HomeMy WebLinkAboutSupplemental Email from Robert GoldbergGloria Harper
From: Robert Goldberg <rgoldberg@live.com>
Sent: Saturday, January 11, 2020 12:12 PM
To: Thomas Moore; Schelly Sustarsic; Mike Varipapa; Sandra Massa-Lavitt; Joe Kalmick
Cc: Jill Ingram; Gloria Harper; Steve Myrter, Patrick Gallegos; Charles M. Kelly, Jeannette
Andruss
Subject: Questions and Comments for Monday Night's Open Session
Attachments: Pool.Westberg+White.pdf, Pool.Griffin Structures.pdf, 1.13.20.Questions.doc
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Dear Council and Staff,
Please find my attached my comments and questions and referenced supporting documents for Monday's
open session meeting.
Thank you for your consideration and service,
Robert Goldberg
Questions & Comments for 1/13/20 (Open Session) from Robert Goldberg
Item B: Demand on Treasury (Warrants)
Page 12- Check #13722 for $5484 and Page 24- Check #13831 for $2265 to OfficeTeam for temporary
staffing services (an Administrative Assistant at $29.00/hr, and an Executive Assistant at $35.95/hr
per PRA 19-465). These recent warrants represent the 15th and 16th payments to OfficeTeam since
June 2019. The total paid through December 19th is now $40,381.
Check #
Check Date
Amount
Check #
Check Date
Amount
11407
6/20/2019
$1,160
13026
10/17/2019
$3,231
11718
7/11/2019
$1,160
13136
10/31/2019
$3,222
12195
8/18/2019
$2,976
13292
11/7/2019
$2,088
12325
8/22/2019
$2,889
13362
11/14/2019
$1,366
12388
8/29/2019
$2,233
13457
11/21/2019
$1,375
12716
9/26/2019
$3,344
13555
11/27/2019
$2,472
12871
10/3/2019
$3,677
13722
12/12/2019
$5,484
12948
10/10/2019
$1,438
13831
12/19/2019
$2,266
Total Paid to Date $40,381
Contracting with OfficeTeam has never been presented to Council for approval, and expenditures
have now far exceeded staff's spending authority of $33,970. This unauthorized "acquisition of
...labor" directly violates Charter Section 420 which reads in part:
SECTION 420. Contracts. Execution. The City shall not be bound by any contract, except as
hereinafter provided, unless the same shall be made in writing, approved by the City
Council... By ordinance or resolution the City Council may authorize the City Manager to
bind the City, with or without a written contract, for the acquisition of equipment,
materials, supplies, labor, services or other items included within the budget approved by
the City Council, and may impose a monetary limit {currently $33,970) upon such authority.
For the December 9th Council meeting, I submitted a historical analysis of current and past warrants
revealing similar ongoing violations of this Charter section involving GTT Communications,
Metropolitan Telecommunications, Verizon Wireless, and Fieldman, Rolapp,& Associates (financial
consulting).
I once again urge the Council to demand that Section 420 of the Charter be followed by staff. To do
otherwise is to continue abrogating the Council's control over spending. This control can be
reasserted by taking the following three actions:
1) Pull Item 8 from the Consent Calendar
2) Pass a motion to not "approve" Checks #13722 and 13831-- While this action will not result in
any refund of money paid, formal non -approval by Council is the mechanism by which the
Council can officially avoid validating staff's violation of the Charter. To wit, the Council has
been told in the past that the listing of warrants on the agenda is not just for informational
purposes, but rather for the Council to officially "approve" them. The Council should exercise its
oversight authority and not approve these two warrants.
3) Direct staff to cease the use of temporary staffing services from Office Team until such time as a
contract is approved by Council.
Page 13, Check #13734 for $13,210.72 to Richards, Watson, & Gershon. There is a line charge of
$5,184 for "Adv Bay City Partners." Bay City Partners is the former owner of the DWP property.
Is this legal work and charge related to the DWP property?
If so, it should be paid by the Successor Agency rather than the General Fund. In a 2016 email to
Councilman Miller, staff stated that "The DWP legal fees are no longer being reimbursed (by the Bay City
Partners} because at the time of the approvals of the project when Bay City offered the park for free
(instead of $1.1 million), the City Council, in its capacity as the RDA, agreed that it would use
redevelopment funds for the RDA's (and Successor Agency's) own legal fees, provided the State did
not object to such use for a former redevelopment project. To date, the State has not objected."
Item H: Communitv Pool Worksho
In August 2019, staff awarded Griffin Structures Inc. a one-year $32,750 contract for work related to
the future swimming pool (see attached contract and check #13734 on page 23 for $8,951). The
Scope of Services included three areas: Project Feasibility Outreach, Lease Negotiations, and
Preliminary Site Investigation Coordination.
The first area, Project Feasibility Outreach, appears to be the major focus of the contract. The
purpose of this effort is to "reach out to the community to ascertain whether or not the community at
large is in support of this project given the cost, time and resources a project of this magnitude will
consume." Griffin will use "high-level design information and assumptions" to estimate total project
costs. This will be followed by three public discussion sessions.
The scope of work in the Griffin contact seems to be very similar to that of our ongoing $239,000
contract with Westberg +White Inc. (see attached) that was awarded in September 2014. You may
recall that W+W held an extensive series of community outreach meetings in 2015 which narrowed
the potential sites down to McGaugh and the Navy base. W+W also concluded that the public
preferred a "community -sized" pool appropriate for local recreational programming, rather than an
Olympic -sized pool to accommodate regional competitive events. Additional tasks listed in the 2014
contract included site analysis (acreage, soils, zoning, environmental), an analysis of potential aquatic
center cost of operation vs. revenues, three possible conceptual site plans and pool designs (with
cost estimates), and finally, preparation of an EIR if necessary.
