delay (sec /veh): 17.9 Optimal Cycle: 63 Level Of Service: B Street Name: T2th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II---------- - - - - - I Control: Permitted Permitted Protected ?rotected Rights: Include Include Include Include Mir.. Green: 24 24 24 24 24 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 n 1 1 0 1 1 0 -{--------------- II--------------- II----- ------- --- II---------- - - - - - I Volume Module: Base Vol: 69 61 33 37 40 35 36 1502 26 28 1513 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 69 61 33 37 40 35 36 1502 26 23 1513 6 Added Vol: 0 0 0 0 0 0 0 0 0 D 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 69 61 33 37 40 35 36 1502 26 28 1513 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.93 0.95 6.95 PHF Volume: 73 64 35 39 42 37 38 1581 27 29 1593 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 D 0 0 Reduced Vol: 73 64 35 39 42 37 38 1581 27 29 1593 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 Finalvolume: 73 64 35 39 42 37 38 1581 27 29 1593 6 ------------ --------------- II----- ---------- II---- -------- - - -II- -- - -- - -I Saturation Flow Module: Sat /Lane: 1900 . 1900 1900 . 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.82 0.82 0.82 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 662 585 317 1524 1_900 1615 1805 3610 1615 1603 3592 14 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol. /Sat: 0.1.1 0.11 0.11 0.03 D.02 0.02 0.02 0.44 0.02 0.02 0.44 0.44 Cr.it Moves: *+ #+ # # ## + * *+ Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.05 0.63 0.63 0.07 0.65 0.65 Volume /Cap: 0.55 0.55 0.55 0.13 0.11 0.11 0.42 0.70 0.03 0.23 0.68 0.68 Delay /Veh: 45.2 45.2 45.2 39.6 39.4 39.5 58.4 15.7 8.4 53.3 14.0 14.0 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 45.2 45.2 45.2 39.6 39.4 39.5 58.4 15.7 8.4 53 -3 14.0 14.0 LOS by Move: D D D D D D E B A D B B HCM2kAvgQ: 6 6 6 1 1 1 2 21 0 1 20 20 Note: Queue reported is the number of cars per lane. Traffix 6.0.0715 (c1 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -29 AM Cum Thu Apr 16, 2013 16:35:40 Page 7 -1 AM Cum Conditions [Caltrans] 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach ----- ----- --- ---- -- --------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH *# k**++*****#*+*}+****+*******#;*#*******#**+**** * # * *+ * ** * * + *k * * ** # *k * * * * # # #} ♦ }k Cycle (sec): 120 Critical Vol.. /Cap.(X): 0.777 Loss Time (sec): 16 Averace Delay (sec /veh): 35.8 Optimal Cycle: 87 Level Of Service: D *#* k**** 1}#}+*##+*++ k#***#+ k+#*#++}#;*i**** k*#;++ }+ * * * * ** # * * Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R _----------- I --------------- il ----------_---- II --------------- II ---------- - - - - - I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: i 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II----- ----- - - - - - I Volume Module: Base Vol: 11 i50 81 374 98 188 131 1394 14 11 1418 406 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 150 81 374 98 188 131 1394 14 11 1418 406 Added Vol: 0 0 0 0 0 0 0 0 0 D 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 150 81 374 98 188 131 1394 14 11 1418 406 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.93 0.95 0.95 PHF Volume: 12 158 85 394 103 198 138 1467 15 12 1493 427 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 158 85 394 103 196 138 1467 15 12 1493 427 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 158 85 394 103 198 138 1467 15 12 1493 427 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1907 1900 1900 Adjustment: 0.95 0.90 0.90 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2220 1199 3502 1900 1615 1605 3610 1615 1805 3610 1615 ------------ I --------------- II-------- ---- - - -II--------------- --------------- Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.11 0.05 0.12 0.08 0.41 0.01 0.01 0.41 0.26 Crit Moves: Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.09 0.49 0.49 0.06 0.47 0.70 Volume /Cap: 0.08 0.89 0.89 0.48 0.23 0.53 0.89 0.83 0.02 0.11 0.89 0.38 Delay /Veh: 51.3 61.8 81.8 40.2 37.6 41.6 95.1 29.4 15.6 53.7 35.1 7.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 51.3 81.8 81.8 40.2 37.6 41.6 95.1 29.4 15.6 53.7 35.1 7.5 LOS by Move: D F F D D D F C B D D A HCM2kAvgQ: 0 7 7 7 3 7 8 26 0 0 29 6 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -30 PM Cum 'Phu Apr 18, 2013 16:35:56 Page 4 -1 PM Cum Conditions (Caltrans] 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection $1 PCH at 1st Street Cvcle (sec): 120 Critical Vol. /Cap.(X): 0.810 Loss Time (sec): 16 Average Delay (sec /veh): 76.4 Optimal Cycle: 95 Level Of Service: E Street Name: PCH 1st Stree_ Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II --------------- II--------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 ------------ --------------- II--------------- II--------------- II---------- -- - - - I Volume Module: Base Vol: 39 1597 3 1 1977 154 158 0 42 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 39 1597 3 1 1977 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 3 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 D 0 0 Initial Fut: 39 1597 3 1 1977 154 158 0 42 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1.00 1.00 FHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 FHF Volume: 41 1681 3 1 2081 162 166 0 44 2 1 3 R.educt Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 41 1681 3 1 2081 162 166 0 44 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1_00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 FinalVolume: 41 1681 3 1 2081 162 166 0 44 Z 1 3 ------------ --------------- II --------------- II --------------- II ---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 I.B6 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1805 3603 7 1805 3312 258 3502 0 1615 581 291 B72 ------------ I --------------- II--------------- II------------ -- -ll--- ------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.47 0.47 0.00 0.63 0.63 0.05 0.00 0 -03 0.00 0.00 0.00 Crit Moves: * * ** * * ** # * +# { * #+ Green /Cycle: 0.05 0.53 0.53 0.06 0.53 0.53 0.14 0.00 0.14 0.14 0.14 0.14 Volume /Cap: 0.45 0.89 0.89 0.01 1.18 1.18 0.34 0.00 0.19 0.03 0.03 0.03 Delay /Veh: 59.0 30.6 30.6 53.5 114 113.9 46.8 0.0 45.9 44.4 44.4 44.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 59.0 30.6 30.6 53.5 114 113.9 46.8 0.0 45.9 44.4 44.4 44.4 LOS by Move: E C C D F _ 1 D A D D D D HCM2kAvgQ: 2 32 32 0 67 67 3 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2006 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -3l Phi Cum Thu Apr 18, 2013 16:35:56 Page 5 -1 PM Cum Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 ACM Operations Method (Future Volume Alternative) Int=rsection #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.740 Loss Time (sec): 12 Average Delay (sec /veh): 27.7 Optimal Cycle: 68 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- il --------------- II --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y -R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 103 63 66 16 75 168 233 1795 102 103 1437 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 63 66 16 75 168 233 1795 102 7.03 1437 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 103 63 66 16 75 168 233 1795 102 103 1437 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 108 066 69 17 79 177 245 1889 107 108 1513 15 Reduce Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 