Loading...
HomeMy WebLinkAboutSupplemental - Revised AKM Staff Report and attachments AGENDA STAFF REPORT DATE: January 28, 2019 TO: Honorable Mayor and City Council THRU: Jill R. Ingram, City Manager FROM: Steve Myrter, P.E. , Public Works Director SUBJECT: Professional Services Agreement with AKM Consulting Engineers for Design Engineering Services of the 6th Street Alley Water line and Sewer line Replacement Project SUMMARY OF REQUEST: That the City Council adopt Resolution 6891 awarding and authorizing the City Manager to execute a professional services agreement to AKM Consulting Engineers to provide engineering services for the design of the 6th Street alley water line and sewer line replacement Project including construction support services for a not-to-exceed agreement amount of$180,928175,496. BACKGROUND AND ANALYSIS: At the fiscal year 2018-19 Capital Improvement Project Budget preparations in June 2018, staff presented the need and proposed scope of work to replace the existing 8-inch diameter water line and existing 6-inch diameter sewer line aligned within the 6th Street Alley between Electric Avenue and the Ocean Avenue Alley. Both of these pipelines have reached their useful service lives and are in need of replacement. The project scope will also include replacing all water services, installation of new sewer manholes, and repaving of the entire alley in the right of way. ENVIRONMENTAL IMPACT: There is no environmental impact related to this item. LEGAL ANALYSIS: The City Attorney has approved the professional services agreement and proposed resolution as to form. Agenda Item: G FINANCIAL IMPACT: In the approved fiscal year 2018-19 CIP Budget a total of $1,400,000 has been allocated for the 6th Street alley water and sewer replacement project (SS1902) with $700,000 allocated from the water fund and $700,000 allocated from the sewer fund. Staff requested that AKM submit a proposal to provide engineering services for the design of this Project including construction support services. AKM submitted a proposal to provide these engineering design services for a not-to-exceed fee of $180,928175,496. RECOMMENDATION: That the City Council adopt Resolution 6891 awarding and authorizing the City Manager to execute a professional services agreement with AKM Consulting Engineers to provide engineering services for the design of the 6th Street alley water line and sewer line replacement Project including construction support services for a not-to-exceed agreement amount of $180,9281-75496. SUBMITTED BY: NOTED AND APPROVED: Steve illy . Jruptant Steve Myrter, P.E. , Public Works Jill R. Ingram, City Manager Director ATTACHMENTS: A. Resolution 6891 B. Agreement RESOLUTION 6891 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH AKM CONSULTING ENGINEERS FOR DESIGN ENGINEERING SERVICES AND CONSTRUCTION SUPPORT SERVICES FOR THE 6TH STREET ALLEY WATER LINE AND SEWER LINE REPLACEMENT PROJECT THE SEAL BEACH CITY COUNCIL DOES HEREBY RESOLVE: SECTION 1. The City Council hereby awards a Professional Services Agreement to AKM Consulting Engineers ("AKM"), to provide engineering services for the design of the 6th Street alley water line and sewer line replacement Project including construction support services, in a total not-to- exceed amount of $180,928175,496. SECTION 2. The City Council hereby authorizes and directs the City Manager to execute the Professional Services Agreement between the City of Seal Beach and AKM, and all related documents, on behalf of the City. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 28th day of January 2019 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Thomas Moore, Mayor ATTEST: Dana Engstrom, Deputy City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Dana Engstrom, Deputy City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy Resolution 6891 on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council at a regular meeting held on the 28th day of January, 2019. Dana Engstrom, Deputy City Clerk ow: Water Resources Infrastructure Construction Management AKM Consulting Engineers 553 Wald Irvine,CA 92618 Telephone:949.753.7333 Facsimile:949.753.7320 www.akmce,com November 12, 2018 City of Seal Beach 2011 Eighth Street Seal Beach,CA 90740 Attn: Mr. David Fait Interim Deputy Director, PW/ Maintenance and Utilities Subject: Proposal for Engineering Services; SS1902 6th Street Alley, Water, and Sewer Improvements Dear Mr. Fait: AKM Consulting Engineers (AKM) is pleased to submit this proposal to provide engineering services for the SS1902 6th Street Alley Sewer Repair Project. Our understanding of the project, proposed scope of work,corresponding fee proposal,and the schedule are as follows. PRO ECT UNDERSTANDING The City of Seal Beach has a 6-inch diameter gravity sewer in the 6th Street Alley. The City lined a portion of the pipe in 2012. Approximately 325 feet of the pipe (200 feet south and 125 feet north of the centerline of Central Avenue) could not be lined due to"defects discovered". Two (2) 48-inch diameter manholes were constructed on this line, one approximately 190 feet south of Central Avenue, and one 410 feet north of Central Avenue. The lining has experienced failures,which results in the City having to clean this sewer frequently. There is a 6-inch asbestos cement water pipe in the alley. This pipe has reached the end of its useful life, and was identified for replacement in the City's 2012 Water Master Plan Update. Additionally, many of the house service meters in 6th Street Alley are located on private property, and need to be relocated to the public right of way. The project will replace the existing 6-inch sewer with a new 8-inch sewer,preferably with steeper slope. This will require a new connection to the 21-inch diameter sewer on Electric Avenue.The water line will be replaced between Electric Avenue and Ocean Avenue Alley with an 8-inch pipe, and all services will be located on the public right of way. The