Loading...
HomeMy WebLinkAboutItem Hl U SCrt AGENDA STAFF REPORT ( I r 114,' Oa DATE: February 26, 2018 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Steve Myrter P.E., Director of Public Works SUBJECT: 15 FIRST STREET BEACH FACILITIES RESTAURANT BUILDING RENOVATION PROJECT NO. BG1808 SUMMARY OF REQUEST: That the City Council adopt a Resolution: 1. Reallocate project saving funds of $125,800 from the West End Pump Station (WEPS) Improvements Project No. SD1801 to the 15 First Street Renovation Project No. BG1808; and, 2. Approving Budget Amendment No 18-08-02 in the amount of $40,000 from Sewer Capital Fund and $14,200 from assigned General Fund for Building; and, 3. Directing staff to begin seeking bids for repairs of the 15 First Street Beach Facilities Restaurant Building Renovation Project No. BG1808 in an amount not to exceed $180,000 and to obtain such further City Council authorization as may be necessary. BACKGROUND: The First Street Beach Concessions Stand, originally built in 1976, was converted to a full-service restaurant in the 1990's. This original building, constructed of masonry block, acquired two additions and several interior modifications as part of this initial conversion. These include conversion of the adjacent storage room building (also built of masonry block in 1976) into a restroom and janitor's closet. The other addition included the construction of a wood framed enclosed dining area on the south side. This addition consisted of an enclosed patio type construction including a corrugated metal shed roof on wood rafters with heavy timber walls. A subsequent addition has been constructed between the original concession masonry structure and the original storage building using a wood frame type construction as well. This last addition Agenda Item H Page 2 provided more enclosed indoor dining area while also serving to essentially join the two original masonry block structures together. The original restaurant building along with the storage building was initially leased to a restaurant service provider (Rivers End Cafe) in 1980's. The lease term with this restaurant service provider expired on April 30, 2017 and the tenant has been on a month-to-month since that time, which will terminate effective February 26, 2018. Over the years additional modifications and expansions were performed by the tenant at various times throughout the tens of the facility lease. ANALYSIS The last comprehensive facility assessment was performed as part of the Citywide Facility Condition Assessment, dated October 2011. The findings for the 15 First Street Beach Facilities Restaurant Building noted that overall the structure of the building is in relatively good condition. The following recommendations were also listed: • Minor roof tile repairs and wood fascia repairs should be made to prevent any interior or structural water damage. • Upon taking possession of this facility the City should complete a general assessment of all building systems. • Perform structural assessment of the entire facility As of February 27, 2018, the City will be taking possession of this facility, as a result of the lease termination to the current restaurant service provider. As such, a comprehensive Facility Renovation Work Plan has been created to ensure the facility is in safe and good working order. Major components contained in this work plan include: 1. Condition/Structural Facility Assessment Work will be performed by a licensed architect and structural engineer. 2. Replace Tile Roof Systems The existing tile roofs will be replaced with new shingle roofs. 3. Install Grease Interceptor The existing facility does not have a grease interceptor that meets City ordinance requirements. 4. Replace HVAC System The existing HVAC system is inoperable. 5. Replace Main Electrical Panel The electrical panel is beyond its useful service life. Page 3 ENVIRONMENTAL IMPACT: This project substitution is limited to authorization for the maintenance and repair of existing facilities and therefore qualifies for a Class 1 exemption from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (d) of the CEQA Guidelines. LEGAL ANALYSIS: The City Attorney has reviewed the resolution and approved it as to form. FINANCIAL IMPACT: In the FY 2017-18 Budget, $200,000 was allocated for West End Pump Station (WEPS) Improvements, Project No. SD1801. At the December 11, 2017 City Council meeting, the City Council approved $40,000 to fund the roof replacement project BG1801 for the WEPS. The project is substantially complete with expenditures to date of $34,112.59. The total projected cost of the WEPS project is $74,112.59. Staff will bring the WEPS project to City