HomeMy WebLinkAboutCC Res 2164 1973-01-08
.-'.
"
"
.~
.'
I
RESOLUTION NO. ..i1..L.Ie.:/..
A RESOLUTION OF TIlE CITY COUNCIL OF TIlE CITY
OF SEAL BEACH ESTABLISHING BUILDING PERMIT
AND PLAN CIlECK FEES AND RESCINDING ALL
RESOLUTIONS IN CONFLIC!l IlEREWITH.
1
THE CITY COUNCIL OF TIlE CITY OF SEAL BEACH DOES IlEREBY RESOLVE:
WHEREAS, Ordinance No. 855 of the City of Seal Beach does provide that a
schedule of appropriate fees shall be paid to the Building Official as established
by resolution of the City Council.
NOW, THEREFORE, BE IT RESOLVED and it is hereby declared that in the interest
of conformity with the fees adopted by other neighboring jurisdictions and the
state of the economy the fee schedules for permits and plan cheeks shall be as
follows:
1. BulldiM fees shall be as shown on Exhibit "A" attached.
2. Valuation data shall be as shown on Exhibit "B" attached.
3. Grading fees shall be as shown on Exhibit "c" attached.
Ii. Miscellaneous fees shall be as shown on Exhibit "D" attached.
5. PIUlllbing fees shall be as shown on Exhibit "E" attached.
1 6. Automatic Fire Extinguishing System fees shall be as shown on
Exhibit "F" attached.
7. Mechanical fees shall be as shown on Exhlbit "G" attached.
8. Electrieal fees shall be as shown on Exhibit ilK" attached.
BE IT FUllTHER RESOLVED tliat all resolutions pertaining to building fees
are hereby rescinded.
AND BE IT FUR'l'IIER RESOLVED that the aforementioned fees seti forth above and
in Exhibits "A" to "G", inClusive. attached hereto shall became effective on
thellidi d~ of January, 1973.
PASSED, APPROVED AND ADOPl'ED by the Citr Counell 0 e City of Seal Beac~~
at a regular meeting thereof held on the 8 ~ d~ of \... ' . 19~ "'- . J
by the following vote: ~
AYES: councilmen,Ld,/ ~.I.u~ },:E/h....<~P*.{.J
NOES: Couneilmen /L~ ,
ABSENT: Couneilmen o/a./ L~.-J
I'
I
~~~
~or PRO.TBIl!,
ATTEST:
~
,
..: -...
:---
,....~.~ -..-
- ..."'
,-..
1
1
1
Resolution Number
'-:.
EXHIBIT "A"
BUILDING PERMIT & PLAN CHECK FEES
TOTAL VALUATION
$1 to $1,000
$1,001 to $25,000
FEE
$5
$5 for first $l,OOO plus $5 for
each additional $1,000 or fraction
thereof, to and including $25,000
$25,001 to $50,000
$125 for the first $25,000 plus $4
for each additional $1,000 or fraction
thereof, to and including $50,000
$50,001 to $100,000
$225 for the first $50,000 plus $3
for each additional $1,000 or fraction
thereof, to and including $100,000
$lOO,OOl to $500,000
$375 for the first $100,000 plus $2
for each additional $1,000 or fraction
thereof, to and iRcluding $500,000
$500,OOl and up
$l,175 for the first $500,000 plus $1
for each additional $1,000 or fraction
thereof.
Plan check fee shall be equal to 60% of permit fee (up to $50,000 valuation).
Plan check fee shall be 65% of said building permit fee when valuation
exceeds $50,000.
Temporary Certificate: Establishes $25.00 fee for Temporary Certificate
of Occupancy and may include utility meter release.
Permanent Certificate: No charge.
Exhibit "A"
Resolution No.
January 15, 197~
. ,
,"
',;.
EXHIBIT "B"
Resolution N~er
BUILDING VALUATION DATA
The unit costs are intended to comply with the definition of
"valuation" in Exhibit "A" and thus include architectural.
structural, electrical, plumbing. and mechanical work. except
as specifically listed below. it also includes the contractor's
profit which should not be omitted if he has a financial
interest in the project.
1
OCCUPANCY AND TYPE
Cost per
Square Foot
Good' Average
1. APARTMENT HOUSES:
*Type I or II .,.......~...$25.00
Type V--Masonry (or
Type 111)................18.90
Type V-Wood Frame .........17.00
Type I-~asement Garage.....
2. CHURCHES:
Type I or II...............
1ype III-l-Hour............
Type III-N.................
Type V-I-Hour..............
Type V-N..... ..............
1
3. CONVALESCENT HOSPITALS:
*Type I or II.........,.....
Type.II~-l-Hour............
