Loading...
HomeMy WebLinkAboutSupplemental Information Received after Posting of Agenda - Item I PowerPointPier Improvements Project BP1002 Update City Council Meeting March 12, 2018 Pier Update 3/12118 Summary of Council Action o History , Plans a Schedule 3/12/2018 1 Council Action ► Approve Plans & Specs History ► Utility Project / Decking ► Structural Assessments ► Damage ► Prior Council Direction s /sz /2018 2 Utility Project / Decking ► Aging utility infrastructure ► City began design work on both potable water line and fire water line ► Decking Phase IV on hold with utility work Structural Assessments ► End of Pier Assessment (2014) Identified $50,000 upgrades needed to support 1 -story restaurant ► Every 5 years (2 01 5) Estimated repairs over $900,000 3/12/2018 3 Hurricane Marie ► August 26, 2014 ► Caused damage to end of pier • Broken pile cap • Broken bracing ► Estimated $50,000 repairs needed due to damage caused 3/12/2018 Ell Prior Council Action on February 22, 2016 Option 1 - Mandatory Repairs Option 1 A - Mandatory Repairs with above deck fire line o Option 2 - Pre - fabricated Bathroom at end of Pier Option 2A - Utilize Existing Bathroom at end of Pier Option 2B - Open Decking with Bathroom Option 3 - Demo Building /Open Deck Option 4 - New 1 Story Building �a 3/12/2018 5 1 Mandatory repairs $1,000,000 $500,000 - S1.500,000 1A Mandatory repairs with above deck Are 51,000,000 5350,000 - $1,350,000 line 2 Pre - fabricated bathroom at end of pier S1,000,000 S670,000 $50.000 $1,720,000 2A Utilize existing bathroom at end of pier $1,010,000 $620,000 - $1,630,000 2B Open decking with bathroom $2,675,000 $665,000 5710,000 $4,050,000 3 Demo building /open deck $2,575.000 $620,000 $15,000 $3,210,000 4 New, 1 story building 52,600.000 5620,000 $665,000 $3,885,000 n New 1 Story Building - Option 4 r $3,885.000 Includes. Immediate Repairs (Hurricane Marie) - $100,000 Repairs (2015 Inspection Report) - $900,000 New Water Line (Fire Protection) - $500,000 New Domestic Water Line - $120,000 Demo Structure - $75,000 Demo Sewer Pump Station - $1 5,000 New Sewer Pump Station and Forcemain - $650,000 New Electrical - $800,000 New Decking - $575,000 CEQA /Permits /Coastal - $100,000 Other Utilities (Verizon /Time Warner /Gas) - $50,000 r .r Tidelands Fund $2,600,000 fthWater Capital Fund $620,000 Sewer Capital Fund $665,000 12 3/12/2018 11 May 2016 Pier Electrical Fire ► Significant damage from Bent 74 to End (Bent 82) > Burned pile caps, stringers, decking, utilities and buildings ;O�Z7 i- 3/12/2018 3/12/2018 May 2016 - Today ► Demolition of burnt structures ► Removal of Edison equipment ► Removal of burnt structural members ► CEQA Mitigated Negative Declaration ► Permitting • California Coastal Commission • Regional Water Quality Control Board • United States Army Corps of Engineers ► Plans and Specifications IB F City of Seal Beach !� Department of Public Works PIER IMPROVEMENTS PROJECT NO. BP 1002 ��� •.\'`. MEL susce�a Mesr i� - ___�_ �.: -•— I i t maw, � �.� VBI WPWEMINR YY IpryT1�Mm s�T sas • y _ 19 Plan components ► Structural members ► Utilities ► Decking ► Other 30 3/12/2018 10 Structural Members Decking ma QS -q 3 -tp' ?1P � Utility Stringers ® I I a Piles m e Pile Caps Cross o ® (Bents /Beams) Bracing Profile View (Cross section) Piles y a m• Plan View (Bird's Eye View) 22 3/12 /2018 11 Pile Caps (Bents /Beams) . c 1 NNW I� - Plan View (Bird's Eye View) 3/12/2018 12 3/12/2018 13 I 1 4 3/12/2018 14 Utilities ► Water Fire line / hydrants Potable water line ► Sewer Pump station Force main ► Gas ► Communications ► Electric • Transformer • Conduit & cabling • Additional City work 30 3/12/2018 15 1 10 Gas i Pota a Water Fire lines Electrical & Communications Sewer Force Main Sewer Pump Station 3/12/2018 16 Decking ► Phase 4 ► Greenheart ► Douglas fir ► Utility corridor 3/12/2018 17 Other ► Handrails ► Lighting s /12 /zois W 3/12/2018 ME 3/12/2018 Construction Schedule Faa Mef q Mry S__ Sep W N pK .M FM W O MW The Coastal Commission does not allow on -site construction activities during summer months 43 Questions? David Spitz, P.E., QSD Associate Engineer Department of Public Works 211 Eighth Street Seal Beach, CA 90740 clsoitz@sealbe& (562) 431 -2527 ext. 1331 3/12/2018 22