HomeMy WebLinkAboutItem IAGENDA STAFF REPORT j �OFOPN� DATE: February 26, 2018 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Steve Myrter, P.E., Director of Public Works SUBJECT: APPROVE REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE SEAL BEACH PIER IMPROVEMENTS PROJECT No. BP1002 SUMMARY OF REQUEST: That the City Council approve the Request for Proposals (RFP) for Construction Management Services for the Seal Beach Pier Utility Upgrade Project No. BP1002 and authorize staff to solicit for proposals. BACKGROUND AND ANALYSIS: At the February 22, 2016 City Council meeting, the City Council discussed options for repairs and improvements to the Pier. At that meeting, City Council provided staff with direction to proceed with necessary improvements to structurally support the potential for a future one-story tenant at the end of the pier. That option included structural repairs to the pier framework, a new fire line and domestic water line, new decking, demolition and replacement of the existing sewer pump station, demolition of the existing building, a new electrical transformer and wiring and all other utility lines as necessary. The purpose of this project is to upgrade aged and damaged utility lines and to restore the structural stability of the Seal Beach Municipal Pier. Routine structural safety inspections of the Pier were performed by City consultants in 2008 and 2015. In May 2016, an electrical fire damaged the end of the pier. As a result of the fire, emergency repairs were required, which included the demolition and removal of all damaged buildings, charred decking and stringers; and necessary stringer replacement at the end of the pier. Also due to the fire, additional structural and utility repairs are required. These include: replacement of fire damaged utility lines, reinforcement and repair of damaged piles and pile caps, new stringers, decking and handrails. Agenda Item I Final design is underway for the Pier Utility Upgrade Project No. BP1002. Staff will bring a request for approval of the Plans and Specifications to City Council on March 12, 2018. If approved, staff will advertise for bids and award a construction contract in the spring of 2018. Construction will begin in the fall of 2018 as allowed by the Permit issued by the California Coastal Commission (CCC), dated November 9, 2017, as the Coastal Commission does not allow construction from Memorial Day through Labor Day. A project of this size and scope requires a qualified and professional Engineering/Construction Management firm with experience in construction management of Capital Improvement Projects, having an emphasis on coastal construction projects, to assist the City. Staff prepared under Attachment A, a Request for Proposals (RFP) to solicit qualified engineering firms. The scope of work includes project management, construction management and inspection services during the award, material procurement, construction and project close out phases of the work. Staff will return to the City Council with a request for award of a Professional Services Agreement with the most qualified consultant in the spring of 2018. ENVIRONMENTAL IMPACT: The approval of a Request for Proposals is not a project within the California Environmental Quality Act. LEGAL ANALYSIS: The City Attorney has reviewed and approved as to form. FINANCIAL IMPACT: The Fiscal Year 2017/2018 Budget allocates $3,730,000 for the project. The current budget amount is anticipated to be sufficient to cover the costs for final design work, construction and Construction Management/Inspection services. RECOMMENDATION: That the City Council approve the Request for Proposals (RFP) for Construction Management Services for the Seal Beach Pier Utility Upgrade Project No. 6131002 and authorize staff to solicit for proposals. Page 2 SUBMITTED BY: NOTED AND APPROVED: Steve yrter, P.E 11 . Ingram, Ci nager Director of Public Works Prepared by: David Spitz, P.E. Associate Engineer Attachments: A. Request for Proposal Page 3 Attachment "A" City of Seal Beach Request for Proposals Construction Management and Inspection Services, Pier Improvements Project No. BP1002 RFP responses to be received until 2:00 P.M., March 27, 2018 in the Public Works Department ATTN: Steve Myrter, P.E., Director of Public Works Approved for Advertising: Steve Myrter, P.E. Director of Public Works Date Issued: February 26, 2018 vkf e warts Table of Contents I. INTRODUCTION II. PROJECT DESCRIPTION III. SCOPE OF SERVICES IV. PRE -PROPOSAL CONFERENCE V. PROJECT SCHEDULE VI. SUBMITTAL REQUIREMENTS A. Acceptance of Submittals B. Information to be submitted VII Fee Proposal Requirements VIII. INTERVIEW IX. SELECTION PROCESS X. GENERAL CONDITIONS A. Signature B. Other Considerations C. Business License Required D. Prevailing Wage ATTACHMENTS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE PIER IMPROVEMENTS PROJECT NO. BP1002 LOCATED AT MAIN STREET AND OCEAN AVENUE, SEAL BEACH, CA 90740 INTRODUCTION The City of Seal Beach ("City") is requesting proposals from qualified and professional Construction Management fines, teams, and individuals with experience in construction management of capital improvement projects (CIP), preferably but not required, for public sector agencies for the construction of the Pier Improvements Project CIP No. BP1002 located at the intersection of Main Street and Ocean Avenue in the City of Seal Beach. The qualified fine, team or individual shall provide consulting