Type V-I-Hour..............
4. DWELLINGS:
Type V-Masonry.............21.10
Type V-Wood I;l!r,ame...oo 00 00 0019.50
Bas~ents.................. 4.00
5. HOSPITALS:
*Type I or II...............
Type III-I-Hour............
Type V-I-Hour
6. HOTELS AND MOTELS:
*Type 1 or II...............
Type Ill-I-Hour............
Type III-N.................
Type V-I-Hour..............
Type V-N...................
1
7. INDUSTRIAL PLANTS:
Type I or II...............
Type III-I-Hour............
Type III-N.................
Tilt-up....................
Type IV-I-Hour.............
Type IV-(Stock)............
Type V-I-Hour..............
Type V-N...................
$20.90
15.40
13.90
8.00
24.80
20.45
17.60
17.50
15.80
26.40
24.91
22.40
16.10
14.80
2.95,
36.80
33.20
27.80
23.80
20.30
18.60
18.40
16.70
14.90
10.85
9.15
6.65
9.05
7.55
9.25
7.55
OCCUPANCY AND TYPE
Cost per
Square Foot
Good Average
8. OFFICES:
* Type I or II............
Type III-I-Hour.........
Type III-N..............
Type V-I-Hour...........
Type V-N ...............
9, PRIVATE GARAGES:
Wood Frame..............
Masonry.................
10. PUBLIC GARAGESI
'* Type I or II............
Type III-I-Hour.........
Type III-N..............
Type IV-N...............
Type V-I-Hour...........
11. RESTAURANTS:
Type III-I-Hour.........
Type III-N..............
Type V-I-Hour...........
Type V-N................
12. STORES:
"'Type I or II............
Type III-I-Hour.........
Type III-N..............
Type V-I~Hour...........
Type V-N................
13. SCHOOLS:
Type I or II............
Type III-I-Hour.........
Type III-N..............
Type V-I-Hour...........
14. SERVICE STATIONS:
Type III-I-Hour.........
Type IV-N...............
Type V-I-Hour...........
Cano~ies................
l~. THEATERS:
Type I or II............
Type III-I-Hour.........
Type III-N..............
Type V-I-Hour...........
Type V-N................
* Add O. 8 per cent to total cost
for each story over three.
$25.90
19.30
17.60
16.20
14.50
5.00
6.80
11.50
10.35
8.65
8.80
7.50
23.80
22.10
21.10
19.40
20.05
15.00
13.30
13.30
11.60
24.10
19.75
18.05
18.00
,
16.35
15.50
10.90
5.35
, ,
25.65
21. 90
20.20
19.30
17.60
116.
1
1
, ,
OCCtil'ANCY AND TYPE
Cost per
Square Foot
Good Average
WAREHOUSES:
Type I or 11.............
Type III...I-Honr..........
Type III-N...............
Type'IV or v-I Hour......
Type IV or V-N..........
$12.10
8.80
7.25
8.10
6.40
Resolution Nurnper
"
EQUIPMENT
"-II\. CONDITIONING:
Commercial.................
Residential................
SPRINKLER SYST~I:.............
"Add 0.8,per eent to total cost for each
story over three. .
Exhibit liB" (2)
Resolution No.
January l:i
,1973
Sl.50
1.30
0.65
,
l. ~ "
Resolution N~~r
, ,
,"
"
EXHIBIT "c"
GRADING PERMIT & PLAN CHECK FEES
I 100 cubic yards or less
101 to 1,000 cubic ysrds
$26
l!!
$26 for the first 100 cubic yards
plus $9 for each additional 100
cubic yards or fraction thereof.
1,001 to 10,000 cubic yards
$110 for the first 1,000 eubic yards,
plus $9 for each additional 1,000
cubic yards or fraction thereof
10,001 to 100,000 cubic yards
$l96 for the first 10,000 cubic yards,
plus $39, for each additional 10,000
cubic yards or fraction thereof
100,001 cubic yards or more
$550 for' the' first 100,000 cubic
yards, plus $21 for each additional
10,000 cubic yards or fraction
thereof
Grading plan check fee shall be 40% of the grading permit fee.
I
1
EXHIBIT "c"
Reaolution Ne. .... ,
Januarv IS f 1973"
I
1
1
Resolution Numb~r
EXHIBIT "D"
MISCELLANEOUS FEES
A. DEMOLITION FEES
Demolish complete building or structure: 5% assessed valuation or demolish
portion of building or structure: % of building or structure to be demolished
or 5% of assessed valuation
Plus Building Permit Fees (Exhibit A) based on value of temporary and protective
facilities (estimated or actusl contract cost)
Plus Permit Fees for post demolition on-site grading (Exhibit C) as well as
permits for plumbing (Exhibit E), Fire Protection (Exhibit F), Mechanical
(Exhibit G) and Electrical (Exhibit H) for temporary and protective
facilities incidental to and/or as required for the demolition work.
