FY 2019-20 CAPITAL
IMPROVEMENT
PROGRAM
JUNE 5, 2019 CIP BUDGET WORKSHOP
Overview
Capital Improvement Program (CIP) Overview
FY2018-19 CIP accomplishments
FY2019-20 proposed CIP
Specific capital projects
Proposed Community Pool Complex
Proposed Main Street Revitalization
- Pier Base Structural Evaluation
Unfunded capital projects
Fleet Replacement/Addition
Capital Improvement Program
Sets priorities and appropriates funds
Provides a basis for project planning and identify
coordination needs
Develops, constructs and maintains public improvements
Addresses significant maintenance and upgrade needs
Responds to changing legislation, conditions and
priorities
CIP scheduling
Capital Project Timeline
(8 months to 2 years +)
Planning Engineering Construction
Develop Project
Objectives
Review Master
Plans)
Conduct Field
Observations
➢ Environmental
Review
➢ Award PSA
➢ Execute PSA
➢ Manage Design
Team
➢ Final Design
Approval
➢ Advertise/Award
Const. Contract
Execute Const.
Contract
Provide Inspection
Oversight
Render Field Decisions
Oversee Construction
Documentation
Project Acceptance
6/5/2019
2
accomplishments
Projects Completed
Pier Improvement Project
Senior Center Kitchen Renovations
FY -18 Concrete Repair Program
FY -18 Slurry Seal Program
✓ Ocean Avenue Upgrades
✓ Arterial Paving
✓ Marina — Storm Water Focus Design
CPE — Storm Water Focus Design
Sewer Manhole Rehabilitation
Parking Management Plan
"NWIM _ W101"41
Project Costs
$8,400,000
$ 28,500
$ 62,000
$ 186,000
$ 214,500
$ 63,000
$ 100,000
$ 100,000
$ 10,000
$ 450,000
Total Expenditures: $ 9,614,000
current capital projects
Project Title Project Phase
FY16/17/19 Local Street Paving Construction
2018 Environmental Clean -Up Construction
15 151 Street Restaurant Repairs Construction
Traffic Signal Battery Back -Up Construction
Project Title Project Phase
City Monument Sign Design
Seal Way Storm Drain Design
6tn St Alley Sewer/Water Replacement Design
Sewer Pump Station 35 Upgrades Design
Bolsa Chica Well Rehabilitation Design
Lampson Well Analysis Design
6/5/2019
3
FY 2018-19 CIP summary
As of June 30, 2019:
10 Capital Projects completed or substantially completed at a
total value of $9.6 million
4 Capital Projects in the Construction Phase
6 Capital Projects in the Design Phase
Inter -agency coordination
1-405 Widening (toll lanes)
OCSD Western Regional Sewer Program
development
Ocean Place
Citywide Small -Cell Telecommunication/Fiber Installations
6/5/2019
11
funding sources
Unrestricted Funds
General Funds
Restricted Funds
State Gas Tax (transportation funding only)
SB -1 Gas Tax (transportation funding only)
M2 (transportation funding only)
Water Enterprise
Sewer Enterprise
SB Cable Foundation
Park Improvements
Tidelands
Grants
restricted funds - transportation
M2 Funding (OC Sales Tax)
City's annual allocation is approx. $400,000 which must be
expended on transportation -related activities/projects
Seal Beach must meet a minimum "Maintenance of Effort"
(MOE) annual expenditure of non -restricted funds to access M2
funding
MOE annual expenditure requirement for Seal Beach is
$ 551,000
SB1 Funding (State Gas Tax)
City's annual allocation is approx. $550,000 which must be
expended on transportation related activities/projects
The MOE annual expenditure requirement for Seal Beach is $1.3
million to access SB1 funding
6/5/2019
61
fy 19-20 project type summary
Beach & Pier
$526,000
Buildings & Facilities
$2,705,000
Parks
$170,000
Sewer
$2,069,000
Storm Water
$1,162,000
Streets & Transportation
$3,959,000
Water
$2,027,500
TOTAL
$12,618,500
Scat e
ti
U
c4[iFOf+MP /i
FY 19-20 project type summary
$526,000
Beach & Pier
$2,027,500 a Buildings & Facilities
$2,705,000 ■ Parks
a
■ Sewer
$3,959,000 $170,000
■ Storm Water
■ Streets &
Transportation
Water
$1,162,000
6/5/2019
A
6/5/2019
FY 19-20 CIP fund summary
General Fund (001)
$3,838,300(3o%ofov)
Gas Tax (040)
$1,020,000
Measure M2 (042)
$1,588,000
Sewer Enterprise (044)
$1,595,000
Water Enterprise (019)
$2,654,500
SB Cable Foundation (050)
$30,000
Grants (080)
$893,000
Park Improvement (016)
$16,700
Tidelands (034)
$433,000
SB -1 (039)
$550,000
TOTAL
$12,618,500
FY 19-20 CIP fund summary
$433,000
$16,700 $550,000
$893,000
$30,000
$2,654,5
General Fund
Mot/
$3,838,300..