I believe the last payment to W+W was made in January 2019, and that we have only spent about
$84,000 of the $239,000 originally budgeted. The remaining funds are in the FY 19-20 budget by
virtue of a "roll-over purchase order," and the 2014 contract has no expiration date.
Is it staff's intention to no longer use Westberg +White, or is Griffin providing supplemental
services beyond the capacity of Westberg +White? Please explain.
•
0
PROFESSIONAL SERVICES AGREEMENT
Between
City of Seal Beach
211 - 8th Street
Seal Beach, CA 90740
Westberg + White, Inc.
1775 Hancock St., Ste. 120
San Diego, CA 92110
619-542-1188
This Professional Service Agreement (`tre Agreement') is made as of, Seatember 8. Nz �,
20 4_ (the "Effective Date"), by and between Westberg + White, Inc. ("Consultant"), a
California Corporation, and the City of Seal Beach ("City"), a California charter city, Z3s� `t3"
(collectively, "the Parties").
•
RECITALS
A. City desires certain professional services.
B. Consultant represents that it is qualified and able to provide City with such
services.
NOW THEREFORE, in consideration of the Parties' performance of the
promises, covenants, and conditions stated herein, the Parties hereto agree as
follows.
AGREEMENT
1.0 Scope of Services
1.1. Consultant shall provide those services ("Services") set forth in the
attached Exhibit A, which is hereby incorporated by this reference To the extent
that there is any conflict between Exhibit A and this Agreement, this Agreement
shall control.
1.2. Consultant shall perform all Services under this Agreement in
accordance with the standard of care generally exercised by like professionals
under similar circumstances and in a manner reasonably satisfactory to City.
1.3. In performing this Agreement, Consultant shall comply with all
applicable provisions of federal, state. and local law.
1.4. Consultant will not be compensated for any work performed not
specified in the Scope of Services unless the City authorizes such work in
advance and in writing. The City Manger may authorize extra work to fund
unforeseen conditions up to $28,850. Payment for additional work in excess of
this amount requires prior City Council authorization.
2.0 Term
This term of this Agreement shall commence as of the Effective Date and sha'
continue until all tasks identified in the scope of service are completed or unless
previously terminated as provided by this Agreement.
3.0 Consultant's Compensation
City will pay Consultant in accordance with the hourly rates shown on the fee
scheduie set forth in Exhibit B for Services but in no event will the City pay more
than $238,930.00. Any additional work authorized by the City pursuant to Section
1 4 will be compensated in accordance with the fee schedule set forth in Exhibit
B
2of9
City of Seal Beach EXHIBIT A
SCOPE OF WORK NARRATIVE
Task t,- Public Participation Process and Anal yAls
The City of Seal Beach has stated that they are seeking "creative methods and tools to successfully
accomplish a comprehensive community wide outreach program to obtain participation from residents in
establishing the ranking of multiple sites and determining if a 30 or 50 meter sized pool is most desirable."
Our Team, with Community Change Partners leading this phase will begin by creating a demographic
profile of a community surrounding a potential project which we have already completed and has been
included in this proposal Information was gamered from census data as well as from site visits. To begin
the community outreach process, elected officials, key stakeholders, community and business groups,
non -profits, schools and other community institutions are identified and a database compiled.
Interfacing with the City of Seal Beach elected representatives and City departments and staff will be an
important component of outreach efforts to understand their needs and desires for the project at the
outset and keep them in the communication loop as the community engagement process proceeds
To engage the entire community of Seal Beach and pool users to identify locations for a new aquatics
center and then to give feedback and input on design features, we would do initial PR, media and
outreach about the effort (developing a name for the campaign/effort) and create 4 -fun kick-off event for
the commuriit-. The kick-off event would be similar to a community fair with food_ and fun activities to
provide feedback on locations and des%e7 features for the new aquatics facility. As part of the event, we
-wouldcite a_citywide scavenger hunt to have people go to various parts of the city to identify sites acid
get points which can be redeemed for prizes. We will prepare site recommendation forms to be used and
provide cameras to take pictures of sites_ After the event, we will have a window of time for people to
submit additional sites for consideration. We will also do our own reconnaissance and work with local real
estate agents and city planning and recreation staff to identify appropnate sites
Once we have compiled a list of appropriate sites and the feasibility analysis phase has begun, we will
begin engaging the community around the various sites. We will conduct individual meetings with key
stakeholders, small group meetings and go door to door to talk with those immediately adjacent to the
sites to understand their needs and concerns. We feel that this develops mutual respect and trust with
key stakeholders that will ensure a smoother process in the long run. At this stage we will be talking with
people about site issues and design features desired We will also conduct outreach at the existing pool
facility to understand the needs and concerns of current pool users and seek input from potential users,
such as those interested in water polo and competition swim meets to understand their requirements
We will create a consensus building decision process to decide on a site once the feasibility analysis is
completed and pros and cons of each site enumerated. We will use on-line polling tools for people to rank
their preference of sites. While the site selection process is occurring, we will provide the architect with
input from the community on design features to begin creating conceptual ideas for the aquatics center.
Once a site is selected, we will work closely with the surrounding neighborhood to address any concerns
they have involving them in the process to gain buy -in
Having effectively engaged the greater community through small group or individual meetings, workshops
and door-to-door outreach, we are better able to prepare a design that incorporates stakeholder needs
and concerns from the outset, allowing for a more respectful dialogue, more being accomplished at
meetings and workshops and more meaningful input being provided.
A write-up is completed for all meetings and outreach efforts, providing the client, architect and planners
with information that will be needed to design or modify the project. There will be a back and forth iterative
process with the desrgr, team and stakeholders Formats can include public meetings. workshops, on-line
public meeting tools, focus groups, and surveys.
