Loading...
HomeMy WebLinkAboutItem AA Regional Fire Operations & Training Cienter ag"OL O C � r o/ �. ,y � /. ? / �_ ��, -� — i Orange County Fire Authority Board of Directors ' Shawn Boyd, Seal Beach Chair • Susan Ritschel, San Clemente Vice Chair • Todd Spitzer, County of Orange Tom Wilson, County of Orange ITBDI, Alisio Viejo Patsy Marshall, Buena Park Frank McCoy, Cypress ■ Harold Kaufman, Dana Point Chris Mears, Irvine Ken Blake, La Palma Illb R. Craig Scott, Laguna Hills Joe Brown, Laguna Niguel ` Dr. Brenda Ross, Laguna Woods Helen Wilson, Lake Forest Marilynn Poe, Los Alamitos k Sherri Butterfield, Mission Viejo Chris Lowe, Placentia Carol Gamble, Rancho Santa Margarita • John Greiner, San Juan Capistrano David Shawver, Stanton Tracy Wills Worley, Tustin • Bob Bell, Villa Park Tony Lam, Westminster Ken Ryan, Yorba Linda r r r • f F1Rp ' Orange County Fire Authority p` PO Box 86, Orange, CA 92856 -9086 • 180 S. Water St., Orange CA 92866 -2123 Chip Prather, Fire Chief(714) 744 -0400 www.ocfa.org 'Oamact' ' April, 2001 Dear Friends: 1 would like to share with you the OCFA plan to "Safeguard the Future." The following pages contain information developed to inform Orange County Fire Authority residents and businesses of our vision to build a new Regional Fire Operations and Training Center. This campus will be comprised of 911 emergency communications center, training, and public safety support facilities which will meet the ' needs ofcurrent and future Orange County generations to come. Sincerely, ' Chip Prather Fire Chief ' Serving the Cities of: Alisio Viejo • Buena Park • Cypress • Dana Point • Irvine • La Palma • Laguna Hills • Laguna Niguel • Laguna Woods • Lake Forest • Los Alamitos • Mission Viejo • Placentia • Rancho Santa Margarita • San Clemente • San Juan Capistrano Seal Beach • Stanton • Tustin • Villa Park • Westminster • Imba Linda ' and Unincorporated Areas of Orange Counry This document highlights why the center is needed and how it will improve the reliability of fire protection and emergency medical service systems. The time for undertaking this project could not be more appropriate. The dedication of a 16.5 -acre site, a $3 million planning grant from the State, ' and a positive financial forecast all contribute to making this campus feasible. We have developed an extensive public outreach effort to the communities surrounding the project ' to keep them informed on the progress of our project and elicited their input on design consider- ations. OCFA elected officials who play a key role in approving the design, budget and financing ' requirements are also provided with regular briefings and updates on the project. I personally extend an invitation to each of you to share our vision and support this important under- ' taking which allows us to meet the future emergency services needs of our communities. Sincerely, ' Chip Prather Fire Chief ' Serving the Cities of: Alisio Viejo • Buena Park • Cypress • Dana Point • Irvine • La Palma • Laguna Hills • Laguna Niguel • Laguna Woods • Lake Forest • Los Alamitos • Mission Viejo • Placentia • Rancho Santa Margarita • San Clemente • San Juan Capistrano Seal Beach • Stanton • Tustin • Villa Park • Westminster • Imba Linda ' and Unincorporated Areas of Orange Counry Our Vision You can count on us... Every member of the Orange County Fire Authority contributes to the quality of life within our community. We protect and support the needs of our "neighbors" to the fullest extent possible while helping and supporting ourselves. We believe in our proud traditions and our dynamic future. Our community respects and values our services and we constantly reinforce that the responsibilities with which we are entrusted are well placed. Our Mission We proudly serve the changing needs of our communities by providing the highest quality regional emergency, safety, and support services with: Professionalism Enthusiasm Organizational Integrity Pride Leadership Effectiveness Our people pledge a commitment to preserving the quality of life. We protect lives, property, and the environment with compassion, vigilance, and dedication to excellence. 