alley pavement will be replaced within the public right of way,as well as in areas on private property where the existing water meters are removed. The total length of each improvement is approximately 1,230 feet. Due to the narrow width of the alley and the number of improvements involved,we propose to prepare the plans at a scale of 1"=10' (6 sheets of plans and profiles for water and sewer; 6 sheets of plans for the alley pavement replacement, and 4 sheets of details. SCOPE OF WORK We propose to implement the following scope of work: AKM Proposal 18-1104 1 SS1902 City of SeaL13ect h. StveetAlley Solver 1Zepaie- Nave-in/yet-12,2018 1. Project Management and Meetings We will start the meeting with a kickoff meeting to review and refine the scope of work,establish lines of communication,and discuss the initial schedule. We will submit monthly progress status reports along with our invoices,and meet with City staff to review the progress and obtain additional information/direction. We will conduct weekly in-house quality control review of the project, and address any issues that may be identified. 2. Obtain and review all as-built utility plans We will obtain the water, sewer, and storm drain information from the City, and gas, electric, telephone, and cable facility information from the respective owners. We will maintain a utility coordination log to ascertain that appropriate communication has taken place. We will verify the visible facilities during field walk of the alignment. 3. Review CCTV Inspection Reports and Recordings. We will review the CCTV data to locate the precise location of the sewer house laterals 4. Field Surveying We will utilize the existing topography, and supplement it with field surveys, including cross sections of the alley at approximately 20-ft intervals. The survey crew will dip all manholes and catch basins,where they exist. S. Geotechnical Investigation We propose to conduct a geotechnical investigation to develop design recommendations for bedding, backfill, shoring, and dewatering required for the project. The field work will include two borings extending to 10 feet below the bottom of the proposed improvements 6. Potholing This task involves potholing to determine precise location and elevation of existing utilities that may interfere with the construction of the proposed water and sewer improvements. It will be invoiced only if used. 7. Prepare Plans,Specifications,and Estimates for Sewer,Water,and Alley Improvements This task will include walking the alignment with City staff to determine the extent of work to be performed on private property where the pavement elevations do not match,where the existing water meters are on private property, and where the existing meter boxes are not of the size required by the current standards. As described under project understanding,we propose to develop the plans at 1"=10'scale. We will review the development of the plans with the City staff at progress review meetings,and submit them at the 70% completion stage, along with technical specifications and construction cost estimate. We will address the City's comments, and finalize the documents. 8. Project Close-out We will prepare as-built drawings based upon the redlines provided by the contractor and the City's inspector. AKM Propo%a.18-1104 2 SS1902 ccty of seat13uuz,, 6 Street Alley Sewer 12epcz.;,r November 12, 2018 9. Bidding Assistance We will attend a pre-bid meeting. We will respond to requests for information, and issue an addendum,if necessary. 10. Engineering Support During Construction We will attend the pre-construction meeting, review shop drawing submittals, and respond to requests for information during the construction. SCHEDULE We propose to complete the scope of work tasks 1 through 7 within 18 weeks of receipt of notice to proceed. We will complete tasks 8 through 10 as required by the progress of the work. FEE ESTIMATE To complete scope of work described above,we estimate a budget of$180,928 will be required.The work will be performed on a time and material basis, in accordance with AKM's billing rates. AKM will not exceed the authorized budget without written approval from the City. Breakdown of the fee estimate for the project,including workhours,is attached to our proposal We appreciate the opportunity to submit this proposal, and look forward to being of service to the city of Seal Beach. Should you have any questions regarding our proposal or require additional information, please feel free to contact us at your convenience. Very truly yours, AKM Consulting Engineers 7Z-1.- Zeki Kayiran, P.E. Principal AKM Proposal 18 1104 3 5,51902 City of Saab Butch. 6th Street Alley Sewer'Repair November 22,2018 - Proposed Fee Estimate Project Project Associate Total Subconsultant Task Description Manager Engineer Engineer CADD Clerical Hours Labor Cost Cost/Expenses Total Cost 1 Project Management and Meetings 8 16 4 28 $5,064 $5,064 2 Research,Utility Coordination 8 40 4 52 $7,448 $7,448 3 Review CCTV Inspection Reports and 16 16 $2,240 $2,240 Recordings 4 Field Surveying 4 16 20 40 $4,984 $8,500 $13,484 5 Geotechnical Investigation Services(2 2 4 4 10 $1,364 $21,000 $22,364 Boring Locations) 6 Potholing Services(assuming 10 8 4 12 $1,512 $10,500 $12,012 potholing locations per City approval) 7 Plans,Specifications,and Estimates Sewer Design Plans 8 32 80 120 240 $30,880 $2,000 $32,880 Waterline Design Plans 8 28 60 100 196 $25,336 $1,000 $26,336 Alley Design Plans 8 24 40 80 152 $19,792 $1,000 $20,792 Contract Documents/Specifications 12 40 16 32 100 $14,792 $14,792 Cost Estimates 2 8 8 18 $3,100 $3,100 8 Project Close-out 8 40 48 $5,040 $1,000 $6,040 9 Bidding Assistance 4 4 4 4 4 20 $2,840 $2,840 10 Engineering Support During 12 24 24 60 $10,536 $1,000 $11,536 Construction Total Hours 64 188 324 372 44 992 Hourly Rate $206 $196 $140 $98 $70 TOTAL $13,184 $36,848 $45,360 $36,456 $3,080 $134,928 $46,000 $180,928 AKM Proposal,18-1104 4