services on an "as needed" basis for the construction of the Pier Improvements during the term of the contract. It is the City's intent to select one Construction Management Consultant for this project. The Construction Manager will support the City, represent its interests, and lead the everyday construction management and contract administration efforts related to the construction of the Pier Improvements Project. Proposals must conform to the requirements of this Request for Proposal (RFP), and must be submitted in a sealed envelope, to the Department of Public Works no later than 2:00 p.m., on Tuesday, March 27, 2018. The City reserves the right to waive any irregularity in any proposal, or to reject any proposal that does not comply with this RFP. The City alone, using criteria determined by the City, will select the qualified firm. Failure to submit the Proposal in accordance with the procedures outlined may be caused for disqualification. The successful Professional Consultant will be required to enter into an agreement with the City as described in Appendix A, which will include the requirements of this RFP as well as other requirements to be specified at a later date. By submitting a proposal, the Contractor agrees to all of the terms of this RFP. PROJECT DESCRIPTION Routine structural safety inspections of the Pier were performed by City consultants in 2008 and 2015. Recommendations for improvement included structural repairs to the pier framework, a new fire line and domestic water line, new decking, demolition and replacement of the existing sewer pump station, demolition of the existing building, a new electrical transformer (provided and constructed by Southern California Edison) and wiring and all other utility lines as necessary. The purpose of this project is to upgrade aged and damaged utility lines and to restore the structural stability of the Seal Beach Municipal Pier. In May 2016, an electrical fire damaged the end of the pier. As a result of the fire, emergency repairs were required, which included the demolition and removal of all damaged buildings, charred decking and stringers; and necessary stringer replacement at the end of the pier. Due to the fire, additional structural and utility repairs are required. These include: replacement of fire damaged utility lines, reinforcement and repair of damaged piles and pile caps, new stringers, decking and handrails. By September 2018, the City is expecting to commence construction of improvements to the Seal Beach Municipal Pier. Substantial completion is expected by May 2019, over an anticipated 9 month construction process. The design firms of Moffatt and Nichol Consultants and AKM Consulting Engineers prepared the construction drawings and specifications and will serve as project Design Engineers during the construction process. The construction bid is expected to be awarded by May 2018. SCOPE OF SERVICES Construction Costs for the new Library is estimated at approximately $3 million. The preliminary scope of service below is the minimum scope of services intended to be performed by the construction management consultant (CM). Each proposer should elaborate on scope items to further define the scope, and to demonstrate the proposer's understanding and experience in the performance of similar services. The CM will serve as the City's representative and liaison with the City Project Manager and Project Management Team that may include the Director of Public Works, City Manager, City Attorney, City Engineer, and Design Engineers. The CM will also be the City's representative to administer the construction contract during the construction of the project. The scope of work for the Construction Management Services includes the following essential tasks: A. Construction Phase Services As directed by the City, the Construction Manager will manage and oversee the City's Contractor(s), coordinate with the City's consultants, utility companies and other jurisdictional agencies as necessary and required t0 ensure projects constructed for the City are of high quality and integrity, and such projects move forward in a timely and fiscally prudent manner, and will provide support throughout the project's construction phase. 3.1 Basic Services Construction management is the discipline of planning, organizing, securing and managing resources to achieve specific goals as defined by the project specifications. The primary responsibility of the Consultant Construction Manager is to achieve all of the project goals and objectives while honoring the project's constraints. Primary constraints for a project can be identified as scope, time, and budget. The following services will be required of a qualified, professional Construction Manager on an "as needed" basis for assigned projects: 3.1.1 Represent the City and its interests in all negotiations, meetings, community outreach and related activities during all phases of the Project. 3.1.2 Monitor project performance and coordinate project meetings with City staff and consultant design team to ensure compliance with the City's design and construction standards, project schedules and project budgets. 3.1.3 Prepare project schedules in Primavera P6 Format or latest version (or approved equal program) and track all schedule deviations. 3.1.4 Identify, prepare, recommend and monitor any required changes to contract(s). 