1 1 1 1 1 1 i 1 i 1 1 1 1 1 1 1 1 1 1 1 1 i Table of Contents Introduction I page 1 Executive Summary I page 3 Project Overview I page 7 Financial Strategy I page 10 Conclusion I page 11 Appendix I page 13 OCFA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 I ' Introduction ' Ever since the Orange County Fire Department was formed in 1900 and later became the Orange County Fire Authority (OCFA) in 1995, a new training center ' has always been a distant dream. That dream, however, is now becoming a reality as progress continues with the new Regional Fire Operations and Training Center or RFOTC. To embark on this large and complex project, it was necessary to retain the services of a strong project management firm. In July 2000, the local Orange ' erne Countyfirm of Holmes& Narverwas selected to oversee and advise OCFA on all aspects of the project through move -in. The international company of Hellmuth, ' f X Obata, and Kassabaum (HOK), was hired in September 2001 as the design Professional to finalize a needs assessment, develop design plans, and provide ' design administration through construction. Pending financing approval from OCFA's 22 member cities and County of Orange in early summer 2001, groundbreaking and construction is planned for fall 2001. ' This document provides an overview of the Regional Fire Operations and Training Center(RFOTCI project. It is intended to give readers insight into OCFA's need to ' design and construct a 911 emergency communications center, fire training, and support facilities. ' This document is broken down into four sections. • The first section is an Executive Summary providing an overview of the business need for a new headquarters campus. • The second section will present a Project Overview with a brief description of the components for the new campus. ' • The third section will discuss Financial Strategies being considered to pay for the project. ' • Thefourth section isthe Conclusion summarizing the need for the headquarter campus. • The Appendix provides a Brief Overview of the OCFA, its membership, the services provided and how it operates. I NewLobbYflendenng NewBoerdflmm flendenng 2 1 1 1 i 1 1 1 i i 1 1 1 i 1 1 1 1 1 i 1 1 1 1 1 1 The Orange County Fire Authority (OCFA) serves as the fire department for 22 Orange County cities and the County's unincorporated area, and is committed to serving more than 1.2 million citizens. Primary services include firefighting, Executive Summary over multiple locations, most within leased space, is not cost efficient and does not encourage or support effective management and communication goals or practices. emergency medical services, hazardous materials response, Despite the importance of training for firefighter safety and and search and rescue. Additional responsibilities include fire performance, the OCFA does not have a dedicated t code enforcement, plan review, and public safety education. These services are provided by 1543 employees that includes 754 career firefighters, and 483 reserve firefighters who respond from 63 fire stations. Support staff are located throughout facilities located in the City of Orange. Challenges faced by OCFA personnel require a high degree of preparation and training. While the cornerstone of the department is primarily fire protection, fire prevention, and emergency service delivery, the department also reaches into the community through activities such as, Junior Firefighter programs in the schools, the Explorer program, CPR training, and participation in community events. Statement of OCFA's Current Facility Issues When the OCFA became an independent organization by forming a Joint Powers Authority IJPAI in 1995, it absorbed many of the responsibilities and services that had previously been performed bythe County. To respond to this growth over the years, OCFA increased space by remodeling and enlarging older buildings which now includes 13 facilities spread throughout the City of Orange. These properties represent over 70,000 sf of space, of which over 20,000 sf is leased. The existing Headquarters in Orange, consists of a 911 emergency communications center, vehicle maintenance and repair, warehousing, equipment repair, fire prevention, a training office, administration and support activities. While some activities are located in decentralized leased facilities, the majority of the essential facility functions occur in structures that were constructed in or before the 1960's. These facilities do not meet modern earthquake or security standards; do not have reliable utilities; are undersized; and do not allow for expansion to keep pace with changes in technology. In addition to the physical condition of these facilities, the separation of support departments spread out rainng facility. As one of the largest fire departments in the State of California, there is not adequate classrooms or areas to practice the most basic of firefighting techniques. Training must be scheduled at facilities owned by others. OCFA, and the community its serves, would benefit from a modern training complex where timely, consistent, and verifiable training can be conducted. For a number of years the OCFA has known that it needs a major new complex and now there is an opportunity and plan for building it. Setting the Stage with Our Accomplishments Over the past several years, OCFA has been successful in making significant strides towards a new