Loading...
HomeMy WebLinkAboutCC Res 2951 1980-03-26 , I I I ~ ~ . . ,- . RESOLUTION NO. ~ ~~ J' A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH ESTABLISHING BUILDING VALUATION DATA AND MISCELLANEOUS FEES AND RESCINDING RESOLUTION NO. 2790. THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE: WHEREAS, Ordinance No. 1079 of the City of Seal Beach provides for permit fees as per the Uniform Codes adopted; and WHEREAS, Ordinance No. 1079 further provides that building valuation data and miscellaneous fees not included in the Uniform Codes be established by resolution of the City Council. NOW, THEREFORE, BE IT RESOLVED that in the interest of conformity in the building industry the bUilding valuation data and miscellaneous permit fees be adopted as follows: 1. Building Valuation Data shall be as shown on Exhibit "A" attached. 2. Miscellaneous fees shall be as shown on Exhibit "B" attached. BE IT FURTHER RESOLVED that Resolution No. 2790 dated June 26, 1978, is hereby rescinded. AND BE IT FURTHER RESOLVED that the aforementioned building valuation data and miscellaneous fees set forth in Exhibits,~" and "B" attached hereto shall become effective on th~ day of,~A.- 1980. PASSED, APPROVED AND ADOPTED BY THE City Council of the City of Seal Beach at a regular meeting thereof held on day of , 1980, by the following vote: AYES: Councilme NOES: Councilm n ABSENT: Councilmen ~ ''j' I ~~~~_~<h Itj Cler - ", . .. . Resolution Number BUILDING VALUATION DATA . The unit costs are intended to comply with the definition of "valuation" in Section 423 of the Uniform Building Code and thus include architectural, structural, electrical, lIIumbing, and mechanical work, except as specifically listed below. It also includes e contractor's profit which should not be omitted if he has a financial interest in e project. Cost per Cost per October, 1979 Square Foot October, 1979 Square Foot Occupancy and Type Good Average Occupancy and Type Good Average 1. APARTMENT HOUSES: 9. MEDICAL OFFICES: *Type I or II F.R. $50.50 $42.20 *Type I or II F.R. $60.20 Type V -Masonry (or Type II I-l-Hour 46.20 Type III) 39.20 32.10 Type III-N 43.80 Type V-Wood Frame 34.40 28.30 Type V-l-Hour 41. 20 Type I-Basement Garage 18.90 Type V-N 39.00 2. BANKS: 10. OFFICES: *Type I or II F.R. 67.30 *Type I or II F.R. 53.00 Type III-l-Hour 56.90 Type II I -l-Hour 39.30 Type III-N 54.70 Type III-N 36.90 Type V-l-Hour 48.00 Type V-l-Hour 32.90 Type V-N 45.60 Type V-N 30.60 3. CHURCHES: 11. PRIVATE GARAGES: Type I or II F.R. 49.00 Wood Frame 9.90 Type II I - l-Hour 39.40 Masonry 13.00 I Type I II-N 37.00 Open Carports 5.30 Type V-l-Hour 35.30 Type V-N 33.10 12. PUBLIC GARAGES: *Type I or II F.R. 25.80 4. CONVALESCENT HOSPITALS: Type II-N 17.10 *Type I or II F.R. 65.90 Type I II - l-Hour 20.60 Type III-l-Hour 54.10 Type III-N 17 .10 Type V-l-Hour 43.20 Type V -l-Hour 17.10 5. DWELLI NGS : 13. RESTAURANTS: Type V-Masonry 43.30 32.90 Type II I - l-Hour 48.50 Type V-Wood Frame 39.60 30.10 Type II I-N 46.30 Basements-Finished 10.30 7.60 Type V-l-Hour 42.40 Unfinished 8.00 6.00 Type V-N 40.00 6. HOSPITALS: 14. STORES: *Type I or II F.R. 84.40 *Type I or II F.R. 40.40 Type II I-l-Hour 73.80 Type II I-l-Hour 30.80 Type V-l-Hour 63.60 Type I II-N 28.60 Type V -l-Hour 27.10 7. HOTELS AND MOTELS: Type V-N 24.40 *Type I or II F.R. 48.80 15. SCHOOLS: Type I II - l-Hour 41.40 Type I II-N 39.20 Type I or II F.R. 48.90 Type V - l-Hour 36.50 Type I II-l-Hour 41.40 I Type V-N 34.10 Type III-N 39.20 Type V-l-Hour 37.20 INDUSTRIAL PLANTS: Type I or II F.R. 30.20 16. SERVICE STATIONS: Type II -l-Hour 19.20 Type II-N 37.20 Type II-(Stock) 17.00 Type III-l-Hour 40.50 Type II I-l-Hour 22.20 Type V -l-Hour 25.70 Type II I-N 20.00 Canopies 12.80 Ti 1 t-up 14.20 Type Vol-Hour 19.20 Type V-N 17.00 (* Add 0.8 percent to total cost for each story over three.) ~ ., . . ". Resolution Number , . . . . ~ . Cost per October, 1979 Square Foot Occupancy and Type Good Average 17. THEATERS: Type I or II F.R. $ $56.70 Type I II-l-Hour 41. 