Loading...
HomeMy WebLinkAboutItem 1 FSEA�• , _�_- ENVIRONMENTAL QUALITY ITEM NUMBER : 'L.] 77.--=— : CONTROL BOARD t ; 1 Si_ 6-.1e, NAP., STAFF REPORT TO: Environmental Quality Control Board FROM: Interim Director of Community Development MEETING DATE: July 12, 2017 SUBJECT: SCHEDULED ITEM - DISCUSSION CITY OF LONG BEACH: DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION HAYNES GENERATING STATION UNITS 3 THROUGH 6 DEMOLITION PROJECT LOCATION: 6801 East 2nd Street, Long Beach RECOMMENDATION: Staff recommends that the Environmental Quality Control Board review the Draft Initial Study/Mitigated Negative Declaration, provide comments and/or recommendations, and authorize the chair to sign a letter incorporating these comments in response to the Haynes Generating Station Units 3 through 61 Demolition Project. 1 City of Long Beach:Haynes Generating Station July 12, 2017 DISCUSSION: The Haynes Generating Station has prepared a Draft Initial Study/Mitigated Negative Declaration to assess potential environmental effects that could result from the proposed demolition of four non-operational generating units, two storage tanks, and ancillary facilities related to the prior operation of the generators. The Haynes Generating Station consists of 160 acres with 11 operating generating units on the subject site Two of the four generating units that are proposed for demolition were decommissioned in 2004 while the other two were decommissioned in 2013. The functionality of units 3 through 6 were replaced by other operating .generator units on site. This proposal does not identify future proposed uses for the area once the decommissioned structures are removed but it does state that the site may be used for future new facilities, including repowering and/or energy storage projects. A Draft Initial Study/Mitigated Negative Declaration (IS/MND) was prepared to assess potential environmental impacts that may result from the proposed demolition on the Haynes Generating Station. The proposed scope of demolition work, including vehicle trips, dismantling, and waste removal was assessed for potential impacts on the surrounding areas. The community of Leisure World within the City of Seal Beach is located adjacent to the project site so there is a high potential that impacts from the project could affect this portion of the Seal Beach Community. The proposed demolition project is estimated to consist of a 2.5 year period that is anticipated to begin at the end of 2018 or early 2019. Demolition activity is expected to occur five days.a week, Monday through Friday, with workers arriving on site at 6:30 a.m. and work commencing at 7:00 a.m. until 3:30 p.m. Given the project site's close proximity to a community with residents who have existing respiratory conditions, the potential air quality impacts are of significant concern with this project. Additionally, the demolition of the generating units will require significant use of cranes and hand torches because the primary equipment to be used, hydraulic shears, can reach a max height of 90 feet and the generating units are 150 feet tall, 400 feet if the stacks are included.' While the IS/MND identifies no impact after project completion there is no assessment of the impact during the as year demolition period. The Environmental Quality Control Board will be asked to provide potential comments and recommendations that will be forwarded to the Los Angeles Department of Water and Power in response to the public review period for the Draft IS/MND. At the July 12, 2017 EQCB meeting, staff will present proposed comments related to air quality and aesthetics for the Board's consideration and seek additional comments for inclusion in the response letter. 7 City of Long Beach..Haynes Generating Station July 12, 2017 RECOMMENDATION Staff recommends that the Environmental Quality Control Board listen to the presentation, discuss and provide comments, concerns, and recommendations then authorize the chair to sign a letter in response to the Draft Initial Study/Mitigated Negative Declaration Haynes Generating Station Units 3 through 6 Demolition Project. SA as. crystal rrav- / Interim Dire 4.• .fCommunity Development Attachments: (1) ATTACHMENT 1: City of Long Beach: Draft Initial Study/Mitigated Negative Declaration Haynes Generating Station Units 3 through 6 Demolition Project (Previously delivered on June 29, 2017) • 3 City of Long Beach:Haynes Generating Station July 12,2017 ATTACHMENT 1 CITY OF LONG BEACH: DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION HAYNES GENERATING STATION UNITS 3 THROUGH 6 DEMOLITION PROJECT (Previously delivered on June 29, 2017) Available On-Line: www.ladwp.com/envnotices • 4