Regional Fire Operations and Training Center, due in part to the following accomplishments: • Secured ownership of a 16.5 acre site centrally located in the City of Irvine. The property was obtained from The Irvine Company and is valued at $17 million. It was obtained at no direct cost to the OCFA. A Conditional Use Permit was also obtained which allows the project to be constructed on this property. Imarsection olJamboree Roedand Tusdn Ranch Road 3 • Received a$3 million state grant to begin site development and fund initial project start-up costs. Entered into 10 -year service contracts with member jurisdictions that allow for organizational stability and for financing to be achieved. • Retained the services of Holmes& Newer at a cost Of $2 million for all phases of the project through move -in. Holmes & Newer is an experienced project management firm who provides a high degree of assurance that the project will be completed on time and on budget. • Engaged the architectural /engineering firm of Hellmuth, Obata, and Kassabum, me fee of $3.1 million, to finalize a needs assessment for the project in order to establish squarefootage and adjacency requirements. Withvaluable input from the Board of Directors, City of Irvine, City of Tustin, The Irvine Company and interested community members, a project design and cost estimate of $50.4 million was established for the project. • Initiated an aggressive Community Outreach Program with the adjacent residential area neighborhoods and held two town -hall meetings to present project information, obtain input, and answer questions. Two signs were installed at the existing site entrance to indicate the nature of the proposed project, Including a designated contact number for questions. A community web site was also developed to provide interested persons with updated information (RFOTC.COW of any financing plan associated with the project and also assists in selecting finance professionals for debt financing. The Project The project site, known as the Regional Fire Operations and Training Center jHFOTC), is located at the intersection of Jamboree Road and Tustin Ranch Road in northwest Irvine. The 16.5 -acre complex will house the following essential fire service components: • An Emergency Communications Center to house 911 systems and dispatch staff, radio, paging, and telephone communication systems, expanded dispatch, an emergency policy center, information systems. Back -up emergency power will allow the facility to remain operational during and after major emergency events. • A dedicated Training Tower and Grounds designed to provide firefighters with classroom education and hands - on training props that provide realistic and simulated hazardous work environments. Training for emergencies before they happen insures a proper and safe response in the community. An observation window in the training tower will allow the public to watch firefighters conduct various training activities. • Conducted a financial analysis to verify the project's affordability. Established a Financial Technical Advisory Committee to provide an independent third party review 4 t t 1 1 • An Automotive Maintenance Facility that will provide optimal working conditions for safe and efficient maintenance, repair and testing of fleet vehicles and equipment. An adjacent materiel warehouse area will allow for organized storage, maintenance, construction and repair of essential supplies and equipment. • Make presentations before the governing boards of each member agency to obtain approval of the financing plan with final approval of financing by the OCFA Board of Directors in August 2001. • Award a public works construction contract in September 2001 with groundbreaking to be held in October 2001. • Begin construction November 1 for a period of 18 months. • Transition to new facility by August 2003 and continuing through August 2004. A Window of Opportunity In 1997, a preliminary needs assessment was performed to assess organizational needs and determine if the proposed 16.5 -acre site in Irvine would accommodate OCFA needs. It • A Public Services and Support Facility designed as a concluded that the best -fit solution to support OCFA's centralized one -stop customer service center that includes functional needs was a headquarters and training complex Fire Prevention, Community Relations & Education, a organized in a'campus like' setting. Training and Education Center, Human Resources, Clerk of the Authority, Finance, and other administrative support functions. Estimated Cost Based on the results of the program needs assessment and subsequent schematic design efforts, a target budget was established at $50.4 million. This estimate represents the total cost of the RFOTC project including program Given the