Loading...
HomeMy WebLinkAboutFINAL 2018 5 YEAR CIP_5.25.17Programs     Beach and Pier  Building and Facilities  Parks  Sewer  Storm Drain  Streets and Transportation  Water Systems City of Seal Beach Proposed 5 Year Capital Improvement Program FY 2017/2018 – 2021/2022 City of Seal Beach City of Seal Beach TABLE OF CONTENTS City Council and Executive Team ………………………………… 2 Message from the Director ………………………………… 3 – 4 CIP Accomplishments ………………………………… 5 – 6 CIP Process ………………………………… 7 – 8 CIP Summary Schedule By Fund Type ………………………………… 9 – 13 By Project Type ………………………………… 14 – 16 SECTION I - BEACH AND PIER Summary Sheet ………………………………… 17 Individual Project Detail Sheets ………………………………… 18 – 20 SECTION II - BUILDING AND FACILITIES Summary Sheet ………………………………… 21 Individual Project Detail Sheets ………………………………… 22 – 30 SECTION III - PARKS Summary Sheet ………………………………… 31 Individual Project Detail Sheets ………………………………… 32 – 33 SECTION IV - SEWER Summary Sheet ………………………………… 34 Individual Project Detail Sheets ………………………………… 35 – 38 SECTION V – STORM DRAIN Summary Sheet ………………………………… 39 Individual Project Detail Sheets ………………………………… 40 – 44 SECTION VI - STREETS AND TRANSPORTATION Summary Sheet ………………………………… 45 – 47 Individual Project Detail Sheets ………………………………… 48 – 68 SECTION VII - WATER Summary Sheet ………………………………… 69 – 70 Individual Project Detail Sheets ………………………………… 71 – 83 SECTION VIII – UNFUNDED PROJECTS/NEEDS Summary Sheet ………………………………… 84 1 City of Seal Beach City of Seal Beach Principal Officers City Council Sandra Massa-Lavitt Mayor Mike Varipapa Mayor Pro-Tem Ellery Deaton Council Member Schelly Sustarsic Council Member Thomas Moore Council Member City Executive Team Jill R. Ingram City Manager Joe Bailey Marine Safety Chief Victoria L. Beatley Finance Director/City Treasurer Patrick Gallegos Assistant City Manager Crystal Landavazo Interim Director of Community Development Joe Miller Interim Chief of Police Steve Myrter Director of Public Works Robin Roberts City Clerk Craig A. Steele City Attorney 2 City of Seal Beach City of Seal Beach June 1, 2017 Message from the Director of Public Works: Honorable Mayor, Members of the City Council and Citizens of the City of Seal Beach: The Department of Public Works is pleased to submit the fiscal year 2017/18 through 2021/22 5-year Capital Improvement Program (CIP) for the City of Seal Beach. The CIP is a vital planning document that outlines priorities for the City’s infrastructure. The first year of the CIP is identical to the Capital Improvements section of the City’s FY 2017-18 budget document. Whereas the budget is the plan for the next 12 months of the City, the CIP strategically plans and prioritizes projects to maximize the efficient use of funds. The financial resources of the City vary with the economy, but the needs of the infrastructure and community are consistent. The CIP generally presents a balanced approach to invest in the City’s infrastructure by proactively managing the assets and planning the most effective method of expenditure. The Staff is looking for innovative ways to deliver on needs for the City, in an efficient delivery method that does not impact City residents quality of life nor business and visitors ability to enjoy the City as well. The Capital Improvement Program allows for planning of large expenditures and aggressive pursuit of grant funding to augment City funds. Projects within the CIP are divided into seven (7) operational areas; Beach & Pier, Building & Facilities, Parks, Sewer System, Storm Drain System, Street & Transportation and Water. The proposed CIP includes over 60 projects to be delivered during the next 5 years totaling over $33 million in value. The funding sources start with local funds including the City’s General Fund, grants, enterprise accounts, and fees. Those funds are aggressively augmented with grants. Numerous unfunded needs are currently identified and listed in the unfunded needs section totaling more than $206 million. Unfunded projects are crucial to identifying and planning future needs for the City. Those needs should be and are reviewed annually to locate funding sources. Responsible planning of the Capital Improvement Program will always include unfunded needs, and further highlight the importance of efficiency with expenditure of the City’s fiscal resources. The ultimate goal for the Capital Improvements Program is to effectively manage the City’s physical assets by delivering capital projects that meet schedule, stay within budget, and minimize the impact to the public. Not every alternate funding source is utilized as they sometimes add in duration and can attach conditions in exchange for the funding. Grant opportunities are individually assessed for viability. 3 City of Seal Beach City of Seal Beach The amount of expenditures outlined within this Capital Improvement Program is consistent with the expenditures from previous years. The City of Seal Beach has aggressively constructed capital improvements without excessive amounts of bonds or loans. The Pavement Management Program countywide indicated among the Cities in Orange County the condition of the streets in Seal Beach is among the highest in the county. The Capital Improvement Program is delivered as a team effort by the staff from the entire City. The Public Works Department is staffed with four engineers and 16 technical and maintenance staff. In addition to the typical construction obstacles, every project expends effort and resources on obtaining funding, property ownership, environmental processing, etc. I would like to thank the staff for their hard work and dedication that makes all of these projects possible. _____________________________ Steve Myrter, P.E. Director of Public Works 4 City of Seal Beach City of Seal Beach CIP Accomplishments In Fiscal Year 2016/17 the City completed seven Capital Improvement Projects totaling almost $1.7 million in value with a overall savings of over $250,000. A list of those projects is below: Project No. Description Budget Expenditures BG1401/1402 Council Chambers and Seal Beach TV 3 Remodel Projects $525,000 $398,335 PR1602 Eisenhower Tot Lot Rehabilitation Project $250,000 $220,198 SD1601 West End Pump Station Improvement Project $250,000 $193,637 ST1408 Traffic Management Center Update $661,720 $660,109 ST1601 Annual Slurry Seal Project $140,000 $106,237 ST1604 Annual Concrete Repair Project $75,000 $67,886 ST1510 PCH and Anderson Landscape Improvements $50,000 $49,926 $1,951,720 $1,696,328 Project Savings $255,392 The City also has eight (8) capital projects currently in design, near completion, or construction phase and are as follows: Project No. Project Name Phase SS1301 Sewer Master Plan Update Design SS1401 Sewer Rate Update Design WT1501 Water Rate Update Design WT1607 7th Street Alley Water/Sewer Line Replacement Project Near Completion WT0904 Beverly Manor Booster Station Improvements Project Design BP1002 Pier Remodel Design ST1509/1610 Westminster Ave. Street and Median Improvements Construction 5 City of Seal Beach City of Seal Beach The City’s CIP consists of the following seven major areas: 1. Beach & Pier 2. Building & Facilities 3. Parks 4. Sewer 5. Storm Drain 6. Streets & Transportation 7. Water Beach & Pier. The City’s Beach and Pier are landmark tourist attractions that draw approximately 2 million visitors per year. The Pier is made up of a wooden deck with lighting, utility infrastructure, and a restaurant. The beach includes 3 parking lots, approximately 2 miles of dry sand beach, 2 sets of public restrooms, 2 parks, and landscaping. Building & Facilities. The City’s Building and Facilities house employees, visitors, tenants and business owners citywide in 22 structures. Structures include City Hall, Police Station, 2 Fire Stations, city maintenance facilities, and recreation and community centers. A facility master plan was adopted in FY 2011/12. Projects within this CIP were identified within that Facility Master Plan. Others are included in the unfunded needs. Parks. The City’s Park infrastructure provides landscaping and the City’s Urban Forest. Seal Beach has 70 park and landscape sites citywide. The forestry has over 150 species to maintain and nourish. Three projects are included within this year’s CIP. Sewer. The City provides sewer collection for the residents of Seal Beach and passes the raw sewage to the Orange County Sanitation District for treatment. The City’s Sewer System has more than 160,000 feet of pipe, 700 manholes, and 7 pump stations. Storm Drain. The City’s Storm Drain System collects surface runoff in 11 drainage areas throughout the City with one Storm Drain pump station. Streets & Transportation. The City’s Streets and Transportation System is responsible for more than 101 lane miles, continuous traffic flow, landscaped medians, traffic signals and utility work within the streets. Water. The Water Division conveys potable water to all residents, business owners, tenants and the Naval Base. The infrastructure includes two booster stations, two reservoirs, four wells, telemetry, valves, pressure regulation stations, fire hydrants, meters and control center. 6 City of Seal Beach City of Seal Beach CIP PROCESS The Capital Improvement Program is comprised of construction projects and equipment purchases (excluding vehicles) which cost $10,000 or more. The CIP also includes activities that can be planned for or occur on an irregular or one time basis. Minor capital outlays of less than $10,000 and reoccurring maintenance activities will be included with the operation and maintenance budget. The Capital Improvement Program is a plan that identifies the capital projects to be funded during a five year planning horizon. The CIP is updated annually, and the first year of the plan serves as the current year capital budget. The CIP is a planning document to help City Council systematically schedule and finance capital projects to ensure cost-effectiveness as well as conformance with established policies. The CIP is organized into the same functional groups used for the operating programs. The CIP reflects a balance between capital replacement projects that repair, replace, or enhance existing facilities, equipment or infrastructure, and capital facility projects that significantly expand or add to the City’s existing fixed assets. The CIP will emphasize project planning with projects typically progressing through the following phases: 1. Identification of Project. Improvements within the Capital Improvement Plan are generated or identified as follows: Advanced planning: Most of the improvements are identified within a Planning document or Master Plan. Many master plans are required by funding agencies. All master plans are adopted by the City Council. Currently the City has master plans adopted as follows:  2005 Sewer Master Plan (Currently being updated)  2008 Master Plan of Drainage  2010 Water Rate Study  2012 Water Master Plan  2011 Street Tree Master Plan  2011 Facility Master Plan  2012 Fleet Management Plan  2013 Concrete Rehabilitation Master Plan  2013 Park and Community Services Master Plan  2016 Pavement Management Plan  2015 Pier Condition Assessment  2016 Urban Water Management Plan 2. Reaction to need or opportunity: Projects may originate through a need or opportunity. An example of a project that was delivered as a result of a need and opportunity is the El Nino Storm Prep that occurred this year. 3. Desire from the community: Projects may originate through a desire from the community. One example in the proposed CIP is PCH and Anderson Landscaping Improvements project. 