Loading...
HomeMy WebLinkAboutCC AG PKT 2007-05-14 #K e e e AGENDA REPORT DATE: May 14, 2007 TO: Honorable Mayor and City Council nm.U: Greg Beaubien, Interim City Manager FROM: Mark Vukojevic, P.E. Director of Public Works/City Engineer SUBJECT: NOTICE OF COMPLETION FOR. SEAL BEACH BOULEVARD PAVEMENT REHABILITATION AHRP (SEGMENT 4) AND SEAL BEACH BOULEVARD TRAFFIC SIGNAL INTERCONNECT PROJECT NO. 50187 SUMMARY OF REOUESTS: The proposed City Council action will adopt Resolution No._ and formally accept the completion of the Seal Beach Boulevard Pavement Rehabilitation, and the Seal Beach Traffic Signal Interconnect Project No. 50187. BACKGROUND: In the 2005-2006 Capital Improvements Program two projects were approved on Seal Beach Boulevard north of the 1-405 freeway. Prior to bidding, two projects were merged into one larger project (No.50l87) for construction simplification, to lessen the impact to the public, and to obtain lower cost with economies of scale. The two Projects are Seal Beach Boulevard Pavement Rehabilitation AHRP (Segment 4), Project No. 50196, and Seal Beach Boulevard Traffic Signal Interconnect, Project No. 50198 and are described below: Seal Beach Boulevard Pavement Rehabilitation AHRP (Segment 4), Project No. 50196 On June 14,2004, the City Council approved the City's Pavement Management System (PMS). The system was also approved by the Orange County Transportation Authority (aCTA) as part of Measure M funding eligibility. As part of the Federal Arterial Highway Restoration Program (AHRP), the City competed for and won federal timc!ing through aCTA for pavement rehabilitation on Seal Beach Boulevard. The current project is the fourth segment of the pavement rehabilitation along Seal Beach Blvd. and rehabilitates Seal Beach Boulevard between St. Cloud Drive and Bradbury Road. On April 24, 2006, City Council approved and authorized staff to initiate the bidding process for the Seal Beach Boulevard Pavement Rehabilitation AHRP (Segment 4), Project No 50196. When funds are involved with the AHRP program Caltrans authorization is required prior to bidding. Authorization was received on August 28, 2006. The rehabilitation consisted of constructing a rubberized asphalt overlay, curb ramps, and traffic striping. Agenda Item k e e e Seal Beach Boulevard Trame Signal Interconnect, Project No. 50198 As part of aCTA's Measure M Signal Improvement Program and GMA No.2, the City competed for and secured funding through aCTA for Signal Improvements on Seal Beach Boulevard. The proposed project is the third phase of the upgrading coordination of traffic signals along Seal Beach Boulevard. This phase extended between Bradbury Road and Lampson Avenue. Traffic signal coordination is a method of timing groups of traffic signals along an arterial to provide for the smooth movement of traffic with minimal stops. The goal of the coordination system is to efficiently move the greatest number of vehicles through the system with the fewest possible stops. The :first phase of the traffic signal upgrades and coordination along Seal Beach Boulevard has been completed, with the installation of new traffic controllers and cabinets. The second phase involved linking the traffic signals south of the 1-405 Interchange through new buried fiber optic lines in a local network. It enabled centralized control, coordination, and networking via a state- of - the-art computer equipment and programs. This phase of the project is similar in scope to the second phase improvements, except the fiber optic lines were placed north of the 1-405 interchange. In accordance with the plans and specifications, the contractor has completed the aforementioned project for a final contract amount of$901,967.01. FISCAL IMPACT: City Council has approved a budget of$I,401,000 for the design, construction, and inspection of both projects within the City's 5-year Capital Improvement program. Included within those funds the Public Works Department has secured competitive grants from aCTA's AHRP program in the amount of $301,200, from aCTA's Signal Interconnect Program (SIP) in the amount of $197,800, and from the Growth Management Agency (GMA 2) in the amount of $70,000. The project was successfully completed $300,200 under budget for a total project cost oUI,108,200. The $300,200 in remaining funds, of which $175,000 are Measure M funds and $125,000 are gas tax funds, will be carried forward to the next Arterial Paving Program as approved by City Council. RECOMMENDATION: It is recommended that the City Council: 1. By resolution, determine the work' has been completed in accordance with the contract documents and declare the work to be accepted and the total amount of the contract is in the sum of$901,967.0l. 2. Direct the City Clerk, within ten (10) days from the date of acceptance, file a "Notice of Completion" with the Orange County Recorder. 