HomeMy WebLinkAboutCC Min 1999-03-02
3-2-99
Seal Beach, California
March 2, 1999
The City Council of the City of Seal Beach met in regular
adjourned session at 4:03 p.m. with Mayor Yost calling the
meeting to order with the Salute to the Flag.
ROLL CALL
Present:
I
Mayor Yost
Councilmembers Boyd, Campbell, Doane, Snow
Absent: None
Also present: Mr. Till, City Manager
Mrs. Yeo, City Clerk
As requested by Mayor Yost, the consensus of the Council was
to allow public comments during the workshop session.
AGENDA AMENDED
Boyd moved, second by Campbell, to amend the agenda to
include Public Comments.
AYES:
NOES:
Boyd, Campbell, Doane, Snow, Yost
None Motion carried
COUNCIL STUDY SESSION - 1999/2000 PRIORITIES
Mayor Yost explained that the purpose of this session is to
discuss priorities, the members of the City Council to bring
forth no more than five issues for the purpose of
consideration.
I
The priorities of Mayor Yost were:
* Infrastructure - sewer, water, streets~
* Water Quality / San Gabriel River - allocate
staff time and resources, also an oversight
committee to add more broad based support~
* Treatment of the City entrance at the
corner of 5th and Marina Drive as well as
traffic calming at 4th Street and Central
to avoid increased problems at 5th Street~
* Allocate staff time and resources to make
Marina Drive two lanes and extend the
bike path from the River down Marina
contiguous with the southbound lane,
similar to what is believed Councilman
Boyd is planning to do from Surfside, for a
continuous regional bike path.
The priorities of Councilman Boyd,
were:
*
specific to District One,
*
Repair of sidewalk, curb and gutter damage
throughout Old Town~
Rehabilitation of two specific alleys,
inclusive of sewer and water lines - Main
Street/10th Street and 15th/16th Street~
Seal Beach Boulevard Rehab - storm drains,
curbs, sidewalks, gutters, parkway, street
median - between Electric and Pacific
Coast Highway~
Bike path from Surfside Colony entrance to
Seal Beach Boulevard and Electric~
Securing County, State, and Federal funds
I
*
*
*
3-2-99
for beach cleanup and shoreline protection
in conjunction with continuing lobbying
efforts.
I
councilman Doane noted that his constituents read in the news
that based upon the financial projections of the City Manager
nothing can be done about the utility users tax until the
year 2001, their comments were that they elected him to do
something about the utility users tax:
* He would be making some suggestions with
regard to a goal to reduce the utility users
tax.
Councilman Snow said his issues would likely overlap the
suggestions of others:
* Flood Control;
* Sewer System Master Plan;
* Privatization/Alternatives;
* Pavement Plan implementation;
* San Gabriel River pollution.
I
Councilman Snow said he can not understand why the Department
of Water and Power has not sold its acreage to the City of
Seal Beach, and why it can not be developed.
It was explained that the City has an adopted Specific Plan
for that land, someone would have to buy the site, provide
seven acres of open space and develop three acres. As to the
issue of asbestos on the property, it was explained that the
site was cleaned of asbestos years ago. Councilman Snow
mentioned that the DWP is one of the worst to work with, in
view of their financial problems, initially reported as a
$4.5 billion deficit, now raised to $7 billion, they have
problems with several cities such as Anaheim, Glendale,
Pasadena, to name a few, it would seem they would want to rid
themselves of that property, they are not even producing
power at the Haynes plant.
The priorities of Councilmember Campbell were:
* Regrade Lampson near the curve;
* Repaving of streets in College Park East,
especially the cul-de-sacs;
* Park equipment for Bluebell Park;
* Block wall by the Navy golf course removed
from WestEd east to parkwood - cleaned
and landscaped;
* Remove block wall from the end of the Bixby
property to the WestEd building and
landscape area - issues four and five could
be combined.
I
Mayor Yost suggested that possibly the biggest issue should
be discussed first, that being infrastructure, except for the
issue brought forth by Councilman Doane. Councilman Doane
said his intent is to talk about things to help meet the
infrastructure need. It was mentioned that there has been a
consensus of the Council to devote resources of the City to
work on infrastructure problems, also, there needs to be
sufficient revenue sources in order to reduce the utility
tax.