7 City of Seal Beach City of Seal Beach Finally, before a project can be identified for inclusion into the CIP, funding for the project must be secured, or it will remain on the unfunded list of the CIP. A. Permitting and Environmental Analysis. Environmental Analysis is performed on every CIP project to comply with the California Environmental Quality Act (CEQA) and in some cases with the National Environmental Quality Act (NEPA). Permitting is required from a variety of agencies and is assessed for every project. Permits may be necessary from agencies such as the California Coastal Commission, Caltrans, Department of Fish and Wildlife, Army Corps of Engineers, State Lands Commission, County of Orange, etc. B. Design. Projects are designed in-house with public works staff wherever possible. The City’s engineering staff in many cases does not have the available time or resources to perform the design, or the expertise to perform the design. In these cases, the City will locate and secure the service of an appropriately qualified consultant. Construction documents including plans and specifications are prepared and approved by the City Council prior to beginning construction. C. Construction. Improvements will be constructed in a manner that will minimize impacts to the residents. The City employs a construction manager (with materials testing) to ensure that all construction projects are carried out safely, and constructed to meet the construction documents. D. Incorporate into maintenance activities. All CIP projects are incorporated into the maintenance activities of the City. The maintenance staff will incorporate any new facilities into all routine inspections and ongoing maintenance programs. Staff will include new facilities into future maintenance budgets. E. Equipment Acquisitions. Equipment acquisitions such as vehicles, heavy machinery, computers, office furnishings, and other equipment items are included in the Capital Improvement Program and are acquired and installed independently from construction contracts. 8 CI P S U M M A R Y S C H E D U L E BY F U N D I N G T Y P E Fu n d i n g S o u r c e Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 BudgetTotalPreviously Approved Carryover Ge n e r a l F u n d BG 0 9 0 4 N e w S w i m m i n g P o o l 4, 7 8 2 , 4 0 0 $ 4,782,400$ Yes BG 1 5 0 4 C i t y w i d e F i n a n c i a l I n f o r m a t i o n S y s t e m 19 0 , 0 0 0 $ 50 0 , 0 0 0 $ 10 0 , 0 0 0 $ 790,000$ Yes BG 1 6 0 3 C o u n t y w i d e 8 0 0 m h z A g r e e m e n t 18 0 , 0 0 0 $ 180,000$ Yes BG 1 8 0 1 C i t y F a c i l i t i e s R o o f R e p a i r P r o j e c t 35 2 , 7 0 0 $ 352,700$ BG 1 8 0 3 M a r i n a C o m m u n i t y C e n t e r H V A C R e p l a c e m e n t 30 , 0 0 0 $ 30,000$ BG 1 8 0 4 P o l i c e D e p t . E l e c t r i c V e h i c l e C h a r g i n g S t a t i o n 30 , 0 0 0 $ 30,000$ BG 1 8 0 5 S e n i o r C e n t e r I m p r o v e m e n t P r o j e c t 50 , 0 0 0 $ 50,000$ EM 1 6 0 3 T e n n i s C e n t e r W o r k o u t R o o m a n d L o c k e r R o o m E m e r g e n c y R e p a i r s 15 , 0 0 0 $ 15,000$ Yes EM 1 7 0 1 W e s t E n d P u m p S t a t i o n E m e r g e n c y P r o j e c t 59 , 0 0 0 $ 59,000$ PR 1 7 0 1 A n n u a l C i t y w i d e C ou r t R e h a b i l i t a t i o n 30 , 0 0 0 $ 30,000$ Yes PR 1 8 0 1 A n n u a l C i t y w i d e C ou r t R e h a b i l i t a t i o n 30 , 0 0 0 $ 30 , 0 0 0 $ 30 , 0 0 0 $ 30 , 0 0 0 $ 30,000 $ 150,000$ SD 1 8 0 1 W e s t E n d P u m p S t a t i o n I m p r o v e m e n t s 20 0 , 0 0 0 $ 200,000$ SD 1 8 0 2 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s M a r i n a D r i v e 10 0 , 0 0 0 $ 100,000$ SD 1 8 0 3 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s S e a l W a y 10 0 , 0 0 0 $ 100,000$ SD 1 8 0 4 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s C o l l e g e P a r k E a s t 10 0 , 0 0 0 $ 100,000$ ST 1 2 0 7 S e a l B e a c h C o m p r e h e n s i v e P a r k i n g M a n a g e m e n t P l a n 64 2 , 0 0 0 $ 642,000$ Yes ST 1 3 0 2 U t i l i t y U n d e r g r ou n d i n g P r o j e c t 10 , 0 0 0 $ 10,000$ Yes ST 1 7 0 7 A n n u a l S t r e e t T r e e P l a n t i n g P r o g r a m 19 , 0 0 0 $ 19,000$ Yes ST 1 8 0 7 A n n u a l S t r e e t T r e e P l a n t i n g P r o g r a m 20 , 0 0 0 $ 20 , 0 0 0 $ 20 , 0 0 0 $ 20 , 0 0 0 $ 20,000 $ 100,000$ 6, 9 4 0 , 1 0 0 $ 55 0 , 0 0 0 $ 15 0 , 0 0 0 $ 50 , 0 0 0 $ 50,000 $ 7,740,100$ St a t e G a s T a x ST 1 5 0 8 O l d T o w n P a r k i n g a n d S i g n a g e I m p r o v e m e n t s 91 , 0 0 0 $ 91,000$ Yes ST 1 6 0 6 A n n u a l S i g n a g e R e p l a c e m e n t P r o g r a m 8, 8 0 0 $ 8,800$ Yes ST 1 6 1 0 W e s t m i n s t e r A v e n u e Re h a b i l i t a t i o n ( W C L t o S e a l B e a c h B l v d ) 19 2 , 0 0 0 $ 192,000$ Yes ST 1 7 0 1 A n n u a l S l u r r y S e a l P r o g r a m 15 0 , 0 0 0 $ 150,000$ Yes ST 1 7 0 4 A n n u a l C o n c r e t e R e p a i r P r o g r a m 50 , 0 0 0 $ 50,000$ Yes ST 1 7 0 5 A n n u a l S t r i p i n g P r o g r a m 25 , 0 0 0 $ 25,000$ Yes ST 1 7 0 8 W e s t m i n s t e r / 1 7 t h S t . C o r r i d o r T r a f f i c S i g n a l S y n c h r o n i z a t i o n 50 , 0 0 0 $ 50,000$ Yes ST 1 8 0 1 A n n u a l S l u r r y S e a l P r o g r a m 25 0 , 0 0 0 $ 10 0 , 0 0 0 $ 10 0 , 0 0 0 $ 10 0 , 0 0 0 $ 100,000 $ 650,000$ ST 1 8 0 2 A n n u a l C o n c r e t e R e p a i r P r o g r a m 75 , 0 0 0 $ 50 , 0 0 0 $ 50 , 0 0 0 $ 50 , 0 0 0 $ 50,000 $ 275,000$ ST 1 8 0 5 A n n u a l S t r i p i n g P r o g r a m 25 , 0 0 0 $ 25 , 0 0 0 $ 25 , 0 0 0 $ 25 , 0 0 0 $ 25,000 $ 125,000$ ST 1 8 0 6 A n n u a l S i g n a g e R e p l a c e m e n t P r o g r a m 10 , 0 0 0 $ 10 , 0 0 0 $ 10 , 0 0 0 $ 10,000 $ 40,000$ 91 6 , 8 0 0 $ 18 5 , 0 0 0 $ 18 5 , 0 0 0 $ 18 5 , 0 0 0 $ 185,000 $ 1,656,800$ FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y of Seal Beach 9 CI P S U M M A R Y S C H E D U L E BY F U N D I N G T Y P E Fu n d i n g S o u r c e Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 BudgetTotalPreviously Approved Carryover FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y of Seal Beach Me a s u r e M 2 F u n d s ST 1 5 0 9 W e s t m i n s t e r A v e M e d i a n I m p r o v e m e n t 11 9 , 0 0 0 $ 119,000$ Yes ST 1 6 0 2 L o c a l S t r e e t R e s u r f a c i n g P r o g r a m 27 0 , 0 0 0 $ 270,000$ Yes ST 1 6 1 0 W e s t m i n s t e r A v e n u e R e h a b i l i t a t i on ( W C L t o S e a l B e a c h B l v d ) 38 8 , 6 0 0 $ 388,600$ Yes ST 1 7 0 2 L o c a l S t r e e t R e s u r f a c i n g P r o g r a m 17 5 , 0 0 0 $ 27 5 , 0 0 0 $ 27 5 , 0 0 0 $ 27 5 , 0 0 0 $ 275,000 $ 1,275,000$ Yes ST 1 7 0 3 A r t e r i a l S t r e e t R e s u r f a c i n g P r o g r a m 20 0 , 0 0 0 $ 20 0 , 0 0 0 $ 20 0 , 0 0 0 $ 20 0 , 0 0 0 $ 200,000 $ 1,000,000$ Yes ST 1 8 0 8 N e w T r a f f i c S i g n a l B a t t e r y B a c k - u p P r o j e c t 10 0 , 0 0 0 $ 100,000$ 1, 2 5 2 , 6 0 0 $ 47 5 , 0 0 0 $ 47 5 , 0 0 0 $ 47 5 , 0 0 0 $ 475,000 $ 3,152,600$ Se w e r C a p i t a l F u n d BP 1 0 0 2 P i e r R e m o d e l P r o j e c t 62 2 , 0 0 0 $ 622,000$ Yes BP 1 1 0 2 L o c a l C o a s t a l P l a n 80 , 0 0 0 $ 80,000$ Yes SS 1 3 0 1 S e w e r S y s t e m M a s t e r P l a n U p d a t e 66 , 0 0 0 $ 66,000$ Yes SS 1 4 0 1 S e w e r S y s t e m R a t e S t u d y 64 , 0 0 0 $ 64,000$ Yes SS 1 6 0 1 A n n u a l S e w e r M a n h o l e Re h a b i l i t a t i o n P r o g r a m 10 , 0 0 0 $ 10 , 0 0 0 $ 10 , 0 0 0 $ 10 , 0 0 0 $ 10,000 $ 50,000$ Yes SS 1 8 0 1 C i t y Y a r d R o o f R e p a i r 25 , 0 0 0 $ 25,000$ W T 1 8 0 1 S C A D A I m p r o v e m e n t U p g r a d e P r o j e c t 10 0 , 0 0 0 $ 100,000$ 96 7 , 0 0 0 $ 10 , 0 0 0 $ 10 , 0 0 0 $ 10 , 0 0 0 $ 10,000 $ 1,007,000$ Wa t e r C a p i t a l F u n d BP 1 0 0 2 P i e r R e m o d e l P r o j e c t 57 7 , 0 0 0 $ 577,000$ Yes BP 1 1 0 2 L o c a l C o a s t a l P l a n 80 , 0 0 0 $ 80,000$ Yes SS 1 8 0 1 C i t y Y a r d R o o f R e p a i r 25 , 0 0 0 $ 25,000$ W T 0 9 0 4 B o o s t e r S t a t i o n R e h a b . - B e v e r l y M a n o r 5, 2 0 0 , 0 0 0 $ 5,200,000$ Yes WT 1 3 0 1 M a i n L i n e R e p l a c e m e n t H e l l m a n R a n c h 51 , 0 0 0 $ 50 0 , 0 0 0 $ 2, 5 0 0 , 0 0 0 $ 3,051,000$ Yes WT 1 5 0 1 W a t e r S y s t e m R a t e U p d a t e 73 , 0 0 0 $ 73,000$ Yes WT 1 5 0 4 C i t y W i d e W a t e r M e t e r R e p l a c e m e n t 34 , 0 0 0 $ 34,000$ Yes WT 1 6 0 2 L e i s u r e W o r l d W e l l I m p r o v e m e n t s 70 0 , 0 0 0 $ 700,000$ Yes WT 1 6 0 3 W a t e r W e l l R e h a b . - B o l s a C h i c a W e l l 75 0 , 0 0 0 $ 750,000$ Yes WT 1 6 0 5 N a v y R e s e r v o i r C h l o r i n a t i o n S y s t e m U p g r a d e s 14 0 , 0 0 0 $ 140,000$ Yes WT 1 6 0 6 W a t e r V a l v e R e p l a c e m e n t P r o g r a m 42 , 5 0 0 $ 42,500$ Yes WT 1 7 0 1 W e s t O r a n g e C o u n t y C o n n e c t o r W a t e r l i n e E x t e n s i o n 67 5 , 0 0 0 $ 675,000$ Yes WT 1 7 0 2 W e s t m i n s t e r A v e . W a t e r M a i n R e p l a c e m e n t 2, 8 8 4 , 0 0 0 $ 2,884,000$ Yes WT 1 7 0 3 4 0 5 W i d e n i n g W a t e r L i n e R e c o n f i g u r a t i o n 75 0 , 0 0 0 $ 750,000$ Yes WT 1 7 0 4 L a m p s o n A v e . W a t e r M a i n R e p l a c e m e n t 1, 3 4 0 , 0 0 0 $ 1,340,000$ Yes WT 1 8 0 1 S C A D A I m p r o v e m e n t P r o g r a m 10 0 , 0 0 0 $ 100,000$ 12 , 7 2 1 , 5 0 0 $ 50 0 , 0 0 0 $ 2, 5 0 0 , 0 0 0 $ 70 0 , 0 0 0 $ 16,421,500$ 10 CI P S U M M A R Y S C H E D U L E BY F U N D I N G T Y P E Fu n d i n g S o u r c e Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 BudgetTotalPreviously Approved Carryover FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y of Seal Beach Tr a f f i c I m p a c t F e e s ( F u n d 0 4 9 ) ST 1 2 0 7 S e a l B e a c h C o m p r e h e n s i v e P a r k i n g M a n a g e m e n t P l a n 35 , 0 0 0 $ 35,000$ Yes 35 , 0 0 0 $ 35,000$ Se a l B e a c h C a b l e F o u n d a t i o n F e e s ( F u n d 5 0 ) BG 1 8 0 2 A u d i o / V i s u a l C o u n c i l C h a m b e r s U p g r a d e 30 , 0 0 0 $ 30,000$ Yes 30 , 0 0 0 $ 30,000$ Gr a n t s ( F u n d 0 8 0 ) ST 1 4 0 8 T r a f f i c M a n a g e m e n t C e n t e r U p g r a d e s 68 , 0 0 0 $ 68,000$ Yes ST 1 6 1 0 W e s t m i n s t e r A v e n u e Re h a b i l i t a t i o n ( W C L t o S e a l B e a c h B l v d ) 48 1 , 0 0 0 $ 481,000$ Yes ST 1 7 0 8 W e s t m i n s t e r / 1 7 t h S t . C o r r i d o r T r a f f i c S i g n a l S y n c h r o n i z a t i o n 23 1 , 0 0 0 $ 231,000$ Yes 78 0 , 0 0 0 $ 780,000$ CF D L a n d s c a p e ( F u n d 2 0 9 ) ST 1 5 0 9 W e s t m i n s t e r A v e n u e M e d i a n I m p r o v e m e n t s 12 2 , 0 0 0 $ 122,000$ Yes 12 2 , 0 0 0 $ 122,000$ Ti d e l a n d s ( F u n d 0 3 4 ) BP 1 0 0 2 P i e r R e m o d e l P r o j e c t 2, 5 3 1 , 0 0 0 $ 2,531,000$ Yes BP 1 1 0 2 L o c a l C o a s t a l P l a n 80 , 0 0 0 $ 80,000$ Yes BP 1 8 0 1 B o a r d w a l k B l o c k w a l l R e p l a c e m e n t 50 , 0 0 0 $ 50,000$ 2, 6 6 1 , 0 0 0 $ 2,661,000$ TO T A L 2 6 , 4 2 6 , 0 0 0 $ 1, 7 2 0 , 0 0 0 $ 3, 3 2 0 , 0 0 0 $ 1, 4 2 0 , 0 0 0 $ 720,000 $ 33,606,000$ 11 Fu n d i n g S o u r c e Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t 5-year total Ge n e r a l F u n d 6, 9 4 0 , 1 0 0 $ 5 5 0 , 0 0 0 $ 1 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 7 , 7 4 0 , 1 0 0 $ Ci t y T r a f f i c I m p a c t F e e s 35 , 0 0 0 $ - $ - $ - $ - $ 35,000$ St a t e G a s T a x 91 6 , 8 0 0 $ 18 5 , 0 0 0 $ 18 5 , 0 0 0 $ 18 5 , 0 0 0 $ 18 5 , 0 0 0 $ 1,656,800$ Me a s u r e M 2 1, 2 5 2 , 6 0 0 $ 4 7 5 , 0 0 0 $ 4 7 5 , 0 0 0 $ 4 7 5 , 0 0 0 $ 4 7 5 , 0 0 0 $ 3 , 1 5 2 , 6 0 0 $ Se w e r C a p i t a l 96 7 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 , 0 0 7 , 0 0 0 $ Wa t e r C a p i t a l 12 , 7 2 1 , 5 0 0 $ 50 0 , 0 0 0 $ 2, 5 0 0 , 0 0 0 $ 70 0 , 0 0 0 $ - $ 1 6 , 4 2 1 , 5 0 0 $ Se a l B e a c h C a b l e F o u n d a t i o n 30 , 0 0 0 $ - $ - $ - $ - $ 30,000$ Gr a n t s 78 0 , 0 0 0 $ - $ - $ - $ - $ 780,000$ Co m m u n i t y F a c i l i t i e s D i s t r i c t 12 2 , 0 0 0 $ - $ - $ - $ - $ 122,000$ Ti d e l a n d s 2, 6 6 1 , 0 0 0 $ - $ - $ - $ - $ 2 , 6 6 1 , 0 0 0 $ TO T A L 26 , 4 2 6 , 0 0 0 $ 1, 7 2 0 , 0 0 0 $ 3, 3 2 0 , 0 0 0 $ 1, 4 2 0 , 0 0 0 $ 72 0 , 0 0 0 $ 33,606,000$ CI P S U M M A R Y S C H E D U L E BY F U N D I N G T Y P E FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h 12 CI P S U M M A R Y S C H E D U L E BY F U N D I N G T Y P E FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h Ge n e r a l  Fu n d   23 . 