Loading...
HomeMy WebLinkAboutPC Res 25-06 - 2025-09-29 RESOLUTION NO. 25-06 RESOLUTION OF THE SEAL BEACH PLANNING COMMISSION ADOPTING A MITIGATED NEGATIVE DECLARATION (MND) FOR MINOR USE PERMIT (MUP 22-03) TO ALLOW THE INSTALLATION AND OPERATION OF A 1.5 MEGAWATT (MW) FIXED- TILT GROUND MOUNTED SOLAR PHOTOVOLTAIC (PV) SYSTEM AT THE EXISTING HELLMAN RANCH OIL AND GAS PRODUCTION FACILITY, LOCATED AT 1 PACIFIC COAST HIGHWAY, SEAL BEACH, CALIFORNIA, IN THE HELLMAN RANCH SPR—OE (OIL EXTRACTION) ZONE WHEREAS, the Hellman Ranch Oil and Gas Production Facility ("Applicant") submitted an application to the City of Seal Beach Department of Community Development for Minor Use Permit (MUP 22-03) to allow the installation and operation of a 1 .5 MW fixed-tilt ground mounted solar photovoltaic (PV) system at the existing Hellman Ranch Oil and Gas Production Facility ("Project"); and WHEREAS, pursuant to the California Environmental Quality Act (CEQA), Public Resources Code Sections 21000 et seq., and the CEQA Guidelines, Title 14, Section 15000 et seq., the City prepared an Initial Study for the Project; and WHEREAS, based on the Initial Study, the City determined that the Project would not have a significant effect on the environment with the incorporation of mitigation measures, and therefore prepared a Mitigated Negative Declaration (MND) pursuant to Public Resources Code Section 21080(c) and Seal Beach Municipal Code Section 11 .5.35.010.L; and WHEREAS, the Mitigated Negative Declaration identified mitigation measures to reduce potential impacts to less-than-significant levels, including but not limited to measures addressing biological resources (bird nesting avoidance, sensitive plant protection), cultural resources (Native American monitoring), soil stability and erosion control, glare reduction, and protection of City waterlines; and WHEREAS, the Environmental Quality Control Board held a duly noticed meeting on August 20, 2025, received public testimony, and recommended additional conditions regarding soil testing at pile-hole depth, and the monitoring and reporting of bird fatalities; and WHEREAS, a duly noticed public hearing was held before the Seal Beach Planning Commission on September 29, 2025, at which time the Planning Commission considered the Initial Study, the proposed Mitigated Negative Declaration, the staff report, written materials, and oral testimony presented at the hearing; and 1 of 4 3 Resolution 25-06 Hellman Ranch OGPF WHEREAS, the Planning Commission finds that the Mitigated Negative Declaration reflects the independent judgment of the City of Seal Beach, has been completed in compliance with CEQA, and together with the record of proceedings, provides adequate information on which to base environmental findings for the Project. THE PLANNING COMMISSION OF THE CITY OF SEAL BEACH DOES HEREBY FIND AND RESOLVE AS FOLLOWS: Section 1 . The Planning Commission hereby adopts the Mitigated Negative Declaration for MUP 22-03. Section 2. The Planning Commission finds that: A. The Mitigated Negative Declaration has been prepared in accordance with CEQA and the CEQA Guidelines. B. There is no substantial evidence that the Project, as mitigated, will have a significant effect on the environment. C. The Mitigated Negative Declaration reflects the Planning Commission's independent judgment and analysis. Section 3. The Planning Commission hereby adopts the Mitigation Monitoring and Reporting Program, ensuring that all mitigation measures identified in the MND will be implemented as conditions of approval. Section 4. The documents and materials that constitute the record of proceedings upon which this decision is based are available for public review at the City of Seal Beach Community Development Department, 211 8th Street, Seal Beach, California PASSED, APPROVED, AND ADOPTED by the Seal Beach Planning Commission at a meeting thereof held on September 29, 2025, by the following vote: AYES: Commissioners /1/1:4y pne Naito_ NOES: Commissioners Cu be 11 ABSENT: Commissioners v✓heeleC ABSTAIN: Commissioners argo Wheeler Chairperson • 2 of.3 Resolution 25-06 Hellman Ranch OGPF ATTEST: 5j---' '- '---2. Shaun Temple Planning Commission Secretary • 3 of kg