Ongoing communication with the surrounding neighborhood(s) and interested stakeholders is critical
throughout the process, from conceptuaiization to project completion. We foresee using various means to
communicate with the Seal Beach community which could include- emailing updates, creating a
Facebook page, creating a website, and using MindM xer, an on-line public engagement tool However,
even when providing electronic updates, in person update meetings and phone calls are very effective in
creating a personal connection that people appreciate, We will work with the schools and libraries to help
people provide input who do not have access to a computer.
In addition, we believe that through an engagement process for a community facilities project, such as
this one, there is an opportunity to create a sense of community not found in all neighborhoods, which will
enhance the project and its constituents, customers and stakeholders for the long-term. This can be
accomplished through special activities and events specifically designed to bring people together around
the project in a fun and relevant way such as described for the kick-off event. We have broad experience
in developing ideas for activities and events and implementing them.
Task 2 - Site Selection Recommendation
We understand that we will be required use our professional expertise and analysis to recommend the
most practical site to locate a multi -generational community aquatic center within the City limits based
upon location, costs and design.
Selecting the most appropriate and practical site is an important and vital consideration for this project.
The location, size, shape, orientation, access, views, surrounding neighbors, geology, water table,
hazardous material and drainage among others will greatly influence the site selection and affect the
program master plan. Our approach is to develop the community aquatic program and master plan and
select the site based upon the interrelationships of the program that was developed through the public
participation process.
Once a preliminary program is developed that conceptually illustrates the present and future needs of the
community aquatic center we should begin the site selection process Because the perfect site may not
be able to be located that meets all the criteria of the program, we'll need to set priorities for the site
selection and be prepared to make compromises. After walking the potential sites with the site selection
committee, we should consider selecting three (3) sites and ranking the sites based on the Feasibility
Analysis.
Successful real estate feasibility analysis must be based on community input and the results of the public
participation process to define the program and relevant factors to consider when ranking sites. All
feasibility starts with "highest and best use" for each property - uses that are physically feasible, legally
permissible, and financially optimal - but selecting the best site for a community recreational amenity has
to consider a wide range of additional measures including accessibility, impacts on nearby uses, and the
ability to mitigate those impacts.
James Suhr & Associates (JSA) will prepare a feasibility study for the proposed Seal Beach Community
Aquatics Center, as part of the Westberg + White team, which builds on the community outreach results
to be generated by team member Community Change Partners. Among the many factors to be used to
rank potential sites, community suitability and community accessibility will be heavily weighted so that the
process does not generate unviable site selections
Jim Suhr, principal of JSA, holds a California broker's license, and will work with City staff closely on the
selection of the recommended site(s) and negotiation with property owners for site acquisitions Suhr has
30 years of experience as a developer and consultant in Southern California real estate markets, with
particular expertise on site due diligence, feasibility, and acquisitions.
As noted in the RFP, the real estate market in Seal Beach is very tight - few sites are available at any
point in time, and huge portions of the City are subject to significant constraints (Naval Weapons Stat on.
National Wildlife Refuge Leisure World) placing much of the jurisdiction out of reach. Not withstanding
the difficulty, we should keep the Navy and Wildlife Refuge at the discussion table JSA will work with
City staff and the local brokerage community to identity any/an available properties, as well as using
adaptive reuse and redevelopment creativity to identify additional potential sites that are off -market. City
staff and the selected team will need to explore shared -use alternatives with existing facilities to create as
large a list of potential sites for consideration.
Potential sites for the Seal Beach Community Aquatics Center would be evaluated using the following
preliminary matrix/weighting system. Each site will be scored using a 0-5 scale for each factor, other than
estimated cost categories, and then each category subtotal score will be adjusted by the weighting factor
shown below to arrive at the overall weighted score for each candidate property
Site size adequate for use
Site existing improvements
Existing/newparking adequate for use
Environmental condition foruse
Soils/Water Table condition for use
Permitted use by existing zoning
Ability to satisfy all code req'ts
CommuniySuftailift?(50%ojWoo I I 1 I
— pedestrian/bike
— transit
—private vehicle
No impacts on adjoininguses
Adjoininguses favor Aquatics Center
Financial Feasibility (30 %
Estimated acquisition cost (relative to lowest
S)
Estimated site prep cost (relative to lowest $) j
Overall WelahtedScore
This evaluation process will result in a ranked list of potential Aquatics Center sites, factoring in the
community outreach and stakeholder input responses gathered by the team, which will serve to guide
City staff and JSA in subsequent real estate negotiations
We understand that we will be expected to provide a detailed analysis of the site being recommended.
This analysis will include but not limited to the following features: acreage, surrounding land uses, soil
types, environmental issues, historic uses, floodplains, drainage and coning
The process that will be used for our analysis is illustrated in Task 2 - Site Selection Recommendation
Seal Beach has many amenities including 25 parks or community facilities, including the beach The
existing aquatics center is located or the campus of McGaugt, Elementary School. The City runs a robust
aquatics program, which includes lap swirrming aquasize classes, swim team, recreational swim, swim
;essons, and a summer swim program. At the current site, the swim team cannot hest competitions and
the pool cannot support a water polo program which is desired by many.
There are two pools currently the large pool with 6 lanes for lap swimming and an area called "the
widths' for people to lounge and water walk There is an adjacent small shallow pool that does not get
much use most of the year It is used during the summer months for recreational swimming or for games
as a reward after swim lessons During the summer months, the pool complex can be rented out for pool
parties. Pool users include the local residential community in Seal Beach and surrounding areas of all
ages and people who work it Seal Beach There are only a few people that come from Leisure World
since they have multiple pools within their complex.