2 % Ci t y  Tr a f f i c  Im p a c t  Fe e s 0. 4 % St a t e  Ga s  Ta x 3. 0 % Me a s u r e  M2 4. 2 % Ti d e l a n d s 10 . 8 % Se w e r  Ca p t i a l   5. 3 % Wa t e r  Ca p i t a l   47 . 8 % SB T V  Fu n d s 0. 9 % Gr a n t s 3. 9 % Co m m u n i t y  Fa c i l i t i e s   Di s t r i c t 0. 5 % 20 1 7 / 1 8  CI P  BY  FU N D I N G  SO U R C E 13 CI P S U M M A R Y S C H E D U L E BY P R O J E C T T Y P E Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t P r o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Total Previously Approved Carryover Bu i l d i n g s a n d F a c i l i t i e s BG 0 9 0 4 N e w S w i m m i n g P o o l 4, 7 8 2 , 4 0 0 $ 4,782,400$ Yes BG 1 5 0 4 C i t y w i d e F i n a n c i a l I n f o r m a t i o n S y s t e m 1 9 0 , 0 0 0 $ 5 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 7 9 0 , 0 0 0 $ Yes BG 1 6 0 3 C o u n t y w i d e 8 0 0 m H z A g r e e m e n t 18 0 , 0 0 0 $ 180,000$ Yes BG 1 8 0 1 C i t y F a c i l i t i e s R o o f R e p a i r P r o j e c t 35 2 , 7 0 0 $ 352,700$ BG 1 8 0 2 A u d i o / V i s u a l C o u n c i l C h a m b e r s U p g r a d e 3 0 , 0 0 0 $ 30,000$ BG 1 8 0 3 M a r i n a C o m m u n i t y C e n t e r H V A C R e p l a c e m e n t 3 0 , 0 0 0 $ 30,000$ BG 1 8 0 4 P o l i c e D e p t . E l e c t r i c V e h i c l e C h a r g i n g S t a t i o n 3 0 , 0 0 0 $ 30,000$ BG 1 8 0 5 S e n i o r C e n t e r I m p r o v e m e n t P r o j e c t 5 0 , 0 0 0 $ 50,000$ EM 1 6 0 3 T e n n i s C e n t e r W o r k o u t R o o m a n d L o c k e r R o o m E m e r g e n c y R e p a i r s 1 5 , 0 0 0 $ 15,000$ Yes 5, 6 6 0 , 1 0 0 $ 50 0 , 0 0 0 $ 10 0 , 0 0 0 $ 6,260,100$ Be a c h a n d P i e r BP 1 0 0 2 P i e r U t i l i t y U p g r a d e P r o j e c t 3, 7 3 0 , 0 0 0 $ 3,730,000$ Yes BP 1 1 0 2 L o c a l C o a s t a l P l a n 24 0 , 0 0 0 $ 240,000$ Yes BP 1 8 0 1 B o a r d w a l k B l o c k w a l l R e p l a c e m e n t 50 , 0 0 0 $ 50,000$ 4, 0 2 0 , 0 0 0 $ 4,020,000$ Pa r k s PR 1 7 0 1 A n n u a l C i t y w i d e C o u r t R e h a b i l i t a t i o n 30 , 0 0 0 $ 30,000$ Yes PR 1 8 0 1 A n n u a l C i t y w i d e C o u r t R e h a b i l i t a t i o n 30 , 0 0 0 $ 30 , 0 0 0 $ 30 , 0 0 0 $ 30 , 0 0 0 $ 30,000 $ 150,000$ 60 , 0 0 0 $ 30 , 0 0 0 $ 30 , 0 0 0 $ 30 , 0 0 0 $ 30,000 $ 180,000$ St o r m D r a i n EM 17 0 1 W e s t E n d P u m p S t a t i o n E m e r g e n c y P r o j ec t 59 , 0 0 0 $ 59,000$ Yes SD 1 8 0 1 W e s t E n d P u m p S t a t i o n I m p r o v e m e n t s 20 0 , 0 0 0 $ 200,000$ SD 1 8 0 2 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s M a r i n a D r i v e 10 0 , 0 0 0 $ 100,000$ SD 1 8 0 3 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s S e a l W a y 10 0 , 0 0 0 $ 100,000$ SD 1 8 0 4 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s C o l l e g e P a r k E a s t 10 0 , 0 0 0 $ 100,000$ 55 9 , 0 0 0 $ 559,000$ Pr o j e c t N u m b e r & N a m e FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h 14 CI P S U M M A R Y S C H E D U L E BY P R O J E C T T Y P E Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t P r o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Total Previously Approved Carryover Pr o j e c t N u m b e r & N a m e FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h Se w e r S y s t e m SS 1 3 0 1 S e w e r S y s t e m M a s t e r P l a n U p d a t e 6 6 , 0 0 0 $ 66,000$ Yes SS 1 4 0 1 S e w e r R a t e S t u d y 6 4 , 0 0 0 $ 64,000$ Yes SS 1 6 0 1 A n n u a l M a n h o l e R e h a b i l i t a t i o n 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 5 0 , 0 0 0 $ Yes SS 1 8 0 1 C i t y Y a r d R o o f R e p a i r 5 0 , 0 0 0 $ 50,000$ 19 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 2 3 0 , 0 0 0 $ St r e e t s a n d T r a n s p o r t a t i o n ST 1 2 0 7 S e a l B e a c h C o m p r e h e n s i v e P a r k i n g M a n a g e m e n t P l a n 6 7 7 , 0 0 0 $ 677,000$ Yes ST 1 3 0 2 U n d e r g r o u n d U t i l i t y P r o j e c t ( R u l e 2 0 A ) 1 0 , 0 0 0 $ 10,000$ Yes ST 1 4 0 8 T r a f f i c M a n a g e m e n t C e n t e r U p g r a d e ( 3 6 1 ) 6 8 , 0 0 0 $ 68,000$ Yes ST 1 5 0 8 O l d T o w n P a r k i n g a n d S i g n a g e I m p r o v e m e n t 9 1 , 0 0 0 $ 91,000$ Yes ST 1 5 0 9 W e s t m i n s t e r A v e M e d i a n I m p r o v e m e n t 2 4 1 , 0 0 0 $ 241,000$ Yes ST 1 6 0 2 L o c a l S t r e e t R e s u r f a c i n g P r o g r a m 2 7 0 , 0 0 0 $ 270,000$ Yes ST 1 6 0 6 A n n u a l S i g n a g e R e p l a c e m e n t 8 , 8 0 0 $ 8,800$ Yes ST 1 6 1 0 W e s t m i n s t e r A v e . R e h a b i l i t a t i o n ( W C L t o S e a l B e a c h B l v d ) 1 , 0 6 1 , 6 0 0 $ 1,061,600$ Yes ST 1 7 0 1 A n n u a l S l u r r y S e a l P r o g r a m 1 5 0 , 0 0 0 $ 150,000$ Yes ST 1 7 0 2 L o c a l S t r e e t R e s u r f a c i n g P r o g r a m 1 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 1 , 2 7 5 , 0 0 0 $ Yes ST 1 7 0 3 A r t e r i a l S t r e e t R e s u r f a c i n g P r o g r a m 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 1 , 0 0 0 , 0 0 0 $ Yes ST 1 7 0 4 A n n u a l C o n c r e t e R e p a i r P r o g r a m 5 0 , 0 0 0 $ 50,000$ Yes ST 1 7 0 5 A n n u a l S t r i p i n g P r o g r a m 2 5 , 0 0 0 $ 25,000$ Yes ST 1 7 0 7 A n n u a l S t r e e t T r e e P l a n t i n g P r o g r a m 1 9 , 0 0 0 $ 19,000$ Yes ST 1 7 0 8 W e s t m i n s t e r / 1 7 t h S t . C o r r i d o r T r a f f i c S i g n a l S y n c h r o n i z a t i o n 2 8 1 , 0 0 0 $ 281,000$ Yes ST 1 8 0 1 A n n u a l S l u r r y S e a l P r o g r a m 2 5 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 6 5 0 , 0 0 0 $ ST 1 8 0 2 A n n u a l C o n c r e t e R e p a i r P r o g r a m 75 , 0 0 0 $ 50 , 0 0 0 $ 50 , 0 0 0 $ 50, 0 0 0 $ 50,000 $ 275,000$ ST 1 8 0 5 A n n u a l S t r i p i n g P r o g r a m 25 , 0 0 0 $ 25 , 0 0 0 $ 25 , 0 0 0 $ 25 , 0 0 0 $ 25,000 $ 125,000$ ST 1 8 0 7 A n n u a l S t r e e t T r e e P l a n t i n g P r o g r a m 20 , 0 0 0 $ 20 , 0 0 0 $ 20 , 0 0 0 $ 20 , 0 0 0 $ 20,000 $ 100,000$ ST 1 8 0 6 A n n u a l S i g n a g e R e p l a c e m e n t 10 , 0 0 0 $ 10 , 0 0 0 $ 10 , 0 0 0 $ 10,000 $ 40,000$ ST 1 8 0 8 N e w T r a f f i c S i g n a l B a t t e r y B a c k - u p P r o j e c t 10 0 , 0 0 0 $ 100,000$ 3, 7 9 7 , 4 0 0 $ 68 0 , 0 0 0 $ 68 0 , 0 0 0 $ 68 0 , 0 0 0 $ 680,000 $ 6,517,400$ 15 CI P S U M M A R Y S C H E D U L E BY P R O J E C T T Y P E Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t P r o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Total Previously Approved Carryover Pr o j e c t N u m b e r & N a m e FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h Wa t e r S y s t e m W T 0 9 0 4 W a t e r S t a t i o n R e h a b . - B e v e r l y M a n o r 5 , 2 0 0 , 0 0 0 $ 5,200,000$ Yes W T 1 3 0 1 H e l l m a n R a n c h P e r m i t 5 1 , 0 0 0 $ 5 0 0 , 0 0 0 $ 2 , 5 0 0 , 0 0 0 $ 3 , 0 5 1 , 0 0 0 $ Yes W T 1 5 0 1 W a t e r R a t e S t u d y U p d a t e 7 3 , 0 0 0 $ 73,000$ Yes W T 1 5 0 4 C i t y W i d e W a t e r M e t e r R e p l a c e m e n t 3 4 , 0 0 0 $ 34,000$ Yes WT 1 6 0 2 L e i s u r e W o r l d W e l l I m p r o v e m e n t s 70 0 , 0 0 0 $ 7 0 0 , 0 0 0 $ Yes W T 1 6 0 3 W a t e r W e l l R e h a b B o l s a C h i c a 7 5 0 , 0 0 0 $ 750,000$ Yes W T 1 6 0 5 N a v y r e s e r v o i r C h l o r i n a t i o n S y s t e m U p g r a d e s 1 4 0 , 0 0 0 $ 140,000$ Yes W T 1 6 0 6 W a t e r V a l v e R e p l a c e m e n t P r o g r a m 4 2 , 5 0 0 $ 42,500$ Yes W T 1 7 0 1 W e s t O r a n g e C o u n t y C o n n e c t o r W a t e r l i n e E x t e n s i o n 6 7 5 , 0 0 0 $ 675,000$ Yes W T 1 7 0 2 W e s t m i n s t e r A v e . W a t e r M a i n R e p l a c e m e n t 2 , 8 8 4 , 0 0 0 $ 2,884,000$ Yes W T 1 7 0 3 4 0 5 W i d e n i n g W a t e r L i n e R e c o n f i g u r a t i o n 7 5 0 , 0 0 0 $ 750,000$ Yes W T 1 7 0 4 L a m p s o n A v e W a t e r M a i n R e p l a c e m e n t 1 , 3 4 0 , 0 0 0 $ 1,340,000$ Yes W T 1 8 0 1 S C A D A I m p r o v e m e n t U p g r a d e P r o j e c t 2 0 0 , 0 0 0 $ 200,000$ 12 , 1 3 9 , 5 0 0 $ 5 0 0 , 0 0 0 $ 2 , 5 0 0 , 0 0 0 $ 7 0 0 , 0 0 0 $ - $ 1 5 , 8 3 9 , 5 0 0 $ 26 , 4 2 6 , 0 0 0 $ 1 , 7 2 0 , 0 0 0 $ 3 , 3 2 0 , 0 0 0 $ 1 , 4 2 0 , 0 0 0 $ 7 2 0 , 0 0 0 $ 3 3 , 6 0 6 , 0 0 0 $ 16 SE C T I O N I - B E A C H A N D P I E R SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Approved 5-year total Be a c h a n d P i e r ( B P ) BP 1 0 0 2 P i e r R e m o d e l P r o j e c t Wa t e r C a p i t a l F u n d 57 7 , 0 0 0 $ 577,000$ Se w e r C a p i t a l F u n d 62 2 , 0 0 0 $ 622,000$ Fu n d 0 3 4 - T i d e l a n d s 2, 5 3 1 , 0 0 0 $ 2,531,000$ To t a l 3, 7 3 0 , 0 0 0 $ 3,730,000$ BP 1 1 0 2 L o c a l C o a s t a l P l a n P r e p a r a t i o n a n d P r o c e s s i n g Wa t e r C a p i t a l F u n d 80 , 0 0 0 $ 80,000$ Se w e r C a p i t a l F u n d 80 , 0 0 0 $ 80,000$ Fu n d 0 3 4 - T i d e l a n d s 80 , 0 0 0 $ 80,000$ To t a l 24 0 , 0 0 0 $ 240,000$ BP 1 8 0 1 B o a r d w a l k B l o c k w a l l R e p l a c e m e n t Fu n d 0 3 4 - T i d e l a n d s 50 , 0 0 0 $ 50,000$ 5 Y E A R T O T A L 4 , 0 2 0 , 0 0 0 $ 4,020,000$ FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h 17 PROJECT CATEGORY Beach & Pier PROJECT No.BP1002 PROJECT NAME Pier Remodel Project TOTAL PROJECT COST $3,885,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION City Pier PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:This project will reduce the need for on-going maintenance by staff. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total Water Capital 577,000$ 577,000$ Sewer Capital 622,000$ 622,000$ Fund 034 - Tidelands2,531,000$ 2,531,000$ TOTAL 3,730,000$ 3,730,000$ Expenditures Design 500,000$ 500,000$ Construction 3,230,000$ 3,230,000$ TOTAL 3,730,000$ 3,730,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 MAP PICTURE This project will upgrade the end of the pier with new decking and utility lines including all new sewer and sewer pump stations, new fire and domestic water lines, and new power lines and communication lines. These will serve the pier for a new restaurant and public restrooms. The utility lines have deteriorated over the years and constant repairs have costs increasing annually. Repairs are needed to maintain pier safety. Both fire inspection and pier inspection have identified the replacement of the fire line as urgent. New decking has been identified as needed and this will complete Phase 4 of the pier redecking. JUSTIFICATIONDESCRIPTION City of Seal Beach 18 PROJECT CATEGORY Beach & Pier PROJECT No.BP1102 PROJECT NAME Local Coastal Plan Preparation and Processing TOTAL PROJECT COST $240,000 PROJECT MANAGER Crystal Landavazo, Acting Director of CD WORKED PERFORMED BY Contract LOCATION Seal Beach Coastal Zone PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:This project will reduce annual permitting cost for the City and its residents. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total Water Capital 80,000$ 80,000$ Sewer Capital 80,000$ 80,000$ Fund 034 -Tidelands80,000$ 80,000$ TOTAL 240,000$ 240,000$ Expenditures Consultant 240,000$ 240,000$ TOTAL 240,000$ 240,000$ The City staff and consultant team will be working with the California Coastal Commission to process a Local Coastal Plan for the City of Seal Beach. By having a Local Coastal Program the City is authorized to issue Coastal Development Permits (CDP). Issuing of permits will save the City and private property owners time and money by not having to apply for the CDP directly with the California Coastal Commission. MAP PICTURE PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 19 PROJECT CATEGORY Beach & Pier PROJECT No.BP1801 PROJECT NAME Boardwalk Block Wall Replacement TOTAL PROJECT COST $50,000 PROJECT MANAGER Dave Fait, Maintenance Services Superisor WORKED PERFORMED BY Contract LOCATION Boardwalk PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:This project will reduce annual permitting cost for the City and its residents. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total Fund 034 -Tidelands50,000$ 50,000$ TOTAL 50,000$ 50,000$ Expenditures Construciton 50,000$ 50,000$ TOTAL 50,000$ 50,000$ PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To replace the blockwall on the boardwalk.The blockwalls along the boardwalk have been detoriated over the years. Some walls have missing blocks with exposed rebar. This project will build back the wall to the original hieght and length. MAP PICTURE City of Seal Beach 20 SE C T I O N I I - B U I L D I N G A N D F A C I L I T I E S SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Approved 5-year total Bu i l d i n g s a n d F a c i l i t i e s ( B G ) BG 0 9 0 4 N e w S w i m m i n g P o o l Fu n d 0 0 1 - G e n e r a l F u n d 4, 7 8 2 , 4 0 0 $ 4,782,400$ To t a l 4, 7 8 2 , 4 0 0 $ 4,782,400$ BG 1 5 0 4 C i t y w i d e F i n a n c i a l I n f o r m a t i o n S y s t e m Fu n d 0 0 1 - G e n e r a l F u n d 19 0 , 0 0 0 $ 5 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 7 9 0 , 0 0 0 $ To t a l 19 0 , 0 0 0 $ 5 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 7 9 0 , 0 0 0 $ BG 1 6 0 3 C o u n t y w i d e 8 0 0 m h z A g r e e m e n t Fu n d 0 0 1 - G e n e r a l F u n d 18 0 , 0 0 0 $ 180,000$ To t a l 18 0 , 0 0 0 $ 180,000$ BG 1 8 0 1 C i t y F a c i l i t i e s R o o f R e p a i r Fu n d 0 0 1 - G e n e r a l F u n d 35 2 , 7 0 0 $ 352,700$ To t a l 35 2 , 7 0 0 $ 352,700$ BG 1 8 0 2 A u d i o / V i s u a l C o u n i c l C h a m b e r s U p g r a d e SB T V 3 F u n d s 30 , 0 0 0 $ 30,000$ To t a l 30 , 0 0 0 $ 30,000$ BG 1 8 0 3 M a r i n a C o m m u n i t y C e n t e r H V A C R e p l a c e m e n t Fu n d 0 0 1 - G e n e r a l F u n d 30 , 0 0 0 $ 30,000$ To t a l 30 , 0 0 0 $ 30,000$ BG 1 8 0 4 P o l i c e D e p t . E l e c t r i c V e h i c l e C h a r g i n g S t a t i o n Fu n d 0 0 1 - G e n e r a l F u n d 30 , 0 0 0 $ 30,000$ To t a l 30 , 0 0 0 $ 30,000$ BG 1 8 0 5 S e n i o r C e n t e r I m p r o v e m e n t P r o j e c t Fu n d 0 0 1 - G e n e r a l F u n d 50 , 0 0 0 $ 50,000$ To t a l 50 , 0 0 0 $ 50,000$ EM 1 6 0 3 T e n n i s C e n t e r W o r k o u t a n d L o c k e r R o o m E m e r g e n c y R e p a i r s Fu n d 0 0 1 - G e n e r a l F u n d 15 , 0 0 0 $ 15,000$ To t a l 15 , 0 0 0 $ 15,000$ 5 Y E A R T O T A L 5, 6 6 0 , 1 0 0 $ 50 0 , 0 0 0 $ 10 0 , 0 0 0 $ 6,260,100$ Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t 21 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG0904 PROJECT NAME New City Swimming Pool TOTAL PROJECT COST $4,782,400 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION To Be Determined PROJECT STATUS Conceptual PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 4,782,400$ 4,782,400$ TOTAL 4,782,400$ 4,782,400$ Expenditures Design 400,000$ 400,000$ Construction 4,382,400$ 4,382,400$ TOTAL 4,782,400$ 4,782,400$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 MAP PICTURE This project will construct a new swimming pool at a location that has yet to be determined. The existing pool has ongoing maintenance with rising annual costs. The City has invested into repairs of the pool to provide a temporary repair. Construction of a new facility will better suit the needs of the community. JUSTIFICATION Undetermined. Capital outlays will be reduced for maintenance. Additional facilities may increase ongoing routine maintenance. DESCRIPTION City of Seal Beach 22 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1504 PROJECT NAME Citywide Financial Information System TOTAL PROJECT COST $790,000 PROJECT MANAGER Victoria Beatley, Director of Finance WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 190,000$ 500,000$ 100,000$ 790,000$ TOTAL 190,000$ 500,000$ 100,000$ 790,000$ Expenditures Study 190,000$ 190,000$ Migration/Acquisition 500,000$ 500,000$ Implementation 100,000$ 100,000$ TOTAL 190,000$ 500,000$ 100,000$ 790,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project is the first step in the process of replacing the financial management system. A consultant will assist with analysis of city needs and vendor selection. The City's financial management system is more than 14 years old, and does not provide effective reporting tools to comply with current citywide needs. <pic of inside Finance Dept> MAP PICTURE City of Seal Beach 23 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1603 PROJECT NAME Countywide 800mhz TOTAL PROJECT COST $180,000 PROJECT MANAGER Joe Miller, Acting Police Chief WORKED PERFORMED BY Contract LOCATION Police Station PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 180,000$ 180,000$ TOTAL 180,000$ 180,000$ Expenditures Implementation 180,000$ 180,000$ TOTAL 180,000$ 180,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION The city has 800 mhz radios that are used for emergency communication that are compatible with agencies througout the region. As a region all of the agencies are upgrading together to allow for seamless transition to new technology. The existing system has been used for more than 10 years and outlived it's usefull life. Upgrade with the region is necessary to allow emergency communication to continue. <pic of inside Finance Dept> MAP PICTURE City of Seal Beach 24 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1801 PROJECT NAME City Facilities Roof Repair Project TOTAL PROJECT COST $352,700 PROJECT MANAGER Dave Fait, Maintenance Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 352,700$ 352,700$ TOTAL 352,700$ -$ -$ 352,700$ Expenditures Construction 352,700$ 352,700$ TOTAL 352,700$ 352,700$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To replace the roofs and spot repairs at the Senior Center, Mary Wilson Library, Police Department and West End Pump Station. Due the age and recent rains experienced in late 2016 and early 2017, the roofs have leaks at the Senior Center, Mary Wilson Library, Police Department and West End Pump Station. MAP PICTURE City of Seal Beach 25 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1802 PROJECT NAME Audio Visual Council Chambers Upgrade TOTAL PROJECT COST $30,000 PROJECT MANAGER Robin Roberts, City Clerk WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 30,000$ 30,000$ TOTAL 30,000$ -$ -$ 30,000$ Expenditures Design/Integration 30,000$ 30,000$ TOTAL 30,000$ 30,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION The audio and visual equipment needs to be updated and replaced. The cost is to design and implement phase one of this project. The remaining phases will be for construction and integration. The existing computer in the Council Chambers helps operate and broadcast the public meetings. The audio and visual equipment are all outdated and need to be replaced. The equipment includes, but not limited to, are the computer hardware, document management software, microphones, lighting and voting system. MAP PICTURE City of Seal Beach 26 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1803 PROJECT NAME Marina Community Center TOTAL PROJECT COST $30,000 PROJECT MANAGER Dave Fait, Maintenance Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 30,000$ 30,000$ TOTAL 30,000$ -$ -$ 30,000$ Expenditures Construction 30,000$ 30,000$ TOTAL 30,000$ 30,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To replace two HVAC units at the Marina Center. The existing HVAC units at the Marina Center are over 17 years old. Due to the close proximity of the salt air and age, the HVAC units have failed and are beyond repair. MAP PICTURE City of Seal Beach 27 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1804 PROJECT NAME Police Department Electric Vehicle Charging Sta.TOTAL PROJECT COST $30,000 PROJECT MANAGER Dave Fait, Maintenance Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 30,000$ 30,000$ TOTAL 30,000$ -$ -$ 30,000$ Expenditures Construction 30,000$ 30,000$ TOTAL 30,000$ 30,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To install two new electric vehicle charging stations in the Police Department parking lot. In the past, the Police Department parking lot had had two electric vehicle charging stations. They were removed due to older technology and cancelled customer support from the manufacturer. Today's technology and the ever growing uses of electric vehicles, a charging station is now needed. All the existing infrastructure is still in place and will be re-used to lower the cost of installation. MAP PICTURE City of Seal Beach 28 PROJECT CATEGORY Buildings & Facilities PROJECT No.BG1805 PROJECT NAME Senior Center Improvement Project TOTAL PROJECT COST $50,000 PROJECT MANAGER Dave Fait, Maintenance Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 50,000$ 50,000$ TOTAL 50,000$ 50,000$ Expenditures Construction 50,000$ 50,000$ TOTAL 50,000$ 50,000$ To renovate the Senior Center interior.Due to the recent rain events in late 2016 and early 2017, the Senior Center experienced roof leaks which lead to damage throughout the Center. The damaged areas include, but limited to, the entire kitchen, multi-purpose room and potentially the bathrooms. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 29 PROJECT CATEGORY Buildings & Facilities PROJECT No.EM1603 PROJECT NAME Tennis Center Workout and Locker Room TOTAL PROJECT COST $15,000 Emergency Repairs PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Tennis Center PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Approved 5-year total General Fund 15,000$ 15,000$ TOTAL 15,000$ 15,000$ Expenditures Construction 15,000$ 15,000$ TOTAL 15,000$ 15,000$ To perform emergency repairs to the workout and locker rooms at the Tennis Center. At the Tennis Center, two building have suffered major termite damage to the workout and locker rooms. Structural members were comprised and therefore was red tagged for no occupancy. Per Resolution 6662 deemed this project as an emergency to repair the rooms. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 30 SE C T I O N I I I - P A R K S SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Proposed 2021- 2022 BudgetApproved 5-year total Pa r k s ( P R ) PR 1 7 0 1 A n n u a l C i t y w i d e C o u r t R e h a b il i t a t i o n Fu n d 0 0 1 - G e n e r a l F u n d 30 , 0 0 0 $ 30,000$ To t a l 30 , 0 0 0 $ 30,000$ PR 1 8 0 1 A n n u a l C i t y w i d e C o u r t R e h a b il i t a t i o n Fu n d 0 0 1 - G e n e r a l F u n d 30 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 150,000$ To t a l 30 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 150,000$ 5 Y E A R T O T A L 6 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 3 0 , 0 0 0 $ 180,000$ Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t 31 PROJECT CATEGORY Parks PROJECT No.PR1701 PROJECT NAME Citywide Court Rehabilitation (Tennis/Basketball)TOTAL PROJECT COST $30,000 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual PICTURE Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 30,000$ 30,000$ TOTAL30,000$ 30,000$ Expenditures Construction30,000$ 30,000$ TOTAL30,000$ 30,000$ To resurface tennis courts at the Tennis Center and basketball courts at various locations citywide. This will also include crack filling, final coating and painting. MAP Tennis and basketball courts need maintenance to the surface. Natural wear and tear from weather, use and time affect the surface. Depending on location and usage, the average life of a court resurface varies from 3 to 6 years. DESCRIPTIONJUSTIFICATION PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 City of Seal Beach 32 PROJECT CATEGORY Parks PROJECT No.PR1801 PROJECT NAME Citywide Court Rehabilitation (Tennis/Basketball)TOTAL PROJECT COST $150,000 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual PICTURE Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ TOTAL30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ Expenditures Construction 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ TOTAL30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 150,000$ To resurface tennis courts at the Tennis Center and basketball courts at various locations citywide. This