70 Type III-N 39.50 Type V-l-Hour 38.90 I Type V-N 36.60 WAREHOUSES: Type I or II F.R. 25.60 Type II or V-l-Hour 17 .00 Type II or V-N 14.60 Type I II-l-Hour 18.70 Type III-N 16.60 EQUIPMENT 1. AIR CONDITIONING: Commercial 2.80 Residential 2.40 2. SPRINKLER SYSTEMS: 1.30 I I ., , - " '.. '. Resolution Number S.M. TAX .50 up to $7214 over multiply by: .00007 . . .' . , . NEW FEE SCHEDULE VALUATION PERMIT FEE 50% PIC RESIDENTIAL 65% PIC COMMERCIAL 1.00 - 500.00 11.25 5.63 7.31 501. 00 - 600.00 13.50 6.75 8.78 11.00 - 700.00 15.75 7.88 10.24 1.00 - 800.00 18.00 9.00 11. 70 1.00 - 900.00 20.25 10.13 13.16 901.00 - 1000.00 22.50 11. 25 14.63 1001.00 - 1100.00 24.75 12.38 16.09 1101. 00 - 1200.00 27.00 13.50 17.55 1201. 00 - 1300.00 29.25 14.63 19.01 1301. 00 - 1400.00 31.50 15.75 20.48 1401. 00 - 1500.00 33.75 16.88 21. 94 1501. 00 - 1600.00 36.00 18.00 23.40 1601. 00 - 1700.00 38.25 19.13 24.86 1701.00 - 1800.00 40.50 20.25 26.33 1801.00 - 1900.00 42.75 21. 38 27.79 1901. 00 - 2000.00 45.00 22.50 29.25 2001.00 - 3000.00 54.00 27.00 35.10 3001. 00 - 4000.00 63.00 31.50 40.95 4001.00 - 5000.00 72.00 36.00 46.80 5001.00 - 6000.00 81. 00 40.50 52.65 6001. 00 - 7000.00 90.00 45.00 58.50 7001. 00 - 8000.00 99.00 49.50 64.35 8001.00 - 9000.00 108.00 54.00 70.20 9001. 00 - 10000.00 117.00 58.50 76.05 10001.00 - 11000.00 126.00 63.00 81. 90 11001.00 - 12000.00 135.00 67.50 87.75 11.00 - 13000.00 144.00 72.00 93.60 1.00 - 14000.00 153.00 76.50 99.45 1.00 - 15000.00 162.00 81.00 105.30 ] 1.00 - 16000.00 171.00 85.50 111.15 16001.00 - 17000.00 180.00 90.00 117.00 17001.00 - 18000.00 189.00 94.50 122.85 18001.00 - 19000.00 198.00 99.00 128.70 19001. 00 - 20000.00 207.00 103.50 134.55 20001.00 - 21000.00 216.00 108.00 140.40 21001.00 - 22000.00 225.00 112.50 146.25 22001.00 - 23000.00 234.00 117.00 152.10 23001. 00 - 24000.00 243.00 121. 50 157.95 24001.00 - 25000.00 252.00 126.00 163.80 25001.00 - 26000.00 258.75 129.38 168.19 26001.00 - 27000.00 265.50 132.75 172.58 27001. 00 - 28000.00 272.25 136.13 176.96 28001.00 - 29000.00 279.00 139.50 181. 35 29001.00 - 30000.00 285.75 142.88 185.74 30001. 00 - 31000.00 292.50 146.25 190.13 31001.00 - 32000.00 299.25 149.63 194.51 32001.00 - 33000.00 306.00 153.00 198.90 33001.00 - 34000.00 312.75 156.38 203.29 34001.00 - 35000.00 319.50 159.75 207.68 35001. 00 - 36000.00 326.25 163.13 212.06 36001.00 - 37000.00 333.00 166.50 216.45 11.00 - 38000.00 339.75 169.88 220.84 1.00 - 39000.00 346.50 173.25 225.23 1.00 - 40000.00 353.25 176.63 229.61 1.00 - 41000.00 360.00 180.00 234.00 41001.00 - 42000.00 366.75 183.38 238.39 42001.00 - 43000.00 373.50 186.75 242.78 43001.00 - 44000.00 380 . 25 190;13 247.16 44001.00 - 45000.00 387.00 193.50 251. 55 45001.00 - 46000.00 393.75 196.88 255.95 ~ , - " '.. Resolution Number Page 2 . " NEW FEE SCHEDULE VALUATION PERMIT FEE 50% PIC RESIDENTIAL 65% PIC COMMERCIAL 46001.00 - 47000.00 400.50 200.25 260.33 11.00 - 48000.00 407.25 203.63 264.71 1.00 - 49000.00 414.00 207.00 269. 10 4 1.00 - 50000.00 420.75 210.38 273.49 5 1.00 - 51000.00 425.25 212.63 276.41 51001.00 - 52000.00 429.75 214.88 279.34 52001.00 - 53000.00 434.25 217 .13 282.26 53001.00 - 54000.00 438.75 219.38 285.19 54001.00 - 55000.00 443.25 221. 63 288.11 55001.00 - 56000.00 447.75 223.88 291.04 56001.00 - 57000.00 452.25 226.13 293.96 57001.00 - 58000.00 456.75 228.38 296.89 58001.00 - 59000.00 461.25 230.63 299.81 59001.00 - 60000.00 465.75 232.88 302.74 60001.00 - 61000.00 470.25 235.13 305.66 61001. 