3.1.5 Manage issues related to the project including insurance, bonds, certified payroll, pay application, retainage, warranty, and grant accounting, and provide other situational resolutions as they may occur. 3.1.6 Maintain orderly and comprehensive records, documentation, design data, drawings, correspondence, etc. pertaining to project. 3.1.7 Ensure project accounting and reporting procedures can support informational needs as requested by the City Departments. 3.1.8 Upon project completion, ensure all close-out procedures, reporting requirements, and records keeping are promptly met. 3.1.9 Other duties as necessary and assigned. 3.1.10 Project Control System — The CM shall set up, host, backup, and maintain the project control systems for tracking and reporting project progress. The hosted system should include enough licenses to allow efficient access for members of the CM, design team, the City's PM and contractor's staff. The CM should assume ten (10) ten licenses for this purpose. This preferred project control system shall include Primavera P8 V8.2 or later and Oracle Contract Manager for documenting, tracking and reporting on budgets, schedules, correspondence, permits, review comments, meeting minutes, consultant and contractor invoices, RFI's, change orders, submittals and daily inspection reports. This system shall also be utilized to track progress through all phases of construction. The CM should have experience using the specified project control systems. The CM may propose the hosting and use of another project control system, but shall be prepared to demonstrate the systems capabilities, ease of use and successful use on similar projects. The approval of the proposed project controls systems will at the sole discretion of the City. Every piece of correspondence produced during the construction phase of the project shall be stamped with a unique identification number, scanned, logged and electronically linked to a database record for easy retrieval and distribution. The City will consider an entirely paperless system if proposed, discussed and approved in advance of the start of construction. 3.1.11 Establish a Submittals List — The CM shall review and develop a log of all required submittals. Numbers will be assigned to each submittal as well as an estimate of long lead items. The submittals list will be given to the contractor during the Preoonstruction Meeting for use during the Construction Phase. Required submittals will be tracked and logged on a regular basis in Contract Manager. 3.1.12 Jurisdictional Project Coordination — The CM will report directly to the City's Project Manager on all project activities and coordinate with the appropriate jurisdictional agencies including other Departments, outside agencies, utility companies and others as follows: • City Attorney's Office (as requested) o Miscellaneous legal matters • City Council's Office (as requested) o Presentations as directed by City Staff o Provide information and respond to citizen and business concerns brought directly to the attention of the Project Manager or City Council (if needed). • Financial Management o Ensure timely processing of consultant and contractor invoices 4 of 18 o Ensure timely processing of City invoices for reimbursement by any City Insurance Company and any other potential outside funding agencies • Fire Department o Coordinate the relocation of fire lines, hydrants, emergency access, etc. in compliance with local officials o Obtain Fire Dept. approval of all deferred design plans and specifications (if required). • Lifeguard Department o Review security and emergency access issues o Coordinate, pier closures, security staffing, contractor work zones, Lay down area and potential night work and communicate timelines and impacts to the City's Lifeguard Department. • Gas & Oil Department o Coordinate relocation/reconstruction of existing gas lines and new service requirements (if needed). o Obtain Gas & Oil Dept. approval of all design plans and specifications (if required). • Police Department o Review security and emergency access issues o Coordinate road closures, pier closures and potential night work and communicate timelines and impacts to all emergency services. • Department of Public Works o Obtain all traffic, engineering, surveying and inspection project design criteria from the appropriate sources and distribute to the design team. o Obtain approval of all plans and specifications from traffic, engineering, surveying and inspection. • Planning & Building Department o Assist the contractor with pulling permits (if required) o Coordinate scheduling of Building Dept. Inspectors when required o Document inspection visits and inspection results o Keep copies of signed cards until all inspections are complete • Water & Sewer 18 Coordinate the reconstruction of domestic water, fire water and wastewater services and assist in determining new service requirements Coordinate the construction of a new sewer pump station, complete with control panels, mechanical and electrical equipment, wet well, dry well with support structures and SCADA equipment Assist the Contractor in the procurement of utility excavation permits through the Public Works Department if necessary • Power o Assist the Contractor with SCE coordination for the installation of a new transformer on the beach parking lot o Coordinate the installation of new conduit and cabling on from the transformer to the pier and along the pier for power to the pier lights, the Lifeguard "Zero Tower", the pier restrooms, and