In getting a preliminary sense of the interests from those currently using the pool, we learned that people
would like a pool that will allow for competition swim meets and water polo matches. The people we
spoke with said that a fountain area or splash pao would be fun for young kids and get more use than the
shallow pool. Current pool users would like to see a 50 meter pool that would allow for 8 lanes for lap
swimming. When shown the photo of Sp ash La Mirada Regiona: Aquatics Center, people were very
excited with the prospect of having a similar facility in Seal Beach The people we spoke with thought that
a larger pool complex would be quickly flled with activities and become well -used. They also thought that
such a destination facility would generate more income from pool parties, activities and usage fees to
help maintain the multi -generational facility
We heard from stakeholders that a few years ago the City considered locating the new aquatics center at
the vacant site along First Street north of Central Avenue adjacent to Marina Park and Community
Center We were told that the project was shelved because the Marina neighborhood did not want a
larger pool facility in that location fearing noise and traffic that would lower the value of their properties
We also understand that this site is contamirated and would have to be cleaned or sealed if the aquatics
center were to be located there Given that this site is one of the few vacant properties of a substantial
sve in the city, the site will most likely oe analyzed in the feasibility study The issues previously raised by
the Marina neighborhood will have to be addressed in the public outreach and engagement process and
environmental review process
BRG Consulting Inc (BRG) will assist the Team during the identification of alternative sites by providing
an ongoing Environmental Opportunities and Constraints Analysis of the potential candidate sites and
surrounding areas. BRG will focus on opportunities to maximize existing environmental values of the
protect areas and avoid potential adverse impacts on s.gnificant environmental and community resources
at the candidate sites. A guide to this environmental evaluation will be the Mandatory Significance
Findings in Section 15065 of the State CEQA Gu.delmes One of the goals of this environmental planning
component of the site selection process s to avoid significant environmental impacts and thereby simp!ify
the CEQA document required for the project
Tae" d — Activity and Anuatic Center Anal AJA
We will identify the community programming and aquatic center needs for the site that was developed in
Task 1 Task 2 and Task ;
in addition to the aquatic certer' s physical analysis we will also provide a Financial Impact Study that will
be developed as an opinion of the facility financial performance and an opinion of suggested operations
for the planned facility. The study wJ include the following elements.
1 Economic Impact
This part of the study will incorporate an analysis of the economic impact of the facility to the
City. In this segment of the study the following will be researched, analyzed and reported
a Demographic research will be completed to appropriately evaluate the
Error[ Unknown document property name.
proposed facility Analysis will include population and age distribution,
income, weather analysis, and local economic considerations that could
affect the project's viability
An opinion of probable expenses will be developed and it will include demands
on labor, contract services, supplies, utilities, maintenance, and funds needed
for future repair.
An opinion of revenue will be developed. Market area demographics for
population, age, and income will be analyzed to understand the economics of
the region and the level of discretionary income that may be used for leisure and
competitive aquatic activity.
Revenue projections will be derived from the likely market penetration, special
user groups through creative programming, and the potential of income The
analysis may include a study of the influence of the tourism This analysis will
incorporate an opinion of attendance and offer recommendations of a
compeUtive fee structure for all facilities.
2. Operational Impact
This part of the study incorporates an analysis of the operational impact of the facility to the
City In this segment of the study the following will be researched, analyzed and reported
a A facility management outline will be completed that includes a facility
operating schedule, facility capacity limits, organization chart, job descriptions,
and a wage structure for all employees.
b. Area aquatic user groups will be identified to determine organizations that will
contribute to filling available capacity in the facility
c A marketing program will be prepared to aid in creatively promoting the facility
once the project is completed.
We will recommend to the City the most feasible site based upon the public participation's desire
location, costs, facility needs and design. Our recommendation will account for the program needs that
were developed through public participation along with necessary support facilities
This recommendation, which is the product of our analysis of Tasks 1 through a will include
Preparation and submittal of an outline of the Design Program of spaces and features for
the proposed aquatic center describing the natatorium, pool size. shape and support spaces
based on preliminary discussions and meetings noted above.
Based on the meetings and committees review of the outline program, develop with the you
a Design Program for the building with recommendations on the size and shape of the pools?
as well as architectural and engineering features of the building and support spaces
Make a final oresentation to the project committee outlining the methods and results of the
study
We will provide conceptual site plan, plans and elevations for the aquatic center that incorporates the
needs of the entire community and the program as developed and prioritized during the public
participation and Tasks 1 through 5. The conceptual plans that we will present will be the Vision,
Translation and Implementation of the Program balancing the needs as follows
A. Based on the agreed upon program, we will prepare three concepts. Typically these concepts
consist of an ideal, preferred and minimum acceptable. The ideal concept includes areas of
programming without taking into account budget considerations The preferred facility
supports the design program with costs to meet the proposed budget The minimum
acceptable concept is a facility that will be considered if the project experiences limited
funding. Through our experience site planning a number of these types of facilities, Westberg +
White and Counsilman-Hunsaker have learned that it is important to provide separate areas
for the competitive swim users and recreational users. The competitive users will require a
large amount of deck space for staging, as there are many swimmers but few in the water at
the same time. The recreational users are best served by thinking of the facility in three
areas with corresponding water depths -
Tots - Characterized by 0" to 12" Deep Water
Family - Characterized by 0" to T-6" Deep Water
Teen/Adult - Characterized by 3'-6' to 12'-6' Deep Water
As an example at Splash! at La Mirada Aquatic Park, we creatively separated the competitive
and recreational users Each designated user had their own bathhouse and separate and
independent heating and filtration systems. For instance during the cooler periods of the year
the less used recreational pools' mechanical and plumbing systems and bathhouse were shut
down to save energy and maintenance costs. The competitive side remained usable and
operational.