106 66 69 17 79 177 245 1889 107 108 1513 15 PCE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.OD 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 108 66 69 17 79 177 245 1889 107 108 1513 15 ------------ --------------- II--------------- II--------------- II- --------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.69 1.00 0.85 0.72 1.00 0.65 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1317 1900 1615 1359 1900 1615 1805 3610 1615 1805 3572 35 ------------ I --------------- II--------------- II----- -- -------- II--- ------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.08 0.03 0.04 0.01 0.04 0.11 0.14 0.52 0.07 0.06 0.42 0.42 Crit Moves: } +k+ * * *+ # *** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.63 0.63 0.07 0.53 0.53 Volume /Cap: 0.41 0.17 0.22 0.06 0.21 0.30 0.80 0.83 0.11 0.83 0.80 0.80 Delay /Veh: 42.9 40.0 40.5 39.0 40.3 27.0 61.6 20.2 8.9 89.7 25.5 25.5 User DelA.dj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 42.9 40.0 40.5 39.0 40.3 27.0 61.6 20.2 8.9 89.7 25.5 25.5 LOS by Move: D D D D D C E C A F C C HCM2kA.vgQ: 4 2 2 1 2 5 11 30 2 6 25 25 Note: Queue reported is the number of cars per lane. Traffic 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -32 PM Cum Thu Apr 18, 2013 16:35:56 Page 6 -1 PM Cum Conditions [Caltrans) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) intersection #3 i2th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.765 Loss Time (sec): 12 Average Delay (sec /veh): 21.1 Optimal Cycle: 73 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - P. L - T - R L - T - R L - T - R ------------ --------------- II --------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 2.4 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------- ----- I--------------- II - --- --- II--------------- II---------- - -- - -I Volume Module: Base Vol: 68 52 39 60 66 24 68 1907 64 39 1525 18 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 68 52 39 60 66 24 68 1907 64 39 1525 16 Added Vol: 0 0 0 D 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 C 0 D Initial Fut: 68 52 39 60 66 24 68 1907 64 39 1525 18 User Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 72 55 41 63 69 25 72 2007 67 41 1605 19 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 72 55 41 63 69 25 72 2007 67 41 1605 19 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 72 55 41 63 69 25 72 2007 67 41 1605 19 ------------ --------------- ll--------------- II----------- ---- II-- -------- - -- - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1.900 Adjustment: 0.81 0.81 0.81 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.33 0.24 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 655 501 375 1518 1900 1615 1805 3610 1615 1805 3561 42 ------------ I --------------- II--------------- II----------- -- -- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.04 0.04 0.02 0.04 0.56 0.04 0.02 0.45 0.45 Crit Moves: * * #* * * *+ * * #* Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.07 0.65 0.65 0.05 0.63 0.63 Volume /Cap: 0.55 0.55 0.55 0.21 0.18 0.08 0.57 0.86 0.06 0.45 0.72 0.72 Delay /Veh: 45.2 45.2 45.2 40.4 40.1 39.1 60.0 19.9 7.7 59.0 16.1 16.1 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 45.2 45.2 45.2 40.4 40.1 39.1 60.0 19.9 7.7 59.0 16 -1 16.1 LOS by Move: D D D D D D E B A E B B HCM2kAvgQ: 6 6 6 2 2 1 3 33 1 2 22 22 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -33 PM Cum Thu Apr 18, 2013 16:35:56 Pace 7 -1 PM Cum Conditions [Caltrans] 2.13.3368.1 Main 5 PCH Mired -Use Center, Seal Beach --------- ----- --- --- - - ---- --- -- ----------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 44 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.822 Loss Time (sec): 16 Average Delay (sec /veh): 42.7 Optimal Cycle: 99 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II--------------- I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 28 6 21 27. 6 21 21 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------- ------ II--- - - - - -- ----- II--------------- II---------- - - - - -I Volume Module: Base Vol: 11 136 91. 410 164 257 201 1626 38 77 1290 273 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 136 91 410 164 257 201 1626 38 77 1290 273 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 O 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 136 91 410 164 257 201 1626 38 77 1290 273 User Adj: 1.00 1.00 1.00 1..00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume; 12 143 96 432 173 271 212 1712 40 81 1358 287 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 143 96 432 173 271 212 1712 40 81 1358 287 PCE Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF A.dj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 143 96 432 173 271 212 1712 40 81 1358 267 ------------ --------------- II--------------- II-------------- II- --------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.89 0.89 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1..00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2033 1360 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I ---------------II---------------II--------------II----- Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.17 0.12 0.47 0.02 0.04 0.38 0.18 Grit Moves: + + ** *r ++ # # ** * + +* Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.13 0.51 0.51 0.05 0.43 0.66 Volume /Cap: 0.09 0.93 0.93 0.53 0.39 0.72 0.8B 0.93 0.05 0.90 0.88 0.27 Delay /Veh: 51.9 93.7 93.7 40.9 39.4 48.9 80.9 37.0 14.9 119.0 38.3 8.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 Adj Del /Veh: 51.9 93.7 93.7 40.9 39.4 48.9 80.9 37.0 14.9 119.0 38.3 8.6 LOS by Mote: D F D D D F D B F D A HCM2k.AvgQ: 0 8 8 8 5 10 11 35 1 5 27 4 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -34 APPENDIX D -VI CUMULATIVE PLUS GAS STATION TRAFFIC CONDITIONS Lwscm. Law& GREENSPAN. engineers LLG Ref. 2 -13 -3368.1 Main & PCH Mixed -Use Center, Seal Beach it Ytan I {", Mi b.ue:;:,.1 , -,("1- { " :f, AM Cum Plus Gas Station Mon Apr 29, 2013 15:03:05 Paqe 4 -1 AM Cum Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -- ------ ------ -------- ----------- --- --- -- -- - - -- -- Level Of service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 41 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.640 Loss Time (sec): 16 Average Delav (sec /veh): 32.5 Optimal Cycle: 73 Level Of Service: C Street Name: PCH 1st Stree- Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 1.7 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 - 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ I ---------------II---------------II---------------II----- Volume Module: Base Vol: 14 1660 6 4 1510 55 211 0 52 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 1660 6 4 1510 55 211 0 52 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 1660 6 4 1510 55 211 0 52 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF volume: 15 1747 6 4 1589 58 222 0 55 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 15 1747 6 4 1589 58 222 0 55 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 i.00 i.00 1.00 1.00 1.00 FinalVolume: 15 1747 6 4 15B9 58 222 0 55 1 0 3 ----- ------- ------- -- --- - --II- --II---------------II---- Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3466 126 3502 0 1615 422 0 1266 ---- ------ -- ------ -- --- - - - -II --------fl---------------II- Capacity Analysis Module: Vol /Sat: 0.01 0.49 0.49 0.00 0.46 0.46 0.06 0.00 