Councilman Doane said he wished to address the issue of
increasing revenues. He suggested that the Council should
not just bring forth things that are needed, the City needs a
lot of things, in fact the approach to this is very
conservative, this should tie into financial availability and
3-2-99
be reflected in the preliminary financial reports which are
prior to development of the budget. One of the things he
looked for however did not see in the Manager's financial
report was reflected in an article in the News Enterprise by
Stan Anderson, Mr. Anderson referred to a number of things on
Main Street that ties into the priorities mentioned,
sidewalks, etc., also mentions something that he too has been
anxious to see, that is parking meters, which has now been
initiated. Councilman Doane said he wants meters on the
entire Main Street and the beach portion of Ocean Avenue,
this is the only City from Shell Beach south that does not
have meters. He said metering the'off-Main lots is just a
start, it is understood that the Main/10th Street parking lot
was paid for through the use of parking meters, after the lot
was paid the meters were removed, they were not taken out
because of failure, they were put in for a purpose, removed
when the goal was met. Councilman Doane said what is being
done now is just a token, saying after every available space
on Main is filled the people can pay to park, his opinion was
that no one will pay as long as there is parking available on
Main Street, and that will not alleviate the problem. He
mentioned sitting at the front window of a local restaurant a
few years ago watching the people, they parked, took their
surfboards and beach gear to the beach, then came back to
remove their car or the chalk marks, at that time he was
urging people to shop locally, which he is doing again, some
people were supportive, some complained that they could not
find parking. He made reference to the Zucker study for
downtown that makes the statement that there is not a parking
shortage, rather, there is a parking management problem, an
observation that he believes still exists. Councilman Doane
again expressed his belief that parking meters should be
installed on Main Street and in the beach parking lots, beach
goers would then not park in the 200 and 300 blocks of Main
Street and take away spaces that could be used by the
business and restaurant customers, they would use the beach
parking lots, that would also eliminate the need for manned
booths into the beach lots, the current rates for the beach
lots are high, they should be more flexible, tokens could be
sold to the merchants at half price for them to distribute to
their customers, his belief is that the businesses are in
support. Councilman Doane recalled that he and former
Councilmember Forsythe visited Huntington Beach, looked at
their computerized system for the lots, the staff was helpful
in answering questions, it is certain they would do so again,
one of the concerns was what potential impact of meters on
Main Street would have on adjoining streets where people
would park for free instead of paying a meter, Huntington
Beach deals with that by means of permit parking, in the case
of this City the permit costs would need to be palatable,
provision for temporary permits for guests, there may be
problems but there are also solutions. He noted having
hosted the Rick Paap Show where one guest spoke for meters on
Main Street, one spoke against, another reviewed the past
history. Councilman Doane suggested that the additional
revenue derived from the installation of the meters then be
placed in a separate fund dedicated to the problems of
downtown, this is the oldest part of the City, the
infrastructure, the sewer and water lines are in need of
repair or replacement, alley reconstruction, that in turn
would free money to be used in other parts of the City.
Councilmember Campbell agreed that any money realized from
parking meters should stay in Old Town. Ms. Sue Corbin
claimed that the lots off the 300 block were both empty
today, pushing the parking down Electric, resident parking is
I
I
I
I
I
I
3-2-99
becoming business parking which was not to have happened with
the in-lieu parking program, the patrons and employees then
park on the residential areas, resident parking was not
supposed to be for businesses. The Mayor asked what the
revenue is from the new metered lots, to that the Manager
reported it was about $2,660 for the first eight days, around
$300 per day for the seventy-five meters, that with a
holiday, however there were a number of citations written.