(-30%)
■ SB Cable Foundation
(050)
Grants (080)
Park Improvement
$1,020,000 (016)
Tidelands (034)
$1,595,000 $1,588,000
SB -1 (039) a �/
w General Fund (001)
■ Gas Tax (040)
■ Measure M2 (042)
■ Sewer Enterprise (044)
■ Water Enterprise (019)
6/5/2019
beach & pier
Local Coastal Plan
Zero Tower Safety Improvements
• Pier Mase Structurai Eva/uatiot
Beach Yard Perimeter Wall Improvements
t
6/5/2019
parks
Citywide Court Rehabilitation'
Playground Replacement Program
Pickleball Court at Marina Park'
Shade Structure at Edison Park'
Edison Park Improvements'
sewer
Sewer Rate Study
61h St Alley Water/Sewer Replacement
Pump Station 35 Upgrades
Manhole Rehabilitation
f�
streets & transportation
Citywide Sign Replacement
Westminster/171h Street TSSP
Traffic Signal Battery Back -Up
Lampson Avenue Bicycle Lane
Local Street Resurfacing
Slurry Seal Program
Arterial Street Resurfacing
Concrete Repair Program & Audit
Striping Program
Traffic Signal Improvement Program
Street Tree Planting Program*
Main Street Paver Program
Main Street Revitalization Program*
a
6/5/2019
10
water
Beverly Manor Station Rehabilitation
Water Rate Study Update
Bolsa Chica Well Rehabilitation
Navy Reservoir Chlorination System Upgrade
Almond Avenue Fire Hydrant Relocation
Lampson Well Head Treatment Analysis
Citywide Water Meter Replacement
Water Valve Replacement Program
61h St Alley Water/Sewer Replacement G'
r
T
SPECIFIC PROJECTS
community pool
Main Street revitalization
pier base structural evaluation
6/5/2019
11
community pool
community pool
D
a
a
a
0
0
2019-20 2020-21
Seal Beach Blvd.
2022-23
Totals by Phase
$150,000
$ 150,000
i
+s
$ 50,000 $ 900,000
$ 950,000
$ 100,000
$ 500,000
$ 500,000
$ 1,100,000
J J
$6,250,000
$6,250,000
$ 12,500,000
$300,000 $1,000,0000
community pool
2019-20 2020-21
2021-22
2022-23
Totals by Phase
$150,000
$ 150,000
$100,000
$ 100,000
$ 50,000 $ 900,000
$ 950,000
$ 100,000
$ 500,000
$ 500,000
$ 1,100,000
$6,250,000
$6,250,000
$ 12,500,000
$300,000 $1,000,0000
$6,750,000
$6,750,000
$14,800,000
Estimated Total Project
Costs: $14.8
million
�V
::u„oeNyv.
6/5/2019
12
community pool
2017-2018 2018-19 2019-20 2020 2021-22 2022-23
Main Street revitalization
y4 s
M ` M
1
i
`10 ik Y
SEA(�y
J~+ YVA".
6/5/2019
13
Main Street revitalization
Phase 2+ - (TBD$)
• Pavement rehabilitation (Electric to Ocean)
• Landscaping
• Parkway concrete rehabilitation/hardscape
On -street amenities
• Neighborhood ID
• Etc... '
I
6/5/2019
14
Main Street revitalization
2019-20 2020-21 2021-22 2022-27.