B. AWNING FEE (Section 4506)
New: $10.00 or 20c per lineal foot
Recovered: $5.00 or 10C per lineal foot
~ whichever is the greater
C. FACTORY BUILT HOUSING OR BUILDING FEE
Building Permit Fee (Exhibit A) for on-site erection based on value of work.
Site Development Fees for Grading (Exhibit C). Plumbing (Exhibit E), Fire
Protection (Exhibit F). Mechanical (Exhibit G) and Electrical (Exhibit H)
*Building Permit Fee for existing house without State of California Approval
Seal: see Moved Building Fee. Building Permit Fee for Existing Building:
see Moved Building Fee.
BUILDING PERMIT FOR NEW BUILDING FEE:
AFFECTED FLOOR AREA
FEE
-0...--- 2,500 sq. ft...........II................ $75.00
2,501 --- 5,000 sq. ft........................... $150.00
5,001 --- 7,500 sq. ft........................... $225.00
7,501 --- 10,000 sq. ft........................... $300.00
Eac~ addtti6nal 10,000 sq. ft. or fraction thereof 75.00
Plus twenty cents per mile between the City Hall and factory'for'each
inspection during fabrication. '
* No building permit required for new house with State of California approval
seal attached.
ExhilJ~t ,!'D"
Resolution No." ',,~
Tanuarv 15 ,1973
"
Resolution Number
"
D.
CHANGE OF OCCUPANCY FEE
Before any application for change of occupancy is accepted, a fee shall be
paid by the applicant to cover the cost to the City of the inspection of the
building for which a change of occupancy is desired. (Building Code,
Section 306(6)
I
The amount of the fee,shall be as follows:
AFFECTED FLOOR AREA
FEE
0--- 2,500 sq. ft. . . . . . . . .
2,501 --- 5,000 sq. ft. . . . . . . . . . .
5,001 -- 7,500 sq, ft. . . . . . . . . . .
7,501 --- 10,000 sq. ft. . . . . . . . . . .
Each additional 10,OOO sq. ft. or fraction thereof
E. PLASTERING PERMIT FEES
SQUARE YARD
20 Yards or less . . . . . . . . . . . . . . .
21 Yards to and including 200 Yards .....
201 Yards to and including 1,000 Yards. . . .
1,001 Yards to and including 3,000 Yards . . .
3,001 Yards and up . . . . . . . . . . . . .
Example: Job with 3,200 sq. yds.
$ 75.00
150.00
225.00
3QO.OO
75.00
FEE
No fee
$ 4.00
.04 per sq. yd.
,02 per sq. 'yd.
.01 per sq. yd.
I 200 Yds. . . . . . . . . . , . . . . . . 4.00
201 Yds. to 1,000 Yds. . . . . . . . . . , 32.00
1,001 to 3,000 Yds. . . . . . . . . . . . . . 40.00
'... 3,001 to 3,200 Yds. . . , . . . . . . . . . . 2.00 .'
Total Fee $78.00 -
F. INVESTIGATIVE FEES
Requested Inspections (Sec. 307) Fees:
AFFECTED FLOOR AREA
MINIMUM FEE
0-- 2,500 sq, ft. . . . . . . . . . . .
2,501 -- 5,000 sq. ft. . . . . . . . . . ,
5,001 -- 7,500 sq. ft. , . . . . . . . . .
7,501 --- 10,000 sq. ft. . . . . . . . . . .
Each additional 10,000 sq. ft. or fraetion thereof
$ 75.00
150.00
225.00
300.00
75.00
Actual man hour cost plus overhead shall be eharged if this minimum fee
is exceeded.
I,
Exhibit liD" (2)
Resolution No.
January 15, 1973
I
I
1
,"
Resolution Nu~er
Special Investigation for permit (Sec. 303-a) FEE;
AFFECTED FLOOR AREA
PAY DOUBLE PERMIT FEE PLUS
'" FEE
o 2,500 sq.
2,501 5,000 sq.
5,001 7,500 sq.
7.501 10,000 sq.
Each additional 10,000
ft..........,.....,... .
ft...................... .
ft. 1111........ .........
ft....... ........ ..........
sq.ft. or fraetioD thereof
$ 25.00
100.00
150.00
200.00
50.00
RELOCATE BUILDINGS
PRE-MOVE EXAMINATION FEE (Sec. 301-i)
AFFECTED FLOOR AREA
* FEE
o 2,500 sq.
