HomeMy WebLinkAboutOC San 3-64B Seal Beach_December 2020Orange County Sanitation District Kathy Millea Director of Engineering December 14, 2020 Sewer Construction Projects Seal Beach City Council Meeting Who is OCSD? regional trunk sewer 388 MILES 15 pump stations 479 service area square MILES 2 2 Treatment Plants Seal Beach Westminster Seal Beach Pump Station Westminster Blvd Construction Projects in Seal Beach Los Alamitos Trunk •Pipeline & manhole rehab/replacement •Construction 2021-2023 Seal Beach Pump Station •Replace existing pump station •Construction 2023-2026 Westminster Blvd. Sewer Project •Install 2 new pipelines •Construction 2020-2022 Los Alamitos 3 OCSD’s Project Team Kathy Millea – Director of Engineering Daisy Covarrubias – Pr. Public Affairs Specialist Hardat Khublall – Project Manager Dickie Fernandez – Project Engineer 4 Los Alamitos Trunk Sewer •2 trunk sewer pipelines •Pipelines run parallel along Los Alamitos Blvd./Seal Beach Blvd. •Katella (Oak St. to Lexington Dr.) •Pipelines constructed in 1959 and 1975 •Pipeline sizes range from 30 to 39 inches 5 What’s the Problem? •Calcium deposits in pipes •Leaking pipe joints •Deteriorated manholes Calcium Deposit in Pipe Photo of Inside Sewer Pipe 6 What’s the Solution? •Calcium deposits in pipes *water jetting •Leaking pipe joints •Replace/Rehab Manholes Calcium Deposit in Pipe Photo of Inside Sewer Pipe Photo of Water Jetting Equipment 7 What’s the Solution? •Calcium deposits in pipes •Leaking pipe joints *chemical grout injection •Replace/Rehab Manholes Robotic chemical grouting equipment 8 What’s the Solution? •Calcium deposits in pipes •Leaking pipe joints •Deteriorated manholes *Rehab/Replace Photo of Manhole Replacement 9 Project Schedule •Advertise for Bids – January 2021 •Construction Award – April 2021 •Construction Start – July 2021 •Construction Complete – February 2023 10 Work Affecting Seal Beach (Along Seal Beach Blvd. and Old Ranch Pkwy.) •Pipeline Rehabilitation •Manhole Replacement, Reconstruction and Rehabilitation •Lane closures (one lane open) •Excavation plated and traffic restored at end of each shift Seal Beach Blvd. Bradbury Rd. Manhole Replacement Manhole with Extended Chimney Manhole Reconstruction New Manhole Abandon Manhole Manhole Rehabilitation 11 Pipe Cleaning & Grouting Work Hours Northbound Seal Beach Blvd Area bordering City of Los Alamitos Saturdays: 7 a.m. – 7 p.m. Southbound Seal Beach Blvd. - Commercial M-Sat: 9 p.m. – 6 a.m. Residential Area (Rossmoor) M-F: 6 p.m. – 6 a.m. Loud activities until 10p.m. City of Los Al City of Seal Beach Business Area Residential Business Area Residential Northbound Seal Beach Blvd M-Sat: 9 p.m. – 6 a.m. Business Area Old Ranch Pkwy. M-Sat: 7 a.m. – 7 p.m. Los Alamitos Blvd. - Commercial M-Sat: 8 p.m. – 6 a.m. Northbound and Southbound Los Alamitos Blvd. - Residential M-Sat: 8:30 a.m. – 9 p.m. 12 Community Outreach •Community Liaison •Construction Hotline •Notifications/Alerts •Website Updates •Email and text alerts •Social Media Posts •Meetings and presentations •Project information signs •Electronic message boards •Close coordination with Cities and adjacent projects 13 Contact Information Construction Hotline: (714) 378-2965 Email: ConstructionHotline@ocsd.com Website: www.OCSD.com/Construction Social Media: @OCSanDistrict 14 Westminster Blvd. Sewer Project Seal Beach Pump Station Two New 36-inch Sewer Pipelines N Westminster Blvd. Sewer Project 16 Seal Beach Westminster Two New 36-inch Sewer Pipelines Seal Beach Pump Station Westminster Blvd Project Location: Westminster Blvd. Seal Beach Blvd to Rancho Rd 17 Westminster Blvd N 2 lanes Bike Lane median Westminster Blvd. – Prior to Construction Existing Pipelines 18 Current Project Photos 21 Westminster Blvd N 2 lanes Bike Lane median Westminster Blvd. – After Construction New Pipelines 22 Current Project Schedule Spring – Summer 2021 Current Construction – Summer 2021 Winter 2020 – Fall 2022 23 Seal Beach Pump Station Project Seal Beach Pump Station Project 25 New Seal Beach Pump Station * Preliminary site layout and architectural renderings of new pump station 26 Project Schedule •Preliminary Design: Present - Jan 2021 •Final Design: Feb 2021 – Oct 2022 •Advertise for Bid: Nov 2022 •Construction: May 2023 – Sept 2026 27