� � -,.. llllllllllllllllll■
&51A
pier base structural evaluation
Separate from Pier Improvement Projects
• Structural evaluation
' Maintain safety and structural integrity
$40,000 preliminary study
k
10 �I
s
6/5/2019
15
unfunded projects
Citywide Facilities Improvements
City Parks Master Plan Projects
Storm Drain Master Plan Projects
Westminster Storm Drain & Bike Trail
PCH Median Project
Citywide Concrete Rehabilitation
Citywide Alley Pavement Rehabilitation
questions & comments
► is
SEa4 e .
6/5/2019
IN
FY19-20 FLEET
REPLACEMENT/ADDITION
2012 policy guidelines
Recommended replacement intervals
- Police Patrol Units —4 years/100,000 miles
- Medium Duty Trucks —12 years/80,000 miles
- Lifeguard — Considered every 5 years
6/5/2019
17
fleet inventory
Fleet inventory since FY 2011-2012
FY 2011-2012 fleet inventory was 96 vehicles and specialty
equipment
Over 63 vehicles replaced since 2012
Total of 28 vehicles added to fleet since 2012
8 Public safety
20 Public Works / Admin / Specialty vehicles
Fleet Inventory - FY 2019-2020
Total of 134 vehicles and pieces of equipment to be maintained
Total vehicles = 124
Public safety vehicles = 55 (30 "code 3" vehicles)
Public Works / Administration vehicles= 31
Specialty equipment (beach tractors, lift truck, etc.) = 38
Total specialty equipment = 10
Average age of the fleet is 4 years
2019-2020 fleet replacement/addition
PD
new
(vehicle addition)
Mini -van
$36,000
$24,000
$60,000
PD
4110
Ford PI
2011
102,478
Ford PPI
$45,000
$15,000
$65,000
PD
4111
Ford PI
2009
111,269
Ford PPI
$45,000
$15,000
$65,000
Chevrolet
LG
5100
Ford PI
2013
25,710
Tahoe
$45,000
$12,000
$57,000
Pkv
59
F550 04
2000
10,57o
Dump Truck
$65,000
$20,000
$85,000
Pick-up
PW
17
F250
2008
93,140
Truck
$36,000
$16,000
$52,000
Ford
Kia
PW
2103
Escape
2007
49066
Sportage
$28,000
$2,000
$30,000
Ford
Pick-up
Rec
2104
Ranger
2005
53,934
Truck
$24,000
$1,000
$25,000
Military
4" Storm
PW
121
Surplus
1988
N/A
Water Pump
$35,000
N/A
$35,000
Stump
PW
131
Doska
1990
N/A
Grinder
$20,000
N/A
$20,000
Proposed Fleet Replacement/Addition Total:
$494,000
6/5/2019
M]
fleet budget summary
Vehicle Replacement Fund $356,000
Water Enterprise Fund $145,000
TOTAL $494,000
city fleet management study
A comprehensive City Fleet Management Study performed in 2012
by Management Partners
Purpose of the 2012 Study:
Review and make recommendations on vehicle replacement
practices and funding
Evaluate and make recommendations on fleet maintenance practices
Key 2012 Study Findings Summary:
The size and complexity of the City's fleet is too large to be handled
by local repair shops
Seal Beach is too far away from the fleet maintenance facilities of
other cities to make contracting a viable option
Adequately staffing and equipping the existing City's vehicle
maintenance facility offers the most efficient approach
6/5/2019
19
city fleet management study
Key 2012 Study Summary of Key Findings - Continued
Establish fleet management policies
Invest in basic shop equipment to improve operational efficiency
and effectiveness (estimated cost is $35,000)
Implement a more rigorous preventive maintenance program
Workload associated with existing fleet requires 1.5 full-time
equivalent staff to provide responsive customer service
Hire one full-time mechanic and reduce the part-time mechanic
to 20 hours per week
city fleet recommendation
FY 2019-2020 City Fleet staffing recommendation:
The 2012 Study Findings concluded the need of 1.5 FTE mechanics to
manage and maintain the City's Fleet of 96 vehicles and specialty
equipment.
For FY 2018-2019 a total of 1.72 FTE mechanics were assigned to
maintain and oversee the maintenance of 133 vehicles and specialty
equipment
The FY 2019-2020 City fleet size will consist of 134 vehicles and
specialty equipment. Utilizing the baseline staffing formula
established in the 2012 Fleet Management Study, staff recommends
that the current staffing of 1.72 FTEs be increased to 2.0 FTEs.
6/5/2019
20