HomeMy WebLinkAboutItem R4�go4 oI
AGENDA REPORT
DATE: June 25, 2001 y
TO: Honorable Mayor and City Council
FROM: John B. Bahorsko
City Manager
SUBJECT: Request to Adopt FY 2001/02 Budget, Information Technology
Strategic Plan, Budget and Fiscal Policies, and Five -Year
Capital Improvement Plan
SUMMARY OF REQUEST:
!Staff is requesting City Council take the following actions:
1. Conduct the public hearing and take public input.
2. Adopt a resolution approving the FY 2001 -02 Budget, Five Year Capital
Improvement Budget and Appropriations limit for Fiscal Year 2000 -2001.
3. Approve the Budget and Fiscal Policies.
4. Approve the Information Technology Strategic Plan.
5. Provide direction on the street sweeping and tree trimming fees.
BACKGROUND:
City Council received the proposed budget on May 21, 2001 in accordance with the City
Charter. A workshop was held on June 11, 2001 to discuss the FY 2001/02 Budget and
supporting documents. As required by the City Charter a public hearing to adopt the
budget was noticed for June 25, 2001. City Council may now take public comment on the
proposed budget, provide additional Council comments on the proposed budget and adopt
the proposed budget along with any changes.
DISCUSSION:
Staff has proposed a FY 2001/02 Budget that includes revenues of $48,806,917 and
expenditures of $46,285,693. General Fund revenues are projected to be $16,765,708 and
General Fund expenditures of $16,678,651. As in past years the City's three largest
revenue sources are utility user tax, property tax, and sales tax. These three sources of
revenues account for 51 % of the total General Fund revenues.
Agenda Item
n
i
General Fund expenditures in FY 2001/02 we projected at $16,678,651. In FY 2001/02
police and fire expenditures consume 51% of the resources. In FY 2001/02 police and
animal control expenditures are $5,676,941 and expenditures for fire are $2,877,769.
Within Water Fund operations there is a projected deficit of $537,793 that will need to be
addressed before the end of FY 2001/02. Staff is already preparing a water rate study to
address the imbalance in the Water Fund. Sewer Fund improvements are continuing due
to the revenues provided by Certificates of Participation issued in June 2000. Several key
projects are planned such as replacement of the sewers in old town and the Boeing pump
station.
In FY 2001 /02 the General Fund will be transferring $793,254 to the Tidelands Beach
Fond for beach related operations and projects. One of the most significant projects is the
sand replenishment project at the cost of $150,000.
FISCAL IMPACT:
The proposed FY 2001/02 Budget will establish the fiscal plan for the City of Seal Beach
over the next year. An undesignated fund balance of $1,686,620 or 10% of the General
Fund expenditures is available for unanticipated expenditures.
RECOMMENDATION:
Adopt resolution number _ approving the FY 2001/02 budget, Five Year Capital
Improvement Plan and FY 2001/02 Appropriations Limit.
Approve the Budget and Fiscal policies.
Approve the Information Technology Strategic Plan.
Provide staff direction on the street sweeping and tree trimming fees.
A. Resolution Number Adopting the FY 2001/02 Budget, Five -Year Capital
Improvement Plan and _ FY 2001/02 Appropriation Limit.
�t EAf 9F,
t qC
i� #
�,� gyp,.
DATE:
TO:
THRU:
FROM:
SUBJECT:
Memo
June 8, 2001
Honorable Mayor and City Council
John B. Bahorski, City Manager
Doug Danes, P.E., Interim Director of Public Works/City Engineer
Street Sweeping Analysis
STREET SWEEPING ANALYSIS
How much does the department currently sweep?
Currently, the Public Works Department maintains 43 miles of street (86 curb miles)
within its network. Most residential areas are swept twice a month, arterials are swept
four times a month, and Main Street and the Beach Parking Lots are swept 4 times
per week. Alleys are swept on an as needed basis.
Leisure World also contracts with the City at an hourly charge, for five hours a month,
to sweep within its community. We also sweep Pacific Coast Highway and invoice
Caltrans back per our maintenance agreement.
What type of equipment does the department use?
The Department has two street sweepers and one street sweeper operator. The
primary street sweeper (75 %) is an old typel993 Mobil broom sweeper with 47,750
miles and 5,300 operating hours. The secondary sweeper (25 %) is a 1986 Tymco
vacuum sweeper with 40,500 and 5,970 operating hours that can remove debris and
standing water. This piece of equipment is used only for specific "hot spot" areas and
College Park East to vacuum standing water and debris.
Both sweepers will soon need replacement next fiscal year. The average life of a
sweeper is seven to ten years. New AQMD are in effect that will require agencies to
purchase PM -10 effident sweepers. These are vacuum sweepers that prevent the
• Page 1
venting of particulate matter of a specific size. The purchase of a PM -10 sweeper
would eliminate the need to maintain two sweepers.
How is the street sweeping service paid for?
The City currently collects $41,000 through the street sweeping fee. Council instituted
an ordinance in 1987 to collect community service fees. These fees have never been
raised.