0.03 0.00 0.00 0.00 Grit Moves: *+ ** # * ** * # ** * *x4 Green /Cycle: 0.06 0.53 0.53 0.05 0.53 0.53 0.14 0.00 0.14 0.14 0.00 0.14 Volume /Cap: 0.14 0.91 0.91 0.05 0.67 0.87 0.45 0.00 0.24 0.02 0.00 0.02 Delay /Veh: 54.4 32.5 32.5 54.5 29.7 29.7 47.8 0.0 46.3 44.3 0.0 44.3 User Del Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 54.4 32.5 32.5 54.5 2.9.7 29.1 47.8 0.0 46.3 44.3 0.0 44.3 LOS by Move: D C C D C C D A D D A D HCM2kAvgQ: 1 34 34 0 30 30 4 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Trafiix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -3 5 AM Cum Plus Gas Station Mon Apr 29, 2013 15:08:05 Page 5 -1 AM Cum Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection N2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.592 Loss Time (sec): 12 Average Delay (sec /veh): 19.6 Optimal Cycle: 57 Level Of Service: B Street Name: Main Street PCH .Approach: North Bound South Bound East Bound West Bound Movement: L - T - R - T - R L - T - R L - T - R ------------ --------------- II-'--____------_ 11 --------------- II --------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 2B 6 21 21 6 21 21 Y -R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--- ------- ----- II------- -- - - ---- I Volume Module: Base Vol: 59 45 52 8 52 107 98 1396 69 40 1470 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 59 45 52 8 52 107 98 1396 69 40 1470 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByvol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 59 45 52 8 52 107 98 1396 69 40 1470 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 62 47 55 8 55 113 103 1469 73 42 1547 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 62 47 55 8 55 113 103 1469 73 42 1547 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 62 47 55 8 55 113 103 1469 73 42 1547 6 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.72 1.00 0.85 0.73 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1374 1900 1615 1387 1900 1615 1805 3610 1615 1805 3592 15 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.05 0.02 0.03 0.01 0.03 0.07 C.06 0.41 0.04 0.02 0.43 0.43 Crit Moves: * { }* * * ** * + *} Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.23 0.12 0.17 0.03 0.14 0.25 0.70 0.65 0.07 0.30 0.70 0.70 Delay /Veh: 40.6 39.5 40.0 38.7 39.7 33.5 6.7.3 15.0 8.9 53.6 166.4 16.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 40.6 39.5 40.0 38.7 39.7 33.5 67.3 15.0 8.9 53.6 16.4 16.4 LOS by Move: D D D D D C E B A D B R HCM2kAvg2: 2 1 2 0 2 3 5 1B 1 2 20 20 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -36 AM Cum Plus Gas Station Mon Apr 29, 2013 15:06:05 Page 6 -1 AM Cum Plus Gas Station Conditions (Caltransl 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ------------------------------ Leve.l. Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection N3 12th Street at Pacific Coast Highway **#*}+*****#*#***#*#********#**+#*+#**#****+}**** * * * ## * *#*++*#* * * * **+** # + # *# # * ** Cycle (sec): 120 Critical Vol. /Cap.(X): 0.639 Loss Time (sec): 1.2 Average Delay (sec /veh): i7.9 Optimal Cycle: 63 Level Of Service: B Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R _--_ II --------------- II --------------- II---------- - - - - - I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 69 61 33 37 40 35 36 1506 26 28 1517 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 69 61 33 37 40 35 36 1506 26 28 1517 6 Added Vol: 0 0 0 0 0 0 0 0 0 C 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 69 61 33 37 40 35 36 1506 26 28 1517 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 73 64 35 39 42 37 38 1585 27 29 1597 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 73 664 35 39 42 37 38 1.585 27 29 1597 6 PCE Adj: i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 73 664 35 39 42 37 38 1585 27 29 1597 6 ------------ I--------------- II--------------- II--------------- II-------- -- - - - - - I Saturation Flow Module: .Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.82 0.82 0.82 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 662 585 317 1524 1900 1615 1805 3610 1615 1805 3592 14 ---- I --------------- II--------------- il--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11. 0.11 0.03 0.02 0.02 0.02 0.44 0.02 0.02 0.44 0.44 Crit Moves: # + ## +_ +# * * ++ Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.05 0.63 0.63 0.07 0.65 0.65 Volume /Cap: 0.55 0.55 0.55 0.13 0.11 0.11 0.42 0.70 0.03 0.23 0.68 0.68 Delay /V--h: 45.2 45.2 45.2 39.66 39.4 39.5 58.4 15.8 8.4 53.5 14.1 14.1 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 Adj Del /Veh: 45.2 45.2 45.2 39.6 39.4 39.5 58.4 15.8 8.4 53.5 14.1 14.1 LOS by Move: D D D D D D F B A D B B HCM2kAvgQ: 6 6 6 1 1 1 2 21 0 1 20 20 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -37 AM Cum Plus Gas Station Mon Apr 29, 2013 15:OB:05 Pace 7 -1 AM Cum Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.778 Loss Time (sec): 16 Average Delay (sec /veh): 35.8 Optimal Cycle: 87 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II--------------- II--------------- I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Mi.n. Green: 6 6 6 28 28 28 6 21 21 6 21. 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.3 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 - --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 11 150 81. 374 98 188 131 1396 14 11 1420 406 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1.00 1.00 Initial Bse: 11 150 81 374 98 188 131 1396 14 11 1420 406 Added Vol: 0 0 0 0 0 0 0 0 0 3 0 0 PasserByVoi: 0 0 0 0 0 0 0 0 0 3 0 0 Initial Fut: 11 150 81 374 98 188 131 1396 14 11 1420 406 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1..00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 156 85 394 103 i98 138 1469 15 12 1495 427 R.educt Vol: 0 0 0 0 0 0 0 0 0 3 0 0 Reduced Vol: 12 158 85 394 103 198 138 1469 15 12 1495 427 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 158 85 394 103 198 138 1469 15 12 1495 427 ----- --------------- II--------------- II----------- - - --II Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.90 0.90 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.0D 2.00 1.00 Final Sat.: 1605 2220 1199 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II------- --- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.11 0.05 0.12 0.08 0.41 0.01 0.01 0.41 0.26 Crit Moves: * + ** ++++ +# #* + + ++ Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.09 0.49 0.49 0.06 0.47 0.70 Volume /Cap: 0.08 0.89 0.89 0.48 0.23 0.53 0.89 0.63 0.02 0.11 0.89 0.38 Delay /Veh: 51.3 82.0 82.0 40.2 37.6 41.6 95.3 29.4 15.6 53.7 35.2 7.