current economy, the OCFA has a window of opportunity to build a new headquarters, 911 Emergency Communications Center, and training complex at the lowest passible cost it will likely war see. With the contribution from The Irvine Company, which dedicated the land, and the State of California, which provided $3 million for initial planning and project management, the Regional Fire Operations and Training Center (RFOTC) is ready to become a reality. ' management, design professional fees, facility construction, construction contingency, furniture, fixtures and equipment The primary goal of the RFOTC will be to meet the organization's functional objectives to enable the OFCA to costs (FF &E). provide quality emergency services to its membership. The RFOTC is more than just buildings and grounds. It will be the ' The Schedule nerve center of the OCFA, and will provide employees with Major milestones necessary for the remainder of the project the right tools and resources to do the job they are entrusted and respective dates to meet them are as follows: to do. The RFOTC's role will be no less than to help "Safeguard the Future" for all those served. t • Submit a financing plan to the OCFA Board of Directorsfor preliminary approval in May 2001 and conduct a workshop for all member agencies to inform them about the plan's provisions. ' Complete design work and submit for plan review in July 2001. 1 5 6 I H 1 1 1 1 With the support of Holmes & Narver the project management firm, Helmuth, Obata +Kassabaum )HOK) was selected as the design professional for the new HFOTC. Their extensive validation efforts of the OCFA Program needs provided the basis for the schematic design phase. In keeping with the OCFA "Good Neighbor" policy, several meetings wereconducted with the local community neighbors, The Irvine Company, the City of Irvine, the City of Tustin and local utility companies to obtain input on key design and development issues such as: ' • Exterior Lighting • Trees for Screening • Exterior Materials & Finishes ' • Noise Attenuation • Elevations ' • Hoof Design & Materials • Building Orientation ' • Energy Efficiency • Traffic Flow ' The feedback provided was developed into the innovative design keeping with the surrounding neighborhood. ' Throughout the schematic design process value engineering efforts were implemented to maintain the project target ' budget. The following paragraphs provide a brief description of each component and their role in supporting the OCFA's functional needs. Project Overview earthquake or emergency. It will be the nerve center for all - essential computer, network, operations and systems equipment including a 911 system, radios, telephones, information systems, and emergency power utilities, such as power and telephones, will be designed to ensure redundancy and reliability to the site. The new center will allow emergency communications staff to meet mission essential needs including efficient and reliable receipt and dispatching of 911 emergency calls. The New Training Tower and Grounds — 24,009 Square Feet The proposed Training Tower and Grounds is planned around a campus -style environment with specialized facilities for both classroom and fire ground training to meet NFPA training guidelines. The focal point of the fire training ground will be a six -story computerized burn -prop training tower that will be used for high -rise, industrial, and residential training scenarios, 7 The New 911 Emergency Communications — 23,896 Square Feet ' The911 Emergency Communications Center is being designed and constructed with base isolation to withstand almost any 1 Project Overview earthquake or emergency. It will be the nerve center for all - essential computer, network, operations and systems equipment including a 911 system, radios, telephones, information systems, and emergency power utilities, such as power and telephones, will be designed to ensure redundancy and reliability to the site. The new center will allow emergency communications staff to meet mission essential needs including efficient and reliable receipt and dispatching of 911 emergency calls. The New Training Tower and Grounds — 24,009 Square Feet The proposed Training Tower and Grounds is planned around a campus -style environment with specialized facilities for both classroom and fire ground training to meet NFPA training guidelines. The focal point of the fire training ground will be a six -story computerized burn -prop training tower that will be used for high -rise, industrial, and residential training scenarios, 7 opposite ends of the same bay. Adequate space has been planned to allow for a safe and efficient operation. In addition to standard automotive functions, the facility will be used for Installation of communications and