the end of the pier facilities • Cable TV o Coordinate with the local cable company and Contractor in the construction of conduit and fiber optic or cable services along the pier to the Lifeguard Zero Tower and to the end of the pier • Phone/Communications o Coordinate with the local phone company and Contractor in the construction of conduit and fiber optic or phone line services along the pier to the Lifeguard Zero Tower and to the end of the pier • California Coastal Commission o Coordinate with the Contractor in the construction of the pier, following all permit requirements set forth by the California Coastal Commission • Regional Water Quality Control Board o Coordinate with the Contractor in the construction of the pier, following all permit requirements set forth by the Regional Quality Control Board • United States Army Corps of Engineers o Coordinate with the Contractor in the construction of the pier, following all permit requirements set forth by the United States Army Corps of Engineers CRIM W&"k& 3.1.13 Review Project Schedules — The CM shall be extremely experienced in the use and review of cost loaded and resource loaded CPM schedules. The CM will evaluate the Contractor's project schedule for the following: • Accurate start dates, completion dates, other dates detailed in the contract • Proper cost loading and resource loading if required • Sufficient detail • Sequence of construction • Potential impacts to other City operations and public • Review of logic and sequence of construction • Review of time impact analysis 3.1.14 Review Schedule of Values and Costs Submitted by the Contractor - Review schedule of values and check for the following: • Unbalanced items • Ensure that all items are quantifiable and can be verified for progress payment and auditing purposes • Clarify work included in each scheduled item 3.1.15 Ensure the Contractor has a Clear Understanding of Project Requirements - Review in detail with the General Contractor's project manager the following: • Contractual, physical and operational constraints • Critical milestones and Initial 4 week look ahead schedules • RFI, RFQ and Submittal Procedures • Required documentation • Progress payment procedures • Permit requirements • City operational procedures, security and priorities 3.1.16 Pre -Construction Meeting - The CM will schedule and conduct a Pre - Construction meeting with the Contractor. The City and Engineering team will be invited to participate in the meeting. In the meeting all contract General Conditions and other contract requirements will be reviewed. At the meeting the Schedule of Values, Initial Baseline Schedule and other critical submittals will be due. 3.1.17 Coordinate and Establish CM Facilities On Site - Discuss with the City and operational staff areas that would least impact existing City/Lifeguard and pier operations and provide the best vantage point for management of the project. Discuss with the Contractor contractual requirement concerning field facilities and coordinate delivery of such items. Once in place, the CM and Inspection staff will mobilize on site and commence Construction Management tasks in the scope of work. 3.1.18 Assist Contractor in Establishing Facilities On -Site - Meet with the Contractor before mobilization to determine the best location for field facilities. Coordinate a suitable location with approval from the City Staff. 3.1.19 Schedule and Conduct Field Meetings - The following meetings will be held on site: • Monthly Progress Meetings with the City and Quality Assurance (QA) inspection staff to discuss all data included in the monthly progress reports. Discussions will focus on the following items: o Progress during the period o Major decisions made o Planned vs. actual schedule o Upcoming work schedule o Current or unresolved problems o Anticipated or pending change orders o Impacts of problems or change orders on schedule & budget o Discussion of new goals o Planned vs. actual budget analysis Weekly Progress Meetings will be mandatory for the A&E firm general contractor and inspection staff. These meetings will be optional or on an as needed basis for involved agencies, local businesses and residents. All parties are always invited to attend. Meeting minutes are distributed to all team members whether in attendance or not. Discussions will focus on the following items: o Comments on last meetings minutes o Contractor presents a detailed 4 week schedule o Progress during the last week o Major decisions made since last meeting o Update of unresolved items from previous meetings o Status of submittals o Review Contractor's Statement of Working Days • Special meetings will be scheduled on an as needed basis to discuss issues that become urgent or which require detailed discussion or review of plans and specifications. If issues are not urgent these meetings are usually scheduled right after the weekly meeting to reduce the number of trips to the site for team members. 3.1.20 Review Contractor Submittals - Based on the approved submittal log the CM will review all contractor submittals for completeness and conformance with the specifications. Submittals requiring the approval of the City or Architect will be forwarded for review and approval. Review of typical contractor submittals will include but not be limited to: 0 Material Certifications P916 wanks • Phasing plans • Equipment and material shop drawings • Material substitution requests 3.1.21 Verify and Process Contractor's Monthly Payment Requests - Upon submittal of the contractor's monthly invoice, the CM will verify work performed during that period and compare it against the approved schedule of values and CPM schedule. The CM will resolve discrepancies with the Contractor and once verged and agreed upon will process the payment application through the City process. 