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.00 Adi Del /Veh: 51.3 82.0 82.0 40.2 37.6 41.6 95.3 29.4 15.6 53.7 35.2 7.5 LOS by Move: D F F D D D F C B D D A HCM2kAvgQ: 0 7 7 7 3 7 8 26 0 0 29 6 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -38 PM Cun Plus Gas Station Mon Apr 29, 2013 15:08:45 Page 4 -1 PM Cum Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection N1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.811 Loss Time (sec): 16 Average Delay (sec /veh): 76.8 Optimal Cycle: 96 Level Of Service: E Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - 'I - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- 11 --------------- I Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 i7 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 ------------ I--------------- II--------------- II---------- ----- II- -- ------- - - - - - I Volume Module: Base Vol: 39 1600 3 1 1980 154 7.58 0 42 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 39 1600 3 1 1980 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 39 1600 3 1 1980 154 158 0 42 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 41 1684 3 1 2084 162 166 0 44 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 41 1684 3 1 2084 162 166 0 44 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 41 1684 3 1 2084 162 166 0 44 2 i 3 --- ---- - - - - -I - --------------- II- -------------- II --------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 1.86 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1805 3603 7 1805 3313 258 3502 0 1615 581 291 872 ------------ I --------------- II--------------- II--- ------------ II-- ------ -- - - - - - I Capacity Analysis Module: Vol /Sat: 0.02 0.47 0.47 0.00 0.63 0.63 0.05 0.00 0.03 0.00 0.00 0.00 Crit Moves: * # *} Green /Cycle: 0.05 0.53 0.53 0.06 0.53 0.53 0.14 0.00 0.14 0.14 0.14 0.14 Volume /Cap: 0.45 0.89 0.89 0.01 1.18 1.18 0.34 0.00 0.19 0.03 0.03 0.03 Delay /Veh: 59.0 30.7 30.7 53.5 115 114.7 46.8 0.0 45.9 44.4 44.4 44.4 User De1Adj': 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 _100 1.00 A.dj Del /Veh: 59.0 30.7 30.7 53.5 115 114.7 46.8 0.0 45.9 44.4 44.4 44.4 LOS by Move: E C C D F F D A D D D D HCM2kAvgQ: 2 32 32 0 67 67 3 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -39 PM Cum Plus Gas Station Mon Apr 29, 2013 15:08:45 Page 5 -1 PM Cum Plus Gas Station Conditions (Caltrans] 2.13.3368.1 Main r, PCH Mixed -Use Center, Seal Beach ---------- --- ----- ---- -- --- -- - - - - -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.767. Loss Time (sec): 12 Average Delay (sec /veh): 28.3 Optimal Cycle: 72 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound Nest Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovi Include Include Min. Green: 24 24 24 26 28 28 6 21 21 6 21 21 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II-------------- -II --------------- --------------- Volume Module: Base Vol: 120 68 66 21 75 168 233 1788 119 116 1430 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 68 66 21 75 168 233 1788 119 116 1430 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 120 68 66 21 75 168 233 1788 119 116 1430 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7..00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.9,5 0.95 0.95 0.95 0.95 0.95 PHF Volume: 126 72 69 22 79 177 245 1882 125 122 1505 15 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 126 72 69 22 79 177 245 1682 125 122 1505 15 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 FinalVolume: 126 72 69 22 79 177 245 1882 125 122 1505 15 -- --------------- II--------------- II---------- -- --- II---------- - - - - - I Saturation, Flow Module: Sat /Lane: 7.900 1900 1900 1900 1900 1900 1900 1500 1900 1900 1900 1900 Adjustment: 0.69 1.00 0.85 0.71 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 1317 1900 1615 1349 1900 1615 1805 3610 1615 1805 3571 35 --- I --------------- II--------------- II--------------- II---------- - - - - - i Capacity Analysis Module: Vol /Sat: 0.10 0.04 0.04 0.02 0.04 0.11 0.14 0.52 0.08 0.07 0.42 0.42 Crit Moves: *+ #} * * #* # *** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.62 0.62 0.09 0.53 0.53 Volume /Cap: 0.48 0.19 0.22 0.08 0.21 0.30 0.80 0.84 0.13 0.84 0.80 0.80 Delay /Veh: 43.9 40.1 40.5 39.2 40.3 27.0 61.2 21.2 9.5 67.9 25.4 25.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.O3 1.00 1.00 Adj Del /Veh: 43.9 40.1 40.5 39.2 40.3 27.0 61.2 21.2 9.5 87.9 25.4 25.4 LOS by Move: D D D D D C E C A F C C HCM2kAvgQ: 5 2 2 1 2 5 11 31 2 7 25 25 Note: Queue reported is the number of cars per lane. Traffix 3.0.0715 (c) 2003 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -40 PM Cum Plus Gas Station Mon Apr 29, 2013 15:08:45 Page 6 -1 PM Cum Plus Gas Station Conditions (Caltrans] 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 120 Critical Vol. /Cap.(X): 0.767 Loss Time (sec): 12 Average Delay (sec /veh): 21.1 Optimal Cycle: 74 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound West Bound Movement: L - '1' - F L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II__ ------------- I Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol: 68 52 39 60 66 24 66 1913 64 39 1531 18 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 68 52 39 60 66 24 68 1913 64 39 1531 18 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 68 52 39 60 66 24 68 1913 64 39 1531 18 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 72 55 41 63 69 25 72 2014 67 Al 1612 19 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 72 55 41 63 69 25 72 2014 67 41 1612 19 PCE Adj: 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 72 55 41 63 69 25 72 2014 67 41 1612 19 ----------- --------------- II --------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.81 0.81 0.81 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.33 0.24 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 655 501 375 1518 1900 1615 1805 3610 1615 1.805 3561 42 ----------- - I - --- ---------- II--------------- II-------- ------- II---------- - - -- -I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.04 0.04 0.02 0.04 0.56 0.04 0.02 0.45 0.45 Crit Moves: * * ** +# ++ # *A' Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.07 0.65 0.65 0.05 0.63 0.63 Volume /Cap: 0.55 0.55 0.55 0.21 0.18 0.08 0.57 0.86 0.06 0.45 0.72 0.72 Delay /Veh: 45.2 45.2 45.2 40.4 40.1 39.1 60.2 20.0 7.7 59.0 16.1 16.1 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L00 1.00 1.00 Adj Del /Veh: 45.2 45.2 45.2 40.4 40.1 39.1 60.2 20.0 7.7 59.0 16.1 16.1 LOS by Move: D D D D D D E C A 7 B B HCM2kAvgQ: 6 6 6 2 2 1 3 33 1 2 22 22 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -41 PM Cum Plus Gas Station Mon Apr 29, 2013 15:08:45 Page 7 -1 PM Cum Plus Gas Station Conditions [Caltrans] 2.13.3368.1 Main S PCH Mixed -Use Center, Seal Beach ---------------------------------------------------------------------- -- - - - - -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.823 Loss Time (sec): 16 Average Delay (sec /veh): 42.9 Optimal Cycle: 99 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II --------------- I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 28 6 21 21 6 21 21 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II --------------- II --- ------------ II ---------- - - - - - I Volume Module: Base Vol: 11 136 91 410 164 257 201 1629 38 77 1293 273 Growth Adj: 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 11 136 91 410 164 257 201 1629 38 77 1293 273 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 136 91 410 164 257 201 1629 38 77 1293 273 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 143 96 432 173 271 212 1715 40 81 1361 287 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 143 96 432 173 271 212 1715 40 81 1361 287 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 12 143 96 432 173 271 212 1715 40 81 1361 287 ------------ --------------- II--------------- II----- --- ------- II---------- - - - -- I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.89 0.89 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2033 1360 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ --------------- II--------------- II--------------- II---------- - - - - - i Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.01 0.12 0.09 0.17 0.12 0.47 0.02 0.04 0.38 0.18 Crit Moves: * **+ * * *' * * ++ } #** Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.13 0.51 0.51 0.05 0.43 0.66 Volume /Cap: 0.09 0.93 0.93 0.53 0.39 0.72 0.89 0.93 0.05 0.90 0.89 0.27 Delay /Veh: 51.9 94.1 94.1 40.9 39.4 48.9 81.3 37.2 14.9 119.0 38.3 8.6 User De1Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 51.9 94.1 94.1 40.9 39.4 48.9 81.3 37.2 '14.9 1.19.0 38.3 8.6 LOS by Move: D F F D D D F D B F D A HCM2kAvcQ: 0 8 8 8 5 10 11 36 1 5 27 4 x***#+*+#+***+}#**++**##*+*******#* ri******+* x* } * # } # *+ ** * #* + # * # * *# ***}}#*++ -4I FI *� Note: Queue reported is the number of cars per lane Traffir. 