other specialized equipment. A tire shop and space for outfitting apparatus with equipment will also be incorporated into the workspace. Additional features within the Automotive Maintenance facility include areas for parts storage and offices; apparatus steam clean bays; a drafting pit; tire storage and changing area repelling, and other technical training maneuvers. Computerized natural gas fire and artificial smoke simulation systems provide for enhanced and safe fire training. This tower will include an observation window so that the public can observe fire behavior and see the techniques used to put out a fire. A fire sprinkler demonstration area will also be utilized for public education purposes. Adjacent to this tower will be a two-story strip mall /storage prop designed with a computerized natural gas fire - training simulator as well as moveable mazes, roof and attic penetration props. An outdoor pavilion will provide seating for debriefing and equipment training and allow viewing for large group demonstrations and venues. Inside the pavilion are two drill ground classrooms, shower /locker facilities and storage. Additional training props on the grounds include a trench rescue prop, confined space prop, tanker full spill prop, car fire prop, railroad tanker simulation area, and a car extrication area. The New Automotive Maintenance Facility — 41,182 Square Feet The proposed Automotive Maintenance Facility will contain service and repair bays to accommodate large apparatus or allow double staging of two smaller, light -duty vehicles an 8 The New Materiel Management Center — 39,734 Square Feet The proposed Materiel Management Center will house Purchasing, Warehouse, and Property Management functions. The facility includes adequate and functional loading docks and is designed with good circulation and workflow in mind. Shelving and storage areas incorporate earthquake safety measures and bracing. Specialty shops for repair and outfitting include metal, welding, wood, signage, and a small engine shop. Emergency medical supplies and firefighter clothing and equipment supplies will also be stored in this facility. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 The New Public Services and Support Center , — 98,120 Square Feet The Public Services and Support Center is intended to be the ' central office building for training, public service activities and administrative functions. This facility is designed around public need with easy access to those offices that have the ' highest level of public interaction. Areas specifically designed to accommodate public services In this facility include Fire Prevention, Community Relations and Education, Human Resources, Clerk of the Authority, Finance, a Boardroom/ Lecture Hall, and several classrooms. Afunctional courtyard ' 1 1 adjacent to a small cafeteria is being designed to allow employees access to an outdoor break area and can also accommodate group meetings and events. Project Budget and Schedule Project Budget The project budget was established at $5C.4 as determined during the 1997 needs assessment and was recently confirmed as being realistic and on- target during the schematic design phase. The following breakdown illustrates the most recent design development cost estimates for the project by category: Construction $35.5 million Construction Contingency $ 1.6 million Furniture, Fixtures & Equipment $ 5.0 million Program Mount &Design S Z.8 million Total $49.9 million Project Schedule Award of the construction contract is scheduled by the end of September 2001 with ground breaking to occur in October. Construction will begin in November with an 18 -month duration planned. Due to the complexities associated with the design and commissioning of major emergency systems and complex components, transition and move -in is planned over 12 -month time period. Final occupancies will be completed by August 2004 Below is a brief outline schedule Of major events from start to completion. JPA Appicval of Design Concepts Jari 2001 Dry Approval Process of Design Concepts Feb-AM 2000 Construction Documents May -Sep, M01 Bid /Award General canvacto, Aug -Nov, M01 Construction Period Nov 201 Qtr, 2003 Building Commissioning & Move in 2nd Oto, 2003 -3rd Qtr, 2004 Key Project Elements The OCFA Board of Directors appointed the Executive Committee to provide key oversight for this project. ADesign Review Ad Hoc Committee provided input and direction for the more frequent and detailed site design review issues. During the programming and schematic stages of the design process, OCFA job knowledge experts provided continuous input to the design professionals and their specialty consultants. Financing Process During the design process, cost estimates were continually refined and