B We will provide a conceptual plan of each building. The purpose of the plans will be to
Illustrate ways to organize the spaces in a functional arrangement and to confirm that the
Building footprint will contain the areas proposed in the Design Program. For the Bathhouse
facility, the location, size, and layout will be developed as an integral part of the overall site
plan. Over the years and through multiple projects we know that these facilities need to be
functional, well -ventilated and lighted and low maintenance while meeting the basic code
requirements and operational requirements of the facility. As a support facility to the aquatic
center we carefully select the structural systems and finishes that are attractive yet economical
so that most of the budget can be used for the pool Since the public does not come to a
family aquatic center or waterpark for the bathhouse. This concept of Recreation First! is a
consistent theme throughout our work
C As an integral decision-making tool, we will prepare a detailed Opinion of Probable
Construction Cost for the new facility. Recent project bid figures of similar projects will be used
as well as national estimating guides and local cost adjustment factors. The hard construction
cost figures will be supplemented by a development cost factor, which will include such "soft"
costs as professional fees, survey, geotechnical report, document reproduction, advertisement
for bids and all anticipated expenses related to the administration of the project. The sum of
these two cost figures will be the total project cost so that you will have a comprehensive
overview before making an informed decision about the project
By making recreation and operations the focus we have successfully stayed within budget, minimized
staffing requirements, and made every possible dollar available for outdoor family aquatic recreation.
It is likely that the new Community Aquatics Center will qualify for preparation of a Negative Declaration
(ND) or Mitigated Negative Declaration (MND), which will foes on only the potential significant
environmental impacts of the project (CEQA Guidelines Article 6) With BRG's partiapabon during the site
selection process (Task 3) and the active community outreach program (Task 1), it is anticipated that
potential significant impacts will be avoided to the maximum extent possible during the planning and site
selection phase, thereby improving the likelihood that an ND or MND can be prepared for the project. The
ND/MND document needs to be circulated for a 21 -day public review, compared to 45 days for an El
The ND/MND will be based on the Initial Study Checklist form found in Appendix G of the State CEQA
Guidelines As described in Task 3, our Environmental Opportunities and Constraints review of the
alternative sites will focus on potential ervirormental issues relative to the Mandatory Significance
Findings in Sector 15065 of the CEQA Guidelines
If the Initial Study for the proposed alternative identifies any significant adverse impacts that cannot be
fully mitigated or avoided, then an Environmental Impact Report (EIR) will need to be prepared The EIR
will be prepared in accordance with the requirements of CEQA (Public Resources Code Section 21000 et
seq.), the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.), and the City
Guidelines for Compliance with CEQA
The following provides a detailed scope of work for preparation of the EIR:
1_ Project Initiation_ NOP and Data Collect'
Our first task to initiate preparation of the EIR is for the Team to meet with City staff to confirm the project
description and scope of analysis for the EIR. The first task to start the public timeline for the EIR will be
preparation and publication of the Notice of Preparation (NOP)
2- Prosect Description:
CEQA requires that the EIR description of the project shall contain certain information but should not
supply extensive detail beyond that needed for evaluation and review of the environmental impact
BRG's project description will provide the following required elements* 1) the precise location and
boundaries of the Proposed Project shall be shown on a detailed local map and on a regional map. using
the Base Maps prepared for the site selection study, 2) a statement of objectives sought for the Proposed
Project. 3) a general description of the project's technical, economic, and environmental characteristics.
considering the principal engineering plans, if any, and supporting public service facilities, and, 4) a
description of the intended uses of the EIR including a list of the agencies that are expected to use the
document in their decision making; a list of permits and other approvals required to implement the project
and a list of related environmental review and consultation requirements required by federal, state, or
local laws, regulations, or policies. The project description will also list the City decisions subject to
CEQA in the order in which they will occur.
For this reason, the project descrption can be a living document initially, incorporating additional detail as
it is developed Ultimately, the project description must become a finite, stable document for the
environmental analysis to be prepared and reported in the First and Subsequent Screencheck Draft and
Final EIRs.
3. Project Alternatives:
Properly defining the project objectives is a critical component of any EIR because CEQA requires that an
EIR shall describe a range of reasonable alternatives to the project, or to the location of the project, which
could feasibly attain most of the objectives of the project, but would avoid or substantially lessen any of
the significant effects of the project.
Identification of project objectives would be one of the first tasks undertaken Based or those objectives,
an initial set of alternatives would be prepared We would also work with City staff to determine the level
of detail for project description information and environmental analysis that would be prepared for the
alternatives.
We anticipate identifying an initial set of alternatives based on City staff and the Team's knowledge of the
project and site Such alternatives would be reported and analyzed in the First Screencheck Draft EIR
CEQA Alternatives cannot be fully defined until the environmental analysis is initially drafted so that City
staff and the BRG Team understand the environmental impacts that nse to a level of significance City
review of the First Screencheck Draft EIR we would work with City staff and Team to identify any
additional alternatives that might need to be considered in the EIR based on the detailed analysis
presented in the First Screencheck Draft EIR. Such alternatives would be developed and reported in the
Second Screencheck Draft EIR and all subsequent EIR submittals. For the purpose of this proposal, we
have assumed the EIR will analyze the Proposed Project, two project alternatives, as well as the No -
Project Alternative.
4. Preparation of Technical Studies:
BRG specializes in the preparation of ervironrrentai documentation for compliance with the requirements
of CEQA For over thirty years, the firm has successfully managed the preparation of technical studies by
others that support the CEQA documents we prepare It may be appropriate to develop specific technical
studies, depending on the environmental issues associated with the Proposed Project. Our principals and
project managers review every technicai document we receive. including the appendices to the technical
studies.
5_ First Screencheek Draft EIR:
BRG will prepare an EIR for the Proposed Project The EIR and associated technical studies will
assemble all data, originate new studies where necessary, and provide an assessment of the probable
direct and indirect, and short- and long-term cumulative impacts of the Proposed Project. The Draft EIR
will provide an evaluation of feasible mitigation measures, which could be carried out to reduce or
eliminate significant adverse impacts of the Proposed Project. One of our initial tasks will be to confirm
overall document format with City staff
The document will include the basis of analysis, a description of the relevant existing conditions,
thresholds of significance, impacts, level of significance prior to mitigation, recommended mitigation
measures to substantially reduce or avoid significant impacts, an analysis of the level of significance after
mitigation measures are applied, and evaluation of the project alternatives. The discussion of mitigation
measures will provide the background for the Candidate Findings under CEQA Guidelines §15091(a)
Environmental issues to be Addressed in EIR
The following environmental issues will be addressed in the EIR. air quality, biological resources,
climate change/greenhouse gas emissions/sea level rise, energy, geology and soils, hazards
and hazardous materials, hydrology and water quality, land use and planning, noise, public
services, transportabon/traffic/parking, utilities and service systems, and cumulative impacts.