2,501 ;5~000 sq.
5,001 7,500 sq.
7,501 10,000 sq.
Each additional 10,000
Posting Fee~
Up to 800 sq. ft.
Over 800 sq. ft.
ft........ ..-.............
ft....... ~...............
ft....................... .
ft...."...., ...... t......."
sq.ft.or fractio~ thereof
$20~00"
250.00
500.00
$ 75.00
150.00
225.00
300.00
75.00
BUilding Permit Fees shall be as
per Exhibit "A" based on value of on..ilite improvements, setting
building on footings, connecting utilities and cost of building
repair, remodel and addition.
In addition, permit fees for ~rading (Exhibit "C~), Pluinb1i1S"(Exhibit "E") ,
Fire Protection (Exhibit "F"), Mechanical (Exhibit "G") and Electrical
{Exhibit "H").
'" Plus twenty cents per mile - round trip - city hall to site
G. REINSPECTION FEE (Sec. 304-i): $20.00
plus twenty cents per mile-round trip-city hall to site.
H. SPECIAL INSPECTOR FEE (Sec. 305):
Examination
Registration
$10.00
$10.00 per year
I. HOME' OWNER QUALIFICATION FEE (Sec. 302-a, 3-c):
Examination
Registration
5.00
No Charge
J. EMPLOYEES QUALIFICATION FEE (Sec. 302-a, 3-c):
Examination
Registration
10.00
10.00 per year
Exhibit "D" U)
Resolution No. ":;
Januarv 15 ,1973
Resolution Number
"
.-'
K. SANDBLASTING FEE
I SQUARE YARD
20 Yards or less . . . . , . . . . . . . . . . . . . $4.00
21 Yards to and including 200 Yards . . . . . . . . .04 per sq, yd.
201 Ysrds to and including 1,000 Yards , . . . . . . . .02 per sq. yd.
1,001 Yards and Over . . . . . . . . . . . . . . . . .01 per sq. yd.
Example: Job with 3,200 Sq. Yds.
20 Yds. . . . . . . . . . . . . . . . . . . . . 4.00
21 Yds to 200 Yds. . . . . . . . . . . . . . . . 7.20
201 Yds. to 1,000 Yds. . . . . . . . . . . . . . . . 16.00
1,001 Yds. to 3,200 Yds. . . . . . . . . . . . . . 22.00
Total fee $49.20
L, TENT FEE
Up to 1,000 sq. ft. $15.00
Each 1,000 sq. ft. or fraction thereof over 1,000 sq. ft. 5.00
M. SWIMMING POOL FEE
Fee based on valuation, Exhibit "A"
1 Valuation:
Commercial, Institutional or Social Organization -
$2,800 + $5.00 per sq. ft. See Exhibit A
Residential Private - $1400 + $550 for heater +
$5.00 per sq. ft. See Exhibit A
N. COPY OF BUILDING CODE ORDINANCE $3.00
I
Exhibit "D" (4)
Resolution No.
January 15, 1973
Resolution Nu~er,
.'
EXHIBIT "E"
PLUMBING PERMIT & PLAN CHECK FEES
PERMIT FEE .
. .
$3.00
I
2.
3.
4.
5 .
6.
7.
8.
9.
1 10.
11.
In addition:
1. For each ~1umbing fixture or trap or set of fixtures
on one trap (including water, drainage piping and
backflow protection therefor)
2.00
For each building sewer
6.50
For each cesspool
6.50
For each private sewage disposal system
12.00
For each pre-investigation of private sewage disposal
system . . .
12.00
For each water heater and/or vent
2.00
For each gas piping system of one (1) to five (5)
outlets . . . . . . . . .
For each gas piping s:ystem of six (6) or more outlets,
per outlet . . . .
Rainwater systems - per drain
2.00
0.50
2.50
For each industrial waste pre-treatment interceptor,
including its trap and vent, excepting kitchen type
grease interceptors functioning as fixture traps. . .
2.00
For installation, alteration, or repair of water
piping and/or water treating equipment (including
water softeners) .. . . .
2.00
12. For repair or alteration of drainage or vent piping
2.00
13. For each residential lawn sprinkler system on anyone
meter including backflow protection devices therefor.
3.00
14. For each commercial (non-residential) lawn, gardening,
or landscape sprinkling system including backflow
protection devices therefor - each head, backflow
device and valve .. ...... ...
2.10
15. For vacuum breakers or backflow protective devices on
tanks, vats, etc., or for installation on unprotected
plumbing fixtures including necessary water piping:
I
16.
One (1) to five (5) each.
3.00
Over five (5), each additional.
0.50
Temporary gas service .
10.00
. .