3.1.22 Issue Written Field Orders - In specific instances when field conditions are identified that indicate a need for the contractor to vary from the plans and specifications, the CM shall perform a field investigation of the issues and identify solutions. The CM shall then contact the City's PM and discuss the situation and make recommendations. Upon direction from the City's PM, the CM will issue written field orders to the Contractor outlining what changes to make and outline how those changes will be paid for. The CM will then follow up this procedure by processing a formal change order for approval. 3.1.23 Process and Track Change Orders - In conjunction with and approval of the City's PM, the CM will process all change orders through the City's approved process. Prior to the submittal of a change order request the CM will: • Review the contractor's request by verifying that the plans and specifications did not include this work in the original scope of work • Review the contractor's cost estimate and perform an independent cost estimate for the changed work • Evaluate any claimed impact to the project schedule and budget • Negotiate and/or clarify scope and price quotes • Discuss all findings with the City's PM and make recommendations • Process all appropriate change order paper work through the City's process 3.1.24 Coordination with Others - The CM shall coordinate the Contractor's activities with local utility companies, insurance agencies, permitting agencies and other City consultants and contractors as necessary to complete all work. The CM will conduct special meetings when necessary to ensure that the contractor and utilities and other companies understand each party's scope of work and schedule. The CM shall coordinate and resolve any conflicts. 3.1.25 Initiate and Maintain Photo Documentation Procedures - Photo documentation is very important to record progress on site. Photo documentation will be done regularly from agreed upon vantage points throughout the project site to establish a progress history. The CM will issued digital cameras to field staff in order to take photographs on an as needed basis to document daily activities, ti I. I��6 ��c wears deficiencies, irregularities and as -built conditions. All digital photographs shall be logged and placed in an electronic photo album software package to be approved by the City. 3.1.26 Initiate and Maintain All Tracking Control Procedures - All tracking control and documentation procedures above will be initiated and maintained. Before implementation each procedure will be presented and reviewed by the City and modified to fit City criteria, if required. 3.1.27 Initiate and Maintain All Reporting Procedures - Prepare Monthly Progress Reports to be submitted to the City, and other agencies as required, at the beginning of each month. Data to be included in the report is as follows: • Report of significant events and accomplished goals • Description of progress with photos to enhance the descriptions • A comparison of Actual vs. Planned Progress, in narrative form as well as bar graph form • The latest detailed 4 Week Look Ahead Schedule submitted by the Contractor and reviewed by the CM • Identification and discussion of current problems or pending change orders and actions taken or planned to resolve such issues • An analysis of change order impacts or potential problems on schedule and budget • A discussion of new short and long term goals for the project • A comparison of Actual vs. Planned budget expenditures • Change order status log • Report of progress payments made to date and invoices in process • Labor Compliance Reports for all Contractor and Subcontractor employees (if required) • A QA/QC (Quality Control) section prepared by the Inspection Team addressing testing and regulatory compliance issues 3.1.28 Coordinate QA/QC and Inspection Activities — The CM will provide a full-time lead inspector who will report to the CM. The City will also contract separately with a materials testing and inspection company to provide special inspections and all required materials testing. The CM shall coordinate the activities of the City's lead inspector and materials testing and inspection company. The Contractor's activities, material deliveries, equipment and work force will be tracked on a daily basis and reviewed for compliance with the approved plans and specifications. The CM will coordinate and set up meetings or other activities as necessary to make sure that QA/QC procedures are followed and deficiencies are resolved in a timely and efficient manner. The CM will coordinate the scheduling of Building Department Inspectors and track visits, approvals and deficiencies from the start of construction through issuance of the Certificate of Occupancy. , l i 3.1.29 Review As -built Plans and Prepare As -built Reports - The CM will always be aware of and document changed field conditions. The CM will not rely on the Contractor to document as -built conditions. Changes in field conditions will be reported and photographed as they occur by the Inspection Team. The CM will also keep a copy of the construction documents in his office specifically for documenting these as -built conditions. The CM will review the Contractor's submittal of as -built conditions and compare this submittal to his own documentation. Discrepancies will be discussed, resolved and recorded. 