SUBJECT: APPROVAL OF SPECIFICATIONS FOR ANNUAL
CONCRETE REPAIR PROGRAM PROJECT No.
ST0806
SUMMARY OF REQUEST:
The City Council is asked to consider a request to approve the specifications for
the Annual Concrete Repair Program No. STOB06 and allow staff to solicit bids.
BACKGROUND:
e
The annual concrete repair program is a project that repairs sidewalk, curb &
gutter, driveways, handicap access ramps and alley aprons damaged by city
trees, cracks or old age.
Through the year, staff complies a list of areas in need of repair that is created by
residential concerns or in the field observations. Over 160 locations have been
identified for repair. Actual quantities will be adjusted based on the bid results to
match the budget.
Engineering staff has prepared the bid documents which has been approved by
the City Engineer and is ready for bidding. The bid documents are available for
review in the City Engineer's office.
FINANCIAL IMPACT:
In the approved 2007/08 budget, Measure M and General Funds are allocated
for Project No. ST0806 in the amount of $100,000. The engineer's estimate for
the construction is $90,000.
e
Fundina
Measure M
General Fund
Total
$50,000
$50.000
$100,000
Agenda Item S
e
Exoenses
Construction $90,000
Continaencv $10,000
Total $100,000
Locations and quantities will be based upon actual bid prices.
RECOMMENDATION:
It is recommended the City Council adopt Resolution No. approving the
specifications for the annual concrete repair program and authorizing staff to
solicit bids.
NOTED AND APPROVED:
~ -
Dav=-rmany,bity Manager
Vince Mastrosi one
Director of Public Works
Attachments:
A. List of Address of Work
B. Resolution
e
e
e
#
LOCATION
SIDEWALK
REPLACEMENT
(SF)
REMOVE
PARKWAYISOD
INSTALLATION
(SF)
CURB &
GUTTER
(SF)
e
1 207 10th St 50
2 225 10th St 180
3 31310th 50
4 325 10th St 50
5 1010 Central Ave 50
6 1104 Central Ave 50
7 129 11th St 50
8 201 11th St (Central side) 50
9 322 11th St 50
10 1008 Ocean 50
11 1112 Ocean 27
12 1000 Ocean 50
13 249 17th 50
14 22517th 50
15 25817th 50
16 31517th 50
17 235 17th 100
18 247 17th 100
19 250 17th 100
20 309 17th 150
21 241 17th 50
22 244 17th 150
23 255 17th 50
24 260 17th 50
25 220 16th 50
26 228 16th 50
27 234 16th 50
28 303 16th 50
29 31916th 50
30 326 16th 50
31 250 16th 100
32 21816th 100
33 1349 Electric 50
34 1349 Electric (14th St side) 100
35 1615 Electric (17th St side) 100
36 1 000 EI ectrlc 100
37 1103 Electric 50
38 1201 Electric 50
39 1310 Electric 50
40 1203 Electric 100
41 1007 Electric 50
42 1210 Electric 100
43 1219 Electric 50
44 1301 Electric 50
45 1507 Electric (40 ft) 50
46 1515 Electric (16th SI. Side) 50
47 1615 Electric (17th SI. Side 3) 50
e
e REMOVE
SIDEWALK PARKWAY/SOD CURB &
REPLACEMENT INSTALLATION GUTTER
# LOCATION (SF) (SF) (SF)
48 128 13th 5t 50
49 152 13th 5t 50
50 219 13th 5t 50
51 312 13th 5t 50
52 31813th5t 50
53 343 13th St 50
54 1501 Land I 50
55 1702 landi 50
56 124 14th 5t 50
57 21414th 5t 50
58 221 14th 5t 50
59 225 14th 5t 50
60 228 14th 5t 50
61 229 14th 5t 50
62 302 14th 5t 50
63 305 14th 5t 50
64 307 14th 5t (2 spots) 50
65 314 14th 5t 50
66 117 Dol hin 50
67 121 Dol hin 50
e 68 123 Dol hln 50
69 125 Dol hln 50
70 128 Dolphin 50
71 129 Dolphin 50
72 134 Dolphin 50
73 138 Dolphin (Electric side 50
74 1527 Marine 50
75 225 10th 5t 50
76 14810th 5t
77
78
79
80
81
82
83
84
TOTAL 5039 100 725
e
e
RESOLUTION NUMBER
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL
BEACH APPROVING THE PLANS AND SPECIFICATIONS FOR
THE FISCAL YEAR 07/08 ANNUAL CONCRETE REPAIR
PROGRAM PROJECT No. ST0806
WHEREAS, The City of Seal Beach desires to repair concrete sidewalk, CLJro
and gutter, and
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH
DOES HEREBY RESOLVE:
Section 1. Approves the Plans and Speclfica~ons for the Fiscal Year 07/08
Annual Concrete Repair Program Project No ST080S.
Section 2. Directs the City Manager to advertise the project for competitive
bidding under the rules and regulations of the Seal Beach City Charter.
PASSED, APPROVED and ADOPTED by the City Council of the City of Seal
Beach at a regular meeting held on the 14th day of ADril . 2008 by
the following vote:
AYES: Councllmember
NOES: Councllmember
ABSENT: Council member
. ABSTAIN: Council member
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA }
COUNTY OF ORANGE } SS
CITY OF SEAL BEACH }
I, Linda Devine, City Clerk of the City of Seal Beach, Callfomla, do hereby certify
that the foregoing resolution Is the original copy of ResollIllon Number _ on
file In the office of the City Clerk, passed, approved, and adopted by the City
Council of the City of Seal Beach at a regular meeting held on the 14th day
of Apnl , 2008.
.
City Clerk