In June, the City approached Griffin
about studying the pros and cons of cua..•a.°w.•.•.+w
making temporary or permanent
.i: "m�°w.ti. �..�.•, �.m,n...,,b
leak repairs to the Lifeguard
a..m •°+»- w.•+ -d....
Headquarters and its associated
°'"° "^y^"^•'^mpn+°•^°�+^^•�°°•w°•+°
- Survey revealed facility was showingz
buildings
�•m- +° +°•*+»me•° <•.•°
assessment
�•
TEMPORARY SOLUTION: Contract with roofing
contractor to identify scope of work and estimate
cost of repair
RECOMMENDED SOLUTION: Obtain a Needs
Assessment and begin planning for construction of
a new facility
Buildings were evaluated in the 2011
a..m •°+»- w.•+ -d....
FCA (see summary to the right)
°'"° "^y^"^•'^mpn+°•^°�+^^•�°°•w°•+°
- Survey revealed facility was showingz
signs of failure at time of
c 1e1v °°°°""^ °b�'"°"^s°°^^°°^'^^�•^°
assessment
a
- Building has been subject to
continuous additions and remodels
uM•mMu•.n•.i.,��wree...mwa
which have resulted in leaks and
potential structural issues
TEMPORARY SOLUTION: Contract with roofing
contractor to identify scope of work and estimate
cost of repair
RECOMMENDED SOLUTION: Obtain a Needs
Assessment and begin planning for construction of
a new facility
• Provides a business -based strategic assessment of needs
• Assists City in identifying and validating present and
future space needs
• Allows for City to analyze options relative to operations
• Improves space and resource utilization
• Resolves code compliance issues
• Creates opportunities for improving operating efficiency
• Develops concept plans to determine site location
and /or phasing considerations
• Identifies costs and trade -offs TNt