updated by an independent firm that compiled the project's official construction cost estimate. This information will provide the basis of the financing plan which to developed and submitted to the Board of Directors for review and approval. The financing plan will then go to the sponsoring City of Irvine, for their approval. Once approved by Irvine, it will go to the other member cities and the County to obtain the 2/3 required majority vote. Community Outreach An important aspect of this project is the Community Outreach Program. An aggressive community outreach program was developed with nearby residential homeowner groups. Door- to-door contact and publicized evening town hall meetings allowed a high degree of interaction and input by the community for key design issues. Various tools (i.e. video, newsletters, pamphlets, public web site etc...) are used to keep the various audiences informed. 9 Financial Strategy Financing Overview To finance the RFOTC, the OCFA has analyzed affordability and considered various methods with which to obtain the estimated $50.4 million needed to complete the project over the next four years. Due to the fact that the current JPA agreements reflect a 10 -year commitment by member jurisdictions, this project will likely be financed within the contract time horizon (approximately nine years after the commencement of financing). OCFA has considered additional options for financing on a longer term basis over 20 -30 years; however, it appears that the most feasible option is to match the financing term to the 10 -year JPA agreements in order to successfully market the financing plan to the investment community. Analysis of Affordability Cash flows and affordability analysis were compiled and evaluated to include all projected revenue sources, operating expenditures, and capital expenditures. OCFA's primary revenue source is property taxes, representing about 67% of operating revenue. Considering the importance of accurate data regarding property tax growth, OCFA retained a consultant to project property tax revenue over the next decade. The result of the analysis indicated that OCFA can afford to support the debt, and still retain a reasonable level of reserve balances. Based on this analysis, OCFA is in a strong Position with respect to this project's affordability. Combined with the value of the 16.5 acres of land worth $17 million, the OCFA is in a very favorable position to obtain low -cost financing. Sources of Financing OCFA has explored multiple sources from which to obtain funds required to support the needs of the RFOTC. Revenue bonds and Certificates of Participation are two viable financing structures available to the OCFA. Revenue bonds involve the pledging of future operating revenues to pay the annual debt payments. Certificates of Participation require the establishment of a non - profit public benefit authority for the purpose of serving as lessor in the financing. Both of these 16 I ih r methods offer the lowest interest rate available in the , marketplace. Financial Plan Accomplishments In November 2000, OCFA established a Financial Technical Advisory Committee (FTAC) to provide an independent third parry review to the Board of any financing plan associated with the RFOTC and to assist in selecting finance professionals for the debt financing. The FTAC and OCFA staff have met on several occasions to discuss various issues relating to the RFOTC financing. Accomplishments to date include: • Developed Request for Proposals for selecting finance professionals. • Completed formal bid processes, interviews, and selection of financial advisors, bond /disclosure counsel, and underwriter. • Compiled and reviewed assumptions for the first draft 10- year financial forecast. • Developed a detailed timeline for the financing. • Determined the recommended method of sale for the debt issuance and selection of underwriter. • Identified the recommended interest rate alternative, the recommended type of debt, and the recommended term of repayment. • Completed a first draft financing plan for review by the FTAC. Timeline for RFOTC Financing/Member Agency Approval The amended Joint Powers Agreement, under which OCFA operates, requires that any long -term bonded indebtedness incurred by OCFA must be approved by two - thirds of its member agencies. In order to obtain the required approval, we plan to make presentations before the governing boards of each member agency in June and July, 2001. We expect to request final approval of the financing plan from the OCFA Board of Directors by September, 2001 and to issue the bonds immediately thereafter. 