We understand that some environmental issues may be added based on responses received
during the public scoping and Nonce of Preparation review process. The following section
summarizes BRG's proposed approach to the environmental issues to be addressed in the EIR
Cumulative Impacts
The cumulative impacts associated with the Proposed Project will be identified and assessed
Our approach would be to utilize the project list approach provided by CEQA. On a resource -by
resource basis, we would identify a study area within which cumulative impacts might be
expected. We would work with City staff to identify all of the potential past, present, and
reasonably foreseeable future projects that should be considered in the Cumulative Impacts
analysis
We aiso will coordinate as necessary with the City, the Navy and the resources agencies that
may provide the necessary cumulative project informabon. We will provide a map showing the
cumulative impact study area and the location of each project, a brief description of each project,
and a summary of envirormental effects for each project organized by each environmental
resource that may be impacted. We would then provide analysis and discussion as to any
significant cumulative impacts Mitigation would be identified if necessary
Other Reou+red Considerations
This section will discuss growth inducemert, significant irreversible environmental changes, and
effects found not to be significant
Quality Assurance/Quality Control
BRG will implement its rigorous Quality Assurance/Quality Control (QAIQC) procedures in
reviewing the First Screencheck Draft EIR (and subsequent submittals as well), and related
technical reports that w l be included as appendices to the EIR document ,n addition to an
independent QA/QC review by our Principai Env rormental Piarner. BRG will assure that
all deliverables undergo a Project Management review BRG is dedicated to delivering high
quality deliverables that have been thoroughly reviewed prior to submittal.
6. Second Screencheck Draft EIR:
BRG will carefully review City staff comments on the First Screencheck Draft EIR. We will prepare a
matrix detailing all substantial comments and identify how each comment is addressed in the EIR. At this
time, we will also make a recommendation as to whether we feel additional alternatives need to be added
to the EIR and discuss our recommendation with City staff. We will incorporate City comments and
perform a final quality control review before submitting the Second Screencheck DEIR to the City. We will
complete the comments matrix by providing a summary of each response and where each response can
be found in the EIR
7. Draft EIR for Public Review:
BRG will carefully review City staff comments on the Second Screencheck Draft EIR. We will incorporate
City comments and perform a final quality control review before submitting the Camera -Ready DEIR to
the City. We will prepare a matrix detailing all substantial comments as described above. We will meet
with City Staff to discuss how we responded to all comments. During this meeting we will discuss any
further changes that may be necessary. After the meeting, BRG will complete any additional changes.
perform a final QA/QC review, then will have one final meeting with City staff to review the Draft EIR.
8. First Screencheck Final EIR:
We understand the First Screencheck Final EIR will consist of the following deliverables: Response to
Comments, revised text, First Screencheck Final EIR, Mitigation Monitoring and Reporting Program
(MMRP), Findings of Fact (Findings), Statement of Overriding Considerations (SOC), figures, and
attachments.
Response to Comments
Upon close of the Draft EIR public review period. BRG will review all comments, number them,
and distribute them to the City. We will assign specific individuals to prepare responses to
comments, based on the nature of each comment. Each individual will be responsible for
preparation of a response to their assigned comments. BRG will assemble and review all
responses for adequacy and consistency. BRG will identify any responses that affect information
contained in the Draft EIR and may require revising or supplementing information in the EIR. The
format of the responses will be in a side-by-side presentation with the comment letter reduced but
legible on the left and corresponding responses on the right
First Screencheck Final EIR. Figures_ and Attachments
BRG will assemble the First Screencheck Final EIR, which will include the responses to
Comments on the Draft EIR and any text that has been revised in response to comments
received during the public review period. The First Screencheck Final EIR will also include all
Figures and Appendices. Again, BRG will implement its QA/QC procedures on the First
Screencheck Final EIR document prior to submittal to the City.
Mitigation Monitoring and Reporting Program
BRG will prepare the MMRP that presents necessary information in table format. The MMRP will
be prepared in accordance with Public Resources Code §21081.6(a)(1) and CEQA Guidelines
§15091. The MMRP will identify the party responsible for monitoring and will include monitoring
qualifications, specific monitoring activities, a reporting system and criteria for evaluating the
success of the mitigation measures.
Findings of Fact
BRG Consulting will prepare draft Candidate Findings in accordance with the requirements of
State CEQA Guidelines Section 15091. The Findings will follow past formats used by the City
and we will confirm the format prior to beginning work on the Findings
Statement of Overriding Considerations
In the event there are significant and unmitigable impacts of the Proposed Project identified in
the EIR, BRG will prepare the draft Statement of Overriding Considerations (SOC) in accordance
with the requirements of State CEQA Guidelines Section 15093. BRG would work closely with
City staff to draft the SOC, incorporating evidence provided by the City for the Findings to support
approval of the Proposed Project should it have significant and unmitigable impacts. The SOC
would document the specific economic, legal, social, technological, or other benefits, including
region -wide or statewide environmental benefits, of the Proposed Project against its unavoidable
environmental risks. The SOC would state in writing the specific reasons to support its action
based on the final EIR and/or other information in the record.
9. Second Screencheck Final EIR,
BRG will carefully review all City comments. We will prepare a comments response matrix as described
previously. We will incorporate comments to prepare the Second Screencheck submittal to include the
revised response to comments, EIR text, MMRP, Findings, SOC, figures, and attachments BRG will
again implement its QA/QC procedures on the Second Screencheck Final EIR document prior to
submittal to the City.
