SUBJECT: AWARD BID FOR SEAL BEACH BOULEVARD
TRAFFIC SIGNAL FIBER OPTIC INTERCONNECT
SYSTEM PROJECT No. 50011.
SUMMARY OF REOUEST:
The proposed action will award a contract for the Seal Beach Blvd Traffic Signal Fiber
Optic Interconnect System Project No. 50011, to the lowest responsible bidder,
Broadband Powering Services, Inc. in the amount of $300,274.00 and authorize the City
Manager to execute the agreement.
BACKGROUND:
This proposed project is the second phase of upgrading and coordinating traffic signals
along Seal Beach Boulevard from Pacific Coast Highway to the 405 Freeway. Traffic
signal coordination is a method of timing groups of traffic signals along an arterial to
provide a smooth movement of traffic with minimal stops. The goal of the coordination
system is to efficiently move the greatest number of vehicles through the system with the
fewest possible stops. Signal coordination from the 405 Freeway to the north City limits
is currently under construction with the Bixby Development and is expected to be
completed in the Spring of 2002.
The first phase of the project has already been completed, with the installation of new
traffic controllers and cabinets along Seal Beach Boulevard. This second phase would
link signals along the Seal Beach arterial, through new buried fiber optic lines in a local
network. It will enable centralized control, coordination, and networking via a state -of-
the -art computer equipment and programs. This proposed project is fully funded under
the competitive Measure M Signal Improvements Program. Monies from this program
may only be used for these purposes and may be forfeited if the project is not completed.
Ten bids were received and opened by the City Clerk on Wednesday, March 27, 2002 as
listed below.
1 Broadband Powering Systems, Inc. $300,274.00
2 C.T. &F., Inc. $309,800.00
Agenda Item
3
Moore Electrical Contracting, Inc.
$318,805.00
4
Inspection Engineering Construction
$327,581.56
5
Baxter - Griffin Co., Inc
$343,100.00
6
Lambco Engineering, Inc.
$348,885.00
7
Benergy, Inc.
$350,960.00
8
ProTech Engineering Corp.
$385,542.50
9
Dynalectric
$389,034.00
10
Herman Weissker, Inc.
$469,476.60
The low bidder is properly licensed to do the work and has appropriate work experience as
well as being the lowest responsible bidder for the project.
FISCAL IMPACT:
Measure M funds in the amount of $550,000 are currently available within the City's
Capital Improvement Program budget for construction of these improvements. This
includes the design, administration, inspection, construction and the purchase of materials
and software for the project. Any remaining funds would be returned to OCTA.
Upon motion of the consent calendar, it is recommended that the City Council:
1. Award the construction contract for the Seal Beach Blvd. Traffic Signal Fiber
Optic Interconnect Project, CIP No. 50011 to the lowest responsible bidder,
Broadband Powering Services, Inc., in the amount of $300,274.00 and authorize
the City Manager to execute the agreement.
Prepared By:
Marl K. Vukojevic, P.E. D .E.
Assistant City Engineer Director of Public Works /City Engineer
NOTED AND APPROVED:
Agenda Item
�, Aso 960 Oct
X389, og�l
�0 ®R� �saieicsr� C;AVi"eAciia9,C y�� , ,19705 — °'
AIFA VA4) &kl d4o�E4, ✓ eve,
�, co, i F" % e
Wo
9
ILO
0
# VD
Al) �&Xree- ✓,re,• 46o
PROOF OF PUBLICATION
(2015.5 C.C.P.)
STATE OF CALIFORNIA,
County of Orange
I am a citizen of the United States
and a resident of the county afore-
said; I am over the age of eighteen
years, and not a party to or inter-
ested in the above - entitled matter.
I am the principal clerk of the printer
of the SEAL BEACH SUN, a
newspaper of general circulation,
printed and published weekly in the
City of Seal Beach, County of
Orange and which newspaper has
been adjudged a newspaper of
general circulation by the Superior
Court of the County of Orange, State
of California, under the date of
2/24/75. Case Number A$_2583; that
the notice of which the annexed is a
printed copy (set in type not smaller
than nonpareil), has been published
in each regular and entire issue of
said newspaper and not in any
supplement thereof on the following
dates, to -wit:
zlzR
all in the year 2002.
I certify (or declare) under penalty of
perjury that the foregoing is true and
correct.
Dated at Seal Beggh, CA,
this2gL day of 2002.
.0
Signature
PUBLICATION PROCESSE Y:
THE SEAL BEACH SUN
216 Main Street
Seal Beach, CA 90740
(562) 430 -7555
This space is for the County
Clerk's Filing Stamp
VO
1\
Oi,ecb,al =Woks
Febuxy 25,iIX'¢.
Pud'en� n tln Seal Beef � Sun Jou,rel.
?/181Q.
oV
N