3.1.30 Final Acceptance of Work - Upon substantial completion of the work, the CM will initiate the following procedures to assist the City and Architect to accept all work: • Development of the Initial Punch List • Continuous inspection of the punch list work until all items are completed • Arrangement of final inspection by the City, other jurisdictional agencies and the Architect • Development of a Final Punch List if necessary • Documentation of acceptance of work by the City 3.1.31 Close -Out — When the contract is nearing completion the CM will initiate Close - Out Procedures. These procedures involve the following tasks: • Transmission to the City all required guarantees, warranties, operations manuals and all other documentation required by the contract • Transmission to the City all keys, spare parts, additional material, maintenance material, complete CM files, videotaping and photo albums and as -built drawings • Preparation and transmission of all required City documentation and paperwork for project compliance and reimbursement. • Preparation of a Final Report or Letters summarizing the project • Progress report as described above from the last period though date of final acceptance • Overall project summary report addressing all issues required in the monthly progress reports • Final Reimbursement request from any outside funding agencies including City Insurance carrier • Suggestions for potential improvement in future projects • Final Commissioning Report. 3.1.32 Claims Management — The CM shall assist the City in the defense of claims. The CM shall document, analyze and compile information for the City related to the claim. The CM shall use issues tracking techniques in Contract Manager to quickly retrieve related documentation. During the construction process, the CM shall prepare a clear and defined paper trail to describe the chronology of events, describe the details and defend the City's position. Should a claim arise during the course of construction, the CM will assist the City in determining liability, establishing cause, calculating damage, and effecting a settlement where possible by: • Evaluating the adequacy of plans and specifications, comparing actual performance to contractual requirements. • Clearly defining the issues and determining the responsible parties. • Collecting, organizing, and evaluating factual information. • Performing scheduling analysis to determine extent of delay utilizing the approved CPM schedule, frag-nets and periodic updates. • Determining the excusable or compensable delays. • Evaluating actions taken to mitigate damages. • Reviewing cost estimates. • Performing audits to determine actual costs. • Maintaining records to allow for the compiling of appeal files. • Participating in negotiations with the claimant. 3.2Terms of Performance A Notice to Proceed will be issued to the successful Proposer subject to successful award by the City Council. The City reserves the right to modify the composition of and the scope of services of this project. The services are subject to performance and termination sections described in the Sample Agreement in Attachment B. This contract will be for a period not to exceed 36 months. The execution of an Agreement between the City and successful fine/individual does not guarantee work throughout the duration of the contract period. Numerous factors will be evaluated by the City in its delivery of project and program assignments. The selection of a consultant to perform specific assignments will be dependent on the technical expertise required, and the competitiveness of each proposal. IV. PRE -PROPOSAL CONFERENCE/QUESTIONS The City will be conducting a pre -proposal conference as part of this RFP process. This meeting is tentatively set for March 13, 2018. For answers to questions or particulars regarding this Reguest for Proposal all interested Parties are to contact: David Spitz, P.E., QSD Associate Engineer Department of Public Works 211 Eighth Street Seal Beach, CA 90740 dspitzAsealbeachca.gov (562) 431-2527 ext. 1331 The City will respond to all questions and requests for clarification received by March 20, 2018. 18 V. PROJECT SCHEDULE The following dates reflect the anticipated schedule for soliciting proposals and selecting the Consultant, awarding the contract, and completing the work requested in this RFP: Construction Management Contract Milestone Dates • Solicit Proposals For Construction Management Services 2/26/2018 • Conduct Pre -Proposal Conference 3/13/2018 • Construction Management Proposals Due 3/27/2018 at 2:00 PM • Conduct Construction Management Consultant Interviews 4/03/2018 • Award of Construction Management Contract 4/23/2018 • Issue Construction Management Contract Notice to Proceed 5/07/2018 • Award Construction Contract by City Council 5/29/2018 • Notice to Proceed to Contractor with Procurement 5/30/2018 • *Notice to Proceed to Contractor 9/0412018 • 'Project Completion 5/2412019 • City Council Approval and NOC 6/24/2019 'California Coastal Commission will not allow construction activities before Labor Day and After Memorial Day. The Notice to Proceed and Project Completion Dates are