HomeMy WebLinkAboutItem Hf`i a 5EA(o AGENDA STAFF REPORT y �CQUF00.NP lr DATE: March 12, 2018 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Steve Myrter, Director of Public Works SUBJECT: Notice of Completion for 2017 Annual Concrete Repair Program Project CIP No. ST1704 SUMMARY OF REQUEST: It is requested that the City Council 1. Adopt a Resolution accepting the 2017 Annual Concrete Repair Program Project CIP No. ST1704 by EBS General Engineering, Inc. in the amount of $51,681; and 2. Direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk -Recorder within ten (10) days from the date of acceptance and to release retention 35 days following the filing of the Notice of Completion. BACKGROUND AND ANALYSIS: On June 26, 2017, the City Council approved the plans and specifications for the 2017 Annual Concrete Repair Program Project CIP No. ST1704 (Project) and authorized the solicitation for bids. On September 11, 2017, the City Council awarded a contract to EBS General Engineering, Inc. for the Project in the amount of $48,450 and approved Budget Amendment No. BA18-03-01 allocating additional State Gas Tax Funds in the amount of $5,000 to the 2017 Annual Concrete Repair Program Project CIP No. ST1704. The Project consisted of repairs identified within year five of the 2012 Update to the Citywide Concrete Inspection Report, which involved repairing of sidewalks, driveways, curb and gutter. During construction, a few locations throughout the City were found to be of lower priority. Those locations were removed from the list and replaced with locations of a higher priority. See Attachment C for a complete list of repair locations. Agenda Item H The Project is now completed to the satisfaction of the City Engineer. The Project was inspected and it meets all standards and requirements within the Project specifications. It is required to formally accept the Project and file a Notice of Completion with the Orange County Clerk's Office. ENVIRONMENTAL IMPACT: This Project has complied with the California Environmental Quality Act. LEGAL ANALYSIS: The City Attorney has reviewed and approved as to forth. FINANCIAL IMPACT: In the approved FY 2017/18 Budget, $50,000 of State Gas Tax Funds were identified for the Project. In addition, $5,000 of State Gas Tax Funds were allocated under Budget Amendment No. BA18-03-01 for contingency. Revenues from the City's 50/50 Sidewalk Program were $2,893.50. Design plans and specifications were prepared in-house. Below is a summary and breakdown of revenues and expenditures for the project: Revenues Description Amount Construction Contract Award $ 48,450.00 Budget Amendment No. BA18-03-01 $ 5,000.00 50/50 Sidewalk Program $ 2,893.50 Estimated Project Total $ 56,343.50 Expenditures Description Amount Construction $ 49,431.00 Inspection $ 2,250.00 Estimated Project Total $ 51,681.00 The awarded contract amount with EBS General Engineering, Inc. was in the amount of $48,450. Total revenues from the 50/50 Sidewalk Program were $2,893.50. The total cost paid to EBS General Engineering, Inc. for the Project is $49,431. Any unspent funds will be returned to the original source of funds. Page 2 That the City Council 1. Adopt a Resolution accepting the 2017 Annual Concrete Repair Program Project CIP No. ST1704 by EBS General Engineering, Inc. in the amount of $51,681; and 2. Direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk -Recorder within ten (10) days from the date of acceptance and to release retention 35 days following the filing of the Notice of Completion. SUBMITTED BY: NOTED AND APPROVED: Steve Myrter W:L� - JYM&M Steve Myrter, Director of Public I R. Ingram, City Mana e Works Prepared by: Patricia Kharazmi ATTACHMENTS: A. Resolution B. Notice of Completion C. Final List of Locations Page 3 Attachment "A" RESOLUTION A RESOLUTION OF THE SEAL BEACH CITY COUNCIL ACCEPTING COMPLETION OF THE 2017 