00 - 62000.00 474.75 237.38 308.59 62001.00 - 63000.00 478.25 239.13 310.86 63001.00 - 64000.00 483.75 241.88 314.44 64001.00 - 65000.00 488.25 244.13 317.36 65001.00 - 66000.00 492.75 246.38 320.29 66001.00 - 67000.00 497.25 248.63 323.21 67001.00 - 68000.00 501. 75 250.88 326.14 68001.00 - 69000.00 506.25 253.13 329.06 69001.00 - 70000.00 510.75 255.38 331. 99 70001.00 - 71000.00 515.25 257.63 334.91 71001.00 - 72000.00 519.75 259.88 337.84 711.00 - 73000.00 524.25 262.13 340.76 7 1.00 - 74000.00 528.75 264.38 343.69 7 1.00 - 75000.00 533.25 266.63 346.61 7 1.00 - 76000.00 537.75 268.88 349.54 76001. 00 - 77000.00 542.25 271.13 352.46 77001.00 - 78000.00 546.75 273.38 355.39 78001.00 - 79000.00 551. 25 275.63 358.31 79001.00 - 80000.00 555.75 277.88 361. 24 80001.00 - 81000.00 560.25 280.13 364.16 81001.00 - 82000.00 564.75 282.38 367.09 82001.00 - 83000.00 569.25 284.63 370.01 83001.00 - 84000.00 573.75 286.88 372.94 84001.00 - 85000.00 578.25 289.13 375.86 85001.00 - 86000.00 582.75 291. 38 378.79 86001. 00 - 87000.00 587.25 293.63 381. 71 87001. 00 - 88000.00 591. 75 295.88 384.64 88001.00 - 89000.00 596.25 298.13 387.56 89001.00 - 90000.00 600.75 300. 38 390.49 90001.00 - 91000.00 605.25 302.63 393.41 91001. 00 - 92000.00 609.75 304.88 396.34 92001.00 - 93000.00 614.25 307.13 399.26 93001.00 - 94000.00 618.75 309.38 402.19 94001.00 - 95000.00 623.25 311.63 405. 11 95001.00 - 96000.00 627.75 313.88 408.04 9600 1. 00 - 97000.00 632.25 316.13 410.96 911. 00 - 98000.00 636.75 318.38 413.89 9 1.00 - 99000.00 641.25 320.63 416.81 9 1.00 - 100000.00 645.75 322.88 419.74 For figures above $100,000 refer to the 1979 UBC Table 3A - double fee shown + 5% .' , I I I " '., Resolution Number PLUMBING PERMIT & PLAN CHECK FEES PERMIT FEE --------------------------------------------------------------------$6.75 PERMIT EXPIRATION: PERMIT SHALL EXPIRE IF WORK IS NOT COMMENCED WITHIN 120 DAYS OR IF THERE HAS BEEN NO INSPECTION WITHIN 120 DAYS FROM DATE OF LAST INSPECTION. ONE-HALF THE AMOUNT REQUIRED FOR A NEW PERMIT FOR SUCH WORK, PROVIDED NO CHANGES HAVE BEEN MADE OR WILL BE MADE IN THE ORIGINAL PLANS AND SPECIFICATIONS FOR SUCH WORK; AND PROVIDED, FURTHER, THAT SUCH SUSPENSION OR ABANDONMENT HAS NOT EXCEEDED ONE YEAR, IN WHICH CASE A FULL FEE WILL BE REQUIRED. 50% OF ALL FEES EXCLUDING PERMIT FEE ITSELF PERMIT RENEWAL FEE: PLAN CHECK FEE: For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection therefore) ---------------------------------------------------- 4.50 For each building sewer and trailer park sewer ------------------ 11.25 Rainwater system - per drain (inside building) ------------------ 4.50 For each cesspool ----------------------------------------------- 11.25 For each private sewage disposal system ------------------------- 22.50 For each gas piping system of one (1) to four (4) outlets ------- 4.50 For each gas piping system of five (5) or more, per outlet ------ 1.13 For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen type grease interceptors functioning as fixture traps ----------------------- 4.50 For installation, alteration or repair of water piping and/or water treating equipment ---------------------------------------- 4.50 For repair or alteration of drainage or vent piping ------------- 4.50 For each lawn sprinkler system or anyone meter, inc~,uding backflow protection devices therefore --------------------------- 4.50 For vacuum breakers or backflow protective devices on tanks, vats., etc., or for installation on unprotected plumbin9 fixtures, including necessary water piping one to four (1-4) ---- 4.50 Five (5) or more each of the above ------------------------------ 1.13 .. Resolution Number . .' ELECTRICAL PERMIT & PLAN CHECK FEES PERMIT FEE ------------------------------------------------------------------ $9.00 PERMIT EXPIRATION: PERMIT SHALL EXPIRE IF WORK IS NOT COMMENCED WITHIN 120 DAYS OR IF THERE HAS BEEN NO INSPECTION WITHIN 120 DAYS FROM THE DATE OF LAST INSPECTION. I PERMIT RENEWAL FEE: ONE-HALF THE AMOUNT REQUIRED FOR A NEW PERMIT FOR SUCH WORK, PROVIDED NO CHANGES HAVE BEEN MADE OR WILL BE MADE IN THE ORIGINAL PLANS AND SPECIFICATIONS FOR SUCH WORK; AND PROVIDED. 