HomeMy WebLinkAboutCC AG PKT 2006-04-24 #T AGENDA REPORT DATE: April 24, 2006 TO: Honorable Mayor and City Council THRU: John B, Bahorski, City Manager FROM: Mark Vukojevic, P.E. Director of Public Works/City Engineer SUBJECT: ACCEPTANCE OF THE MARINA DRIVE BRIDGE REHABILITATION PROJECT NO. 49676 SUMMARY OF REOUESTS: The proposed City Council action will adopt Resolution No. _ and formally accept the completion of the Marina Drive Bridge Rehabilitation Project No. 49676. BACKGROUND: Marina Drive Bridge, which crosses over the San Gabriel River and connects into the City of Long Beach, has been reconstructed with a new cast-in-place/prestressed concrete box girder bridge. In addition, street and landscaping improvements have been constructed on Marina Drive from First Street to the Bridge. The bridge was determined to be subject to collapse if subjected to a major earthquake, and therefore was designated for replacement under the State of California Seismic Safety Retrofit Program and the Federal Highway Bridge Replacement and Rehabilitation Program (HBRR). The replaced bridge was originally constructed in 1938 with a 13 span timber deck structure with concrete pile bents. Construction was completed in two phases. The first phase began on the north half of the roadway and bridge, keeping the south half open to pedestrian/bicycle and vehicle traffic. Upon completion of the north half of the new bridge, the contractor moved to the south half and opened traffic to the north half of the bridge. The project took 30 months to complete. The City of Long Beach and the Coastal Commission requested to keep the bridge open to traffic during construction. The new bridge is a structurally sound roadway and that includes a new fishing pier, sidewalks, bicycle lanes, street lighting and a new median. The new bike lanes will connect to the proposed regional bicycle facility on Marina Drive. The Marina Drive Bridge rehabilitation project was approved by the Federal Highway Administration (FHW A), California Department of Transportation (Caltrans), the CoUnty of Los Angeles Department of Public Works Flood Control District, and the City of Long Beach. In Agenda Item r addition, the City secured permits from the California Coastal Commission and the Army Corp of Engineers. Historv: City Council originally approved the plans and specifications for the project on January 28, 2002. Staff received the authorization to proceed for the project from CaltraDS in May of 2002, On July 10, 2002, bids were received exceeding the original budget for the project. Staff, requested the additional funds from Caltrans. On August 26, 2002, the City Council approved the rejection of all bids and authorized Staff to re-bid the project after the City obtained approval from Caltrans. On March 4, 2003, the City obtained authorization to proceed from Caltrans to re-bid the project. However, since the State was in the midst of their funding crisis, no additional State Seismic funds were available to local agency projects, thereby raising the local match from 11.47% to 20% (State funded $699,950, Seal Beach and Long Beach split the remaining (6%) of the total project cost. Previous State authorizations for matching money would be kept intact to a maximum of $699,950. However, additional matching funds were not available. On March 5, 2003, Staff re-bid the project and also requested an additional alternate bid for a full bridge closure in order to compare costs. In accordance with the plans and specifications and changes directed in the field, the low bidder Griffith Company has completed construction of the project for $7,959,718.25. FISCAL IMPACT: The budget for the project was estimated to be $10,570,000 including design, agency permitting, construction, and project and construction management. A total of $10,257,810.00 was spent for the project. The Federal Highway Bridge Replacement Program has funded 80% of the cost, the State seismic money obligated to the project will fund $699,950, and the City of Seal Beach and the City of Long Beach will each have to fund $707,025. For the City of Seal Beach, $220,000 was obligated from State Gas Tax, $100,000 from Measure M - TOM grant, $25,000 from the sewer capital fund and $362,025 from the water capital fund for the water interconnection with Long Beach. RECOMMENDATION: It is recommended that the City Council: 1. By resolution, determine the work has been completed in accordance with the contract documents and declare the work to be accepted and the total amount of the contract is in the sum of $7,959,718.25 2. Direct the City Clerk, within ten (10) days from the date of acceptance, file a ''Notice of Completion" with the Orange County Recorder. 3. Direct City staff, upon expiration of the thirty-five (35) days from the filing of the "Notice of Completion," to make the retention payment to Griffith Company, in the amount of $399,586.62. Prepared By: Concur: 7I/J4 , ... ~ Sean Crumby, P.E. Deputy City Engineer Mark K. Vukojevic, P.E. Director of Public Works/City Engineer Resolution No. Notice of Completion RECORDING REQUESTED BY AND WHEN RECORDED MAll. TO CITY OF SEAL BEACH Attn: City Clerk 211 8th Street Seal Beach, CA 90740 Space of above this line for Recorder's use. ... No Recording Fee Pursuant to Government Code Section 6103, 27383 .... NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: 2. The full name of the owner is: City of Seal Beach 3. The address of the owner is: City of Seal Beach. 211 8"' Street. Seal Beach. CA 90740 4. The nature of the interest or estate of the owner is; In fee, The City of Seal Beach. 5. A work of improvement on the property hereinafter is described as substantially completed on November 1. 2005. The work was: Marina Drive Brid2e Rehabilitation Proiect 49676, 6. The name of the contractor, if any, for such improvement was: Griffith Comoanv. The date of the Contract was: Aori128. 2003, 7. The property on which said work of improvement was completed in the City of Seal Beach. County of Orange, State of California, and is described as follows: Marina Drive Brid2e Rehabilitation Proiect ~ Date: Signature of owner or corporate officer of owner named in paragraph 2 or his agent. VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have read said notice of completion and know the contents thereof; the same is true of my own knowledge, I declare under penalty of perjury the foregoing is true and correct. Executed on . 20 06, at Seal Beach, California. (Date of Signature) Director of Public Works Exhibit A RESOLUTION NUMBER A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR PROJECr #49676 MARINA DRIVB BRIDGB RBHABILITATION ENTERED INTO BETWEEN CITY OF SEAL BEACH AND GRIFFITH COMPANY WHEREAS, on April 28, 2003, City of SoaI Beach entered ioto a contract wilb Griffilb Company, WHEREAS, the City Bng..eer has determined that lbe work has hoon substantially completed 10 accordance with the contract documents. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES HBREBY RESOLVE, DBCLARE, DETERMINB AND ORDER AS FOLLOWS: Section I Section 2. Section 3 Section 4. That the work required to be performed by aaid Contractor has been completed, That the total cost ofsaid work is in the amount of$7,959,718,25. That the work is hereby accepted and approved. It is further ordered that a "Notice of Completion", Exhibit A, be filed on behalf of the City in the Office of lbe Orange County Recorder within 10 days of the date of this lesolution. PASSBD, APPROVED AND ADOPTED by lbe City Council oflbe City of Soal Beach at a moeting thereof held on the day of 2006 by lbe followmg vote: AYES: Councilmombora NOES: Councilmembora ABSENT: Councilmembora Mayor ArrEST: City Clerk STATEOFCALIFORNlA ) COUNTY OF ORANGE ) SS CITY OF SEAL BEACH ) I, Linda De.ine, City Clerk of lbe City of Soal Beach, CsJifomis, do hereby certify that lbe foregoing resolution is an original copy of Resolution Number on file in the Office of the City Clerk, passed, approved and adopted by the City Council of lbe City of Soal Beach at a mootinglbereof held on the day of , 2006. City Clerk