Loading...
HomeMy WebLinkAboutPC Res 00-21 - 2000-05-17 RESOLUTION NO. 00-21 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SEAL BEACH FINDING THE MARINA DRIVE BRIDGE REPLACEMENT PROJECT IN CONFORMANCE WITH THE SEAL BEACH GENERAL PLAN (GENERAL PLAN CONFORMANCE NO. 00-3) THE PLANNING COMMISSION OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE: WHEREAS, Section 65402 of the California Government Code stipulates that a local agency shall not construct public works within. any city until the location, purpose and extent of such work has been submitted to the planning agency having jurisdiction and the conformity to the city's adopted General Plan has been reported; and . WHEREAS, the City is proposing to replace the Marina Drive Bridge and it is requested that the Planning Commission adopt a resolution finding the above- referenced project in conformity with the Seal Beach General Plan; and WHEREAS, the proposed project is designed to replace an existing bridge rated by Caltrans as "poor" in structural integrity with a new bridge structure constructed to the most current seismic design standards; and WHEREAS, the proposed project conforms to the following policies and provisions of the City of Seal Beach General Plan, for the reasons set forth: o Safety Element Policy 1M - Ensure that any new public facilities are designed and located in such a manner as to eliminate potential hazard impacts that may reduce the utility of the facility following a disaster. o Consistency Determination: The project has been designed to replace an existing bridge spanning the San Gabriel River that has been determined by Caltrans to have a poor structural rating. The purpose of the project is to provide a new bridge structure that complies with the current seismic design standards. o Safety Element Policy 3R - Work with governmental agencies (i.e., CALTRANS and Water Districts) and the public utility companies to identify and promote effective mitigation of the effects of the most probable seismic event on infrastructure which supports the City of Seal Beach. o Consistency Determination: The project has been designed to comply with the current seismic design standards, providing an increased level of protection over the existing poor structural condition of the bridge. o Safety Element Policy 5D - Plan capacity for the 100-year flood and provide short term reasonable protection for locations that would benefit from 10-, 25-, or 50-year storm drainage facilities. o Consistency Determination: The project has been designed to maintain all 100-year storm events within the existing levees of the San Gabriel River. No adverse impact to existing 100-year flood protection systems will occur as a result of the project. o Circulation Element - Marina Drive designation as a "Secondary" roadway, with 80 feet of right-of-way. C:\My Documcnts\RESO\Gcneral Plan Confonnance 00-3. Mnrina Bridge.PC Reso,doc\LW\OS-17-00 l Planning Commission Resolution 00-21 General Plan Conformance 00-3 Marina Drive Bridge Replacement Project May 17, 2000 o Consistency Determination: The project has been designed to maintain Marina Drive within an 80-foot right-of-way configuration. No additional right- of-way beyond 80 feet is required for the proposed bridge. However, since the proposed bridge structure includes the replacement of the existing fishing pier and includes a wider sidewalk on the south side of the bridge compared to the existing sidewalk, the bridge structure (area that includes the replaced fishing pier) will extend outside the existing right-of-way by 3.3 feet. The proposed bridge replacement is considered consistent with this policy. NOW THEREFORE, THE PLANNING COMMISSION FINDS, that the Marina Drive Bridge Replacement Project is in conformiiy with the City of Seal Beach General Plan Safety Element Policies 1M, 3R, 5D and the roadway designation within the Circulation Element of the City of Seal Beach General Plan Circulation Element. PASSED, APPROVED AND ADOPTED by the Planning Commission of the City of Seal Beach at a meeting thereof held on the 17 IZ;t- day of /?/t9 Y , 2000, by the following vote: AYES: Commissioners !3/Z..CJU/N/ CVTllt..J.> .L70~ 6YYoJ/oon NOES: Commissioners NON t5: ABSENT: Commissioners Not-/~ ABSTAIN: Commissioners Nt/He David Hood, Ph.D. Chairman, Planning Co , va e Whittenberg, Secretary Janning Commission General Plan ConformanccOO-3.Marina Bridge. PC Relio 2