Loading...
HomeMy WebLinkAboutSupplemental - PowerPoint from Steve Myrter on Storm Drain & Drainage SystemsCITY OF SEAL BEACH Seal Way Storm Drain and Marina Drive and College Park East Focused Preliminary Design Studi March 25, 2019 LE EE- rE E• Presentation Overview Flood Protection Goals Seal Way Storm Drain Marina Drive Drainage Systems Ironwood, Guava and Elder Avenue Drainage Systems Portable Storm Water Pumps Flood Protection Goals Primary Goal Keep flood level at least 1 -foot below pad elevation for a 100 -year flood. Other Goals Arterial Highways Keep one lane of traffic in each direction open during 10 -year flood (25 -year flood in sump areas). Local Streets Maintain water level below top of curb during 10 -year flood (25- year flood in sump areas). County o, standard rlood Protection Goals County of Orange Protection Goals Standard Flood Additiuoiai vV.aI LJUak,ll ILcs „Q Proposed Storm Drains Convey the design storm peak runoff with hydraulic grade line (HGL) a minimum of 1 -foot below the street gutter grade Size connector pipes to provide a minimum of 6 -inch freeboard at drainage inlet, such as catch basin or grate inlet Questions? Seal Way Storm Drai 3/25/2019 3/25 /2019 3/25/2019 3/25/2019 3/25/2019 i 3/25/2019 di 3/25 /2019 11 3125/2019 Phase 1 Improvements $4,466,504 Phase 2 Improvements $2,198,236 Phase 3 Improvements $2,574,582 Phase 4 Improvements $26,214,858 Phase 5 Improvements $6,124,694 Phase 6 Improvements $3,277,827 Phase 7 Improvements $1,657,199 Total $46,513,900 12 3/25/2019 Storm Drain Se em City ContrlEtttin Areas location IDs AC %of Total Caltrans Contributing Arias Total AC IDs AC %of Total 5133 West End PS to Dory Way LA,2A,6A,7A,7B,8A, IOA, 13A, 12A 127.66 95.2% ICT, 9CT. 12CT 6. 42% 134. SD2 Eleatic Ave, Dory Way to Corsair Way 2A, 64, 7A, 78, 84, 10A, 11A, 12A 1018 94.89/ 9R. 12CT 5.66 5.2% 108.4 SD3 Eleanc Ave, Corsair Way to val leon Wav, 6A, 7A, 7B, 8A, IOA, 11A. 12A 79.76 93.4% 9CT, 12CT 5.66 6.6% 85.a SD4 Eleatic Ave, Galleon Way to 5th St 6A, 8A, 10A, 11A, 12A S%14 91.3% 9R, 12CT 1 5.661 8.7% 64. SD5 Eleatic Ave, SM St to Mari na Dr. IIA, 12A 15.12 82.9% 12CF 3.11 17.1% 18.2 5136 SD7 SD8 SD9 SDSO SDll E.,Stmg 6A 7A, 78 SA, 30A IWA. 110A IIA, 12A S.311 20.62 100.016 100.1P/ N.A. N.A. 9R 9R N.A 12R 0 0 2.55 2.55 0 3.t1 0.0% 0.01% 6.2% 100.0% 0.0% 17.1% 53 20.6 41.2 2.5 36. 18.2 Coastline Dr and Carmel Ave 5th St, Eleatic Ave to PCH 3871 0 3689 15.12 93.8% 0.0'4 100.0% PCH, Storm Drain Extension Coastline Dr and Marvista Ave Manna Dr, Electric Ave to 71h St 82.9{6 SD12 Manna Dr and 7th St to PCH and Main 12A 9.92 76.1% 12CT 3.11 23.9% 13.0 13 Questions ?? Ironwood, Guava a Elder Avenue Drainage Systems 3/25/2019 15 _ 14NPSUY 4VENIlE P� r =_n r. � Y �..v.. � s•n It _ y i op ✓ N'�IAVG k. 4 r ^. °t 3125/2019 16 yL �Y f 'at (n MM AKM- -. _ :. i ^uRi[x4YiYive for 3125/2019 16 �Y Ri; HPNkr. ;;J [ rp�py (GL000 CONiR0. BASiN) Y L ; a t Y yc AA �� 3125/2019 16 3/25/2019 17 Past Rainfall Events January 15, 2019 Past Rainfall Events October 16 -17, 2004 3/2512029 Seal Way Storm Drain $700,000 Marina Drive $46,513,900 Potential Caltrans Contribution $2,531,980 Guava and Elder Alternative 1 $10,677,123 Guava and Elder Alternative 2 $21,113,684 Guava and Elder Alternative 3 $30,697,022 19 3/25/2019 20 Portable Storm Water Pumps • Portable storm water pumps deployed for 4 separate storm events (to date) Total pump rental cost to date: $29,000 Total required staff overtime hours: 65 hours (to date) 1100 . Questions??