Mr. Stan Anderson, Balboa Drive, said he has spoken with both
Councilmembers Doane and Boyd regarding these issues, he also
walked College Park East recently to observe some of their
problems, noting specifically the cul-de-sac areas, showing
that problems are shared throughout the community. He said
he too has had some complaints regarding meters however it
will take some time to work out the problems and let people
get used to them, at this point it appears to be a win
situation where the monies from meters can be retained for
Old Town repairs and free the General Fund for other
infrastructure needs in the community, also, as in other
cities, there may be some flexibility of lowering the meter
rates during off-seasons. He expressed his opinion that
unless Main Street and the beach lots are metered it will be
difficult to have consistency as people will park wherever
they can for free, urging that metering Main Street be
considered and the revenues be used for improvements,
reconstruct the street and bring the curbs back to where they
once were as an example. He added to a comment of Councilman
Doane that a day does not go by that there is not a problem
with the Main Street sidewalks, acknowledging however that no
one really wants meters, yet parking has been free for many
years, meters are fair and are a means of obtaining revenues
to accomplish other things, and there are merchants that have
lost customers because their patrons have been unable to find
parking, this then would help those merchants as well. Ms.
Corbin suggested a citizens committee to look into grants,
there is not staff available to do that but staff could
oversee, to which the Mayor responded that the City is
already doing that, Seal Beach Boulevard, sidewalks, curb
cuts, etc. are examples.
The City Manager mentioned that the Director of Public Works
attended an Orange County Transit Authority meeting last
week, Seal Beach was in the competition with other cities for
grant monies, and was awarded $150,000 for fibre optics for
traffic signals. Councilmember Campbell noted the comment of
Mr. Anderson with regard to the rates being consistent, her
preference would be that they be consistent year round, that
the beach lots be metered as well, stating that no one is
going to pay $6 when they can park elsewhere for less, if the
beach lots are the same rate as Main Street the beach goers
will opt for the beach lots. Councilman Boyd inquired as to
the current rate in the beach lots, his belief is that they
are not a $6 flat rate rather $1 an hour, the same as
metering those lots, in the winter the rates are reduced, he
would not be opposed to opening the beach lots in the winter
at 6:00 or 7:00 p.m. for free rather than manning them until
8:00 p.m. at a rate of $2, in his opinion putting meters in
the beach lots would defeat the purpose since the rates are
equal to what is currently being done, what should be
monitored is the cost of staffing the booth as an equivalent
over possibly a five year period to meters, meters in a beach
environment where they have exposure t9 the salt air will
last three years at best, and cited an example of the rusted
out meters along the cliffs on Pacific Coast Highway before
Go1denwest Street, they are three years old. Councilman Boyd
3-2-99
said he has not come to a conclusion with regard to meters on
Main Street as yet, however the need for additional revenue
is known and he would support those revenues remaining in the
downtown district, it is known also that the purchase of the
off-Main lot was made possible by the revenue generated from
the parking meters, that was a policy decision of that
Council as they could have bought the land, built upon it, I
sold the building or whatever. He noted that the day the
meters were installed in the off-Main lots they were empty,
before that they were full, the merchants were the ones
displaced by putting in meters, his response to some business
people is that the City is not here to provide merchant
parking, the parking is for customers and visitors, their
concern as a merchant should be customer parking not
convenient employee parking. Maintaining those lots for
parking is a policy decision of the Council, the lots are
land owned by the City, the decision has been made that they
remain parking lots, the land could have been sold or built
upon to generate revenue, a policy decision also to meter the
lots and make them revenue generating. Seal Beach may be the
only city in Orange County without meters on its main street
or beach access areas. Councilman Boyd said his thinking is
that there is no alternative use of the streets, revenue can
not be generated from the streets in any other way, it is a
street and will remain so, the parking spaces are not going
to be taken away and turned into patio cafes as has been done
elsewhere. He said before the metering of Main Street is
discussed seriously his belief is that what currently exists
should be evaluated for at least a year, the use monitored
throughout the summer. He noted that what was missed in the
metering program however was the 8th and Central lot, it is I
used at night by Main Street customers and residents, during
the day both City and merchant employees park there by means
of a permit, if metered that program should continue,
currently about twenty-five percent of that lot has parking