10, Final EIR:
BRG will carefully review all City comments. We will prepare a comments response matrix as described
previously. We will incorporate comments to prepare the Final EIR submittal to include the revised
response to comments, EIR text, MMRP, Findings, SOC, figures, and attachments. We will implement our
QA/QC procedures in reviewing the Final EIR document prior to submittal to the City. We will meet with
City Staff and discuss how we responded to all comments. During the meeting we will discuss any further
changes that may be necessary. After the meeting we will complete such changes and perform a final
QA/QC review. We will then have one final meeting with City staff to review the Final EIR to include the
revised response to comments, EIR text, MMRP, Findings, SOC, figures, and attachments.
11. Proiect Coordination and Meetinos:
BRG and our team members anticipate participating in regular meetings with City staff and/or the design
team throughout preparation of the EIR, and that the majority of these meetings will be conducted via
telephone conference call. We will ensure the appropriate project team members are at each meeting.
We will prepare meeting notes to document action items and responsibilities.
EIR Schedule
A proposed schedule for completing all work specified in this Scope of Services is provided on
the following page. BRG proposes to complete the EIR within approximately nine (9) months of
receiving the Notice to Proceed. This is an accelerated schedule that will require significant
coordination with City Staff and the Team The 13RG team will manage the project schedule
carefully, keeping a close watch on critical path tasks.
City of Seal Beach EXHIBIT B
COST PROPOSAL AND FEES
SCOPE OF WORK
Task 1 Public Participation Process and Analysis
Task 2 Site Selection Recommendation 8, Analysis
Task 3 Site Information and Analysis
Task 4 Activity and Aquatic Center Analysis
Task b Aquatic Center Recommendation
Task 6 Conceptual Pians and Cost Analysis
Task 7 Environmental Preparation
Kick -Off Event Refreshment Allowance
Mindmixer Online Platform Allowance
Traffic Engineer Allowance
Total:
Westberg + White (Architect)
Hourly Rates
Partner
$23000
Project Archdect/Manager
$175.00
Senior Designer
$135.00
CAD, Senior
$60.00
CAD, Intermediate
$65.00
Administrative
$60.00
Counsilman-Hunsaker (Aquatic Design)
Hourly Rates
Principal/Studio Director
$160.00
Protect Manager
$135.00
Project Engineer
$11000
Design Associate
$90.00
Administrative
$5500
Community Change Partners (Outreach)
Hourly Rates
Partner
$180,00
James Suhr & Associates (Feasibility Study)
Hourly Rates
Partner $17500
ERG Consulting (CEQA)
Hourly Rates
Principal $285.00
Senior Project Manager $16500
Asst. Project Manager S12000
FEE
$36,800.00
$62,190.00
$17,390.00
$8,600.00
$35,130.00
$63,320.00
$5,000,00
$3,000.00
$7,500.00
$238,930.00
MAN
HOURS
209
358
114
64
270
399
1,414
Environ Analyst II
$9500
Environ Analyst 1
$7500
GIS Specialist
$9500
Documents Manager
$85.00
Leverton & Associates (Cost Estimating)
Hourly Rates
Partner $90.00
Notes
While we believe a (Mitigated) Negative Declaration will likely be the appropriate CEQA document for the
project, it may be determined that an EIR would be the recommended document for compliance with CEQA
This determination will be possible once the site selection process has narrowed the choke of feasible
alternative sites, including community input during the public outreach and our initial environmental review.
In the event an EIR is necessary, the probable range of cost would likely be from $95,000 to $150,000,
including all technical studies. The actual cost of preparing the EIR would be highly dependent on the
number and nature of significant issues to be addressed This cost would be negotiated with the City and
would replace, not be in addition to. the currently proposed $63.320 00 budget for Task 7.
As we proceed with the task of identifying potential saes and making a site selection, other services may be
necessary such as GeotechnicaVHydrology Reports. Civil Engineering and Topographic Surveys etc. which
will be considered as Reimbursable Expenses
The fee for the real estate transaction involvement of James Suhr to represent the City as the buyer would
typically result in a 1% fee based on purchase price
PROFESSIONAL SERVICES AGREEMENT
for
Community Pool —
Program and Construction Management Services
Between
City of Seal Beach
211 8th Street
Seal Beach, CA 90740
0
Griffin Structures, Inc.
2 Technology Drive, Suite 150
Irvine, CA 92618
(949) 497-9000
This Professional Service Agreement ("the Agreement") is made as of August 2,
2019 (the "Effective Date"), by and between Griffin Structures, Inc. ("Consultan
a corporation, and the City of Seal Beach ('City'), a California charter city,
(collectively, "the Parties")
RECITALS
A. City desires certain professional program and construction management
services.
B. Consultant represents that it is qualified and able to provide City with such
services.
NOW THEREFORE, in consideration of the Parties' performance of the
promises, covenants, and conditions stated herein, the Parties hereto agree as
follows.
AGREEMENT
1.0 Scope of Services
1.1. Consultant shall provide those services ("Services') set forth in the
attached Exhibit A, which is hereby incorporated by this reference. To the extent
that there is any conflict between Exhibit A and this Agreement, this Agreement
shall control.
1.2. Consultant shall perform all Services under this Agreement in
accordance with the standard of care generally exercised by like professionals
under similar circumstances and in a manner reasonably satisfactory to City.
1.3. In performing this Agreement, Consultant shall comply with all
applicable provisions of federal, state, and local law.
1.4. Consultant will not be compensated for any work performed not
specified in the Scope of Services unless the City authorizes such work in
advance and in writing.
2.0 Term
This term of this Agreement shall commence as of the Effective Date and shall
continue for a term of one (1) year unless previously terminated as provided by
this Agreement.