ANNUAL CONCRETE REPAIR PROGRAM PROJECT NO. ST1704 AND DIRECTING THE FILING OF A NOTICE OF COMPLETION FOR THE PROJECT THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE Section 1. The Cily accepts the completion of the 2017 Annual Concrete Repair Program Project No. ST1704 (the "Project) by EBS General Engineering, Inc. in the amount of 551,681 for the work performed. Section 2. The City Clerk is hereby directed to file a "Notice of Completion" for the Project with the Orange County Clerk -Recorder within ten (10) days of the date of this resolution and to release retention 35 days following the filing of the Notice of Completion. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 12th day of March , 2018 by the following vote: AYES: Council Members: I:h:x-�•*•10i[:IILLTir1" n ABSENT: Council Members: ABSTAIN: Council Members: Mayor ATTEST: City Clerk STATE OF CALIFORNIA } COUNTYOFORANGE } SS CITY OF SEAL BEACH } I, Robin Roberts, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number _ on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council are regular meeting held on the 12th day of March , 2018. City Clerk Attachment "B" RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Atm: City clerk 211 - 8th Street Seal Beach, CA 90740 Space of above this line for Recorder's use. — No Recording Fee Pursuant to Government Code Section 6103, 27383 "" NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be fled within 10 days after completion. Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: 2. The full name of the owner is: City of Seal Beach. 3. The address of the owner is: 211 – 8th Street, Seal Beach, CA 90740. 4. The nature of the interest or estate of the owner is: In Fee. The City of Seal Beach. 5. A work of improvement on the property, hereinafter is described as substantially completed on January 31, 2018. The work was 2017 Annual Concrete Repair Proorem Project. No. ST1704. 6. The name of the contmctor(s), if any, for such improvement was: EBS General Engineering, Inc. The date of the Contract Award was September 11, 2017. 7. The property on which said work of improvement was completed in the City of Seal Beach, County of Orange, State of California, and is described as follows: Citywide. City of Seal Beach. Date: Director of Public Works, City of Seal Beach Signature of owner or corporate officer of owner named in paragraph 2 or agent. VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have read said notice of completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury the foregoing is We and correct. Executed on , 2018, at Seal Beach, California. (Date of Signature) Director of Public Works, City of Seal Beach Attachment "C" Concrete Location List - Year 5 Legend: *Root Pruning/Grinding or Selective Root Removal Location(s) _ Side Sidewalk (ft) Curb & Gutter (LF) Parkway (SF) Driveway (SIF) 1 Cove 421 Opal Cove Way W 144 28 2 Cove 421 Marble Cove Way' W 96 52 3 Cove 420 Opal Cove Way* E 100 28 4 Cove 409 Crystal Place* W 104 5 CPE 4548 Elder Avenue 5 120 6 CPE 4501 Elder Avenue N 1 76 7 CPE 4480 Birchwood Avenue 5 76 8 CPE 4596 Birchwood Avenue 5 104 50 9 CPE 14157 Birchwood Avenue N 124 10 CPW 100 Yale lane* E 80 11 CPW 112 Stanford Lane* E 156 12 CPW 224 Stanford Lane* E 92 13 CPW 209 Stanford lane* W 128 14 CPW 100 Dartmouth Circle S 116 15 Hill 632 Sea Breeze Drive* E 96 16 Hill 644 Sea Breeze Drive E 112 172 17 Hill 613 Island View Drive W 148 40 18 Hill 1609 Island View Drive* W 95 92 19 Hill 612 Sandpiper Drive E 104 20 Hill 628 Sandpiper Drive* E 144 64 21 Hill 1301 Sandpiper Drive* E 136 22 Hill 712 Taper Drive* E 258 64 55 23 Hill 604 South Shore Drive* E 80 72 24 Old Town 115 3rd Street* W 135 25 Old Town 21816th Street*E 124 26 Old Town 1600 PCH E 96 27 1Old Tawn 1700 PCH' E 357 28 Old Town 1501 Ocean Avenue* E 158 Legend: *Root Pruning/Grinding or Selective Root Removal Location(s)