17. Temporary work-with gas service (occupied residential).
5.00
18. Temporary work-with gas service (occupied commercial) .
10.00
EXHIBIT "E"
Resolution No.
Januarv l~
19l1.
1
1
I
'.'
Resolution Numbe+ ,
19. Inspections for which no fee is herein provided
(valuation of each additional $1,000) . . . .
plus, for each additional $1,000 valuation or part
thereof . . . . . . . ., ..
20. Inspections or investigations for which no fee is
herein provided, per hour. . . .
21. Minimum charge, per half hour or less
22. For each gas pressure regulator
23.
Swimming pool piping
. .
24. Replace piping, filter, heater or miscellaneous
replacement - swimming pool - each. .
25. Annual maintenance permit.
26. Relocated Residential Buildings (one or two family
dwellings):
Pre-lowering inspection . . . .
Building inspection, per square foot.
Garage, carport, detached or attached on same
service, per square foot. "
27. Relocate Other Buildings:
Pre-lowering inspection
Building inspection.. See Exhibit "D"
$ 2.10
12.00
6.00
0.30
3.00
2.50
25.00
5.25
0.0125
0.005
1,0.00
;
Exhibit "E" (2)
Resolution No. 65j
January .l:..~ 197..1...
1
1
I
Resolution N~er
PLAN' 'CHECK FEE
1. Lar~e Installations. For plan checking systems where
work involves fixtures that discharge more than 180
waste fixtures units:
A. Complete project:
(All systems except fire sprinkler, irrigation
sprinkler and swimming pool piping.)
(1) Apartment buildings, three stories and lower.
(a) 15% of the permit fee.
(2) All other buildings.
(a) 50% of the permit fee.
B. Individual systems.
(1) Potable water and standpipe systems only:
(a) 9% of the permit fee ( A(l) above.)
30% of the permit fee ( A(2) above.)
Minimum fee . . . . . . . . . . . . .
(2) Conventional waste and vent systems only:
(8) 6% of the permit fee ( A(l) above.)
25% of the permit fee ( A(2) above.)
Minimum fee . . . . . . . . . . . . .
(3) All other systems:
(a) Fee shall be as shown in subsection 2 below.
2. Other Installations. For plan checking individual systems
not included in plans listed under subsection 1 above.
A. Building sewers, each system. . . . . . .
. .
$10.50
8.00
10.50
B. Combination waste and vent piping systems, each system 8.00
C. Drainage sumps and ejectors, each system. 10.50
D. Dry standpipes, each building 10.50
E. Fuel gas piping systems. . . . 8.00
F. Potable water piping systems:
(1)
Where building supply is one and one-half
inches or less, each building. . . . . . .
(2)
Apartment buildings three stories and less
in height where buildings supply is two
inches or larger, each building. . . . . .
. . .
10.50
16.00
Exhibit "E" (3)
Resolution No. ~
.January 2, 19.1.3.
Resolution Number
'.. ..'
" '
(3) All other systems, where building
supply is two inches or larger, each
building . . . . . . .
$21.00
I
:G~ Water heater vents, each system
lO.50
H. Plan check fee for alterations to approved
plans, . . Value of change.
I. Minimum charge, per half hour or less
6.30
1
1
EXHIBIT "E" (4)
Resolution No__
Januarv a. 191.L
I
I
Resolution N1,1mb!,!r,
'"
" ,
EXHIBIT "F"
AUTOMATIC FIRE EXTINGUISHING SYSTEM PERMIT & PLAN CHECK FEES
PERMIT FEE . .
. . . . . . . . . . . . . . . . . . . . .
I
In addition:
1. Stand pipes, wet or dry (each outlet)
. . . . . . . .
2. Fire sprinkler piping removal, or alterations, or the
replacement of valves, attachments. . . . . . . .
3. Underground fire sprinkler piping, or yard piping
system (when permit fee has not been obtained for
complete fire sprinkler system) . . . . . . ...
4. Fire sprinkler piping installation:
From 1 to 10 fire sprinkler heads
From 11 to 25 fire sprinkler heads
From 26 to 50 fire sprinkler heads
From 51 to 100 fire sprinkler heads.
From 101 to 200 fire sprinkler heads
From~201 to 300 fire sprinkler heads
From 301 to 500 fire sprinkler heads
From 501 to 1000 fire sprinkler heads.
From 1001 to 2000 fire sprinkler heads
From 2001 to 3000 fire sprinkler heads
From 3001 to 4000 fire sprinkler heads
From 4001 to 5000 fire sprinkler heads
From 5001 fire sprinkler heads
5 .
Original test of fire pump. .