will also include crack filling, final coating and painting. Tennis and basketball courts need maintenance to the surface. Natural wear and tear from weather, use and time affect the surface. Depending on location and usage, the average life of a court resurface varies from 3 to 6 years. MAP PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 33 SE C T I O N I V - S E W E R SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Approved 5-year total Se w e r S y s t e m ( S S ) SS 1 3 0 1 S e w e r S y s t e m M a s t e r P l a n U p d a t e Se w e r C a p i t a l F u n d 66 , 0 0 0 $ 66,000$ To t a l 66 , 0 0 0 $ 66,000$ SS 1 4 0 1 S e w e r S y s t e m R a t e S t u d y Se w e r C a p i t a l F u n d 64 , 0 0 0 $ 64,000$ To t a l 64 , 0 0 0 $ 64,000$ SS 1 6 0 1 A n n u a l S e w e r M a n h o l e R e h a b il i t a t i o n P r o j e c t Se w e r C a p i t a l F u n d 10 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 5 0 , 0 0 0 $ To t a l 10 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 5 0 , 0 0 0 $ SS 1 8 0 1 C i t y Y a r d R o o f R e p a i r Se w e r C a p i t a l F u n d 50 , 0 0 0 $ 50,000$ To t a l 50 , 0 0 0 $ 50,000$ 5 Y E A R T O T A L 1 9 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 2 3 0 , 0 0 0 $ Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t 34 PROJECT CATEGORY Sewer System PROJECT No.SS1301 PROJECT NAME Sewer System Master Plan Update TOTAL PROJECT COST $66,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Sewer Fund 66,000$ 66,000$ TOTAL 66,000$ 66,000$ Expenditures Consultant 66,000$ 66,000$ TOTAL66,000$ 66,000$ MAP PICTURE The City strategically plans for improvements to the sanitary sewer system. The sewer system master plan ensures that the CIty complies with all codes and requirements, upgrades structurally deficient and inadeguately sized sanitary sewers. Preparation of a master plan is a requirement of the CItys' Waste Discharge Requirements permit and is typically performed every 5-7 years. The most recent sanitary sewer plan was prepared in 2005. The study will update the City's Sanitary Sewer Master Plan. PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 35 PROJECT CATEGORY Sewer System PROJECT No.SS1401 PROJECT NAME Sewer System Rate Study TOTAL PROJECT COST $64,000 PROJECT MANAGER Steve Myrter, Director of Public Works WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Sewer Fund 64,000$ 64,000$ TOTAL 64,000$ 64,000$ Expenditures Consultant 80,000$ 80,000$ TOTAL80,000$ 80,000$ The study will update the City's Sanitary Sewer Rate Structure so that the appropriate fees are charged to ratepayers for the services recieved. A rate study is necessary to insure that the appropriate fees are charged for the service of the sewer system. A key component to a rate study is outreach to the rate payers regarding input towards future fees. MAP PICTURE PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 36 PROJECT CATEGORY Sewer System PROJECT No.SS1601 PROJECT NAME Annual Sewer Manhole Rehabilitation Project TOTAL PROJECT COST $50,000 PROJECT MANAGER Dave Fait, Maintenance Services Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Sewer Fund 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ TOTAL 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ Expenditures Construction 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ TOTAL 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 50,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION MAP PICTURE To repair, reline, and/or rehabilitate aged sewer manholes city wide.The majority of Sanitary Sewer Manholes were constructed throughout the city 20-40 years ago. Many are below the water table. This programs seeks to locate and rehabilitate a few of the worst manholes every year. By proactively rehabilitating the worst manholes the City will prevent failures and sewer spills. City of Seal Beach 37 PROJECT CATEGORY Sewer System PROJECT No.SS1801 PROJECT NAME City Yard Roof Repair TOTAL PROJECT COST $50,000 PROJECT MANAGER Dave Fait, Maintenance Services Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will reduce maintenance activities. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Sewer Fund 50,000$ 50,000$ TOTAL -$ Expenditures Construction 50,000$ 50,000$ TOTAL 50,000$ PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will repair the roof at a City Yard building.Due the age and recent rains experienced in late 2016 and early 2017, the roof leaked at the City Yard. MAP PICTURE City of Seal Beach 38 SE C T I O N V - S T O R M D R A I N SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 BudgetApproved 5-year total St o r m D r a i n ( S D ) EM 1 7 0 1 W e s t E n d P u m p S t a t i o n E m e r g e n c y P r o j e c t Fu n d 0 0 1 - G e n e r a l F u n d 59 , 0 0 0 $ 59,000$ To t a l 59 , 0 0 0 $ 59,000$ SD 1 8 0 1 W e s t E n d P u m p S t a t i o n I m p r o v e m e n t s Fu n d 0 0 1 - G e n e r a l F u n d 20 0 , 0 0 0 $ 200,000$ To t a l 20 0 , 0 0 0 $ 200,000$ SD 1 8 0 2 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s M a r i n a D r i v e Fu n d 0 0 1 - G e n e r a l F u n d 10 0 , 0 0 0 $ 100,000$ To t a l 10 0 , 0 0 0 $ 100,000$ SD 1 8 0 3 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s S e a l W a y Fu n d 0 0 1 - G e n e r a l F u n d 10 0 , 0 0 0 $ 100,000$ To t a l 10 0 , 0 0 0 $ 100,000$ SD 1 8 0 4 F o c u s P r e l i m i n a r y D e s i g n A n a l y s i s C o l l e g e P a r k E a s t Fu n d 0 3 4 - T i d e l a n d s 10 0 , 0 0 0 $ 100,000$ To t a l 10 0 , 0 0 0 $ 100,000$ 5 Y E A R T O T A L 5 5 9 , 0 0 0 $ 559,000$ FY 2 0 1 6 / 1 7 - 2 0 2 0 / 2 1 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h FY 2 0 1 6 / 1 7 - 2 0 2 0 / 2 1 5 y e a r C I P B u d g e t Ci t y o f S e a l B e a c h Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t 39 PROJECT CATEGORY Storm Drain System PROJECT No.EM1701 PROJECT NAME West End Pump Station Emergency TOTAL PROJECT COST $59,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Old Town PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 59,000$ 59,000$ TOTAL59,000$ 59,000$ Expenditures Construction59,000$ 59,000$ TOTAL59,000$ 59,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION The West End Pump Station is a critical Storm Drain facility that provides drainage for portions of Old Town, the Hill, and Bridgeport. Portions of Old Town and Bridgeport are constructed below the elevation of the banks of the San Gabriel River. In order to prevent flooding the water needs to be pumped over the banks of the river. MAP PICTURE City of Seal Beach 40 PROJECT CATEGORY Storm Drain System PROJECT No.SD1801 PROJECT NAME West End Pump Station Improvements TOTAL PROJECT COST $200,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Old Town PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 200,000$ 200,000$ TOTAL200,000$ 200,000$ Expenditures Construction200,000$ 200,000$ TOTAL200,000$ 200,000$ The West End Pump Station is a critical Storm Drain facility that provides drainage for portions of Old Town, the Hill, and Bridgeport. Portions of Old Town and Bridgeport are constructed below the elevation of the banks of the San Gabriel River. In order to prevent flooding the water needs to be pumped over the banks of the river. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 41 PROJECT CATEGORY Storm Drain System PROJECT No.SD1802 PROJECT NAME Focus Preliminary Design Analysis Marina Drive TOTAL PROJECT COST $100,000 PROJECT MANAGER Michael Ho, City Engineer WORKED PERFORMED BY Contract LOCATION Old Town PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 100,000$ 100,000$ TOTAL100,000$ 100,000$ Expenditures Design 100,000$ 100,000$ TOTAL100,000$ 100,000$ This project is to perform a preliminary design storm drain study which will include, but limited to subsurface investigations, detailed hydraulic analysis, constructability review and a project budget in the Marina Drive area. This will supplement the 2008 Storm Drain Master Plan efforts to focus in on the Marina Drive area to investigate the feasibility of interim improvements as well as ultimate recommended improvements to meet specified flood protection levels. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 42 PROJECT CATEGORY Storm Drain System PROJECT No.SD1803 PROJECT NAME Focus Preliminary Design Analysis Seal Way TOTAL PROJECT COST $100,000 PROJECT MANAGER Michael Ho, City Engineer WORKED PERFORMED BY Contract LOCATION Old Town PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 100,000$ 100,000$ TOTAL100,000$ 100,000$ Expenditures Design 100,000$ 100,000$ TOTAL100,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project is to perform a preliminary design storm drain study which will include, but limited to subsurface investigations, detailed hydraulic analysis, constructability review and a project budget in the Seal Way area. This will supplement the 2008 Storm Drain Master Plan efforts to focus in on the Seal Way area to investigate feasibility of interim improvements as well as ultimate recommended improvements to meet specified flood protection levels. MAP PICTURE City of Seal Beach 43 PROJECT CATEGORY Storm Drain System PROJECT No.SD1804 PROJECT NAME Focus Preliminary Design Analysis College Park East TOTAL PROJECT COST $100,000 PROJECT MANAGER Michael Ho, City Engineer WORKED PERFORMED BY Contract LOCATION College Park East PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 100,000$ 100,000$ TOTAL100,000$ 100,000$ Expenditures Design 100,000$ 100,000$ TOTAL100,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project is to perform a preliminary design storm drain study which will include, but limited to subsurface investigations, detailed hydraulic analysis, constructability review and a project budget in the College Park East area. This will supplement the 2008 Storm Drain Master Plan efforts to focus in on the College Park East area to investigate feasibility of interim improvements as well as ultimate recommended improvements to meet specified flood protection levels. MAP PICTURE City of Seal Beach 44 SE C T I O N V I - S T R E E T S A N D T R A N S P O R T A T I O N SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Approved 5-year total St r e e t s a n d T r a n s p o r t a t i o n ( S T ) ST 1 2 0 7 S e a l B e a c h C o m p r e h e n s i v e P a r k i n g M a n a g e m e n t P l a n Fu n d 04 9 - T r a f f i c I m p a c t F e e 67 7 , 0 0 0 $ 677,000$ To t a l 67 7 , 0 0 0 $ 677,000$ ST 1 3 0 2 U t il i t y U n d e r g r o u n d i n g P r o j e c t Fu n d 00 1 - G e n e r a l Fu n d 10 , 0 0 0 $ 10,000$ To t a l 10 , 0 0 0 $ 10,000$ ST 1 4 0 8 T r a f f i c M a n a g e m e n t C e n t e r U p d a t e 08 0 - 3 6 1 G r a n t Fu n d s 68 , 0 0 0 $ 68,000$ To t a l 68 , 0 0 0 $ 68,000$ ST 1 5 0 8 O l d T o w n P a r k i n g a n d S i g n a g e I m p r o v e m e n t Fu n d 04 0 - G a s T a x 91 , 0 0 0 $ 91,000$ To t a l 91 , 0 0 0 $ 91,000$ ST 1 5 0 9 W e s t m i n s t e r A v e n u e M e d i a n I m p r o v e m e n t s Me a s u r e M 2 T u r n b a c k 11 9 , 0 0 0 $ 119,000$ Fu n d 20 9 - C o m m u n i t y F a c il i t i e s D i s t r i c t 12 2 , 0 0 0 $ 122,000$ To t a l 24 1 , 0 0 0 $ 241,000$ ST 1 6 0 2 L o c a l S t r e e t R e s u r f a c i n g P r o g r a m Me a s u r e M 2 T u r n b a c k 27 0 , 0 0 0 $ 270,000$ To t a l 27 0 , 0 0 0 $ 270,000$ ST 1 6 0 6 A nn u a l S i g n a g e R e p l ac e m e n t P r o g r a m Fu n d 04 0 - G a s T a x 8, 80 0 $ 8,800$ To t a l 8, 8 0 0 $ 8,800$ ST 16 1 0 W es t m i n s t e r A v e n u e R e h a b il i t a t i o n ( W C L t o S B B ) 08 0 - 3 6 1 G r a n t Fu n d s 48 1 , 0 0 0 $ 481,000$ Me a s u r e M 2 T u r n b a c k 38 8 , 6 0 0 $ 388,600$ Fu n d 04 0 - G a s T a x 19 2 , 0 0 0 $ 192,000$ To t a l 1, 0 6 1 , 6 0 0 $ 1,061,600$ ST 1 7 0 1 A nn u a l S l u r r y S e a l P r o j e c t Fu n d 04 0 - G a s T a x 15 0 , 0 0 0 $ 150,000$ To t a l 15 0 , 0 0 0 $ 150,000$ Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t 45 SE C T I O N V I - S T R E E T