HomeMy WebLinkAboutCC AG PKT 2007-08-13 #K e e e AGENDA REPORT DATE: August 13, 2007 . TO: Honorable Mayor and City Council THRU: DavidN. Carmany, City Manager FROM: MarkK. Vukojevic, Director of Public Works/City Engineer SUBJECT: ACCEPTANCE OF THE SEWER PUMP STATION 35 PHASE 1 UPGRADES, PROJECT No. 49886 SUMMARY OF REQUEST: The proposed City Council action will adopt Resolution Number _ and formally accept the completion of the construction for the Sewer Pump Station 35 Phase 1 Upgrades Project No. 49886. BACKGROUND: Sewer Pump Station 35 is located in the southeast comer of Old Town near the comer of Electric Avenue and Seal Beach Boulevard. It is a large wetldry well station which receives all of the sewage flows generated in the Naval Weapons Station, Old Town, Marina, the Hill, and Bridgeport areas. Sewer Pump Station 35 delivers these flows to an Orange County Sanitation District's (OCSD) pump station located at Seal Beach Boulevard and Westminster Avenue via a 16-inch force main that lies in Seal Beach Boulevard. The OCSD sewer pump station then sends the flows on to their treatment plant, for treatment and disposal. The pump station was constructed in 1973 as part of a comprehensive program that eliminated the City's treatment facility. This station was in dire need of refurbisJiment. The existing pumps were installed approximately 10 years ago and showed signs of premature wear. Their power consumption was less efficient than some of the newer pumps available. On average, this station pumps 1.2 million gallons per day with a peak flow of approximately 2,800 gallons per minute. The 2005 Sewer Master Plans defined Sewer Pump Station 35 as the most important facility in the City's Sewer System, and as such, it must be kept in top condition. On November 14, 2005, City Council awarded a project to Cora Constructors, loc for rehabilitation of Phase 1 improvements to Sewer Pump Station 35 which included installation of three variable frequency drives, a gas generator, telemetry equipment, instrumentation control eC!.uipment, and miscellaneous pump station improvements. In accordance with the plans and specifications, the contractor has satisfactorily completed the aforementioned project for a final contract amount of$51l,048.03. Phase 2 improvements to Sewer Pump Station 35 are currently in constroction and include installation of a sewer bypass system, two right angle drives, a flow AGENDA fTlEM k e e e metering system, three sewage pumps with 75 hp motors, various electrical upgrades, ~d miscellaneous pump station improvements and equipment. FISCAL IMPACT: City Council budgeted $1,900,000 for the design, construction, and inspection for the multi- phase Sewer Pump Station 35 Upgrade Project No. 49886. Funding came from the Sewer Capital fund within the City's approved 5-year Capital Improvement Program budget to construct these improvements and had no impact to the General Fund. The final construction cost for the project was $511,043.03, which is $23,756.97 less than the original contract amount of $534,800.00. The net cost of the Phase 1 portion of the project including design, construction, and inspection is $654,789.08. Funding is available within the Sewer Capital Enterprise Funds Account. RECOMMENDATION: Upon motion of the consent calendar, it is recommended that the City Council: I. By resolution, determine the work has been completed in accordance with the contract documents and declare the work to be accepted and the total amount of the contract is in the sum of $5 11,048.03. 2. Direct the City Clerk, within ten (10) days from the date of acceptance, file a ''Notice of Completion" with the Orange County Recorder. 3. Direct City staff, upon expiration of the thirty-five (35) days from the filing of the ''Notice of Completion," to make the retention payment to Pavement Coatings Co., in the amount of$5I,109.80. Concur: Sean Crumby Deputy City Engineer Concur: NOTED AND APPROVED: 4f~4- Mark K. Vukojevic Director of Public Works/City Engineer C"'- ~ . 1 David N. Carmany City Manager Attaclunent: Resolution No. _ Declaring Work Completed Notice of Completion e RESOLUTION NUMBER_ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH DECLARING WORK TO BE COMPLETED AS TO PLANS ANn SPECIFICATIONS FOR PROJECT NO. 49886 SEWER PUMP STATION #35 UPGRADE (PHASE I) WHEREAS, on November 14, 2005, City of Seal Beach entered into a contract with Cora Constructors, Inc. WHEREAS, the City Engineer has detennined that the woric has been substantially completed in accordance with the contract documents. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS: Section 1 That the work ""Iuired to be performed by said Contractor has been complemd. That the total cost of said work is in the amount of $511,048.03. That the work is hereby acceptecland approved. It is further ordered that a "Notice of Completion", E.h,bit A, be filed on behalf of the City in the Office of the Orsnge County Recorder within 10 days of the dab> of this resolution. Seetion 2. Section 3. Section 4. PASSED, APPROVED AND ADOPTED by the City Council of Seal Beach, at a meeting hereof held on the 13th day of Au""st , 2007 by the following vom: AYES: COUNcn.MEMBERS e NOES: COUNcn.MEMBERS ABSENT: COUNCn.MEMBERS ABSTAIN: COUNCn.MEMBERS A1TEST: Mayor City Clerk STATE OF CALIFORNIA I COUNTY OF ORANGE ) SS CITY OF SEAL BEACH I I, Linda Devine, City Clerk for the City of Seal Beach, California, do hereby certify that the foregoing reaolutions is the original copy of Resolution Number_ on file in the office of the City Cleric, passed, approved and adopted by the City Council of the CIty of Seal Beach at a regular meeting hereof held on the 13th day of AUl!USt , 2007. City Clerk e e RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Attn: City Clerk 211 8th Street Seal Beach, CA 90740 Space ofabove this line for Recorder's use. ... No Recording Fee Punuantto Government Code Section 6103, 27383 .... NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. 2. e 3. 4. 5. 6. 7. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: The full name of the owner is: City of Seal Beach The address of the owner is: City of Seal BeAoh 211 81b Street Seal Beach. CA 90740 The nature of the interest or estate of the owner is; In fee. The City of Seal Beach. A work of improvement on the property hereinafter is described as substantially completed on Mav 24. 2007. The work was: Sewer Puma Station #35 Phase I Ual!l'ade Project 49886. The name of the contractor, ifany, for such improvement was: Cora Contructors. mc.. The date of the Contract Award was: November 14.2005. The property on which said work of improvement was completed in the City of Seal Beach, County of Orange, State of California, and is described as follows: Seal Beach Blvd. & Electric Avenue. Date: Signature of owner or corporate officer of owner named in paragraph 2 or his agent. VERIFICATION I, the undersigned, say: the Director of Public Works declanmt of the foregoing notice of completion; have read said notice of completion and lmow the contents thereot; the same is true of my own lmowledge. I declare under penalty ofpetjury the foregoing is true and correct. Executed on . 2007, at Seal Beach, California. (Date of Signature) e Director of Public Works ExIn"bit A