6.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D-42 L'NSC07, LAW 8 GREENSPAN. engineers APPENDIX D -1/11 CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS LLG Ref. 2 -13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach n =n - , f tu'' Pro It., 0 ", eon..., d n.� r.,:: -1. i1h,, -" AM Cum Plus Project Fri Apr 19, 2013 10:30:07 Page 4 -1 AM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ____ _______ ___ ____ _________ ____ ________ _______ __ ______ _ ___ Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 41 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.642 Loss Time (sec): 16 Average Delay (sec /veh): 32.7 Optimal Cycle: 73 Level Of Service: C Street Name: PCH 1st Stree= Approach,: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II ---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ --------------- II--------------- II-------- ------- II---------- - - - - - I Volume Module: Base Vol: 14 1665 6 4 1517 55 211 0 52 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 14 1665 6 4 1517 55 211 0 52 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 14 1665 6 4 1517 55 211 0 52 1 0 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 15 1753 6 4 1597 58 222 0 55 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 15 i753 6 4 1597 58 222 0 55 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 15 1753 6 4 1597 58 222 0 55 1 0 3 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.85 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 0.00 1.00 0.25 0.00 0.75 Final Sat.: 1805 3593 13 1805 3466 126 3502 0 1615 422 0 1266 - I --------------- II------ ----- - - - -II - II---------- -- - - -I Capacity Analysis Module: Vol /Sat: 0.01 0.49 0.49 0.00 0.46 0.46 0.06 0.00 0.03 0.00 0.00 0.00 Crit Moves: +Y +h -. *+ -* * *. ! #a! Green /Cycle: 0.06 0.53 0.53 0.05 0.53 0.53 0.14 0.00 0.14 0.14 0.00 0.14 Volume /Cap: 0.14 0.91 0.91 0.05 0.88 0.88 0.45 0.00 0.24 0.02 0.00 0.02 Delay /Veh: 54.4 32.8 32.8 54.5 29.9 29.9 47.8 0.0 46.3 44.3 0.0 44.3 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 54.4 32.8 32.8 54.5 29.9 29.9 47.8 0.0 46.3 44.3 0.0 44.3 LOS by Move: D C C D C C D A D D A D HCM2kAvgQ: 1 35 35 0 31 31 4 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -43 AM Cum Plus Project Fri Apr 19, 2013 i0:30:07 Page 5 AM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main 5 PCH Mixed -Use Center, Seal Beach ---------------------- --- -- ---- ---- -- ----- - - - -- -- - - -- -- Level Of Service Computation Report 2000 HCM O_oerations Method (Future Volume Alternative) +# 4YY*!+** 4+}***## 4# TL#* 1* x+* a* 4* a#+* 4#} A* Aat** a# + *T +kY * #a* *+ * * # #xt ++} *4 * }+++ } +Y Intersection k2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.584 Loss Time (sec): 12 Average Delay (sec /veh): 19.6 Optimal Cycle: 67 Level Of Service: B Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------------------- II--------------- 11-- ------------- II--------- - - -- - -I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------------- II-------- -- - - - - - I Volume Module! Base Vol: 43 42 50 9 52 107 98 1420 49 41 1486 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 43 42 50 9 52 107 98 1420 49 41 1486 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByvol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 43 42 50 9 52 107 98 1420 49 41 1486 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 45 44 53 9 55 113 103 1495 52 43 1564 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 45 44 53 9 55 113 103 1495 52 43 1564 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 i.00 1.00 1.00 1.00 FinalVolume: 45 44 53 9 55 113 103 1495 52 43 1564 6 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.72 1.00. 0.85 0.73 1.D0 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1374 1900 1615 1391 1900 1615 1805 3610 1615 1805 3592 15 --- I --------------- II--------------- II---- ---- ----- --II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.03 0.02 0.03 0.01 0.03 0.07 0.06 0.41 0.03 0.02 0.44 0.44 Crit Moves: A *A{ 4 **a * + }* Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.16 0.12 0.16 0.03 0.14 0.25 0.70 0.66 0.05 0.32 0.70 0.70 Delay /Veh: 40.0 39.5 39.9 38.7 39.7 33.6 68.1 15.2 8.9 53.9 16.5 16.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 40.0 39.5 39.9 36.7 39.7 33.6 68.1 15.2 8.8 53.9 16.5 16.5 LOS by Move: D D D D D C E B A D B B HCM2k-,vgQ: 1 1 2 0 2 3 5 19 1 2 21 21 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D-44 AM Cum Plus Project Fri Aar 19, 2013 --0:30:07 Page 6 -1 AM Cum Plus Project Conditions [Caltrans) 2.13.3368.1 Main e PCH Mixed -Use Center, Seal Beach -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway ++++++**+}++*} Y++*+«+ r+++#++#++#++#++ Y++ a+*+# r+++ + ++ +Y«+r + + + # + +kk + +Y+r +k ++r + # * #+ Cycle (sec): 120 Critical Vol. /Cap.(X): 0.650 Loss Time (sec): 12 Average Delay (sec /veh): 18.2 Optimal Cycle: 63 Level Of Service: B Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound hest Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 1! 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ---- I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: Base Vol.: 69 61 33 37 40 35 51 1510 30 28 1519 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 69 61 33 37 40 35 51 1510 30 28 1519 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 69 61 33 37 40 35 51 1510 30 28 1519 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 73 64 35 39 42 37 54 1589 32 29 1599 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced 'Vol: 73 64 35 39 42 37 54 1589 32 29 1599 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 73 64 35 39 42 37 54 1589 32 29 1599 6 ------------ --------------- II--------------- II--------------- II--- ------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.82 0.82 0.82 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.37 0.20 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 662 585 317 1524 1900 1615 1805 3610 1615 7.805 3592 14 ------------ I --------------- II--------------- II-- - - - - -- I--- ----- -- - - - - -I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.03 0.02 0.02 0.03 0.44 0.02 0.02 0.45 0.45 Crit Moves: r« ++ *r ++ } * *} Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.05 0.63 0.63 0.07 0.65 0.65 Volume /Cap: 0.55 0.55 0.55 0.13 0.11 0.11 0.59 0.70 0.03 0.23 0.68 0.68 Delay /Veh: 45.2 45.2 45.2 39.6 39.4 39.5 66.1 15.8 8.5 53.5 14.1 14.1 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 45.2 45.2 45.2 39.6 39.4 39.5 66.1 15.E 8.5 53.5 14.1 14.1 LOS by Move: D D D D D D E B A D B B HCM2kAvgQ: 6 6 6 1 1 1 3 21 0 1 20 20.. Note: Queue reported is the number of cars per lane. Traf£ix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -45 