Loading...
HomeMy WebLinkAboutSupplemental Information - PowerPoint5/24/2018 5 Year Capital Improvement Program FY 2018119 —" 2022/23 EMY Agenda • FY 2017 -18 Capital Improvement Program Accomplishments/Status • Proposed FY 2018 -19 Capital Improvement Program • Unfunded Capital Projects List 2017 -18 List of Accomplishments W.om1 Med P ol;et�,. 1 - Canplet d ' ,y34 aoa Ssso,600 VlnimmrterPar'ng fl—.L SOD Completed �h,00e,000 36J3,OOo ]q SL N1eF Waty &SewnlJn R pl ment Coold'.E SSSS.noo $333.000 P 17 Compete Repair Program Completed 356,3m 35i.6oe Mannac wryCenterflVAL _Ccwtplefted _�. $3o,ow _ 'swpp Wv[End PUmp Sntlon Improvements Completed Ved"..o 345.900 City F_,ioVRwf Repair Pwle, Completed 35....ao 3500,000 oleyuzm xe+d Quarter, Remedlaemm Completed 3ao,000 sae,000 SOIB SeverMmtuplanV date'. .Completed ffi6,0oo 566.000 LwF. M138.400 3apyp,00 5/24/2018 FY 2017 -18 Capital Improvement Program Status 1 1- I�I�I�1 1 Funding Sources • General Fund • Sewer Capital Bhml %a uF@'2e oes�fm:Pletu -.. • Seal Beach Cable • OCTA Measure M2 Foundation so:9oj faw Preliml:urrDp�Malysisxal War oslgnVTgoii:g, mia]., , nna.ic.e1G +•trm(oa w..haoaG wwrti) . Ca�CanyNta S11Bd � _ -• •f - LT fi(nnoe Repah Pragmn t! � � Des!gn COrnpkte �j msozanaa "'n lomislrenvaw�gvropn, - Dgp: �:rkr. " Si:ao94 rnH [Agn IR_p_a k pin:al �yy'. j�'��j D g-DOg" SS,BOt xwer ManF kP lubAilition' CotulvNCn . "Wt_:65jyv NvY Resery trC M vfi 'f'+j' +Wi' -4 ra D Ign "OOgoing' \y!:0a' SUDPUpg-. Ees(xwerB Water) ,,. -. Dl.,P 01 ffig, 1 1- I�I�I�1 1 Funding Sources • General Fund • Sewer Capital • Tidelands • Water Capital • State Gas Tax • Seal Beach Cable • OCTA Measure M2 Foundation • Grants 5/24/2018 Tidelands Fund FY 2018 -19 Proposed Projects Pier Utility Upgrade Project $3 576,000 Local Coastal Plan $n3 ooq era Tower Safetv Im rovements $100 ,00 Beach &Pier Total $3,889,000 Buildings & Facilities FY 2018 -1q Proposed Projects 520 o oq ommunity Swimming Pool 54,782,40 �SCADA Improvement Upgrade Project - Ph r Citywide I'manciai Information System $190,00 $1,400,000 PUm Station U rades Countywide Boom Hz Agree ent $14,00 $2,030,000 udioMsual Council Chambers Upgrade $30,00 Senior Center Repair Pro ect 530,00 Tennis Center Roof Re air Project $300,000 Buildings & Facilities Total $5,346,40 Sewer Fund FY 2018 -1q Proposed Projects RM. ewer te Studv 520 o oq Pnnual Manhole Rehabilitation $10,000 �SCADA Improvement Upgrade Project - Ph r $wo 00 6'° Street Alley Sewer Repair ($zoo 000 water) $1,400,000 PUm Station U rades sgoo.000 Sewer Projects Total $2,030,000 Storm Drain FY 2018 -19 Proposed Projects $400,000 Irraffic Management Center Upgrades Focus Preliminary Design Analysis Marina Drive $70,00 $gi,000l Focus Prelin inary Design Wad ' raffic Signal Battery Back -up Upgrade Project Focus Preliminary Design Analysis College Park East S70,00 $94Ae Storm Drain Total $190,0001 Arterial Street Resurfacing Program $zoo,000 Streets - Proposed Projects FY 2018 -19 Seal Beach Comprehensive Parking Management !Plan $400,000 Irraffic Management Center Upgrades 568,000 Id Town Parking& Signage Improvement $gi,000l Westminster/17th St. Corridor Traffic Signal 5 nchronization $63,000 raffic Signal Battery Back -up Upgrade Project $roo,00q ! Annual Slurry Seal Program $94Ae Local Street Resurfacin Program $212,000 Arterial Street Resurfacing Program $zoo,000 Annual Concrete Repair Program 550,000 Annual Strivina Pro ram s25.000 Streets Total: $1,303,000 Water Fund FY 2018 -19 Proposed Projects Water Station Rehab. - Beverly Manor $5,200, 00 Hellman Ranch Transmission Main Stud Permit $50,000 Water Rate Study Update $20,000 Water Well Rehab. - Balsa Chica Well $100,00 Navy Reservoir Chlorination System U graades $1 0 00 Widening Water Line Reconfiguration $750,000 _405 CADA Improvement Upgrade Project - Phase 1 $100,00 5/24/2018 0 I Water Fund FY 2ot8 -t9 Proposed Projects - (continued) Almond Ave Fire Hydrant Relocation $100,000 Lam son Weil Head Treatment Analysis $100,00 Annual City Wide Water Meter Replacement 550,00 Annual Water Valve Replacement Pro ram S42,500 Water Projects Total: $6,652,50 oi 2018 -19 CIP Project Summary * 37 Proposed Projects for FY2o18 -19 *23 Previously Approved Projects -$16.2 M *14 New Projects -$3.z M FY 2018 -19 CIP Project Summary Beach and Pier $ 88 000 Buildings and Facilities $5,346400 Storm Drain $190,000 Sewers stem $2,0 30,000 Streets and Transportation $1,303,000 iiiater System $6.652,5oo 1 FY 2018 -19 CIP Total: $19,410,9001 5/24/2018 Unfunded Project List Proposed Projects Beach and Pier $,00,.00 Buildings and Facilities $4o,651doo Parks $2,0 95,00 form Drain $io6,000,000 Ike Mater $2.000,000 TOTAL; $164,046,100 FY 2018 -19 Fleet Replacement Seal Beach Deparment of Public Works 5/24/2018 11 l 5/24/2018 Agenda I. 2012 Fleet Replacement Plan 2. 2012 Policy Guidelines 3. Proposal Summary for FY 18/19 ➢Add 1 new vehicles ➢Replace 5 vehicles ➢Up -jit vehicles 2012 Policy Guidelines • Recommended Replacement Intervals ➢Police Patrol Units — 4 years/ 100,000miles ➢Medium Duty Trucks — 12 years /80,000miles ➢Lifeguard — Considered every 5 years • Since 2012 over 56 vehicles & equipment replaced 2018/19 Fleet Replacement i� -- PD . 4125 Vvd Fjsa .a 10 ;67j lme nso 's}s.000 .is.000 310,000 j PD_ "V 5414 1"PI y IV 5j 94.059 t F NPI+ . 999.000 .35 .36da00 "P iueFl 1b 60000 P A p iy �; ..,nr m'� .o5 e.yme span eoo sm Fleet Budget Summary Vehicle Replacement Fund $320,000 Sewer Enterprise Fund $200,000 TOTAL $520,000 Questions? s /2a /2018 91