1 1 1 1 f, L� i Conclusion _ The Regional Fire Operations and Training Center will enable the Orange County Fire Authority to pursue its mission to provide the highest level of emergency services. OCFA's reputation brings honor as a dynamic, innovative, and progressive department. i The Regional Fire Operations and Training Center will help "safeguard the fu rule " for alf those we serve. As one of the largest regional fire service organizations in the state of California, firefighters do not have readily available access to adequate fire training facilities to meet ongoing training requirements. The existing headquarters facilities, including a 911 Emergency Communications Center, is undersized and does not allow for expansion to keep pace with changes in technology or permit any appreciable growth to meet service area demands. Despite enhancements and numerous repairs to existing facilities, operating from old and unreliable facilities poses significant risks. The physical separation of support departments spread out over multiple locations, most within leased space, does not encourage or support effective management and communication goals or practices. With the added value of a $17 million parcel of prime land and the $3 million provided through State funding, the opportunity for success will never be better. The opportunity to meet these support facility needs could not be better. Orange County property values are at an all time high and not likely to decline. Based on conservative revenue projectionsfrom OCFA Finance staff, the project is affordable, if financed, over the remaining member contract period. Financial options under consideration by the Financial Technical Advisory Committee include some combination of reserves and secured bond financing. Current plans are to present a financing plan to the Board of Directors for approval. This approach will have any debt paid off within the current member contract period. Beginning the next term of the contract, the OCFA will own the property free and clear, and will be able to avoid uncontrolled escalating lease costs in the future. 12 1 1 1 1 1 1 Overview of the OCFA The Orange County Fire Authority is a Joint Powers Authority (JPA) formed on March 1, 1995. It serves 1.2 million residents over 562 square miles. In addition to protecting its 22 member cities, the OCFA also protects the County 's unincorporated areas which includes providing fire protection services to the State for over 175.000 acres of wildland. OCFA is one of the largest regional fire service organizations in California. JPA Formation The JPA is a legal entity created with direct representation by all jurisdictions that it serves. The OCFA consists of 22 member cities along with two representativestmol the County of Orange. Twenty-four members serve on the Board. Prior to the formation of the JPA, the organization was known as the Orange County Fire Department, or OCFD, and was governed by the Orange County Board of Supervisors. By forming the JPA, members were able to actively participate in a decision - making process with respect to how services were delivered. How is the OCFA Organized? The OCFA is managed by an Executive Management Team that consists of an appointed Fire Chief, a Deputy Fire Chief, and four Assistant Chiefs that head up the four departments responsible for the services provided by the OCFA: • Operations Department • Fire Prevention Department • Business Services Department • Support Services Department Appendix Biennial Budget The Fire Chief presents a biennial budget to the Board of Directors for approval. This document identifies anticipated revenue and authorized appropriations. This document is reviewed and updated annually. Revenues to fund the operations of the OCFA come from a variety of sources. The majority of revenues (67 %) are obtained via property taxes. The next largest (23 %) contribution comes from Cash Contracts - of the 22 member cities, seven are on cash contracts. Other sources of revenue totaling the remaining 10% include Federal and State reimbursement, interest on reserves, fire prevention fees, and some other miscellaneous sources. 13 0 BATTALION HEADQUARTERS 0 EXISTING CAREER STATION Q EXISTING RESERVE STATION 1, EXISTING COMBINATION STATION ❑ PROPWEO STATION Ciry Member Since Aliso Viejo 2001 Buena Park 1994 Cypress 1980 Dana Point 1989 Irvine 1980 La Palma 1980 Laguna Niguel 1989 Laguna Woods 2000 Laguna Hills 1991 Lake Forest 1991 Los Alamitos 1980 Mission Viejo 1988 Placenta 1980 Rancho Santa Margarita 2000 San Clemente 1994 San Juan Capistrano 1980 Seal Beach 1992 Stanton 1987 Tustin 1980 Villa Park 1980 Westminster 1995 Yorba Linda 1980 14 i i i i 1�1 1` 1 1� 1 1 1 1 1 40 flu ca rD 12 O� M flu 7n CD l J O (D mn a O U) rD rt rD ol CD C7 O �z CD rt 0 0 m C CD 10 pool MIT - . . r . . . . . . . ..... -------- �. Cn 0 �. c� r cD 0 C7 0 CL 0 b CD R° 0 C CD 0 aro G� 0 a as H 0 CD R° C O �I yG 4 ii