AM Cum Plus Project Fri Apr 19, 2013 10:30:97 Page 7 -1 AM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH [Nixed -Use Center, Seal Beach - - - - - - -_ ---------------------------------------------------- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection N4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.781 Loss Time (sec): 16 Average Delay (sec /veh): 36.1 Optimal Cycle: 88 Level Of Service: D k****************#*****#* x*#***#* k*#*{** k***#**** * * * # *y ** * * * * * * * * * * * * *# * * ** * * * ** Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II --------------- II --------------- Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ I --------------- II--------------- II--------------- II - - - - -- I Volume Module: Base Vol: 11 150 81 374 98 188 134 1398 14 11 1423 406 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bee: 11 150 81 374 98 188 134 1398 14 11 1423 406 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 11 150 81 374 98 188 134 13398 14 it 1423 406 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 158 85 394 103 198 141 1472 15 12 1498 427 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 158 85 394 103 198 141 1472 1.5 12 1498 427 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0c 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 FinalVolume: 12 158 85 394 103 198 141 1472 15 12 1498 427 ------------ ---------------II---------------II---------------II----- Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.90 0.90 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.30 0.70 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2220 1199 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.11 0.05 0.12 0.08 0.41 0.01 0.01 0.41 0.26 Crit Moves: * * ** #- - -* Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.09 0.49 0.49 0.06 0.47 0.70 Volume /Cap: 0.08 0.89 0.89 0.48 0.23 0.53 0.89 0.83 0.02 0.11 0.89 0.38 Delay /Veh: 51.4 82.9 82.9 40.2 37.6 41.6 95.7 29.4 15.6 53.7 35.7 7.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 Adj Del /Veh: 51.4 82.9 82.9 40.2 37.6 41.6 95.7 29.4 15.6 53.7 35.7 7.6 LOS by Move: D F F D D D F 1 B D A HCM21,AvgQ: 0 7 7 7 3 7 8 26 0 30 6 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -46 PM Cum Plus Project Fri Apr 19, 2013 10:30:21 Page 4 -1 PM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach Level Of Service Computation. Report 2000 H.CM Operations Method (.Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.813 Loss Time (sec): 16 Average Delay (sec /veh): 77.3 Optimal Cycle: 96 Level Of Service: E Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II_-------------- II --------------- II -- _------- - - - - - I Control.: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 17 17 17 Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 I C 1 1 0 2 0 0 1 0 0 0 11 0 0 ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Volume Module: Base Vol: 39 1605 3 1 1984 154 158 0 42 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 I.GO 1.00 1.00 1..00 Initial Bse: 39 1605 3 1 1984 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 39 1605 3 1 1984 154 158 0 42 2 1 3 User Ad-j: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.O0 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 41 1689 3 1 2088 162 166 0 44 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 41 1689 3 1 2088 162 166 0 44 2 1 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 ?.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 41 1689 3 1 2088 162 166 0 44 2 1 3 --------------------------- II--------------- II--------------- 11-------- -- - - - --I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 1.86 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: 1805 3603 7 1805 3313 257 3502 0 1615 581 291 872 ------------ I--------------- II--------------- II--------------- 11-------- -- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.47 0.47 0.00 0.63 0.63 0.05 0.00 0.03 0.00 0.00 0.00 Cri.t Moves! * * ** * * ** * * ** + + ++ Green /Cycle: 0.05 0.53 0.53 0.06 0.53 0.53 0.14 0.00 0.14 0.14 0.14 0.14 Volume /Cap: 0.45 0.89 0.89 0.01 1.18 1.18 0.34 0.O0 0.19 0.03 0.03 0.03 Delay /Veh: 59.0 30.9 30.9 53.5 116 115.6 46.8 0.0 45.9 44.4 44.4 44.4 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 59.0 30.9 30.9 53.5 116 115.6 46.8 0.0 45.9 44.4 44.4 44.4 LOS by Move: E C C D F F D A D D D D HCM2P.AvgQ: 2 32 32 0 68 68 3 0 2 G 0 0 ***+Yi++#+*****+++*++*++*****#*+**.:*+* k*# t*+++#*# ** * *+ * + +i Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -47 PM Cum Plus Project Fri Apr 19, 2013 10:30:21 Page 5 -1 PM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach - -- ---- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #2 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.( %): 0.748 Loss Time (sec): 12 Average Delay (sec /veh): 28.3 Optimal Cycle: 70 Level Of Service: C Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II --------------- Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 28 E 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------- --- --- II- --------- - - - - - t Volume Module: Base Vol: 102 63 65 19 75 168 233 1803 102 1.13 1448 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 102 63 65 19 75 168 233 1803 102 113 1448 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 C. 0 C 0 0 0 0 0 Initial Put: 102 63 65 19 75 168 233 1803 102 113 1448 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.96 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 107 66 68 20 79 177 245 1898 107 119 1524 15 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced 'Vol: 107 66 68 20 79 177 245 1698 107 119 1524 15 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 107 66 68 20 79 177 245 1898 107 119 1524 15 ------------ --------------- II--------------- II-- ------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.69 1.00 0.85 0.72 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.0�1 1.98 0.02 Final Sat.: 1317 1900 1615 1359 1.900 1615 1805 3610 1615 1805 3572 35 I --------------- If-------------- II--------------- II---------- --- - - I Capacity Analysis Module: Vol /Sat: 0.08 0.03 0.04 0.01 0.04 0.11 0.14 0.53 0.07 0.07 0.43 0.43 Crit Moves: + * #} # * *+ * # +# Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.62 0.62 0.03 0.53 0.53 Volume /Cap: 0.41 0.17 0.21 0.07 0.21 0.30 0.80 0.85 0.11 0 -.85 0.80 0.80 Delay /Veh: 42.8 40.0 40.4 39.1 40.3 27.1 62.2 21.2 9.2 89.6 25.6 25.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 42.8 40.0 40.4 39.1 40.3 27.1 62.2 21.2 9.2 89.6 25.6 25.6 LOS by Move: D D D D D C E C A F C C HCM2kAvgQ: 4 2 2 1 2 5 11 31 2 7 26 26 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -48 PM Cum Plus Project Fri Apr 19, 2013 10:30:21 Page 6 -1 PM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #3 12th Street at Pacific Coast Highway Cycle (sec): 12C Critical Vol. /Cap.