PLAN CHECK FEE
1. Fire Sprinklers:
A. Each building (including unde~ground piping)
(1) One (1) through 500 heads:
(a) .When no hydraulic calculations are
required to be submitted, 25% of
permit fee, $8.00 minimum.
(b) When hydraulic calculations are required,
50% of permit fee, $26.00 minimum.
(2) 501 heads and over, 50% of permit fee.
B. Underground piping when not part of a sprinkler
plan, each system. .. ..'. '0'
C. Carbon-dioxide system, each building.
$3.00
3.00
7.50
21.00
8.50
15.00
25.00
42.00
71.00
100.00
146.00
210.00
314.00
420.00
525.00
630.00
735.00
79.00
$10.50
26.00
,/ Exhibit "F"
Resolution No.
.1!11,'u'Sl7 ~, 1~
Resolution NUmQer
','
" '
EXHIBIT "G"
PERMIT FEE------------------------------------------------------------------ $ 3.00
I
I
1
MECHANICAL PERMIT & PLAN CHECK FEES
In addition:
1. Up to and including 100,000 BTU for the installation or
relocation of each forced-air or gravity type furnace or
burner, including ducts and vents attached to such appliance
,.
2. MOre,than 100,000 BTU to and including 500,000 BTU-----------------
3. MOre than 500,000 BTU to and including 1,000,000 BTN---------------,
4. More than 1,000,000 BTU to and including 2,000,000 BTU-------------
5. MOre than 2,000,000 BTU--------------------------------------------
6. For the installation or relocation of each floor furnace
including vent-----------------------------------------------------
7. For the installation or relocation of each suspended heater,
recessed wall'heater or floor mounted unit heater including
vents--------------------------------------------------------------
8. For the installation, relocation, or replacement of each
appliance vent installed and not included in an appliance
permit-------------------------------------------------------______
9. For the repair of, alteration of, or addition to each heating
appliance, refrigeration unit, comfort cooling unit,
absorption unit, or each comfort heating, cooling, absorption,
controls and registers regulated by this code----------------------
10. For the installation or relocation of each boiler or compressor
and including five horsepower, or each absorption system to and
including 100,000 BTU's (including vent)---------------------------
ll. For the installation or relocation of eaeh boiler or compressor
over five horsepower to an including 15 horsepower, or each
absorption system over 100,000 BTU's to and including 500,000
BTU's (including vent)---------------------------------------------
12. For the installation or relocation of each boiler or compressor
over 15 horsepower to and including 30 horsepower, or each
absorption system over 500,000 BTU's to and including
1,000,000 BTU's (including vent)-----------------------------------
13. For the installation or relocation of each boiler or compressor
over 30 horsepower to an including 50 horsepower, or each
absorption system over 1,000,000 BTU's to and including
2,000,000 BTU's (including vent------------------------------------
14. For the installation or relocation of each boiler or
refrigeration compressor over 50 horsepower. or each
absorption system over 2,000,000 BTU's (including vent)------------
5.00
8.00
10.50
16.00
26/00
5.00
5.00
2.00
5.00
5.00
8.50
12.50
19.00
31.00
15. For each air handling unit to and including 2,000 cubic
feet per minute, including ducts attached thereto------------------ 2(00
Exhibit "G"
Resolution No. ~~,
Januarv 15 ,1973
Resolution ~umber '
, ,
. '
16. For each air handling unit over 2,000 cubic feet per \Ilinute
and including 10,000 cubic feet per minute. including
ducts attached thereto------------------------------------------
17. For each air handling unit over 10,000 cubic feet per
minute----------------------------------------------------------
I
18. For each evaporative cooler other than portable type
(commercial)----------------------------------------------------
19. For each ventilating fan connected to a single duct
(commercial)----------------------------------------------------
20. For each ventilation system which is not a portion of any
heating or air conditioning syatem authorized by a permit
(commercial)----------------------------------------------------
21. For the installation of each hood which is served by
mechanical exhaust, including the fans and ducts attached
thereto---------------------------------------------------------
22.
23.
24.
I 25.
26.
27.,
I
For the installation or relocation of each domestic type
incinerator-----------------------------------------------------
For the installation or relocation of each commercial or
industrial type incinerator-------------------------------------
For each appliance or piece of equipment regulated by this
Code, but not elassed in other appliance categories or for
which no other fee is listed in this Code-----------------------
Incidental gas piping-------------------------------------------
Annual maintenance permit fee-----------------------------------
Relocated Residential Buildings (one or two family dwelling):
Pre-lowering inspection--------------------------------------
Building inspection, per square foot--------------------
Garage, carport, detached or attached on same service,
per square foot----------------------------------------------
28. Relocate Other Buildings:
Pre-lowering inspection--------------------------------------
Building inspection (See Exhibit "D")
PLAN CHECK FEE
A. Fifty per cent (SOX) of the Mechanical Permit Fee for the following:
1. Any group A, B, C, D, or E occupancy.
2,. New buildings having an aggregate floor area of 15,00 square
feet and over.