'FURTHER, THAT SUCH SUSPENSION OR ABANDONMENT HAS NOT EXCEEDED ONE FULL YEAR, IN WHICH CASE A FULL FEE WILL BE REQUIRED. PLAN CHECK FEE: 50% OF ALL FEES EXCLUDING PERMIT FEE ITSELF Each service switch 300 volts or less ------------------------- .016 per amp Each service switch 301 volts to 600 volts -------------------- .03 per amp Each service switch over 600 volts ---------------------------- .079 per amp In addition the following fees shall apply to electrical systems contained within or on any new structure, including new additions to existing structures. I 1. $.00563 per sq. ft. (a) Warehouse - that part which is over 5,000 sq. ft. (b) Storage garages where no repair work is done (c) Aircraft hangers where no repair work is done 2. $.0125 per sq. ft. (a) Residential accessory buildings attached or detached, such as garages, carports, sheds, etc. (b) Garages and carports for motels, hotels and commercial parking. (c) Warehouses up to and including 5,000 sq. ft. (d) All other occupancies not listed, that part which is over 5,000 sq. ft. 3. $.025 per sq. ft. All other occupancies not listed up to and including 5,000 sq. ft. 4. $.0025 per sq. ft. Temporary wiring during construction TEMPORARY SERVICE I MISCELLANEOUS Temporary or construction service, including poles or pedestals, each ---------------------------------------------- 11.25 Approval for temporary use of permanent service equipment prior to completion of structure or final inspection, each --- 11.25 Additional supporting poles, each ---------------------------- 4.50 Area lighting standards up to and including 10 on a site, each --------------------------------------------------------- 4.50 Over 10 on a site -------------------------------------------- 2.25 Private residential swimming pools including supply wiring, lights, motors and bonding ----------------------------------- 11.25 Commercial swimming pools ------------------------------------ 22.50 .... I I I " Resolution Number ELECTRICAL FEES CON'T 'i~spection for reinstallation of idle meter(removed by ------~------'il.25: Utility Company) ILLUMINATED SIGNS, NEW-RELOCATED OR ALTERED : Square Feet Up to and including 5 ---------------------------------------------- 11.25 Over 5, not over 25 ------------------------------------------------ 13.50 Over 25, not over 50 ----------------------------------------------- 18.00 Over 50, not over 100 ---------------------------------------------- 22.50 Over 100, not over 200 --------------------------------------------- 27.00 Over 200, not over 300 --------------------------------------------- 33.75 Over 300 ----------------------------------------------------------- .068 per sq. ft. OVERHEAD LINE CONSTRUCTION Poles and anchors, each --------------------------------------------- 4.50 ALTERNATE FEE SCHEDULE: ALTERATIONS, ADDITIONS AND NEW CONSTRUCTION - WHERE NO STRUCTURAL WORK IS BEING DONE OR WHERE IT IS IMPRACTICAL TO USE A SQUARE FOOTAGE SCHEDULE, CONVERT TO UNITS AS FOLLOWS: CHARGING 3.38 FOR EACH UNIT. For each 5 outlets or fraction thereof where current is used or controlled -------------------------------------------------------- 1 unit For each 5 lighting fixtures or fraction thereof where current is used or controlled ------------------------------------------------ 1 unit For multi-assembly (festoon type plug mold etc), each 20 feet or fraction thereof -------------------------------------------------- 1 unit For equipment rated in horsepower (HP), kilowatts (KW), or Kilovoltamperes (KVA), the fee for each motor, transformer and/or appliance shall be: HP, KW, KVA, OR FRACTION THEREOF: o to 1 ------------------------------------------------------------- 3.38 Over 1 and not over 10 --------------------------------------------- 6.75 Over 10 and not over 50 -------------------------------------------- 11.25 Over 50 and not over 100 ------------------------------------------- 22.50 Over 100 and not over 500 ------------------------------------------ 33.75 Over 500 ---------------------------------------------------------- 45.00 NOTE: 1. For equipment or appliances having more t~an one motor or heater the sum of the combined ratings may be used to compute the fee. 2. These fees include all switches, circuit breakers, contactors, relays and other directly related control equipment. PENALTY Failure to obtain a permit prior to commencing any electrical work for which a permit is required shall result in a penalty of a double fee not to include issuance fee. Minimum cost for such penalty is $22.50 EXCEPTION: - " For emergency repair work, a permit may be obtained within 72 hours. . . . I I 10. 11. 12. 13. 14. I 15. 16. 17. '. Resolution Number . .. MECHANICAL PERMIT FEES & PLAN CHECK PERMIT FEE -------------------------------------------------------------- 6.75 PERMIT EXPIRATION: PERMIT SHALL EXPIRE IF WORK IS NOT COMMENCED WITHIN 120 DAYS OR IF THERE HAS BEEN NO INSPECTION WITHIN 120 DAYS FROM DATE OF LAST INSPECTION. ONE-HALF THE AMOUNT REQUIRED FOR A NEW PERMIT FOR SUCH WORK, PROVIDED NO CHANGES HAVE BEEN MADE OR WILL BE MADE IN THE ORIGINAL PLANS AND SPECIFICATIONS FOR SUCH WORK; AND PROVIDED, FURTHER, THAT SUCH SUSPENSION OR ABANDONMENT HAS NOT EXCEEDED ONE YEAR IN WHICH CASE A FULL FEE WILL BE REQUIRED. 50% OF ALL FEES EXCLUDING PERMIT FEE PERMIT RENEWAL FEE: PLAN CHECK FEE: 1. For the installation or relocation of each forced air or gravity type furnace or burner, including ducts and cents attached to such appliance, up to and including 100,000 BTU/H -------------------------- 9.00 2. For the installation or relocation for each forced air or gravity type furnace or burner, including ducts and vents attached to such appliance over 100,000 BTU/H ------------------------------------------- 11.25 3. For the installation or relocation of each floor furnace, including wall heater or floor mounted unit heater ------------------------------- 9.00 4. For the installation, relocation or replacement of each suspended heater, recessed wall heater or floor mounted unit heater ---------------------- 9.00 5. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit ---------------------- 4.50 6. For the repair of, alteration of, or addition to each heating appliance refrigeration unit, cooling unit, absorption unit, or each heating, cooling absorption or evaporative system to and including 100.000 BTU/H-- 9.00 7. For the installation or relocation of each boiler or compressor to and including three hrosepower, or each absorption system to and including 100,000 BTU/H ---------------------------------------------------------- 9.00 8. For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 BTU/H and including 500,000 BTU/H ------------------ 16.88 9. For each air handling unit to and including 100,000 cubic feet per minute, including ducts attached thereto ------------------------------- 6.75 NOTE: This fee shall not apply to an air handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this Code. For each air handling unit over 