spaces available. As to rates he cited Sacramento as an
example, twenty-five cents for twelve minutes, Seal Beach is
twenty-five cents for fifteen minutes, his parking meter
costs for three days was over a hundred dollars, in his
opinion, on those parcels of land that the City owns people
should be required to pay for parking, meters on Main Street
is another issue, people have said they would not support
anyone who approves meters for Main Street, that they will
not pay to park on a public street in their city. He again
suggested a period of time to evaluate the process that has
begun, the parking management plan is not going to be
implemented all at once but in phases with additional data to
consider with each change. Councilmember Campbell asked if
the merchants have been surveyed as to their feelings about
Main Street meters. The City Manager responded that they
have by means of one to one meetings. Councilman Boyd
suggested that the Seal Beach Chamber and Business
Association be requested to do such survey, and Councilmember
Campbell requested that the Council have the opportunity to I
review the survey prior to its distribution. Mr. Anderson
said he believed that there are some merchants that would be
in opposition to Main Street meters right now because they
too were using the free parking in the lots, now they can
not, yet many of the residents he has spoken with are
supportive, his feeling is that some goals need to be set as
to how Seal Beach can be repaired. Mr. Anderson offered his
services to develop a survey, to walk Main Street and some
adjacent residences as well to determine how meters would
impact them. In response to an inquiry, the Mayor described
the exact location of the off-Main lots in the 100 and 300
3-2-99
I
blocks. Councilman Snow noted that the lot in the 300 block
adjacent to the mall has a sign stating 'mall parking only',
to that the Mayor advised that is a private lot and they are
policing the area themselves. To a question of the
involvement of the City of Long Beach, the Manager responded
that they will come into Seal Beach, collect the coins and
maintain the meters for $10,000 per year. Mayor Yost
conveyed appreciation for the input, this somewhat of a pre-
budget session, although discussion is primarily focused on
spending there needs to be thought given to intake as well,
his commitment is to being fiscally responsible.
I
The Mayor pointed out that infrastructure was a high priority
of the Council, to that he mentioned the Pavement Management
Plan recently developed by staff and the prioritization of
future projects, that can be used as an objective measurement
as to what needs to be done first, second, etc. Councilman
Boyd mentioned that the Capital Improvement Program of last
year, covering years 1998 through 2003, proposed the
resurfacing of the beach parking lots in 1999, inquired if it
is still planned that those projects will be done, the cost
for the 8th and 10th Street lots is $50,000 each, the 1st
Street lot is $70,000. He said to him these projects are a
fairly low priority, he would like to delay them for maybe a
year. Councilman Boyd said he walked the area with the tree
committee and identified tree well areas that were in
disrepair or unplanted, new trees were planted and pavers
installed, there are six other locations where the sidewalk,
curb and gutter is extremely damaged and is likely the worst
locations for potential trip and fall incidents, his
preference would be to redesignate the beach lot monies to
Main Street for those repairs. The Mayor said it seemed that
the intent at this meeting was that monies from the parking
meters would be used for some of the downtown/Main Street
problems rather than taking money from other areas or
projects of the City, his understanding was that some of
these projects are part of the Main Street Specific Plan and
contained in budget appropriations. Councilman Boyd noted
that the beach parking lots are all in his district, those
projects budgeted for this year and next, his proposal was if
it is possible to delay those projects, which he understands
they can be, utilize some of those monies now to repair some
of the trip and fall hazards on Main Street, that would be
about $100,000 of work to be commenced in the spring, and
then put the meter revenues back into the resurfacing of the
beach parking lots. The Mayor referred to discussion during
the Pavement Management presentation with regard to the
increase of costs with deferring maintenance, in this case
suggested a report from the City Engineer be forthcoming as
to an assessment of the most cost effective way to deal with
this. Councilman Boyd pointed out that the project consists
of slurry sealing the lots, the City Engineer had said
postponement would be possible however he would need
direction from the Council. Mayor Yost again stated his
preference would be to not reallocate budgeted funds. The
City Manager concurred that this is basically an opening of
the budget process, what he would need as a result of this
meeting would be some direction with regard to staffing
issues, contract professionals, new projects, reprioritized
projects, things that will take additional staff time or
contract people.
I
An approximate five minute recess was called.
3-2-99
The Mayor said he wished to discuss the water quality issue.