3. Installations other than those listed in 1 and 2 above, where
the aggregate BTU input capacity is 350,000 BTU's and over for
comfort heating, or an aggregate of 25 hoursepower and over for
comfort cooling, or an aggregate of 350,000 BTU input capacity
and over for absorption units.
B. Plan Check Fee for alterations to approved plans, per hour-------
C. Minimum charge, per half hour or less
Exhibit I'G" (2)
Resolution No. ' '
Jlinuary"l ~', 1973
5lOO
10.50
4.00
3.00
4.00
5.00
10.50
42.00
4.00
1. 75
25.00
5.25
0.0125
0.005
10.00
12.50
6.00
J
~
\
I
~
~
'.
Resolution Nu~er
- -
~XHIBIT "H"
ELECTRICAL PERMIT & PLAN CHECK FEES
A. New Construction
1. Residential (Single or Multi-family): Fees listed
hereinbelow for n'ew construction include, when this
formula is applied to the square footage area of the
building, all electrical installations:
(a) One and one-half cents (l~~) per square foot, plus
$3 on a single family residence and $5 on a multi-
family residence for each service meter, plus $3 for
permit issuance. Also see Plan Check Fee Schedule
for multi-family "H" occupancy buildings.
(b) One cent (l~) per square foot for detached or
attached garages or carports on the same service.
(c) Additional $1.25 for each room where electrical
radiant heating is installed.
(d) Where service, conduit, cable, or wire is installed,
the additional fee for each service connection shall
be: Underground - $5.00 Overhead - $10.00
2. Hotels and Motels: Use regular fee schedule in Subsection C
below for all areas except garages or carports.
(a) Regarding garages or carports, one-half cent (~t) per
square foot for detached or attached garages or car-
ports on the same service shall be charged for hotel
and motel occupancies.
3. Commercial, Industrial and Assembly Occupancies: Use
regular fee schedule in Subsection C below.
4. Non-domestic electrical installations on H and I
occupancies shall use fee schedule in Subsection C below.
B. Alterations, repairs or improvements: Use regular fee
schedule in Subsection C below.
C. Regular Fee Schedule: Minimum permit issuance fee of ,$3,
plus $5 for each service meter on permit, plus fees as listed
below for specific installations.
1. Each self-contained factory wired laboratory approved
unit such as cooking appliances, ho~e appliances, heaters,
vegetable cases, drinking fountains, heating appliances, etc.
COOKING APPLIANCES
For each electric range (standard) .
For each electric range (commerial).
For cooking unit with oven (domesttc built-in)
For each additional oven or cooking unit (domestic).
For ovens (commercial) not over 20,000 W . . . .
For each fry kettle, toaster, waffle iron, coffee
maker or cooking device . . .
$2.00
5.25
2.00
2.00
5.25
2.00
EXHIBIT "H" (1)
Resolution No.
January - ~,
~ J~
19~
Resolution Number
HEATER AND HEATING APPLIANCES - HAIR DRYERS:
I
For each air heater .
For each water heater
For each hair dryer .
For drying units infra-red or
not over 20 KW
For drying units infra-red or
over 20 KW
For kilns .
$5.25
5.25
5.25
resistance,
5.25
resistance,
. .
10.50
10.50
HOME APPLIANCES
Clothes dryers, each
Dishwashers, each.
Furnaces, each. .
Garbage disposals, each
Kitchen fans, each. .
2.00
2.00
5.25
2.00
2.00
MISCELLANEOUS
For
each moving picture machine, including
sound equipment used in connection
therewith . . . .
each ceiling fan
other permanently connected fans with a
motor of not more than 1/2 HP
each X-Ray machine.
each sterilizer .
each dental unit.
each capacitor over 5 KVA cap
each seli-contained vegetable and meat
case
each
each
each
each
each
5.25
5.25
For
For
.1
For
For
For
For
For
5.25
10.50
10.50
10.50
5.25
. .
5.25
5.25
5.25
5.25
2.00
5.25
For
For
For
For
For
deep-freeze box ..
beverage or ice cream cabinet.
showcase with lights . ..
hot water heater (domestic).
hot water heater (commercial).
2. Radiant ceiling heat per room. . .
1. 30
3.
Fixtures:
First 20 fixtures, each. . .
Each additional fixture .
Each mercury vapor fixture on
Each additional mercury vapor
same pole.
pole.
fixture on the
0.25
0.12
1. 25
. .
