Loading...
HomeMy WebLinkAboutSupplemental Information - Lifeguard Headquarter Facilities�e �.? .,w�'e1�y � c�rr swrn��, m�. www.giNlostrvcmrea.com In June, the City approached Griffin about studying the pros and cons of cua..•a.°w.•.•.+w making temporary or permanent .i: "m�°w.ti. �..�.•, �.m,n...,,b leak repairs to the Lifeguard a..m •°+»- w.•+ -d.... Headquarters and its associated °'"° "^y^"^•'^mpn+°•^°�+^^•�°°•w°•+° - Survey revealed facility was showingz buildings �•m- +° +°•*+»me•° <•.•° assessment �• TEMPORARY SOLUTION: Contract with roofing contractor to identify scope of work and estimate cost of repair RECOMMENDED SOLUTION: Obtain a Needs Assessment and begin planning for construction of a new facility Buildings were evaluated in the 2011 a..m •°+»- w.•+ -d.... FCA (see summary to the right) °'"° "^y^"^•'^mpn+°•^°�+^^•�°°•w°•+° - Survey revealed facility was showingz signs of failure at time of c 1e1v °°°°""^ °b�'"°"^s°°^^°°^'^^�•^° assessment a - Building has been subject to continuous additions and remodels uM•mMu•.n•.i.,��wree...mwa which have resulted in leaks and potential structural issues TEMPORARY SOLUTION: Contract with roofing contractor to identify scope of work and estimate cost of repair RECOMMENDED SOLUTION: Obtain a Needs Assessment and begin planning for construction of a new facility • Provides a business -based strategic assessment of needs • Assists City in identifying and validating present and future space needs • Allows for City to analyze options relative to operations • Improves space and resource utilization • Resolves code compliance issues • Creates opportunities for improving operating efficiency • Develops concept plans to determine site location and /or phasing considerations • Identifies costs and trade -offs TNt