HomeMy WebLinkAboutCC AG PKT 2005-12-12 #Q e e e AGENDA REPORT DATE: December 12, 2005 TO: Honorable Mayor and City Council THRU: John B. Bahorski, City Manager FROM: Mark K. Vukojevic, P.E. Director of Public Works/City Engineer SUBJECT: AWARD OF CONTRACT FOR THE SAND RETENTION GROIN REPAIR, PROJECT No, 50147 SUMMARY OF REQUESTS: The proposed action will adopt resolution _ and award a construction contract for .' the Sand Retention Groin Repair, Project No. 50147 to the lowest responsible bidder, AlS Construction Company in the amount of $948,750,00 and authorize the City Manager to execute the agreement. BACKGROUND: After the construction of the harbor jetties in Long Beach (Alamitos Bay) and at the U. S. Naval Weapons Station (Anaheim Bay), natural beach sand management was permanently altered. Waves reflected by these jetties caused severe beach erosion on the East Beach. To reduce the rate of erosion to manageable rates, a concrete sheetpile groin (750-ft) was constructed in 1959 adjacent to the Seal Beach Pier. The concrete sheetpile groin retains the shifting sand, which results in a wider beach that provides increased protection to coastal structures from wave and flood damage. On its February 23, 2004 meeting, the City Council received and filed additional information regarding the status of the Sand Retention Groin Rehabilitation Project. In addition, Council was briefed on the 2001 Groin Feasibility study, which helped secure the grant funding from the Department of Boating and Waterways (DBA W). Moffat and Nichol Engineers, the City's Coastal Engineering Consultant has prepared a Rehabilitation Study also known as a preliminary design report for the Sand Retention Groin Rehabilitation Project. Staff and the consultant have worked closely together in providing the information on the repair alternatives, environmental impacts, and permit requirements. The consultant has also discussed the project with the California Coastal Commission and the Department of Boating and Waterways. The Study recommended several alternatives for construction and alternative 7 was selected as the most feasible. This includes the reinforcement of the outer 252-feet by the installation of new concrete sheet piles on one side, installation of new sheet piles on the Agenda Item A e opposite side of the damaged piles, construction of a new cap for 350- feet and repairing the remainder of the cap. However, construction will require the use oflarge cranes and the closure of the Pier during construction. Permits have been obtained from the Regional Water Quality Control Board (RWQCB), and US Army Corps of Engineers (USACE). The aforementioned project will be presented for approval to the California Coastal Commission (CCC) on its December board meeting. The construction repair of the groin is being coordinated with the renovation of Ruby's Diner. To reduce public impact of the pier usage, both projects are scheduled to be constructed during low-usage of the pier, between January 2006 through April 2006. Two (2) bids were received and opened by the City Clerk on Thursday, November 3, 2005 as listed below: 1 AIS Construction Company 2 John S. Meek $948,750.00 $1,233,260.00 Staff has reviewed the submitted bid documents and found the low bidder to be in compliance with the contract documents;o e The low bid of $948,750 is thirty-five percent (35%) higher than the engineer's estimate of $702,240. This increase in price is due to recent increases in concrete construction. Staff intends to explore a possible reduction in the scope of work to bring the project within the budget constraints. Reducing the number of concrete sheetpiles constructed (as detailed in alternative 6 of Moffat & Nichol's Project Study) will not adversely affect its structural integrity. FISCAL lMP ACT: Funds are available within the Project No. 50147 of the approved Capital Improvement Program. The estimated total cost of the project including design, environmental, permitting, construction and inspection is $1,067,000 which is funded by $800,000 from DBA W. $267,000 was funded from the undesignated general fund reserve as authorized by City Council on February 10,2003. Staff is anticipating a reduction in the scope of work will bring the project within budget constraints. The main item being discussed is the reduction in the number of sheetpiles constructed. No work will De performed unless adequate funding is available in the project budget. Any funds remaining at the end of this phase of the project will be returned to DBA Wand the City's General Fund. RECOMMENDATION: e It is recommended that the City Council adopt resolution _ and award a construction contract for the Sand Retention Groin Repair, Project No. 50147 to the lowest responsible bidder, AIS Construction Company in the amount of $948,750.00 and authorize the City Manager to execute the agreement. Agenda Item_ e Prepared By: elasco eer Reviewed By: e ~tIi ' Mark K.. Vukojevic P .E. Director of Public Works/City Engineer Attachment: Proposed Resolution No. e Concur: Sean P. Crumby, P.E. Deputy City Engineer NOTED AND APPROVED: , Agenda Item_ e RESOLUTION NUMBER A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH AWARDING THE BID FOR THE SAND RETENTION GROIN REPAIR, PROJECT NO. 50147 NOW, THEREFORE, THB CITY COUNCIL OF THE CITY OF SEAL BEACH DOBS HEREBY RESOLVB, DBCLARE, DBTBRMINB AND ORDER AS FOLLOWS: SBCTION 1. The City Council hereby approves the contract between the City of Seal Beach and AIS Construction Company for tho Sand Rotention Groin Repair ProjoctNo.5D147. SBCTION 2. Tho Council hereby directs tho City Manager to exocuto tho contract for the Sand Rotontion Groin Repair, Projoct No. 50147, to AIS Construction Company. P ASSBD, APPROVBD AND ADDOPTBD by the City Council of the City of Soal Beach at a mooting thoreofhold on the day of 2005 by the following vote: AYES. Council Members NOBS: Councd Members e ABSENT: Council MombOIll Mayor AITBST: City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGB . ) SS CITY OF SEAL BEACH ) I, Linda Devino, City Clerk of the City of Seal Beach, California, do bereby certifir that the foregoing Resolution is tho original copy of Resolution Number _ on file in the office of tho City Clerk, passed, approved, and adopted by the City Council of the City ofS..1 Beach at a meoting thoreofhold on the day of .2005. City Clerk e