Ms. Corbin made the suggestion that if there were dumpsters
on the beach above the mean high tide line it is likely
people would pick up trash and put it in them, the greatest
problem is near the San Gabriel River, if there were plastic
bags to distribute to the fishermen they might pick up their
own debris, the biggest problem is the fishermen and the flow
down the channel. Councilman Doane pointed out that the
storm drains flow into the channel, debris of all types wash
down the storm drains and then into the river. Mayor Yost
noted that water quality was mentioned, to which he asked in
what form would the Council like to have staff put their
energies, Councilman Boyd had mentioned a professional
lobbyist to seek funds, in his personal opinion he felt that
the issue needs to be dealt with at a higher level, one thing
he would like would be a broader based community active
organization, the Environmental Quality Control Board might
be good as far as looking at the heavy metal counts, toxic
counts, raw trash counts, coliform counts, etc., this issue
can probably be dealt with by both groups, his feeling is
that the larger organization needs to take responsibility for
the River and make it nicer, it will likely be an issue that
will be dealt with long term, considering issues such as
discharge from the power plants, water temperature, and it
may be something that will dovetail into the Hellman project
and the wetlands creation to assure they are healthy.
Councilmember Campbell offered that this issue will likely
require an effort on several fronts, should probably be
brought up to the member cities of the Orange Coast
Association to determine what they are doing because at some
point this may require legislation to deal with the cities
upstream. The Santa Ana River is considered to be the
dirtiest river mouth, the San Gabriel the next, possibly
Huntington Beach and Newport should be queried as to what
they are doing with regard to the Santa Ana. The Mayor
mentioned that there are two bills pending in the legislature
at the present time. The Manager said there are groups in
place that are trying to tackle these problems, Seal Beach is
the least equipped to do so, some cities have assigned staff
full time to deal with the Orange County Water District issue
relating to the annexation and Irvine Ranch Water Company,
Seal Beach does its best with a small staff, it is hard, upon
hearing the Council say this is a priority that needs to be
addressed on several fronts, next is the consideration of the
allocation of resources. Councilmember Campbell offered that
if Seal Beach could connect with the efforts of Huntington
Beach, Newport Beach, and Long Beach it would be to the
City's benefit, to that Mayor Yost said he has had some
discussions with representatives of Huntington Beach and Long
Beach thus far. Councilman Boyd noted that Matt Knabe will
be attending the Orange Coast Association luncheon as a guest
of the City. He noted that the Los Angeles Board of
Supervisors provides the City of Long Beach $500,000 annually
for beach cleaning, beach cleaning could be a first victory
in this effort, and to that said he had pointed out to
Supervisor Don Knabe that the flow of the San Gabriel River
empties into Seal Beach not Long Beach, they have the
advantage of the additional length of jetty that protects the
debris from going into Alamitos Bay, it is acknowledged that
they also have the Los Angeles River, yet it is known that
the San Gabriel is the second dirtiest. Councilman Boyd said
his request of the Supervisor was a fixed dollar amount for
the purpose of beach cleaning, it is not believed that the
jetty on the Seal Beach side of the channel will be
lengthened nor will the Alamitos Bay jetty be shortened, said
I
I
I
I
I
I
3-2-99
in his opinion the first step would be to physically remove
the trash from the beach, next would be to prevent debris
from coming down the River, which is probably a legislative
issue. He noted the issues are shoreline protection, sand,
trash on the beach, removal thereof, and water quality, the
sand issue has been accomplished, the next should be removal
of trash from the beach, that will require passage of a
resolution once a dollar figure is established, then
attendance at a Los Angeles Board of Supervisors meeting to
lobby for funds in the public forum. Councilmember Campbell
said it is not just beach cleaning, money is needed for
booms, chemical removal, and Mayor Yost mentioned that booms
were just recently placed in the Los Angeles River, hopefully
the San Gabriel will be next. Councilman Snow noted that
there is a spirit of cooperation with the Sanitation
District, they have studied this issue for years.