The fee was established, primarily, at an assessment of fifty cents per water meter
with some language for exceptions. These included commercial, manufacturing,
vacant properties, etc... were charge on cent per lineal foot served by a city street
sweeper or the minimum assessment of fifty cents per water meter, whichever is
greater. The City Attorney's office is reviewing the process necessary to raise the
fees and whether or not there are "prop 218" issues.
How much does the department currently spend on street sweeping?
The Engineering Division performed a comprehensive analysis on the Department's
street sweeping operation. In summary, the costs were broken down into the
following categories: labor, overhead, capital, equipment, miscellaneous
adjustments.
Labor included payroll costs, shift differential, fringe benefits, uniform and training
costs. Overhead included supervision and administration costs. Capital included the
cost to purchase a new sweeper, interest payments, and return on salvage value
based upon a seven -year life. Equipment included tires, fuel, oil and grease, brooms,
in house parts and contract services. Miscellaneous adjustments included the credits
back from Leisure World and Caltrans.
LABOR COSTS
I $
53,287.20
OVERHEADCOSTS
i $
1,000.00
CAPITAL COSTS
i $
24,528.57
EQUIPMENTCOSTS
I $
18,842.25
EWIROM4ENTAL REGULATIONS
is
-
MISCELLANEOUS ADJUSTMENTS
I $
(10,560.00)
Total City Costs!
$
87,098.02
How does this compare with contracting for outside services?
To compare in -house vs outsourcing it is important to make an "apples" to "apples"
comparison. This is done by adding all the costs it currently takes in -house to perform
that operation then divide that by a production rate.
In this case, the production rate is curb miles. The City crews sweep approximately
2,800 curb miles per year at a cost of approximately $87,100. This works out to $31 a
curb mile.
• Page 2
Staff spoke with several street sweeping contractors and outside services are
charging between $13.00 and $15.00. The yearly cost for the service with additional
inspection/monitoring costs would be $50,000 per year.
From the analysis, it is more cost effective to contract out. Some of the reasons for
this cost differential are the continued maintenance of the equipment, work
schedules, the ability of a private company to purchase machines at lower rates, and
the productivity gain from being specialized. Staff examined ways to improve our
operation significantly but even if procedures and production rates were modified it
still would not be sufficient to close the gap vs contracting out.
There has been a trend for some time now for smaller agencies to contract out this
service. Just some of the Cities that have successfully contracted out street
sweeping include Dana Point, Signal Hill, Hermosa Beach, Manhattan Beach, and
Laguna Niguel. Even Los Angeles County contracts out 75% of their street sweeping.
The success of a maintenance contract depends on the quality of the contractor as
well as the commitment for administration and inspection. It is recommended that the
City put out a request for proposals if this option is selected so a quality contractor is
chosen.
How would a contract sweeper be evaluated?
In a street sweeping contract, the evaluation of services is based on the level of
cleanliness after sweeping, adherence to schedules, driver and equipment safety,
courtesy of operators, and number of complaints received. Photographs are often
used to establish various levels of cleanliness. There would also be performance
monitoring and liquidated damages or payment deductions for poor performance.
Also, if the City were unhappy with the performance of a contractor it go back out for
proposals for new contractors or re-establish in -house street sweeping. It is
recommended that every three years the Department re- evaluate its maintenance
contracts for costs and overall performance.
Are there any other factors to consider?
It is also important to note that there is some debate statewide concerning the issue
of prevailing wages. The Department of Industrial Relations has authored a letter
stating that agencies must pay contract sweepers at the prevailing wage of a
"Operating Engineer, Group 4." Although its effect has not been fully realized, it is
expected to raise curb mile cost approximately 60 — 80 %. The City would remain
unaffected since Seal Beach is a charter city and does not have pay prevailing
wages.
Second, if City were to contract out it would need to either transfer the street sweeper
operator to a vacant position within the Department or lay off the employee.
• Page 3
Currently, there is a vacancy in the Sewer Division for a Mtce 11 that is about to be
filled and d is recommended that he be transferred.
Also, there may be a secondary effect of morale concerning contracting out which
could be mitigated through proper communication and education concerning the
plans for the department.
What is the gap between what the City collects and its operation?
There is a $46,000 shortfall between what the City currently collects and what it
spends on street sweeping in- house.
What are Council's options?
Council has several options. The average property owner pays $.50 per month for
Street Sweeping.
Option 1: Keep In -House Street Sweeping — Same Schedule $87,000 per year.
The street sweeping fee would raise from $.50 to a $1.56 per month for a $1.06
increase.
Option 2: Contract Out Street Sweeping — Same Schedule $50,000 per year
The street sweeping fee would raise from $.50 to a $.59 per month for a $.09
increase.
What if council wanted to increase service so that all streets were swept weekly?
Option 3: Contract Out Street Sweeping — Sweep all Streets Weeldy $80,000
per year plus one time cost of $26,000 to $58,000 for signs.
This option would provide greater ocean water quality as well as increased aesthetic
benefits. The street sweeping fee would raise from $.50 to a $1.46 per month for a
$.96 increase over the life of the program.