10,000 CFM ----------------------------- 11.25 For each evaporative cooler other than portable type ------------------- 6.75 For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit----------------------- 6.75 For each ventilation fan connected to a single duct -------------------- 4.50 ~or.the installation or relocation of each domestic type lnClnerator ----------------------------------------------------------- 11.25 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood ----------------------------- 6.75 For the installation or relocation of each commercial or industrial type incinerator ------------------------------------------------------- 45.00 For each appliance or piece of equipment regulated by this Code but not classified in other appliance categories, or for which no other fee is listed in this Code --------------------------------------------- 6.75 18. Duct extensions, other than thise attached, each ----------------------- 4.50 " Resolution Number .: .:. MISCELLANEOUS FEES '.. I A. TMEPORARY CERTIFICATE OF OCCUPANCY ------------------------------------ 56.25 B. SPECIAL INVESTIGATIVE FEES: AFFECTED FLOOR AREA o - 2500 sq. ft. ------------------------------------------ 168.75 2,501 - 5,000 sq. ft. ----------------------------------------- 337.50 5,001 - 7,500 sq. ft. ----------------------------------------- 506.25 7,501 - 10,000 sq. ft. ---------------------------------------- 675.00 Each additional 10,000 sq. ft. or fraction thereof ------------ 168.75 C. SANDBLASTING Sandblasting will be figured at .05 per sq. ft. of wall surface D. TENT FEE: Up to 1,000 sq. ft. -------------------------------------------- 33.75 Each additional 1,000 sq. ft. or fraction thereof ---------------------------------------------- 11.25 E. SWIMMING POOL FEE: I Valuation: Residential, Commercial, Institutional or Social Organization: $3000 + 13.50 per sq. ft. + 550 for heater. Fee: Same as Building Permit Fee according to Table #3A of the Uniform Building Code, or adopted fee schedule. Public Works Bond for damages to Public Improvements ------------ 337.50 Public Works Street Permit for Rubbish Container ---------------- 22.50 F. SPA POOL FEE: Valuation: Residential, Commercial, Institutional or Social Organization: $1400 + 11.25 per sq. ft. + $550 for heater Fee: Same as Building Permit Fee according to Table #3A of the Uniform Building Code or adopted fee schedule. G. PATIO FEE: Valuation: Open Patio ----------------------------------------- 11.25 per sq. ft. Screened Patio -------------------------------------- 22.50 per sq.ft. Fee: Same as Building Permit Fee according to Table #3A of the Uniform Building Code or adopted fee schedule. III H. FENCES AND/OR BLOCK WALLS Valuation: Fences & Block Walls --------------------------- 22.50 per lin. ft. Fee: Same as Building Permit Fee according to Table #3A of the Uniform Building Code or adopted fee schedule. ~ -: . ~ .... .. I I I Resolution Number ~ : .. '" MISCELLANEOUS FEES CON'T 1. SIGN FEE: Valuation: Free Standing Si90s ---------------------------- $33.75 per sq. ft. (each face) + $300 Wall Signs -------------------------------------- 22.50 per sq. ft. Fee: Same as Building Permit Fee according to Table #3A of the Uniform Building Code or adopted fee schedule. J. ROOFING FEE: Valuation: Composition & Gravel ----------------------------- $101.25 per sq. Composition Shingles ----------------------------- 101.25 per sq. Wood Shingles ------------------------------------- 146.25 per sq. Wood Shakes -------------------------------------- 207.50 per sq. Clay Tile ----------------------------------------- 270.00 per sq. Fee: Same as Building Permit Fee according to Table #3A of the Uniform Building Code or adopted fee schedule.