HomeMy WebLinkAboutCC AG PKT 2007-08-13 #J AGENDA REPORT DATE; TO: THRU: FROM: August 13, 2007 Honorable Mayor and City Council O~vid N. Carmany, City Manager ..;. Mark K. Vukojevic, Director of Public Works/City Engineer Jt1. SUBJECT; REQUEST TO WITHDRAW ITEM J. FROM AUGUST 13,2007 CITY COUNCIL MEETING SUMMARY OF REOUEST: Staff is requesting Item J. Acceptance of the Navy Booster Station Upgrades Project No. 50156 be withdrawn from consideration at tonight's City Council meeting. Corrections will be made and brought forward for approval at a future City Council meeting. e DATE: TO: THRU: FROM: SUBJECT: AGENDA REPORT August 13, 2007 Honorable Mayor and City Council David N. Carmany, City Manager Mark K. Vukojevic, Director of Public Works/City Engineer ACCEPTANCE OF THE NAVY BOOSTER STATION UPGRADES PROJECT No. 50156 SUMMARY OF REOUEST: The proposed City Council action will adopt Resolution Number and formally accept the completion of the construction for the Navy Booster Station Upgrades Project No. 50156. BACKGROUND: The completed project, Navy Booster Station Upgrades Project No. 50156 made various repairs, improvements, and upgrades to critical components of the City's water service system, specifica11y the Navy Booster Station and Water Reservoir. The Navy Booster Station Upgrades Project No. 50156 is a combination of the following projects: Navy Reservoir Repairs Project No. 50154, Water System Telemetry/SCADA Project No. 50155, Navy Booster Pump Station Upgrades Project No. 50156, and the Navy Reservoir COlTOsion Protection Project No. 50167. e The Navy Reservoir Project retrofitted and upgraded the existing above ground steel structure and inlet and outlet lines to the reservoir, which was built in 1963. The Water System Telemetry/SCADA Project upgraded the existing telemetry system to current standards by replacing the current reporting equipment with a new computer based system. The Navy Booster Pump Station Project replaced and upgraded several components of the station to bring the facility, to current standards including the building, pumps and controls, and cathodic protection for the steel reservoir. A detailed description of the projects is available in the Council approved 2003 Water Master Plan.. The City also added several items to the project including cathodic protection upgrades, re-piping of the chlorine building, electrical work, a new prefabricated building, asphalt paving, and painting and roofing of the old reservoir. On November 14,2005, City Council awarded a project to Cora Constructors, Inc. In accordance with the plans and specifications, the contractor has satisfactorily completed the 8forementioned project for a final construction contract amount of $1,950,751.16. e Agenda ltem~ e FISCAL IMPACT: City Council budgeted $2,050,000 for the design, construction, and inspection for the Navy Booster Station Ugrades Project No. 50156. Funding came from the Water Capital fund within the City's approved 5-year Capital Improvement Program budget to construct these improvements and had no impact to the General Fund. The net cost of the project including design, construction, and construction management is $I,977,2?7.26. The entire project was completed $72,772.74 under budget and the remaining funds shall be reallocated back to the Water Capital Enterprise Fund. RECOMMENDATION: Upon motion of the consent calendar, it is recommended that the City Council: I. By resolution, determine the work has been completed in accordance with the contract documents and declare the work to be accepted and the total amount of the contract is in the sum of$I,950,751.l6. 2. Direct the City Clerk, within ten (10) days from the date of acceptance, file a ''Notice of Completion" with the Orange County Recorder. e 3. Direct City staff, upon expiration of the thirty-five (35) days from the filing of the ''Notice of Completion," to make the retention payment to Cora ntractors, Inc., in the amount ofSI95,075.l2. Concur: Sean Crumby Deputy City EngiI).eer Concur: NOTED AND APPROVED: {#~ Mark . VukojeVlc Director of Public Works/City Engineer ~o. t David N. Carmany City Manager Attachment: Resolution No. _ Declaring Work Completed Notice of Completion e Agenda Item_ e RESOLUTION NUMBER A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIF1CA TIONS FOR PROJECT NO. 50156, NAVY BOOSTER STATION UPGRADES WHEREAS, on November 14, 2005, City of Seal Beach entered into a contract with Cora Constructors, Inc. WHEREAS, the City Engineer has determined that the work has been substantislly completed in accordance with the contrBCt documents. NOW, 'I'HEREflORE, THE CITY COUNCll.. OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOu..oWS: Section 1. That the work required to be perlormed by said Contractor has been completed. That the total cost of said work is in the amount of $1,950,751.16. That the work is hereby accepted and approved. It is further ordered that a "Notice of Completion", Eshibit A, be filed on behalf of the City in the Office of the Orange County Recorder within 10 days of the date of this lCSolution, PASSED, APPROVED AND ADOPTED by the City Council of Seal Beach, at a meeting hereof held on the 13th day of AUl!1lSt ,2007 by the following vote: Section 2. Section 3. Section 4. AYES: COUNClLMEMBERS e NOES: COUNClLMEMBERS ABSENT: COUNCILMEMBERS ABSTAIN: COUNClLMEMBERS Mayor A TrEST: City Clerk STATE OF CALIFORNIA COUNTY OF ORANGE SS CITY OF SEAL BEACH I, Linda Devine, City Clerk for the City of Seal Beach. California. do hereby certify that the foregoing resolutions is the original copy of Resolution Number_ on file in the office of the City Clerk, passed, approved and edopted by the City CounClI of the City of Seal Beach at a regular meeting hereof held on the 13th day of AUl!1lSt , 2007. City Clerk e e RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Attn: City Clerk 211 8th Street Seal Beach, CA 90740 Space ofabove this line for Recorder's use. ... No Recording Fee Pursuant to Government Code Section 6103, 27383 .... NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. 2. e 3. 4. 5. 6. 7. The undersigned is owner or corporate officer of the owner of the interest or estate ststed below in the property hereinafter described: The full name of the owner is: City ofSesI Beach The sddress of the owner is: City of Seal Beach. 211 8th Street Seal Beach. CA 90740 The nature of the interest or estste of the owner is; In fee. The City of SesI Beach. A work of improvement on the property hereinafter is described ss substantially completed on Julv 10. 2007. The work was Naw Booster Station Unl!rlldes Proiect No. 50156. The name of the contractor, if any, for such improvement was: Cora Constructors. Inc. The date of the Contract Award wss: November 14. 2005. The property on which said work of improvement was completed in the City of SesI Beach, County of Orange, State ofCsIifomia, and is described ss follows Naval Weanons Station. Date: Signature of owner or corporate officer of owner named in paragraph 2 or his agent. VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have resd said notice of completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury the foregoing is true and correct. Executed on . 2007, at SesI Beach, CsIifornia. (Date of Signature) Director of Public Works e Exhibit A