S A N D T R A N S P O R T A T I O N SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Approved 5-year total Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t ST 1 7 0 2 L o c a l S t r e e t R e s u r f a c i n g P r o g r a m Me a s u r e M 2 T u r n b a c k 17 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 1 , 2 7 5 , 0 0 0 $ To t a l 17 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 2 7 5 , 0 0 0 $ 1 , 2 7 5 , 0 0 0 $ ST 1 7 0 3 A r t e r i a l S t r e e t R e s u r f a c i n g P r o g r a m Me a s u r e M 2 T u r n b a c k 20 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 1 , 0 0 0 , 0 0 0 $ To t a l 20 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 2 0 0 , 0 0 0 $ 1 , 0 0 0 , 0 0 0 $ ST 1 7 0 4 A nn u a l C o n c r e t e R e p a i r P r o g r a m Fu n d 04 0 - G a s T a x 50 , 0 0 0 $ 50,000$ To t a l 50 , 0 0 0 $ 50,000$ ST 1 7 0 5 A nn u a l S t r i p i n g P r o g r a m Fu n d 04 0 - G a s T a x 25 , 0 0 0 $ 25,000$ To t a l 25 , 0 0 0 $ 25,000$ ST 1 7 0 7 A nn u a l S t r e e t T r e e P l a n t i n g P r o g r a m Fu n d 00 1 - G e n e r a l Fu n d 19 , 0 0 0 $ 19,000$ To t a l 19 , 0 0 0 $ 19,000$ ST 1 7 0 8 W e s t m i n s t e r / 1 7 t h S t . C o r r i d o r T r a f f i c S i g n a l S y n c h r o n i z a t i o n 08 0 - 3 6 1 G r a n t Fu n d s 23 1 , 0 0 0 $ 231,000$ Fu n d 04 0 - G a s T a x 50 , 0 0 0 $ 50,000$ To t a l 28 1 , 0 0 0 $ 281,000$ ST 1 8 0 1 A nn u a l S l u r r y S e a l P r o j e c t Me a s u r e M 2 T u r n b a c k 25 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ 6 5 0 , 0 0 0 $ To t a l 25 0 , 0 0 0 $ 10 0 , 0 0 0 $ 10 0 , 0 0 0 $ 10 0 , 0 0 0 $ 100,000 $ 650,000$ 46 SE C T I O N V I - S T R E E T S A N D T R A N S P O R T A T I O N SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Pr o p o s e d 20 2 1 - 2 0 2 2 Bu d g e t Approved 5-year total Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t ST 1 8 0 2 A nn u a l C o n c r e t e R e p a i r P r o g r a m Fu n d 04 0 - G a s T a x 75 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 2 7 5 , 0 0 0 $ To t a l 75 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 5 0 , 0 0 0 $ 2 7 5 , 0 0 0 $ ST 1 8 0 5 A nn u a l S t r i p i n g P r o g r a m Fu n d 04 0 - G a s T a x 25 , 0 0 0 $ 2 5 , 0 0 0 $ 2 5 , 0 0 0 $ 2 5 , 0 0 0 $ 2 5 , 0 0 0 $ 1 2 5 , 0 0 0 $ To t a l 25 , 0 0 0 $ 2 5 , 0 0 0 $ 2 5 , 0 0 0 $ 2 5 , 0 0 0 $ 2 5 , 0 0 0 $ 1 2 5 , 0 0 0 $ ST 1 8 0 7 A nn u a l S t r e e t T r e e P l a n t i n g P r o g r a m Fu n d 00 1 - G e n e r a l Fu n d 20 , 0 0 0 $ 2 0 , 0 0 0 $ 2 0 , 0 0 0 $ 2 0 , 0 0 0 $ 2 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ To t a l 20 , 0 0 0 $ 2 0 , 0 0 0 $ 2 0 , 0 0 0 $ 2 0 , 0 0 0 $ 2 0 , 0 0 0 $ 1 0 0 , 0 0 0 $ ST 1 8 0 6 A nn u a l S i g n a g e R e p l ac e m e n t P r o g r a m Me a s u r e M 2 T u r n b a c k 10 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 4 0 , 0 0 0 $ To t a l 10 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 1 0 , 0 0 0 $ 4 0 , 0 0 0 $ ST 1 8 0 8 N e w T r a f f i c S i g n a l B a t t e r y B a c k - U p P r o j e c t -$ Me a s u r e M 2 T u r n b a c k 10 0 , 0 0 0 $ 100,000$ To t a l 10 0 , 0 0 0 $ 100,000$ 5 Y E A R T O T A L 3 , 7 9 7 , 4 0 0 $ 6 8 0 , 0 0 0 $ 6 8 0 , 0 0 0 $ 6 8 0 , 0 0 0 $ 6 8 0 , 0 0 0 $ 6 , 5 1 7 , 4 0 0 $ 47 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1207 PROJECT NAME Comprehensive Parking Manag. Plan TOTAL PROJECT COST $677,000 PROJECT MANAGER Patrick Gallegos, Assistant City Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Traffic Impact Fee677,000$ 677,000$ TOTAL677,000$ 677,000$ Expenditures Design 677,000$ 677,000$ TOTAL677,000$ 677,000$ MAP PICTURE This plan provides various policies and programs that result in more efficient use of parking resources. This project will study parking in the city. City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 48 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1302 PROJECT NAME Rule 20A Undergrounding TOTAL PROJECT COST $10,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Seal Beach Blvd.PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 10,000$ 10,000$ TOTAL10,000$ 10,000$ Expenditures Design 10,000$ 10,000$ TOTAL 10,000$ 10,000$ MAP PICTURE To underground utility lines on Seal Beach Blvd at Golden Ranch Road and South of PCH. This allocation will provide inspection services during construction of underground utilities by SCE. City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 49 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1408 PROJECT NAME Traffic Management Center Upgrade TOTAL PROJECT COST $68,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION City Hall PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE Grant On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Grant Funds 68,000$ 68,000$ TOTAL68,000$ 68,000$ Expenditures Construction68,000$ 68,000$ TOTAL68,000$ 68,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To relocate the existing TMC from the City Yard to City Hall.The existing TMC was constructed over 10 years ago with aging technology and damaged equipment. The City has applied for and successfully was awarded an OCTA grant. MAP PICTURE City of Seal Beach 50 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1508 PROJECT NAME Old Town Parking and Signing Improvements TOTAL PROJECT COST $91,000 PROJECT MANAGER Patrick Gallegos, Assistant City Manager WORKED PERFORMED BY Contract LOCATION Old Town PROJECT STATUS Will Start PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 91,000$ 91,000$ TOTAL91,000$ 91,000$ Expenditures Construction91,000$ 91,000$ TOTAL91,000$ 91,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project seeks to implement recommendations from the Parking Management Plan and includes Wayfarer Signage, replacement of street sweeping signs, and signage replacement as a result of parking changes. The Parking Management Study will provide recommendations to improve parking for residents, businesses, and visitors to the community. MAP PICTURE City of Seal Beach 51 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1509 PROJECT NAME Westminster Ave Median Improvements TOTAL PROJECT COST $241,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Ave PROJECT STATUS Construction PRIORITY Low ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Measure M2 $ 119,000 $ 119,000 CFD Landscape (209)122,000$ 122,000$ TOTAL 241,000$ 241,000$ Expenditures Construction 241,000$ 241,000$ TOTAL 241,000$ 241,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will remove the existing asphalt medians and replace with landscaping. The asphalt in the median has cracks, rubble and is beyond deterioration. The new landscape will beautify the area. MAP PICTURE City of Seal Beach 52 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1602 PROJECT NAME Local Street Resurfacing Program TOTAL PROJECT COST $270,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Reduce future maintenance costs. Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Measure M2 270,000$ 270,000$ TOTAL270,000$ 270,000$ Expenditures DesignIn House Construction270,000$ 270,000$ TOTAL270,000$ 270,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION MAP PICTURE The pavement management report was adopted that analyzed surface conditions and planned a cost efficient pavement maintenance schedule. City streets deteriorate over time and require maintenance. This project will resurface local streets per the pavement management report. City of Seal Beach 53 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1606 PROJECT NAME Annual Signage Replacement TOTAL PROJECT COST $8,800 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 8,800$ 8,800$ TOTAL8,800$ -$ -$ -$ -$ 8,800$ Expenditures Construction 8,800$ 8,800$ TOTAL 8,800$ -$ -$ -$ -$ 8,800$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will replace damaged or missing signs.The program will keep a uniformity of signage throughout the City. <insert picture of a street name sign> MAP PICTURE City of Seal Beach 54 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1610 PROJECT NAME Westminster Ave Rehabilitation (WCL to SBB)TOTAL PROJECT COST $1,061,600 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Ave. PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE Grant On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Measure M2 388,600$ 388,600$ Grant Fund 481,000$ 481,000$ State Gas Tax 192,000$ 192,000$ TOTAL 1,061,600$ 1,061,600$ Expenditures Construction 1,061,600$ 1,061,600$ TOTAL 1,061,600$ 1,061,600$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will resurface Westminster Ave. between Seal Beach Blvd. and West City Limits. The City received $500,000 to rehabilitate the pavement. It is funded by a grant from the Orange County Transportation Authority. MAP PICTURE City of Seal Beach 55 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1701 PROJECT NAME Annual Slurry Seal Project TOTAL PROJECT COST $150,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 150,000$ 150,000$ TOTAL 150,000$ -$ -$ -$ -$ 150,000$ Expenditures Design In House Construction 150,000$ 150,000$ TOTAL 150,000$ -$ -$ -$ -$ 150,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This program applies maintenance slurry seals to streets to extend the life of the pavement. The Pavement Management System data will be used as a guideline to select project streets. Slurry Seal is a proven strategy to extend the life of asphalt pavements. The program is well received by residents. MAP PICTURE City of Seal Beach 56 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1702 PROJECT NAME Local Street Resurfacing Program TOTAL PROJECT COST $1,275,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Measure M2 175,000$ 275,000$ 275,000$ 275,000$275,000$ 1,275,000$ TOTAL 175,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,275,000$ Expenditures Design In House Construction 175,000$ 275,000$ 275,000$ 275,000$275,000$ 1,275,000$ TOTAL 175,000$ 275,000$ 275,000$ 275,000$ 275,000$ 1,275,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will resurface local streets per the pavement management system. A pavement management report was adopted that analyzed surface conditions and planned a cost efficient pavement maintenance schedule. City streets deteriorate over time and require maintenance. This project will reduce future maintenance costs and add value to neighborhoods. MAP PICTURE City of Seal Beach 57 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1703 PROJECT NAME Arterial Street Resurfacing Program TOTAL PROJECT COST $1,000,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Measure M2 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ TOTAL200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ Expenditures DesignIn House -$ Construction200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ TOTAL200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will resurface arterial streets per the pavement management system. MAP PICTURE A pavement management report was adopted that analyzed surface conditions and planned a cost efficient pavement maintenance schedule. City streets deteriorate over time and require maintenance. City of Seal Beach 58 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1704 PROJECT NAME Annual Concrete Repair Program TOTAL PROJECT COST $50,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 50,000$ 50,000$ TOTAL50,000$ -$ -$ -$ -$ 50,000$ Expenditures Design In House Construction 50,000$ 50,000$ TOTAL 50,000$ -$ -$ -$ -$ 50,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This program replaces portions of deteriorated concrete sidewalks, curbs and gutters within the City, and brings handicap ramps current to ADA Standards. The program is required to eliminate trip hazards and safety issues. Reduced liability exposure is a benefit of this activity. MAP PICTURE City of Seal Beach 59 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1705 PROJECT NAME Annual Striping Program TOTAL