0.25
4. Power Apparatus:
Generators, motors, transformers, rectifiers, '
sychronous converters, capacitors, industrial
heating, cooking or baking equipment, and other
apparatus as follows:
,I
EXHIBIT "H" (2)
Resolution No. 'M'
January 15" 1973
"
1
1
,.
.
Resolution Number
"
...:
Rating in horsepower (HP), kilowatts (KW) ,
or kilovolt amps (KVA)
Up to and including 1, each.
Over 1 and not over 10, each
Over 10 and not over 50, each
Over 50 and not over 100, each
Over 100 and not over 500, each
Over 500, each. .
$1. 25
3.00
5.25
10.50
15.75
26.00
These fees include all switches, circuit breakers,
contactors, relays, and other directly related
control equipment. For each motor-generator set
or frequency changer, the fee shall be 100% greater
from the motor alone.
5. Outlets:
First 20 outlets, each. .
Each additional outlet
Each 5 feet or fraction thereof of multiple outlet
assembly . . .
Each multiple appliance outlet assembly
. .
0.25
0.12
0.12
1. 25
. "
6.
Signs and High Potential Gas Tube Lighting:
One sign and one transformer
Each additional sign and one transformer at the
same location (same building) . . .
Each extra transformer, flasher or time clock
Each additional sign and one transformer on
same lot . . . .
Each sign and one transformer moved to new location
Each additional sign and transformer moved to the
same new location .
For altering or changing letters of an existing
sign . .
For converting of each sign or decorative outlet
tubing.
1. 25
8.00
4.00
1. 25
2.50
2.50
1. 25
1. 25
7. Lamp Holding Devices Used on Sign or Marquees:
First 20, each
Next 100, each
Each additional
0.06
0.03
0.01
8.
Temporary Service:
Temporary electrical service (each meter) .
Temporary work-with service (occupied residential,
each meter) . ...
Temporary work-with service (occupied commercial,
each meter) .. ..
For services supplying a temporary power pole,
pedestal, or piggyback
For a system of distribution and utilization
poles for temporary construction power, each
pole. .. . . .
3.00
26.00
10.50
15.75
5.25
Temporary Construction Lighting:
500 lamps or less
Over 500 lamps .
. ..
2.00
4.00
EXHIBIT "H" (3)
Resolution No.
January ~5" 1973
Resolution Number
.
. . . .
$1. 25
11.
10. Each Time Clock.
. .
I
117.
18.
Relocated Residential Buildings:
Pre-lowering inspection . . .
Building inspection, per square foot
Garage, carport, detached or attached on same
service, per square foot.
5.00
0.0125
0.005
12. Relocated Other Buildings:
Pre-lowering inspection
Building inspection See Exhibit "D"
5.25
13. Underfloor duct and cellular floors, each 100 feet
or fraction thereof. .. . .
5.25
14.
Busways:
For tralley and plug-in type busways, each 100
feet or fraction thereof .
5.25
15. Annual Maintenance Permit Fee
26.00
16.
Switchboard Changes or
600 volt or less
First section .
Each additional
Over 600 volts
First section .
Each additional
Additions:
section.
10.50
7.25
. . .
21.00
10.50
section
Swimming Pool:
Fees for underground raceway
. .
2.00
. .
Special Equipment Inspection:
For equipment exempt from laboratory approval, at
applicant's request, at rate per hour of
Minimum
10.50
21. 00
PLAN CHECK FEES
A. A plan check fee shall be paid at the time of submitting plans on
Group'A to A occupancies to include revisions, alterations. and
additions, also, on pre-fabs or special contruction for Group I
and J occupancies, or as requred.
I
1. Plan checking fees shall be equal to fifty per
cent (50%) of the total electrical permit fees,
provided, however, the minimum fee shall be
15.75
2. Plan check fee for alterations or revisions to
approved plan, per hour. .
12.50
3. Minimum charge per half hour or less
6.25
4. If cost of checking plans exceeds fees paid, a
charge shall be made per hour of .
12.50
5. Inspections for which no fee is herein prescribed:
Each inspection, per hour . .
Minimum charge, per half hour or less . . .
12.50
6.30
EXHIBIT "H" (4)
January 15" 1973
I
I
~
I
Resolution N~ber
"
,
. '
B. A fee of $25 shall be paid for each annual electric permit
at the time such permit is issued. Fees for all new work
installed under such permit since date of previous inspec-
tion shall be paid, according to the above schedule, at
the time when such work is inspected; these fees shall be
in addition to fee paid at time when annual permit is
issued.
EXHIBIT "H" (5)
January l:fi, 1973