3.0 Consultant's Compensation
City will pay Consultant in accordance with the hourly rates shown on the fee
schedule set forth in Exhibit A for Services but in no event wmore
than Thirty Two Thousand Seven Hundred Fifty Dollart__.$32,750.00). ' Any
additional work authorized by the City pursuant to Sec iorl—l- - will be
compensated in accordance with the fee schedule set forth in Exhibit A.
1 of 8
GRIFFIN STRUCTURES FEE PROPOSAL
POOL PROJECT
CITY OF SEAL BEACH
,)'' 17? 24)19
Griffin Structures' Fee Proposal is based on all reasonable costs uecessar- to per•forn► Prograrn ;u►d Construe ticx,
Mairagetticnt Services for the City of Seal Beach's Pool Project For these requisite services Griffin Strurtme,
proposes the following 1NQt-to-Exceed Fee:
Program and Construction Managenictir Services: $ 32,500
Reimbursable Costs:
250
1 otal $ 32,750
I'lease see the end of this document for a hourly fee schedide.
SCOPE OF SERVICES
PROJECT FEASIBILITY OUTREACH
The Cit) of Seal Beach would like to reach out to the community to ascertain whether of not the communis% at
iiil ge is rn support of this project given the cost, utue and resources a project of this magnitude will consun►c. I o
address this opportunity, Griffin Structures proposes toapple the following approach:
"Task 1: Conceptual Estimating
1 conceptual plan was developed which we will review in detail and develop a conceptual stateu►cnt of prolxible
n=l li,ued on the suggested program. sizes of facilities and related site work. The cost.% will be based on unit and
niay--i component cost facto", and on high-lc.vel design inforuuition and assumptions. Griffin's Tear" has vci
unrest experience wnh the delivery 0fthis IaIciltty type and will reflect local construction conditious and flit: local
bio market 'I he couceptual statement of probable post will he presented in such a "manner so that, once approval
to pi oct•ed is given and de,•sirm is utken further, the estiufate can be refined.
I lit ,<,.t ni�,dcl will include 'total pruject cost%* to tin• degree possible. Site costs will be piep:aied based ;fu
ltaforuruion reclttested of, and provided by, the Citti, C:rifiin will include allowances for pre -development cost~.
building c.onstrucuon costs, architectural and engineering costs. program and ronstruct.ion management, other
:ees and permits, consulting costs. insurance costs. FF!t E allo.sance. landscaping, reasonable comingencnes. end
kAhe► :tpprol,riate components of total project costs, based on input from the City. hosts will exclude coats tot
off-site improvefnents and will he based on site condition information as available.
I his tnformatinn will be critical to having urteiltgcnt and accurate f11formatiun as we move toraard 11110 the puliht
.utn'.u•h prc,cess
lecnnotaQy pave. Suite 150 ■ Irvine CA 92618 0 949 497 90W ■ prtf}instructures corn
Task 2: Outreach Planning Meeting
(,I111it1 proposes to meet in a face-to-face setting with City stall to cooftrnt objecuves for each public sessinn.
idcncifi, kev stakeholders to engage, and best outreach opportunities; ideas to encourage comniunity attendance.
Possible dues, tithes, and locations for the sessions will be determined during this meeting as well. Workshop
:!airs and :approaches will be entablished during this hutial meeting. along with the identification of kev issues
and .iakehcldei concerns.
Task 3: Prom otion%notification
B,vwd on the discussion in Task 2, Griffin will coordinate with Citi Stall'to develop and disseminate: public until es
-nni ,nsit.mons to fiat 6ripate.,ucb as
• Flyers
• Press :•eleases
• 1 ables at local events. libraries, cominuitity centers, etc-
. Wchsitelernail notices
• '�orial ttuedia announcements (as applicable)
Task 4: Public Discussion Sessions
on tilt specific objectives established tvi each of the tlurc sesSionb. Giiffut will develop agewi,as.
,eiueabonal PowerPoint presentations, Post -it. Note exploration exercises, small group breakout conversations,
fa,i itated Iarge group dialogue, flip chart recording, etc. Nvpothetital scenarists ntay be included as part of dw
,tn.ill t;: oup activities. After each session, a sununart of the stakeholder input will be prepared.
LEASE NEGOTIATIONS
i t it ,rt `cal beach has requested Griffin Stnirtures assist in least, negotiations wish the navy. This wrll include
"nulerstaaduig milestones and key schedule requirements to ensure tnomenturn is not lost during the procr,s.
\',r .:itl atirnd rcgiiLu negotiauon ineeungs and serve as a resource fat tine City to review infolrtrttion alit)
pi ett.r, e a( tion iteu,s accordingly.
PRELIMINARY SITE INVESTIGATION COORDINATION
As ;),i; of the C:iWs due diligence phase. (aill'iu trill coordinate ptelintinary exploraturN work vtilth the
�, uirrlinical vngineer for- Site composition uicludutg, but noi linutecl t'), un site soils txn_lttgs, hyuetacul n
1m„trntiai, InAllvertrllt discovery plan. monitor llig plan. anti a Phase I (and III if rerlurstecl.
Page 2 of 3
BILLING RATES
t)ur cram kill bill based on a not to exceed fee identified on page I of this proposal and will he hilled cin si witc
and materials basis as noted in the hourly fcc schrdide below. Dote hourly rates are fullti burdened grid includc•
c;%erhead. profit. taxes. and benefits.
Principal -in -Charge
$240.00
u * t.
.. F!
e
CFO 8 Financial
$210.00
CJ tfiEltpCuhtl�sr r 1 r �
�yP "I ,f .<
Program Manager
$195.00
Sto�ngtru�tiorliNtan4a�� 44 `#
Construction Manager
$185.00
P
}
i
Public Outreach
$175.00
IfAm- 00, W 44m,"
Estimating
$160.00 I
71
WWI
Rates are applicable from July 2019 — July 2020
Page 3of3