PROJECT COST $25,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 25,000$ 25,000$ TOTAL25,000$ -$ -$ -$ -$ 25,000$ Expenditures Design In House Construction 25,000$ 25,000$ TOTAL 25,000$ -$ -$ -$ -$ 25,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will restripe worn pavement markings, bike lanes and traffic lanes. The program will keep a uniformity of pavement marking and striping citywide. MAP PICTURE City of Seal Beach 60 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1707 PROJECT NAME Street Tree Planting Program TOTAL PROJECT COST $19,000 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 19,000$ 19,000$ TOTAL19,000$ -$ -$ -$ -$ 19,000$ Expenditures Construction 19,000$ 19,000$ TOTAL 19,000$ -$ -$ -$ -$ 19,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This program provides funding for the installation of new trees throughout the City. Locations are identified continually. This program helps improve the local environment for residents and visitors. MAP PICTURE City of Seal Beach 61 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1708 PROJECT NAME Westminster/17th St. Corridor Traffic Signal Synchronization TOTAL PROJECT COST $281,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Avenue PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE Grant On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Grant Fund 231,000$ 231,000$ State Gas Tax 50,000$ 50,000$ TOTAL 281,000$ 281,000$ Expenditures Design In House Construction 281,000$ 281,000$ TOTAL 281,000$ 281,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will synchronize the traffic signals on Westminster Ave. from the West to the East Seal Beach city limits. The effects of this project will help traffic flow tremendously along Westminster Ave. MAP PICTURE City of Seal Beach 62 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1801 PROJECT NAME Annual Slurry Seal Project TOTAL PROJECT COST $650,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 250,000$ 100,000$ 100,000$ 100,000$100,000$ 650,000$ TOTAL 250,000$ 100,000$ 100,000$ 100,000$ 100,000$ 650,000$ Expenditures Design In House Construction 250,000$ 100,000$ 100,000$ 100,000$100,000$ 650,000$ TOTAL 250,000$ 100,000$ 100,000$ 100,000$ 100,000$ 650,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This program applies maintenance slurry seals to streets to extend the life of the pavement. The Pavement Management System data will be used as a guideline to select project streets. Slurry Seal is a proven strategy to extend the life of asphalt pavements. The program is well received by residents. MAP PICTURE City of Seal Beach 63 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1802 PROJECT NAME Annual Concrete Repair Program TOTAL PROJECT COST $275,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 75,000$ 50,000$ 50,000$ 50,000$ 50,000$ 275,000$ TOTAL 75,000$ 50,000$ 50,000$ 50,000$ 50,000$ 275,000$ Expenditures Design In House Construction 75,000$ 50,000$ 50,000$ 50,000$ 50,000$ 275,000$ TOTAL 75,000$ 50,000$ 50,000$ 50,000$ 50,000$ 275,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This program replaces portions of deteriorated concrete sidewalks, curbs and gutters within the City, and brings handicap ramps current to ADA Standards. The program is required to eliminate trip hazards and safety issues. Reduced liability exposure is a benefit of this activity. MAP PICTURE City of Seal Beach 64 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1805 PROJECT NAME Annual Striping Program TOTAL PROJECT COST $125,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Will Start PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ TOTAL 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ Expenditures Design In House Construction 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ TOTAL 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 125,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will restripe worn pavement markings, bike lanes and traffic lanes. The program will keep a uniformity of pavement marking and striping citywide. MAP PICTURE City of Seal Beach 65 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1806 PROJECT NAME Annual Signage Replacement TOTAL PROJECT COST $40,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total State Gas Tax -$ 10,000$ 10,000$ 10,000$ 10,000$ 40,000$ TOTAL -$ 10,000$ 10,000$ 10,000$ 10,000$ 40,000$ Expenditures Design In House -$ Construction -$ 10,000$ 10,000$ 10,000$ 10,000$ 40,000$ TOTAL -$ 10,000$ 10,000$ 10,000$ 10,000$ 40,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will replace damaged or missing signs.The program will keep a uniformity of signage throughout the City. <insert picture of a street name sign> MAP PICTURE City of Seal Beach 66 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1807 PROJECT NAME Street Tree Planting Program TOTAL PROJECT COST $100,000 PROJECT MANAGER Tim Kelsey, Recreation Manager WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Annual Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total General Fund 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ TOTAL 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ Expenditures Construction 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ TOTAL 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This program provides funding for the installation of new trees throughout the City. Locations are identified continually. This program helps improve the local environment for residents and visitors. MAP PICTURE City of Seal Beach 67 PROJECT CATEGORY Streets and Transportation PROJECT No.ST1808 PROJECT NAME New Traffic Signal Battery Back-up TOTAL PROJECT COST $100,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Measure M2 100,000$ 100,000$ TOTAL100,000$ 100,000$ Expenditures Construction100,000$ 100,000$ TOTAL100,000$ 100,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To provide battery back-up to various signalized traffic intersections.The project will provide power to signalized traffic intersections during power outages. MAP PICTURE City of Seal Beach 68 SE C T I O N V I I - W A T E R SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Proposed 2021- 2022 BudgetApproved 5-year total Wa t e r S y s t e m WT 0 9 0 4 B o o s t e r S t a t i o n R e h a b . - B e v e r l y M a n o r Wa t e r C a p i t a l F u n d 5, 2 0 0 , 0 0 0 $ 5,200,000$ To t a l 5, 2 0 0 , 0 0 0 $ 5,200,000$ WT 1 3 0 1 M a i n l i n e R e p l a c e m e n t H e l l m a n R a n c h Wa t e r C a p i t a l F u n d 51 , 0 0 0 $ 5 0 0 , 0 0 0 $ 2 , 5 0 0 , 0 0 0 $ 3 , 0 5 1 , 0 0 0 $ To t a l 51 , 0 0 0 $ 5 0 0 , 0 0 0 $ 2 , 5 0 0 , 0 0 0 $ 3 , 0 5 1 , 0 0 0 $ WT 1 5 0 1 W a t e r S y s t e m R a t e U p d a t e Wa t e r C a p i t a l F u n d 73 , 0 0 0 $ 73,000$ To t a l 73 , 0 0 0 $ 73,000$ WT 1 5 0 4 C i t y W i d e W a t e r M e t e r R e p l a c e m e n t Wa t e r C a p i t a l F u n d 34 , 0 0 0 $ 34,000$ To t a l 34 , 0 0 0 $ 34,000$ WT 1 6 0 2 L e i s u r e W o r l d W e l l I m p r o v e m e n t s Wa t e r C a p i t a l F u n d 70 0 , 0 0 0 $ 7 0 0 , 0 0 0 $ To t a l 70 0 , 0 0 0 $ 7 0 0 , 0 0 0 $ WT 1 6 0 3 W a t e r W e l l R e h a b il i t a t i o n - B o l s a C h i c a W e l l Wa t e r C a p i t a l F u n d 75 0 , 0 0 0 $ 750,000$ To t a l 75 0 , 0 0 0 $ 750,000$ WT 1 6 0 5 N a v y R e s e r v o i r C h l o r i n a t i o n S y s t e m U p g r a d e s Wa t e r C a p i t a l F u n d 14 0 , 0 0 0 $ 140,000$ To t a l 14 0 , 0 0 0 $ 140,000$ WT 1 6 0 6 W a t e r V a l v e R e p l a c e m e n t P r o g r a m Wa t e r C a p i t a l F u n d 42 , 5 0 0 $ 42,500$ To ta l 42 , 5 0 0 $ 42,500$ Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t 69 SE C T I O N V I I - W A T E R SU M M A R Y S H E E T Pr o p o s e d 20 1 7 - 2 0 1 8 Bu d g e t Pr o p o s e d 20 1 8 - 2 0 1 9 Bu d g e t Pr o p o s e d 20 1 9 - 2 0 2 0 Bu d g e t Pr o p o s e d 20 2 0 - 2 0 2 1 Bu d g e t Proposed 2021- 2022 BudgetApproved 5-year total Ci t y o f S e a l B e a c h FY 2 0 1 7 / 1 8 - 2 0 2 1 / 2 2 5 y e a r C I P B u d g e t WT 1 7 0 1 W a t e r S y s t e m I n f r a s t r u c t u r e R e p a i r s Wa t e r C a p i t a l F u n d 67 5 , 0 0 0 $ 675,000$ To t a l 67 5 , 0 0 0 $ 675,000$ WT 1 7 0 2 W e s t m i n s t e r A v e . W a t e r M a i n R e p l a c e m e n t Wa t e r C a p i t a l F u n d 2, 8 8 4 , 0 0 0 $ 2,884,000$ To t a l 2, 8 8 4 , 0 0 0 $ 2,884,000$ WT 1 7 0 3 4 0 5 W i d e n i n g W a t e r L i n e R e c o n f i g u r a t i o n Wa t e r C a p i t a l F u n d 75 0 , 0 0 0 $ 750,000$ To t a l 75 0 , 0 0 0 $ 750,000$ WT 1 7 0 4 L a m p s o n A v e n u e W a t e r M a i n R e p l a c e m e n t Wa t e r C a p i t a l F u n d 1, 3 4 0 , 0 0 0 $ 1,340,000$ To t a l 1, 3 4 0 , 0 0 0 $ 1,340,000$ WT 1 8 0 1 S C A D A I m p r o v e m e n t U p g r a d e P r o j e c t Se w e r C a p i t a l F u n d 10 0 , 0 0 0 $ 100,000$ Wa t e r C a p i t a l F u n d 10 0 , 0 0 0 $ 100,000$ To t a l 20 0 , 0 0 0 $ 200,000$ 5 Y E A R T O T A L 1 2 , 1 3 9 , 5 0 0 $ 5 0 0 , 0 0 0 $ 2 , 5 0 0 , 0 0 0 $ 7 0 0 , 0 0 0 $ 1 5 , 8 3 9 , 5 0 0 $ 70 PROJECT CATEGORY Water System PROJECT No.WT0904 PROJECT NAME Booster Sta. Rehab. - Beverly Manor TOTAL PROJECT COST $5,200,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION North Gate Road PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:It will eliminate the existing monthly maintenance cost. Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 5,200,000$ 5,200,000$ TOTAL5,200,000$ 5,200,000$ Expenditures Design231,000$ 231,000$ Construction4,969,000$ 4,969,000$ TOTAL5,200,000$ 5,200,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION MAP PICTURE This project will construct upgrades and improvements to the Beverly Manor Water Well, Booster Station and Reservoir as identified in the 2011 Water System Master Plan. The water system requires continual capital maintenance to maintain reliability and to meet water quality standards. City of Seal Beach 71 PROJECT CATEGORY Water System PROJECT No.WT1301 PROJECT NAME Main Line Repl. Hellman TOTAL PROJECT COST $3,051,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Hellman Ranch Properties PROJECT STATUS Pre-planning PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Constructing the project will minimize the water main breaks in this area. Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 51,000$ 500,000$ 2,500,000$3,051,000$ TOTAL500,000$ 2,500,000$ 3,000,000$ Expenditures Design51,000$ 500,000$ 551,000$ Construction2,500,000$2,500,000$ TOTAL500,000$ 2,500,000$ 3,051,000$ MAP PICTURE This project will replace or relocate an 18" transmission line on Hellman Ranch to feed Marina and Old Town. This is a replacement of an existing line. It provides redundancy for the part of the system serving Old Town. It will maintain system reliability. The existing pipeline is in poor condition. City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 72 PROJECT CATEGORY Water System PROJECT No.WT1501 PROJECT NAME Water Rate Study TOTAL PROJECT COST $73,000 PROJECT MANAGER Steve Myrter, Director of Public Works WORKED PERFORMED BY Consultant LOCATION City Wide PROJECT STATUS Planned PRIORITY High ALTERNATE FUNDING SOURCE N/A On-going Operating & Maintenance Impact:None Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 73,000$ 73,000$ TOTAL 73,000$ 73,000$ Expenditures Design 73,000$ 73,000$ TOTAL 73,000$ 73,000$ The study will update the rate structure for the City's Potable Water System. The operation of the City's Water System is funded through a water enterprise fee that is charged to the residents bimonthly. The rate structure is typically studied and set approximately every 5 years. This will insure that the fee charged is appropriate for the services that are rendered. