HomeMy WebLinkAboutItem E May 24, 1999
STAFF REPORT
To: Mayor and Members of the City Council
Attention: Keith R. Till, City Manager
From: Stephen G. Badum, Director of Public Works/City Engineer
Subject: AWARD OF CONSTRUCTION CONTRACT FOR
CENTRAL AVENUE/4TH STREET ROUNDABOUT & MAIN
STREET/CENTRAL AVENUE STREET IMPROVEMENTS,
PROJECT NO. 803
GENERAL DESCRIPTION
The proposed City Council action will award a contract for: the construction of the Central
Avenue/4th Street Roundabout & Main Street/Central Avenue Street Improvements, Project #803
to the lowest responsible bidder, Nobest, Inc., in the amount of$98,498.20 and authorize the City
Manager to execute same.
DISCUSSION
On April 12, 1999, City Council approved plans and specifications for the Central Avenue/4th
Street Roundabout, Project #803. The proposed project will construct a roundabout at the
intersection of Central Avenue and 4th Street. Included in the project is the construction of curb,
gutters, pavement, irrigation, landscaping, safety lighting, and signing.
Also included in this project is the construction of curb, gutter, sidewalk, pavers, and street trees
on Main Street and Central Avenue. This work is being performed as a cooperative project
between the City and private property and business owners and was added to the roundabout
project to expedite the project and take advantage of bid prices. Under the City's Municipal
Codes and conditional use permits, the property owners at 113-116 Main Street and 143 Main
Street are required to share in the cost to remove and replace existing curb, gutter, and sidewalk.
The work to be performed adjacent to 113-116 Main Street also includes the installation of two
new street trees, grates, and pavers. The work to be performed adjacent to 143 Main Street also
includes the removal and replacement of curb, gutter, and sidewalk along Central Avenue from
Main Street to the alley. In order to preserve the existing Ficus trees along Central Avenue, it will
be necessary to narrow the street by one foot to accommodate new curb and gutter. This
realignment necessitates the continuation of curb, gutter, and sidewalk construction to 8tStreet.
The work will include the installation of pavers, grates, and two additional street trees.
1 AGENDA ITEM
Central Avenue/4th Street Roundabout
City Council Staff Report
May 24, 1999
On May 19, 1999, the following bids were received and opened by the City Clerk:
Central Avenue/4th Street Roundabout&Main Street/Central Avenue Street Improvements,
Pro'ect#803, Bid Results
Name Amount
1 Nobest, Inc. $98,498.20
2 Excel Paving Co. $127,850.00
3 $0
Although plans and specifications were distributed to eleven potential bidders, only two bids were
received. Several potential bidders responded that they had exceeded their bonding limits and
could not bid the project. However, the low bid for the Central Avenue/4th Street Roundabout
Project is competitive and is slightly higher(9%)than the City's estimated cost of$ 90,000.
Nobest has successfully performed work for the City on past contracts such as the 12th Street
Rehabilitation Project. City staff recommends that the construction contract for the Central
Avenue/4th Street Roundabout&Main Street/Central Avenue Street Improvements, Project
#803, be awarded to Nobest, Inc. in the amount of$98,498.20.
Management and inspection of the construction will be performed by the City's Public Works
contract engineering and inspection staff
FISCAL IMPACT:
Funds for the Central Avenue/4t Street Roundabout&Main Street/Central Avenue Street
Improvements and the City's share of the Main Street and Central Avenue street improvements
are currently within the City's Capital Improvement Program budget under the Central/4th
Roundabout and the Annual Sidewalk, Curb, and Gutter Rehabilitation Program accounts.
RECOMMENDATION:
Staff recommends that the City Council :
1. Award a contract for the construction of Central Avenue/4th Street Roundabout& Main
Street/Central Avenue Street Improvements, Project#803 to the lowest responsible bidder,
Nobest, Inc., in the amount of$98,498.20;and
2. Authorize the City Manager to execute the contract for the Central Avenue/4th Street
Roundabout&Main Street/Central Avenue Street Improvements, Project#803.
NOTED AND APPROVED
11:711,. . :adum, Director Keith R. Till
Pub ' ' orks Department City Manager
2 AGENDA ITEM
. /My /9, / 99
/o : doo �4
/ '/B fiE-40/41-J? — /%eoi-"ae_i ‘1 Y16, 5 -=--
"/" Jr2EEr e,/ leaurieAt, 4/E
_-_-"-lips dE At > SAA,
/v
A
/ 48L1
A-. � 'S�' ,2d
06) 6502, 9/3 , Jr-- ',g; 'Ogg
----.
72. 4dEe._ (
/ .t t q ( o. mo
PROOF OF PUBLICATION This space is for the County
(2015.5 C.C.P.) Clerk's Filing Stamp
STATE OF CALIFORNIA,
County of Orange
i am a citizen of the United States
and a resident of the county afore-
said; I am over the age of eighteen Proof of Publication of
years, and not a party to or inter-
ested in the above-entitled matter.
I am the principal clerk of the printer CITY OF SEAL BEACH
of the SEAL BEACH SUN, a NOTICE INVITING SEALED BIDS CCpDpB , DAVIS BACON ACT: Not
PROJECT NAME: 4th Street and
newspaper of general circulation, Central Avenue Improvement Plan, COMPLETION OF WORK:All work
Project No.803 shall be completed within 45 working
printed and published weekly in the BIDS MUST BE RECEIVED BY: days following the date specified inthe
written notice to proceed from the City.