Councilmember Campbell stated she does not want someone to
pay for the cleaning of the beach, it needs to be stopped
from being polluted, to that Councilman Boyd said there will
need to be a progression, and the Mayor offered that when
going to the Board of Supervisors it would be helpful to have
a broad based group that is overseeing the beach and cleanup,
they tend to listen more when there are several prominent
people who are traditionally involved in such issues and are
taking responsibility for their beach. The Manager noted the
discussion focus on a grass roots citizen effort, getting
them actively involved and supportive, there could also be a
supportive group that would pursue money and legislation and
long term resolution, which may not be realized for several
years. Councilmember Campbell offered that if something is
not commenced now what will the situation be in five or ten
years. The Manager said he was trying to interpret if the
idea is for staff to reallocate time, tag onto the efforts of
the larger agencies, or, maybe some of that and let a
contract to a firm that would conduct the technical studies
for the City, a lot will involve data collection, that would
involve some costs, also seek data of other agencies. The
Mayor said first phase to him would be getting a
quantification of the problems, the gross volume of trash,
the actual bacteria counts, and levels of heavy metals, those
need to be monitored and more may be needed depending upon
what is found in the River, that is traditionally done by
technical people, possibly that staffing could come through
the EQCB. Councilman Doane mentioned that with the
development of Hellman and Bixby the EQCB will have less to
do therefore possibly their expertise could be utilized for
assistance in lieu of staff time. Councilman Boyd pointed
out that the EQCB primarily holds meetings, the scope of what
they can do is very limited, if there is to be a citizens
committee, define what it is they are to do, give them
written guidelines, otherwise the committee will get
frustrated and walk away as did the prior Beach Commission,
also, it seems there should be a dedicated staff person,
suggesting the Assistant to the City Manager, Mr. Dorsey,
given his years of experience in the Lifeguard Department and
grasp of the beach issues, someone needs to coordinate the
effort on the staff and volunteer level. Councilman Boyd
recommended that a formal request of the Los Angeles Board of
Supervisors be prepared to seek funding, a resolution in
support of any legislation that would support the City's
goal, define what the citizens group is to do and commission
them to do that task, if it is a political task it will be
limited because the Boards of Supervisors for Los Angeles and
Orange Counties will want to hear any requests from the
members of the Council and not a citizens group, their
3-2-99
support of any request of the City is essential but not the
most important issue, that being an organized plan of attack
or strategy to do exactly what is wanted to be done, go after
the first two priorities which, hearing the comments today,
would be to seek funds for the physical cleanup of the beach,
and second would be to substantiate by means of data
collection the levels of bacteria in the River, the water
temperatures, where it flows, and said his understanding is
that former Public Works supervisor Cornwell had kept a
record of the amount of trash collected during the El Nino,
that is the type of data needed to approach the Board of
supervisors for immediate funding, then to approach the
City's representatives to prepare legislation of a bi-
partisan nature, not too liberal or conservative.
Councilmember campbell suggested contacting other beach
cities to see what tactic they are taking and then build upon
it, suggesting too some staff time to determine what has been
done. The Mayor suggested that Mr. Dorsey sit in on the EQCB
meetings as well. The Manager said he wanted to develop a
strategy for this issue and come back to the Council.
Councilman Boyd recommended that the City Manager designate a
staff person for the committee, water quality, shoreline
protection, all phases of this beach/water effort, he will be
the primary contact for all, work with the Mayor and Council
for guidelines for the committee, etc. The Mayor mentioned
that Long Beach has basically done nothing other than place
booms in the L. A. River. Mr. Stan Anderson mentioned that a
primary concern during the last election was the River, noted
the comments with regard to staff time to which he suggested
the use of the telephone, if a blue ribbon committee is
established it will consist of experts, the best resources in
this community, it is important also to utilize the other
cities to establish background data. He agreed with the
importance of beach cleanup, the community of Seal Beach
impacted much more than Long Beach by the San Gabriel, yet
they receive $500,000 for beach cleanup. Mr. Anderson said
he felt that this has been talked about for long enough, his
hopes were that there would have been some answers at this
meeting rather than just questions. The Mayor mentioned that
he has met with the Los Angeles Director of Public Works and
a Supervisor to discuss these issues yet this will not be
something that gets done quickly.