hard dates. They cannot be altered for any reason. It is the responsibility of the Consultant to take into account the deadlines and other schedule requirements listed above. The Consultant shall prepare and submit with the Proposal a schedule showing how they intend to meet these dates. It is the City's intent to use the schedule submitted by the Consultant to administer the Consultant's contract. If the Consultant is not able to meet the dates as stated above, exceptions must be clearly noted in the Proposal. VI.SUBMITTAL REQUIREMENTS A. Acceptance of Submittals The City will accept Proposals up until 2:00 PM March 27, 2018. The Proposal shall be submitted to: Steve Myrter, P.E. Director of Public Works, Department of Public Works 211 Eighth Street Seal Beach, CA 90740 smvrterOsealbeachca. oov (562) 431-2527 ext. 1321 n Please submit one (1) original and four (4) copies of the Consultant's Proposal. Proposals received after the date and time listed above will not be accepted or considered for this Project. B. Information to be Submitted Proposals shall be limited to 25 pages, excluding proposal cover, cover letter, table of contents, and dividers. The following information shall be provided in the format specked below. o Cover Letter o Company Qualification o Work Plan o References o work Schedule o Insurance Requirements o Organization Chart/Staffing Plan o Sealed Fee Proposal Cover Letter: Cover letter shall not exceed two pages. It shall provide an executive summary of the proposal. Table of Contents: The table of contents shall list the following sections with page numbers and information in each section shall be provided as indicated below: Work Plan: Provide a description of your firm's understanding of the project and a detailed scope of services. Indicate your firm's approach to the project for ensuring quality and fiscal responsibility, and to complete the work in compliance with contract documents, City's standards, all applicable rules, regulations, standards, and requirements. Work Schedule and Proposed Effort: Provide a project work schedule with milestone dates and appropriate work phases including a breakdown of the hourly effort of involved personnel across the various tasks and activities including services beginning at the pre - construction phase and extending throughout post -construction. Staffing Plan: Provide an organizational chart showing the names and responsibilities of key personnel. Identify the individual(s) authorized to negotiate the contract on behalf of the consulting firm and the consultant's project manager. The proposed Project Resident Engineer shall be a professional engineer licensed in California, or certified Construction Manager, and shall have experience working with Public Agencies in similar assignments. It is important that the key project team members have served public agencies in various capacities, and are accustomed to working with governmental agencies, and have good understanding of public agencies, procedures, and policies. The City is looking for a qualified team that can provide turn -key services, and be the single Point of Contact and the Responsible Party representing the City in all aspects of the project. Company Qualifications: Provide a summary of your firm's qualifications, including background and experience. Please indicate your firm's experience in undertaking similar projects and the experience of the team proposed for this project. References: Contractors should provide a minimum of five (5) references from similar projects performed for state and/or large local government clients within the last three years. Information provided shall include: • Client name; • Project description; • Project dates (starting and ending); • Technical environment; • Staff assigned to reference engagement that will be designated for work per this RFP; • Client project manager name and telephone number. Insurance requirements: The consultants shall review the City's attached sample contract agreement and insurance requirements. The proposal shall specify that consultant will meet the insurance requirements and execute contract if selected. Level Effort: Provide a table showing the proposed total level of effort required by each CM team member to complete each task and sub -task identified in the scope of services. The tabulation shall, to the extent feasible, show the individuals that will be assigned to complete these tasks. Fee Proposal: A Fee Proposal shall be submitted in a separate, sealed envelope and marked as "Fee Proposal" along with the name of the project. The information and detail included in the fee proposal shall conform to the provisions of Section VII., Fee Proposal Requirements, of this RFP. VII. FEE PROPOSAL REQUIREMENTS In preparing the fee proposal for this project, the consultant shall take into consideration the following: 1. Compensation for services provided will be on a time and materials not -to -exceed amount. 2. A work plan, together with a breakdown of labor hours by employee billing classification, together with the cost of non -labor and sub -consultant services shall be included with the fee proposal. The labor breakdown shall be compiled by project phases and be based on a listing of work tasks that correlates with the consultant's defined scope of work for the project proposal. This information will be used by City staff to evaluate the reasonableness of the fee proposal and may be used in negotiating the final fee amounts for the contract agreement. 