Council for completion at a future meeting. With the $200,000 allocation for the WEPS and complete project cost of $74,112.59, this will have a remaining balance of $125,887.41 in the General Fund. Staff is recommending approval to reallocate the project savings of $125,887.41 and apply it to the 15 First Street Renovation Project No. B01808. The total cost of the 15 First Street Facility Renovation Project is $180,000. Of the $180,000, $40,000 is sewer related for the grease interceptor and the relocation of sewer lines, which requires a Budget Amendment. This leaves a need of $140,000 to complete the 15 First Street Facility Renovation Project. Staff proposes to apply the project savings from the WEPS in the amount of $125,887.41 to the 15 First Street Facility Renovation Project of $140,000. This leaves a shortfall of $14,112.59. In the 2017-18 FY Budget, $63,481 remains in the Assigned Building Fund Balance. Staff proposes to apply the $63,481 Assigned Building Fund Balance to the shortfall of $14,112.59 which will leave a balance of $49,368.41 for the Assigned Building Fund Balance. Therefore Budget Amendment No. 18-08-02 is required per the following breakdown: Reveed/Adopted Proposed Budget (DIM Descnpeon A=unt Budget Budget Amendment Sewer CepUl PmJeot 01497549605 $ 1,0T'800 $ 1,117,800 $ 40,000 Transfer Oul 001.080-47000 $ 9,932,600 $ 9,948,800 It 14,200 Transferin 045000-31500 $ 13,118,100 $ 13,132,300 $ 14,200 Oapital Project 045-333.14000 $ 13,118,100 $ 13,132,300 $ 14,200 Page 4 Below is a breakdown of the project funding and sources: Source Amount SDI 801 WEPS Project Savings $119,156.40 Sewer Scope Budget Amendment BA 18-08-02 $40,000.00 Assigned Building Fund Balance $20,843.60 TOTAL PROJECT BUDGET $180,000.00 RECOMMENDATION: That the City Council adopt a Resolution: Reallocate project saving funds of $125,800 from the West End Pump Station (WEPS) Improvements Project No. SDI 801 to the 15 First Street Renovation Project No. BG 1808; and, 2. Approving Budget Amendment No 18-08-02 in the amount of $40,000 from Sewer Capital Fund and $14,200 from assigned General Fund for Building; and, 3. Directing staff to begin seeking bids for repairs of the 15 First Street Beach Facilities Restaurant Building Renovation Project No. BG1808 in an amount not to exceed $180,000 and to obtain such further City Council authorization as may be necessary. SUBMITTE BY: NOTED AND APPROVED: Steve M , P. J I Fj. Ingram, Director of Public orks City Manager Attachments: A. Resolution Attachment "A" RESOLUTION A RESOLUTION OF THE SEAL BEACH CITY COUNCIL APPROVING THE REALLOCATION OF WEST END PUMP STATION IMPROVEMENTS PROJECT NO. SD1801 WITH THE 15 FIRST STREET BEACH FACILITIES RESTAURANT RENOVATION PROJECT BG1808 AND APPROVE BUDGET AMENDMENT No. 18-08-02 AND DIRECTING STAFF TO SEEK BIDS FOR RENOVATIONS TO 15 FIRST STREET BEACH FACILITIES RESTAURANT THE SEAL BEACH CITY COUNCIL DOES HEREBY FIND AND RESOLVE: Section 1. The City Council will take possession of the 15 First Street Beach Facility Restaurant effective February 26, 2018, and has determined to carry out a renovation project totaling $180,000. Section 2. The City Council hereby approves reallocating project saving funds of $125,800 from the West End Pump Station (WEPS) Improvements Project No. SD1801 to the 15 First Street Renovation Project No. BG1808. Section 3. The City Council approves Budget Amendment No 18-08-02 in the amount of $40,000 from Sewer Capital Fund and $14,200 from assigned General Fund for Building as follows: Revised/Adopted Proposed Budget (DM Desanption A== BWpet eutlpet AmeWmeM Bawer Capital Protect 09497549800 $ 1,077,800 $ 1,117,800 $ 40,000 Transfer Out— 001-080-47000 $ 9,932,000 $ 9,998,800 $ 14,200 Trandw in 045000-31500 $ 13,118,100 $ 13,132,300 $ 14,200 CapOal Pmje 04533344000 $ 13,118,100 $ 13,132,300 $ 14,200 Section 4. The City Council directs staff to begin seeking bids for repairs of the 15 First Street Beach Facilities Restaurant Building Renovation Project No. BG1808 in an amount not to exceed $180,000 and to obtain such further City Council authorization as may be necessary. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 26th day of February 2018 by the following vote: AYES: Council Members: NOES: Council Members: ABSENT: Council Members: ABSTAIN: Council Members: Mike Varipapa, Mayor ATTEST: Robin L. Roberts, City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH ) I, Robin Roberts, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of the Resolution on file in the office of the City Clerk, passed, approved, and adopted by the City Council at a regular meeting held on 26th day of February 2018. Robin L. Roberts, City Clerk