Loading...
HomeMy WebLinkAboutSupplemental Information Received at Meeting Naval Weapons Station Seal Beach PowerPointNAVAL WEAPONS STATION SEAL BEACH Replacement Ammunition Pier and Turning Basin Project Environmental Assessment �EAPONSS�y ;Pv T�i1� 2� I CH - GP���= Seal Beach City Council May 8. 2017 04\1 S, We serve a majority of the U.S. Pacific Fleet • The only major weapons station port within 1,000 miles of the fleet concentration in San Diego Navy growing and ships moving from Atlantic to Pacific Fleet = More ships to support Need to recapitalize base infrastructure, most of which is 50 -70+ years old NAVAL WEAPONS STATION SEAL BEACH • Ammunition Wharf - Current Status The current base ammunition wharf is past it's design life, unable to support current and future fleet requirements and has other deficiencies. • Built in 1953, before the advent of modern earthquake codes • Too small to support larger Navy ships such as helicopter carriers (LHAs and LHDs) • Too small to support the loading of two medium -sized ships at the same time • Security and safety concerns due to adjacent civilian small craft channel. NAVAL WEAPONS STATION SEAL BEACH Proposed Alternatives 1 NAVAL WEAPONS STATION SEAL BEACH . • • Preferred Alternative (Alternative 1)• 4eBe�e \ R4 FYI a} - Ro4ofedtl PmM- mun�pon Pror Pmp�feE MOnrrng pprpM1�n Rgv[e� lladm9 ' �� — pgpnrn Carwelk ; FrNnrp iemrrry Barmr wMK N.rrBmnner — RgroaN Bmokwarer E�Mnp NTCr1 Foen 1 A FWO BMpe I • NAVAL•WEAPONS STATION SEAL BEACH - Environmental Assessment (EA) Issues Addressed • Land use Water resources AA NAVAL WEAPONS STATION SEAL BEACH Draft EA Findings - Project Construction No significant environmental impact, with avoidance, minimization, and mitigation efforts employed when necessary: Biological Resources • Wildlife monitors would be in place and would stop construction if marine mammals enter project area. • Displaced eelgrass beds in Anaheim Bay would be replaced. Noise • Pile driving would be the primary noise source. At distance to nearest homes, noise would be at background traffic levels. Boat Traffic • Construction would be phased so that small craft navigation channel to Huntington Harbour remains available. NAVAL WEAPONS STATION SEAL BEACH Draft EA Findings - Project Operations No significant environmental impact, with avoidance, minimization, and mitigation efforts employed when necessary: Ocean Circulation • Flushing times for Huntington Harbour and the Seal Beach National Wildlife Refuge would improve. View • Some views from Seal Way homes would be temporarily blocked when some types of ship are in port. Beach Erosion • The project would not impact beach erosion. Air Emissions • Air emissions would increase due to additional and larger ships visiting, but would remain within the area's AQMD emissions budget. NAVAL WEAPONS STATION SEAL BEACH .... Environmental Assessment (EA)• EA and Public Review Timeline • Public Scoping Period - March 18 -April 18, 2016 (complete) • Public Meeting -April 7, 2016 (complete) • Draft Environmental Assessment Released - April 14, 2017 • Available online at: www.SealBeachEA.com • Public Comment Period - April 14 - May 30, 2017 • Public Meeting - May 16, 2017 @ Marina Center • Final Environmental Assessment - Est. Early 2018