I
I
Mayor Yost noted the mention of bike path priorities,
possibly seek money from outside sources, inquiring if that
would be through Public Works. The Manager offered that
staff could lay the ground work and then it would be up to
the Council. Councilman Boyd said this would not only be for
the Marina Drive path but also Surfside to Seal Beach, the
Council needs to direct the staff to develop some preliminary
engineering drawings and visuals, there has been an
indication by the City's Supervisorial representative that
there may be funding. The Mayor agreed that the response to
him had been similar, it is important to link the paths
together for a regional bike path. Councilman Doane asked if
the greenbelt is presently designated as bike path, the
response was affirmative, therefore the proposed paths would
be linked by means of the greenbelt path, also, serve to
bring more bicycle traffic to Main Street.
I
Mayor Yost mentioned other issues brought forth, block walls,
regrading of the Lampson Avenue curve, and inquired about the
engineering study for same. The Manager mentioned that it
has been found that there are people who have done studies
and analysis of Lampson, before going into an expensive
I
I
I
3-2-99
design plan there needs to be a review of what has been done
in the past, also, the Engineering Department has been asked
to obtain an overview observation type report and design
analysis by an independent outside engineer as to the
conditions and what type of options could be explored by the
City for traffic calming purposes, beautify the area, and
improve conditions overall. The Mayor noted that Almond
Avenue, etc. are part of the overall, prioritized Pavement
Management Plan, to that Councilmember Campbell asked if
there is a perceived commencement of roadway improvements,
the Manager responded that the report provided a time frame.
Councilmember Campbell said she requested an engineering
study because the curve is not graded at all, there are two
sections near Old Ranch that are graded and there has never
been a problem in that area, in her opinion the curve was
never graded because then there could be a drainage problem
in that the water would naturally flow towards the houses.
She noted that money was placed in the budget for an
engineering study, said she wanted that done as soon as
possible to see what is needed, there is a history of deaths
on that street, the block wall will show the many times it
has been repaired, some sections as many as six times. As to
removal of the northerly block wall, asked if any estimates
of cost have been done, to that the Manager responded he
believed those items were included in the Bixby Development
Agreement, funds for removal of the block wall/fence were
thought to be $35,000. As to Bluebell Park, Mayor Yost said
he believed that $1 million from the Bixby project had been
designated for park improvements, etc., to that Councilmember
Campbell reported the equipment is bad, a cover over the
picnic benches must be taken down, an estimate to refurbish
the Park was about $20,000, the Neighborhood Association is
holding a paper drive each month for that purpose however it
is very slow and the desire is to expedite the process, to
that Councilman Boyd referred to Public works Account 49-701
which provides a playground equipment replacement program
with an allocation of $5,000 annually, and pointed out that a
number of things being mentioned are already in the Capital
Improvement budget. The self-help efforts were commended for
improvements in all areas of the community.
Councilman Boyd reported receipt of a letter from the Chief
of the Orange County Fire Authority advising of the intent to
initiate the process to build a new headquarters, the cost of
which could be passed on to the cash contract cities, the
letter advises also of realizing an opportunity to request
State budget funds for the building of the Authority
facility. Councilman Boyd noted the request is that each
member City adopt a resolution and letter of support, read
excepts of the request, noted also that the Authority has
received an irrevocable offer of 16.5 acres of land from the
Irvine Company for a Regional Fire Operations Training
Center, the value of land is $10 million and conveyance of
the land must occur by January 1, 2000, the property to be
used only as a Fire Operations and Training Center or the
property will revert back to the Irvine Company. He said a
conceptual plan has been developed for the Training Center,
detailed site plans must be prepared to continue the process,
partial funding is sought to hire the appropriate consultants
and an architect to begin the necessary site development
work. Councilman Boyd requested Council adoption of a
resolution in support as it will eventually reduce the costs
to the City associated with the Fire Authority, if the
Authority does not get the requested funds the cost to build
the new headquarters could become a burden of the cities.