16 of 18 The City will negotiate the final fee with the top ranked consultant. 3. The consultant's standard billing rates for all classifications of staff likely to be involved in the project shall be included with the fee proposal along with the mark-up rate for any non -labor expenses and sub -consultants. Vlll. INTERVIEW Top ranked consultant teams will be interviewed by the selection committee. Proposed key personnel (up to four) from the Project Team may be requested to present the teams' and their qualifications at an interview. The interview format will consist of a 10 minute presentation given by the consultant (PowerPoint optional) followed by a 30 minute round table discussion (questions and answers led by the panel). IX.SELECTION PROCESS The criteria for evaluating the proposals are described below. A selection committee will review the Proposals and consider the following criteria to select the most qualified firm: Criteria: Point Value: Proposal Responsiveness 5 Demonstrated understanding of the project requirements, including identification of critical elements and key issues. 25 CM Team's Technical Expertise and Experience related to similar kinds of work 30 Firm's Financial Responsibility 10 Results of reference checks. 15 Reasonableness of Fee 15 Approach to Document Handling 15 After evaluation of the Proposals, the selection committee shall rank the firms. The selection committee will then interview the top ranked firms, and select the top firm. The Committee will then initiate negotiations with the top firm to confirm final scope and fee. If the committee and the firm fail to reach an agreement, the City will then begin negotiating with the second ranked firm. This process will continue until the committee is able to reach a mutually agreeable scope, cost, and schedule. This will serve as a basis to make a recommendation for ratification to the City Council. � w w X. GENERAL CONDITIONS A. Signature The Proposal shall be signed by an individual authorized to bind the consultant. B. Other Considerations: The City shall not be liable for any pre -contractual expenses incurred by any firm considering submitting a proposal in response to this RFP. The City reserves the right to accept or reject any and all proposals, or any part of, or waive any informalities or irregularities. The City reserves the right to withdraw, to cancel this RFP at any time without prior notice and the City makes no representations that any contract will be awarded to any firm responding this RFP. C. Business License Required The Seal Beach Municipal Code requires all businesses operating in the City to pay a business license tax. For more information, go to www.sealbeachca.gov. D. Prevailing Wage All work performed in connection with execution of this contract work shall be performed in compliance with all applicable laws, ordinances, rules and regulations of federal, state, county or municipal governments or agencies (including, without limitation, all applicable federal and state labor standards, including the prevailing wage provisions of sections 1770 at seq. of the California Labor Code), and (b) all directions, rules and regulations of any fire marshal, health officer, building inspector, or other officer of every governmental agency now having or hereafter acquiring jurisdiction. The Consultant shall indemnify, defend and hold the City harmless from any and all claims, causes of action and liabilities based upon or arising from the failure of any work related to the Project to comply with all such applicable legal requirements, including, without limitation, any such claims, causes of action or liabilities that may be asserted against or incurred by City with respect to or in any way arising from the Project's compliance with or failure to comply with applicable laws, including all applicable federal and state labor requirements including, without limitation, the requirements of California Labor Code section 1770 at seq. Consultant agrees that all public work (as defined in California Labor Code section (1720) performed pursuant to this Agreement (the "Public Work"), if any, shall comply with the requirements of California Labor Code sections 1770 et seq. City makes no representation or statement that the project or any portion thereof, is or is not a "public work" as defined in California Labor Code section 1720. In all bid specifications, contracts and subcontracts for any such Public Work, Consultant shall obtain the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification or type of worker P1116119 WM*8 needed to perform the Public Work, and shall include such rates in the bid specifications, contract or subcontract. Such bid specifications, contract or subcontract must contain the following provision: "It shall be mandatory for the consultant to pay not less than the said prevailing rate of wages to all workers employed by the contractor in the execution of this contract. The consultant expressly agrees to comply with the penalty provisions of California Labor Code section 1775 and the payroll record keeping requirements of California Labor Code section 1771." E. Registration with the Department of Industrial Relations In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)]. The Department of Industrial Relations Registration Number shall be listed for the consultant and each subcontractor, if any, in the bid proposal. Enclosures: Sample Agreement