Wednesday, May 19, 1999. 10:00
City of Seal Beach, County of am Pursuant to Section§ 1770 et. seq.
BIDS TO BE OPENED BY: Wed- of the Labor Code of the State of Cal-
BIDS
May19,1999,10:00 am ifornia,the Director of the Department
Orange and which newspaper has y of Industrial Relations has determined
PLACE OF BID RECEIPT: City of the general prevailing rate of wages
;been adjudged a newspaper of Seal Beach,Office of the City Clerk, applicable to the work to be done.
First Floor,211 Eighth Street,Seal This rate and scale are on file with
general circulation by the Superior Beach.CA 90740 the Director of Public Works and
copies will be made available to any
C o u rt of the County of Orange, State
NOTICE IS HEREBY GIVEN that the interested party on request.The con-
City of Seal Beach.County of Orange, tractor to whom the contract is award-
California,will receive up to,but no ed and the subcontractors under him
of California, under the date of later than the time set forth above, must pay not less than these rates to
sealed contract bids for the award of all workers employed in the execu-
2/24/75. Case Number A82583; that a contract for labor,materials and tion of this contract.
equipment for the above-named pro- At the time of the award of the con-
fect.All bid proposals shall be made tract,the successful bidder shall pos-
onthe notice of which the annexed is a the proposal forms furnished by sess a valid contractor's license,and
the City and placed,together with the
printed copy (set in type not smaller accompanying documents and secu- shall comply with any applicable Cityrequirements concerning contractor
rity,in a sealed package addressed qualifications.Submission of a bid by
than nonpareil), has been published to the City Clerk at the above address. a bidder without alssione subjects
The Contractor shall submit bids in a the bidder to civil penalties pursuant
in each regular and entire issue of sealed envelope marked outside. to Business&ProfessionsCodeSec-
SEALED BID FOR THE CITY OF tion§7028.15.The bidder must pos-
SEAL BEACH,4TH STREET AND Bess a Contractor License A.No con-
said newspaper and not in any CENT 00 NOT OPEN WITH REG- tract will be awarded to any bidder
who is not a properly licensed Cali-
supplement thereof on the following ULAR MAIL."All bid proposals must fornia contractor as required by the
comply with the requirements con- California Business and Professions
dates, to-wit: tained in this Notice and in the spec- Code.
ifications and other contract docu-
ments.All bids in apparent comshall b- provided for in section 22300 of the
once with such requirements shall be
'"7-z opened and publicly read aloud at the Public Contracts Code.the Contrac-
kilt- above-stated time at the place of bid for may substitute securities for any
receipt identified above. monies withheld by,the City to ensure
performance under the Contract.
all in the year 1999• DESCRIPTIONn- INSURANCE AND BONDING
tractor shall furnish all necessary REQUIREMENTS:The Contractor
materials,labor.equipment and other shall not begin work under the Agree-
incidental and appurtenant work nec- ment until it has given the City evi
I certify (or declare) under penalty of essary for the proper construction t of dence of comprehensive public liabii-
this project,including o but not limited it insurance and Workers'Compen-
to the construction off sidewalk,park- sation Insurance coverage together
perjury that the foregoing is true and ng,curb and gutter,PCC pavement, with additional Insured Endorsements.
traffic circle apron, and handicap The successful Contractor shall also
Correct. access ramps, accordance with furnish 2 bonds required by the State
these contract documents. Contract Act.Each of the said bonds
OBTAINING CONTRACT DOCU- shall be executed in a sum equal to
MENTS:Contract documents for the the contract price.One of the said
Dated at Seal Beach, CA, above-referenced project may be bonds shall guarantee the faithful per-
obtained at the Office of the Director formance of the said contract by the
this "?f- /rQ day of - (t—1`/ , 1999. of Public Works,211 Eighth Street, Contractor,and the other said bond
/ \ ► 6Seal Beach,CA.for a non-refundable shall secure the payment of claims
fee of$30,or$40 if mailed. No bid for labor and material.
proposal will be received unless it is CITY OF SEAL BEACH RIGHT OF
made on the official proposal forms REJECTION OR WAIVER:The City
furnished by the City,is accompanied reserves the right to reject any or all
�`� —a by an execution Non-Collusion Affi- bids or any parts thereof,and to waive
4. Signature davit and is accompanied by cash,a any irregularities or informalities in
certified or cashier's check payable any bid or in the bidding.and to make
PUBLICATION PROCESSED BY:
to the City or a satisfactory bidder's awards in all or part in the best inter-
band in favor of the city executed by ests of the City.
the bidder as principal and a satis-
THE
OF BID: bidder
SUN NEWSPAPERS factory surety yless company surety,in
an amount not than as10%sof the n WITHDRAWALay withdraw his bid for a No bidder
period of
bid amount, as provided in Public 60 days after the date set for the
216 Main Street Contract Code section§20170 et. opening of bids.
seq.Should the bidder to whom the City of Seal Beach
Seal Beach, CA 90740 contract is awarded fail to enter into Stephen Badum,P E.
the,subject contract,such bid securi- Director of Public Works
ty be forfeited pursuant to Pub-
(562) 430-7555 • (949) 759-7726 tic Contract Code section 20172, April 13,1999
except as otherwise provided in Pub- Published in the Seal Beach Sun
tic Contract Code section§20174. Journal,04/22/99.