There is a one time cost to change out for weekly sweeping. The Department would
need to change out all the signs within the City. With over approximately 1400 signs
at $40 per sign installed, it would amount to approximately $56,000 for the change
out.
Of this amount, approximately $30,000 could be saved if the in College Park West
and College Park East sweeping restrictions were placed on both sides of the street
for the same day. This would allow for the posting of signs on only entrance streets of
the tract (CPW 1, CPE 5). The Department would then remove all the existing signs
which would improve community aesthetics. This method has been instituted in other
cities such as tracts in Brea.
• Page 4
Council could fund the $56,000 or the $26,000 by raising the street sweeping fee
accordingly over and by using the salvage value of the existing equipment if the
service were contracted.
• Page 5
CITY OF SEAL BEACH
MEMO
TO: City Council
via J. Bahorski, City Manager
FROM: Nancy Beard
DATE: May 24, 2001
RE: Tree Maintenance Fees
The City of Seal Beach maintains approximately 5,000 trees on public
property with plans to install more trees over the next few years. The
City is working creatively to enhance its Urban Forest with an
aggressive planting program and by partnering with the Trees for Seal
Beach non -profit organization dedicated to increasing the same cause.
Maintaining the City's existing forest and caring for new trees that have
been planted, requires appropriate funding highlighting the City's
investment in healthy trees and ensuring high quality appearance. The
Urban Forest in Seal Beach is on a two to three year grid trimming
cycle maintaining approximately 1,200 trees annually. Palm trees in
Old Town and the trees on Main Street are the exception to that plan as
they are trimmed on an annual basis. Advantages to an appropriate
trim cycle are apparent following any of the City's major storms. The
City has experienced very little damage and few claims as a result of its
diligence where tree care in involved.
The City currently allocates $55,000 for tree trimming. The City's tree
trimming fee provides only $36,000 creating an annual general fund
impact of $19,000.
Tree maintenance does not end with trimming. The City must also
remove, replant and root prune trees as well as provide root barriers
when appropriate, soil replacement, perform sidewalk grinding and
repair or replace curb and gutter damaged by the city's trees increasing
the cost of preserving trees.
Staff estimates, based on existing tree inventory, that the city has
approximately 300 Ficus, Black Locust and Brazilian Peppers trees
which do or will require sidewalk and or curb and gutter removal and
replacement. The City currently has a backlog of sidewalk repair, which
can be attributed to its Urban Forest.
The following is a table of the services and costs included in tree
maintenance.
Costs to Fix Damage to Public
Improvements caused by City Trees
Activity
Avg
Quantity
per
Location
Mtce.
Unit
Price
Amount
Permanent Repairs
Remove and Replace Damaged Curb
and Gutter
15 LF
$35/LF
$350
Remove and Replace Sidewalk (Avg
5ft x l Oft panel)
50 SF
$8 /SF
$400
Interim Repairs
Grind Raised Sidewalk
1 Location
$50/Loc
$50
Asphalt Patch
1 Location
$25/Loc
$25
Tree Removals
Remove Tree (Assume 13 inch
diameter)
13 inch
$13 /in
$169
Tree Plantings
Plant 15 gallon Tree
1 each
$100
$100
Plant 24 gallon Tree
1 each
$200
$200
Soil Replacement
1 location
1 yard
soil $24
$24 labor
Root Pruning
1 location
$95
$95
In modifying the services provided for tree maintenance, there may be
four fiscal scenarios. The City may adjust the existing tree trimming fee
to accurately reflect the direct cost of annual trimming. The annual cost
of grinding sidewalk to prolong the life of both the concrete and tree
(estimated to be 3 years) could be added to the annual fee. Another
approach would be to add an annual cost for sidewalk and gutter
R
repairs related to parkway trees to the fee. An all- inclusive and
aggressive approach would be to encompass all the related fees for tree
maintenance including tree trimming, removal and replacement of the
trees and gutter and sidewalks replacements.
Option 1.
To enhance the tree trimming assessment to cover the direct cost of
trimming trees.
This option raises the single - family resident's monthly fee from .50 to
.92 per month for an annual fee totaling $55,200.
Option 2.
Encompass tree maintenance on a grinding or patching basis with an
anticipated life span of 3 years together with recovering the direct cost
of trimming.
This option would raise the current single- family resident's monthly fee
from .50 to $1.05 for an annual fee totaling $63,000.
Option 3.
Encompass tree maintenance in the fee, which would include tree
trimming and sidewalk and gutter removal and replacement.
This option would raise the current single - family resident's monthly fee
from .50 to $2.08 for an annual fee totaling $124,800.
Option 4.
Encompass all tree maintenance in the fee including, trimming
($55,000), tree removal and replacements ($75,000) and sidewalk and
gutter replacements ($70,400).
This option would raise the current single - family resident's monthly fee
from .50 to $3.34 for an annual fee totaling $200,400.
Staff is recommending City Council consider implementing Option 3 for
Adoption. At a minimum, staff believes Option 1 is necessary to reduce
the general fund subsidy.