AWARD CONSTRUCTION CONTRACT FOR FIRST
STREET SEWER PUMP STATION IMPRQVEMENTS,
PROJECT No. 50214
SUMMARY OF REQUEST:
The proposed City Council action will approve the plans and specifications, award a
construction contract to the lowest responsible bidder, SoCal Pacific Construction Inc., in
the amount of $288,000, adopt Resolution No. _ awarding a construction contract and
authorize the City Manager to execute the agreement, and approve Resolution No. _
authorizing a budget amendment transferring $170,000 from Sewer Capital Enterprise
Funds.
e
BACKGROUND:
The First Street Pump Station is a small submersible facility located directly adjacent to
the beach parking lot at the end of First Street. Currently, the station services a restroom
facility, a restaurant, and the City's maintenance yard located adjacent to the San Gabriel
River.
The pump station was originally constructed in 1968 and is in need of rehabilitation. The
station consists of a 5-foot diameter manhole serving as the wet well. Pumps, piping, and
valves are all located within this wet well. The existing pump station's deficiencies are
primarily attributed to poor equipment access; age of the equipment; and lack of a
telemetry system. The 2005 update of the Sewer Master Plan documented the First Street
Pump Station as being in poor condition and reaching the end of its useful life. This
project will greatly increase the reliability of the pump station and will help provide
protection against the possibility of a sewer spill. The project's immediate vicinity to the
San Gabriel River and the Pacific Ocean put it in very high priority due to the significant
impacts that a sewer spill would make to the environment. The project does not increase
capacity and will only serve the existing users at the site.
e
This project will increase the life of the facility; reduce power consumption and
maintenance costs; while improving reliability and the quality of service to the residents
and property owners of Seal Beach. The City's consultant, AKM Consulting Engineers,
Agenda ltem 0
e
e
e
has completed plans and specifications for the First Street Sewer Pump Station
Improvement Project which will upgrade the controls, pumps, piping, meters, and
improvements to the facility. The plans and specifications have been reviewed by the
City's Engineering and Maintenance staff.
6 Bids were received and opened by the City Clerk on Thursday, January 4, 2007 at
10:00 a.m. and are listed below:
1 SoCaI Pacific Construction, Corp. 5288,000.00
2 GCI Construction, Inc. $324,300.00
3 Fleming Environmental, Inc. $326,970.00
4 Orion Construction Corp. $348,700.00
5 Denboer Engineering & Construction, Inc. $387,600.00
6 Garcia Juarez Construction, Inc. $785,000.00
The bids received were higher than originally estimated during last year's budget process
due to overall rising construction costs and additional remote telemetry unit programming
costs. Re-bidding the project is not expected to net any further savings. It is
recommended that City Council move forward with the project including the
recommended budget amendment transferring funding as outlined in the Fiscal Impact
section due to the necessity of the completion of this project to keep our sewer
infrastructure in good working condition.
Staff has reviewed the submitted bid documents and found the low bidder to be in
compliance with the contract documents. Upon the successful execution of the contract
documents, the project is scheduled to begin in March. The contractor will have several
months to procure materials. This project has been coordinated with the affected
businesses and residents. Specific notices will be sent before the start of construction.
FISCAL IMPACT:
$200,000 has been budgeted in the current Fiscal Year for the construction and inspection
of this projcct within the City's 5-year Capital Improvement program and the City's
Council approved budget. The total projected project cost is $370,000 which includes
construction, construction management, inspection, and contingency costs. Additional
funds are required to construct this project and funding is available from the Sewer
Capital Enterprise Funds Account. A budget amendment in the amount of $170,000 is
required from the Sewer Capital Enterprise Account.
Agenda Item_
e
e
e
RECOMMENDATION:
It is recommended that City Council approve the plans and specifications for the First
Street Sewer Pump Station Improvements Project, award a construction contract to the
lowest responsible bidder, SoCal Pacific Construction Inc., in the amount of $288,000,
adopt Resolution No. _ awarding a construction contract and authorize the City
Manager to execute the agreement, and approve Resolution No. _ authorizing a budget
amendment transferring $170,000 from Sewer Capital Enterprise Funds.
Sean P. Crumby, P.E.
Deputy City Engineer
ConcUr:
MM?t~~ "
Director of Public Works/City Engineer
']Z:-
ahorski
anager
Attachment:
Proposed Resolution No. _ authorizing A ward of Contract
Proposed Budget Amendment Resolution No. _
-
Agenda ltem_
e
RESOLUTION NUMBER
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL
BEACH AWARDING THE BID FOR THE FIRST STREET SEWER PUMP
STATION IMPROVEMENTS, PROJECT No. 50214
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES
HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The City Council hereby approves the contract between the City of Seal
Beach and SoCal Pacific Construction Inc. for the First Street Sewer Pump
Station, Project No. 50214
SECTION 2. The Council hereby directs the City Manager to execute the contract for the
First Street SewerPinnp Station, Project No. 50214
PASSED, APPROVED AND ADOPTED by the City Council of the City of Seal Beach at a
meeting thereof held on the day of 2007 by the following
vote:
AYES:
Council Members
e
NOES:
Council Members
ABSENT:
Council Members
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF SEAL BEACH )
I, Linda Devine, City Clerk of the City of Seal Beach, California, do hereby certify that the
foregoing Resolution is the original copy of Resolution Number on file in the office
of the City Clerk, passed, approved, and adopted by the City Council of the City of Seal
Beach at a meeting thereof held on the day of .2007.
e City Clerk
e
e
e
RESOLUTION NUMBER
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH
AMENDING THE APPROPRIATION FOR THE FIRST STREET SEWER
PUMP STATION IMPROVEMENTS, PROJECT No. 50214
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES
HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The City Council hereby approves an amendment increasing the appropriation for
the First Street Sewer Pump Station, Project No. 50214 as follows:
Description
Current
AccountIProject Appropriation
Revised Appropriation
Appropriation Modification
1 a Street Pump Station Improvements
50214
200,000
370,000
170,000
PASSED, APPROVED AND ADOPTED by the City Council of the City of Seal Beach at Ii
meeting thereof held on the day of . 2007 by the following vote:
AYES:
Council Members
NOES:
Council Members
ABSENT:
Council Members
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA
COUNTY OF ORANGE
CITY OF SEAL BEACH
)
) SS
)
:
I, Linda Devine, City Clerk of the City of Seal Beach, California, do hereby certify that the
foregoing Resolution is the original copy of Resolution Number on file in the office of
the City Clerk, passed, approved, and adopted by the City Council of the City of Seal Beach at a
meeting thereof held on the day of ,2007.
City Clerk
.'