(X): 0.768 Loss Time (sec): 12 Average Delay (sec /veh): 21.6 Optimal Cycle: 74 Level Of Service: C Street Name: 12th Street Pacific Coast Highway Approach: North Bound South Bound East Bound west Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II--------------- i Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 24 24 24 24 24 24 6 14 14 6 21 21 y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 0 0 11 0 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- II--------------- II--------------- II------- --- - --- - I Volume Module: Base Vol: 68 52 39 60 66 24 85 1917 69 39 1530 18 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 68 52 39 60 66 24 85 1917 69 39 1530 18 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Put: 68 52 39 60 66 24 85 1917 69 39 1530 18 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PRE Volume: 72 55 41 63 69 25 89 2018 73 41 1611 19 Reduct Vol: 0 0 0 0 0 0- 0 0 0 0 0 0 Reduced Vol: 72 55 41 63 69 25 89 2018 73 41 1611 19 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 72 55 41 63 69 25 89 2018 73 41 1611 19 --------------------------- II--------------- II--------------- II---------- - - - - -1 Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.81 0.81 0.81 0.80 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 0.43 0.33 0.24 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.98 0.02 Final Sat.: 655 501 375 1518 1900 1615 1805 3610 1615 1805 3561 42 ------------ I --------------- II--------------- II----- -- -------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.11 0.11 0.11 0.04 0.04 0.02 0.05 0.56 0.04 0.02 0.45 0.45 Crit Moves: * **+ .Y ** } } ## Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.20 0.07 0.65 0.65 0.05 0.63 0.63 Volume /Cap: 0.55 0.55 0.55 0.21 0.18 0.08 0.71 0.86 0.07 0.45 0.72 0.72 Delay /Veh: 45.2 45.2 45.2 40.4 40.1 39.1 71.9 20.1 7.7 59.0 16.1. 16.1 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 45.2 45.2 45.2 40.4 40.7, 39.1 77..9 20.1 7.7 59.0 16.1 16.1 LOS by Move: D D D D L D E C A E B B HCM2kAvgQ: 6 6 6 2 2 1 5 33 1 2 22 22 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D-49 PM Cum: Plus Project Fri Apr 19, 2013 10:30:21 Page 7 -1 PM Cum Plus Project Conditions [Caltrans] 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach -- ----- ----- ------ - -- ----- - - -- -- - - - -' Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #4 Seal Beach Blvd at PCH Cycle (sec): 120 Critical Vol./Cap-(X): 0.824 Loss Time (sec): 16 Average Delay (sec /veh): 43.1 Optimal Cycle: 99 Level Of Service: D Street Name: Seal Beach Blvd PCH Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------ ------ ---- -------- - - -II- ------------- 11--------------- II---------- - - - - -I Control: Split Phase Split Phase Protected Protected Rights: Include Include Include Ovl Min. Green: 6 6 6 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 2 0 1 0 1 1 0 2 0 1 1 0 2 0 1 ------------ --------------- II--------------- II --------------- II -- ------- -- - - - - I Volume Module: Base Vol: 11 136 91 410 164 257 205 16331 38 77 1294 273 Growth Adj: 1.00 1.00 1_00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: it 136 91 410 164 257 205 1631 38 77 1294 273 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 11 136 91 410 164 257 205 1631 38 77 1294 273 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 12 143 96 432 173 271 216 1717 40 81 1362 287 Reduct Vol: C. 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 12 143 96 432 173 271 216 1717 40 81 1362 287 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 12 143 96 432 173 271 216 1717 40 81 1362 287 ------------ --------------- II--------------- II-- ----- --- ---- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.85 0.89 0.92 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.85 Lanes: 1.00 1.20 0.80 2.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 Final Sat.: 1805 2033 1360 3502 1900 1615 1805 3610 1615 1805 3610 1615 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.01 0.07 0.07 0.12 0.09 0.17 0.12 0.48 0.02 0.04 0.38 0.18 Crit Moves Green /Cycle: 0.08 0.08 0.08 0.23 0.23 0.23 0.13 0.51 0.51 0.05 0.42 0.66 Volume/Cap: 0.09 0.94 0.94 0.53 0.39 0.72 0.89 0.94 0.05 0.90 0.89 0.27 Delay /Veh: 51.9 94.4 94.4 40.9 39.4 48.9 81.7 37.3 14.9 119.0 38.9 8.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 51.9 94.4 94.4 40.9 39.4 48.9 81.7 37.3 14.9 119.0 38.9 8.7 LOS by Move: D F F D D D F D B _ D A HCM2kAvgQ: 0 8 8 8 5 10 11 36 1 5 28 4 Note: Queue reported is the number of cars per lane. Traf_`ih 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -50 L!Nsco-m LAW $ GREENSPAN, entilMaI5 APPENDIX D -VIII CUMULATIVE PLUS PROJECT PLUS MITIGATION TRAFFIC CONDITIONS LLG Rep, 2- 13- 3368 -1 Main & PCH Mixed -Use Center, Seal Beach y. Ii. y�! Allry� .S01R,- Y,dry "Ii "p +uyFlYrin�•. e MITIG8 - AM Cum Plus ProjecTUe Apr 30, 2013 16:58:01 Page 1 -1 AM Cum Plus Project Conditions (Caltrans] (Mitigation) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ------------------------------ -- ------ ----------- - --_- -- ----- --- --- ---- --- - - -'_ Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at 1st Street Cycle (sec): 120 Critical Vol. /Cap.(X): 0.642 Loss Time (sec): 16 Average Delay (sec /veh): 20.8 Optimal Cycle: 64 Level Ot Service: C Street Name: PCH 1st Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------- 11--------------- 1_ 11 --------------- Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 6 6 6 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 1 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 --- --- - - - - -- -- --- --- ---- --- ---------- - - - - -H --------------- 11 --------------- I Volume Module: Base Vol: 14 1665 6 4 1517 55 211 0 52 1 0 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 Initial Bse: 14 1665 6 4 1517 55 211 0 52 1 0 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 C 0 0 0 0 Initial Fut: 14 1665 6 4 1517 55 211 0 52 1 0 3 User Adj: 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 C.95 0.95 PHF Volume: 15 1753 6 4 1597 58 222 0 55 1 0 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 15 1753 6 4 1597 S8 222 0 55 1 0 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 15 1753 6 4 1597 58 222 0 55 1 0 3 -- ----- - - - -- --------------- --------------- --------------- --------------- Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.95 0.95 0.92 1.00 0.65 0.89 1.00 0.89 Lanes: 1.00 1.99 0.01 1.00 1.93 0.07 2.00 O.00 1.00 0.25 0.00 0.75 Final Sat.: 1605 3593 13 1805 3466 126 3502 0 1615 422 0 1266 ------------ I--------------- --------------- --------------- --------------- Capacity Analysis Module: Vol /Sat: 0.01 0.49 0.49 0.00 0.46 0.46 0.06 0.00 0.03 0.00 C•.00 0.00 Crit Moves: * * +* # }+* * * #* + # #* Green /Cycle: 0.07 0.63 0.63 0.05 0.61 0.61 0.14 0.00 0.14 0.05 0.00 0.05 Volume /Cap: 0.12 0.78 0.78 0.05 0.76 0.76 0.45 0.00 0.24 0.05 C.00 0.05 Delay /Veh: 53.2 18.3 18.3 54.5 18.6 18.6 47.8 0.0 46.3 54.5 0.0 54.