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 73 PROJECT CATEGORY Water System PROJECT No.WT1504 PROJECT NAME Water Meter Replacement TOTAL PROJECT COST $50,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Planned PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Newer meters will reduce the need for repairs and maintenance due to leaks Funding Source Proposed 2015-2016 Budget Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 5-year total Water Fund 34,000$ 34,000$ TOTAL 34,000$ 34,000$ Expenditures Design 34,000$ 34,000$ TOTAL 34,000$ 34,000$ Replacing existing, aged water meters with newer water meters.Many existing water meters are past their useful life throughout the City. These meters are leaking or providing innacurate meter reads. Changing out these aging meters with newer meters will provide more accurate water meter reads and will reduce system leaks throughout the city. <insert pic of any waterline> MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2015/16 - 2019/20 DESCRIPTION JUSTIFICATION City of Seal Beach 74 PROJECT CATEGORY Water System PROJECT No.WT1602 PROJECT NAME Leisure World Well Improvements TOTAL PROJECT COST $700,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Leisure World PROJECT STATUS Planned PRIORITY Medium ALTERNATE FUNDING SOURCE N/A On-going Operating & Maintenance Impact:- Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 700,000$ 700,000$ TOTAL 700,000$ 700,000$ Expenditures Design 70,000$ 70,000$ Construction 630,000$ 630,000$ TOTAL 700,000$ 700,000$ To upgrade the well discharge piping and pump replacement at the Leisure World Well Site. The well discharge piping and the pump have reached the end of its expected useful life . MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 75 PROJECT CATEGORY Water System PROJECT No.WT1603 PROJECT NAME Bolsa Chica Well Improvement Project TOTAL PROJECT COST $750,000 PROJECT MANAGER Cesar Rangel, Associate Engineer WORKED PERFORMED BY Contract LOCATION Bolsa Chica Road PROJECT STATUS Design PRIORITY Medium ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Project will eliminate the maintenance of the electrical pump & equipment Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 750,000$ 750,000$ TOTAL -$ -$ Expenditures Design 75,000$ 75,000$ Construction 675,000$ 675,000$ TOTAL -$ 750,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will rehabilitate the well site pumps, generators, motors and water treatment equipment. This project will rehabilitate the Bolsa Chica Water Well as identified in the 2003 Water System Master Plan. MAP PICTURE City of Seal Beach 76 PROJECT CATEGORY Water System PROJECT No.WT1605 PROJECT NAME Navy Reservoir Chlorination System Upgrades TOTAL PROJECT COST $140,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Navy Reservoir PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:The maintenance of the system will remain unchanged with this project. Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 140,000$ 140,000$ TOTAL 140,000$ 140,000$ Expenditures Construction 140,000$ 140,000$ TOTAL 140,000$ 140,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION The Navy Reservoir is one of two reservoirs in the City. Water is stored within the reservoir and then added into the pressurized system as needed. A chlorination system is located at the reservoir and technology improvements are recommended. The water system requires continual upkeep to keep it reliable. The system provides drinking water to residents and businesses as well as for fire protection. This project will insure that the drinking water in Seal Beach continues to meet requirements for distribution. MAP PICTURE City of Seal Beach 77 PROJECT CATEGORY Water System PROJECT No.WT1606 PROJECT NAME Water Valve Replacement Program TOTAL PROJECT COST $42,500 PROJECT MANAGER Darrick Escobedo, Water Services Supervisor WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:The maintenance of the system will remain unchanged with this project. Funding Source Proposed 2015-2016 Budget Proposed 2016-2017 Budget Proposed 2017-2018 Budget Proposed 2018-2019 Budget Proposed 2019-2020 Budget Proposed 5-year total Water Fund 42,500$ 42,500$ TOTAL 42,500$ -$ -$ -$ -$ 42,500$ Expenditures Construction 42,500$ 42,500$ TOTAL 42,500$ -$ -$ -$ -$ 42,500$ City of Seal Beach PROJECT INFORMATION SHEET FY 2015/16 - 2019/20 DESCRIPTION JUSTIFICATION The water system has valves distributed througout the City. The valves close off individual water lines, and are critical to operation of the water system. Closing of valves allows staff to control the flow of water and allow for isolation of a water line should a main break occur. This project will replace aged valves at the end of their useful life. The Water Department has a valve excercising program whereby every valve in the City is tested regularly. As the valves age they periodically need replacement. Failure of the valves does not occur at the same age for every valve. This program allows for replacement of individual valves when failure is encountered. Well working valves are critical to turn off of water. MAP PICTURE City of Seal Beach 78 PROJECT CATEGORY Water System PROJECT No.WT1701 PROJECT NAME West OC Connector Waterline Extension TOTAL PROJECT COST $675,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Citywide PROJECT STATUS Design PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Emergency repairs will be reduced Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 675,000$ 675,000$ TOTAL 675,000$ 675,000$ Expenditures Design 67,500$ 67,500$ Construction 607,500$ 607,500$ TOTAL 675,000$ 675,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION This project will relocate a 33-inch transmission line on Westminster Ave. that crosses the 405 freeway. Relocation is needed with the 405 expansion project. Due to the 405 widening project, many utilities that cross have to be relocated and rebuilt. This water line serves as a connection point of imported water to the northwestern cities of Orange County. Six water districts will participate in the cost for relocation of this line. MAP PICTURE City of Seal Beach 79 PROJECT CATEGORY Water System PROJECT No.WT1702 PROJECT NAME Westminster Ave. Water Main Replacement TOTAL PROJECT COST $2,800,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Westminster Ave. PROJECT STATUS Construction PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 2,884,000$ 2,884,000$ TOTAL 2,884,000$ 2,884,000$ Expenditures Construction 2,884,000$ 2,884,000$ TOTAL 2,884,000$ 2,884,000$ This project will replace the existing water main line on Westminster Ave.This project will update the deteriorated water line located on Westminster Ave. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 80 PROJECT CATEGORY Water System PROJECT No.WT1703 PROJECT NAME 405 Widening Water Line Reconfiguration TOTAL PROJECT COST $750,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION 405 Freeway PROJECT STATUS Ongoing PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact: Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 750,000$ 750,000$ TOTAL 750,000$ 750,000$ Expenditures Design 70,000$ 70,000$ Construction 680,000$ 680,000$ TOTAL 750,000$ 750,000$ This project will extend water line connections due to the 405 widening project. Two water lines that cross the 405 and feed parts of the city North and South of the 405 need to be rebuilt per Caltrans regulations in line with the 405 widening project. MAP PICTURE City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION City of Seal Beach 81 PROJECT CATEGORY Water System PROJECT No.WT1704 PROJECT NAME Lampson Ave Water Main Replacement TOTAL PROJECT COST $1,340,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Lampson Avenue PROJECT STATUS Planned PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:- Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Water Fund 1,340,000$ 1,340,000$ TOTAL 1,340,000$ 1,340,000$ Expenditures Design 134,000$ 134,000$ Construction 1,206,000$ 1,206,000$ TOTAL 1,340,000$ 1,340,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION To remove and replace the existing 12" ACP waterline on Lampson Ave from Seal Beach Blvd. to Basswood St. The existing Lampson waterline has historically failed and caused numerous main line breaks. It has outlasted its useful life. <insert pic of any waterline> MAP PICTURE City of Seal Beach 82 PROJECT CATEGORY Water System PROJECT No.WT1801 PROJECT NAME SCADA Improvement Upgrade Project TOTAL PROJECT COST $200,000 PROJECT MANAGER David Spitz, Associate Engineer WORKED PERFORMED BY Contract LOCATION Adolofo Lopez Maintenance Yard PROJECT STATUS Planned PRIORITY High ALTERNATE FUNDING SOURCE None On-going Operating & Maintenance Impact:Will provide an efficient monitoring system which will reduce maintenance costs. Funding Source Proposed 2017-2018 Budget Proposed 2018-2018 Budget Proposed 2019-2020 Budget Proposed 2020-2021 Budget Proposed 2021-2022 Budget Proposed 5-year total Sewer Fund $ 100,000 $ 100,000 Water Fund100,000$ 100,000$ TOTAL200,000$ 200,000$ Expenditures Construction200,000$ 200,000$ TOTAL200,000$ 200,000$ City of Seal Beach PROJECT INFORMATION SHEET FY 2017/18 - 2021/22 DESCRIPTION JUSTIFICATION Portions of the City's water system is managed and monitored at the the SCADA base station at the City's Adolofo Lopez maintenance yard. Due to faulty readings and aging equipment, the City needs to upgrade and/or completely install new SCADA equipment at various well, booster and pumping stations as well at at the maintenance yard. the Current SCADA system provides old and unreliable data which cannot be used by City crew to monitor and manage the City's distribution system effectively. New or upgraded systems are necessary for the optimal function of the distribution system. MAP PICTURE City of Seal Beach 83 UNFUNDED NEEDS/PROJECTS Project Name Cost Beach and Pier 8th and 10th Street City Parking Lot Rehabilitation 300,000$ 8th and 10th Street Utility Undergrounding and Lighting Improvements 200,000$ 500,000$ Buildings and Facilities Pier Entrance Improvements 100,000$ Main Street - Streetscape Improvements (Street Furniture)150,000$ McGaugh Pool Deck Rehabilitation 200,000$ ADA Upgrades to all City Buildings 500,000$ Community Center Improvements 1,500,000$ Beach Facility-Maintenance Building 601,370$ Beach Facility-Storage Building 63,470$ Library/Senior Center Improvements 3,739,670$ North Seal Beach Community Center 1,096,150$ Facility Improvements Citywide (per 2011 Facility Condition Assessment)$38,853,000 Old City Hall Remodel 1,649,450$ 48,453,110$ Parks New Pedestrian lighting on Electric Ave Greenbelt 300,000$ Citywide Park and Turf Renovation 1,000,000$ Edison Park Improvements 1,000,000$ Zoeter Field Rehabilitation (including stands)100,000$ Zoeter Bleachers 526,020$ Zoeter Building(Daycare)382,250$ Arbor Park Field Restoration 50,000$ Heather Park Improvements 800,000$ City Entry Monument Signs 100,000$ Seal Way Boardwalk Sidewalk Improvements 200,000$ Annual Citywide Court Rehabilitation 90,000$ Tennis Center Club House 820,050$ Tennis Center Site 302,500$ Tennis Center Locker/Shower/Restrooms 1,510,630$ Marina Community Center/Park 1,615,130$ 8,796,580$ Storm Drain Storm Drain Master Plan Projects 106,000,000$ 106,000,000$ Streets and Transportation Seal Beach Boulevard and Rossmoor Center Way Intersection Improvements 200,000$ Westminster Avenue Storm Drain Undergrounding 3,000,000$ Traffic Signal Upgrades 1,000,000$ Lampson Avenue Bicycle Lane Improvements 1,000,000$ Gold Coast Stub Ends Improvements 300,000$ Citywide Concrete Rehabilitation 1,000,000$ Citywide Street Paving Rehabilitation 18,000,000$ Alley Pavement Rehabilitation 5,000,000$ Westminster Ave. Bicycle Path and Drainage Improvements 200,000$ Old Town Parking and Signage Improvements 100,000$ 29,800,000$ Sewer System Sewer Master Plan Projects 7,000,000$ 7,000,000$ Water System Lampson Water Well Connection Improvements 1,200,000$ Anaheim Bay Water System Improvements 2,000,000$ College Park West Water Rehabilitation 1,000,000$ Water Valve Replacement Program 150,000$ Water System Infrastructure Repairs 1,200,000$ 5,550,000$ TOTAL 206,099,690$ FY 2017/18 -2021/22 5 year CIP Budget City of Seal Beach 84