HomeMy WebLinkAboutSBCCF Min 2006-03-20
...
.
.
.
SEAL BEACH CABLE COMMUNICATIONS FOUNDATION
BOARD OF DIRECTORS MEETING
MINUTES FOR MARCH 20, 2006
The Board of Directors for the Seal Beach Cable Communications Foundation met on March 20,
2006 at the Seal Beach Studio in Seal Beach, California. Board President, Dick Davies called
the meeting to order at 7:03pm.
PJ,EDGJ; O~ j\LLEQ~j;E.
The pledge of allegiance was led by Mr. Davies.
R.QLL C~
Ms. Martin. Ms. WaIz, Ms. Lee, Mr. Anninos, Mr. Davies. Robin Fort-Lincke, the PEO Station
Manager and Mr. Russ Bllllman, the Chief Engineer were present.
Alr.B9VAL OF,DIl AGJ:ND4
Motion was made by Mr. Anninos to approve the agenda and seconded by Ms. Martin.
AYES: Ms. Martin, Mr. Anninos, Ms. WaIz, Ms. Lee, Mr. Davies
NA YES: -0-
MOTION PASSED: 5-0
gm~J~J' ~ALEm!.yl
MINUTES OF FEBRUARY 20, 2006 BOARD OF DIRECTORS MEETING
Motion was made by Ms. Lee and seconded by Ms. WaIz to approve the minutes of the February
20,2006 Board of Directors meeting with corrections.
AYES: Ms. Lee, Ms. WaIz, Ms. Martin, Mr. Anninos
NAYES: -0-
ABSTENTION: Mr. Davies
MOTION PASSED: 4-0, I abstention
~IJE~K REOUUI
Ms. Martin made a motion to accept aDd pay the items listed on the check request. Mr. Anninos
seconded the motion.
AYES: Mr. Anninos, Ms. Martin. Ms. Lee, Mr. Davies, Ms. WaIz
NAYES: -0-
MOTION PASSED: 5-0
Page 1 of3
sbccfminutes 3-2006.doc
.,
FINANCIAL STATEMENT
Ms. Martin made a motion to receive and file the financial statClnent prepared by Ms. Fort-
. Lincke and the city statement. Ms. Lee seconded the motion.
AYES: Ms. Martin. Mr. Davies, Ms. Lee, Ms. WaIz, Mr. Anninos
NA YES: -0-
MOTION PASSED: 5-0
01.0 BUSINESS
EQUIPMENT REPAIR
Ms. Fort-Lincke stated that the Panasonic record S- VHS deck in the L W editing bay was back
and operating in the system.
Mr. Anninos stated that he would pick up battery replacements for the battery belt used by the
L W video producers.
There was discussion about getting information on the Ikegami video monitors in the studio as to
whether or not they may be repairable depending upon the estimates.
FUNDING FOR PROGRAMS
.
Ms. Fort-Lincke stated that the McGaugh school3n1 grade concert had been covered and the next
scheduled shoot would be the McGaugh lit Grade concert on April 6th.
AllDlE:t!CE C()MMUNIC.\nO~
There was no audience communication.
u,PQm
PEG STATION MANAGERlEXECUTIVE DIRECTOR REPORT
Ms. Fort-Lincke stated that one of the longtime producers, Terri Quinlan had lost her mother and
she sent a floral ammgement from the board and producers. She also stated that the WAVE
award presentation would be either April4lb or April 24lb.
CHIEF ENGINEER REPORT
Mr. Bauman gave a short report on his trip to Colorado to pick up the Grass Valley switcher that
was donated by the 1V station in Vail, Colorado, along with many other equipment items. There
was discussion.
CQRQ~I'ONDJ~g;
.
Page 2 of3
sbccfminutes 3-2oo6.doc
" " .
Ms. Fort-Lincke stated that there was no correspoudence. Mr. Davies stated that he had received
no correspondence.
. AUDIEN,CE CO)fl\<j~
There was no audience communications.
BQARD COMM!OOCATIO~
Board members thanked Mr. Bauman for this efforts on his trip to Colorado and commended
both he and Ms. Fort-Lincke for COnlim.ing to pursue the Colorado equipmenl for such a long
time.
AJ!10URNMENI
Mr. Davies adjourned the meeting at 7:35pm.
AYES: Mr. Davies, Ms. Lee, Ms. WaIz, Ms. Martin, Mr. Anninos
NAYES: -0-
MOTION PASSED: 5-0
.
~k h4-~'vuL~
Ms. Robin Fort-Lincke, PEO Station Mgr
Mr. Dick Davies, Presidenl, SBCCF
.
Page 3 of3
sbccfminutes 3-2oo6.doc