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel /Veh: 53.2 18.3 18.3 54.5 18.6 18.6 47.8 0.0 46.3 54.5 0.0 54.5 LOS by Move: D B B D B B D A D D A D HCM2kAVgQ: 1 26 26 0 24 24 4 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (C) 2008 Dowling ASSOC. Licensed to LLG Costa Mesa, CA D -il AM Cum Plus Project Fri Apr 19, 2013 10:45:48 Page 5 -1 AM Cum Plus Project Conditions [Caltrans] (Mitigation) 2.13.3368.1 Main s PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection 42 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.605 Loss Time (sec): 12 Average Delay (sec /veh): 19.7 optimal Cycle: 67 Level Of Service: B **# t#}*#;}}*}}*}**#**}#********}}* f****#**#}*+#*# + * * * } * {} * * # } **** *i+*}}} *} ** * * ** Street Name: Main Street PCH Approach: North Bound South Bound East Bound West Bound Movement: L - I - R L - T - R L - T - R L - T - R ------------ --------------- II--------------- II --------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include OV1 Include Include Min. Green: 24 24 24 28 28 28 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ------------ --------------- II--------------- II--------- ----- -II---------- - - - - -I Volume Module: Base Vol: 43 42 50 9 52 107 98 1420 49 41 1486 6 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 43 42 50 9 52 107 98 1420 49 41 1486 6 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fur: 43 42 50 9 52 107 98 1420 49 41 1486 6 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 45 44 53 9 55 113 103 1495 52 43 1564 6 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 45 44 53 9 55 113 103 1495 52 43 1564 6 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 45 44 53 9 55 113 103 1495 52 43 1564 6 --------------- II--------------- II--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1.900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.72 0.92 0.92 0.65 1.00 0.85 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 0.46 0.54 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.99 0.01 Final Sat.: 1374 797 949 1233 1900 1615 1905 3610 1615 1803 3592 i5 ------------ I --------------- II--------------- il--------------- II-- - - - - -- - - - - - -I Capacity Analysis Module: Vol /Sat: 0.03 0.06 0.06 0.01 0.03 0.07 0.06 0.41 0.03 0.02 0.44 0.44 Crit Moves: i }+* * * ** * * ** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.28 0.08 0.62 0.62 0.08 0.62 0.62 Volume /Cap: 0.16 0.28 0.28 0.04 0.14 0.25 0.70 0.66 0.05 0.32 0.70 0.70 Delay /Veh: 40.0 41.1 41.1 38.8 39.7 33.6 68.1 15.2 8.8 53.9 16.5 16.5 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 40.0 41.1 41.1 38.8 39.7 33.6 66.1 15.2 8.8 53.9 16.5 16.5 LOS by Move: D D D D D C E B A D B B Hr_M2kAvgQ: 1 3 3 0 2 3 5 19 1 2 21 21 Note: Queue reported is the number or cars per lane. Tra££ix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LLC Costa Mesa, CA D -52 MITIG8 - PM Cum Plus ProjecTue Apr 30, 2013 16:58:24 Page 1 -1 PM Cum Plus Project Conditions [Caltrans] (Mitigation) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach ---------------------------------------------------------- --------------- - - - - -- Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) Intersection #1 PCH at 1st Street ***#* FkF******** R**}**#** Y#* k#+* Y}**+ f*+ W} k****** hFkA #W *k }f * * * *f } *+ } # } * }} # + } # + ++ Cycle (sec): 120 Critical Vol. /Cap.(X): 0.813 Loss Time (sec): 16 Average Delay (sec /veh): 34.0 Optimal Cycle: 96 Level Of Service: C Street Name: PCH 1st Street Approach: North Bound South Bound Bast Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R --------------------------- --------------- --------------- ---------- - - - --� Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 6 14 14 6 17 17 17 17 17 6 6 6 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 - 1 0 1 0 1 1 0 2 0 0 1 0 0 0 1! 0 0 -------------- --------------- --------------- ---------- - - - - -� Volume Module: Base Vol: 39 1605 3 1 1984 154 158 0 42 2 1 3 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 39 1605 3 1 1984 154 158 0 42 2 1 3 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 39 1605 3 1 1984 154 158 0 42 2 1 3 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 ?HE Volume: 41 1689 3 1 2088 162 166 0 44 2 1 3 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 41 1689 3 1 2088 162 166 0 44 2 i 3 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOiume: 41 1689 3 1 2088 162 166 0 44 2 i 3 - --------------- --------------- ------- -------- ----- ---- - - --- -� Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.95 0.95 0.95 0.95 0.94 0.94 0.92 1.00 0.85 0.92 0.92 0.92 Lanes: 1.00 1.99 0.01 1.00 1.86 0.14 2.00 0.00 1.00 0.33 0.17 0.50 Final Sat.: i805 3603 7 1805 3313 257 3502 0 1615 581 291 872 ---------- I --------------- --------------- --------------- ---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.02 0.47 0.47 0.00 0.63 0.63 0.05 0.00 0.03 0.00 0.00 0.00 Crit Moves: * * ** * *•* * * ** * * ** Greer. /Cycle: 0.05 0.61 0.61 0.07 0.63 0.63 0.14 0.00 0.14 0.05 0.05 0.05 Volume /Cap: 0.45 0.77 0.77 0.01 1.01 1.01 0.34 0.00 0.19 0.07 0.07 0.07 Delay /Veh: 59.0 18.9 18.9 52.5 43.7 43.7 46.8 0.0 45.9 54.7 54.7 54.7 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 59.0 18.9 18.9 52.5 43.7 43.7 46.8 0.0 45.9 54.7 54.7 54.7 LOS by Move: F B B D D D D A D D D D HCM2kAvgQ: 2 25 25 0 52 52 3 0 2 0 0 0 Note: Queue reported is the number of cars per lane. Traffix 8.0.0715 (c) 2008.DOwling Assoc. Licensed to LLG Costa Mesa, CA D-53 PM Cum Plus Project Fri Apr 19, 2013 10:45:58 Page 5 -1 PM Cum Plus Project Conditions [Caltrans) (Mitigation) 2.13.3368.1 Main & PCH Mixed -Use Center, Seal Beach Level Of Service Computation Report 2000 HCM Operations Method (Future Volume Alternative) *# h++**** a** a*** h***** a++**#***+*+*# w**+4#++# i* w* * Intersection 42 Main Street at PCH Cycle (sec): 120 Critical Vol. /Cap.(X): 0.743 Loss Time (sec): 12 Average Delay (sec /veh): 28.4 Optimal Cycle: 69 Level Of Service: i C Street Name: Main Street PCH Approach: North Sound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II--------------- I Control: Permitted Permitted Protected Protected Rights: Include Ovl Include Include Min. Green: 24 24 24 28 28 26 6 21 21 6 21 21 Y +R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 2 0 1 1 0 1 1 0 ---- I --------------- II- -------- ------ II --------------- --------------- Volume Module: Base Vol: 102 63 65 19 75 168 233 1803 102 113 1448 14 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial 2se: 102 63 65 19 75 168 233 1803 102 113 1448 14 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 ]Initial Fur: 102 63 65 19 75 168 233 1803 102 113 1448 14 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 PHF Adj: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHF Volume: 107 66 68 20 79 177 245 1898 107 119 1524 15 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 107 66 68 20 79 177 245 1898 107 119 1524 15 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLE Adj: 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVOlume: 107 66 68 20 79 177 245 1898 107 119 1524 15 ------------ I - ------ --- -- - - -II- ------- II--------------- II- --------- - -- - -I Saturation Flow Module: Sat /Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adjustment: 0.69 0.92 0.92 0.56 1.00 0.65 0.95 0.95 0.85 0.95 0.95 0.95 Lanes: 1.00 0.49 0.51 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.96 0.02 Final Sat.: 1317 864 892 1066 1900 1615 1805 3610 1615 1805 3572 35 ----------- - I - - -- -- II----------- - - - -II -------- II---------- - - - --I Capacity Analysis Module: Vol /Sat: 0.08 0.08 0.08 0.02 0.04 0.11 0.14 0.53 0.07 0.07 0.43 0.43 Crit Moves: ­k, *a *+ **** Green /Cycle: 0.20 0.20 0.20 0.20 0.20 0.37 0.17 0.62 0.62 0.08 0.53 0.53 Volume /Cap: 0.41 0.38 0.38 0.09 0.21 0.30 0.80 0.85 0.11 0.65 0.80 0.80 Delay /Veh: 42.8 42.3 42.3 39.3 40.3 27.1 62.2 21.2 9.2 89.6 25.6 25.6 User DelAdj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Del /Veh: 42.8 42.3 42.3 39.3 40.3 27.1 62.2 21.2 9.2 89.6 25.6 25.6 LOS by Move: D D D D D C E C A F C C HCM2'.tAVgQ: 4 5 5 1 2 5 11 31 2 1 26 26 ++#+*++**+* F*+*+** w#* w*#***##*+#**+***#' F4* k+#**** * * # # *} *F*i *k * *#a *+ * *+ * ++* * #4 * +* Note: Queue reported is the number of cars per lane. Traffix B.O.C715 (c) 2008 Dowling Assoc. Licensed to LLG Costa Mesa, CA D -54