3-2-99
With regard to the utility users tax issue, councilman Boyd
noted that last year the legislature brought forth a proposal
to cut the car tax, most orange County cities passed
resolutions opposing it, it did not pass as a result of
efforts of the League of cities, it is now coming back as an
initiative, in less than thirty days they have half of the
required signatures, it is guaranteed that the car tax will
be cut, the issue for this Council is whether or not to
support it, the initial thought is to not support it, yet the
initiative freezes the motor',vehic1e fee rate at the 1992
appreciation schedule, it is understood that when the car tax
stops there will be a loss of interest, yet there is $408,000
that would be returned to the city if the initiative passes,
there would also be a shift in State General Fund revenue to
stop any loss of revenue to the City, that is about $1.2
million, the initiative guarantees no loss of revenue to
counties, special districts, and cities. He offered to
provide Council with the information, the Council could take
a collective or individual posi~ion, if th~re is. an intent to
give tax relief to the residents it could be done by cutting
the utility users tax but that is the only revenue the City
has control over, the car tax is revenue over which the State
has control, they will cut it whether the cities like it or
not, however the voters are going to cut it, if the City says
do not cut it then the citizens are going to want a utility
tax cut, or support the vehicle license cut which would
result in no lost revenue and in fact would be a gain of
$408,000 on a one time basis. He noted this will be on the
March, 2000 ballot, Assemblyman McClintock is the author of
the initiative, the average return could be on average about
$1,200 per household per year based on the age and number of
cars. Mayor Yost agreed that the Council should consider
taking a collective position. Councilman Boyd referred to
Senate Bill 165 and Assembly Bill 24 as well, both an attempt
to bring property tax back to where it was in about 1992, a
shift of about twelve cents of every property dollar lost,
which could mean about $2 million per year to Seal Beach,
suggesting that the Council take a position of support of
those bills also.
I
I
With regard to Charter amendments, Councilman Boyd noted that
there was some consideration of amendments a few months back,
there are some constitutional issues that need to be updated,
also, the Charter sets forth a spending limit of $5,000
whereby if something needs to be done that exceeds that
amount it requires the formal bidding process, to that he
suggested that the City Manager and Public Works Director
determine a reasonable amount, possibly $25,000, also, that
he did not want a committee to prepare amendments, rather,
the legislative body, the Council. It was confirmed that
Charter amendments are required to be submitted to the
voters. The City Manager offered that he has been involved
in Charter amendments in the past, some have been by means of
a committee, suggesting that that be given consideration.
Counci1member Campbell announced the intent to update the
City's letterhead and showed samples from other communities,
to which Councilman Boyd added that he has obtained a couple
of quotes for preparation of design and printing.
Counci1member Campbell reported that representatives of the
Orange County Regional Airport Authority will be traveling to
WaShington, D. C. in either March or April and that she has
been asked to make the trip, the intent is to make a
statement in support of airport reuse of E1 Toro, and
requested Council consideration and authorization of
I
3-2-99 / 3-8-99
expenses.
ADJOURNMENT
It was the order of the Chair,
to adjourn the meeting at 5:58
with consent of the Council,
p.m.
I
~
Approved: ~
~",iit!
Ci Y Clerk
Ie
Attest:
Seal Beach, California
March 8, 1999
I
The City Council of the City of Seal Beach met in regular
session at 7:01 p.m. with Mayor Yost calling the meeting to
order.
The Salute to the Flag was led by Girl Scout Troop 1282 from
College Park East. Councilmember Campbell presented a
commemorative pin to each Scout and expressed appreciation
for their leading of the Pledge.
ROLL CALL
Present:
Mayor Yost
Councilmembers Boyd, Campbell, Doane, Snow
Absent:
None
I
Also present: Mr. Till, City Manager
Mr. Barrow, City Attorney
Mr. Whittenberg, Director of Development
Services
Ms. Stoddard, Director of Administrative
Services
Chief Sellers, Police Department
Mr. Dorsey, Assistant to the City Manager
Ms. Beard, Director of Recreation and Parks
Mr. Danes, Assistant City Engineer
Ms. Yeo, City Clerk
APPROVAL OF AGENDA
Yost moved, second by Campbell, to approve the order of the
agenda as presented.
AYES:
NOES:
Boyd, Campbell, Doane, Snow, Yost
None Motion carried