3. Direct City staff, upon expiration of the thirty-five (35) days from the filing of the ''Notiqe of Completion," to make the retention payment to All American Asphalt in the amount of $90,196.70. Agenda Item e e e Reviewed By: Sean Crumby, P.E. Deputy City Engineer Concur: NOTED AND APPROVED: Mark ~IIf:P.E. . Director of Public Works/City Engineer . Attachments: Resolution No. Acceptance of Project Notice of Completion Agenda Item e RESOLUTION NUMBER A RESOLUTION OF TIlE CITY COUNCIL OF TIlE CITY OF SEAL BEACH DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR PROJECT NO. SOlS7 SEAL BEACH BOULEVARD PAVEMENT REHABILITATION AHRP (SEGMENT 4) AND SEAL BEACH BOULEVARD TRAFFIC SIGNAL INTERCONNECT PROJECT ENTERED INTO BETWEEN CITY OF SEAL BEACH AND ALL AMERICAN ASPHALT. INC. WHEREAS. on October 23. 2006, the City of Seal Beocb entered into a contrBCt with All American Asphalt, Inc., WHEREAS, the City Engineer has deteJmined that the wod< has been substantially completed in accordance with the conlract documents. NOW, THEREFORE, TIlE CITY COUNCIL OF TIlE CITY OF SEAL BEACH DOES HBREBY RESOLVE. DECLARE, DETERMINE AND ORDER AS FOLLOWS: Section 1. Section 2. Section 3. Section 4. That the work required to be performed by said Conllllctor has been completed. Thll the total cost of said wod< is in the amount ofS901.967.0I. That the work is hereby aceepted and approved. It is further ordered that a "Notice of Completion". Exhibit A. b. filed on behalf of the City in the Office of the Orang. County Recorder within 10 days of the dale of this resolution. PASSED. APPROVED AND ADOPTED by the City Council of the City of Seal Beach II a meeting th.....f held on the day of . 2007 by the following vote: AYES: Councilmembers e NOES: Councilmembers ABSENT: Councilmcmbers ABSTAIN: Councilmcmbcrs Mayor ATTEST: City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE )SS CITY OF SEAL BEACH ) I, Linda Devine, City Clerk of the City of Seal Bcocb, California, do hereby certify thll the foregoing resolution is an original copy of Resolution Number on fil. in the Office ofth. City Clerk, p....d. approved and adopted by the City Council of the City of Seal Beach at a meeting thcrcofheld on the day of .2007. City Clerk e e RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Attn: City Clerk 211 8th Street Seal Beach, CA 90740 Space of above this line for Recorder's use. ... No Recording Fee Pursuant to Government Code Section 6103, 27383 .... NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. e 2. 3. 4. 5. 6. 7. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: The full name of the owner is: City of Seal Beach The address of the owner is: City of Seal Beach. 21 I 8111 Street. Seal Beach. CA 90740 The nature of the interest or estate of the owner is; In fee. The City of Seal Beach. A work of improvement on the property hereinafter describe as completed on Amil 13.2007. The work was: Seal Beach Boulevard Pavement Rehabilitation AHRP rSel!ll1ent 4) and Seal Beach Boulevard Traffic S;......1 Interconnect Proiect No. 50 I 87. The name of the contractor, ifany, for such of improvement was: All American Ashoall Inc. The date of the Contract was: October 23. 2006. The property on which said work of improvement was completed in the City of Seal Beach, County of Orange, State of California, and is descnlled as follows: Seal Beach Boulevard Pavement Rehabilitation AHRP rSel!ll1ent 4) and Seal Beach Boulevard Traffic Silmal Interconnect Proiect No. ~ Date: Sean Crumby, P.E. Deputy City Engineer VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have read said notice of completion and know the contents thereof; the same is true ofmy own knowledge. I declare under penalty ofperjury the foregoing is true and correct. Executed on . 20 ---' at Seal Beach, California. e (Date of Signature) Mark Vukojevic, P.E. Director of Public Works Exlnllit A